

Series SM20, SM40, SM50, SM60 & SM80

Dean, a member of the Commercial Food Equipment Service Association, recommends using CFESA Certified Technicians.
PRINTED IN THE USA 24-Hour Service Hotline 1-800-551-8633 MAY 2006

Please read all sections of this manual and retain for future reference.



NOTICE IF, DURING THE WARRANTY PERIOD, THE CUSTOMER USES A PART FOR THIS ENODIS EQUIPMENT OTHER THAN AN UNMODIFIED NEW OR RECYCLED PART PURCHASED DIRECTLY FROM FRYMASTER DEAN, OR ANY OF ITS AUTHORIZED SERVICE CENTERS, AND/OR THE PART BEING USED IS MODIFIED FROM ITS ORIGINAL CONFIGURATION, THIS WARRANTY WILL BE VOID. FURTHER, FRYMASTER DEAN AND ITS AFFILIATES WILL NOT BE LIABLE FOR ANY CLAIMS, DAMAGES OR EXPENSES INCURRED BY THE CUSTOMER WHICH ARISE DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART, DUE TO THE INSTALLATION OF ANY MODIFIED PART AND/OR PART RECEIVED FROM AN UNAUTHORIZED SERVICE CENTER.


DANGER Adequate means must be provided to limit the movement of this appliance without depending upon the gas line connection. Single fryers equipped with legs must be stabilized by installing anchor straps. All fryers equipped with casters must be stabilized by installing restraining chains. If a flexible gas line is used, an additional restraining cable must be connected at all times when the fryer is in use.





Safe and satisfactory operation of Frymaster Dean equipment depends upon its proper installation. Installation MUST conform with local codes, or in the absence of local codes, to European Union (CE) Standards.





1.1 Applicability and Validity Dean Super Marathon Series gas model family has been approved by the European Union (EU) for sale and installation in all EU countries. This manual is applicable to and valid for all Dean Super Marathon Series gas units sold in English-speaking countries, including those in the European Union. Where conflicts exist between instructions and information in this manual and local or national codes of the country in which the equipment is installed, installation and operation shall comply with those codes. This appliance is for professional use only. Operating information for Dean equipment has been prepared for use by qualified and/or authorized personnel only, as defined in Section 1.5. All installation and service on Dean equipment must be preformed by qualified, certified, licensed, and/or authorized installation or service personnel, as defined in Section 1.5. 1.2 Ordering Parts Customers may order parts directly from their local Authorized Parts Distributor. For this address and phone number, contact your maintenance and repair center or call the factory. The factory address and phone numbers are on the back cover of this manual. To speed up your order, the following information is required:
Model Number Type Serial Number Optional Equipment Item Part Number Quantity Needed 1.3 Service Information Call the 1-800-551-8633 or (318) 865-1711 Service Hotline number for the location of your nearest maintenance and repair center. Always give the model and serial numbers of your fryer.
To assist you more efficiently, the following information will be needed:
Model Number Type Serial Number Optional Equipment Nature of Problem Additional information (i.e. cooking environment, time of day, and other pertinent information) may be helpful in solving your service problem.

1.4 Safety Information Before attempting to operate your unit, read the instructions in this manual thoroughly. Throughout this manual, you will find notations enclosed in double-bordered boxes similar to the ones below.
Qualified/authorized operating personnel are those who have carefully read the information in this manual and have familiarized themselves with the equipment functions, or have had previous experience with the operation of equipment covered in this manual. Qualified Installation Personnel
Qualified installation personnel are individuals, or firms, corporations, or companies, which, either in person or through a representative are engaged in and are responsible for the installation of gas-fired appliances. Qualified personnel must be experienced in such work, be familiar with all gas precautions involved, and have complied with all requirements of applicable national and local codes. Qualified Service Personnel
Qualified service personnel are those who are familiar with Dean equipment and have been authorized by Dean to perform service on Dean equipment. All authorized service personnel are required to be equipped with a complete set of service parts manuals and stock a minimum amount of parts for Dean equipment. A list of Dean Factory Authorized Service Centers (FASCs) was included with the fryer when shipped from the factory. Failure to use qualified service personnel will void the Dean warranty on your equipment.

A. Check that the container is upright. Use an outward prying motion - no hammering - to
remove the carton. Unpack the fryer carefully and remove all accessories from the carton. Do not discard or misplace these, as they will be needed.
B. After unpacking, immediately check the equipment for visible signs of shipping damage. If
damage has occurred, contact the carrier and file the appropriate freight claims. Do not contact the factory. Shipping damage responsibility is between the carrier and the dealer.
If your equipment arrives damaged:
C. Remove all plastic skin from sides, front, and doors of the fryer(s). Failure to do this prior to
initial fryer operation will make it very difficult to remove later. 2.2 General Qualified, licensed, and/or authorized installation or service personnel only (as defined in Section 1.5) should perform the following:

2.2 General (cont.) Dean Super Marathon Series gas fryers are energy efficient gas-fired units. All units are shipped completely assembled, with accessories packed inside the frypot. All units are adjusted, tested, and inspected at the factory prior to crating for shipment.
WARNING The on-site supervisor is responsible for ensuring that operators are made aware of the inherent dangers of operating a hot-oil fryer/filter system, particularly the aspects of fryer operation, oil filtration, and draining/cleaning procedures. 2.3 Principles of Operation The incoming gas flows through orifices and is mixed with air in the burners to create the correct ratio for proper combustion. The mixture is ignited at the front end of each heat tube by the pilot light. Internal diffusers slow the flame as it goes through the burner tube. This slower and more turbulent flame gives much better heat transfer to the walls of the tubes, thereby heating the oil more efficiently. 2.4 Rating Plate
DANGER Fryers MUST be connected ONLY to the gas type identified on the attached rating plate. The rating plate can be found on the inside panel of the fryer door. Information on this plate includes the model and serial numbers, kW/hr (BTU/hr) of the burners, outlet gas pressure in mbars (inches W.C.), and configuration: natural or propane gas. Rating plate data is essential for proper unit identification, communicating with the factory or requesting special parts and/or information.

2.5 Pre-Installation
certified for the following installations:

2.5 Pre-Installation (cont.) C. Installation Standards
American National Standard Institute CAN 1-B149 Installation Codes ANSI Z83.11 Canadian Gas Association American Gas Association 55 Scarsdale Road 8501 E. Pleasant Valley Road Don Mills, ONT, M3B 2R3 Cleveland, OH 44131 National Electrical Code Canadian Electric Code c22.1, part 1 ANSI/NFPA #70 Canadian Standards Association American National Standard Institute 178 Rexdale Blvd. 1430 Broadway Rexdale, ONT, M9W 1R3 New York, NY 10018 NFPA Standards #96 and #211 National Fire Protection Association 470 Atlantic Avenue Boston, MA 02110
2.6 Equipment Installed at High Altitudes 1. The fryer input rating [BTU/hr (kW/hr)] is for elevations up to 2,000 feet (610-m). For elevations above 2,000 feet (610-m), the rating should be reduced 4-percent for each additional 1,000 feet (305-m) above sea level. 2. The correct orifices are installed at the factory if the operating altitude is known at the time of the customer’s order.

2.7 Air Supply and Ventilation
Keep the area around the fryer clear to prevent obstruction of combustion and ventilation airflow. 1. Do not connect this fryer to an exhaust duct. 2. Correct installation and adjustment will ensure adequate airflow to the fryer system. 3. A commercial, heavy-duty fryer must vent its combustion wastes to the outside of the building. A deep-fat fryer must be installed under a powered exhaust hood, or an exhaust fan must be provided in the wall above the unit, as exhaust gas temperatures are approximately 800-1000°F (427-538°C). Check air movement during installation. Strong exhaust fans in the exhaust hood or in the overall air conditioning system can produce slight air drafts in the room. 4. Do not place the fryer’s flue outlet directly into the plenum of the hood, as it will affect the gas combustion of the fryer. 5. Never use the interior of the fryer cabinet for storage or store items on shelving over or behind the fryer. Exhaust temperatures can exceed 800°F (427ºC) and may damage or melt items stored in or near the fryer. 6. Adequate distance must be maintained from the flue outlet of the fryer(s) to the lower edge of the filter bank. Per NFPA Standards No. 96, a minimum of 18-inches (45-cm) should be maintained between the flue(s) and the lower edge of the exhaust hood filter. 7. Filters and drip troughs should be part of any industrial hood, but consult local codes before constructing and installing any hood. The duct system, the exhaust hood and the filter bank must be cleaned on a regular basis and kept free of grease. 2.8 Conversion of Units
Pressure: 1 mbar = 10,2 mm W.C. = 0,4-inch W.C. 20 mbar = 204 mm W.C. = 8-inch W.C. 1-inch W.C. = 25,4 mm W.C. = 2,5 mbar Heat Input: 1 kW = 3410 BTU/hr 100 BTU/hr = 0,0293 kW Temperature: 0° Celsius = 32° Fahrenheit Temperature in degrees Celsius = (Temperature in degrees Fahrenheit (F) – 32) x 0,555 100° Celsius = (212° Fahrenheit – 32) x 0,555

3.1 Installing the Fryer A. Initial Installation: If installed with legs, do not push against the fryer’s side to adjust its
position. Use a pallet or lift jack to lift the fryer slightly and place it where it is to be installed. B. Relocating the Fryer: If relocating a fryer installed with legs, remove all weight from each leg
repair/replacement.



3.2 Leg and Caster Installation (cont.)
not level from side to side, a platform or other surface adjustment is needed; there is no side-to- side level adjustment on a fryer equipped with caster/leg combinations. (If a fryer is equipped with legs only, side-to-side level adjustments can be made. If a fryer is equipped with casters only, no level adjustments can be made.). If the fryer is not level, the unit may not function efficiently, the oil may not drain properly for filtering and in a multi-fryer battery, it may not match adjacent units.
Legs (Only)

C. If the fryer is moved, re-level the fryer following the instructions given in Steps 3.3, A-C.
D. An installed fryer must be restrained to prevent tipping, which could splash hot oil. Restraints
can be straps or chains anchored to an immovable object (wall, floor anchor), or the manner of installation (installing the fryer in an alcove, battering to other appliances, etc.).

3.3 Leveling the Fryer (cont.) NOTE: The installation must be inspected after it is complete to ensure it meets the intent of these instructions. The on-site supervisor and/or operator(s) should be informed that the appliance is installed with restraints. If restraints are removed to move fryer (cleaning beneath and behind, relocation, etc.), ensure that they are re-installed when fryer is returned to its permanently installed position.


I2E(R)B G20/G25 20/25 BELGIUM (BE) I3+ G30/G31 28-30/37 DENMARK (DK)
ITALY (IT) IRELAND (IE) PORTUGAL (PT) UNITED KINGDOM (GB)

3.4 Gas Connections (cont.) NATIONAL CODE REQUIREMENTS: NON-CE This equipment is to be installed in compliance with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the U.S. Food and Drug Administration. This equipment is manufactured to use the type of gas specified on the rating plate attached to the door. Connect equipment stamped "NAT" only to natural gas and that stamped "PRO" only to LP (Propane) gas. Australia Only: Installation is to be in accordance with the requirements of AS5601/AG601, local regulatory authority requirements and other statutory regulations.

3.4 Gas Connections (cont.) Supply Line Specifications The incoming gas supply line should be a minimum of 1½" (40 mm) in diameter. The gas supply lines must be sized as indicated in the chart below, based on the total number of fryers connected to the main gas supply.
Recommended Gas Connection Line Sizes Gas Types Number of Fryers 1 2 to 3 4 or 5 (*) Natural Gas 3/4" (20 mm) 1" (25 mm) 1-1/4" (32 mm) Propane Gas 1/2" (15 mm) 3/4" (20 mm) 1" (25 mm) (*) When exceeding 18 feet (6 meters) for a configuration of four to five fryers, it is necessary to
provide a 1-¼" (32 mm) rigid gas connection. For six or more fryers, contact factory for connection line specifications.
DANGER All connections must be sealed with a joint compound suitable for the gas being used and all connections must be tested with a solution of soapy water before lighting any pilots. Never use matches, candles, or any other ignition source to check for leaks. If gas odors are detected, shut off the gas supply to the appliance at the main shut-off valve and immediately contact the local gas company or an authorized service agency for service.
DANGER "Dry-firing" your unit will cause damage to the frypot and can cause a fire. Always ensure that melted shortening, cooking oil or water is in the frypot before firing the unit. Rigid Connections Check any installer-supplied intake pipe(s) visually and clean metal particles or other foreign matter from the threads before installing into a service line. If the intake pipes are not clear of all foreign matter, the orifices will clog when gas pressure is applied. When using thread compound on gas piping, use very small amounts and only on male threads. Use a pipe thread compound that is not affected by the chemical action of LP gases. DO NOT apply thread compound to the first two pipe threads – doing so will cause clogging of the burner orifices and control valve. Manual Shut-Off Valve This gas service supplier-installed valve must be installed in the gas service line ahead of the fryers in the gas stream and in a position where it can be reached quickly in the event of an emergency.

3.4 Gas Connections (cont.) Regulating Gas Pressure The fryer and shut-off valve must be disconnected from the gas supply during any pressure testing of the system. External gas regulators are not normally required on this fryer. A safety control valve protects the fryer against pressure fluctuations. If the incoming pressure is in excess of ½" PSI (3.45 kPa/35 mbar), a step-down regulator will be required.
the regulator is out of adjustment, or serious pressure fluctuations are observed.
C. Only qualified service personnel should make adjustments to the regulators. D. Orifices: The fryer can be configured to operate on any available gas. The correct safety control
valve, appropriate gas orifices, and pilot burner are installed at the factory. While the valve can be adjusted in the field, only qualified service personnel should make any adjustments with the proper test equipment.

Gas Type CE Color Code Natural Blue Propane Red E. Flexible Couplings, Connectors and Casters
evenly.

3.5 Adjustments/Adaptation To Different Gases A. Proper operation of appliances requires operator to inspect the following adjustments in Section
3.6 in terms of gas inputs and pressures. B. Dean Super Marathon Series gas fryers are manufactured to use the type of gas and pressure
specified on the rating plate. When changing gas, adaptation must be performed by qualified personnel. Failure to use qualified personnel will void the Dean warranty.
DANGER This appliance was configured at the factory for a specific type of gas. Converting from one gas type to another requires the installation of specific gas-conversion components. Switching to a different type of gas without installing the proper conversion components may result in fire or explosion. NEVER ATTACH THIS APPLIANCE TO A GAS SUPPLY FOR WHICH IT IS NOT CONFIGURED! Conversion of this appliance from one type of gas to another should only be performed by qualified, licensed, and authorized installation or service personnel, as defined in Section 1.5 of this manual.

3.6 Gas Inputs CE UNITS ONLY: A. Nominal Heat Inputs (Qn), Gas Type, Orifice Size, Part Number and Quantity/Color are listed in
the table below:

SM 35 GM SM 40 GM 26 G20 G25 G31
2/BLUE 2/BLUE 2/RED B. Adjustments for different gases are as follows:

26N 26N 16LP *SM prefix- Super Marathon Series *GM suffix- gas millivolt system with no electrical supply connections required (1) The Netherlands (NL) only.

3.6 Gas Inputs (cont.) NON-CE ONLY: A. Nominal Heat Inputs (Qn), Gas Type, Orifice Size (applicable for fryer operation at altitudes of
2000 feet or less), Part Number and Quantity are listed in the table below:

2.53(#39) 1.51(#53) 810-2048 810-2059 4 4 SM 35 GM SM 40 GM 105 NAT
2.18(#44) 1.40(#54) 810-2050 810-0710 2 2 B. Adjustments for different gases are as follows:

Manifold Gas Pressure [Inches W.C. (mbar)]* 4" W.C. (10 mbars) 11" W.C. (27.5 mbars)
* For controls and adjustments, please refer to gas valve illustration on page 3-14. (Pilot Flame Adjustment: Turn the pilot adjustment screw clockwise/counter-clockwise until the desired flame- volume is achieved).

DANGER This appliance was configured at the factory for a specific type of gas. Converting from one gas type to another requires the installation of specific gas-conversion components. Switching to a different type of gas without installing the proper conversion components may result in fire or explosion. NEVER ATTACH THIS APPLIANCE TO A GAS SUPPLY FOR WHICH IT IS NOT CONFIGURED! Conversion of this appliance from one type of gas to another should only be performed by qualified, licensed, and authorized installation or service personnel, as defined in Section 1.5 of this manual. CE UNITS ONLY: See page 3-13 for gas valve illustration and gas valve, burner and orifice location when performing the following conversions. When converting from G20 to G25 gas, the following procedures apply:
♦ Equipment replacement is not required. ♦ Adjust orifice gas pressure to the appropriate value listed in the table on page 3-10 by turning the gas valve "adjustment screw". ♦ After adjustment, replace the adjustment-screw cover. When converting from G20 (or G25) gas to G31 propane (or vice-versa), the following procedures apply:
♦ Burner orifices and pilot orifice MUST be replaced. ♦ Adjust orifice gas pressure to the appropriate value listed in the table on page 3-10 by turning the gas-valve adjustment screw. ♦ After adjustment, replace the adjustment-screw cover. ♦ Affix the new rating plate included with the conversion kit. If a new rating plate was not included contact your local FASC to obtain one. When converting from G20 (20 mbar) to G25 (25 mbar), or vice-versa, the following procedures apply:
♦ Check pilot-adjustment and adjust as necessary. ♦ Other adjustments are not necessary.

3.7 Gas Conversion Procedures (cont.) Conversion from one gas family to another (i.e. changing from natural gas to propane) requires special components. Obtain the necessary components using the cross-reference in Section 3.8, Gas Conversion Components. Conversions can only be executed by qualified, factory-authorized personnel.

Typical gas valve, burner and orifice locations (SM35 shown above).

3.7 Gas Conversion Procedures (cont.) NON-CE UNITS ONLY: See gas valve illustration below and gas valve, burner and orifice location on page 3-15 when performing the following conversions. When converting from natural gas to propane (or vice-versa), the following procedures apply:
♦ Burner orifices and pilot orifice MUST be replaced (see page 3-11 for required component part numbers). ♦ Adjust orifice gas pressure by turning the gas-valve adjustment screw (see page 3-11 for gas types and pressures). ♦ After adjustment, replace the adjustment-screw cover. ♦ Affix the new label included with the conversion kit next to the existing rating plate stating that the gas type has been converted. Remove any references to the previously used gas from the existing rating plate. Conversion from one gas family to another (i.e. changing from natural gas to propane) requires special components. Obtain the necessary components using the tables on page 3-11. Conversions can only be executed by qualified, factory-authorized personnel.

Pressure flow adjustment (remove cover screw to access)
Regulator Vent Pilot pressure adjustment (remove cover screw to access)
Pilot gas supply connection
Typical gas valve (Millivolt- Non-CE).
ON/PILOT/OFF Gas-Cock Knob · Pressure Tap

3.8 Gas Conversion Components Use the following components to convert from natural gas to propane and vice-versa. See Section 3.6 for orifice quantities required for conversion.

Natural Gas to Propane Components Propane To Natural Gas Components
Burner orifice* (See Tables on Page 3-10 – 3-11)
Burner orifice* (See Table on Page 3-10 – 3-11)
* Burner orifices listed on page 3-10 – 3-11 are for fryers operating at altitudes of 2000 feet (610 meters) or less. For altitudes greater than 2000 feet (610 meters), contact the factory for the correct orifice size. 3.9 Electrical Connections Fryers without built-in filtration do not require electrical connection. Fryer systems with built-in filtration when installed must be electrically grounded in accordance with local codes, or in the absence of local codes, with the appropriate national standards.

For fryers with built-in filtration systems: The rating plate and wiring diagram are located on the inside front door panel. Built-in filtration systems are equipped with 120VAC single-phase 60-hertz system (Domestic), or 230VAC single-phase 50-hertz system (International/CE). Do not cut or remove the ground prong from the power cord plug.



WARNING The on-site supervisor is responsible for ensuring that operators are made aware of the inherent hazards of operating a hot oil frying system, particularly the aspects of system operation, oil filtration, draining and cleaning procedures. Cleaning: New units are wiped clean with solvents at the factory to remove any visible signs of dirt, oil, grease, etc. remaining from the manufacturing process, then coated lightly with oil. Before any food preparation, wash thoroughly with hot, soapy water to remove any film residue and dust or debris then rinse out and wipe dry. Also wash any accessories shipped with the unit. Close the drain valve completely and remove the crumb screen covering the heating tubes. Ensure the screws holding the thermostat and high-limit control sensing bulbs into the frypot are tight.


Typical frypot drain valve (SM40 shown).
Typical high-limit/sensor probe location and mounting hardware.

4.1.1 Pilot Lighting Procedures, Standing Pilot Only Initial Pilot Lighting: All Dean fryers are tested, adjusted and calibrated to sea level conditions before leaving the factory. Adjustments to assure proper operation of pilot may be necessary on installation to meet local conditions, low gas pressure, differences in altitude and variations in gas characteristics. These adjustments correct possible problems caused by rough handling or vibration during shipment, and are to be performed only by qualified service personnel. These adjustments are the responsibility of the customer and/or the dealer and are not covered by the Dean warranty. The inlet pipe at the lower rear of the fryer brings incoming gas to the pilot safety control valve, then to the pilot and main burners. The pilot is located high in the cabinet center, at the base of the frypot.

PILOT
OFF
OFF

ON
PILOT Position ON Position Non-CE Gas Valve Perform the following steps in sequence before lighting or re-lighting the pilot: 1. Turn the operating thermostat "OFF". 2. For CE units: Depress the Pilot Off button (red) on the safety control valve to turn "OFF". For Non-CE units: Depress and turn the gas valve knob to the OFF position. 3. Wait at least 5 minutes for any accumulated gas to disperse.
Honeywell CE Gas Valve
NOTE: Inspect high-limit thermostat/temperature probe locations prior to filling frypot with water or oil. Ensure that connecting hardware is intact and bulbs are properly attached. 4. Fill the frypot with oil or water to the bottom OIL LEVEL line scribed on the frypot back. Ensure heating tubes are covered in liquid prior to engaging burners. 5. Open the manual shut-off valve on the incoming service line. For Non-CE units: Rotate the gas valve knob to the pilot position. If fryer is equipped with a piezo ignitor, go to Step 9.

4.1.1 Pilot Lighting Procedures, Standing Pilot Only (cont.) 6. For CE units: Apply a lighted match or taper to the pilot burner head. Press the white pilot light button on the gas valve and hold approximately 45 seconds to 1 minute, until the pilot stays lit. For Non-CE units: Push and hold the knob in and apply a lighted match or taper to the pilot burner head. Continue to hold the knob in for about 60 seconds after the flame appears on the pilot. Release the knob. The pilot should remain lit. 7. If fryer is equipped with a piezo ignitor, press and hold the white pilot light button, then repeatedly press the piezo ignitor button until the pilot lights. Release the white button after approximately 45 seconds to 1 minute.
Pour cleaning solution into the frypot and add water to the top OIL LEVEL line scribed in the back of the frypot.
Set the operating thermostat dial to 225°F (107ºC), just above that of boiling water.
A. The main burner will ignite.
B. When the solution nears the boiling point, reset the temperature controller to 200°(93ºC).
C. The burners should shut off just as the water starts to boil.

4.2 Boil-Out Procedure cont. D. The burners will heat the boil-out solution to a simmer. Simmer the solution for approximately
45 minutes. Wearing protective gloves, scrub the sides of the frypot and the tubes with the L- shaped Teflon brush, being careful not to disturb the temperature sensing probes and the high- limit thermostat.
E. Do not allow the water level to decrease below the top OIL LEVEL line in frypot during boil-
out operation.
F. After boil out is complete, turn the thermostat dial to "OFF" and drain the solution from the
frypot. Place a metal stockpot of sufficient size to safely hold the entire contents of the frypot under the drain port to collect the water/boil-out solution. G. Filtration Equipped Units: Do not allow water or boil-out solution to drain into the filter pan.
The filter pump is not designed for water operation, and will be irreparably damaged. H. Close the drain, add fresh water (without boil-out solution) and wash all surfaces of the frypot.
Drain again.
I. Refill the frypot with fresh water and vinegar to neutralize any residual boil-out solution.
Wash all surfaces of the frypot. Drain completely and wipe down all surfaces of the frypot to completely remove all water. NOTE: It is recommended that the boil-out procedure be performed each time the oil is changed.

4.3 Final Preparation
4.3.1 Filling the Fryer with Oil or Shortening A. When using liquid shortening or cooking oil, fill the fryer to the bottom OIL LEVEL line
scribed into the back of the frypot. B. When using a solid shortening, cut it into small pieces and pack it below, between and above
the heat tubes, leaving no air spaces around the tubes. Do not disturb or bend the sensing bulbs. C. After the shortening is packed around the tubes, turn the burners "ON" for about 10 seconds,
"OFF" for a minute, etc., until the shortening is melted. If you see smoke coming from the shortening during the melting process, shorten the "ON" cycle and lengthen the "OFF" cycle. Smoke indicates potential scorching of the shortening, which will shorten its useful life. D. Before starting operation, turn the operating thermostat to the probable working temperature;
wait for the temperature to stabilize then check with a high-quality immersion thermometer. For filtration instructions and troubleshooting, consult the operating manual or instructions provided with the filtration equipment.
4.3.2 Extending Shortening/Oil Life Although 350°F (177°C) is the recommended temperature for most cooking operations, set the fryer at the lowest possible temperature which produces a high quality product. This ensures maximum life of shortening. When the fryer is not in use, set the thermostat to a lower temperature from that used during cooking. Light loads may be cooked at lower temperatures. Experiment to determine the optimum temperature and load conditions for various food items being cooked.


Any equipment works better and lasts longer when maintained properly and kept clean. Cooking equipment is no exception. Super Marathon Series gas fryers should be kept clean during the working day and thoroughly cleaned at the end of each day. Below are recommendations for daily, weekly and periodic preventative maintenance.
5.1.1 Daily

A. Remove and wash all removable parts.
B. Clean all exterior surfaces of the cabinet. Do not use cleaners, steel wool, or any other
abrasive material on stainless steel.
C. Filter the cooking oil and replace if necessary. The oil should be filtered more frequently
when under heavy use. 5.1.2 Weekly
A. Completely drain the oil from the fryer into a metal stockpot of sufficient size to safely hold
the entire contents of the frypot for disposal. Do not use a glass or plastic container.
B. Clean the frypot by following boil-out procedures in Chapter 4-2.


SUPER MARATHON SERIES GAS FRYERS CHAPTER 5: PREVENTATIVE MAINTENANCE
A. Do not use steel wool, abrasive cloths, cleansers or powders.
B. Do not use a metal knife, spatula or any other metal tool to scrape stainless steel! Scratches
are almost impossible to remove.
C. If it is necessary to scrape the stainless steel to remove any encrusted materials, soak the area
first to soften the deposit, then use a wood or nylon scraper only.

DANGER Hot cooking oil will cause severe burns. Never attempt to move this appliance when filled with hot cooking oil or to transfer hot cooking oil from one container to another. The problems and possible solutions covered are those most commonly encountered. To troubleshoot, perform the test set-up at the beginning of each condition. Follow each step in sequence. 6.2 Pilot Burner Malfunction
A. Pilot will not ignite. No evidence of gas at pilot burner.
B. Pilot burner ignites but will not remain lit when gas valve manual knob is released (Non-CE),
or the pilot button is released (CE).
C. Pilot flame of proper size, but is unstable. Flame wavers and does not envelope the
thermocouple completely at all times.

6.3 Main Burner Malfunctions
A. Main burner will not come "ON"; gas not detected at main burner.
B. Main burner flames are small and appear lazy; shortening does not come up to temperature
quickly.
C. Signs of excessive temperature: shortening scorches and quickly becomes discolored.
D. Fryer will not reach the temperature setting and/or runs erratically.

6.4 Wiring Diagrams CE UNITS ONLY:
PP TH
THERMOPILE HONEYWELL 807-3565
OPERATING THERMOSTAT
COAXIAL LEAD TO THERMOCOUPLE 812-1284
HIGH-LIMIT
HONEYWELL CE
NON-CE UNITS ONLY:
CONTROL CIRCUIT
Vent Valve Combination Gas
GENERATOR
PILOT ADJ.
1/2 P.S.I.
HONEYWELL
HONEYWELL 1/2 P.S.I.
ON
TH TP TH
1/2 P.S.I.
TP
OFF
N/O COM N/C
THERMOPILE
HI
LIMIT
THERMOSTAT OPERATING
Honeywell Millivolt Gas Valve Wiring
Robertshaw Millivolt Gas Valve Wiring

6.5 Recommended Spare Parts CE UNITS ONLY: Commonly replaced parts in CE Super Marathon Series gas fryers are: Gas Valve (Honeywell)- Natural- 807-2122 Gas Valve (Honeywell)- LP- 807-2121 High-Limit Thermostat- Manual Reset (CE- 210°C)- 807-3560 Thermopile- 807-3485 Thermocouple- 812-1284 Thermostat, Operating- 807-1692 Knob, Thermostat- 816-0139 NON-CE UNITS ONLY: Commonly replaced parts in Non-CE Super Marathon Series gas fryers are: Gas Valve (Honeywell)- Natural- 807-1603 Gas Valve (Honeywell)- LP- 807-1604 Gas Valve (Robertshaw)- Natural- 807-3645 Gas Valve (Robertshaw)- LP- 810-2399 High-limit Thermostat- 435°F Automatic Reset- 807-3516 High-limit Thermostat- 450°F Manual Reset- 807-3680 Thermopile- 810-2033 Thermostat, Operating- 826-2013 Knob, Thermostat- 810-2035



Dean, 8700 Line Avenue, PO Box 51000, Shreveport, Louisiana 71135-1000
TEL 1-318-865-1711 FAX (Parts) 1-318-688-2200 FAX (Tech Support) 1-318-219-7135
1-800-551-8633 MAY 2006
Pages referenced in this manual — manufacturer, support and downloads.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.