7000 Series ATS Automatic Transfer Switches J–design, 260, 400, & 600 A

Operator’s

Manual

Refer to the outline and wiring drawings provided with your 7000 Series ATS for all installation and connection details and accessories.

Refer to Group 5 Controller User’s Guide 381333–126 for ATS status display messages, time delays, pickup & dropout settings, and adjustments.

Rating Label

Each automatic transfer switch (ATS) has a rating label to define the loads and fault circuit withstand/closing ratings. Refer to the label on the transfer switch for specific values.

Emerson 400 — Rating Label diagram (page 1)
Fig. 1 · Rating Label

Do not exceed the values on the rating label. Exceeding the rating can cause personal injury or serious equipment damage.

Nameplate The Transfer Switch nameplate includes data for each specific ASCO 7000 Series ATS. Use the ATS only within the limits shown on this nameplate.

An experienced licensed electrician must install the ATS.

TABLE OF CONTENTS

INSTALLATION 1-1 Mounting and Line Connections 1-1 Auxiliary Circuits and Harness 1-2 Engine Starting Contacts 1-2 Functional Test 1-2 through 1-5

TESTING & SERVICE 2-1 Transfer Test 2-1 Preventive Maintenance 2-1 Disconnecting the Controller 2-1 Manual Load Transfer 2-2 Trouble-Shooting 2-2

INDEX back cover

260 amp. size

381333–283 B 50 Hanover Road, Florham Park, New Jersey 07932–1591 USA For sales or service call 1 800 800–2726 (ASCO) www.ascopower.com

ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3 telephone 519 758–8450, fax 519 758–0876, for service call 1 888 234–2726 (ASCO) www.asco.ca

section-page

Page 2 of the Emerson 400 user manual — 7ATS C 3 600 N 5 C
Page 2 · click to enlarge
Page 2

Catalog Number Identification

A typical Catalog Number is shown below with its elements explained. The example is for a 7000 Series 7ATS with overlapping neutral, 3 pole, 600 amp, 480 V, in a Type 1 enclosure:

J design prefix letter

7ATS C 3 600 N 5 C

Voltage Controller Enclosure A 115 J 400 5 – standard C – type 1 B 120 K 415 5X – if F – type 3R C 208 L 440 accessories G – type 4 ordered D 220 M 460 H – type 4X E 230 N 480 L – type 12 F P blank – open type 240 550 G Q 277 575 H R 380 600 Voltage A 115 B 120 C 208 D 220 E 230 F 240 G 277 H 380J 400 K 415 L 440 M 460 N 480 P 550 Q 575 R 600
Emerson 400 — 7ATS C 3 600 N 5 C diagram (page 2)
Fig. 2

transfer control & lights

260 amp. size in typical enclosure with location of customer connections

Show 12 more labels / short text on this page
Phase Poles Neutral · A – solid · 260 400 · C – overlapping · blank – none · customer terminals block · load power connections · emergency power connections · Transfer · Switch · Controller · normal power connections
Page 3 of the Emerson 400 user manual — Harnesses
Page 3 · click to enlarge
Page 3

SECTION 1 INSTALLATION

ASCO 7000 Series Automatic Transfer Switches (ATSs) are factory wired and tested. Field installation requires requires mounting and connection of service cables, and auxiliary control circuits (if required).

Testing Power Conductors

Do not connect the power conductors to the transfer switch until they are tested. Installing power cables in conduit, cable troughs and ceiling-suspended hangers often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor’s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation.

Remove the Shipping Skid (large ATSs)

For large ATSs, open the front door and remove the four lag screws (2 in front, 2 in rear) securing enclosure to the wood skid.

Supporting Foundation

The supporting foundation for the enclosure must be level and straight. Refer to the applicable enclosure outline drawing included with the switch for all mounting details including door opening space.

Protect the automatic transfer switch from construction grit and metal chips to prevent malfunction or shortened life of the ATS.

If bottom cable entry is used, the foundation must be prepared so that the conduit stubs are located correctly. Refer to the enclosure outline drawing for specified area and location. Provide cable bending space and clearance to live metal parts. When a concrete floor is poured, use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment.

Connecting Power Conductors

After the power cables have been tested, connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with the switch. Make sure the lugs provided are suitable for use with the cables being installed. Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the switch. Be careful when stripping insulation from the cables; avoid nicking or ringing the conductor. Remove surface oxides from cables by cleaning with a wire brush. When aluminum cable is used, apply joint compound to conductors. Tighten cable lugs to the torque specified on rating label.

Mounting

Refer to the applicable enclosure outline drawing furnished with this switch and mount the automatic transfer switch according to details and instructions shown on diagram.

Controller Ground

Line Connections

A grounding wire must be connected to the controller’s lower left mounting stud. Because the controller is mounted on the enclosure door, a conductive strap must be used between the enclosure and the door. This connection provides proper grounding which does not rely upon the door hinges.

Refer to the Wiring Diagram provided with the switch. All wiring must be made in accordance with the National Electrical Code and local codes.

It is not necessary to remove pole covers from the transfer switch for cabling. If you do remove them, reinstall them carefully.

Harnesses

The transfer switch is connected to the left side of the controller by a plug–in harness (two plugs).

De–energize the conductors before making any line or auxiliary circuitry connections. Be sure that Normal and Emergency line connections are in proper phase rotation. Place engine generator starting control in the OFF position. Make sure engine generator is not in operation.

Page 4 of the Emerson 400 user manual — Functional Test
Page 4 · click to enlarge
Page 4

Engine Starting Contacts

All customer connections, including the engine control contact connections, are located on terminal block TB which is mounted on the top right side of the enclosure. Refer to the wiring diagram provided with the automatic transfer switch and connect the engine start wires to the appropriate terminals. See Figure 1–1 and Table A.

Emerson 400 — Engine Starting Contacts diagram (page 4)
Fig. 3 · Engine Starting Contacts

Table A. Engine start connections.

When normal source failsTerminals on Terminal Block TB contact closesTB1 and TB2 contact opensTB1 and TB3

Auxiliary Circuits

Connect auxiliary circuit wires to appropriate terminals on transfer switch terminal block TB as shown on the wiring diagram provided with this automatic transfer switch.

Figure 1-1. Customer terminal block on the top right

side of the enclosure.

Functional Test

The Functional Test consists of three checks:

Read all instructions on the Wiring Diagram and labels affixed to the automatic transfer switch. Note the control features that are provided and review their operation before proceeding.

S 1 — Manual Operation Test, page 1–3

S 2 — Voltage Checks, page 1–4

S 3 — Electrical Operation, page 1–5

Continue to 1 – Manual Operation Test on next page.

Do these checks in the order presented to avoid damaging the automatic transfer switch.

engine start connections · on customer · terminal block TB

Page 5 of the Emerson 400 user manual — 1 – Manual Operation Test
Page 5 · click to enlarge
Page 5

1 – Manual Operation Test

Emerson 400 — 1 – Manual Operation Test diagram (page 5)
Fig. 4 · 1 – Manual Operation Test

left side of transfer switch

A detachable maintenance handle is provided on the frame of the Transfer Switch for maintenance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically).

Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.

1. After deenergizing both power sources, open the enclosure door. Locate and remove the maintenance handle from the clips on the left side of the transfer switch frame. Insert the handle into the hole in the molded hub on the left side of the operator. See Figures 1–2 and 1–3 and Table B.
2. Move the maintenance handle up or down as shown to manually operate the transfer switch. It should operate smoothly without any binding. If it does not, check for shipping damage or construction debris.
3. Return the transfer switch to the Normal position. Observe that the window indicators (right side) show the top shaft O (open) and the bottom shaft C (closed).

Table B. Maintenance handle positions.

ATS PositionHandleIndicators NormalE NupE = O upper contacts open N = C lower contacts closed EmergencyE NdownE = C upper contacts closed N = O lower contacts open

Figure 1-2. Maintenance handle and its storage clips.

4. Remove the maintenance handle and store it on the frame (left side) in the clips provided.

Verify that the maintenance handle has been removed before proceeding!

Now continue to 2 – Voltage Checks on next page.

reversed this operation is also reversed.

Emerson 400 — 1 – Manual Operation Test diagram (page 5)
Fig. 5 · 1 – Manual Operation Test

UP closes the Normal source contacts (lower)

window indicators O is open C is closed

contact position indicators (right side)

DOWN closes the Emergency source contacts (upper) frame

Figure 1-3. Maintenance handle operation and contact position indicators.

Show 7 more labels / short text on this page
maintenance · handle · storage clip · Emergency contacts · handle · hub · Normal contacts
Page 6 of the Emerson 400 user manual — Note
Page 6 · click to enlarge
Page 6
Emerson 400 — 283b1 diagram (page 6)
Fig. 6 · 283b1
Emerson 400 — 283b1 diagram (page 6)
Fig. 7 · 283b1

GREEN

RED

RED GREEN

Figure 1-4. Standard controls and indicators.

1Close the normal source circuit breaker. The Transfer Switch Connected To Normal and the Normal Source Accepted lights should come on. 2Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch normal source terminals. 3Close the emergency source circuit breaker. (Start generator, if necessary.) The Transfer Switch Connected To Normal & Emergency Source Accepted lights should come on. 4Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch emergency source terminals.* 5Use a phase rotation meter to check phase rotation of emergency source; it must be the same as the normal source.A B C 6Shut down the engine–generator, if applicable. The Emergency Source Accepted light should go off. Then put the starting control selector switch (on the generator set) in the automatic position. Close enclosure door.
Emerson 400 — GREEN diagram (page 6)
Fig. 8

2 – Voltage Checks

First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.

Verify that the feeders have been connected to the proper lugs.

Emerson 400 — 2 – Voltage Checks diagram (page 6)
Fig. 9 · 2 – Voltage Checks

Use extreme caution when using a meter to measure voltages in the following steps. Do not touch power terminals; shock, burns, or death could result !

Perform steps 1 through 6 at the right. Observe the status lights. See Figure 1–4.

Q Black square means light is on.

S White square means light is off.

* If necessary, adjust voltage regulator on the generator according to the manufacturer’s recommendations. The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer Switch nameplate.

Note

Emerson 400 — Note diagram (page 6)
Fig. 10 · Note

Refer to Section 3 of Group 5 Controller User’s Guide 381333–126 for how to display the Status of the ATS and the Voltage and Frequency of each source.

Now continue to 3 – Electrical Operation on next page.

observe these lights

Page 7 of the Emerson 400 user manual — Transfer Test
Page 7 · click to enlarge
Page 7

GREEN

RED

RED GREEN

Figure 1-5. Standard controls and indicators.

1The Transfer Switch Connected To Normal and Normal Source Accepted lights should be on. 2Turn and hold Transfer Control switch clockwise to Transfer Test until the engine starts and runs (within 15 sec.). Emergency Source Accepted light should come on. 3Transfer switch will operate to the Emergency position after Feature 2B time delay. The Transfer Switch Connected To Emergency light should come on and Load Connected to Normal light goes off. 4Transfer switch will operate back to Normal position after Feature 3A time delay. For immediate retransfer turn Transfer Control counterclockwise to Retransfer Delay Bypass. The Transfer Switch Connected To Normal light should come on; Transfer Switch Connected to Emergency light should go off. 5The engine–generator will stop after the Feature 2E time delay (unloaded running engine cooldown). The Emergency Source Accepted light should go off.
Emerson 400 — GREEN diagram (page 7)
Fig. 11

3 – Electrical Operation

This procedure will check the electrical operation of the Automatic Transfer Switch. See Figure 1–5.

Emerson 400 — 3 – Electrical Operation diagram (page 7)
Fig. 12 · 3 – Electrical Operation

Be sure to close the enclosure door before proceeding to prevent personal injury in case of electrical system fault !

Emerson 400 — 3 – Electrical Operation diagram (page 7)
Fig. 13 · 3 – Electrical Operation

Transfer Test

Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure.

Perform steps 1 through 5 at the right. Observe the status lights.

Emerson 400 — Transfer Test diagram (page 7)
Fig. 14 · Transfer Test

Q Black square means light is on.

S White square means light is off.

Emerson 400 — Transfer Test diagram (page 7)
Fig. 15 · Transfer Test

This completes the Functional Test of the ATS.

operate this switch · observe these lights

Page 8 of the Emerson 400 user manual — REPLACEMENT PARTS
Page 8 · click to enlarge
Page 8

SECTION 2 TESTING & SERVICE

TRANSFER TEST

DISCONNECTING THE CONTROLLER

Operate the 7000 Series ATS at least once a month by following the five–step Electrical Operation Transfer Test procedure on page 1–5.

The harness disconnect plugs are furnished for repair purposes only and should not have to be unplugged. If the controller must be isolated, follow these steps:

PREVENTIVE MAINTENANCE Reasonable care in preventive maintenance will insure high reliability and long life for the 7000 Series ATS. An annual preventive maintenance program is recom- mended.

Do not unplug the controller until step 1a. or 1b. below is completed.

1. Observe the position of the transfer switch.

In the United States, ASCO Services, Inc. (ASI) is ASCO Power Technologies’s national service organization. ASI can be contacted at 1-800-800-2726 (ASCO) for information on preventive maintenance agreements.

a. If the transfer switch is in the Normal position,

first place standby engine starting control in the off position. Second, then open the emergency source circuit breaker. Third, open the normal source circuit breaker.

In Canada, for service call 1-800-234-2726 (ASCO).

b. If the transfer switch is in the Emergency posi-

tion, first open the normal source circuit break- er. Second, place the engine starting control in the test or run position. Third, open the emer- gency source circuit breaker.

Checklist for Yearly Inspection

2. Separate the two quick disconnect plugs by squeezing the latches. Do not pull on the harness wires.

Hazardous voltage capable of causing shock, burns, or death is used in this transfer switch. Deenergize both Normal – Emergency power sources before performing inspections!

S Clean the ATS enclosure. Brush and vacuum

away any excessive dust accumulation. Remove any moisture with a clean cloth.

Do not reconnect the controller until step 1a. or 1b. below is completed.

S Check the transfer switch contacts. Remove

1. Observe the position of the transfer switch.

the transfer switch barriers and check contact condition. Reinstall barriers carefully. The non–replaceable main contacts are designed to last the life of the transfer switch.

a. If the transfer switch is in the Normal position,

first be sure that both normal and emergency source circuit breakers are open. Second, be sure that the standby engine starting control is still in the off position.

S Maintain transfer switch lubrication. If the

transfer switch is subjected to severe dust or abnormal operating conditions, renew factory lubrication on all movements and linkages. Relubricate the solenoid operator if the TS coil is replaced. Do not use oil; order lubrication kit 75-100.

b. If the transfer switch is in the Emergency posi-

tion, first be sure that both normal and emer- gency source circuit breakers are open.

2. The two harness plugs and sockets are keyed. Carefully align the plugs with the sockets and press straight in until both latches click. Close the door!

S Check all cable connections & retighten them.

3. Restore the two sources in sequence as follows:

REPLACEMENT PARTS

a. If the transfer switch is in the Normal position,

Replacement parts are available in kit form. When ordering parts provide the Serial No., Bill of Material No. (BOM), and Catalog No. from the transfer switch nameplate. Contact your local ASCO Power Technolo- gies Sales Office or ASI:

first close the normal source circuit breaker. Second, close the emergency source circuit breaker. Third, place the standby engine starting control in the automatic position.

b. If the transfer switch is in the Emergency

in United States call 1 800 – 800 – ASCO (2726)

position, first close the emergency source circuit breaker. Second close the normal source circuit breaker.

or in Canada call 1 800 – 234 – ASCO (2726)

Disconnecting the Plugs · Reconnecting the Plugs

Page 9 of the Emerson 400 user manual — TROUBLE-SHOOTING
Page 9 · click to enlarge
Page 9

TESTING & SERVICE (continued)

MANUAL LOAD TRANSFER

2. Use the maintenance handle to manually operate the transfer switch to the opposite source. See Manual Operation on page 1–3.

This procedure will manually transfer the load if the controller is disconnected.

3. Then remove the maintenance handle. See page 1–3.

Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.

Verify that the maintenance handle has been removed before proceeding!

1. Deenergize both the normal and emergency source conductors (remove fuses or open circuit breakers).
4. If the transfer switch is in the Emergency position manually start the engine generator and then install emergency source fuse or close the circuit breaker.

TROUBLE-SHOOTING

Hazardous voltage capable of causing shock, burns, or death is used in this switch. Do not touch the power or load terminals of the transfer switch!

Table 2-1. Trouble-Shooting Checks.

CHECK IN NUMERICAL SEQUENCE PROBLEM1 OPERATION2 GEN-SET3 VOLTAGE Engine–generator set does not start when the Transfer Control switch is turned and held in Transfer Test position or when the normal source fails.Hold Transfer Test switch 15 seconds or the outage must be long enough to allow for Feature 1C time delay plus engine cranking and starting time.Starting control must be in the automatic position. Batteries must be charged and connected. Check wiring to engine starting contacts on customer terminal block TB. Verify that the small plug J3 is connected to receptacle P3.– Transfer switch does not transfer the load to the emergency source after the engine–generator set starts.Wait for Feature 2B time delay to time out (if used).Generator output circuit breaker must be closed. Generator frequency must be at least 95% of nominal (57 Hz for a 60 Hz system.) *Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals EA and EC (or EL1 and EL2 for 2 pole switches). * Transfer switch does not transfer the load to normal source when normal returns or when the Transfer Control switch is released.Wait for Feature 3A time delay to time out (if used).–Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals NB and NC, NC and NA, and NA and NB (or NL1 and NL2 for 2 pole switches). Engine–generator-set does not stop after load retransfer to the normal source.Wait for Feature 2E time delay to time out (if used).Starting control must be in the automatic position.–

* These are factory settings. Refer to the Group 5 Controller User’s Guide.

If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies sales office or ASI. In the United States, call 1–800–800–2726. In Canada, call 1–800–234–2726. Furnish the Serial No. and Catalog No. from the transfer switch nameplate.

Page 10 of the Emerson 400 user manual — HELP
Page 10 · click to enlarge
Page 10

INDEX

A

P

phase rotation check, 1–4

indicators, contact position, 1–3

R

lugs, 1–1 preparation, 1–1

rating label, inside cover

catalog number, inside cover

field terminal block TB, 1–2 rating, inside front cover

S

M

contact position indicators, 1–3

see Controller User’s Guide

illustration of, 1–3 warning, 1–3

T

see Controller User’s Guide grounding, 1–1

test, functional, 1–2, 1–3, 1–4, 1–5

E

time delays, 1–5, 2–2

manual load transfer, 2–2

see Controller User’s Guide

Transfer Control selector switch

Emergency Source Accepted light,

illustration of, 1–3 warning, 1–3

Retransfer Delay Bypass, 1–5 Transfer Test, 1–5

Transfer Switch Connected To

engine starting contacts, 1–2

N

Emergency light, 1–4, 1–5

F

Transfer Switch Connected To

Normal light, 1–4, 1–5

Normal Source Accepted light, 1–4

transfer test, 1–5, 2–1

functional test, 1–2, 1–3, 1–4, 1–5

O

transfer to emergency, 1–5

G

transfer to normal, 1–5

electrical, 1–5 manual, 1–3

ground lugs, inside front cover

illustration of, 1–3 warning, 1–3

H

voltage, pickup and dropout settings

see Controller User’s Guide

see Controller User’s Guide

HELP

800–800–2726 (ASCO) customercare@asco.com

Printed in U.S.A. Copyright --- ASCO Power Technologies, L.P. 2007

Show 30 more labels / short text on this page
auxiliary circuits, 1–2 · inspection, 2–1 · parts, 2–1 · installation, 1–1 · problem, 2–2 · cable · labels, · replacement parts, 2–1 · cleaning, 2–1 · lights, 1–4, 1–5 · connections · lubrication, 2–1 · line, 1–1 · settings · controller, 1–1 · maintenance handle, 1–3 · disconnecting, 2–1 · maintenance, preventive, 2–1 · electrical operation, 1–5 · manual operation, 1–3 · 1–4, 1–5 · nameplate, inside cover · frequency, generator, 2–2 · operation · trouble–shooting, 2–2 · ground, controller, 1–1 · voltage checks, 1–4 · optional accessories · harness, 1–1 · disconnect plugs, 2–1
Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the Emerson 400

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson 400

Be the first to ask — other owners or our team will answer.

Original document

Emerson 400 manual PDF

10 pages·1.7 MB·Switch·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…