EN
Emerson logo
Official user manual

Emerson Automatic Transfer Switch (185)

12 pages·1.1 MB·Switch·PDF·ENDEFRITNLJA
Emerson Automatic Transfer Switch (185)
Table of Contents 8 sections 319a0 · 319ap · 319a1 · 319a25 · … ShowHide
Page 1 of the Emerson Automatic Transfer Switch (185) user manual — TABLE OF CONTENTS
Page 1 · click to enlarge
Page 1

Operator’s

Series 185 Automatic Transfer Switches 100 through 400 ampere sizes

Manual

Refer to the outline and wiring drawings provided with your ASCO Series 185 ATS for all installation details.

ASCO Series 185 Automatic Transfer Switches (ATSs) are Listed under Underwriter’s Laboratories Standard for Transfer Switch Equipment, UL–1008. They are intended for use only in optional standby systems in accordance with the National Electrical Code, NEC/NFPA 70, Article 702. This ATS is for use with 2–wire automatic start generators only.

Refer to Application Informaton 381339–292 to confirm that you have selected tha appropriate product for the intended installation.

This automatic transfer switch is intended for standby power applicatons in residential / light commercial use only. This product is not intended for emergency or life–support systems.

An experienced licensed electrician must install the ATS.

Emerson Automatic Transfer Switch (185) — Operator’s diagram (page 1)
Fig. 1 · Operator’s

If you have more stringent application requirements contact ASCO Power Technologies for other products suitable for critical applications.

Rating Label

Each automatic transfer switch contains a rating label to define the loads and fault circuit withstand / closing ratings. Refer to the label on the transfer switch for specific values.

Do not exceed the values on the rating label. Exceeding the rating can cause personal injury or serious equipment damage.

TABLE OF CONTENTS

INSTALLATION 1

CONTROLLER 2–5

FUNCTIONAL TEST 6

SEQUENCE OF OPERATION 7

TROUBLESHOOTING 8–9

INDEX 10

381333–319 A 50 Hanover Road, Florham Park, New Jersey 07932–1591 USA For sales or service call 1 800 800–2726 (ASCO) www.ascopower.com

ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3 telephone 519 758–8450, fax 519 758–0876, for service call 1 888 234–2726 (ASCO) www.asco.ca

page · 100–230 ampere sizes

Page 2 of the Emerson Automatic Transfer Switch (185) user manual — Nameplate
Page 2 · click to enlarge
Page 2

Nameplate

Catalog Number Identification

The Transfer Switch nameplate includes data for each specific ASCO Series 185 ATS. Use the ATS only within the limits shown on this nameplate.

A typical Catalog Number is shown below with its elements explained. The example is for a D–design, 2 pole, 200 A, 220–240 V, in a Type 1 indoor enclosure: D 185 A 2 200 F 4 C

Voltage Controller Enclosure F 220---240 4 – standard C – Type 1 4X – if M – Type 3R accessories ordered VoltageEnclosure F 220---240C – Type 1 M – Type 3R

load power connections cable spacers (see INSTALLATION)

Emerson Automatic Transfer Switch (185) — Nameplate diagram (page 2)
Fig. 2 · Nameplate

200 ampere size in typical enclosure with location of customer connections

Show 17 more labels / short text on this page
Series 185 · 260 230 · clock battery · emergency power connections · neutral connections · terminals for optional · switch position contacts · (shown installed) · Transfer · Switch · ground connections · membrane · generator control connections · Controller · controls · utility power connections · harness plug
Page 3 of the Emerson Automatic Transfer Switch (185) user manual — Cable Spacers for 200 and 230 A
Page 3 · click to enlarge
Page 3

INSTALLATION Series 185

Installation of the ASCO Series 185 automatic transfer switch (ATS) must be performed by a licensed electrician. It must be installed according to the National Electrical Code (NEC) and all local electrical code requirements. Remove the enclosure cover and inspect the ATS for shipping damage. If damage is evident do not install the ATS.

2 --- Electrical Power Connections

Refer to the wiring diagram. The ATS must be protected by suitably sized circuit breakers feeding the utility and generator source terminals. The rating of the circuit breakers must be based on the requirements of the National Electrical Code for its nameplate ampere and short circuit withstand ratings.

1 --- Mounting

Refer to the enclosure outline drawing. Mount the ATS according to details and instructions shown on this diagram. Mount the ATS vertically to a rigid supporting structure. Level all mounting points by using flat washers behind the holes to avoid distortion of the enclosure.

ELECTROCUTION HAZARD Turn off utility power and turn off the generator to prevent electrocution when wiring the transfer switch.

Cable Spacers for 200 and 230 A

Three cable spacers are included with 200 and 230 ampere transfer switches. Run the copper power cables through the cable spacers as shown in Figure 2. Position the cable spacers approximately 1½ inches from the terminal lugs.

MALFUNCTION or SHORTENED LIFE Protect the ATS from construction grit and metal chips to prevent malfunction or shortened life.

Transfer switches rated 260 and 400 amperes are mounted on an insulator backing piece (installed behind the transfer switch). If the transfer switch is removed from the enclosure and then reinstalled, this insulator must be placed behind the transfer switch. See Figure 1.

CABLE LOOSENING DUE TO SHORT CIRCUIT Install three cable spacers 1 1/2 inches from the power terminals to prevent the cables from loosening during a short–short condition.

Emerson Automatic Transfer Switch (185) — Cable Spacers for 200 and 230 A diagram (page 3)
Fig. 3 · Cable Spacers for 200 and 230 A

FLASH HAZARD – DAMAGE Be sure that the insulator piece is installed behind the 260 and 400 ampere transfer switches.

Emerson Automatic Transfer Switch (185) — Cable Spacers for 200 and 230 A diagram (page 3)
Fig. 4 · Cable Spacers for 200 and 230 A

1 ½ inch approximate

use copper power cables only for 200 and 230 A

Figure 2. Cable spacers for 200 and 230 A.

Figure 1. Insulator for 260 and 400 A.

cable spacers · insulator backing piece · cable spacer

Page 4 of the Emerson Automatic Transfer Switch (185) user manual — Automatic Generator Exerciser
Page 4 · click to enlarge
Page 4

CONTROLLER Series 185

The Group 4 digital Controller is used in ASCO Series 185 automatic transfer switches. It provides the sensing, timing, and control functions for the ATS. This micro– processor–based controller includes built–in control buttons and status lights for control of the ATS and generator.

1 --- Push Buttons

On the front control display are three push buttons that control the operation of the generator and the ATS.

Before using the transfer test button, be sure that conditions are safe for running the generator and for load transfer.

clock battery cover see page 3

Emerson Automatic Transfer Switch (185) — 1 --- Push Buttons diagram (page 4)
Fig. 5 · 1 --- Push Buttons

Transfer Test

Use this button to test the system. This operation starts the generator and transfers the load. Be sure that conditions are safe to do this operation.

Bypass Time Delay

Use this button to cancel the active time delay or exercise period (stops the generator after cooldown).

Emerson Automatic Transfer Switch (185) — Bypass Time Delay diagram (page 4)
Fig. 6 · Bypass Time Delay

Set Engine Exerciser

Use this button to set the automatic generator exerciser (page 3).

Load on Utility light

2 --- Indicator Lights

Bypass Time Delay button

On the front control display are five lights that indicate the status of the sources and the ATS.

Load on Generator light

Utility Acceptable

This light indicates that the utility voltage is acceptable for connection to the load.

Automatic Generator Exerciser light

Generator Acceptable

This light indicates that the generator voltage is acceptable for connection to the load.

Figure 3. Front view of controller.

Load on Utility

This light indicates that the generator voltage is acceptable for connection to the load.

Load on Generator

This light indicates that the generator voltage is acceptable for connection to the load.

Automatic Generator Exerciser

When the utility is acceptable and the load is on the utility, this light flashes the number of days until the next exercise period. When it is off, no exerciser period is set. The light is also off when the generator is running.

Show 4 more labels / short text on this page
Utility Acceptable light · Transfer Test button · Set Exerciser button · Generator Acceptable light
Page 5 of the Emerson Automatic Transfer Switch (185) user manual — To Cancel an Active Exercise Period
Page 5 · click to enlarge
Page 5

CONTROLLER Series 185 (continued)

3 --- Generator Starting Contacts

5 --- Automatic Generator Exerciser

The generator starting contacts connections are on the controller. Refer to the generator manual. Disconnect the generator battery and verify that the ignition switch is in the OFF position. Connect the generator starting wires to the appropriate terminals on terminal block TB7 as shown on the wiring diagram. For wiring convenience terminal block TB7 has a removable plug. See Figure 4 and Table A.

The built–in automatic generator exerciser can be set to exercise the generator for 20 minutes once every week.

Clock Battery

Be sure a fresh battery is installed and turned on. It will maintain the exerciser clock for about 24 hours in case of a power outage.

Recommended 9 volt alkaline batteries are (see Figure 5): Duracell MN 1404, Everready 522, Panasonic 6AM6

Emerson Automatic Transfer Switch (185) — Clock Battery diagram (page 5)
Fig. 7 · Clock Battery

Turn on battery by putting S2 DIP switch actuator 10 in the on position (up). See Table B and Figure 6.

1 2 3 4 5 6 7 8 9

Exercise with or without Load

TB7 removable terminal block

The generator should be exercised under load or follow the recommendations of the generator manufacturer. Be sure the exerciser is turned on. Then select either exercise with or without load. The ATS will transfer the load to the generator when the exercise with load is selected. See Figure 6 and Table B.

TB7–4, TB7–5, TB7–6

Figure 4. TB7 generator starting contact terminals.

Table B. Generator Exercise Settings

Table A. Generator Start Connections

FunctionFactory SettingDIP SwitchDIP ActuatorActuator Position clock batteryoffS210on (up) off (down) exerciseroffS17on (up) off (down) with load or without loadwithout loadS18without (up) with (down)
When the Utility failsTerminals on Controller contact closesTB7–4 and TB7–5 contact opensTB7–5 and TB7–6

4 --- Settings

The time delay and sensor setting in the Group 4 controller are accessible on the inside. Refer to Tables B and C and to Figures 6 and 7. Use a ball–point pen or other pointed tool to slide the DIP switch actuators up or down to match setting shown.

To Set Exerciser

Press and hold (5 seconds) the Set Engine Exerciser button. The exercise period occurs immediately and at the same time weekly thereafter. The status light below the button blinks rapidly to indicate that the exerciser has been set. The number of flashes indicates the number of days until the next exercise period (at approximately the same time the button was pressed).

All power must be off before making any changes.

The factory default settings are shown in Table G on page 5.

To Cancel an Active Exercise Period

Emerson Automatic Transfer Switch (185) — To Cancel an Active Exercise Period diagram (page 5)
Fig. 8 · To Cancel an Active Exercise Period

cover must be removed to replace 9V battery (use alkaline type)

Press the Set Engine Exerciser button to stop an exercising generator. If exercise with load is set, the ATS retransfers the load to the utility, then stops the generator after cooldown.

Figure 5. Battery replacement.

screw

Page 6 of the Emerson Automatic Transfer Switch (185) user manual — Series 185 CONTROLLER (continued)
Page 6 · click to enlarge
Page 6

Series 185 CONTROLLER (continued)

Emerson Automatic Transfer Switch (185) — Series 185 CONTROLLER (continued) diagram (page 6)
Fig. 9 · Series 185 CONTROLLER (continued)

Figure 6. DIP switches S1 and S2 at the top right.

The time delay settings are shown in Figures 6 and 7 and in Table C. The sensor settings are shown in Figure 6 and in Table D. The standard (factory) settings are shown in Tables C, D, and H.

Figure 7. DIP switch S3 at the bottom center.

Table C. Time Delay Settings

Time Delay DescriptionFactory SettingSettingsDIP SwitchDIP ActuatorActuator Position override momentary utility outages3 seconds1 secondS21on (up) 3 secondsS21off (down) transfer to generator10 seconds (approx.)–––– override momentary generator outages4 seconds4 secondS39on (up) 0S39off (down) transfer to utility15 minutes (approx.)–––– unloaded running (generator cooldown)5 minutes5 minutesS110on (up) 0S110off (down)
Emerson Automatic Transfer Switch (185) — Series 185 CONTROLLER (continued) diagram (page 6)
Fig. 10 · Series 185 CONTROLLER (continued)

Table D. Voltage and Frequency Settings

Setting DescriptionSettingFactory SettingSettingsDIP SwitchDIP ActuatorActuator Position voltage–220 – 240 Vnon–adjustableS22on (up) frequencynominal60 Hz50 HzS14on (up) 60 HzS14off (down) phase–singlenon–adjustableS12off (down) utility voltagepickup198 V198 VS13on (up) 209 V *S13off (down) dropout187 V198 V *S11off (down) S12off (down) 187 VS11on (up) S12off (down) 176 VS11off (down) S12on (up) 154 VS11on (up) S12on (up) generator voltagepickup198 Vnon–adjustable––– dropout165 V generator frequencypickup57 Hz (nom 60 Hz) 48 Hz (nom 50 Hz)non–adjustable––– dropout51 Hz (nom 60 Hz) 43 Hz (nom 50 Hz)
Emerson Automatic Transfer Switch (185) — Series 185 CONTROLLER (continued) diagram (page 6)
Fig. 11 · Series 185 CONTROLLER (continued)

* If the dropout voltage is set to 198 V, the pickup voltage must be set to 209 V.

Page 7 of the Emerson Automatic Transfer Switch (185) user manual — Bypass load transfer to utility time delay
Page 7 · click to enlarge
Page 7

CONTROLLER Series 185 (continued)

6 --- Remote Control Features

7 --- Factory Settings --- Summary

These remote control features require a customer– supplied normally–closed contact suitable for a 5 V dc low energy circuit. Refer to the wiring diagram provided with the ATS. Activate the appropriate DIP switch S3 actuators as shown in Tables E, F, or G. See Figure 7.

Table H. Factory Settings – Summary

DIP SwitchDIP ActuatorActuator Position S11on (up) 2off (down) 3on (up) 4off (down) 5off (down) 6on (up) 7off (down) 8off (down) 9off (down) 10on (up) S21off (down) 2on (up) 3off (down) 4on (up) 5on (up) 6on (up) 7on (up) 8on (up) 9off (down) 10off (down) S31on (up) 2on (up) 3on (up) 4on (up) 5on (up) 6off (down) 7on (up) 8on (up) 9on (up) 10on (up)
Emerson Automatic Transfer Switch (185) — 6 --- Remote Control Features diagram (page 7)
Fig. 12 · 6 --- Remote Control Features

Remote test

Normally–closed input. When opened, it simulates a utility failure. The generator is signalled to start immediately and the load transfers to the generator (if acceptable). If the generator fails, the load stays on the generator until the remote test circuit is closed.

Table E. Remote test

FunctionFactory SettingDIP SwitchDIP ActuatorActuator Position disableddisabled (on)S33on (up) enabledoff (down)

Remote test (with automatic retransfer)

Normally–closed input. When opened, it simulates a utility failure. The generator is signalled to start immediately and the load transfers to the generator (if acceptable). If the generator fails, the load transfers back to the utility (if acceptable).

Table F. Remote transfer to generator

FunctionFactory SettingDIP SwitchDIP ActuatorActuator Position disableddisabled (on)S32on (up) enabledoff (down)

Bypass load transfer to utility time delay

Normally–closed input. When opened, it bypasses or cancels the generator to utility load transfer time delay. The load transfers back to the utility.

Table G. Bypass load transfer to utility time

FunctionFactory SettingDIP SwitchDIP ActuatorActuator Position disableddisabled (on)S31on (up) enabledoff (down)

delay

Page 8 of the Emerson Automatic Transfer Switch (185) user manual — 2 --- Voltage Checks
Page 8 · click to enlarge
Page 8

FUNCTIONAL TEST Series 185

After installing the Series 185 automatic transfer switch (ATS) perform the following three–part functional test.

Emerson Automatic Transfer Switch (185) — FUNCTIONAL TEST Series 185 diagram (page 8)
Fig. 13 · FUNCTIONAL TEST Series 185

With ALL POWER OFF grasp maintenance handle and turn it quickly with your thumb and fingers.

1 --- Manual Operation

A handle is provided on the transfer switch for mainte- nance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically).

weight marked P (utility) and A (generator)

Figure 8. Maintenance handle for 100–230 A.

Emerson Automatic Transfer Switch (185) — 1 --- Manual Operation diagram (page 8)
Fig. 14 · 1 --- Manual Operation

Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.

1. Turn OFF both the utility and generator circuit breakers feeding the ATS. Verify that ALL POWER IS OFF!
2. 100–230 A Grasp the maintenance handle and turn it quickly with your thumb and fingers to manually operate the transfer switch. 260–400 A Insert the maintenance handle into the hole in the shaft, left side of the operator. Move the handle as shown to manually operate the transfer switch.

Figure 9. Maintenance handle for 260–400 A.

3 --- Electrical Operation

This procedure checks the electrical operation of the ATS.

3. The switch should operate smoothly without binding. If it does not, check for shipping damage or construction debris.
1. Install the enclosure cover and tighten the screws.
2. Verify that the generator battery is connected and that the generator’s starting controls are set for automatic.
4. After checking the manual operation, use the handle again to return the transfer switch to the utility source position. 100–230 A see Figure 8. The letter P (utility) on the round weight is facing you. 260–400 A see Figure 9. The letter N (utility) on the round weight is facing you. Remove the maintenance handle and store it on the transfer switch in the place provided.
3. Turn on both the utility and generator circuit breakers.
4. Verify that the Utility Acceptable and Load on Utility lights are on.
5. This step will start the generator. Press and hold the Transfer Test button until the Generator Acceptable light comes on and stays on. Then release the button.
6. After the Generator Acceptable light comes on, the ATS transfers the load from the utility to the generator (after approx. 10 second delay). The Load on Generator light comes on.
7. The ATS stays connected to the generator for 15 minutes (approx.). The utility must be acceptable for 15 minutes continuously. Then the load is transferred back to the utility. To bypass time delay, press the Bypass Time Delay button.

260–400 A Remove the maintenance handle before proceeding!

2 --- Voltage Checks

8. After load retransfer to utility, the generator runs 5 minutes (without load), then shuts down. The Generator Acceptable light goes off indicating that the generator is off.

The ATS is rated for 220–240 V ac 60 or 50 Hz. Verify that both the utility and generator sources are 220–240 V ac 60 or 50 Hz.

This completes the Functional Test.

Show 5 more labels / short text on this page
maintenance handle · maintenance · hole · handle · shaft
Page 9 of the Emerson Automatic Transfer Switch (185) user manual — £ electrical loads switched to generator
Page 9 · click to enlarge
Page 9

Sequence of Operation --- Utility Failure Series 185

¡

Utility power good. Electrical loads on utility

Emerson Automatic Transfer Switch (185) — Sequence of Operation --- Utility Failure Series 185 diagram (page 9)
Fig. 15 · Sequence of Operation --- Utility Failure Series 185

3 sec.)

unloaded for 5 min.

¥

© electrical loads

Emerson Automatic Transfer Switch (185) — ¥ diagram (page 9)
Fig. 16
Emerson Automatic Transfer Switch (185) — ¥ diagram (page 9)
Fig. 17
Emerson Automatic Transfer Switch (185) — ¥ diagram (page 9)
Fig. 18

observe these power lights

observe these switch lights

wait 15 min.

for utility to stabilize

Emerson Automatic Transfer Switch (185) — ¥ diagram (page 9)
Fig. 19
Emerson Automatic Transfer Switch (185) — ¥ diagram (page 9)
Fig. 20

¢

Emerson Automatic Transfer Switch (185) — ¢ diagram (page 9)
Fig. 21

generator acceptable ¤

wait 10 sec. for generator

£ electrical loads switched to generator

Show 34 more labels / short text on this page
light is on · light is off · generator · stops · Utility fails · (longer than · generator runs · utility acceptable · load on utility · switched back · utility acceptable · utility off · start generator · to utility · generator off · load on utility · load off · generator acceptable · generator off · generator · utility acceptable · utility off · starting · load on utility · load on generator · generator acceptable · utility off · generator acceptable · utility returns · waiting for utility · load on generator · to warm up · to return · generator acceptable
Page 10 of the Emerson Automatic Transfer Switch (185) user manual — TROUBLESHOOTING Series 185
Page 10 · click to enlarge
Page 10

TROUBLESHOOTING Series 185

This troubleshooting guide describes some of the simple causes of problems with the installation of the automatic transfer switch. Troubleshooting beyond the scope of this guide should not be attempted by the installer. A licensed electrician must perform all internal troubleshooting. ASCO Power Technologies can be contacted at: 1–800–800–2726 or customercare@asco.com

ELECTROCUTION FLASH HAZARD Do not work on the transfer switch until both the utility and generator are off. Turn OFF both circuit breakers.

ProblemCause and Solution The Utility Acceptable light does not come on when utility power is connected to the ATS.1. Verify that the utility feed is connected and that its circuit breaker is ON. 2. With ALL POWER OFF, verify that the utility feed is 220–240 V ac and 60 Hz. Check DIP switch S2 actuator 2, and DIP S1 actuator 4. See Table D for voltage and frequency settings. 3. With ALL POWER OFF, verify that the utility feed is wired to the terminal lugs on the bottom of the transfer switch marked L1 and L5. See the wiring diagram. 4. With ALL POWER OFF, verify that the transfer switch harness is connected properly to the controller (plug and receptacle tight). The generator does not crank when the utility source fails or when the Transfer Test button is pressed.1. Hold the Transfer Test button for at least 15 seconds. 2. Verify that the generator starting controls are set for automatic operation (not in manual mode). 3. Verify that the generator battery is connected and that the battery voltage meets the generator manufacturer’s recommendation. 4. Verify that the correct contact (normally open or normally closed) is being utilized (see the generator manual). 5. With ALL POWER OFF, verify engine start low voltage wiring between the controller terminal block and the generator. See the wiring diagram. Check that the plug is properly seated in the receptacle on the controller. The generator cranks but does not start and run when the utility source fails or when the Transfer Test button is pressed.1. Verify proper generator operation (fuel in tank, oil level, spark plugs --- see generator manual). 2. With ALL POWER OFF, verify engine start low voltage wiring between the controller terminal block and the generator. See the wiring diagram. Check that the plug is properly seated in the receptacle. The generator starts and runs but the Generator Acceptable light does not come on.1. Verify that the generator feed is connected and that its circuit breaker is ON. 2. With ALL POWER OFF, verify that the generator feed is 220–240 V ac and 60 Hz. Check DIP switch S2 actuator 2, and DIP S1 actuator 4. See Table D for voltage and frequency settings. 3. With ALL POWER OFF, verify that the generator feed is wired to the terminal lugs on the top of the transfer switch marked L2 and L6. See the wiring diagram. 4. With ALL POWER OFF, verify that the transfer switch harness is connected properly to the controller (plug and receptacle tight). 5. Verify generator ac output (voltage and frequency --- see generator manual). The generator starts and runs but the ATS does not transfer the load to the generator.1. Verify that the Generator Accepted light is on. If it is off, see previous troubleshooting problem. The ATS will not transfer the load to an unacceptable source. 2. With ALL POWER OFF, verify that the transfer switch harness is connected properly to the controller (plug and receptacle tight).
Page 11 of the Emerson Automatic Transfer Switch (185) user manual — TROUBLESHOOTING Series 185 (continued)
Page 11 · click to enlarge
Page 11

TROUBLESHOOTING Series 185 (continued)

ProblemCause and Solution The ATS does not immediately transfer the load to the generator.1. Verify that the Generator Accepted light is on. If it is off, see previous troubleshooting problem. The ATS will not transfer the load to an unacceptable source. 2. Wait approximately 10 seconds for the transfer to generator time delay. This fixed delay allows the generator output to stabilize before a load is applied to it. 3. Press the Bypass Time Delay button for immediate load transfer to the generator. The ATS transfers the load to the generator, but the generator bogs down (struggles or slows down). The ATS retransfers back to the utility.1. The generator may be overloaded. Check to see if the generator circuit breaker tripped. Check the sum of the loads to be sure it does not exceed the capacity of the generator. Some motor loads require three times more power for starting. 2. Check for short circuit in a connected load. 3. Observe the Load on Utility and Load on Generator lights. The generator stops after a running for awhile. The ATS retransfers back to the utility (if acceptable).1. Verify proper generator operation; it may have run out of fuel or shut down because of low oil level (see generator manual). 2. The generator may be overloaded. Check to see if the generator circuit breaker tripped. Check the sum of the loads to be sure it does not exceed the capacity of the generator. Some motor loads require three times more power for starting. 3. Check for short circuit in a connected load. 4. Observe the Load on Utility and Load on Generator lights. The ATS does not retransfer the load back to the utility.1. Verify that the Utility Accepted light is on. The ATS will not transfer the load to an unacceptable source. 2. Wait approximately 15 minutes for the retransfer to utility time delay. The utility must be acceptable for 15 minutes continuously. 3. Press the Bypass Time Delay button for immediate load retransfer to the utility. The ATS retransfers the load back to the utility but the generator keeps running.1. Wait approximately 5 minutes for the unloaded running (engine cooldown) time delay. 2. The engine cooldown fixed time delay is important to prevent generator damage. The generator exerciser does not seem to work.1. Verify that the Automatic Generator Exerciser light is blinking. When the utility is acceptable and the load is on the utility, this light flashes the number of days until the next exercise period. When the light is off, no exercise period is set. The light is also off when the generator is running. 2. With ALL POWER OFF, verify that the exerciser is turned on. Check DIP switch S1 actuator 7, and S2 actuator 10. See Table B for generator exerciser settings. 3. With ALL POWER OFF, check the 9 volt battery. Replace, if necessary, with a quality alkaline battery: Duracell MN1404, Everready 522, Panasonic 6AM6, or equivalent. See Figure 5. The generator exerciser does not transfer the load to the generator.1. With ALL POWER OFF, verify that exercise with load is turned on. Check DIP switch S1 actuator 8. See Table B for generator exerciser settings.
Page 12 of the Emerson Automatic Transfer Switch (185) user manual — Table of contents
Page 12 · click to enlarge
Page 12

Table of contents

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Fix-it

Troubleshooting

Common problems, likely causes, and what to do.

ProblemPossible causeRemedy
The Utility Acceptable light does not come on when utility power is connected to the ATS.1. Verify that the utility feed is connected and that its circuit breaker is ON. 2. With ALL POWER OFF, verify that the utility feed is 220–240 V ac and 60 Hz. Check DIP switch S2 actuator 2, and DIP S1 actuator 4. See Table D for voltage and frequency settings. 3. With ALL POWER OFF, verify that the utility feed is wired to the terminal lugs on the bottom of the transfer switch marked L1 and L5. See the wiring diagram. 4. With ALL POWER OFF, verify that the transfer switch harness is connected properly to the controller (plug and receptacle tight). p.10
The generator does not crank when the utility source fails or when the Transfer Test button is pressed.1. Hold the Transfer Test button for at least 15 seconds. 2. Verify that the generator starting controls are set for automatic operation (not in manual mode). 3. Verify that the generator battery is connected and that the battery voltage meets the generator manufacturer’s recommendation. 4. Verify that the correct contact (normally open or normally closed) is being utilized (see the generator manual). 5. With ALL POWER OFF, verify engine start low voltage wiring between the controller terminal block and the generator. See the wiring diagram. Check that the plug is properly seated in the receptacle on the controller. p.10
The generator cranks but does not start and run when the util- ity source fails or when the Transfer Test button is pressed.1. Verify proper generator operation (fuel in tank, oil level, spark plugs --- see generator manual). 2. With ALL POWER OFF, verify engine start low voltage wiring between the controller terminal block and the generator. See the wiring diagram. Check that the plug is properly seated in the receptacle. p.10
The generator starts and runs but the Generator Acceptable light does not come on.1. Verify that the generator feed is connected and that its circuit breaker is ON. 2. With ALL POWER OFF, verify that the generator feed is 220–240 V ac and 60 Hz. Check DIP switch S2 actuator 2, and DIP S1 actuator 4. See Table D for voltage and frequency settings. 3. With ALL POWER OFF, verify that the generator feed is wired to the terminal lugs on the top of the transfer switch marked L2 and L6. See the wiring diagram. 4. With ALL POWER OFF, verify that the transfer switch harness is connected properly to the controller (plug and receptacle tight). 5. Verify generator ac output (voltage and frequency --- see generator manual). p.10
The generator starts and runs but the ATS does not transfer the load to the generator.1. Verify that the Generator Accepted light is on. If it is off, see previous trouble- shooting problem. The ATS will not transfer the load to an unacceptable source. 2. With ALL POWER OFF, verify that the transfer switch harness is connected properly to the controller (plug and receptacle tight). p.10
The ATS does not immediately transfer the load to the generator.1. Verify that the Generator Accepted light is on. If it is off, see previous trouble- shooting problem. The ATS will not transfer the load to an unacceptable source. 2. Wait approximately 10 seconds for the transfer to generator time delay. This fixed delay allows the generator output to stabilize before a load is applied to it. 3. Press the Bypass Time Delay button for immediate load transfer to the generator. p.11
The ATS transfers the load to the generator, but the genera- tor bogs down (struggles or slows down). The ATS retran- sfers back to the utility.1. The generator may be overloaded. Check to see if the generator circuit breaker tripped. Check the sum of the loads to be sure it does not exceed the capacity of the generator. Some motor loads require three times more power for starting. 2. Check for short circuit in a connected load. 3. Observe the Load on Utility and Load on Generator lights. p.11
The generator stops after a running for awhile. The ATS retransfers back to the utility (if acceptable).1. Verify proper generator operation; it may have run out of fuel or shut down because of low oil level (see generator manual). 2. The generator may be overloaded. Check to see if the generator circuit breaker tripped. Check the sum of the loads to be sure it does not exceed the capacity of the generator. Some motor loads require three times more power for starting. 3. Check for short circuit in a connected load. 4. Observe the Load on Utility and Load on Generator lights. p.11
The ATS does not retransfer the load back to the utility.1. Verify that the Utility Accepted light is on. The ATS will not transfer the load to an unacceptable source. 2. Wait approximately 15 minutes for the retransfer to utility time delay. The utility must be acceptable for 15 minutes continuously. 3. Press the Bypass Time Delay button for immediate load retransfer to the utility. p.11
The ATS retransfers the load back to the utility but the generator keeps running.1. Wait approximately 5 minutes for the unloaded running (engine cooldown) time delay. 2. The engine cooldown fixed time delay is important to prevent generator damage. p.11
The generator exerciser does not seem to work.1. Verify that the Automatic Generator Exerciser light is blinking. When the utility is acceptable and the load is on the utility, this light flashes the number of days until the next exercise period. When the light is off, no exercise period is set. The light is also off when the generator is running. 2. With ALL POWER OFF, verify that the exerciser is turned on. Check DIP switch S1 actuator 7, and S2 actuator 10. See Table B for generator exerciser settings. 3. With ALL POWER OFF, check the 9 volt battery. Replace, if necessary, with a quality alkaline battery: Duracell MN1404, Everready 522, Panasonic 6AM6, or equivalent. See Figure 5. p.11
The generator exerciser does not transfer the load to the generator.1. With ALL POWER OFF, verify that exercise with load is turned on. Check DIP switch S1 actuator 8. See Table B for generator exerciser settings. p.11

Ask about the Emerson Automatic Transfer Switch (185)

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson Automatic Transfer Switch (185)

Be the first to ask — other owners or our team will answer.

Original document

Emerson Automatic Transfer Switch (185) manual PDF

12 pages·1.1 MB·Switch·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…