EN
InFocus logo
Official user manual

InFocus Video Conferencing System (165)

8 pages·370 KB·Projector·PDF·ENDEFRITNLJA
InFocus Video Conferencing System (165)
Table of Contents 35 sections Manual for automatic 2–wire start generators · Rating Label · Nameplate · 165 A 2 200 F 3 C · … ShowHide
Page 1 of the InFocus Video Conferencing System (165) user manual — 165 A 2 200 F 3 C
Page 1 · click to enlarge
Page 1

Series 165 Automatic Transfer Switches rated 100, 200, & 230 amps, single phase, 240 V ac Owner’s

Manual for automatic 2–wire start generators

ASCO Series 165 Automatic Transfer Switches are Listed under the Underwriter’s Laboratories Standard for Transfer Switch Equipment, UL–1008. They are intended for use only in optional standby systems in accordance with the National Electrical Code, NEC/NFPA 70, Article 702. This ATS is for use with 2–wire automatic start generators only.

from high voltages capable of causing shock, burns, or death.

Refer to Application Information 381339–219 to confirm that you have selected the appropriate product for the intended installation.

Rating Label

personal injury.

Each Automatic Transfer Switch (ATS) has rating labels to define the loads and fault current withstand/ closing ratings. Refer to those label on the Transfer Switch for specific values.

of possible equipment damage.

Installation should be performed by a licensed electrician and in accordance with the National Electrical Code (NEC) and all local electrical code requirements. Read and understand all instructions before installing, servicing, or operating. Failure to do so could result in serious personal injuries or property damage.

INJURY or SWITCH DAMAGE Do not exceed the rating label values; it can cause personal in-

jury or serious switch damage.

Nameplate

InFocus Video Conferencing System (165) — Nameplate diagram (page 1)
Fig. 1 · Nameplate

The Transfer Switch nameplate includes data for each specific ASCO Series 165 ATS. Use the switch only within the limits shown on this nameplate. A typical Catalog Number is also shown below with its elements explained:

Automatic Transfer Switch for use on Standby Systems Cat No 165A2200F3C Ser No 123456 200 A BOM 999999 240 V 60 Hz

165 A 2 200 F 3 C

enclosure C = Type 1 F = Type 3R

A = solid neutral

poles 2 = 2 lines

ampere rating 100, 200, or 230 amps voltage code F = 240 V AC

381333–163 C 50 Hanover Road, Florham Park, New Jersey 07932–1591 USA 1 800 937–2726 (ASCO), for service call 1 800 800–2726 (ASCO) www.asco.com

ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3 telephone 519 758–8450, fax 519 758–0876, for service call 1 888 234–2726 (ASCO) www.asco.ca

Show 9 more labels / short text on this page
! · ! · ! · Series · Catalog number · product designation · neutral · control group code · 3 = automatic
Page 3 of the InFocus Video Conferencing System (165) user manual — INTRODUCTION
Page 3 · click to enlarge
Page 3

SPECIFICATIONS

ENCLOSED AUTOMATIC TRANSFER SWITCH

CONTROLLER

Voltage (nominal) 220–240 V ac Pickup (source acceptable) 204 V ac Dropout (source unacceptable) 180 V ac

Type 1 24” H x 14¼” W x 8” D

(610 mm H x 362 mm W x 203 mm D) Type 3R 25” H x 14¾” W x 8½” D

(635 mm H x 375 mm W x 216 mm D)

Frequency (nominal) alternate (generator) source 60 Hz . Pickup (source acceptable) 57 Hz Dropout (source unacceptable) 54 Hz

Weight Type 1 enclosure 67 lb Type 3R enclosure 82 lb

Operating –4˚ F to +122˚ F(–20˚ C to +50˚ C) . . . Storage –67˚ F to +149˚ F(–55˚ C to +65˚ C)

Start / Stop spdt 5 A max / 300 mA min at 30 V dc max.

terminals accept #22 to #14 AWG

stranded copper wire per terminal

TRANSFER SWITCH

Poles 2 Voltage (nominal) 220–240 V ac single phase

Ignore preferred (utility) source outages 3 sec Ignore alternate (generator) source outages 15 sec Load transfer to alternate (generator) source 15 sec Load retransfer to preferred (utility) source 5 min Generator cooldown period (after load retransfer) 1 min.

Frequency (nominal) 60 Hz Current (depending upon the unit) 100, 200, or 230 amps

Withstand / Close–On Current 10,000 amps RMS Symmetrical amps 240 V ac max. for any circuit breaker, manufacturer, or Type

Repeat time every 14 days Duration 20 minutes

per National Electrical Code, NEC/NFPA 70 100 amp. Transfer Switch power terminals accept wire sizes one #14 to 4/0 AWG AL or CU 200 amp. Transfer Switch power terminals accept wire sizes one #14 to 4/0 AWG CU (copper only) 230 amp. Transfer Switch power terminals accept wire sizes one #14 to 4/0 AWG CU (copper only)

INTRODUCTION

INTRODUCTION

This product is not intended for emergency or life–support systems. If you have more stringent application requirements contact ASCO for other products suitable for critical applications.

ASCO Series 165 Automatic Transfer Switches are Listed under the Underwriter’s Laboratories Standard for Transfer Switch Equipment, UL–1008. They are intended for use only in optional standby systems in accordance with theNational Electrical Code, NEC/NFPA 70, Article 702.

The automatic transfer switch helps provide safe connection of the alternate source (generator) to the electrical load after disconnecting the preferred source (utility). It contains a double–throw, electromechanical switching device for inherent isolation of the preferred and alternate sources. This isolation prevents the danger of connecting the utility to the generator which could cause damage or personal injury. The automatic transfer switch’s digital controller provides continuous monitoring of both power sources and a start/stop signal to the generator.

This automatic transfer switch is intended for standby power applications in residential or light commercial use only.

The Series 165 Automatic Transfer

Switch is not for emergency or

life–support systems.

Show 6 more labels / short text on this page
Enclosure Size · Temperature · Generator control contacts · Time Delays · Automatic Generator Exerciser · !
Page 4 of the InFocus Video Conferencing System (165) user manual — GENERATOR STARTING CONTACTS
Page 4 · click to enlarge
Page 4

INSTALLATION

Installation of the ASCO Series 165 automatic transfer switch must be performed by a licensed electrician. It must be installed according to the National Electrical Code and all local electrical code requirements. Refer to the installation drawing and wiring diagram.

CABLE LOOSENING DUE TO SHORT–CIRCUIT. Install

3 cable spacers 1½ in. from terminal lugs to prevent cables from loosening in a short–circuit condition.

CABLE CONNECTIONS (see wiring diagram)

MALFUNCTION or SHORTENED LIFE Protect the unit from construction grit and metal

Prepare the wires for connection as follows: strip the insulation; avoid nicking or ringing the conductors when stripping the cable. Remove surface oxides from conductors by cleaning with a wire brush. Apply electrical joint compound and wipe away excess. Insert prepared cable into lug and tighten the lug to the torque specified on the rating label on the transfer switch.

chips to prevent malfunction or shortened life.

Remove the enclosure cover and inspect the unit for ship– ping damage. If damage is evident do not install the unit. Type 1 enclosure is for indoor use only (refer to local codes for Type 4 use). Mount the automatic transfer switch vertically to a rigid supporting structure. Level all mounting points with flat washers behind the holes to avoid distortion of enclosure.

Connect the preferred source (utility) line 1 and 2 wires to the terminal lugs marked L1 and L5 at the bottom. Connect the alternate source (generator) line 1 and 2 wires to the terminal lugs marked L2 and L6 at the upper middle. Connect the load line 1 and 2 wires to the terminal lugs marked L3 and L7 at the top of the transfer switch. Neutral and ground terminals are provided.

ELECTRICAL LINE CONNECTIONS

Installation wiring must be performed by a licensed electrician in accordance with the National Electrical Code (NEC) and all local electrical code requirements.

The automatic transfer switch must be protected by suitably sized circuit breakers feeding the preferred and alternate source terminals. The ratings of the circuit breakers must be based on the requirements of the National Electrical Code for its nameplate ampere and short circuit withstandratings. See the wiring diagram provided with the unit.

GENERATOR STARTING CONTACTS

Before wiring the generator starting contacts refer to the generator manufacturer’s installation manual for require- ments. Make all connections to the controller with the gen- erator battery disconnected. Verify that the ignition switch is in the OFF position. Connect the generator starting con- tacts to the appropriate terminals on terminal block TB7 on the Controller (CP). See the wiring diagram provided with the unit. For wiring convenience terminal block TB7 has a removable plug. Reconnect the plug with terminal screws facing inward.

ELECTROCUTION HAZARD Turn off utility power and turn off the

generator to prevent electrocution

when wiring the transfer switch.

CABLE SPACERS (200 and 230 amp. units)

CONTROLLER DAMAGE. Observe polarity when connecting the generator battery to the controller.

Three cable spacers are included with 200 and 230 ampere size transfer switches. Run the power cables through the cable spacers as shown here and position the cable spacers approximately 1½ inches from the terminal lugs. Use copper cables for 200 and 230 amp. transfer switches.

Refer to wiring diagram. Be sure to reinstall the

TB7 block with terminal screws facing inward.

InFocus Video Conferencing System (165) — GENERATOR STARTING CONTACTS diagram (page 4)
Fig. 2
InFocus Video Conferencing System (165) — GENERATOR STARTING CONTACTS diagram (page 4)
Fig. 3

1 ½ inch approximate from terminal lugs

200 & 230 amp. transfer switches require cable spacers and copper cables

facing inward.

Show 15 more labels / short text on this page
! · ! · ! · load · cable spacers · removable · terminal block TB7 · Be sure to · alternate source (generator) · reinstall · with terminal · digital controller · screws · cable spacer · preferred source (utility)
Page 5 of the InFocus Video Conferencing System (165) user manual — 3 – ELECTRICAL OPERATION
Page 5 · click to enlarge
Page 5

FUNCTIONAL TEST(after installation)

After installing the Series 165 automatic transfer switch perform the following three–part functional test.

1 – MANUAL OPERATION

InFocus Video Conferencing System (165) — 1 – MANUAL OPERATION diagram (page 5)
Fig. 4

ELECTROCUTION – FLASH HAZARD Do not manually operate the transfer

switch until utility and generator are disconnected; open circuit breakers.

1. Put both the preferred source circuit breaker and the alternate source circuit breaker feeding the automatic transfer switch in the OFF position. Verify that ALL POWER IS OFF ! (See page 2 for handle location.)
2. Grasp the maintenance handle and turn it quickly with your thumb and fingers to manually operate the transfer switch. The switch should operate smoothly without binding. If it does not, check for shipping damage or construction debris.

transfer switch on utility (preferred source) light

transfer switch on generator

InFocus Video Conferencing System (165) — 1 – MANUAL OPERATION diagram (page 5)
Fig. 5

With ALL POWER OFF grasp maintenance handle and turn it quickly with your thumb and fingers.

3. Turn on the preferred source (utility) circuit breaker.
4. Turn on the alternate source (generator) circuit breaker.
5. Verify that UTILITY (preferred source) acceptable light is on.
6. Verify that the TRANSFER SWITCH on utility (preferred source) light is on.
7. This step will start the generator. Press and hold the Push to Test button until the GENERATOR (alternate source) acceptable light comes on and stays on. Then release the button.

weight marked P (preferred) and A (alternate)

3. After checking the manual operation operate the handle again quickly to return the transfer switch to the preferred position (letter P on the round weight facing you).

This light indicates that the generator is running and that its output voltage and frequency are acceptable. Under typical conditions, the light should come on after about 5 to 10 seconds. If the generator is running and fails to produce the proper voltage and frequency after 60 seconds then a malfunction has occurred (consult the Troubleshooting section).

2 – VOLTAGE CHECKS

The Series 165 automatic transfer switch is rated for nominal 240 V ac at 60 Hz (as stated on the nameplate). Verify that both your preferred and alternate sources are also 240 V ac nominal, 60 Hz. See the wiring diagram.

8. About 15 seconds after the GENERATOR (alternate source) acceptable light comes on, the automatic transfer switch transfers the load from the utility to the generator. The TRANSFER SWITCH on generator (alternate source) light comes on.

3 – ELECTRICAL OPERATION

This procedure checks the electrical operation of the automatic transfer switch. If the actual operation does not follow this procedure, consult the Troubleshooting section.

9. The transfer switch stays connected to the generator for 5 minutes. Then the load is transferred backto theutility. To bypass time delay, press and release the Push to Test button again.

PERSONAL INJURY HAZARD Install front cover before operation.

An electrical system fault could

cause a flash and cause injury.

10. After load retransfer to utility, the generator runs 1 minute (without load), then shuts down. The GENERATOR acceptable light goes off indicating that generator is off.
1. Install the enclosure cover and tighten the screws.
2. Verify that the generator battery is connected and that the generator’s starting controls are set for automatic.

This completes the Functional Test. Proceed to next page.

Show 5 more labels / short text on this page
source acceptable lights · test button · maintenance handle · (alternate source) light · !
Page 6 of the InFocus Video Conferencing System (165) user manual — INDICATOR LIGHTS
Page 6 · click to enlarge
Page 6

OPERATION

utility (preferred source) acceptable light

PUSH BUTTONS

On the front control display are two push buttons that control the operation of the generator and the automatic transfer switch.

  • Push to Test (button on the left side)
  • This button is used to test the system. See the Manual Generator Testing section on the next page.
  • This button can be used to cancel any active time delay. Press and release the button to bypass the time delay.
  • This button can be used to clear displayed error codes. See Troubleshooting section, Problem 8 .
  • Automatic Generator Exerciser (right button)
  • This button is used to set the automatic generator exerciser. See the next page.

UTILITY FAILURE

(alternate source) light transfer switch on utility

transfer switch on generator

The load is normally connected to the preferred source (utility) if that source is acceptable. If the preferred source (utility) fails, the following sequence occurs: 1. The UTILITY source acceptable light goes off.

INDICATOR LIGHTS

On the front control display are five lights that indicate the status of the sources and the automatic transfer switch.

2. The automatic transfer switch waits three seconds to prevent nuisance starting of the generator from momentary dips of the utility voltage. If the utility is restored during the three seconds, the UTILITY source acceptable light comes on and no further action is taken.

❍Utility (preferred source) acceptable

(light at the top left of the display)

  • When on, this light indicates that the utility voltage is acceptable for connection to the load.
3. If the utility remains unacceptable for three seconds, the automatic transfer switch cranks and starts the generator.

❍Generator (alternate source) acceptable

(light at the top right of the display)

4. Once the generator starts, the automatic transfer switch waits until the generator voltage and frequency are acceptable. Then the GENERATOR source acceptable light comes on.
  • When on, this light indicates that the generator voltage and frequency are acceptable for connection to the load.

❍Transfer Switch on utility (preferred source)

5. When the generator is acceptable, the automatic transfer switch waits 15 seconds to allow the generator to warm up. Then it transfers the load to the generator. The TRANSFER SWITCH on generator (alternate source) light comes on.

(light at the center left of display)

  • When on, this light indicates that the load is connected to the utility (preferred source).
6. The automatic transfer switch waits for the utility source to be restored. When the utility again becomes acceptable the UTILITY source acceptable light comes on.

❍Transfer Switch on generator (alt. source)

(light at the center right of display)

  • When on, this light indicates that the load is connected to the generator (alternate source).
7. The automatic transfer switch then waits 5 minutes to allow the utility to stabilize. Then it retransfers the load back to the utility. The TRANSFER SWITCH on utility (preferred source) light comes on.

❍Automatic Generator Exerciser

(light above button at the right of display)

8. After load retransfer the generator will continue to run unloaded for one minute for engine cooldown. Then it is stopped. The GENERATOR acceptable light goes off.
  • When the utility is acceptable and the load is on the utility, this light flashes the number of days until the next exercise period. When it is off, no exerciser period is set. The light is also off any time the generator is running.
Show 4 more labels / short text on this page
generator (alternate source) · acceptable light · exerciser light · (preferred source) light
Page 7 of the InFocus Video Conferencing System (165) user manual — GENERATOR TEST WITH LOAD TRANSFER
Page 7 · click to enlarge
Page 7

AUTOMATIC GENERATOR EXERCISER

automatic generator exerciser light

The automatic generator exerciser automatically exercises the generator for 20 minutes once every 14 days. TO SET EXERCISER Press and release the Automatic Generator Exerciser but- ton. After about 8 seconds the exerciser light flashes 14 times to indicate that the exerciser has been set. The number of flashes indicates the number of days until thenext exercisepe- riod (at approximately the same time the button was pressed).

TO DISABLE EXERCISER Press and hold the Automatic Generator Exerciser button until the light above the button goes off (light flashes then goes off). The exerciser is now disabled and the light is off.

TO ENABLE EXERCISER Press and hold the Automatic Generator Exerciser button until the light goes off (light flashes then goes off). Exerciser is now enabled. After about 8 seconds exerciser light flashes 14 times to indicate that the exerciser has been re–enabled.

MANUAL GENERATOR TESTING

GENERATOR TEST WITH LOAD TRANSFER

GENERATOR TEST WITHOUT LOAD TRANSFER

During this test a utility failure is simulated. The generator starts and the load transfers to the generator. Then the load retransfers back to the utility and generator stops.

During the test the generator cranks and starts and the GENERATOR light comes on (if it is acceptable). After running for 20 minutes it stops. Throughout the test the load remains connected to the utility (the automatic transfer switch does not transfer the load to the generator).

1. Press and hold the Push to Test button until the GENERATOR acceptable light comes on and stays on (the generator cranks and starts).
1. Press and release (do not hold) the Push to Test button. The generator cranks and starts, and the GENERATOR acceptable light comes on and stays on.
2. The automatic transfer switch waits 15 seconds to allow the generator to warm up. Then it transfers the load to the generator. The TRANSFER SWITCH on generator (alternate source) light comes on.
2. The generator runs for 20 minutes. The automatic transfer switch does not transfer the load to the generator. The TRANSFER SWITCH on utility (preferred source) light stays on.
3. After 5 minutes the auto– matic transfer switch re– transfers the load back to the utility. To bypass the time delay, press and release the Push to Test button again. The TRANS– FER SWITCH on utility (preferred source) light comes on.
3. To bypass the time delay or

cancel the test, press and release the Push to Test button again.

4. The generator stops and

the GENERATOR accept- able light goes off.

4. After load retransfer the generator will continue to run unloaded for one minute for engine cooldown. Then it is stopped. The GENERATOR acceptable light goes off.

(alternate source) light transfer switch on utility

transfer switch on generator

(preferred source) light 7

Show 4 more labels / short text on this page
set exerciser button · source acceptable lights · load transfer · test button
Page 8 of the InFocus Video Conferencing System (165) user manual — Problem 4
Page 8 · click to enlarge
Page 8

TROUBLESHOOTING

This troubleshooting guide describes some of the simple causes of problems with the installation of the automatic transfer switch. Troubleshooting beyond the scope of this guide should not be attempted by the installer. A licensed electrician must perform all internal troubleshooting. ASCO can be contacted at 800–937–ASCO or www.asco.com

Problem 5

The automatic transfer switch does not transfer the load to the generator (TRANSFER SWITCH on generator light does not come on).

  • Verify that the GENERATOR source acceptable light is on. The transfer switch will not retransfer the load to the generator until the generator output is acceptable. If the light is off verify that the circuit breaker for the generator feed is ON.

ELECTROCUTION – FLASH HAZARD

Do not work on the transfer switch until both the utility and generator are

  • Wait 15 seconds. There is a 15 second delay after the generator output becomes acceptable to permit the generator to warm up.

off. Turn OFF both circuit breakers.

  • If the GENERATOR source acceptable light still does not come on, see Problems 3 and 4 .

Problem 1

  • The UTILITY acceptable light does not come on when utility power is connected to the automatic transfer switch.
  • Verify that the utility feed is 240 V ac nominal and 60 Hz.
  • Verify that the utility feed is wired to the terminal lugs on the bottom of the transfer switch marked L1 and L5 .
  • Verify that the utility feed is connected and that its circuit breaker is ON.
  • With ALL POWER OFF , verify that the transfer switch harness is connected properly to the controller (plug at the bottom).

Problem 6

The automatic transfer switch does not transfer the load back to the utility (TRANSFER SWITCH on utility light does not come on). ●Verify that the UTILITY source acceptable light is on. The transfer switch will not retransfer the load to the utility until the utility source is acceptable and the light is on. If light is off, verify that the circuit breaker from the utility feed isON.

  • Wait 5 minutes. There is a 5 minute delay on retransfer to the utility.

Problem 2

Problem 7

Power is connected (UTILITY acceptable light and/or GENERATOR acceptable lights are on) but both TRANSFER SWITCH position lights are off.

The GENERATOR source acceptable light does not go off after the automatic transfer switch retransfers the load back to the utility.

  • With ALL POWER OFF , verify that the transfer switch harness is connected properly to the controller (plug at the bottom).
  • Wait 1 minute. After load retransfer to the utility, there is a 1 minute delay for generator cooldown before shut down.
  • Verify proper operation of the generator (see the generator manual).

Problem 3

Generator does not crank when the utility source fails or when the Push to Test button is pressed.

Problem 8

  • Verify that the generator starting controls are set for automatic operation.

Both TRANSFER SWITCH position lights are flashing (this indicates an error condition). * ●Count the number of times the Automatic Generator Exerciser light flashes (repeats after pause). This number is the error code.

  • Verify engine start low voltage wiring between controller terminal block TB7 (plug on the left) and the generator. Check that TB7 plug is properly seated in TB7 receptacle.
  • Verify that the generator battery is connected and that the battery voltage meets the generator manufacturer’s recommendation.
  • Verify that the correct contact (normally open or normally closed) is being utilized (see the generator manual).
  • Error codes: 2 Generator failed to start. See Problems 3 and 4. 3 Generator failed after starting.See generator manual. 4 Generator over frequency. See generator manual. 5 Transfer Switch did not transfer the load

to the generator. Service required. 6 Transfer Switch did not transfer the load

Problem 4

Generator cranks but does not start when the utility source fails or when the Push to Test button is pressed.

to the utility. Service required. 7 Controller error. Service required. ●To clear error code, press and release Push to Test button.

  • Verify engine start low voltage wiring between controller terminal block TB7 (plug on the left) and the generator. Check that TB7 plug is properly seated in TB7 receptacle.
  • Verify proper generator operation (see generator manual).

* NOTE: These lights will flash only when controller power is available from either of the two power sources.

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the InFocus Video Conferencing System (165)

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the InFocus Video Conferencing System (165)

Be the first to ask — other owners or our team will answer.

Original document

InFocus Video Conferencing System (165) manual PDF

8 pages·370 KB·Projector·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…