EN
Graco logo
Official user manual

Graco A-25

38 pages·5.2 MB·Outboard Motor·PDF·ENDEFRITNLJA
Graco A-25
Table of Contents 56 sections Proportioner Models · Systems · Related Manuals · Warnings · … ShowHide
Page 1 of the Graco A-25 user manual — Air operated, electrically heated, plural component proportioner
Page 1 · click to enlarge
Page 1

Operation

® A-25

EN

P L U R A L C O M P O N E N T P R O P O R T I O N E R

Air operated, electrically heated, plural component proportioner

For spraying or dispensing 1:1 ratio polyurethane foam formulations and other 1:1 fast setting materials.

Not for use in explosive atmospheres or hazardous locations.

This model is field-configurable to the following supply voltages: 230 V, 1 Phase 230 V, 3 Phase 380 V, 3 Phase

2000 psi (14 MPa, 138 bar) Maximum Fluid Working Pressure 80 psi (550 kPa, 5.5 bar) Maximum Air Working Pressure

See page 9 for model information, including maximum working pressure and approvals.

Page 2 of the Graco A-25 user manual — Table of contents
Page 2 · click to enlarge
Page 2

Table of contents

Proportioner Modelsp.3Systemsp.3Related Manualsp.3Warningsp.4Important Two-Component Material Informationp.7Isocyanate Conditionsp.7Material Self-ignitionp.7Keep Components A and B Separatep.7Moisture Sensitivity of Isocyanatesp.7Foam Resins with 245 fa Blowing Agentsp.7Changing Materialsp.8Typical Installation, without Circulationp.9Typical Installation, with Circulationp.10Component Identificationp.11Control Panelp.13Temperature Controls and Indicatorsp.13Setupp.15Locate Reactor A-25p.15Determine Power Sourcep.15Electrical Requirementsp.15Configure to Supply Powerp.16Ground Systemp.18Iso Pump Lubrication System Setupp.18Fluid Supply Connectionsp.18Air Supply Connectionp.18Recirculation / Pressure Relief Linesp.19Install Fluid Temperature Sensor (FTS)p.19Connect Heated Hosep.19Close Gun Fluid Inlet Valves A and Bp.20Connect Whip Hose to Gun or Gun Fluid Manifoldp.20Initial Startupp.21Pressure Check Hosep.21Set Temperaturesp.22Supply Wet-Cups with Throat Seal Liquidp.23Sprayingp.24Spray Adjustmentsp.25Parkp.26Pressure Relief Procedurep.26Shutdownp.26Flushingp.27Operationp.28Daily Start-up Procedurep.28Fluid Circulationp.30Circulation Through Reactorp.30Circulation Through Gun Manifoldp.31DataTrak Controls and Indicatorsp.32DataTrak Operationp.33Setup Modep.33Run Modep.33Maintenancep.34Diagnostic Codesp.35Temperature Control Diagnostic Codesp.35DataTrak Diagnostic Codesp.35Dimensionsp.36Technical Datap.37Graco Standard Warrantyp.38
Page 3 of the Graco A-25 user manual — Related Manuals
Page 3 · click to enlarge
Page 3

Proportioner Models

All proportioners can be configured to operate on 380V (4 wire), 230V (3 wire), or 230V 1Ø.

Part No.Maximum Fluid Working Pressure psi (MPa, bar)Maximum Air Working Set Pressure psi (kPa, bar)Includes:Approvals DataTrak (cycle count only)Wheels 2625722000 psi (14, 138)80 psi (550, 5.5)------3172585 Conforms to ANSI/UL Std. 499 Certified to CAN/CSA Std. C22.2 No. 88 2626142000 psi (14, 138)80 psi (550, 5.5)24A592

Systems

All systems include a proportioner, spray gun, and 60 ft (18.3 m) of heated hose.

PartMaximum Working Pressure psi (MPa, bar)Proportioner (see Typical Installation, without Circulation)Heated HoseGun 50 ft (15 m)10 ft (3 m)ModelPart P226142000 (14, 138)262614246678246050Probler P2GCP2R1 AP26142000 (14, 138)262614246678246050Fusion™ AP246101 CS26142000 (14, 138)262614246678246050Fusion™ CSCS01RD P225722000 (14, 138)262572246678246050Probler P2GCP2R1 AP25722000 (14, 138)262572246678246050Fusion™ AP246101 CS25722000 (14, 138)262572246678246050Fusion™ CSCS01RD

Related Manuals

Manuals are available at www.graco.com

ManualDescription 309550Fusion™ AP Spray Gun, Instructions-Parts 312666Fusion™ CS Spray Gun, Instructions-Parts 313213Probler P2 Spray Gun, Instructions-Parts 313541DataTrak Kits, Installation-Parts 312796NXT® Air Motor, Instructions-Parts

Component manuals in English:

ManualDescription 3A1570Reactor A-25 Proportioner, Repair-Parts 309577Proportioning Pump, Repair-Parts 309815Feed Pump Kit, Instructions-Parts 309827Feed Pump Air Supply KIt, Instructions-Parts 309852Circulation and Return Tube Kit, Instructions-Parts 309572Heated Hose, Instructions-Parts

Proportioner Models

Page 4 of the Graco A-25 user manual — WARNING
Page 4 · click to enlarge
Page 4

Warnings

The following warnings are for the setup, use, grounding, maintenance, and repair of this equipment. The exclama- tion point symbol alerts you to a general warning and the hazard symbols refer to procedure-specific risks. When these symbols appear in the body of this manual, refer back to these Warnings. Product-specific hazard symbols and warnings not covered in this section may appear throughout the body of this manual where applicable.

WARNING

ELECTRIC SHOCK HAZARD This equipment must be grounded. Improper grounding, setup, or usage of the system can cause electric shock.

  • Turn off and disconnect power at main switch before disconnecting any cables and before servicing or installing equipment.
  • Connect only to grounded power source.
  • All electrical wiring must be done by a qualified electrician and comply with all local codes and regulations.

TOXIC FLUID OR FUMES HAZARD Toxic fluids or fumes can cause serious injury or death if splashed in the eyes or on skin, inhaled, or swallowed.

  • Read MSDSs to know the specific hazards of the fluids you are using.
  • Store hazardous fluid in approved containers, and dispose of it according to applicable guidelines.
  • Always wear chemically impermeable gloves when spraying, dispensing, or cleaning equipment.

PERSONAL PROTECTIVE EQUIPMENT You must wear appropriate protective equipment when operating, servicing, or when in the operating area of the equipment to help protect you from serious injury, including eye injury, hearing loss, inhalation of toxic fumes, and burns. This equipment includes but is not limited to:

  • Protective eyewear, and hearing protection.
  • Respirators, protective clothing, and gloves as recommended by the fluid and solvent manufacturer.

BURN HAZARD Equipment surfaces and fluid that’s heated can become very hot during operation. To avoid severe burns:

  • Do not touch hot fluid or equipment.
Page 5 of the Graco A-25 user manual — WARNING
Page 5 · click to enlarge
Page 5

WARNING

FIRE AND EXPLOSION HAZARD Flammable fumes, such as solvent and paint fumes, in work area can ignite or explode. To help prevent fire and explosion:

  • Use equipment only in well ventilated area.
  • Eliminate all ignition sources; such as pilot lights, cigarettes, portable electric lamps, and plastic drop cloths (potential static arc).
  • Keep work area free of debris, including solvent, rags and gasoline.
  • Do not plug or unplug power cords, or turn power or light switches on or off when flammable fumes are present.
  • Ground all equipment in the work area. See Grounding instructions.
  • Use only grounded hoses.
  • Hold gun firmly to side of grounded pail when triggering into pail.
  • If there is static sparking or you feel a shock, stop operation immediately. Do not use equipment until you identify and correct the problem.
  • Keep a working fire extinguisher in the work area.

SKIN INJECTION HAZARD High-pressure fluid from gun, hose leaks, or ruptured components will pierce skin. This may look like just a cut, but it is a serious injury that can result in amputation. Get immediate surgical treatment.

  • Engage trigger lock when not spraying.
  • Do not point gun at anyone or at any part of the body.
  • Do not put your hand over the fluid outlet.
  • Do not stop or deflect leaks with your hand, body, glove, or rag.
  • Follow the Pressure Relief Procedure when you stop spraying and before cleaning, checking, or servicing equipment.
  • Tighten all fluid connections before operating the equipment.
  • Check hoses and couplings daily. Replace worn or damaged parts immediately.
Page 6 of the Graco A-25 user manual — WARNING
Page 6 · click to enlarge
Page 6

WARNING

EQUIPMENT MISUSE HAZARD Misuse can cause death or serious injury.

  • Do not operate the unit when fatigued or under the influence of drugs or alcohol.
  • Do not exceed the maximum working pressure or temperature rating of the lowest rated system component. See Technical Data in all equipment manuals.
  • Use fluids and solvents that are compatible with equipment wetted parts. See Technical Data in all equipment manuals. Read fluid and solvent manufacturer’s warnings. For complete information about your material, request MSDS from distributor or retailer.
  • Do not leave the work area while equipment is energized or under pressure. Turn off all equipment and follow the Pressure Relief Procedure when equipment is not in use.
  • Check equipment daily. Repair or replace worn or damaged parts immediately with genuine manufacturer’s replacement parts only.
  • Do not alter or modify equipment.
  • Use equipment only for its intended purpose. Call your distributor for information.
  • Route hoses and cables away from traffic areas, sharp edges, moving parts, and hot surfaces.
  • Do not kink or over bend hoses or use hoses to pull equipment.
  • Keep children and animals away from work area.
  • Comply with all applicable safety regulations.

PRESSURIZED ALUMINUM PARTS HAZARD Use of fluids that are incompatible with aluminum in pressurized equipment can cause serious chemical reaction and equipment rupture. Failure to follow this warning can result in death, serious injury, or property damage.

  • Do not use 1,1,1-trichloroethylene, methylene chloride, other halogenated hydrocarbon solvents or fluids containing such solvents.
  • Many other fluids may contain chemicals that can react with aluminum. Contact your material supplier for compatibility.

THERMAL EXPANSION HAZARD Fluids subjected to heat in confined spaces, including hoses, can create a rapid rise in pressure due to the thermal expansion. Over-pressurization can result in equipment rupture and serious injury.

  • Open a valve to relieve the fluid expansion during heating.
  • Replace hoses proactively at regular intervals based on your operating conditions.

MOVING PARTS HAZARD Moving parts can pinch, cut or amputate fingers and other body parts.

  • Keep clear of moving parts.
  • Do not operate equipment with protective guards or covers removed.
  • Pressurized equipment can start without warning. Before checking, moving, or servicing equipment, follow the Pressure Relief Procedure and disconnect all power sources.
Page 7 of the Graco A-25 user manual — Keep Components A and B Separate
Page 7 · click to enlarge
Page 7

Important Two-Component Material Information

Isocyanate Conditions

Moisture Sensitivity of Isocyanates

Isocyanates (ISO) are catalysts used in two component foam and polyurea coatings. ISO will react with moisture (such as humidity) to form small, hard, abrasive crystals, which become suspended in the fluid. Eventually a film will form on the surface and the ISO will begin to gel, increasing in viscosity. If used, this partially cured ISO will reduce performance and the life of all wetted parts.

Spraying or dispensing materials containing isocyanates creates potentially harmful mists, vapors, and atomized particulates.

Read material manufacturer’s warnings and material MSDS to know specific hazards and precautions related to isocyanates.

Prevent inhalation of isocyanate mists, vapors, and atomized particulates by providing sufficient ventilation in the work area. If sufficient ventilation is not available, a supplied-air respirator is required for everyone in the work area.

To prevent exposing ISO to moisture:

  • Always use a sealed container with a desiccant dryer in the vent, or a nitrogen atmosphere. Never store ISO in an open container.

To prevent contact with isocyanates, appropriate personal protective equipment, including chemically impermeable gloves, boots, aprons, and goggles, is also required for everyone in the work area.

  • Keep the ISO lube pump reservoir (if installed) filled with Graco Throat Seal Liquid (TSL), Part 206995. The lubricant creates a barrier between the ISO and the atmosphere.

Material Self-ignition

  • Use moisture-proof hoses specifically designed for ISO, such as those supplied with your system.
  • Never use reclaimed solvents, which may contain moisture. Always keep solvent containers closed when not in use.

Some materials may become self-igniting if applied too thickly. Read material manufacturer’s warnings and material MSDS.

  • Always lubricate threaded parts with ISO pump oil or grease when reassembling.

Keep Components A and B Separate

Foam Resins with 245 fa Blowing Agents

Some foam blowing agents will froth at temperatures above 90°F (33°C) when not under pressure, especially if agitated. To reduce frothing, minimize preheating in a circulation system.

Cross-contamination can result in cured material in fluid lines which could cause serious injury or damage equipment. To prevent cross-contamination of the equipment’s wetted parts, never interchange component A (isocyanate) and component B (resin) parts.

Page 8 of the Graco A-25 user manual — Changing Materials
Page 8 · click to enlarge
Page 8

Changing Materials

Changing the material types used in your equipment requires special attention to avoid equipment damage and downtime.

  • When changing materials, flush the equipment multiple times to ensure it is thoroughly clean.
  • Always clean the fluid inlet strainers after flushing.
  • Check with your material manufacturer for chemical compatibility.
  • When changing between epoxies and urethanes or polyureas, disassemble and clean all fluid components and change hoses. Epoxies often have amines on the B (hardener) side. Polyureas often have amines on the B (resin) side.
Page 9 of the Graco A-25 user manual — H
Page 9 · click to enlarge
Page 9

Typical Installation, without Circulation

Typical Installation, without Circulation

Graco A-25 — Typical Installation, without Circulation diagram (page 9)
Fig. 1 · Typical Installation, without Circulation

H

* Shown exposed for clarity. Wrap with tape during operation.

F IG . 1Typical Installation, without Circulation

Key for FIG. 1

A Reactor Proportioner B Heated Hose C Fluid Temperature Sensor (FTS) D Heated Whip Hose E Spray Gun F Proportioner and Gun Air Supply Hose G Feed Pump Air Supply Lines H Waste Containers J Fluid Supply Lines K Feed Pumps L Agitator (if required)

M Desiccant Dryer N Bleed Lines/Over Pressure Relief P Gun Fluid Manifold

Page 10 of the Graco A-25 user manual — N
Page 10 · click to enlarge
Page 10

Typical Installation, with Circulation

Typical Installation, with Circulation

Key for FIG. 2

A Reactor Proportioner B Heated Hose C Fluid Temperature Sensor (FTS) D Heated Whip Hose E Spray Gun F Proportioner and Gun Air Supply Hose

G Feed Pump Air Supply Lines J Fluid Supply Lines K Feed Pumps L Agitator (if required) M Desiccant Dryer N Recirculation/Over Pressure Relief Return Hoses P Gun Fluid Manifold

Graco A-25 — Typical Installation, with Circulation diagram (page 10)
Fig. 2 · Typical Installation, with Circulation

N

* Shown exposed for clarity. Wrap with tape during operation.

F IG . 2Typical Installation, with Circulation
Page 11 of the Graco A-25 user manual — AH
Page 11 · click to enlarge
Page 11

Component Identification

Graco A-25 — Component Identification diagram (page 11)
Fig. 3 · Component Identification

AH

AB

U

F IG . 3Typical Installation

Component Identification

Page 12 of the Graco A-25 user manual — Component Identification
Page 12 · click to enlarge
Page 12

Key:

R Main Disconnect Switch - Controls power to heating circuits. I

AH *Primary Heater Over-Temperature Switches -

Sends signal to temperature controller if heater exceeds maximum temperature condition.

S Main Air Filter - Filters system air supply.

AI Resin (B) Pump Wet Cup - Access for daily wet cup refill.

T Resin (B) Pressure Gauge - Displays pressure in resin proportioning system (B side).

DD Main Air Inlet Ball Valve - (1/2 NPT female fitting)

U Resin (B) - Inlet Supply Valve

FF ISO (A) Inlet - Fitting (3/4 swivel fitting)

GG Resin (B) Inlet - Fitting (3/4 swivel fitting)

V Resin (B) Fluid Y-Strainer - (20 mesh)

W ISO (A) Pressure Gauge - Displays pressure in isocyanate proportioning system (A side).

X ISO (A) - Inlet Supply Valve

Y ISO (A) Fluid Y-Strainer - (20 mesh)

Z ISO (A) Pump Lube System - Behind Proportioner shroud. (A side only)

AA ISO (A) - Packing Nut and Lube Cup - (A side

AB *Primary Heater Thermocouples - Senses

temperature of primary heater and inputs that information.

AC FTS Jumper Harness - Carries electrical signal

from FTS sensor in isocyanate hose to hose temperature controller.

AD Primary Heaters - Heats material to required

dispensing temperature.

AE ISO (A) - (Isocyanate) Proportioning Pump -

Draws in and dispenses a fixed volume of isocyanate to gun.

AF Resin (B) Proportioning Pump - Draws in and

dispenses a fixed volume of resin to gun.

AG Power-Lock™ Hose Heat Connection - Connects

power to heated hoses.

Component Identification · only)

Page 13 of the Graco A-25 user manual — Temperature Controls and Indicators
Page 13 · click to enlarge
Page 13

Control Panel

Graco A-25 — Control Panel diagram (page 13)
Fig. 4 · Control Panel

DataTrak (optional) See page 32. See Tempera- ture Controls and Indicators

E L EC T RO N IC M O N I T O R IN G S Y S T E M

Air Motor Pressure Gauge

Air Motor Shutoff Valve

Temperature Controls and Indicators

Graco A-25 — Temperature Controls and Indicators diagram (page 13)
Fig. 5 · Temperature Controls and Indicators

To prevent damage to the softkey buttons, do not press the buttons with sharp objects such as pens, plastic cards, or fingernails.

Graco A-25 — Temperature Controls and Indicators diagram (page 13)
Fig. 6 · Temperature Controls and Indicators

Zone A Arrow Keys

Heater A On/Off Key

Zone B Arrow Keys

Heater B On/Off Key

Hose Zone Arrow Keys

Hose Heater On/Off Key

Show 7 more labels / short text on this page
Component Identification · Air Pressure Regulator · Heater Power Indicators · Temperature Displays · Actual Temperature Key · Temperature Scale Keys · Target Temperature Key
Page 14 of the Graco A-25 user manual — Temperature Arrow Keys
Page 14 · click to enlarge
Page 14

Main Power Switch

Temperature Displays

Located on right side of unit, page 11. Turns heater

Show actual temperature or target temperature of heater zones, depending on selected mode. Defaults to actual at startup. Range is 32-190°F (0-88°C) for A and B, 32-180°F (0-82°C) for hose.

power ON and OFF . Does not turn

heater zones or pumps on.

Circuit Breakers

Actual Temperature Key/LED

Press to display actual temperature.

Located inside Reactor cabinet.

Press and hold to display electrical current.

Graco A-25 — Circuit Breakers diagram (page 14)
Fig. 7 · Circuit Breakers

Target Temperature Key/LED

Press to display target temperature.

Press and hold to display heater control circuit

Graco A-25 — Target Temperature Key/LED diagram (page 14)
Fig. 8 · Target Temperature Key/LED

board temperature.

Temperature Scale Keys/LEDs

Press or to change temperature scale.

° F ° C

Heater Zone On/Off Keys/LEDs

Press to turn heater zones on and off. Also clears

heater zone diagnostic codes, see page 35.

Temperature Arrow Keys

Press , then press or to adjust tem-

perature settings in 1 degree increments.

Component Identification

Page 15 of the Graco A-25 user manual — Determine Power Source
Page 15 · click to enlarge
Page 15

Setup

Locate Reactor A-25

Electrical Requirements

1. Locate Reactor A-25 on a level surface and bolt in place to the floor with 3/8 in. (10 mm) bolts, unless the Reactor needs to remain portable.

Improper wiring may cause electric shock or other serious injury if work is not performed properly.

  • Two bolts through the 2 in. (50 mm) deep caster bushings in the rear.
  • Have a qualified electrician connect power and ground to main power switch terminals and ground lug.
  • Two bolts through the 3-5/8 in. (168 mm) deep caster bushings in the front.
  • Ensure your installation complies with all National, State, and Local safety and fire codes.
2. Do not expose Reactor A-25 to rain.
  • Ensure that incoming power is disconnected and locked out at the source.
3. If you need to move the machine, add optional wheel kit.
4. Lift with hoist only from bar spanning across top of cart.

Determine Power Source

Reactor A-25 can be wired to 3 types of power source:

  • 230 Volt / 1 Phase
  • 230 Volt / 3 Phase Delta (3 wire + ground PE)
  • 380 Volt / 3 Phase WYE (4 wire + ground PE) (220 Volts to Neutral)

Setup

Page 16 of the Graco A-25 user manual — PD
Page 16 · click to enlarge
Page 16

Configure to Supply Power

230V, 1 Phase: Use a screwdriver to connect two power leads to the top two middle terminal positions as shown. Connect green to ground (GND). See page 17 for proper jumper positions.

Step One - Connect Electrical Cord

1. Using a flat screw driver, turn cover fasteners 90° counterclockwise. Lift and pull the front cover away.
2. Connect main power cord to electrical console as follows:

230V, 3 Phase Delta: Use a screwdriver to connect three power leads to top three left terminals as shown. Connect green to ground (GND). See page 17 for proper jumper positions.

a. Feed power cord through strain relief (SR) on right side of unit. Push black die release lever (RL) down to release contacts block (PD) for easy wiring.

b. Connect power leads to Power Disconnect Switch (PD). Snap contacts block (PD) back onto switch.

c. Tighten strain relief nut.

380V, 3 Phase WYE: Use a screwdriver to connect four power leads to the top terminals as shown. Connect neutral only to N. Connect green to ground (GND). See page 17 for proper jumper positions.

d. Connect ground wire to ground lug (GL).

Graco A-25 — Step One - Connect Electrical Cord diagram (page 16)
Fig. 9 · Step One - Connect Electrical Cord

PD

GL

3. Replace lower front shroud. Reinstall the two screws retained in Step 1.

Setup

Page 17 of the Graco A-25 user manual — 3000 WATTS 6000 WATTS
Page 17 · click to enlarge
Page 17

Step Two - Install Power Jumpers

1. Turn screws counter-clockwise on the upper part of the shroud until they stop. Pull door up and out.

Find location for power jumpers which are in a plastic bag tie wrapped to the ground lug.

2. Install red jumpers from the storage bag to the positions shown for your power.
  • Push the jumper firmly into the new position.
  • If necessary, a flat-blade screwdriver can be used under the ridge on the side of the jumper to remove them.

Heater Jumper Location NEW

3. Replace front shroud.

ti17569a Heater Jumpers Install Power Jumpers

Step Two

TB2

Terminal Blocks Install red jumpers

230V 1ø 230V 3ø Delta 380V 3ø WYE

Step Three - Reposition Heater Jumpers (if necessary)

1. Turn screws counter-clockwise on the upper part of the shroud and remove by pulling them out.

Find location of Heater Jumpers.

2. Move red jumpers from the storage positions to the positions shown for your power.
  • A flat-blade screwdriver can be used under the ridge on the side of the jumper to remove them.

Machines are shipped with heaters wired for 6000 watts. To reposition heater jumpers for 3000 watts, change jumper positions as shown below.

  • Push the jumper firmly into the new position.
3. Replace lower front shroud.

Step Three

TB2

Terminal Blocks Position red jumpers

3000 WATTS 6000 WATTS

Setup · Power Jumper Location

Page 18 of the Graco A-25 user manual — Iso Pump Lubrication System Setup
Page 18 · click to enlarge
Page 18

Ground System

Fluid Supply Connections

Graco A-25 — Ground System diagram (page 18)
Fig. 10 · Ground System

Feed pumps are typically used. Siphon feeding is not recommended. Connect material supply to inlets of proportioning unit as follows:

The equipment must be grounded to reduce the risk of static sparking and electric shock. Electric or static sparking can cause fumes to ignite or explode. Improper grounding can cause electric shock. Grounding provides an escape wire for the electric current.

1. Connect fluid inlet ball valves (U.X) and y-strainers (V, Y) to pump inlets.
2. Ensure the Aand Binlet ball valves (U,X) on proportioning unit are closed.
Graco A-25 — Ground System diagram (page 18)
Fig. 11 · Ground System
3. Connect and tighten Bsupply hose (J) to 3/4 NPT swivel fitting (GG) on Binlet ball valve (U), and to resin transfer pump.
  • Reactor : is grounded through power cord; see page 16.
  • Spray gun : connect whip hose ground wire to FTS; see page 19. Do not disconnect wire or spray without whip hose.
  • Fluid supply containers : follow your local code.
  • Object being sprayed : follow your local code.
  • Solvent pails used when flushing : follow your local code. Use only metal pails that are conductive. Place them on a grounded surface. Do no place pail on a nonconductive surface, such as paper or cardboard, which interrupts grounding continuity.
4. Connect and tighten Asupply hose (BB) to 1/2 NPT swivel fitting (FF) on Ainlet ball valve (X), and to isocyanate transfer pump. See F IG . 3, page 11.

Air Supply Connection

  • To maintain grounding continuity when flushing or relieving pressure , hold a metal part of spray gun firmly to the side of a grounded metal pail, then trigger gun.

Connect main air supply (F) to air inlet 1/2 in. npt (f) valve (DD) at air filter (S). Hose fitting requires a 1/2 NPT male fitting.

Graco A-25 — Air Supply Connection diagram (page 18)
Fig. 12 · Air Supply Connection

Iso Pump Lubrication System Setup

Prepare isocyanate pump lubrication system as follows:

1. Lift lubricant reservoir out of bracket and remove reservoir from cap.
2. Fill reservoir 3/4 full with TSL.
3. Thread reservoir onto cap assembly and place it into bracket.

The lubrication system is now ready for operation; no priming is required.

Setup

Page 19 of the Graco A-25 user manual — Install Fluid Temperature Sensor (FTS)
Page 19 · click to enlarge
Page 19

Recirculation / Pressure Relief Lines

Connect Heated Hose

Graco A-25 — Recirculation / Pressure Relief Lines diagram (page 19)
Fig. 13 · Recirculation / Pressure Relief Lines
Graco A-25 — Recirculation / Pressure Relief Lines diagram (page 19)
Fig. 14 · Recirculation / Pressure Relief Lines

Do not install shutoffs downstream of the PRESSURE RELIEF/SPRAY valve outlets (BA, BB). The valves function as over pressure relief valves when set to SPRAY. Lines must be open so valves can automatically relieve pressure when machine is operating.

The fluid temperature sensor (FTS) and whip hose must be used with heated hose; see page 19. Hose length, including whip hose, must be 60 ft (18.3 m) min- imum.

1. Turn main power OFF.
2. Assemble heated hose sections, FTS, and whip hose. See Heated Hose manual for instructions.

If circulating fluid back to the supply drums, use high pressure hose rated to withstand the maximum working pressure of this equipment.

3. Connect A and B hoses to A and B outlets on Reactor fluid manifold (FM). Hoses are color coded: red for component A (ISO), blue for component B (RES). Fittings are sized to prevent connection errors.

If Recirculating to Supply Drum: Connect high pressure hose (R) to relief fittings (BA, BB) of both PRESSURE RELIEF/SPRAY valves. Route hose back to component A and B drums. Refer to manual 309852.

Graco A-25 — Recirculation / Pressure Relief Lines diagram (page 19)
Fig. 15 · Recirculation / Pressure Relief Lines

Alternate recirculation hoses (requires adapter fittings):

FM

249508 - ISO (A) (moisture guard) red hose, 1/4 in. (6 mm) ID; #5 JIC fittings (m x f); 35 ft (10.7 m) long.

249509 - Resin (B) blue hose; 1/4 in. (6 mm) ID, #6 JIC fittings (m x f), 35 ft (10.7 m) long.

Graco A-25 — FM diagram (page 19)
Fig. 16

R

BB

4. Connect heated hose air line (AH) to proportioner air hose.

Install Fluid Temperature Sensor (FTS)

Install FTS between main hose and whip hose. See Heated Hose manual for instructions.

Setup

Page 20 of the Graco A-25 user manual — Close Gun Fluid Inlet Valves A and B
Page 20 · click to enlarge
Page 20
5. Connect cables (SS). Connect electrical connectors (NN). Be sure cables have slack when hose bends. Wrap cable and electrical connections with electrical tape.

Connect Whip Hose to Gun or Gun Fluid Manifold

For Probler P2 guns: Connect hoses to inlet valves.

Graco A-25 — Connect Whip Hose to Gun or Gun Fluid Manifold diagram (page 20)
Fig. 17 · Connect Whip Hose to Gun or Gun Fluid Manifold

For Fusion guns: Connect hoses to inlet manifold. Do not connect manifold to gun.

SS

1. Overlap A and B component hoses and assemble to gun or gun manifold fittings as shown.
2. Tighten fittings to A and B component hoses. Ensure hose remains flat after fittings are tightened. Loosen and retighten fittings as necessary to eliminate any torque on hoses. ti17787a
Graco A-25 — SS diagram (page 20)
Fig. 18

Close Gun Fluid Inlet Valves A and B

Graco A-25 — Close Gun Fluid Inlet Valves A and B diagram (page 20)
Fig. 19 · Close Gun Fluid Inlet Valves A and B

Fusion AP Gun shown.

Setup

Page 21 of the Graco A-25 user manual — Pressure Check Hose
Page 21 · click to enlarge
Page 21

Initial Startup

Graco A-25 — Initial Startup diagram (page 21)
Fig. 20 · Initial Startup
6. Purge air from hoses.

a. For Probler P2 guns: Loosen hose fittings and bleed out air until air-free fluid comes from hoses.

Do not operate Reactor without all covers and shrouds in place.

Load Fluid with Feed Pumps

b. For Fusion guns: Hold gun fluid manifold over two grounded waste containers. Open fluid valves A and B until clean, air-free fluid comes from valves. Close valves.

Graco A-25 — Load Fluid with Feed Pumps diagram (page 21)
Fig. 21 · Load Fluid with Feed Pumps

The Fusion AP Gun is shown.

1. Check that Setup process is complete; see page 15.
2. Turn on component B agitator, if used.
3. Turn both PRESSURE RELIEF/SPRAY valves (SA, SB) to SPRAY.
Graco A-25 — Load Fluid with Feed Pumps diagram (page 21)
Fig. 22 · Load Fluid with Feed Pumps

Pressure Check Hose

See hose manual. Pressure check for leaks. If no leaks, wrap hose and electrical connections to protect from damage.

5. Start feed pumps. Do not start proportioner air motor or pumps.
Graco A-25 — Pressure Check Hose diagram (page 21)
Fig. 23 · Pressure Check Hose

Always provide two grounded waste containers to keep component A and component B fluids separate.

Initial Startup

Page 22 of the Graco A-25 user manual — ° F ° C
Page 22 · click to enlarge
Page 22

Set Temperatures

6. Turn on and heat zones by pressing

for each zone.

See Setup, page 15.

7. Hold to view electrical currents for each

zone.

1. Turn main power ON .
8. Hold to view heater control circuit board tem-
2. Press or to change temperature

° F ° C

perature.

scale.

9. Manual current control mode only :
Graco A-25 — ° F ° C diagram (page 22)
Fig. 24
Graco A-25 — ° F ° C diagram (page 22)
Fig. 25

When in manual current control mode, monitor hose temperature with thermometer. Install per instructions below. Thermometer reading must not exceed 160°F (71°C). Never leave machine unattended when in manual current control mode.

or until display shows desired temper-

If FTS is disconnected or display shows diag- nostic code E04, turn main power switch OFF

then ON to clear diagnostic

startup, display will show hose current (0A). See step 9, page 22.

code and enter manual current control mode.

display will show current to hose. Current

Graco A-25 — ° F ° C diagram (page 22)
Fig. 26

is not limited by target temperature.

Do not turn on hose heat without fluid in hoses.

Press or to adjust current setting.

5. Turn on heat zone by pressing . Pre-

To prevent overheating, install hose thermome- ter close to gun end, within operator view. Insert thermometer through foam cover of A compo- nent hose so stem is next to inner tube. Ther- mometer reading will be about 20°F less than actual fluid temperature.

heat hose (15-60 min). Indicator will flash very slowly when fluid reaches target temperature. Dis- play shows actual fluid temperature in hose near FTS.

Graco A-25 — ° F ° C diagram (page 22)
Fig. 27

If thermometer reading exceeds 160°F (71°C),

reduce current with key.

Thermal expansion can cause over pressurization, resulting in equipment rupture and serious injury, including fluid injection. Do not pressurize system when preheating hoses.

Initial Startup

Page 23 of the Graco A-25 user manual — AK
Page 23 · click to enlarge
Page 23

Supply Wet-Cups with Throat Seal Liquid

Pump rod and connecting rod move during operation. Moving parts can cause serious injury such as pinching or amputation. Keep hands and fingers away from wet-cup during operation. Close main air valve before filling wet-cup.

1. Component A (ISO) Pump: Keep reservoir (Z) 3/4 filled with TSL. Wet-cup piston circulates TSL through wet-cup to carry away isocyanate film on displacement rod. Change the fluid in the reservoir when it becomes milky-looking.
2. Component B (Resin) Pump: Check felt washers in packing nut/wet-cup (AK) daily. Keep saturated with TSL to prevent material from hardening on displacement rod. Replace felt washers when worn or contaminated with hardened material.

AK

Z

Initial Startup

Page 24 of the Graco A-25 user manual — Spraying
Page 24 · click to enlarge
Page 24
Graco A-25 — Spraying diagram (page 24)
Fig. 28 · Spraying
1. After reaching spray temperatures, engage gun piston safety lock.
2. Close gun fluid inlet valves A and B.
6. Turn the air regulator counterclockwise to 0 pressure.

E L EC T RO N IC M O N I T O R IN G S Y S T E M

3. Attach gun fluid manifold. Connect gun air line. Open air line valve.
4. Set PRESSURE RELIEF/SPRAY valves (SA, SB) to SPRAY.

Spraying

Page 25 of the Graco A-25 user manual — GA
Page 25 · click to enlarge
Page 25
9. Slowly increase the air regulator setting until the approximate stall (static) pressure is achieved on fluid gauges (GA) and (GB).

Spray Adjustments

Flow rate, atomization, and amount of overspray are affected by four variables.

Graco A-25 — Spray Adjustments diagram (page 25)
Fig. 29 · Spray Adjustments

SB SA

  • Fluid pressure setting. Too little pressure results in an uneven pattern, coarse droplet size, low flow, and poor mixing. Too much pressure results in excessive overspray, high flow rates, difficult control, and excessive wear.

GA

GB

  • Fluid temperature. Effects are similar to when fluid pressure setting is too high or too low.
10. Check fluid pressure gauges (GA, GB) to ensure proper pressure balance. If imbalanced, reduce pressure of higher component by slightly turning PRESSURE RELIEF/SPRAY valve for that component toward PRESSURE RELIEF/CIRCULATION, until gauges show balanced pressures.
  • Mix chamber size. Choice of mix chamber is based on desired flow rate within machine capability and fluid viscosity.
  • Cleanoff air adjustment. Too little cleanoff air results in droplets building up on the front of the nozzle, and no pattern containment to control overspray. Too much cleanoff air results in air-assisted atomization and excessive overspray.
11. Open gun fluid inlet valves A and B.
Graco A-25 — GA diagram (page 25)
Fig. 30
12. Disengage gun piston safety lock.
Graco A-25 — GA diagram (page 25)
Fig. 31
13. Test spray onto cardboard. Adjust the air regulator to get the minimum fluid pressure that results in a good spray pattern.
14. Check A and B fluid pressure gauges (GA, GB) to ensure proper pressure balance between A and B.
15. Equipment is ready to spray.

Spraying

Page 26 of the Graco A-25 user manual — Pressure Relief Procedure
Page 26 · click to enlarge
Page 26

Park

5. Engage gun piston safety lock.
Graco A-25 — Park diagram (page 26)
Fig. 32 · Park

Park the pumps at the end of the day to cycle propor- tioner pumps to home position, submerging displace- ment rod.

Graco A-25 — Park diagram (page 26)
Fig. 33 · Park
6. Close gun fluid inlet valves A and B.
2. Trigger the gun until pumps stops at the bottom and relieves pressure.

Pressure Relief Procedure

Shutdown

1. Turn main heater power OFF .

The Fusion AP gun is shown.

2. Follow Park ; see page 26.
1. Turn off feed pumps and agitator if used.
3. Check and fill wet-cups (AK, Z).
2. Park component A pump. Follow Park ; see page 26.
4. Follow gun shutdown procedure. See gun manual.
3. Close the air inlet valve.
4. Trigger spray gun until gauges read zero.

Park

Page 27 of the Graco A-25 user manual — N
Page 27 · click to enlarge
Page 27

Flushing

Flush equipment only in a well-ventilated area. Do not spray flammable fluids. Do not turn on heaters while flushing with flammable solvents.

  • Flush out old fluid with new fluid, or flush out old fluid with a compatible moisture-free solvent.
  • Use lowest possible pressure when flushing.
  • To flush feed hoses, pumps, and the heater separately from the heated hoses, set PRESSURE RELIEF/SPRAY valves (SA, SB) to PRESSURE RELIEF/CIRCULATION. Flush through bleed lines (N).

N

SB SA

N

  • To flush entire system, circulate through gun fluid manifold (with manifold removed from gun).
  • Always leave hydraulic oil or a non-water based, non-water absorbent fluid in system. Do not use water.

Only use flush solvents that are compatible with Fluoroelastomer seals. Non-compatible solvents will damage seals and cause hazardous conditions, such as high pressure leaks.

Flushing

Page 28 of the Graco A-25 user manual — SB
Page 28 · click to enlarge
Page 28

Operation

Daily Start-up Procedure

8. Check that hose setpoint temperature is correct.
9. Turn on all three heat zones.
10. The hose power controller automatically adjusts the hose current to the hose to compensate for hose length and ambient temperature. Wait for actual hose temperature readout to match hose setpoint temperature.
Graco A-25 — Operation diagram (page 28)
Fig. 34 · Operation
1. Check condition isocyanate lubrication system and service as required. Change pump lubricant when it shows signs of change to a milky color.

To prevent excessive pressure build-up in heated hoses, always bring hoses and primary heater up to operating temperature before opening air motor shutoff valve.

2. Ensure supply fluid is at correct temperature as recommended by chemical system supplier. Ensure individual chemicals are correctly agitated within their drums/day tanks, and moisture protection system is properly set for operation. Recirculate heated fluid back to supply drums if necessary; see page 30.
11. Set PRESSURE RELIEF/SPRAY valves (SA, SB) to SPRAY.
3. Turn on main air supply to transfer pumps.
Graco A-25 — Operation diagram (page 28)
Fig. 35 · Operation

SA

Graco A-25 — SA diagram (page 28)
Fig. 36
4. Pressurize transfer pumps and open Aand B-inlet supply valves.

SB

12. Check that heat zones are on and temperatures are on target, page 22.
13. Open air motor shutoff valve.
14. Pumps will pressurize the fluid according to air regulator pressure.

Uncoil heated hoses before turning on hose heater switch to prevent overheating and hot spots within hose.

7. Uncoil heated hose.

Operation

Page 29 of the Graco A-25 user manual — GA GB
Page 29 · click to enlarge
Page 29
15. Check A and B fluid pressure gauges (GA, GB) to ensure proper pressure balance between A and B. If imbalanced, bleed off the high side with valves SA and SB until balanced.

GA GB

16. Open gun fluid manifold valves A and B.

The Fusion AP gun is shown.

Graco A-25 — GA GB diagram (page 29)
Fig. 37
17. Disengage gun piston safety lock.
Graco A-25 — GA GB diagram (page 29)
Fig. 38
18. Test spray onto cardboard.
19. Equipment is ready to spray.

Operation

Page 30 of the Graco A-25 user manual — SB
Page 30 · click to enlarge
Page 30

Fluid Circulation

Circulation Through Reactor

5. Set temperature targets, see page 22. Turn on
Graco A-25 — Fluid Circulation diagram (page 30)
Fig. 39 · Fluid Circulation

and heat zones by pressing .

Do not turn on heat zone unless hoses are

Do not circulate fluid containing a blowing agent without consulting with your material supplier regarding fluid temperature limits.

already loaded with fluid.

To circulate through gun manifold and preheat hose, see page 31.

6. Press to display actual temperatures.
1. Follow Initial Startup , page 21.

A

7. Turn the air regulator to a low pressure until
Graco A-25 — A diagram (page 30)
Fig. 40

B

and temperatures reach targets. Increase

the pressure once the temperatures are on target.

Do not install shutoffs downstream of the PRESSURE RELIEF/SPRAY valve outlets (BA, BB). The valves function as overpressure relief valves

8. Turn on heat zone by pressing .

when set to SPRAY . Lines must be open so valves can automatically relieve pressure when machine is operating.

9. Set PRESSURE RELIEF/SPRAY valves (SA, SB) to
Graco A-25 — B diagram (page 30)
Fig. 41
2. See Typical Installation, with Circulation , page 10. Route circulation lines back to respective component A or B supply drum. Use hoses rated at the maximum working pressure of this equipment. See Technical Data , page 37.

SB

3. Set PRESSURE RELIEF/SPRAY valves (SA, SB) to
Graco A-25 — SB diagram (page 30)
Fig. 42

Fluid Circulation

Page 31 of the Graco A-25 user manual — P
Page 31 · click to enlarge
Page 31

Circulation Through Gun Manifold

5. Set temperature targets, see page 22. Turn on

, , and heat zones by pressing

Do not circulate fluid containing a blowing agent without consulting with your material supplier regarding fluid temperature limits.

6. Press to display actual temperatures.

Circulating fluid through the gun manifold allows rapid preheating of hose.

7. Turn the air regulator to a low pressure until

A

1. Install gun fluid manifold (P) on accessory circulation kit (CK). Connect high pressure circulation lines (R) to circulation manifold.

B

and temperatures reach targets. Increase

the pressure once the temperatures are on target.

Graco A-25 — B diagram (page 31)
Fig. 43

P

R CK

The Fusion AP gun manifold is shown.

Table 1: Circulation Kit (CK) Part Gun Manual 246362 Fusion AP 309818 256566 Fusion CS 313058 GC1703 Probler P2 313213

2. Route circulation lines back to respective component A or B supply drum. Use hoses rated at the maximum working pressure of this equipment. See manual for installation instructions.
3. Follow Initial Startup , page 21.
4. Turn main power ON .

Fluid Circulation

Page 32 of the Graco A-25 user manual — AB
Page 32 · click to enlarge
Page 32

DataTrak Controls and Indicators

DataTrak Controls and Indicators

The DataTrak on the Reactor A-25 sprayers do not have runaway protection. For setup and operation instructions see DataTrak Operation, page 33.

Key for FIG. 4

AB Combined Lower Displacement (user settable)

RK Reset Key (Resets faults. Press and hold for 3 seconds to

clear the batch totalizer.) Push to toggle between flow rate and cycle rate. CF Cycle/Flow Rate BT Batch Totalizer GT Grand Totalizer RT Runaway Toggle (leave disabled)

AC Flow Rate Units (user settable to gpm [US], gpm

[Imperial], oz/min [US], oz/min [Imperial], l/min, or cc/min) AD LED (fault indicator when lit) AE Display PF Prime/Flush Key (Enables Prime/Flush mode. While in

Prime/Flush mode, the batch totalizer [BT] will not count.) LED will flash while in Prime/Flush mode.

GT

AE, see details at right

Graco A-25 — GT diagram (page 32)
Fig. 44
Graco A-25 — GT diagram (page 32)
Fig. 45

PF RK

CF BT

AD

RT

AC

Graco A-25 — PF RK diagram (page 32)
Fig. 46

AB

RK PF

FIG. 4. DataTrak Controls and Indicators

Show 4 more labels / short text on this page
/min, · Run Mode · ti8622b · Setup Mode TI11883a
Page 33 of the Graco A-25 user manual — Diagnostics
Page 33 · click to enlarge
Page 33

DataTrak Operation

Counter/Totalizer

See FIG. 4, page 32. The last digit of the batch totalizer (BT) represents tenths of gallons or liters. To reset the totalizer, press any key to wake up the display, then

press and hold for 3 seconds.

  • If AC is set to gallons or ounces, BT and GT display gallons.
  • If AC is set to liters or cc, BT and GT display liters.
  • If AC is set to cycles, BT and GT display cycles.

Setup Mode

1. See F IG . 4, page 32. Press and hold for 5 seconds until Setup menu appears.
2. To enter settings for lower size, flow rate units, and

Press to toggle between flow rate units and cycles. A letter under the BT display indicates that both BT and GT are displaying gallons (g) or liters (l). No letter means both BT and GT are displaying cycles.

disable runaway protection press to change the

value, then to save the value and move the cur- sor to the next data field.

Display

  • Set lower size to 98cc.
  • Disable runaway.

See FIG. 4, page 32. The display (AE) will turn off after 1 minute of inactivity in Run mode or 3 minutes in Setup mode. Press any key to wake up the display.

3. Move the cursor to the E5 error enable option field,

then press once more to exit Setup mode.

Run Mode

Prime/Flush

1. See F IG . 4, page 32. To enter Prime/Flush mode, press any key to wake up the display, then press

Diagnostics

See DataTrak Diagnostic Codes page 35.

. The Prime/Flush symbol will appear in the dis-

play and the LED will flash .

2. While in Prime/Flush mode, the batch totalizer (BT) will not count. The grand totalizer (GT) continues to count.
3. To exit Prime/Flush mode, press any key to wake up

the display, then press . The Prime/Flush sym- bol will disappear from the display and the LED will stop flashing.

DataTrak Operation

Page 34 of the Graco A-25 user manual — Maintenance
Page 34 · click to enlarge
Page 34

Maintenance

  • Check and add TSL to B side pump wet-cup daily.
  • Check ISO lube bottle for significant discoloration or crystallization daily. Replace with fresh TSL when needed.
  • Ensure ISO (A) pump is down and in PARK position during every shutdown.
  • Keep any ISO (A) fluid from being exposed to atmosphere to prevent crystallization.
  • Remove inlet filter screen plug (V, Y) and clean screens if increased unbalanced pressures between A and B is noticed or as needed for fluids used. Also clean after flushing.
  • Close gun fluid shutoff valves when not in use.
  • If using a Fusion AP or Probler P2 gun, add grease with grease gun per manual.
  • Clean gun filter screens and mix chamber ports regularly, or when increased unbalanced pressures between A and B is noticed. See gun manual.
  • Use lithium grease or Iso Pump Oil on all threaded fluid fittings on the “A” side.

Maintenance

Page 35 of the Graco A-25 user manual — DataTrak Diagnostic Codes
Page 35 · click to enlarge
Page 35

Diagnostic Codes

Temperature Control Diagnostic Codes

Temperature control diagnostic codes appear on tem- perature display.

Code Code Name Alarm Zone

01 High fluid temperature Individual

These alarms turn off heat. E99 clears automatically when communication is regained. Codes E03 through

02 High zone current Individual

03 No zone current Individual

E06 can be cleared by pressing . For other codes,

04 FTS or thermocouple disconnected Individual

05 Control board over temperature Individual

06 Communication cable unplugged Individual

turn main power OFF then ON to clear.

30 Momentary loss of communication All

99 Loss of communication All

See repair manual for corrective action. NOTE: For hose zone only, if FTS is disconnected at startup, display will show hose current 0A.

DataTrak Diagnostic Codes

DataTrak can diagnose several problems with the pump. When the monitor detects a problem, the LED (AD, FIG. 4) will flash and a diagnostic code will appear on the dis- play.

To acknowledge the diagnosis and return to the normal

operating screen, press once to wake up the display, and once more to clear the diagnostic code screen.

Symbol Code Code Name Diagnosis Cause

E-2 Diving Down Leak during downstroke. Worn intake valve.

E-3 Low Battery Battery voltage too low to stop runaway.

Low battery. Replace battery; see Reactor A-25 Repair manual.

E-6 Blown Fuse Fuse is blown. Replace fuse; see Reactor A-25 Repair manual.

  • Faulty solenoid or solenoid wiring.
  • Extreme temperatures (above 140°F [60°C]).

Diagnostic Codes

Page 36 of the Graco A-25 user manual — Dimensions
Page 36 · click to enlarge
Page 36

Dimensions

Graco A-25 — Dimensions diagram (page 36)
Fig. 47 · Dimensions
Graco A-25 — Dimensions diagram (page 36)
Fig. 48 · Dimensions

Dimension in. (mm) in. (mm) A 43.5 (1105) 43.5 (1105) B 29 (736.6) 21.5 (546) C 30 (762) 24.5 (622)

Dimensions

Page 37 of the Graco A-25 user manual — Technical Data
Page 37 · click to enlarge
Page 37

Technical Data

Category Data Maximum Fluid Working Pressure 2000 psi (14 MPa, 138 bar) Maximum Air Supply Pressure 125 psi (0.9 MPa, 9 bar) Maximum Air Working Pressure 80 psi (550 kPa, 5.5 bar) Pressure Ratio 25:1 Air consumption with 02 tip at 1500 psi stall pres- sure

28 scfm (0.8m3/min)

Machine Maximum Power with hose 9000 Watts Voltage Requirement (50/60 Hz)

230 V, 1 Phase 230 V, 3 Phase (Delta) 380 V, 3 Phase (WYE 220 V to Neutral) Amperage Requirement (Full Load Peak)* 40 amps @ 230 V, 1 Phase 32 amps @ 230 V, 3 Phase 18.5 amps @ 380 V, 3 Phase Maximum Heater Fluid Temperature 190 °F (88 °C) Maximum Hose Fluid Temperature 180 °F (82 °C) Maximum Ambient Temperature 120 °F (49 °C) Maximum Output 25 lb/min. (11.4 kg/min.) Output Per Cycle (A and B) 0.025 gal/cycle (0.095 ltr/cycle) Heater Power 6000 Watts Hose Power 2790 Watts Sound Pressure (see NXT air motor manual) 70.2 dB(A) Sound Power (see NXT air motor manual) 80.1 dB(A) Viscosity Range 250-1500 centipoise (typical) Maximum Fluid Inlet Pressure 300 psi (2.1 MPa, 21 bar) or 15% of output pressure Fluid Inlet/Strainer Filter 20 mesh standard Air inlet Filter Mesh 40 Micron Component B (Resin) Inlet 3/4 npt(f) swivel Component A (Isocyanate) Inlet 3/4 npt(f) swivel Recirculation/Block Hose Connections Iso (A) side: #5 JIC (m); Resin (B) side: #6 JIC (m) Maximum Heated Hose Length*** 210 ft of 3/8 ID Weight 310 lb (140.6 kg) Wetted Parts Carbon steel, stainless steel, chrome, aluminum, Fluoroelastomer, PTFE, nylon

(230 V Nominal195-253 VAC) (380 V Nominal: 338-457 VAC)

*Full load amps with all devices operating at maximum capabilities with 210 ft (64.1 m) of hose.

***210 ft (64 m) of heated hose will produce the maximum allowable heat capacity. 310 ft (94 m) of heated hose may be used, but will have 25% less heat capacity.

Technical Data

Page 38 of the Graco A-25 user manual — Graco Information
Page 38 · click to enlarge
Page 38

Graco Standard Warranty

Graco warrants all equipment referenced in this document which is manufactured by Graco and bearing its name to be free from defects in material and workmanship on the date of sale to the original purchaser for use. With the exception of any special, extended, or limited warranty published by Graco, Graco will, for a period of twelve months from the date of sale, repair or replace any part of the equipment determined by Graco to be defective. This warranty applies only when the equipment is installed, operated and maintained in accordance with Graco’s written recommendations.

This warranty does not cover, and Graco shall not be liable for general wear and tear, or any malfunction, damage or wear caused by faulty installation, misapplication, abrasion, corrosion, inadequate or improper maintenance, negligence, accident, tampering, or substitution of non-Graco component parts. Nor shall Graco be liable for malfunction, damage or wear caused by the incompatibility of Graco equipment with structures, accessories, equipment or materials not supplied by Graco, or the improper design, manufacture, installation, operation or maintenance of structures, accessories, equipment or materials not supplied by Graco.

This warranty is conditioned upon the prepaid return of the equipment claimed to be defective to an authorized Graco distributor for verification of the claimed defect. If the claimed defect is verified, Graco will repair or replace free of charge any defective parts. The equipment will be returned to the original purchaser transportation prepaid. If inspection of the equipment does not disclose any defect in material or workmanship, repairs will be made at a reasonable charge, which charges may include the costs of parts, labor, and transportation.

THIS WARRANTY IS EXCLUSIVE, AND IS IN LIEU OF ANY OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO WARRANTY OF MERCHANTABILITY OR WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE.

Graco’s sole obligation and buyer’s sole remedy for any breach of warranty shall be as set forth above. The buyer agrees that no other remedy (including, but not limited to, incidental or consequential damages for lost profits, lost sales, injury to person or property, or any other incidental or consequential loss) shall be available. Any action for breach of warranty must be brought within two (2) years of the date of sale.

GRACO MAKES NO WARRANTY, AND DISCLAIMS ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, IN CONNECTION WITH ACCESSORIES, EQUIPMENT, MATERIALS OR COMPONENTS SOLD BUT NOT MANUFACTURED BY GRACO. These items sold, but not manufactured by Graco (such as electric motors, switches, hose, etc.), are subject to the warranty, if any, of their manufacturer. Graco will provide purchaser with reasonable assistance in making any claim for breach of these warranties.

In no event will Graco be liable for indirect, incidental, special or consequential damages resulting from Graco supplying equipment hereunder, or the furnishing, performance, or use of any products or other goods sold hereto, whether due to a breach of contract, breach of warranty, the negligence of Graco, or otherwise.

FOR GRACO CANADA CUSTOMERS The Parties acknowledge that they have required that the present document, as well as all documents, notices and legal proceedings entered into, given or instituted pursuant hereto or relating directly or indirectly hereto, be drawn up in English. Les parties reconnaissent avoir convenu que la rédaction du présente document sera en Anglais, ainsi que tous documents, avis et procédures judiciaires exécutés, donnés ou intentés, à la suite de ou en rapport, directement ou indirectement, avec les procédures concernées.

Graco Information

For the latest information about Graco products, visit www.graco.com

TO PLACE AN ORDER, contact your Graco distributor or call to identify the nearest distributor. Phone: 612-623-6921 or Toll Free: 1-800-328-0211 Fax: 612-378-3505

All written and visual data contained in this document reflects the latest product information available at the time of publication.

Graco reserves the right to make changes at any time without notice.

For patent information, see www.graco.com/patents

Original instructions. This manual contains English. MM 3A1569

Graco HeadquartersMinneapolis International Offices: Belgium, China, Japan, Korea
  • GRACO INC. AND SUBSIDIARIES
  • P.O. BOX 1441
  • MINNEAPOLIS MN 55440-1441
  • USA

Copyright 2011, Graco Inc. All Graco manufacturing locations are registered to ISO 9001.

www.graco.com Revised July 2013

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Display codes

Error codes

What the fault codes shown on the display mean and how to clear them.

CodeMeaningFix
E-2Leak during downstroke. p.35
E-3Battery voltage too low to stop runaway. p.35
E-6Fuse is blown. Replace fuse; see Reactor A-25 Repair manual. p.35

Ask about the Graco A-25

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Graco A-25

Be the first to ask — other owners or our team will answer.

Original document

Graco A-25 manual PDF

38 pages·5.2 MB·Outboard Motor·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…