SG Series
g
2500 Discovery Blvd.
General Electric Company · Rockwall, TX 75032

Author:
Identification No.:
1.1 “3-wire kit” for RPA Parallel System 11/05/2003 COPYRIGHT © 2003 by GE Industrial Systems
All rights reserved.
The information contained in this publication is intended solely for the purposes indicated.
The present publication and any other documentation supplied with the UPS system is not to be reproduced, either in part or in its entirety, without the prior written consent of GE Industrial Systems.
The illustrations and plans describing the equipment are intended as general reference only and are not necessarily complete in every detail.
The content of this publication may be subject to modification without prior notice.
OPM_SGS_ISG_M22_M30_0US_V011.doc 2/38 Installation Guide SG Series 225 & 300 kVA
Up-dating · Revision Concern Date

Dear Customer, We thank you for selecting our products and are pleased to count you amongst our very valued customers at GE. We trust that the use of the SG Series Uninterruptible Power Supply system, developed and produced to the highest standards of quality, will give you complete satisfaction. Please carefully read the Installation Guide. It contains all the necessary information about the installation of the UPS.
START UP AND COMMISSIONING A GE Global Services Field Engineer must perform start-up and commissioning of the UPS. Please Contact G.E. Global Services at least two weeks prior to schedule start-up and commissioning at 1-800-637-1738, or by E-mail at gedeservices@indsys.ge.com
General Electric Company 6595 Riazzino (Locarno) Switzerland
OPM_SGS_ISG_M22_M30_0US_V011.doc 3/38 Installation Guide SG Series 225 & 300 kVA

Congratulations on your choice of a SG Series Uninterruptible Power Supply (UPS). It will help eliminate load disturbances due to unexpected power problem. This manual describes how to prepare the installation site, and it provides weight and dimensions and procedures for moving, installing and connecting the UPS. Please refer to the Operating Manual, which describes the function of the UPS module, the purpose and location of the switches, the meaning of the system events related to the front panel indication, and provides procedures for starting and stopping the equipment. While every care has been taken to ensure the completeness and accuracy of this manual, GE Industrial Systems assumes no responsibility or liability for any losses or damages resulting from the use of the information contained in this document.
SG Series 225 and 300 kVA, is a product that needs to be installed by a licensed and knowledgeable contractor.
We recommend that this manual be kept next to the UPS for future references. If any problems are encountered with the procedures contained in this manual, please contact your Service Center before you proceed. This document shall not be copied or reproduced without the permission of GE Industrial Systems. Some of the information contained in this manual may be changed without notice to reflect technical improvements.
Read the safety instructions contained on the following pages carefully before the installation of the UPS, options and battery system. Pay attention to the rectangular boxes included in the text: They contain important information and warning concerning electrical connections and personnel safety.
When included in the text, this symbol refers to operation needed only for parallel system.
OPM_SGS_ISG_M22_M30_0US_V011.doc 4/38 Installation Guide SG Series 225 & 300 kVA



This manual contains important instructions for models SG Series 225 and 300 kVA that should be followed during installation and maintenance of the UPS and battery.
- Move the UPS in an upright position in its original package to the final destination room. To lift the cabinets, use a forklift or lifting belts with spreader bars. - Check for sufficient floor and elevator loading capacity. - Check the integrity of the UPS equipment carefully.
If you notice visible damage, do not install or start the UPS. Contact the nearest Service Center immediately. - WARNING! RISK OF ELECTRICAL SHOCK: Do not remove covers; there are no user serviceable parts inside. - All maintenance and service work should be performed by qualified service personnel. The UPS contains its own energy source (battery). - The field-wiring terminals may be electrically live, even when the UPS is disconnected from the utility. - Dangerous voltages may be present during battery operation. The battery must be disconnected during maintenance or service work. - This UPS contains potentially hazardous voltages. - Be aware that the inverter can restart automatically after the utility voltage is restored.
- This UPS must be installed and connected only by trained personnel. - Verify accurately during Commissioning and Maintenance of the UPS, for the following:
Damaged components, squeezed wires and cables, or not correctly inserted plugs. - After removing the sidewalls of the UPS, make sure that all earth connections when reassembling, are correctly reattached - This UPS is intended for use in a controlled indoor environment free of conductive contaminants
and protected against animals intrusion. - HIGH GROUND LEAKAGE CURRENT: Ground connection is essential before connecting to AC input! - Switching OFF the unit does not isolate the UPS from the utility. - Do not install the UPS in an excessively humid environment or near water. - Avoid spilling liquids on or dropping any foreign object into the UPS. - The unit must be placed in a sufficiently ventilated area; the ambient temperature should not exceed 104°F (40°C). - Optimal battery life is obtained if the ambient temperature does not exceed 77°F (25°C). - It is important that air can move freely around and through the unit. Do not block the air vents. - Avoid locations in direct sunlight or near heat sources.
- Store the UPS in a dry location; storage temperature must be within -13°F (-25°C) to 131°F (55°C). - If the unit is stored for a period exceeding 3 months, the battery must be recharged periodically (time depending on storage temperature).
- The battery-voltage is dangerous for person’s safety. - When replacing the battery, use the same number, voltage (V) and capacity (Ah). - Proper disposal or recycling of the battery is required.
Refer to your local codes for disposal requirements. - Never dispose of battery in a fire: They may explode. - Do not open or mutilate battery: Their contents (electrolyte) may be extremely toxic. If exposed to electrolyte, wash immediately with plenty of water. - Avoid charging in a sealed container. - Never short circuit battery. When working with battery, remove watches, rings or other metal objects, and only use insulated tools.
OPM_SGS_ISG_M22_M30_0US_V011.doc 6/38 Installation Guide SG Series 225 & 300 kVA

EXTERNAL BATTERY MUST BE INSTALLED AND CONNECTED TO THE UPS BY QUALIFIED SERVICE PERSONNEL. INSTALLATION PERSONNEL MUST READ THIS ENTIRE SECTION AND REFER TO THE BATTERY MANUFACTURERS INSTALLATION MANUAL BEFORE HANDLING THE UPS AND BATTERY. UPS intended to be used with a remote battery supply – All models: “Please refer to the battery manufacturer’s installation manual for battery installation and maintenance instructions”.
DANGER! Full voltage and current are always present at the Battery Terminals. The Battery used in this system can provide dangerous voltages, extremely high currents and a risk of electric shock. They may cause severe injury if the terminals are shorted together or to ground. You must be extremely careful to avoid electric shock and burns caused by contacting Battery Terminals or shorting terminals during battery installation. Do not touch un insulated Battery Terminals.
A qualified service person that is familiar with Battery systems and required precautions must install and service the Battery. The installation must conform to national and local codes. Keep unauthorized personnel away from Battery.
The qualified service person must take these precautions:
1 Wear protective clothing, such as rubber gloves and boots and protective eye wear. Batteries contain caustic acids and toxic materials and can rupture or leak if mistreated. Remove rings and metal wristwatches or other metal objects and jewelry. Do not carry metal objects in your pockets where the objects can fall into the Battery Cabinet.
2 Tools must have insulated handles and must be insulated so that they will not short Battery Terminals. Do not allow a tool to short between individual or separate Battery Terminals or to the cabinet or rack. Do not lay tools or metal parts on top of the Battery, and do not lay them where they could fall onto the Battery or into the cabinet.
3 Install the Battery as shown on the drawing provided with the Battery. When connecting cables, never allow a cable to short across a Battery’s Terminals, the string of batteries, or to the cabinet or rack.
4 Align the cables on the Battery Terminals so that the cable lug will not contact any part of the cabinet or rack, even if the Battery is moved. Keep the cable away from any sharp metal edges.
5 Install the Battery Cables so the UPS or Battery Cabinet Doors cannot pinch them.
6 Do not connect the Battery Terminal to Ground. If any Battery Terminal is inadvertently grounded, remove the source of the ground. Contacting any part of a grounded Battery can cause a risk of electric shock.
7 To reduce the risk of fire or electric shock, install the Battery in a temperature and humidity controlled indoor area, free of contaminants.
8 Battery System Chassis Ground (earth) must be connected to the UPS chassis ground (earth). If you use conduit, this ground conductor must be routed in the same conduit as the Battery Conductors.
9 Where conductors may be exposed to physical damage, protect the conductors in accordance with all applicable codes.
10 If you are replacing Battery or repairing Battery Connections, shut OFF the UPS and remove the Battery Fuses or open the Battery System disconnect.
OPM_SGS_ISG_M22_M30_0US_V011.doc 7/38 Installation Guide SG Series 225 & 300 kVA

Safety symbols and warnings Safety warnings The text of this manual contains some warnings to avoid risk to the persons and to avoid damages to the UPS system and the supplied critical loads. The non-observance of the warnings reminding hazardous situations could result in human injury and equipment damages. Please pay attention to the meaning of the following warnings and symbols. Throughout this manual the following symbols are defined:
PE (Earth) – GND (Ground) PROTECTIVE GROUNDING TERMINAL: A terminal which must be connected to earth ground prior to making any other connection to the equipment.
A terminal to which or from which an alternating (sine wave) current or voltage may be applied or supplied.
A terminal to which or from which a direct current or voltage may be applied or supplied.
This symbol indicated the word “phase”.
This symbol indicates the principal on/off switch in the on position.
This symbol indicates the principal on/off switch in the off position.
OPM_SGS_ISG_M22_M30_0US_V011.doc 8/38 Installation Guide SG Series 225 & 300 kVA

2.1 LAYOUT SG Series 225 AND 300 KVA

Fig. 2.1-1 SG Series general view
Fig. 2.1-2 SG Series general view with open doors

1 Opening for top cable entry 2 Opening for bottom cable entry 3 Compression lugs for Utility input and Load output 4 Compression lugs for external Battery connection CR Connectivity Rack PA 24VDC / 1A Auxiliary Power
Supply XA Terminals for 24VDC Auxiliary Power Supply connection XB Terminals for EPO connection
Fig. 2.1-3 SG Series general view with optional 5th harmonic filter and removed protection panels
OPM_SGS_ISG_M22_M30_0US_V011.doc 9/38 Installation Guide SG Series 225 & 300 kVA

Transport UPS only in upright position!

The UPS is packaged on a pallet suitable for handling with a forklift.
Pay attention to the center of gravity.
The UPS must be moved in upright position. Do not tilt cabinets more than +/- 10° during handling.

Move the UPS in it’s original package to the final destination site.
Do not stack other packages on top: This could damage the UPS.
If the UPS must be lifted by crane, use suitable lifting straps and spreader bars. Note of the center of gravity marked on the package.
Check for sufficient floor and elevator loading capacity.
Fig. 3.1-1 UPS cabinets moving
3.1.1 Dimensions and weight


W D Fig. 3.1.1-1 UPS cabinet dimensions

SG Series 225 kVA 2,756 / 1,250 194 / 947 SG Series 300 kVA 3,087 / 1,400 218 / 1,061
P.S.: Weights including the 5th harmonic filter.
OPM_SGS_ISG_M22_M30_0US_V011.doc 10/38 Installation Guide SG Series 225 & 300 kVA
Forklift · Crane

When delivered, inspect the package integrity and the physical conditions of the cabinets carefully. In case of any damage sustained during transport, immediately inform the carrier and contact your local Service Center. A detailed report of the damage is necessary for any insurance claim.
A DAMAGED UPS MUST NEVER BE INSTALLED OR CONNECTED TO UTILITY OR BATTERY!
3.3.1 Storage of the UPS
The UPS is carefully packed for transport and storage so that it is in perfect condition when installed. Never leave a UPS outside the building and don’t store other packages on the top of the UPS. It is advisable to store the UPS in its original package in a dry, dust-free room, away from chemical substances, and with a temperature range not exceeding -13°F (-25°C) to 131°F (55°C). Some important functions of the UPS, such as the customized functions, are defined by parameters stored in a RAM memory. A small backup Battery located on the Control Unit board supplies the RAM. If the storage time of the UPS exceeds 1 year, these functions should be verified by an authorized Service Center before putting the UPS into operation.
3.3.2 Storage of Battery
When the delivery includes a maintenance free Battery, keep in mind that they are subject to self-discharge and therefore you must recharge the Battery. The storage time without Battery recharge depends on the temperature of the storage site. The optimal temperature for Battery storage is 68°F (20°C) to 77°F (25°C).
Recharge stored maintenance free Battery every:
6 months when the storage temperature is 68°F (20°C)
3 months when the storage temperature is 86°F (30°C)
2 months when the storage temperature is 95°F (35°C)
OPM_SGS_ISG_M22_M30_0US_V011.doc 11/38 Installation Guide SG Series 225 & 300 kVA

3.4.1 UPS location

A qualified electrical contractor must carry out the installation and cabling of the UPS. If optional cabinets and accessories are included with the UPS, please refer to those accompanying manuals for installation and operating instructions.
It is important to have a clean, dust-free environment provided with proper ventilation and air- conditioning to keep the ambient temperature within the specified operating range. The recommended air inlet temperature is from 68°F (20°C) to 77°F (25°C) (max. 95°F / 35°C). Refer to section 3.5. Check for sufficient floor load capacity before installing the UPS and the Battery. Refer to section 3.1.1. For Battery installation follow the local codes and the recommendation of the battery supplier.
Temperature is very important for valve-regulated batteries (maintenance free). Operation at temperatures higher than 77°F (25°C) will reduce battery life. The SG Series UPS can radiate radio frequency energy. Although some RFI filtering is inherent to the UPS there is no guarantee that the UPS will not influence sensitive devices such as cameras and monitors that are positioned close by. If interference is expected, the UPS should be moved away from the sensitive equipment. A single-phase power outlet (120 VAC) should be provided near the UPS for connection of power tools, test equipment or connectivity devices. This outlet must be grounded.
Positioning of the UPS SG Series
Min. 16" / 400mm
The rear panel of the UPS may be mounted flush to a wall or other structure. Clearance around the front of the unit should be sufficient to enable free passage of personnel with the doors fully open, and to allow sufficient airflow to the door vents. Check section 110-26(A) of the NEC code for specific requirements. Recommended minimum clearance between ceiling and top of the UPS should be 16” (400 mm) for proper cooling air exhaust. In case of additional cabinets (external Batteries or input, output transformers) these can be placed on either side of the cabinet.
Fig. 3.4.1-1 SG Series 225 and 300 kVA clearances
OPM_SGS_ISG_M22_M30_0US_V011.doc 12/38 Installation Guide SG Series 225 & 300 kVA
SGS_225-300_UPS disposition_GE_01


SG Series openings are provided on the top and the bottom of the UPS for the connection of input and output cables. Pay attention to the position of these openings, when choosing the placement of the UPS. These openings are covered with a protective plate.
Fig. 3.4.1-2 Opening on top of the cabinet for input and output cables
Fig. 3.4.1-3 Opening on the bottom of the cabinet for input and output cables

The UPS cabinet is free standing and normally does not require to be bolted to the floor. The UPS cabinet can be fixed however to the floor by bolting it with the supporting blocks to the floor.
Fig. 3.4.1-4 Fixing of the UPS cabinet on the floor
OPM_SGS_ISG_M22_M30_0US_V011.doc 13/38 Installation Guide SG Series 225 & 300 kVA


In case of parallel system, try to place the UPS modules in sequence of their numbers (marked on the packing).
If the units are positioned “side by side”, the side panels must be mounted on all units.
Fig. 3.4.1-5 RPA system disposition
3.4.2 Battery location
Batteries require a well-ventilated room with controlled temperature to obtain reliable operation. The Battery can be install immediately adjacent to the UPS (left or right side) or remotely from the UPS. If the Battery is installed remotely from the UPS, a wall mounted DC disconnect device must be installed within line-of-site to both the UPS and the Battery. The optimal room temperature for the Battery is 68°F (20°C) to 77°F (25°C). The life of valve-regulated batteries will be reduced by 50% for each additional 18°F (10°C) that the Battery ambient temperature is above 77°F (25°C). The Battery System associated with larger UPS is usually either rack mounted or installed in multiple Battery Cabinets. Installation and assembly must be made according to the local standards and Battery System manufacturer‘s recommendations. The Battery Circuit Breaker or Battery Fuse Box must be mounted as near as possible to the Battery.

Battery installation and connection must be performed by qualified personnel only.
Read all safety instructions before proceeding with the installation.
OPM_SGS_ISG_M22_M30_0US_V011.doc 14/38 Installation Guide SG Series 225 & 300 kVA


Fig. 3.5-1 Installation on plain floor Fig. 3.5-2 Installation on raised floor
The heat produced by the UPS is transferred to the environment by its ventilation. Air inlets for UPS ventilation are located on the front of the UPS, while air outlets are on top of the cabinet. A suitable ventilation or cooling system must be installed to extract the heat from the UPS room.
Do not put anything on the top of the cabinet.
Air filtration systems could be required when the UPS operates in a dirty environment. Contact your Dealer or the nearest Service Center for appropriate solutions. In order to prevent overheating of the UPS, the available air intake flow rate must exceed the total air exhaust flow rate requirement of the UPS system. The below table indicates the heat dissipation at full Load at PF = 0.8 lag. and charged Battery, up to 3,280 ft (1,000 m) altitude, for cooling air 77°F (25°C) to 86°F (30°C).
Losses Cooling air flow UPS rating
BTU / hr kW CFM m3 / h
SG Series 225 kVA 50,512 14.80 2,541 4,317
SG Series 300 kVA 64,164 18.80 3,228 5,484
OPM_SGS_ISG_M22_M30_0US_V011.doc 15/38 Installation Guide SG Series 225 & 300 kVA

The UPS and Battery Cabinets may be shipped packaged in carton boxes or in wooden crates (if requested). Move the cabinets as close as possible to the final location before removing from the pallet. If delivered in a wooden crate, remove the cabinet from the pallet with care, because of the heavy weight of the equipment.
Take care not to damage the UPS when moving by forklift.
For parallel systems, the delivery also includes the bus control cables for inter-connecting the UPS modules.

Packing material recycling GE Industrial Systems, in compliance with environment protection, uses only environmentally friendly material. UPS packing materials must be recycled in compliance with all applicable regulations.
OPM_SGS_ISG_M22_M30_0US_V011.doc 16/38 Installation Guide SG Series 225 & 300 kVA

UPS installation and connection must be performed by qualified service personnel only. It is the responsibility of the installation technician to ensure that all local and national electric codes are adhered to.
3.7.1 Utility input connection
Ensure that the AC and DC external isolators are OFF and locked out to prevent their inadvertent operation. Do not apply power to the equipment prior to the commissioning by a qualified service engineer. Before any other input connection, connect and check the grounding wire.
The UPS has available input terminations for the Rectifier and Bypass. The unit may be powered from a common input source or separate input sources if desired.
Separate input Rectifier & Bypass (recommended)
The Bypass and Rectifier Inputs are to be powered from different Utility supplies (F1 and F2 inputs). In this case, when the Rectifier Input Fuses are opened, the Bypass and the Manual Bypass are supplied by the other source.
In this case, remove the interconnection links BR1, BR2 and BR3 on the input terminals or bus bars. See Fig. 3.8.3-2.
Common input Rectifier & Bypass
The same power source is to be used for both Bypass Supply and Rectifier Input (input F3). Bear in mind that when the Utility Fuses are opened there is a supply failure to the Rectifier as well as to the Bypass and Manual Bypass.
In this case, the interconnection links BR1, BR2 and BR3 on the input terminals or bus bars must remain connected. See Fig. 3.8.3-2.
Separate input Rectifier & Bypass (recommended) Common input Rectifier & Bypass

Fig. 3.7.1-1 Separate input Rectifier & Bypass Fig. 3.7.1-2 Common input Rectifier & Bypass 1 = Rectifier 2 = Inverter 3 = Automatic Bypass 4 = Manual Bypass 6 = Load 5 = Utility input 7 = Battery
OPM_SGS_ISG_M22_M30_0US_V011.doc 17/38 Installation Guide SG Series 225 & 300 kVA

3.7.2 Input/output over current protection and wire sizing
The cabling of the UPS system has to be sized according to the UPS power rating. Sizing of circuit breakers, fuses and cables for Input Utility, Output Load and Battery must meet the requirements of local and national electrical codes. Before connecting the UPS, verify that the Utility Voltage and Frequency, the Output Load Voltage and Frequency and Battery Data (cells number, floating voltage, autonomy) are according to the required specifications. Output Load configuration may be such that one phase may carry a Load current at 100% of that phases maximum current rating while the other two phases run at 0% or any combination in between. Ensure that the Load does not consist of any equipment that may require high starting currents such as electric motors, laser printers, etc. This may cause the UPS to occasionally go into Bypass due to overload conditions To choose the correct input fuses or circuit breaker, consider the available short-circuit current of the system up-stream. Choose the correct fuse or breaker using current data shown in the chart and the appropriate NEC code. The ratings indicated in the following chart do not consider any line voltage drop. In case of optional input transformer the input protective devices should be sized to allow the transformer magnetization inrush current. Caution when using four-pole circuit breakers as protection. A potential problem exists for situations with Non-linear Loads: The neutral current could be greater than the phase currents. The three-phase Utility power supply must be symmetrical with respect to ground, due to the existence of voltage surge protection devices inside the UPS.
If you use ELCB breaker (Earth Limiting Circuit Breaker) to protect the input connections, consider the high leakage current generated by the noise suppression capacitors. If these ELCB breakers are strictly necessary, we suggest using the largest type suitable for non-linear current and for delayed operations. To ensure coordination when the UPS is configured for separate Bypass and Rectifier Inputs, special care must be taken in choosing the fuse or circuit breaker ratings installed in the output distribution circuits. Protective devices on the output of the UPS should be coordinated with the Bypass Input circuit protection. Due to the relatively low short circuit capability of the UPS inverter, a short circuit in the Load will cause an immediate transfer to Bypass. The largest fuse or circuit breaker in the output distribution should be rated at no more than 60% of the rating of the protective device supplying the Bypass line. If circuit selectivity is required while the Load is fed from the inverter (Bypass Utility not available), the largest fuse or circuit breaker should be rated at no more than 20% of the UPS output current rating.
OPM_SGS_ISG_M22_M30_0US_V011.doc 18/38 Installation Guide SG Series 225 & 300 kVA

3.7.3 Battery over current protection and wire sizing
The AC values below are current ratings per phase. These maximum and nominal ratings should be considered when choosing the
appropriate AC over current protection device. NEC (National Electric Code) Section 210-20 a rules must be applied. DC current rating is the maximum battery discharge current which the UPS allows.
(See Fig. 3.7.1-1 and 3.7.1.2) AC Input
Bypass AC Input DC Input
Nom. Max. F2 Nom. Max. F4
SG Series 225 kVA 301 A 360 A 271 A 301 A 360 A 401 A SG Series 300 kVA 401 A 480 A 361 A 401 A 480 A 535 A
Size of Branch Circuit Over current Protection - All Models: - "CAUTION - To reduce
the risk of fire, only connect UPS to a circuit provided with (See below) maximum
amperes branch circuit over current protection in accordance
with the NEC (National Electric Code), NSI / NFPA 70
Bypass AC Input DC Input
F1 F2 F3 F4 SG Series 225 kVA 450 A 350 A 450 A 600 A SG Series 300 kVA 600 A 500 A 600 A 700 A
WIRING Wire sizing according to NEC Section 210-20 (a) Table 310-16 Use 75°C (167°C) copper wire Wiring requirements: AC INPUT RECTIFIER: 3-Phase, 3 wire plus Ground AC INPUT BYPASS: 3-Phase, 4 wire plus Ground AC OUTPUT: 3-Phase, 4 wire plus Ground DC INPUT: 2 wire (positive and negative) plus Ground

Maximum cable diameter that compression lugs can accept. Refer to torque specifications table for torque requirements. Rectifier Input Bypass Input DC Input AC Output GND SG Series 225 kVA 2 x 500 kcmil 2 x 500 kcmil 2 x 750 kcmil 2 x 500 kcmil 350 kcmil SG Series 300 kVA 2 x 750 kcmil 2 x 500 kcmil 2 x 750 kcmil 2 x 500 kcmil 350 kcmil
OPM_SGS_ISG_M22_M30_0US_V011.doc 19/38 Installation Guide SG Series 225 & 300 kVA

NEC SECTION 210-20 (a) Table 310-16. Allowable Ampacities of Insulated Conductors Rated O Through 2000 Volts, 60°C Trough 90°C (140°F Trough 194°F) Not More than Three Current-Carrying Conductors in Raceway, Cable, or Earth (Directly Buried), Based on Ambient Temperature of 30°C (86°F).
Size Temperature Rating of Conductor (See table 310-13)
60°C (140°F) 75°C (167°F) 90°C (194°F) 60°C (140°F) 75°C (167°F) 90°C (194°F)
Types FEPW, RH, RHW, THHW,
Types TBS, SA, SIS, FEP, FEPB, MI,
Types TBS, SA, SIS, THHN, THHW,
AWG
THW, THWN,
RHH, RHW-2, THHN, THHW,
THW-2, THWN-2, RHH, RHW-2, USE-2,
XHHW, USE,
XHHW, USE
ZW
THW-2, THWN-2, USE-2,
XHH, XHHW,
XHH, XHHW, XHHW-2,ZW-2
XHHW-2,
ZW-2
COPPER ALUMINUM or COPPER-CLAD ALUMINUM
18 --- --- 14 --- --- --- 16 --- --- 18 --- --- --- 14 20 20 25 --- --- --- 12 25 25 30 20 20 25 10 30 35 40 25 30 35 8 40 50 55 30 40 45 6 55 65 75 40 50 60 4 70 85 95 55 65 75 3 85 100 110 65 75 85 2 95 115 130 75 90 100 1 110 130 150 85 100 115 1/0 125 150 170 100 120 135 2/0 145 175 195 115 135 150 3/0 165 200 225 130 155 175 4/0 195 230 260 150 180 205 250 215 255 290 170 205 230 300 240 285 320 190 230 255 350 260 310 350 210 250 280 400 280 335 380 225 270 305 500 320 380 430 260 310 350 600 355 420 475 285 340 385 700 385 460 520 310 375 420 750 400 475 535 320 385 435 800 410 490 555 330 395 450 900 435 520 585 355 425 480 1000 455 545 615 375 445 500 1250 495 590 665 405 485 545 1500 520 625 705 435 520 585 1750 545 650 735 455 545 615 2000 560 665 750 470 560 630 CORRECTION FACTORS
Ambient Temp. (°C)
For ambient temperatures other than 30°C (86°F), multiply the allowable ampacities shown above by the
appropriate factor below 21 - 25 1.08 1.05 1.04 1.08 1.05 1.04 26 - 30 1.00 31 - 35 0.91 0.94 0.96 0.91 0.94 0.96 36 - 40 0.82 0.88 0.91 0.82 0.88 0.91 41 - 45 0.71 0.82 0.87 0.71 0.82 0.87 46 - 50 0.58 0.75 0.82 0.58 0.75 0.82 51 - 55 0.41 0.67 0.76 0.41 0.67 0.76
OPM_SGS_ISG_M22_M30_0US_V011.doc 20/38 Installation Guide SG Series 225 & 300 kVA

3.8.1 Power connections
Input/output and DC connections are provided with compression lugs. Please refer to chart for torque specifications. Carefully read the following recommendations before proceeding: • Ensure that the AC and DC external isolators are OFF and locked to prevent their inadvertent operation.
Torque Specifications Mechanical Compression Lugs Input / Output / Battery and GND
WIRE SIZE RANGE
1/0 – 2/0 180 20.3 500 – 750 375 42.4
OPM_SGS_ISG_M22_M30_0US_V011.doc 21/38 Installation Guide SG Series 225 & 300 kVA


How to access the compression lugs for the cable connections.
Fig. 3.8.1-1 Access to the input / output connections
To access input, output and Battery Connections proceed as follows:
OPM_SGS_ISG_M22_M30_0US_V011.doc 22/38 Installation Guide SG Series 225 & 300 kVA

3.8.2 Power connection with common input utility

Position of the PE compression lugs in case the cable input is from the bottom of the UPS
Fig. 3.8.2-1 Power connections Common Input Utility

L1-1 Rectifier + Bypass Phase A L2-1 Rectifier + Bypass Phase B L3-1 Rectifier + Bypass Phase C N Neutral (Bypass) PE Ground

L1 Load Phase A L2 Load Phase B L3 Load Phase C N Neutral PE Ground
Bus bars BR1, BR2 and BR3 must remain connected. Cable terminations are to the Rectifier Input Lugs and Output Lugs as shown above. Connect wire to the Lugs using appropriate tools and appropriate torque. Torque specification for input/output and DC power connections on Bus Bars: Section 3.8.1.
OPM_SGS_ISG_M22_M30_0US_V011.doc 23/38 Installation Guide SG Series 225 & 300 kVA

This UPS is only designed to operate in a wye-configured electrical system with a solidly grounded neutral. In case of 3-wire utility input the following solutions are possible:
1- Connection of a “3-wire kit” between Utility Input and Neutral of the output transformer.

In a RPA configuration with 3-wire kit, it’s most important to connect the Neutrals of the UPS outputs together (see Fig .3.8.2-2). Cable section for this connection shall be not less then AWG 1.
Fig. 3.8.2-2 3-wire kit for RPA Parallel System 2- Bypass transformer. In this case the Neutral of wye secondary winding must be connected to the Neutral of the output transformer.
Contact your Service Centre, which will help you to find valuable solutions.
OPM_SGS_ISG_M22_M30_0US_V011.doc 24/38 Installation Guide SG Series 225 & 300 kVA

3.8.3 Power connection separate input utility

PE Input rectifier Position of the PE compression lugs in case the cable input is from the bottom of the UPS
Fig. 3.8.3-1 Power connections Separate Input Utility

L1-1 Rectifier Phase A L1-2 Bypass Phase A L2-1 Rectifier Phase B L2-2 Bypass Phase B L3-1 Rectifier Phase C L3-2 Bypass Phase C N Neutral (Bypass) PE Ground
The interconnection links BR1, BR2 and BR3 must be removed (see Fig. 3.8.3-2).

L1 Load Phase A L2 Load Phase B L3 Load Phase C N Neutral PE Ground
Bus bars BR1, BR2 and BR3 must be removed. Cable terminations are to the Rectifier/Bypass Input Lugs and Load Output Lugs as shown above. Connect wire to the Lugs using appropriate tools and appropriate torque. Torque specification for Input/Output and DC power connections on Bus Bars: Section 3.8.1.
OPM_SGS_ISG_M22_M30_0US_V011.doc 25/38 Installation Guide SG Series 225 & 300 kVA

This UPS is only designed to operate in a wye-configured electrical system with a solidly grounded neutral. In case of 3-wire utility input the following solutions are possible: 1- Connection of a “3-wire kit” between Utility Input and Neutral of the output transformer. Attention: With this configuration, load can only be connected phase- phase. Absolutely no load connection permitted to the Neutral of the output transformer.

In a RPA configuration with 3-wire kit, it’s most important to connect the Neutrals of the UPS outputs together (see Fig .3.8.3-2). Cable section for this connection shall be not less then AWG 1.
Fig. 3.8.3-2 3-wire kit for RPA Parallel System 2- Bypass transformer. In this case the Neutral of wye secondary winding must be connected to the Neutral of the output transformer.
Contact your Service Centre, which will help you to find valuable solutions.
SGS_225-300_UPS BR1-2-3_01
Q1 Q2
BR1
BR2
BR3
Fig. 3.8.3-3 AC bus bars BR1, BR2 and BR3
For separate Bypass and Rectifier input configuration AC bus bars BR1, BR2 and BR3 must be removed.
OPM_SGS_ISG_M22_M30_0US_V011.doc 26/38 Installation Guide SG Series 225 & 300 kVA

3.8.4 Battery connection

Fig. 3.8.4-1 Power connections Battery

+ Positive pole of the Battery – Negative pole of the Battery
Do not insert the Battery Fuses before the commissioning.
Battery Cable Terminations are to the Positive and Negative Terminals as shown above. Connect wire to the Lugs using appropriate tools and appropriate torque. Torque specification for Input/Output and DC power connections on Bus Bars: See section 3.8.1.
OPM_SGS_ISG_M22_M30_0US_V011.doc 27/38 Installation Guide SG Series 225 & 300 kVA

3.8.5 Setup for SG Series when functioning as frequency converter
When the SG Series is utilized for different output frequency compared to the input frequency, the Automatic Bypass and Manual Bypass functions are disabled, therefore the Load cannot be transferred to Utility in case of overload, short circuit, or inverter failure. In situations where the UPS needs to be powered down for maintenance purposes, the critical Load must also be powered down during this time, the UPS cannot be transferred to Manual Bypass, serious damage to the Load could result.

Circuit breaker Q2 - Manual Bypass must be blocked in the open position, to avoid any accidental closure, by means of a padlock or a similar device, when the UPS is used as a frequency converter. As an added measure of safety the bus bar connections BR1, BR2 and BR3 should also be removed. See Fig. 3.8.3-2.

The standard SG Series UPS may be operated at 50Hz input with 60Hz output frequency conversion. It is recommended that the static switch bypass be electronically blocked if the UPS is to operated as a frequency converter in order to prevent damage to the load. Check with a Global Services Field Service Engineer to facilitate the parameter change.

The output transformer of the UPS is designed for 60Hz only. Operation at 50Hz, 480V output may overheat the transformer. The optional 5th harmonic filter is designed for 60Hz operation. If the UPS is purchased with this internal filter it may not be operated at 50Hz input or damage to the filter could result.
OPM_SGS_ISG_M22_M30_0US_V011.doc 28/38 Installation Guide SG Series 225 & 300 kVA

To guarantee good Load sharing between the units of a parallel system, we recommend it is recommended that the cable length from the input distribution board (5) to the output distribution board (10) are the same length for each unit (a+b = c+d = e+f = g+h = i+l = m+n = o+p = q+r). Tolerance: +/-10%. The AC input power of the Bypass must be the same for all units of the parallel system - no phase shift allowed between units.
It is strongly recommended that no transformers, automatic circuit breakers or fuses should be inserted between the unit’s output and the Load common bus bars. However, it is recommended that a disconnect or isolation switch be inserted in order to totally isolate a unit if needed
Verify that power wiring and control wiring are run in separate conduits or cable trays. UPS input cables must be run in separate conduits from the output cables.

Fig. 3.9-1 RPA Parallel System 1 = Rectifier c = Unit Number 1 2 = Inverter 2 = Unit Number 2 3 = Electronic Bypass 3 = Unit Number 3 4 = Manual Bypass 4 = Unit Number 4 5 = Input Utility Distribution 5 = Unit Number 5 6 = Unit Output Load 6 = Unit Number 6 7 = External Battery MCB 7 = Unit Number 7 8 = External Battery fuse 8 = Unit Number 8 9 = External Battery 10 = Common Busbar and Output Load Distribution
In a RPA configuration with 3-wire kit, it’s most important to connect the Neutrals of the UPS outputs together (see Fig .3.8.2-2 and 3.8.3-2). Cable section for this connection shall be not less then AWG 1
OPM_SGS_ISG_M22_M30_0US_V011.doc 29/38 Installation Guide SG Series 225 & 300 kVA


Under no circumstance should the control bus cable connecting JA (1/2/3/4/5/6/7) and JB (1/2/3/4/5/6/7) be connected or disconnected after the system has been powered On.
JA1 + JB1 JA2 + JB2 JA3 + JB3
Fig. 3.10-1 RPA System - Control bus connection The shield of the control bus cable, connected on JA and JB must be connected to ground with the appropriate cable clamps fitted on parallel bus socket. It is important to place the units in sequence of their assigned number. A unit number from 1 to 8, is defined by the setting of parameters and displayed on the panel. This number is also marked inside and outside the packaging.
OPM_SGS_ISG_M22_M30_0US_V011.doc 30/38 Installation Guide SG Series 225 & 300 kVA


Fig. 3.10-2 Bus connection on terminal units Terminal units On the parallel bus PCB “P34 – Bus Interface IM0048”, of the first and last units (terminal) of the parallel system the Jumpers JP1, JP2, JP3 and JP4 must be inserted.
Fig. 3.10-3 Bus connection on intermediate units Intermediate units On the parallel bus PCB “P34 – Bus Interface IM0048” of the intermediate units of the parallel system the Jumpers JP1, JP2, JP3 and JP4 must be removed.
In a parallel system composed of 2 or more units, only the first and last units (having 1 input JA and JB free) have the Jumper JP1, JP2, JP3 and JP4 inserted on parallel bus PCB “P34 – Bus Interface IM0048” (see Fig. 3.10-2).
OPM_SGS_ISG_M22_M30_0US_V011.doc 31/38 Installation Guide SG Series 225 & 300 kVA

SGS_225-300_RPA control bus cable_01
Access to the control bus connection. The control bus connection between parallel units must be made on the front of the electronic module fitted behind the front doors. To properly route the control bus cables the safety screen “A” must be removed.
A
Fig. 3.11-1 View electronic module on intermediate unit
A
JB
SGT5000_100-150_RPA control bus cable_02US
Control bus cables connection. • Plug the cables JA (1/2/3/4/5/6/7) and JB (1/2/3/4/5/6/7) onto the RJ connectors JA and JB located on parallel bus PCB “P34 – Bus Interface IM0048” (going to “P13 – RPA Board IM0006” J52(A) and J62(B)).
JA2
A JA
Fig. 3.11-2 Front view electronic module on intermediate unit
OPM_SGS_ISG_M22_M30_0US_V011.doc 32/38 Installation Guide SG Series 225 & 300 kVA
Next parallel unit

SGS_225-300_RPA control bus cable_02US
JB
JA1
JA
JB1 JB2 JB
JA JA2 JA1
Q1 Q2
Q1 Q2 JB1
JA1
UPS 1 UPS 2
JB2
unit 3, 4, 5,
Fig. 3.11-3 Control Bus cable routing and connection Control bus cables routing Place and fix the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 inside the UPS cabinets in the position illustrated in the drawing.
Pay attention when cabling and routing the bus cables JA and JB inside the UPS cabinet. In case one unit should be removed from the parallel system, the bus cables JA and JB must be removed from the cabinet without disconnecting them from the metal plate where the sockets JA and JB are located. For reliability reasons the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 connecting the units should be run in separated protected conduits (as indicated in fig. 3.11-3) separated from the power cables. It is important that the cable JA must be the same length as cable JB.
The connection of the control bus cable in a UPS system already powered requires a special reset operation, which can be made by only a trained operator.
OPM_SGS_ISG_M22_M30_0US_V011.doc 33/38 Installation Guide SG Series 225 & 300 kVA
Next parallel · 6, 7, 8

Serial port J3 - RS 232 (sub D - female 9 pin)
Suitable for JUMP protocol Pin 2: TX (out) Pin 3: RX (in) Pin 5: GND
1 2 3 4
J2 (subD-female 25p) – Output signals on voltage free contacts J2/1, 2, 3 - NO, C, NC - Utility Failure (def. Param. RL=1) J2/4, 5, 6 - NO, C, NC - Load on Inverter (def. Param. RL=3) J2/7, 8, 9 - NO, C, NC - Stop Operation (def. Param. RL=5) J2/14, 15, 16 - NO, C, NC - Load on Utility (def. Param. RL=2) J2/17, 18, 19 - NO, C, NC - General Alarm (def. Param. RL=4) J2/20, 21, 22 - NO, C, NC - Acoustic Alarm (def. Param. RL=6)
Signals on terminals X1 and on connector J2 are in parallel and therefore not separated galvanically from each other. The programmable signals on X1 and J2 will be disabled with Q1 open, with the exception of the signals for “16 - Manual Bypass ON” and “26 - EPO”.
XB - Terminals for EPO connection X2 / 1, 2 or J2 / 12, 25 NC EPO (Emergency Power Off) Note: to enable this function, remove cable short-circuiting XB / 2 – 3 and the Jumper JP3 on P4 – Customer Interface.
J4
X1 – Output signals on voltage free contacts - terminals X1/1, 2, 3 - NO, C, NC - Utility Failure (def. Param. RL=1) X1/4, 5, 6 - NO, C, NC - Load on Inverter (def. Param. RL=3) X1/7, 8, 9 - NO, C, NC - Stop Operation (def. Param. RL=5) X1/12, 13, 14 - NO, C, NC - Load on Utility (def. Param. RL=2) X1/15, 16, 17 - NO, C, NC - General Alarm (def. Param. RL=4) X1/18, 19, 20 - NO, C, NC - Acoustic Alarm (def. Param. RL=6)
Input contacts X1/10, 21 or J2/10, 23 Programmable (default = RL1) X1/11, 22 or J2/11, 24 Programmable / Generator ON (NO) (def. = RL2)
1 2 3 4
Fig. 4.1-1 Customer interface NO = normally open C = common NC = normally closed The connectors J4 and J5 can be used for additional SNMP Card, Environmental Card (not available yet) or an additional Customer Interface (installation only when the UPS is switched Off). XA: terminals for 24VDC Auxiliary Power Supply connection. XB: terminals for EPO connection.
Programmable user relays Programmable functions on contacts (X1 - J2) On terminals X1 or J2 connector, six of the following 26 signals can be selected from the display, entering with the appropriate password. 0- No Information 1- Buzzer 2- General Alarm 3- Load on Utility 4- Stop Operation 5- Load on Inverter 6- Utility Failure 7- DC Over Voltage 8- Low Battery 9- Overload 10- Over Temperature 11- Inverter-Utility not syncr. 12- Bypass Locked 13- Bypass Utility Failure
Some UPS functions can be activated with parameters when an external Normally Open contact is closed on: X1-10, 21 / J2-10, 23 or X1-11, 22 / J2- 11, 24 Selectable functions by changing parameters (password required) are: 0 - No function 1 - Inverter ON 2 - Inverter OFF 3 - Print All 4 - Status Relay 5 - Generator ON 6 - External Bypass ON 7 - External Battery Fuses, or External K3. See Alarm 4104 - “Battery Fuses”. Voltage free contacts: Max. DC / AC: 24V / 1.25A
14- Rectifier Utility Failure 15- Battery Discharge 16- Manual Bypass ON 17- Rectifier ON 18- Inverter ON 19- Boost Charge 20- Battery Earth Fault 21- Battery Fault 22- Relay Input 1 23- Relay Input 2 24- Relay Output ON 25- Relay Output OFF 26- EPO (Emergency Power Off)
IEC 950 (SELV circuit) Min. Signal Level: 5VDC/50mA
OPM_SGS_ISG_M22_M30_0US_V011.doc 34/38 Installation Guide SG Series 225 & 300 kVA
SGS_225-300_Customer interface_01

4.1.1 Serial Port J3
Serial port J3 - RS-232 (sub D, female 9 pin) that allows: • Total remote management of the system using new generation software JUMP (Java Universal Management Platform) for system protection and management of systems using GE Industrial Systems UPS’s. JUMP system is written in JAVA and supports virtually all platforms having JAVA runtime environment version 1.1 or higher.
The serial port J3 - RS-232 is enabled on all the units of the parallel system.
Serial port J3 connection to PC

Fig. 4.1.1-1 Serial port J3 connection to PC
4.1.2 Output potential free contacts
The interface board provide 6 voltage free relay contacts giving some UPS critical alarms and operation mode.
These signals are available either on connector J2- (sub D, female 25 pin) or terminal blocks X1.
The meaning of the alarms on the free contacts in standard configuration (default) is the following:
X1 / 1, 2, 3 or J2 / 1, 2, 3 (NO, C, NC) Utility Failure (def. Par. RL=1)
X1 / 4, 5, 6 or J2 / 4, 5, 6 (NO, C, NC) Load on Inverter (def. Par. RL=3)
X1 / 7, 8, 9 or J2 / 7, 8, 9 (NO, C, NC) Stop Operations (def. Par. RL=5)
X1 / 12, 13, 14 or J2 / 14, 15, 16 (NO, C, NC) Load on Utility (def. Par. RL=2)
X1 / 15, 16, 17 or J2 / 17, 18, 19 (NO, C, NC) General Alarm (def. Par. RL=4)
X1 / 18, 19, 20 or J2 / 20, 21, 22 (NO, C, NC) Acoustic Alarm (def. Par. RL=6)
In case different alarms or operating status are required, they can be configured on the same terminals via software from the control panel. The configuration can be changed in parameters mode by a trained operator using the appropriate password.
The programmable signals on X1 and J2 will be disabled with Q1 open, with the exception of the signals for “16 - Manual Bypass ON” and “26 - EPO”.
OPM_SGS_ISG_M22_M30_0US_V011.doc 35/38 Installation Guide SG Series 225 & 300 kVA

4.1.3 Programmable input free contacts
Some programmable UPS functions (indicated in section 4.1), can be activated by closing an external contact, if connected, on:
X1 / 10, 21 or J2 / 10, 23 User Input 1 (default = Not used) (RL1) X1 / 11, 22 or J2 / 11, 24 User Input 2 (default = Emergency GEN ON) (RL2)
4.1.4 Gen Set Signaling (GEN ON)
If an emergency generator set supplies the UPS in case of Utility Failure and the generator is particularly unstable in frequency, it should be suitable to install the signal “Generator ON” on X1/11, 22 or J2/11, 24 (this input is programmed as default for this function).
In a parallel system a separate NO (Normally Open) contact must be connected individually to each unit.
4.1.5 AUX external Maintenance Bypass
If the UPS system is equipped with an external Maintenance Bypass Switch, it is possible to connect a NO (normally open) voltage free aux. contact from the External Bypass Switch to the programmable input X1/10-21 or J2/10-23, making the UPS operate as if the internal switch Q2 has closed.
This function can be activated by changing a dedicated parameter (password required).
When this NO (Normally Open) contact closes, the output Inverter Contactor K7 it is automatically opened and the Load transfer back to Inverter will be inhibited.
In a parallel system, the input on customer interface of each unit must be connected to a separate AUX contact of the External Maintenance Bypass Switch.
4.1.6 Auxiliary Power Supply (APS) 24 VDC / 1A

XA - 2 GND
XA - 3 24 VDC
XA - 4 GND
Fig. 4.1.6-1 Terminals for connection 24 VDC
OPM_SGS_ISG_M22_M30_0US_V011.doc 36/38 Installation Guide SG Series 225 & 300 kVA

4.1.7 EPO (Emergency Power Off) Input contact

An external Emergency switch (Normally Closed voltage-free contact) can be connected on terminals XB / 1 - 4 or connector J2 / 12 - 25 of the P4 - Interface Customer.
Remove the cable short- circuiting terminals XB 2 - 3) when using this external switch.
Fig. 4.1.7-1 Terminals for connection EPO

To enable this function, remove cable short-circuiting XB / 2 - 3 on the Terminal XB and the Jumper JP3 on P4 – Customer Interface, when the cables have been already connected on XB or J2.
In a parallel system a separate NC (Normally Closed) contact must be connected individually to each unit. When opened, this contact causes the immediate opening of the Contactors K3, K4, K6, K7 and K8, as well as the shutdown of Rectifier, Inverter and Static-Switch.
Be aware: The reliability of the system depends on this contact!
After closure of the Emergency contact, a reset is necessary to enable the restart of the UPS, by pressing the key “O” (inverter off) on the control panel.
In case of a parallel system press the key “O” (inverter off) on the control panel of each unit connected on parallel bus and having it’s output switch Q1 closed.
OPM_SGS_ISG_M22_M30_0US_V011.doc 37/38 Installation Guide SG Series 225 & 300 kVA

It is recommended to note in this section Notes, with date and short description all the operations performed on the UPS, as: Maintenance, components replacement, anormal situations, etc.
Date Description Done by
OPM_SGS_ISG_M22_M30_0US_V011.doc 38/38 Installation Guide SG Series 225 & 300 kVA
Pages referenced in this manual — manufacturer, support and downloads.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.