EN
GE logo
Official user manual

GE Uninterruptible Power Supply (LP 33)

57 pages·2.4 MB·Power Supply·PDF·ENDEFRITNLJA
GE Uninterruptible Power Supply (LP 33)
Table of Contents 80 sections Digital Energy™ · LP 33 Series · Manufactured by: Distributed by: Your service contact: g · Preface · … ShowHide
Digital Energy™p.1LP 33 Seriesp.1Manufactured by: Distributed by: Your service contact: gp.3Prefacep.4WARNING!p.4Safety instructionsp.4Parallel version secured with RPAp.41 SAFETY RULESp.6NOTE !p.6GENERALp.7STORAGEp.7BATTERYp.72 INTRODUCTIONp.92.1 GENERAL DESCRIPTIONp.93 DESCRIPTIONp.103.1 BLOCK DIAGRAM AND MAIN ELEMENTS DESCRIPTIONp.103.2 OPERATION MODESp.113.3 RPA PARALLEL SYSTEMp.14UTILITY INPUTp.14F2 F1 F3 F4p.14LOADp.143.4 UPS PARALLELED ON THE SAME BATTERYp.153.5 SERVICE AND TECHNICAL SUPPORTp.163.6 RECYCLING AT THE END OF SERVICE LIFEp.17WARNING !p.174 LAYOUTp.184.1 LAYOUT LP 33 Series / 30 & 40 kVAp.185 SYSTEM HANDLINGp.195.1 CONTROL PANELp.195.2 COMMAND PUSH BUTTONS AND SWITCHESp.206 LCD SCREENp.21APPLICATION ON UPSp.21= 70% SERVICE REQUIREDp.21U3=121Vp.22RECTIFIERp.226.2 EVENT SCREENS (Alarm)p.234000 SETUP VALUESp.23LOSTp.234001 REGULATION BOARDp.23FAILUREp.234004 UPS FAILUREp.234100 RECTIFIER FUSESp.234102 K4 CLOSINGp.234103 K4 OPENINGp.234110 RECTIFIER MAINS OUT OF TOLERANCEp.234115 LOW BATTERYp.23VOLTAGEp.234116 HIGH BATTERYp.234118 BATTERYp.24FAULTp.244130 TURN ON RECT. OR SHUTDOWN UPSp.244140 RECTIFIER CONTROL FAILUREp.244301 INVERTER FUSES FAILUREp.244304 K7 CLOSINGp.244305 K7 OPENINGp.244312 INV. VOLTAGE OUT OF TOLERANCEp.244320 ISMAX DETECTIONp.244340 INVERTER CONTROL FAILUREp.244347 OSCILLATORp.244402 RECTIFIER CANNOT BE TURNED ONp.244404 K6 CLOSINGp.244405 K6 OPENINGp.244410 BYPASS MAINS OUT OF TOLERANCEp.244520 NO INVERTERp.25POWERp.254530 LOAD LOCKEDp.25ON MAINSp.254531 LOAD ON MAINS BY ERROR DETECTORp.254563 EMERGENCY OFFp.25ACTIVATEDp.254570 OVERLOADp.254571 OVERLOAD: LOAD ON MAINSp.254697 BATTERY OVERTEMPERATUREp.254698 BATTERY POWERp.25INSUFFICIENTp.254700 DC LOWp.254900 LOAD LOCKEDp.25ON INVERTERp.254955 OVERTEMPERATUREp.254998 LOAD OFF DUE TO EXTENDED OVERLOADp.25
Page 1 of the GE Uninterruptible Power Supply (LP 33) user manual — Digital Energy™
Page 1 · click to enlarge
Page 1
GE Uninterruptible Power Supply (LP 33) — Digital Energy™ diagram (page 1)
Fig. 1 · Digital Energy™

Digital Energy™

LP 33 Series

30 & 40 kVA 208 VAC UL / Series 0 Manufactured by: GE Zenith Controls General Electric Company 2501 Pecan Street Bonham, Texas 75418 T 903 640 7900 T 903 640 7900

www.geindustrial.com/cwc/home

GE Uninterruptible Power Supply (LP 33) — Digital Energy™ diagram (page 1)
Fig. 2 · Digital Energy™
Page 2 of the GE Uninterruptible Power Supply (LP 33) user manual — Digital Energy™
Page 2 · click to enlarge
Page 2
ModelLP 33 Series / 30 & 40 kVA / Series 0
Date of issue01/01/2005
File nameOPM_LPS_3UO_30K_40K_0US_V010
Revision1.0

Identification No.

COPYRIGHT © 2005 by GE Consumer & Industrial All rights reserved.

The information contained in this publication is intended solely for the purposes indicated.

The present publication and any other documentation supplied with the UPS system is not to be reproduced, either in part or in its entirety, without the prior written consent of GE.

The illustrations and plans describing the equipment are intended as general reference only and are not necessarily complete in every detail.

The content of this publication may be subject to modification without prior notice.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Up-dating · Revision Concerns Date

Page 3 of the GE Uninterruptible Power Supply (LP 33) user manual — Manufactured by: Distributed by: Your service contact: g
Page 3 · click to enlarge
Page 3

Dear Customer, We thank you for selecting our products and are pleased to count you amongst our very valued customers at GE. We trust that the use of the LP 33 Series Uninterruptible Power Supply system, developed and produced to the highest standards of quality, will give you complete satisfaction. Please carefully read the Installation Guide. It contains all the necessary information about the installation of the UPS. Thank you for choosing GE !

START UP AND COMMISSIONING A GE Global Services Field Engineer must perform start-up and commissioning of the UPS. Please Contact G.E. Global Services at least two weeks prior to schedule start-up and commissioning at 1-800-637-1738, or by E-mail at gedeservices@indsys.ge.com

Manufactured by: Distributed by: Your service contact: g

GE Digital Energy General Electric Company CH – 6595 Riazzino (Locarno)

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Switzerland

Page 4 of the GE Uninterruptible Power Supply (LP 33) user manual — Parallel version secured with RPA
Page 4 · click to enlarge
Page 4

Preface

Congratulations on your choice of a LP 33 Series Uninterruptible Power Supply (UPS). It will help eliminate load disturbances due to unexpected power problem. This Installation Guide describes how to prepare the installation site, and it provides weight and dimensions and procedures for moving, installing and connecting the UPS. While every care has been taken to ensure the completeness and accuracy of this manual, GE assumes no responsibility or liability for any losses or damages resulting from the use of the information contained in this document.

WARNING!

LP 33 Series / 30 & 40 kVA, is a product that needs to be installed by a licensed and knowledgeable contractor.

We recommend that this manual be kept next to the UPS for future references. If any problems are encountered with the procedures contained in this manual, please contact your Service Center before you proceed. This document shall not be copied or reproduced without the permission of GE. Some of the information contained in this manual may be changed without notice to reflect technical improvements.

Safety instructions

Read the safety instructions contained on the following pages carefully before the installation of the UPS, options and battery system. Pay attention to the rectangular boxes included in the text: They contain important information and warning concerning electrical connections and personnel safety.

Parallel version secured with RPA

GE Uninterruptible Power Supply (LP 33) — Parallel version secured with RPA diagram (page 4)
Fig. 3 · Parallel version secured with RPA

When included in the text, this symbol refers to operation needed only for parallel system.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 5 of the GE Uninterruptible Power Supply (LP 33) user manual — Preface
Page 5 · click to enlarge
Page 5
Page 5 of the GE Uninterruptible Power Supply (LP 33) user manual — Preface
Page 6 of the GE Uninterruptible Power Supply (LP 33) user manual — NOTE !
Page 6 · click to enlarge
Page 6

1 SAFETY RULES

With this document, GE gives to the user all the necessary information about the correct use of the UPS. We recommend that this manual be kept next to the UPS for future references. If any problems are encountered with the procedures contained in this manual, please contact the nearest Service Center before you proceed. All UPS installation, maintenance and service work should be performed by qualified service personnel only.

The KNOWLEDGE and the FULLY compliance of the safety instructions and the warning contained in this manual are THE ONLY CONDITION to avoid any dangerous situations during installation, operation, maintenance work, and to preserve the maximum reliability of the UPS system.

NOTE !

LP 33 Series / 30 & 40 kVA is a FCC Class A-UPS Product. While every care has been taken to ensure the completeness and accuracy of this manual, GE assumes no responsibility or liability for any losses or damages resulting from the use of the information contained in this document.

GE Refuses any responsibility in case of non-observance, unauthorised alterations or improper use of the delivered UPS.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 7 of the GE Uninterruptible Power Supply (LP 33) user manual — BATTERY
Page 7 · click to enlarge
Page 7

SAVE THESE INSTRUCTIONS This manual contains important instructions for models LP 33 Series / 10 & 20 kVA that should be followed during installation and maintenance of the UPS and battery.

GENERAL

- Move the UPS in an upright position in its original package to the final destination room. - Check for sufficient floor and elevator loading capacity. - Check the integrity of the UPS equipment carefully. If you notice visible damage, do not install or start the UPS. Contact the nearest Service Center immediately. - WARNING! RISK OF ELECTRICAL SHOCK: Do not remove covers; there are no user

serviceable parts inside.

- After switching off takes 5 minutes for the DC capacitors to discharge because a lethally

high voltage remains at the terminals of the electrolytic capacitors.

- All maintenance and service work should be performed by qualified service personnel. The UPS contains its own energy source (battery).

- The field-wiring terminals may be electrically live, even when the UPS is disconnected from the utility.

- Dangerous voltages may be present during battery operation. The battery must be disconnected during maintenance or service work.

- This UPS contains potentially hazardous voltages.

- Be aware that the inverter can restart automatically after the utility voltage is restored.

STORAGE

- Store the UPS in a dry location; storage temperature must be within -13°F (-25°C) to 131°F (55°C).

- If the unit is stored for a period exceeding 3 months, the battery must be recharged periodically (time depending on storage temperature).

BATTERY

- The battery-voltage is dangerous for person’s safety. - When replacing the battery, use the same number, voltage (V) and capacity (Ah). - Proper disposal or recycling of the battery is required. Refer to your local codes for disposal requirements. - Never dispose of battery in a fire: They may explode. - Do not open or mutilate battery: Their contents (electrolyte) may be extremely toxic. If exposed to electrolyte, wash immediately with plenty of water. - Avoid charging in a sealed container. - Never short circuit battery. When working with battery, remove watches, rings or other metal objects, and only use insulated tools.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 8 of the GE Uninterruptible Power Supply (LP 33) user manual — GENERAL
Page 8 · click to enlarge
Page 8

Safety symbols and warnings Safety warnings The text of this manual contains some warnings to avoid risk to the persons and to avoid damages to the UPS system and the supplied critical loads. The non-observance of the warnings reminding hazardous situations could result in human injury and equipment damages. Please pay attention to the meaning of the following warnings and symbols. Throughout this manual the following symbols are defined:

PE (Earth) – GND (Ground) PROTECTIVE GROUNDING TERMINAL: A terminal which must be connected to earth ground prior to making any other connection to the equipment.

A terminal to which or from which an alternating (sine wave) current or voltage may be applied or supplied.

A terminal to which or from which a direct current or voltage may be applied or supplied.

This symbol indicated the word “phase”.

This symbol indicates the principal on/off switch in the on position.

This symbol indicates the principal on/off switch in the off position.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 9 of the GE Uninterruptible Power Supply (LP 33) user manual — 2.1 GENERAL DESCRIPTION
Page 9 · click to enlarge
Page 9

2 INTRODUCTION

2.1 GENERAL DESCRIPTION

The LP 33 Series Uninterruptible Power Supply (UPS) provides the energy supply for critical loads which need a reliable, continuous free from voltage disturbances and frequency fluctuations supply.

In case the mains fails, or it exceeds the permitted tolerances, the energy to supply the load is furnished by the battery with a backup time dependent on its capacity, until the mains recovers.

LP 33 Series is a truly VFI double conversion Uninterruptible Power Supply (UPS), equipped with automatic bypass, where the load is normally supplied by the inverter.

LP 33 Series can be configured, if chosen, for the ECO Mode permitting the maximum energy saving.

The main typical performances of the LP 33 Series system are the following:

  • VFI ( Voltage Frequency Independent) double conversion technology to provide an excellent quality power supply.
  • Input power factor 0.8.
  • Input current THD <10%.
  • Automatic bypass and manual bypass to improve reliability and maintenance.
  • Microprocessor controlled supervision.
  • Dual AC inputs (optional).
  • ECO Mode operation.
  • Compact and agreeable design expressly conceived for “Office environment”.
  • Low level acoustic sound, 50 dB(A) (10 kVA), 55 dB(A) (20 kVA) and 61 dB (A) (30 & 40 kVA) to avoid noise to the persons operating in the same environment.
  • Multi-language LCD screen.
  • Total battery management: SBM (Superior Battery Management)
  • High battery capacity, 22 minutes (10 kVA), 9 minutes (20 kVA), 29 minutes (30 kVA) and 19 minutes (40 kVA), with battery housed in the UPS cabinet.
  • Wide rectifier input voltage tolerance: 152 ÷ 240 VAC (phase – phase).
  • Wide rectifier input frequency tolerance: +/-10% (54 ÷ 66 for 60 Hz).
  • RPA (Redundant Parallel Architecture) up to 4 units.
  • GE Connectivity.
  • Compliance with UL standard 1778.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 10 of the GE Uninterruptible Power Supply (LP 33) user manual — 3.1 BLOCK DIAGRAM AND MAIN ELEMENTS DESCRIPTION
Page 10 · click to enlarge
Page 10

3 DESCRIPTION

3.1 BLOCK DIAGRAM AND MAIN ELEMENTS DESCRIPTION

GE Uninterruptible Power Supply (LP 33) — 3.1 BLOCK DIAGRAM AND MAIN ELEMENTS DESCRIPTION diagram (page 10)
Fig. 4

Fig. 3.1-1 UPS block diagram The Uninterruptible Power Supply System LP 33 Series / 30 & 40 kVA can be divided into the following main elements: Electronics The UPS is designed with a microprocessor–controlled supervision and diagnostic system. Communication between user and UPS is achieved by the front panel consisting of an LCD screen, displaying the operation modes, the measurements and the events / alarms. Rectifier The rectifier converts the 3-phase mains voltage into a controlled and regulated DC-voltage, in order to supply power to the booster, and to charge the battery through the battery-charger. Inverter The inverter converts the DC voltage into a three-phase AC-voltage with constant amplitude and frequency, which is completely independent from the AC-input voltage. Automatic Bypass The automatic bypass consists of a static semiconductor-switch (SSR: Static Switch Relay), used to provide an uninterrupted transfer of the load from inverter to mains when operating in VFI Mode. If chosen the ECO Mode, the SSM transfer the load from mains to inverter in case the utility fails. Back-Feed Protection All LP 33 Series UPS’s are equipped with an automatic system for the protection against voltage back feeding towards Utility, through the Bypass (Applied Standard IEC 62040-1). This protection works automatically by opening contactor K6 (in series with the thyristors of the static switch) and eventually K7, and acts in case of internal defects of the system, or due to wrong manipulations on the maintenance bypass Q2. Manual Bypass The manual bypass consists of a pair of manual switches Q1 and Q2, which allow the isolation of the UPS from the load, while still supplying the load with power directly from the mains. Battery The battery, normally stored by the battery-charger, supplies the DC energy to inverter in the event of mains failure.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 11 of the GE Uninterruptible Power Supply (LP 33) user manual — 3.2 OPERATION MODES
Page 11 · click to enlarge
Page 11

3.2 OPERATION MODES

This section describes the different possible operation modes of the UPS explaining the function of the main modules of the UPS. VFI (Voltage Frequency Independent) Mode operation

GE Uninterruptible Power Supply (LP 33) — 3.2 OPERATION MODES diagram (page 11)
Fig. 5

Under normal conditions the load is permanently powered by the inverter with constant amplitude and frequency. The rectifier, powered by the mains, supplies the inverter and the battery-charger keeps the battery fully charged.

Fig. 3.2-1 Energy flow in VFI Mode operation

The inverter converts the DC voltage in a new AC sine wave voltage with constant amplitude and frequency independently from the input mains power. ECO Mode operation (Intelligent Energy Management) When the ECO Mode is selected, and the mains power is available, the load is normally powered through the automatic bypass. When the mains voltage is detected out of the prescribed tolerances, the load is automatically transferred to the inverter. When the mains recovers, the load returns to the automatic bypass after a variable time defined by the control unit.

GE Uninterruptible Power Supply (LP 33) — 3.2 OPERATION MODES diagram (page 11)
Fig. 6

Fig. 3.2-2 Energy flow in ECO Mode operation

The ECO Mode can be configured directly by the user for higher efficiency, considering the mains reliability and criticality of the load. The selection between the two operation modes “VFI Mode and ECO Mode”, or switching between operation modes at required time, can be done through the UPS control panel (see Section 6.3.1-5).

In case of parallel system

ECO Mode cannot be enabled for RPA Parallel System.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 12 of the GE Uninterruptible Power Supply (LP 33) user manual — 3.2 OPERATION MODES
Page 12 · click to enlarge
Page 12
GE Uninterruptible Power Supply (LP 33) — 3.2 OPERATION MODES diagram (page 12)
Fig. 7

In VFI (Voltage Frequency Independent) operation mode, the load is permanently supplied by the inverter but, in case of trouble on the inverter, or when overload or short-circuit on the output occur, if the mains voltage do not exceed the admitted tolerances, the load is instantly transferred to the mains through the automatic bypass, taking advantage of the higher short circuit power.

Fig. 3.2-3 Energy flow in automatic bypass operation

When the inverter recovers, the load will be re-transferred automatically to the inverter.

In case of parallel system Each unit has its own bypass. All the bypasses in the system work together, their control being managed in the same manner by all units. The units are continuously exchanging information before taking such decision. In case the inverter of one unit fails, its bypass remains operating. It is excluded only if the unit is separated from the common bus by opening its output switch Q1. Mains recovery operation

GE Uninterruptible Power Supply (LP 33) — 3.2 OPERATION MODES diagram (page 12)
Fig. 8

As soon as the mains recovers, the rectifier starts up automatically supplying the inverter and the battery-charger recharges the battery. In case the inverter has been shut down following a complete discharge of the battery, when the mains recovers the system start up automatically.

Fig. 3.2-4 Energy flow at mains recovery operation

When the energy stored in the battery is sufficient to ensure a minimum time of operation with the actual load, in case of a future mains failure, the load will be retransferred to inverter (if selected VFI Mode).

In case of parallel system When the AC input power recovers, the rectifiers will start up sequentially according to their number in the parallel system in order to avoid an initial inrush current. The inverters will start up automatically, but only when the battery has recharged enough for a minimum runtime with the present load. When enough inverters to supply the load have been restarted, the load will be transferred from the automatic bypass back to the inverter bus-bars.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Automatic bypass operation

Page 13 of the GE Uninterruptible Power Supply (LP 33) user manual — 3.2 OPERATION MODES
Page 13 · click to enlarge
Page 13

The manual bypass circuit consisting of Q1 and Q2 manual switches, permits the transfer of the load directly to the mains without interruption, leaving the UPS galvanically separated from the output load. This type of operation is normally used when the UPS system must be completely turned off for maintenance or reparation.

GE Uninterruptible Power Supply (LP 33) — 3.2 OPERATION MODES diagram (page 13)
Fig. 9

Fig. 3.2-5 Energy flow in manual bypass operation

In the event of a mains power failure, the rectifier and the battery-charger turn OFF, while the inverter continues to supply the load without interruption using the energy stored in the battery. During the battery discharge, the LCD screen displays the remaining autonomy, based on the battery capacity and the applied load.

GE Uninterruptible Power Supply (LP 33) — 3.2 OPERATION MODES diagram (page 13)
Fig. 10

Fig. 3.2-6 Energy flow during mains failure operation

In the event of an extended mains failure, before the battery is fully discharged, the alarm “stop operation” warns the user that the UPS will start the shutdown procedures when the indicated time expired (normally 3 minutes).

In case of parallel system With parallel system for power capacity: • With the bypass mains power available as the warning “battery low” occurs on one unit, after timeout (selectable) the load is transferred to mains.

  • With missing bypass mains power as the warning occurs on one unit, the system starts the timeout (selectable) of “Stop operation” and then the output load shuts down. With redundant parallel system :
  • As the warning battery low occurs on one unit unnecessary to support the present load, after timeout (selectable) this unit shuts down and the load is shared between the other units. As the warning occurs on one unit necessary to support the present load, the system starts the timeout (selectable) of “stop operation” and then the output load shuts down.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Manual bypass operation · Mains failure operation

Page 14 of the GE Uninterruptible Power Supply (LP 33) user manual — UTILITY INPUT
Page 14 · click to enlarge
Page 14

3.3 RPA PARALLEL SYSTEM

The RPA (Redundant Parallel Architecture) allows to extend the unit to a parallel system with 2, 3, or 4 units LP 33 Series connected on the same bus, which ensure the highest reliability rate and increase the power availability. Parallel system for power capacity Two or more units can be paralleled in order to achieve output power superior to the maximum power delivered by a single UPS unit. The maximum total load shared between the n parallel units can achieve the 100% of the installed nominal power system. In the event of one unit fails, the load will be suddenly transferred to the mains by the bypass. Parallel system for redundancy The parallel system can be defined redundant only in case the nominal power rating of n-1 units of n parallel units is sufficient to supply the required load power.

UTILITY INPUT

F2 F1 F3 F4

LOAD

Fig. 3.3-1 RPA system diagram

The load in a parallel redundant system, is equally shared by n units connected on the output bars. Should one of the parallel units trip off-line, the remaining (n-1) units will share the load maintaining the applications protected by inverter until the normal situation restores. Load sharing between parallel units The control bus exchanging the data between the microprocessors of the paralleled units provide for a constant proportional load sharing in every load condition. Management and synchronization of the parallel system All the units are identical without master and slaves. One unit is arbitrarily selected as the reference (the first unit connected on power bus) being this unit the first synchronized with the mains voltage, and all the other units synchronize with the first one. In case the reference unit fails or it is excluded from the parallel power bus any other unit will take over the reference role. The AC input power source of all the bypasses must be the same for all the units of the parallel system excluding any phase shift between them. Control bus of the parallel system A high-speed serial bus, guarantees communication, synchronization and load sharing between the UPS modules. Each module controls it’s own function, while the Master (each unit can be Master) controls and commands the status of the system.

GE Uninterruptible Power Supply (LP 33) — UTILITY INPUT diagram (page 14)
Fig. 11

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Show 9 more labels / short text on this page
LPS33U_030-040_RPA system_GE_01 · LP 33 Series · LP 33 Series · LP 33 Series · LP 33 Series · RPA Board · RPA Board · RPA Board · RPA Board
Page 15 of the GE Uninterruptible Power Supply (LP 33) user manual — 3.4 UPS PARALLELED ON THE SAME BATTERY
Page 15 · click to enlarge
Page 15

3.4 UPS PARALLELED ON THE SAME BATTERY

Usually each UPS Unit runs with its own Battery. In case of parallel units running with a Common Battery (max. 4 UPS - see Fig. 3.4-1), the sharing circuit between the individual UPS is integrated in the communication bus of the system in order to assure an equal sharing of the Rectifiers output currents.

GE Uninterruptible Power Supply (LP 33) — 3.4 UPS PARALLELED ON THE SAME BATTERY diagram (page 15)
Fig. 12
1. 2 – 3 – 4 – 5 – 6 – 7 – 8 –

Rectifier Inverter Automatic Bypass Manual Bypass Mains Power Load Bus Bar External Battery Fuse Battery

Fig. 3.4-1 Diagram RPA system with UPS on common battery

Pay attention to the following recommendations:

  • The units delivered for this functioning mode needs a special parameters setting, so they must be prepared in advance before the installation.
  • The installation must be performed only with the UPS system completely shut down.
  • The AC Rectifiers input power (5) must be the same, with clockwise phase rotation for each unit.
  • Each Rectifier must be set for the same floating DC voltage and the same Battery current limitation.
  • It is mandatory to install the fuses / MCB (7) on each line connecting the Rectifiers to the common Battery for maintenance / safety reasons (see Section 4.7.2 ).
  • In case a unit must be powered down for maintenance, switch-OFF the concerned unit before open the DC fuses / MCB on the Battery line (7).
  • If an emergency generator set supplies the UPS, and the free contact “Generator ON” is connected to the Customer Interface , connect a separate NO free contact on each parallel unit.
  • Do not connect the temperature sensor for automatic battery floating voltage compensation.
  • Do not enable the function Boost charge .

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 16 of the GE Uninterruptible Power Supply (LP 33) user manual — 3.5 SERVICE AND TECHNICAL SUPPORT
Page 16 · click to enlarge
Page 16

3.5 SERVICE AND TECHNICAL SUPPORT

GE Uninterruptible Power Supply (LP 33) — 3.5 SERVICE AND TECHNICAL SUPPORT diagram (page 16)
Fig. 13

Stamp of your Dealer or local responsible of the Technical Assistance

For any request of technical support please contact the supplier who provided the system.

GE Uninterruptible Power Supply (LP 33) — 3.5 SERVICE AND TECHNICAL SUPPORT diagram (page 16)
Fig. 14

The requested data permitting to identify your UPS are marked on the identification label fixed on the front of the cabinet, behind the lower front door. For fast and efficient Technical Support solutions, please mention the data marked on the identification label.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 17 of the GE Uninterruptible Power Supply (LP 33) user manual — WARNING !
Page 17 · click to enlarge
Page 17

3.6 RECYCLING AT THE END OF SERVICE LIFE

NOTE !

This product has been designed to respect the environment, using materials and components respecting eco-design rules.

It does not contain CFCs (Carbon Fluor Clorid) or HCFCs (Halogen Carbon Fluor Clorid).

GE Uninterruptible Power Supply (LP 33) — 3.6 RECYCLING AT THE END OF SERVICE LIFE diagram (page 17)
Fig. 15

GE, in compliance with environment protection recommends to the User that the UPS equipment, at the end of its service life, must be recovered conforming to the local applicable regulations.

WARNING !

Leads contained in the batteries is a dangerous substance for the environment, therefore it must be correctly recycled by specialised companies!

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 18 of the GE Uninterruptible Power Supply (LP 33) user manual — 4.1 LAYOUT LP 33 Series / 30 & 40 kVA
Page 18 · click to enlarge
Page 18

4 LAYOUT

4.1 LAYOUT LP 33 Series / 30 & 40 kVA

GE Uninterruptible Power Supply (LP 33) — 4.1 LAYOUT LP 33 Series / 30 & 40 kVA diagram (page 18)
Fig. 16 · 4.1 LAYOUT LP 33 Series / 30 & 40 kVA
GE Uninterruptible Power Supply (LP 33) — 4.1 LAYOUT LP 33 Series / 30 & 40 kVA diagram (page 18)
Fig. 17 · 4.1 LAYOUT LP 33 Series / 30 & 40 kVA

Fig. 4.1-3 Control panel

GE Uninterruptible Power Supply (LP 33) — 4.1 LAYOUT LP 33 Series / 30 & 40 kVA diagram (page 18)
Fig. 18 · 4.1 LAYOUT LP 33 Series / 30 & 40 kVA

Fig. 4.1-4 Q1 & Q2 switches

Fig. 4.1-1 General view

GE Uninterruptible Power Supply (LP 33) — 4.1 LAYOUT LP 33 Series / 30 & 40 kVA diagram (page 18)
Fig. 19 · 4.1 LAYOUT LP 33 Series / 30 & 40 kVA

CI Customer Interface Board (optional)

Q1 UPS output switch

Q2 Manual bypass switch

SNMP Advanced SNMP Card (optional)

RS232 Serial port RS232

Fig. 4.1-2 General view with open door

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

BC Battery cabinet · F5-6-7 Battery fuses · RC Relay card

Page 19 of the GE Uninterruptible Power Supply (LP 33) user manual — 5.1 CONTROL PANEL
Page 19 · click to enlarge
Page 19

5 SYSTEM HANDLING

5.1 CONTROL PANEL

GE Uninterruptible Power Supply (LP 33) — 5.1 CONTROL PANEL diagram (page 19)
Fig. 20

Fig. 5.1-1 Control panel LCD screen Shows the UPS system data, events messages and UPS setting. The data is displayed on 4 rows, 20 characters each, allowing the operator to select between 7 languages: English, German, French, Spanish, Italian, Finnish or Polish. If there is no keypad activity during 1 minute the LCD screen will return to default screen. Metering Shows electric parameters, operating statistics and some information screens (see Section 6.1). Alarm Shows in chronological order, all the events occurred (alarms, messages, commands, handling, etc.) and resets general alarm / buzzer (see Section 6.2). Menu Allows the user to adapt certain features of the UPS to his needs, to reset the command total off, to test the LEDs panel, and to command the inverter ON/OFF (see Section 6.3). + Scroll to following screen. Entering in PARAMETER MENU/USER, allows to select the horizontal editable position. - Entering in Alarm and Metering, scroll to previous screen. Entering in menu allows to select the row including the needed command. Enter Confirms the selected command. Entering in PARAMETER MENU/USER allows the user to change the parameters. LED Alarm (red)

  • It warns about the imminent inverter stop and the consequent load shutdown as result of:
  • The battery is fully discharged and the load cannot be transferred on mains (default parameter = 3 min.).
  • Overtemperature (default = 3 min.) or overload condition (125%-10 min, 150%-1 min.) and the load cannot be transferred on mains . LED Warning (yellow)

When blinking, it means the UPS is in alert condition with the buzzer sounding. The yellow LED will remain lit after pressing the key Alarm. It remains lit also when the output switch Q1 is open or battery disconnected. LED Operation (green)

When lit, it means the UPS is correctly operating and the load is powered by the inverter. When blinking, it means SERVICE REQUIRED

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 20 of the GE Uninterruptible Power Supply (LP 33) user manual — 5.2 COMMAND PUSH BUTTONS AND SWITCHES
Page 20 · click to enlarge
Page 20

5.2 COMMAND PUSH BUTTONS AND SWITCHES

GE Uninterruptible Power Supply (LP 33) — 5.2 COMMAND PUSH BUTTONS AND SWITCHES diagram (page 20)
Fig. 21

total off Press simultaneously the keys “Alarm” and “-” on the panel. This will cause the opening of all contactors (K4, K6 and K7), shutdown of booster, Inverter, battery- charger and SSM.

In a parallel system pressing total off on one unit all the units will shut down.

Using the command total off, the load will be immediately powered down.

To restart the unit, command total off must be restored entering the screen

GE Uninterruptible Power Supply (LP 33) — 5.2 COMMAND PUSH BUTTONS AND SWITCHES diagram (page 20)
Fig. 22
GE Uninterruptible Power Supply (LP 33) — 5.2 COMMAND PUSH BUTTONS AND SWITCHES diagram (page 20)
Fig. 23

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 21 of the GE Uninterruptible Power Supply (LP 33) user manual — = 70% SERVICE REQUIRED
Page 21 · click to enlarge
Page 21

6 LCD SCREEN

Shows the UPS system data, events messages and UPS setting. The data is displayed on 4 rows, 20 characters each, allowing the operator to select between 7 languages: English, German, French, Spanish, Italian, Finnish and Polish. If there is no keypad activity during 1 minute the LCD screen will return to default screen. 6.1 METERING SCREENS (Metering)

This menu allows, when the keypad Metering is pressed, to show on the LCD panel a series of screens containing metering information about AC and DC parameters.

LP 33 40kVA P1

1. UPS family, nominal rating and for RPA : P + No. UPS.

APPLICATION ON UPS

2. Load status: application on UPS, on utility, supply off, manual bypass (appl. on manual dev.) and ECO Mode .

= 70% SERVICE REQUIRED

3. The load amount as a percentage of the nominal load (referred to the most loaded phase).
4. The signalling, combined with the green LED Operation blinking, is done only in case the respective parameter (protected by password) has been enabled. See Section 8.4 .

Udcp=215V Udcn=215V Ubp=164V Ubn=164V O Charge Level = 100% Autonomy = 15min

1. Booster DC voltage + pole ( Udcp ) and – pole ( Udcn ).
2. Battery DC voltage + pole (Ubp) , – pole (Ubn) and the status SBM (Superior Battery Management). The functionality of SBM can help to reduce the Battery recharging time, and improve the lifetime of the Battery.

Beside the indication of the Battery voltage on the display, a letter shows, according to the table below, the operational status of SBM:

Sigle Status of charger Charter voltage Description

O OFF 0 VDC Battery open circuit voltage

T ON Boost (176 VDC) Boost charge with new Battery

F ON Floating (164 VDC) Battery charged

L ON Floating (164 VDC) Normal charge

B ON Boost (176 VDC) Boost charge

E ON Boost (179 VDC) Battery equalization

Access to the Parameters for setting the SBM mode is password protected. Please call your Service Center.

3. Battery charge level.
4. Estimated battery backup time with actual load.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 22 of the GE Uninterruptible Power Supply (LP 33) user manual — U3=121V
Page 22 · click to enlarge
Page 22
1. Mains input voltage information screen. 2. Mains input frequency. 3. Mains line voltage L1 (A) and L2 (B)phases. 4. Mains line voltage L3 (C) phase.

MAINS f=60.0Hz U1=120V U2=119V

U3=121V

1. Rectifier input voltage information screen. 2. Mains input frequency. 3. Input line voltage L1 (A) and L2 (B) phases. 4. Input line voltage L3 (C) phase.

RECTIFIER

f=60.0Hz U1=120V U2=119V

U3=121V

1. Inverter voltage information screen. 2. Output inverter line voltage L1 (A), L2 (B) and L3 (C) phases 3. Output frequency. 4. Synchronization status inverter with respect to mains.
INVERTERU1=120V U2=120V U3=120V Frequency = 60.0Hz Synchronized
1. Load on output phases information screen. 2. Voltage, current and load percentage phase L1 (A). 3. Voltage, current and load percentage phase L2 (B). 4. Voltage, current and load percentage phase L3 (C).

LOAD ON PHASE U1=120V I1=56A 50% U2=120V I2=50A 45% U3=120V I3=61A 55%

1. Screen informing about the battery and time of operation. 2. Battery temperature. 3. Operating time (CPU powered) for the UPS (hours). 4. Operating time with inverter supplying the load (hours).

MISCELLANEOUS Battery Temp. = +25°C UPS Oper Time= 450h INV Oper Time= 430h

1. Screen informing about the quality of the input power. 2. The quantity of bypass mains out of tolerance faults. 3. The quantity of rectifier mains out of tolerance faults. 4. The total number of detected output overloads.

MAINS FAULTS STAT. Minor = 100 Major = 150 Overloads = 30

1. Screen containing the data identifying the unit. 2. UPS family, nominal rating and for RPA: P + no. UPS. 3. The software version implemented on the control board. 4. The serial number of the unit.

IDENTIFICATION LP 33 40kVA P1 SW Version: x.x S/N: Q0040-0105-0001

Screen containing the statistic evaluation in % (100= good; 0= bad) of the utility, for the ECO Mode operation. 4. The number of fast transients occurred on the bypass utility on the last seven days.

ECO Mode RATE 100% NR FAST TRANSIENT 2ms >5ms >10ms 25 10 7 3

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 23 of the GE Uninterruptible Power Supply (LP 33) user manual — 4116 HIGH BATTERY
Page 23 · click to enlarge
Page 23

6.2 EVENT SCREENS (Alarm)

Each of the following listed alarms or messages can be displayed on the LCD screen or transmitted to a PC through the serial port RS232 or the SNMP card (optional). Entering the Alarm mode, the LCD screen displays a sequence of screens corresponding to the last 256 alarms & events, each screen indicating:

01.01.2005 12:15:45 NR=255 Status=A588 4580: INVERTER AND MAINS SYNCHRONIZED

1. The exact date and time when the event occurred.
2. The number (255 being the most recent) and status code.
3. The software version implemented on control board and

explicit text description of the event. 6.2.1 Alarms list

Are defined alarms: all the events which activate the LED Warning (yellow) and the buzzer in order to alert the user about an abnormal situation.

4000 SETUP VALUES

Parameters are lost and have been replaced with default values.

LOST

Voltage supply +/-15 VDC has been detected out of tolerance on the P1 – Control board or the programmable circuits are defective.

4001 REGULATION BOARD

FAILURE

4004 UPS FAILURE

The master unit detected the slave unit missing on the communication bus even though switch Q1 is still closed.

The trip indicator mounted on rectifier input fuses indicates a blown fuse. The rectifier is turned Off (K4 open) and the load will be supplied by the battery.

4100 RECTIFIER FUSES

FAILURE

4102 K4 CLOSING

K4 not closed despite a closing command being done. The rectifier is switched OFF.

FAILURE

4103 K4 OPENING

K4 not open despite an opening command being done. The rectifier is switched OFF.

FAILURE

4110 RECTIFIER MAINS OUT OF TOLERANCE

Rectifier input mains has been detected out of tolerance (voltage, frequency or phase).

The battery has been discharged and reached “stop operation” time-out (default 3 minutes), the inverter will be shut down. It restarts automatically only when the battery has recovered energy to ensure min. a “stop operation” time to the actual load.

4115 LOW BATTERY

VOLTAGE

4116 HIGH BATTERY

VOLTAGE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Code Alarm Meaning

Page 24 of the GE Uninterruptible Power Supply (LP 33) user manual — 4410 BYPASS MAINS OUT OF TOLERANCE
Page 24 · click to enlarge
Page 24

During battery test the DC voltage falls under the critical level. If the boost voltage has not been reached within 24 hours, then the charge voltage returns to floating voltage. Battery test is stopped.

4118 BATTERY

FAULT

Rectifier and inverter are OFF. The DC power supply is discharging the battery slowly. Rectifier must be restarted or battery must be disconnected in order to avoid damages.

4130 TURN ON RECT. OR SHUTDOWN UPS

Rectifier voltage hasn’t reached the set value. Probably fault on regulation loop. The DC capacitors are not equally charged (more of 50 VDC of difference). The rectifier is switched OFF.

4140 RECTIFIER CONTROL FAILURE

Inverter output fuses blown. Signaled by electronic detector. Inverter can be started manually after replacement of fuses.

4301 INVERTER FUSES FAILURE

K7 not closed despite a closing command being done. Signaled by auxiliary contact. Load will be supplied by mains.

4304 K7 CLOSING

FAILURE

K7 not open despite an opening command being done. Signaled by auxiliary contact. Load will be supplied by mains.

4305 K7 OPENING

FAILURE

Inverter output voltage is out of the tolerances defined in respective parameter (±10%). Inverter is switched OFF.

4312 INV. VOLTAGE OUT OF TOLERANCE

Detection of inverter bridge (Is) current limitation cause inverter OFF and automatic restart (message 320). After 3 times inverter switches OFF for persistent Is max detection in time. Inverter switch OFF, and it can be restarted manually.

4320 ISMAX DETECTION

4340 INVERTER CONTROL FAILURE

The slave oscillator is not synchronized with the master, thus causing the shutdown of it’s inverter.

Auto calibration of the Inverters free-run frequency was not possible. The oscillator frequency of this unit is out of tolerance.

4347 OSCILLATOR

FAILURE

4402 RECTIFIER CANNOT BE TURNED ON

The rectifier cannot be turned on because the DC link voltage has not reached the requested value.

K6 not closed despite a closing command being done. Signaled by auxiliary contact. The load cannot be supplied by electronic bypass.

4404 K6 CLOSING

FAILURE

4405 K6 OPENING

K6 not open despite an opening command being done. Signaled by auxiliary contact.

FAILURE

The mains bypass voltage is out of the tolerances (±10%). K6 opens, synchronization with mains is inhibited and transfer to mains is blocked.

4410 BYPASS MAINS OUT OF TOLERANCE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Code Alarm Meaning

Page 25 of the GE Uninterruptible Power Supply (LP 33) user manual — 4999 LOAD OFF DUE TO
Page 25 · click to enlarge
Page 25

4520 NO INVERTER

The load supplied by utility is over 100%. The load remains blocked on utility as long as alarm overload is active.

POWER

Load is locked on mains because 3 transfers on mains have been detected in a short time (default 30 seconds). Transfer will be free again after a time defined by respective parameter (default 30 seconds).

4530 LOAD LOCKED

ON MAINS

4531 LOAD ON MAINS BY ERROR DETECTOR

Load is transferred to mains because the error detector detected a disturbance on the output voltage.

Alarm after detection of an Emergency Off from an external safety device connected on Customer Interface. Consequently K4, K6 and K7 open and shut down inverter, booster and rectifier.

4563 EMERGENCY OFF

ACTIVATED

The UPS-System is in an overload condition >125% on inverter, or >150% on mains. A sequence of “stop operation” starts. Time out depending on load quantity.

4570 OVERLOAD

With mains bypass supply available and load >115%, the load is transferred on mains. Load will be transferred again automatically on inverter when load will be

4571 OVERLOAD: LOAD ON MAINS

4581 INVERTER AND MAINS NOT SYNCH.

The voltages of mains and inverter are not synchronized, which causes the opening of K6.

The battery temperature exceeds the value inserted in parameter. Disabled with parameter (service only).

4697 BATTERY OVERTEMPERATURE

4698 BATTERY POWER

In case of utility failure, with the actual load, the autonomy time would result below “stop operation” time (default 3 minutes).

INSUFFICIENT

Battery voltage is at the lowest limit. Shutdown of inverter until the battery voltage reaches the value in respective parameter.

4700 DC LOW

The load is locked on Inverter following 3 load transfers within 30 seconds. After time out of the value in respective parameter (default 30 seconds), bypass will be free.

4900 LOAD LOCKED

ON INVERTER

An overtemperature condition has been detected on inverter. Elapsed “stop operation” time, inverter shutdown. With mains available, load is transferred on mains.

4955 OVERTEMPERATURE

4998 LOAD OFF DUE TO EXTENDED OVERLOAD

Load Off after time-out of “stop operation” for overload on inverter or bypass (time depending on the % of overload).

Load Off after time-out of “stop operation” with missing mains due to battery low voltage or overtemperature condition.

4999 LOAD OFF DUE TO

UBATT OR TEMP.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Code Alarm Meaning

Page 26 of the GE Uninterruptible Power Supply (LP 33) user manual — 4361 INVERTER
Page 26 · click to enlarge
Page 26

6.2.2 Messages list

Are defined messages: all the recorded events which are referred to the operation status coherent with the normal situation of the UPS.

4111 RECTIFIER MAINS OK

Rectifier input mains is again within the admitted tolerance (voltage, frequency and phase).

The UPS is in Load OFF status, resulting in Battery supply for the power supply. Should the Battery voltage decrease to a value below of the one set in a parameter, then power supply will shutdown to avoid damage to the Battery

4114 UPS SHUTDOWN (LOW BATT VOLTAGE)

Start of manual or automatic battery test. Rectifier output voltage is decreased to the value defined by respective parameter.

4119 BATTERY TEST

STARTED

End battery test. End of manual or automatic battery test. Rectifier output voltage is restored to floating voltage.

4120 BATTERY TEST

STOPPED

4141 ISMAX DETECTION

Detection of persistent booster (Is) current limitation.

BOOSTER

4161 RECTIFIER

Rectifier received the command to switch ON.

ON

4162 RECTIFIER

Rectifier received the command to switch OFF for: input mains out of tolerance / EPO / UDC max.

OFF

4163 GENERATOR

Customer Interface (X1 / 11, 22) received a Gen set ON signaling. Operating mode dependent on setting of respective parameters.

ON

Customer Interface (X1 / 11, 22) received a Gen set OFF signaling. Function bypass enabled dependent on setting of respective parameter.

4164 GENERATOR

OFF

  • Inverter cannot be switched on because one of the following conditions are still present:
  • Overtemperature;
  • Low battery voltage;
  • Inverter fuses;
  • Overload;
  • K7 opening failure;
  • High battery voltage;
  • DC low;
  • EPO (Emergency Power Off).

4302 INVERTER CANNOT BE TURNED ON

4303 INVERTER CANNOT BE TURNED OFF

Inverter cannot be switched OFF, because the load cannot be transferred on mains (voltage out of tolerance, not synchronizing, bypass blocked).

The command to start the inverter has been activated on the control panel.

4361 INVERTER

ON

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Code Message Meaning

Page 27 of the GE Uninterruptible Power Supply (LP 33) user manual — 4601 COMMAND UPS
Page 27 · click to enlarge
Page 27

4362 INVERTER

The command to switch OFF the inverter has been done by the control panel or automatically for alarm detection.

OFF

4411 BYPASS MAINS

Bypass input mains is again within the admitted tolerance (voltage, frequency and phase).

OK

4500 COMMAND

Disconnection of the load by opening K4, K6 and K7 for: EPO / Total Off / Overload / Stop operation.

LOAD OFF

4521 NO BYPASS

With the load supplied by electronic bypass, a mains failure or K6 opening occurred.

POWER

4534 MULTIPLE LOAD

2 transfers inverter-mains have been detected in a short time, defined by respective parameter (default 30 seconds).

TRANSFER

4535 BYPASS LOCKED

Transfer on mains not enabled due to settings of respective parameters. Contactor K6 is open.

Settings of respective parameters enable bypass transfer on mains. Contactor K6 can be closed.

4536 BYPASS

FREE

4561 TOTAL

Push-button Total Off behind the front door has been pressed, with the output circuit breaker Q1 closed.

OFF

4562 DETOUR

The auxiliary contact indicates that manual bypass Q2 has been closed.

ON

4564 DETOUR

The auxiliary contact indicates that manual bypass Q2 has been opened.

OFF

4567 COMMAND LOAD ON MAINS

The control unit received a command to transfer the load on mains.

4568 COMMAND LOAD ON INVERTER

The control unit received a command to transfer the load on inverter.

4572 NO MORE OVERLOAD

End of the overload condition previously detected with alarm 4570.

4580 INVERTER AND MAINS SYNCHRONIZED

The voltages of inverter and mains bypass are synchronized.

Command not to synchronize with mains has been done for: mains bypass out of tolerance (4410) or setting respective parameters.

4582 COMMAND NOT TO

SYNCHRONIZE

4583 COMMAND TO SYNCHRONIZE

Command to synchronize with mains has been done for: mains BP OK (4410) or setting respective parameters.

The ECO Mode function has been disabled or the programmed time is expired. The UPS returns to VFI Mode supplying the load normally by inverter.

4600 COMMAND

UPS ON

The function ECO Mode is enabled, and according to the time program the UPS will run in ECO Mode, supplying the load normally by mains.

4601 COMMAND UPS

STAND BY

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Code Message Meaning

Page 28 of the GE Uninterruptible Power Supply (LP 33) user manual — 4764 REMOTE CONTROL
Page 28 · click to enlarge
Page 28

4602 Q1 OPEN

The auxiliary contact indicates that the output switch Q1 has been opened.

4603 Q1 CLOSED

The auxiliary contact indicates that the output switch Q1 has been closed.

  • Not possible to start battery test (it is postponed) for:
  • No mains rectifier or bypass;
  • Battery not fully charged;
  • Load is below 10% or above 80%.

4699 BATTERY TEST

IMPOSSIBLE

Inverter can be started or shutdown by remote control. Commands source can be chosen depending on the value of respective parameter (password required): 0 = Only local panel. 1 = Only serial port on CI (TLC). 2 = Both.

4763 REMOTE CONTROL

ON

Inverter can be started or shutdown by remote control. Commands source can be chosen depending on the value of respective parameter (password required): 0 = Only local panel. 1 = Only serial port on CI (TLC). 2 = Both.

4764 REMOTE CONTROL

OFF

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Code Message Meaning

Page 29 of the GE Uninterruptible Power Supply (LP 33) user manual — 6.2.3 Event report LP 33 Series
Page 29 · click to enlarge
Page 29

6.2.3 Event report LP 33 Series

In case of failure or malfunction, before calling the nearest Service Centre please note the most important identification data of your UPS and the most recent events displayed. In order to make the diagnosis easier for our Diagnostic Centre we suggest you make a copy of this page, fill it in with the requested data, and send it by fax.

GE Uninterruptible Power Supply (LP 33) — 6.2.3 Event report LP 33 Series diagram (page 29)
Fig. 24 · 6.2.3 Event report LP 33 Series

UPS No.: - - Series:

Date: / / Signature:

GE Uninterruptible Power Supply (LP 33) — 6.2.3 Event report LP 33 Series diagram (page 29)
Fig. 25 · 6.2.3 Event report LP 33 Series

Description of repair action taken:

Actual situation:

Remarks:

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 30 of the GE Uninterruptible Power Supply (LP 33) user manual — ALARMS UPS FAILURE CALL SERVICE
Page 30 · click to enlarge
Page 30

6.3 MENU SCREENS (Menu)

Pressing the menu keypad a series of screens will be displayed, permitting the user to set some functions of the UPS, to restore the command total off, to perform the LEDs TEST, and to switch the inverter ON/OFF.

1. UPS family, nominal rating and for RPA: P + No. UPS. 2. The operating mode of the UPS (UPS ON/OFF).

LP 33 40kVA P1 UPS ON

1. Screen inverter command. 2. Inverter ON. 3. Inverter OFF. (The visualization of *, indicates the Inverter status).

LAMP TEST RESET TOTAL OFF *

1. Signaling LEDs test and buzzer test. 2. Restore the output supply following the command total off (the asterisk * beside the text means that the command total off has been activated with Q1 closed).
1. Screen parameters set-up for user and service. 3. Level 1: this first level not protected by password allows the user to modify some parameters of the UPS (see Section 6.3.1 ). 4. Level 2: access protected by password reserved for service engineers.

PARAMETER MENU LEVEL 1: USER LEVEL 2: SERVICE

1. Screen indicating the presence of alarm condition and the consequent operation mode. 2. UPS status: UPS shutdown due to UPS FAILURE (fuse blown) or abnormal conditions for UPS (OVERTEMPERATURE or MAINS FAILURE). 3. Action needed following the alarm condition CALL SERVICE or output statement which can be APPLIC. ON UTILITY if the output is powered by mains or APPLIC. PROTECTED when the load is normally powered by the inverter.

ALARMS UPS FAILURE CALL SERVICE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 31 of the GE Uninterruptible Power Supply (LP 33) user manual — PARAMETER MENU
Page 31 · click to enlarge
Page 31

6.3.1 User parameters screen

This screen allows the user to modify some parameters permitting to adapt some functions of the UPS to his/her needs, described as follows. This screen can be accessed by entering MENU/PARAMETER MENU/LEVEL 1: USER and confirming with the key Enter.

PARAMETER MENU

LEVEL 1: USER LEVEL 2: SERVICE

In PARAMETER MENU the buttons + / - / Enter perform the following functions:

+ This key allows to scroll forward to the next screen and, once the key Enter has been pressed, to move the horizontal selection to the next editable position.

- This key allows to move the selection to the next parameter and, once the key Enter has been pressed, to change the value of the selected character by the underscore cursor.

Enter Start the editing for the currently selected parameter. 1. Date and time set-up

DATE AND TIME D M Y Date: 01.01.2005 Hour: 12:15:45

1. Date and time setup. 2. D = Day M = Month Y = Year.
3. Date set-up: the set value is thoroughly checked to be a correct format “ dd.mm.yyyy ”.
4. Time set-up: the set value is thoroughly checked to be a correct format “ hh.mm.ss ”. The time is specified in 24 hour format. 2. Modem protocol set-up

PROTOCOL SETUP Modem enabled = N Init=BEQV1X3&D0S0=2 Alarm=N Delay=30s

1. Modem protocol set-up. 2. Y : enables or N : disables the modem call.
3. Init : this parameter presents the modem initialization string.

It can be 39 characters long and considers that a blank character terminates the string. If no blank character is found then all 39 characters are used

4. Alarm : Y/N controls the automatic events signaling through modem. If this parameter is set to Y (yes) the UPS itself will call the remote location when a new event occurs.

Delay: This parameter controls the delay between the occurrence of a new event and the modem dialing. It is useful because since the events typically do not occur isolated but in certain sequences, you can eliminate the need for multiple dial-outs for such a sequence of events.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 32 of the GE Uninterruptible Power Supply (LP 33) user manual — 4520 NO INVERTER
Page 32 · click to enlarge
Page 32
3. Telephone numbers set-up

Tel1: This parameter specifies a first tel. number to be used for modem dial-out. The telephone number has a maximum of 39 characters and cannot contain intermediate blank. If the desired number is shorter than 39 characters, finish the string with blanks.

Tel1Tel1 enabled: N Tel2: Tel2 enabled: N

Tel1 enabled: this parameter Y/N specifies if the first telephone number will be used for dial-out.

Tel2: it records the second dial-out number.

Tel2 enabled: this parameter Y/N specifies if the second telephone number will be used for dial-out.

Tel3: it records the third dial-out number.

Tel3 enabled: this parameter Y/N specifies if the third telephone number will be used for dial-out.

Tel4: it records the fourth dial-out number.

Tel4 enabled: this parameter Y/N specifies if the fourth telephone number will be used for dial-out. 4. LCD Display

LCD Display UPS NAMELP 33
1. LCD display screen. 2. UPS name : the user can choice the name of the UPS model showed on the main page (11 digits).
4. Language : his parameter allows the choice of language used to display the information. Valid choices are English, German, French, Spanish, Italian, Finnish and Polish . 5. Operation mode selection ( VFI Mode or ECO Mode )

HOURS SELECTED 24 24 12

1. ECO Mode This parameter (values Y / N ) enables or disables the operation in ECO Mode .

If the value is Y and the current time is in the interval for the current day, the ECO Mode is active.

The activation / disactivation of ECO Mode is indicated each time in the event list.

In order to check the inverter function, at least 1 minute of VFI Mode must be programmed during the week (the Y / N parameter is automatically disabled if this condition is not satisfied). In case this minimum time in VFI Mode is not respected, the ECO Mode will be disabled.

If the value is N, the UPS is normally operating in VFI / double conversion mode at all times.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Language = ENGLISH

Page 33 of the GE Uninterruptible Power Supply (LP 33) user manual — 4520 NO INVERTER
Page 33 · click to enlarge
Page 33

2. d1 ÷ d7: Enabling time in function of weekdays. For the weekdays from d1 to d7 (Saturday to Friday) the edit mode (edit day) allows to define time intervals when the UPS is operating in ECO Mode. The hour is given in 24-hour format. These intervals are defined by: ECO Mode START: the hour of the day after which the ECO Mode is enabled. The ECO Mode is enabled until the following ECO STOP time is reached (the ECO STOP time of the same day if this is later than the ECO START time, the ECO STOP time of the following day otherwise). ECO Mode STOP: the hour of the day before which the ECO Mode is enabled. The ECO Mode is enabled starting from the preceding ECO START time (the ECO START time of the same day if this is earlier than the ECO STOP time, the ECO START time of the previous day otherwise). Identical times for ECO START and ECO STOP maintain the existing mode only in case the previous command was ECO START and the following command will be ECO STOP. 3. HOURS SELECTED: The number of ECO Mode hours per weekday (from d1 - Saturday to d7 - Friday) is displayed in the operation mode parameter window (ceiling value). To better understand the ECO Mode programming, some typical examples are shown: Example 1: For continuous ECO Mode set the ECO START times to 00:00 and the ECO STOP times to 23:59 for all weekdays, but almost 1 day must have 1 minute of VFI programmation: i.e d2 - Sunday 00:00 to 23:58).

GE Uninterruptible Power Supply (LP 33) — 4520 NO INVERTER diagram (page 33)
Fig. 26

Weekday d1 - Saturday d2 - Sunday d3 - Monday d4 - Tuesday d5 - Wednesday d6 - Thursday d7 - Friday

ECO START 00:00

ECO STOP 23:59 23:58 23:59 Example 2: ECO Mode STOP before ECO Mode START. ECO START 18:00, ECO STOP 06:00 for weekday d4 - Tuesday. Means that on d4 - Tuesday the ECO Mode is active between 00:00 and 06:00 and between 18:00 and 23:59.

GE Uninterruptible Power Supply (LP 33) — 4520 NO INVERTER diagram (page 33)
Fig. 27

Weekday d1 - Saturday d2 - Sunday d3 - Monday d4 - Tuesday d5 - Wednesday d6 - Thursday d7 - Friday

ECO START 00:00 00:00 00:00 18:00 00:00 00:00 00:00

ECO STOP 23:59 23:59 23:59 06:00 23:59 23:59 23:59 Example 3: ECO Mode during the night and week-end. If the ECO Mode must be enabled all nights (d3 - Monday ÷ d7 - Friday) between 18:00 in the evening and 06:00 of the following morning and during all Saturday (d1) and Sunday (d2), the corresponding parameters are:

GE Uninterruptible Power Supply (LP 33) — 4520 NO INVERTER diagram (page 33)
Fig. 28

Weekday d1 - Saturday d2 - Sunday d3 - Monday d4 - Tuesday d5 - Wednesday d6 - Thursday d7 - Friday

ECO START 00:00 00:00 18:00

ECO STOP 23:59 23:59 06:00

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 34 of the GE Uninterruptible Power Supply (LP 33) user manual — 4520 NO INVERTER
Page 34 · click to enlarge
Page 34

Example 4: If the ECO Mode must be enabled on Monday (d3) and Tuesday (d4) between 18:00 in the evening and 06:00 of the following morning, on Friday (d7) between 12:00 and 13:00, during all Saturday (d1) and on Sunday (d2) until 20:00, the corresponding parameters are.

GE Uninterruptible Power Supply (LP 33) — 4520 NO INVERTER diagram (page 34)
Fig. 29

Weekday d1 - Saturday d2 - Sunday d3 - Monday d4 - Tuesday d5 - Wednesday d6 - Thursday d7 - Friday

ECO START 00:00 00:00 18:00 18:00 00:00 00:00 12:00

ECO STOP 23:59 20:00 23:59 06:00 06:00 00:00 13:00

ECO START ECO STOP In dark colour are displayed the times with ECO Mode operation. The arrows indicate the conditions given by the ECO START and ECO STOP times introduced with the parameters. Note that on day d6 - Tuesday the interval has length 0 (zero), therefore the ECO Mode is not enabled on this day. Example 5: An equivalent set of parameters for Example 4 is.

GE Uninterruptible Power Supply (LP 33) — 4520 NO INVERTER diagram (page 34)
Fig. 30

Weekday d1 - Saturday d2 - Sunday d3 - Monday d4 - Tuesday d5 - Wednesday d6 - Thursday d7 - Friday

ECO START 00:00 00:00 18:00 18:00 06:00 09:00 12:00

ECO STOP 23:59 20:00 18:00 06:00 06:00 09:00 13:00

ECO START ECO STOP The ECO Mode is active from 18:00 of weekday d3 - Monday until 06:00 of weekday d4 - Tuesday (as indicated by the ECO STOP time of weekday d4 - Tuesday). The ECO STOP time of weekday d3 - Monday has no effect as it is followed by the ECO STOP time of weekday d4 - Tuesday. It can be, without change of meaning, any time between 18:00 and 23:59. Similarly, the ECO Mode is active from 18:00 of weekday d4 - Tuesday until 06:00 of weekday d5 - Wednesday. The ECO START time of weekday d5 - Wednesday has no effect as it is preceded by the ECO START time of weekday d4 - Tuesday. It can be, without change of meaning, any time between 00:00 and 06:00.

GE Uninterruptible Power Supply (LP 33) — 4520 NO INVERTER diagram (page 34)
Fig. 31
  • To avoid undesired ECO Mode operation, verify:
  • Date and Time (first page of parameter).
  • ECO Mode screen how many hours of ECO Mode operation have been selected for each day of the week.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 35 of the GE Uninterruptible Power Supply (LP 33) user manual — EXECUTING MAINBOARD
Page 35 · click to enlarge
Page 35

7 OPERATION

7.1 PROCEDURES FOR SINGLE LP 33 Series

7.1.1 Start-up of the LP 33 Series

Before connecting hazardous voltages, make sure that:

  • The connection to the electrical system has been performed by qualified personnel;
  • The equipment frame has been correctly grounded to the main earth ;
  • Make sure that mains input protection is removed;
  • All the panels removed to allow the UPS connection have been correctly reinstalled;
  • The UPS switches Q1 and Q2 are OFF (Pos. 0);
  • The battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) are removed.

This procedure must be performed for the first start-up following the installation, with the UPS completely switched Off and not powered. This procedure presupposes that the load is not yet supplied by the UPS system.

1. Switch ON the mains power at the input distribution panel . As a result the UPS performs a self-test and the LCD will show the following screen:

EXECUTING MAINBOARD

SELF TEST 00000000000 SELF TEST OK!

2. Insert the battery fuses F5, F6, F7 and eventual external fuses in case of external battery .

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Continue ►

Page 36 of the GE Uninterruptible Power Supply (LP 33) user manual — END OF PROCEDURE
Page 36 · click to enlarge
Page 36
3. Switch On the output switch Q1 (Pos. I) . The output will be supplied by the mains through the bypass.

APPLICAT. ON UTILITY

Udcp=215V Udcn=215V Ubp=164V Ubn=164V F Charge level = 100% Autonomy = 800min

Verify, selecting the screen METERING/Udcp and Udcn, that the booster voltage has reached about 215 VDC.

4. Switch On the inverter entering the screen : MENU/COMMAND MENU/ INVERTER ON

Some seconds later the load will be transferred on inverter and the main screen will display: APPLICATION ON UPS

APPLICATION ON UPS

5. Operation mode selection . LP 33 Series is delivered normally selected for permanent VFI operation. ECO Mode can be enabled and the ECO START time & ECO STOP time can be programmed for each day of the week (see Section 6.3.1-5 ).

END OF PROCEDURE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Show 4 more labels / short text on this page
LP 33 40kVA · = 70% · LP 33 40kVA · = 70%
Page 37 of the GE Uninterruptible Power Supply (LP 33) user manual — APPLICAT. ON UTILITY
Page 37 · click to enlarge
Page 37

7.1.2 UPS shutdown with load transfer on manual bypass (Q2)

The purpose of this procedure is to supply the load directly by mains through manual bypass Q2. This procedure is normally performed when the UPS must be completely switched OFF for maintenance or service purpose, performed by an authorized Service Center.

1. Switch OFF the inverter by entering the screen : MENU/COMMAND MENU/ INVERTER OFF Attention : to switch OFF permanently the inverter the key Enter must be pressed 2 times .

The output will be supplied by the mains through the automatic bypass. LP 33 40kVA

APPLICAT. ON UTILITY

2. Switch ON the maintenance bypass Q2 (Pos. I) . LP 33 40kVA

APPL. ON MANUAL DEV.

3. Switch OFF the output switch Q1 (Pos. 0) .
4. Perform the command total off .
5. Remove the battery fuses F5, F6, F7 and eventual external fuses in case of external battery .

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

= 70% · = 70% · Continue ►

Page 38 of the GE Uninterruptible Power Supply (LP 33) user manual — END OF PROCEDURE
Page 38 · click to enlarge
Page 38
6. In order to discharge the DC link capacitors, start once more the inverter through the screen : MENU/COMMAND MENU/ INVERTER ON

Remark: command INVERTER ON will be enabled only when the inverter voltage of each phase decreases below 7 VAC (about 30 seconds).

INVERTERU1= 7V U2= 7V U3= 7V Frequency = 60.0Hz

Udcp= 5V Udcn= 5V Ubp=0V Ubn=0V O Charge level = 0% Autonomy = 0min

Before proceeding to step 7, check on the display panel that the DC link voltage (both polarities) Udcp and Udcn has reached the minimum voltage of 5 VDC (about 30 seconds).

7. Switch OFF the inverter by entering the screen : MENU/COMMAND MENU/ INVERTER OFF

The load is now powered directly by mains through the manual bypass Q2.

END OF PROCEDURE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Synchronized

Page 39 of the GE Uninterruptible Power Supply (LP 33) user manual — APPLICATION ON UPS
Page 39 · click to enlarge
Page 39

7.1.3 Start-up following the operation on manual bypass (Q2)

This procedure presupposes that the load is powered by the manual bypass switch:

  • The inverter is switched OFF;
  • The manual bypas s switch Q2 is switched ON (pos. I);
  • The output switch Q1 is switched OFF (Pos. 0);
  • The battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) are removed.
1. Insert the battery fuses F5, F6, F7 and eventual external fuses in case of external battery .
2. Switch ON the output switch Q1 (Pos. I) .
3. Only in case it has been previously activated ( * present beside the text RESET TOTAL OFF ), restore the command total off by entering the screen: MENU/ RESET TOTAL OFF

LED TEST RESET TOTAL OFF *

4. Switch OFF the maintenance bypass Q2 (Pos. 0) . Verify, selecting the screen METERING/ Udcp and Udcn , that the booster voltage has reached about 215 VDC .

Udcp=215V Udcn=215V Ubp=164V Ubn=164V F Charge level = 100% Autonomy = 800min

5. Switch ON the inverter by entering the screen : MENU/COMMAND MENU/ INVERTER ON

Some seconds later the load will be transferred on inverter and the main screen will display: APPLICATION ON UPS LP 33 40kVA

APPLICATION ON UPS

END OF PROCEDURE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

= 70%

Page 40 of the GE Uninterruptible Power Supply (LP 33) user manual — 7.1.4 Complete shutdown
Page 40 · click to enlarge
Page 40

7.1.4 Complete shutdown

As a result of this procedure the UPS is completely switched OFF and not powered.

1. Perform the command total off . 2. Switch OFF the output switch Q1 (Pos. 0) . 3. Remove the battery fuses F5, F6, F7 and eventual external fuses in case of external battery . 4. In order to discharge the DC link capacitors, start once more the inverter through the screen : MENU/COMMAND MENU/ INVERTER ON
GE Uninterruptible Power Supply (LP 33) — 7.1.4 Complete shutdown diagram (page 40)
Fig. 32 · 7.1.4 Complete shutdown

Remark: command INVERTER ON will be enabled only when the inverter voltage of each phase decreases below 7 VAC (about 30 seconds).

INVERTERU1= 7V U2= 7V U3= 7V Frequency = 60.0Hz

Udcp= 5V Udcn= 5V Ubp=0V Ubn=0V O Charge level = 0% Autonomy = 0min 5. Switch OFF the inverter by entering the screen: MENU/COMMAND MENU/INVERTER OFF

Before proceeding to step 5, check on the display panel that the DC link voltage (both polarities) Udcp and Udcn has reached the minimum voltage of 5 VDC (about 30 seconds).

COMMAND MENU INVERTER ON INVERTER OFF * 6. Switch OFF the mains power at the AC input distribution panel.

GE Uninterruptible Power Supply (LP 33) — 7.1.4 Complete shutdown diagram (page 40)
Fig. 33 · 7.1.4 Complete shutdown

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 41 of the GE Uninterruptible Power Supply (LP 33) user manual — APPLICATION ON UPS
Page 41 · click to enlarge
Page 41

7.1.5 Restore to normal operation after “total off”

View of the panel after pressing the button “total off”:

APPLICAT. SUPPLY OFF

  • All Contactors are open.

= 0% 1. Reset “total off”. Restore the command “total off” by entering the screen: MENU/RESET TOTAL OFF

  • Booster, inverter and Static-Switch shutdown.

LED TEST RESET TOTAL OFF * The load is supplied by the mains through the automatic bypass. The booster starts automatically.

LP 33 40kVA APPLICATION ON BYPASS

The LCD screen must display the status: APPLICATION ON BYPASS

2. Switch ON the inverter by entering the screen : MENU/COMMAND MENU/ INVERTER ON

The LCD screen must display the status: APPLICATION ON UPS

APPLICATION ON UPS

END OF PROCEDURE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Show 4 more labels / short text on this page
LP 33 40kVA · = 70% · LP 33 40kVA · = 70%
Page 42 of the GE Uninterruptible Power Supply (LP 33) user manual — APPLICATION ON UPS
Page 42 · click to enlarge
Page 42

7.1.6 Restore to normal operation after “EPO – Emergency Power Off”

View of the panel after pressing the button “EPO”:

APPLICAT. SUPPLY OFF

  • All Contactors are open.

= 0% 1. Reset the button “EPO”.

  • Booster, inverter and Static-Switch shutdown.

01.01.2005 12:15:45 NR=255 Status=A588 4563: EMERGENCY OFF ACTIVATED

Press Alarm, to reset alarm and buzzer.

2. Reset the UPS by entering the screen : MENU/COMMAND MENU/ INVERTER OFF

The load is supplied by the mains through the automatic bypass. The booster starts automatically.

LP 33 40kVA APPLICATION ON BYPASS

The LCD screen must display the status: APPLICATION ON BYPASS

3. Switch ON the inverter by entering the screen : MENU/COMMAND MENU/ INVERTER ON

The load will be automatically transferred from mains to the inverter.

The LCD screen must display the status: APPLICATION ON UPS

APPLICATION ON UPS

END OF PROCEDURE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Show 4 more labels / short text on this page
LP 33 40kVA · = 70% · LP 33 40kVA · = 70%
Page 43 of the GE Uninterruptible Power Supply (LP 33) user manual — EXECUTING MAINBOARD
Page 43 · click to enlarge
Page 43

7.2 PROCEDURES FOR PARALLEL SYSTEM LP 33 Series

7.2.1 Parallel System start-up of the LP 33 Series

Before connecting hazardous voltages, make sure that:

  • The connection to the electrical system has been performed by qualified personnel;
  • The equipment frame has been correctly grounded to the main earth ;
  • Make sure that mains input protection is removed;
  • All the panels removed to allow the UPS connection have been correctly reinstalled;
  • The UPS switches Q1 and Q2 are OFF (Pos. 0);
  • The battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) are removed.

This procedure must be performed for the first start-up following the installation, with all the units completely switched Off and not powered. This procedure presupposes that the load is not yet supplied by the UPS system.

1. Switch ON the mains power for each unit at the input distribution panel . As a result each unit performs a self-test and the LCD will show the following screen:

EXECUTING MAINBOARD

SELF TEST 00000000000 SELF TEST OK!

The LCD screen will display the number of the unit in the parallel system (P1, P2, P3 or P4).

2. Insert the battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) on each unit .

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Continue ►

Page 44 of the GE Uninterruptible Power Supply (LP 33) user manual — APPLICATION ON UPS
Page 44 · click to enlarge
Page 44
3. Switch ON the output switch Q1 (Pos. I) on each unit . When the last Q1 will be closed, the output will be supplied by the mains through all bypass .

LP 33 40kVA P1

APPLICAT. ON UTILITY

Verify, selecting the screen METERING/Udcp and Udcn, that the booster voltage has reached about 215 VDC.

Udcp=215V Udcn=215V Ubp=164V Ubn=164V F Charge level = 100% Autonomy = 800min

4. Switch ON the inverter on the first unit entering the screen : MENU/COMMAND MENU/ INVERTER ON
5. Switch ON the inverter on the other units in the same manner . (Do not start the next inverter until the sequence of the previous one ends – about 10 seconds).

Some seconds later the load will be transferred on inverter and the main screen of each unit will display: APPLICATION ON UPS

LP 33 40kVA P1

APPLICATION ON UPS

END OF PROCEDURE

It is recommended to recharge the battery during a few hours in order to provide the complete battery energy stored to the load in the event of mains failure.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

= 70% · = 70%

Page 45 of the GE Uninterruptible Power Supply (LP 33) user manual — APPLICAT. ON UTILITY
Page 45 · click to enlarge
Page 45

7.2.2 Parallel UPS shutdown with load transfer on manual bypass (Q2)

The purpose of this procedure is to supply the load directly by mains through manual bypass Q2. This procedure is normally performed when the UPS must be completely switched OFF for maintenance or service purpose, performed by an authorized Service Center. 1. Switch OFF the inverter on each unit entering the screen: MENU/COMMAND MENU/INVERTER OFF

The output will be supplied by the mains through all automatic bypass. LP 33 40kVA P1

APPLICAT. ON UTILITY

2. Switch ON the maintenance bypass Q2 (I) on each unit . LP 33 40kVA P1

APPL. ON MANUAL DEV.

3. Switch OFF the output switch Q1 (0) on each unit .
4. Perform the command total off on each unit .
5. Remove the battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) on each unit .

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

= 70% · = 70% · Continue ►

Page 46 of the GE Uninterruptible Power Supply (LP 33) user manual — END OF PROCEDURE
Page 46 · click to enlarge
Page 46
6. In order to discharge the DC link capacitors, start once more the inverter on each unit through the screen : MENU/COMMAND MENU/ INVERTER ON

Remark: command INVERTER ON will be enabled only when the inverter voltage of each phase decreases below 7 VAC (about 30 seconds).

INVERTERU1= 7V U2= 7V U3= 7V Frequency = 60.0Hz

Udcp= 5V Udcn= 5V Ubp=0V Ubn=0V O Charge level = 0% Autonomy = 0min

Before proceeding to step 7, check on the display panel that the DC link voltage (both polarities) Udcp and Udcn has reached the minimum voltage of 5 VDC (about 30 seconds).

7. Switch OFF the inverter on each unit entering the screen : MENU/COMMAND MENU/ INVERTER OFF

The load is now supplied directly from the mains through the manual switches Q2.

END OF PROCEDURE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Synchronized

Page 47 of the GE Uninterruptible Power Supply (LP 33) user manual — APPLICATION ON UPS
Page 47 · click to enlarge
Page 47

7.2.3 Start-up following the operation on maintenance bypass (Q2)

This procedure presupposes that the load is powered by the manual bypass switch:

  • The inverter is switched OFF;
  • The manual bypas s switch Q2 is switched ON (Pos. I);
  • The output switch Q1 is switched OFF (Pos. 0);
  • The battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) are removed. 1. Insert the rectifier input fuses F1, F2, F3 and the battery fuses F9, F10, F11 / F13, F14, F15 (and eventual external battery fuses) on each unit .
2. Switch ON the output switch Q1 (Pos. I) on each unit .
3. Only in case it has been previously activated ( * present beside the text RESET TOTAL OFF ), restore the command total off on any one of the units by entering the screen: MENU/ RESET TOTAL OFF

LED TEST RESET TOTAL OFF *

4. Open the maintenance bypass switch Q2 (Pos. 0) on each unit . Verify, selecting the screen METERING/ Udcp and Udcn , that the booster voltage has reached about 215 VDC on each unit .

Udcp=215V Udcn=215V Ubp=164V Ubn=164V F Charge level = 100% Autonomy = 800min

5. Switch ON the inverter on each unit entering the screen : MENU/ COMMAND MENU / INVERTER ON (Do not start the next inverter until the sequence of the previous one ends – about 10 seconds).

The load will be automatically transferred from mains to the inverters as the needed power requested from the applied load is achieved on inverter side. The main screen of each unit will display: APPLICATION ON UPS

LP 33 40kVA P1

APPLICATION ON UPS

END OF PROCEDURE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

= 70%

Page 48 of the GE Uninterruptible Power Supply (LP 33) user manual — END OF PROCEDURE
Page 48 · click to enlarge
Page 48

7.2.4 Shutdown of a single unit in a parallel system

With purpose to separate one unit from the parallel system. 1. Switch OFF the inverter only on this unit entering the screen: MENU/COMMAND MENU/INVERTER OFF Attention: to switch OFF permanently the inverter the key Enter must be pressed 2 times.

COMMAND MENU INVERTER ON INVERTER OFF * 2. Switch OFF the output switch Q1 (0) only on this unit. 3. Perform the command total off only on this unit. 4. Remove the battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) only on this unit. 5. In order to discharge the DC link capacitors, start once more the inverter only on this unit through the screen: MENU/COMMAND MENU/INVERTER ON

Remark: command INVERTER ON will be enabled only when the inverter voltage of each phase decreases below 7 VAC (about 30 seconds).

INVERTERU1= 7V U2= 7V U3= 7V Frequency = 60.0Hz

Before proceeding to step 6, check on the display panel that the DC link voltage (both polarities) Udcp and Udcn has reached the minimum voltage of 5 VDC (about 30 seconds).

Udcp= 5V Udcn= 5V Ubp=0V Ubn=0V O Charge level = 0% Autonomy = 0min

6. Switch OFF the inverter only on this unit entering the screen : MENU/COMMAND MENU/ INVERTER OFF

COMMAND MENU INVERTER ON INVERTER OFF * 7. Switch OFF the mains power only on this unit at the AC input distribution panel.

END OF PROCEDURE

WARNING ! In case the unit should be disconnected and removed from the operating system, the operation must be performed by qualified persons. If an intermediate unit must be disconnected from a parallel system pay attention do not open the control bus: keep the plugs J3 and J4 connected to the board “P16 - Connector adapter RPA” (see Section 4.8.4).

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Synchronized

Page 49 of the GE Uninterruptible Power Supply (LP 33) user manual — 7.2.5 Start-up an additional unit in a parallel system
Page 49 · click to enlarge
Page 49

7.2.5 Start-up an additional unit in a parallel system

GE Uninterruptible Power Supply (LP 33) — 7.2.5 Start-up an additional unit in a parallel system diagram (page 49)
Fig. 34 · 7.2.5 Start-up an additional unit in a parallel syst…
  • Before connecting hazardous voltages, make sure that:
  • The connection to the electrical system has been performed by qualified personnel;
  • The equipment frame has been correctly grounded to the main earth ;
  • Make sure that mains input protection is removed;
  • All the panels removed to allow the UPS connection have been correctly reinstalled;
  • The UPS switches Q1 and Q2 are OFF (Pos. 0);
  • The battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) are removed.

This procedure must be performed when the load is supplied by the other units of the UPS system and an additional unit must be switched ON and connected to the parallel bus in order to share the load with each other. This unit must be completely switched OFF and not powered. 1. Switch ON the mains power at the input distribution pane on this unit. As a result the UPS performs a self-test and the LCD will show the following screen:

GE Uninterruptible Power Supply (LP 33) — 7.2.5 Start-up an additional unit in a parallel system diagram (page 49)
Fig. 35 · 7.2.5 Start-up an additional unit in a parallel syst…
GE Uninterruptible Power Supply (LP 33) — 7.2.5 Start-up an additional unit in a parallel system diagram (page 49)
Fig. 36 · 7.2.5 Start-up an additional unit in a parallel syst…

Udcp=215V Udcn=215V Ubp=164V Ubn=164V F Charge level = 100% Autonomy = 800min 4. Switch ON the inverter of this unit entering the screen: MENU/COMMAND MENU/INVERTER ON

Verify, selecting the screen METERING/Udcp and Udcn, that the booster voltage has reached about 215 VDC of this unit.

When the inverter will be synchronized, the unit will be automatically connected with the parallel bus-bar and the load will be shared with the other units. The main screen of each unit will display: APPLICATION ON UPS

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 50 of the GE Uninterruptible Power Supply (LP 33) user manual — END OF PROCEDURE
Page 50 · click to enlarge
Page 50

7.2.6 Complete shutdown of a parallel system

As a result of this procedure the parallel system is completely switched OFF and not powered.

1. Perform the command total off on any one of the units . 2. Switch OFF the output switch Q1 (Pos. 0) on each unit . 3. Remove the battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) on each unit . 4. In order to discharge the DC link capacitors, start once more the inverter on each unit through the screen : MENU/COMMAND MENU/ INVERTER ON
GE Uninterruptible Power Supply (LP 33) — 7.2.6 Complete shutdown of a parallel system diagram (page 50)
Fig. 37 · 7.2.6 Complete shutdown of a parallel system

Remark: command INVERTER ON will be enabled only when the inverter voltage of each phase decreases below 7 VAC (about 30 seconds).

INVERTERU1= 7V U2= 7V U3= 7V Frequency = 60.0Hz

Udcp= 5V Udcn= 5V Ubp=0V Ubn=0V O Charge level = 0% Autonomy = 0min 5. Switch OFF the inverter on each unit entering the screen: MENU/COMMAND MENU/INVERTER OFF

Before proceeding to step 5, check on the display panel that the DC link voltage (both polarities) Udcp and Udcn has reached the minimum voltage of 5 VDC (about 30 seconds).

MENU COMANDI INVERTER ON INVERTER OFF * 6. Switch OFF the mains power of each unit at the AC input distribution panel.

END OF PROCEDURE

GE Uninterruptible Power Supply (LP 33) — END OF PROCEDURE diagram (page 50)
Fig. 38

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 51 of the GE Uninterruptible Power Supply (LP 33) user manual — APPLICATION ON UPS
Page 51 · click to enlarge
Page 51

7.2.7 Restore to normal operation after “total off”

View of the panel after pressing the button “total off”:

LP 33 40kVA P1

APPLICAT. SUPPLY OFF

  • All Contactors are open.

= 0% 1. Reset “total off” of the parallel system. Restore the command “total off”, on any one of the units, by entering the screen: MENU/RESET TOTAL OFF

  • Booster, inverter eand Static-Switch shutdown.

LED TEST RESET TOTAL OFF * The load is supplied by the mains through the automatic bypass. The booster starts automatically.

LP 33 40kVA P1 APPLICATION ON BYPASS

The LCD screen must display on all Units the status: APPLICATION ON BYPASS

2. Switch ON the inverter on first unit by entering the screen : MENU/COMMAND MENU/ INVERTER ON In case of sufficient output power, the output will transfer to Inverter.
3. Switch ON the inverter on the other units by entering the screen: MENU/COMMAND MENU/ INVERTER ON (Do not start the next inverter until the sequence of the previous one ends – about 10 seconds).

As soon as the output power of the inverters is sufficient to supply the load, the output of the units with running inverter will transfer to inverter. The LCD screen must display on all Units the status: APPLICATION ON UPS

LP 33 40kVA P1

APPLICATION ON UPS

END OF PROCEDURE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

= 70% · = 70%

Page 52 of the GE Uninterruptible Power Supply (LP 33) user manual — END OF PROCEDURE
Page 52 · click to enlarge
Page 52

7.2.8 Restore to normal operation after “EPO – Emergency Power Off”

GE Uninterruptible Power Supply (LP 33) — 7.2.8 Restore to normal operation after “EPO – Emergency Power Off” diagram (page 52)
Fig. 39 · 7.2.8 Restore to normal operation after “EPO – Emerg…

View of the panel after pressing the button “EPO”:

LP 33 40kVA P1

APPLICAT. SUPPLY OFF

  • All Contactors are open.

= 0% 1. Reset the button “EPO”.

  • Booster, inverter and Static-Switch shutdown.

01.01.2005 12:15:45 NR=255 Status=A588 4563: EMERGENCY OFF ACTIVATED 2. Reset all UPS by entering the screen: MENU/COMMAND MENU/INVERTER OFF The load is supplied by the mains through the automatic bypass.

Press Alarm, to reset alarm and buzzer.

GE Uninterruptible Power Supply (LP 33) — APPLICAT. SUPPLY OFF diagram (page 52)
Fig. 40

The booster starts automatically.

The LCD screen must display on all Units the status: APPLICATION ON BYPASS

3. Switch ON the inverter on first unit by entering the screen : MENU/COMMAND MENU/ INVERTER ON In case of sufficient output power, the output will transfer to Inverter
4. Switch ON the inverter on the other units by entering the screen: MENU/COMMAND MENU/ INVERTER ON (Do not start the next inverter until the sequence of the previous one ends – about 10 seconds).
GE Uninterruptible Power Supply (LP 33) — APPLICAT. SUPPLY OFF diagram (page 52)
Fig. 41

As soon as the output power of the inverters is sufficient to supply the load, the output of the units with running inverter will transfer to inverter. The LCD screen must display on all Units the status: APPLICATION ON UPS

END OF PROCEDURE

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 53 of the GE Uninterruptible Power Supply (LP 33) user manual — 8.1 OPTIONS GENERAL VIEW
Page 53 · click to enlarge
Page 53

8 OPTIONS

8.1 OPTIONS GENERAL VIEW

GE Uninterruptible Power Supply (LP 33) — 8.1 OPTIONS GENERAL VIEW diagram (page 53)
Fig. 42

RPA kit Redundant Parallel Architecture

Allows to extend the unit to a parallel system with 2, 3, or 4 units connected on the same bus, which ensure the highest reliability rate and increase the power availability without prior investments.

For battery with extended backup time (max. 15A).

Dimensions (WxDxH)16.93” x 28.55” x 70.95” / 430 x 725 x 1802 mm
  • The Customer Interface allows the client the exchange of information (monitoring and control) with the following interfaces:
  • Serial port RS232 .
  • 6 programmable output channels.
  • 2 programmable input channels, of witch one for GEN-ON .
  • EPO (Emergency Power Off).

16 15 14 13 12 22 21 20 19 18 17

1 2 3 4 5 6 7 8 9 10 11

Advanced SNMP Card Simple Network Management Protocol

The Advanced SNMP Card is an interface to the Ethernet Network, and provides UPS information via the standard SNMP Protocol (UPS-MIB (RFC-1628); GE Single MIB; GE Parallel MIB). The UPS can therefore be managed by a Network Management System (NMS) or by our applications (for instance JUMP), which uses this information to determine the state of the UPS in order to guarantee safe and orderly shutdown of the server, when needed.

GE Uninterruptible Power Supply (LP 33) — 8.1 OPTIONS GENERAL VIEW diagram (page 53)
Fig. 43
GE Uninterruptible Power Supply (LP 33) — 8.1 OPTIONS GENERAL VIEW diagram (page 53)
Fig. 44

Connectivity Software JUMP Software Suite / IRIS Service, etc.

Software application for the control and monitoring of the UPS.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Show 4 more labels / short text on this page
LPS33U_OPT_Cabinet battery_01 · Additional battery charge · Customer Interface · SGT4000_customer interface_02
Page 54 of the GE Uninterruptible Power Supply (LP 33) user manual — 9.1 GENERAL MAINTENANCE
Page 54 · click to enlarge
Page 54

9 MAINTENANCE

WARNING !

All maintenance and service works must be performed by QUALIFIED SERVICE PERSON.

9.1 GENERAL MAINTENANCE

When used properly, the LP 33 Series UPS is virtually maintenance free. Take care of proper environmental conditions (see Installation Guide - Section 3.5 – Ventilation & Cooling) and keep air inlets/outlets free from dust and any other obstacle. 9.2 COOLING FAN MAINTENANCE

The expected operational life of the cooling fans is approximately 40.000 hours of continuous operation. A high ambient temperature will shorten this operational life. 9.3 BATTERY MAINTENANCE

The service life of the battery is from 3 to 6 years, depending on the operating temperature and on the number of discharge cycles. The UPS LP 33 Series offers the possibility of SBM (Superior Battery Management). The function SBM can be activated through a service Parameter. The functionality of SBM reduces the Battery recharging time together with improved lifetime of the Battery. As a healthy battery is essential to the performance of the UPS, an automatic or manual battery test can be performed regularly to ensure failsafe operation, in order to check if the battery can provide the expected backup time in case of mains failure. We recommend the battery test be performed at least every 1 month, especially if the battery is not sufficiently discharged during normal operation. Since the parameter enabling the battery test protected by user password, please contact your Service Center for more information. Please consider that, if you did a full battery test to verify the full runtime of the battery, the charger needs at least 8 hours to recharge the battery up to 90% of its capacity. To guarantee that the battery is fully charged, the UPS system should be in operation for at least 12 hours every 3 months. When the condition of the battery is critical, the warning signal will be activated (general alarm, buzzer and alarm message “4118 - Battery fault”). In this case the battery must be replaced as soon as possible. Please contact your Service Center.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 55 of the GE Uninterruptible Power Supply (LP 33) user manual — APPLICATION ON UPS
Page 55 · click to enlarge
Page 55

9.4 SERVICE REQUIRED

If this lamp lights up during the normal operation (service parameter with password), the performances of the UPS remain the same, but that means the unit has not been serviced for the last 20.000 hours by a qualified GE Service Engineer.

LP 33 40 kVA

APPLICATION ON UPS

= 70% SERVICE REQUIRED

Some components of the UPS which need periodic maintenance, if not replaced, could cause a reliability reduction of the supply system. We highly recommend that you contact your Service Center for preventive maintenance work.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 56 of the GE Uninterruptible Power Supply (LP 33) user manual — 10.1 NOTES FORM
Page 56 · click to enlarge
Page 56

10 NOTES

10.1 NOTES FORM

It is recommended to note in this section Notes, with date and short description all the operations performed on the UPS, as: maintenance, components replacement, abnormal situations, etc. .

Date Description Done by

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Page 57 of the GE Uninterruptible Power Supply (LP 33) user manual — 4520 NO INVERTER
Page 57 · click to enlarge
Page 57

RIDER FOR WARRANTY FOR SALE OF SiteProTM, DIGITAL ENERGYTM SG Series and LP Series UPS. This Rider incorporates by reference the Terms and Conditions in GE Industrial Systems (herein called GE) GETC2003, and includes the following additional provisions contained herein. In the event of conflict between this Rider and GETC2003, the Rider shall take precedence. Limitation on use with life support equipment: Customer understands and agrees that the products sold hereunder are not intended for application or use, and shall not be used: (i) in conjunction with or for life support equipment when failure of any product can be reasonably be expected to cause failure of or diminish the effectiveness of such life support Customer represents and warrants that it shall NOT USE THE PRODUCTS FOR ANY SUCH PURPOSES, OR PERMIT OTHERS TO USE THE PRODUCTS FOR ANY SUCH PURPOSES. If, in breach of the foregoing, any such use occurs, Seller shall have no liability for any resulting damage or injury, in addition to any other legal or equitable rights of Seller, Customer shall indemnify Seller against any such liability, whether arising as a result of breach of contract, warranty, indemnity, tort (including negligence),

If reperformance is not practicable, Seller will furnish without charge

services in an amount essentially equal to those that, in the sole judgment of Seller, would have been required for reperformance. Where a failure cannot be corrected by Seller’s reasonable efforts, the parties will negotiate an equitable adjustment in price. In providing a replacement Product or parts, Seller reserves the right to use refurbished circuit boards, which shall be warranted in accordance with this Warranty Provision. The correction of any failure or the supply of repaired or replacement parts or Products pursuant to this Warranty Provision shall not extend the duration of the applicable Warranty Period. Seller does not warrant the following items: (i) computer hardware, (ii) any computer software, including software provided by Seller with any Product, (iii) products or services obtained from others or (iv) any batteries used in conjunction with the products, including those provided by Seller, and in regard to these items, only the warranty of the manufacturer, if any, shall apply. Seller's obligation under this Provision entitled “Warranty” shall terminate immediately upon any modification of the Product by Customer unless made with the approval of Seller. The Warranty Period applicable to each Product can be extended, if Customer purchases an extended warranty from Seller. If Customer purchases an extended warranty from Seller, the terms of such extended warranty shall supersede these warranty provisions. THE PRECEDING PARAGRAPHS OF THIS WARRANTY PROVISION SET FORTH THE EXCLUSIVE CLAIMS (EXCEPT AS TO TITLE) BASED ON DEFECT IN OR FAILURE OF A PRODUCT, WHETHER THE CLAIM IS IN CONTRACT, INDEMNITY, WARRANTY, TORT (INCLUDING NEGLIGENCE), STRICT LIABILITY OR OTHERWISE.

strict liability or otherwise. WARRANTY: Seller warrants to Customer that during the “Warranty Period” applicable for its SitePro, Digital EnergyTM SG Series and LP Series UPS Product furnished hereunder (the “Product”) will be free from defects in material, workmanship and title. The warranty period (“Warranty Period”) for the specified Product begins on the earlier of three (3) months after the delivery date or upon commissioning of the Product (if applicable) and ends at the end of the period as set forth below: The Warranty Period for the specified Product is as follows: SitePro / Digital EnergyTM SG Series UPS 12 Months LP Series UPS 24 Months

Upon the expiration of the applicable Warranty Period, all such liability shall terminate and Customer shall have a reasonable time, not to exceed thirty (30) days after the applicable Warranty Period, to give written notice of any defects that appeared during the Warranty Period. THE FOREGOING WARRANTIES ARE EXCLUSIVE AND IN AND IN LIEU OF ALL OTHER WARRANTIES, WHETHER WRITTEN, ORAL, IMPLIED OR STATUTORY. NO IMPLIED STATUTORY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE SHALL APPLY. INSTALLATION AND COMMISSIONING OF INSTALLABLE SYSTEMS: If the Products cannot be installed immediately after delivery, Customer is responsible for maintaining proper storage conditions according to operating manuals and any other instructions provided by Seller. Installable Products may only be installed by certified electrical installers and must be installed according to Seller’s specifications, appropriate national electrical codes and accepted standards of workmanship. For purposes of these GE Terms and Conditions, “Installable Products” shall mean Products that require the services of a certified electrical installer to be connected to the power grid. The commissioning of installable Products may only be done by a technician authorized by Seller and must be done according to Seller’s specifications. For purposes of these GE Terms and Conditions, “commissioning” shall mean the start-up of the installable Products and the testing of the installable Products in connection with the load. If commissioning is to be performed by Seller, Seller may refuse to commission the installable Products, if the operating conditions at Customer’s site do not allow safe commissioning and operation of the installable Products. Any costs resulting from a delay in commissioning will be charged to Customer.

In no case does this warranty apply to any failure or nonconformance with specifications caused by or attributable to any associated or complementary products not supplied under these Terms and Conditions, nor shall it in any case apply to the quantity or quality of the product of Customer or the process of manufacture on which any products are used. The warranties and remedies set forth herein are conditioned upon (a) proper transportation, handling, storage, installation, commissioning, operation, use and maintenance in conformance with the operation instruction manuals (including revisions thereto) provided by Seller, any applicable recommendations of Seller and any applicable laws, regulations or codes (b) repair or modification pursuant to Seller’s instructions or approval and (c) Customer promptly notifying Seller of any defects and, if required, promptly making the Product available for correction at Customer’s expense. This warranty shall not apply (a) if Customer or any other unauthorized person has made any modifications, alterations or repairs to the Product not authorized by Seller, including Customer’s use of parts in conjunction with the Product (excluding batteries) not admitted or delivered by Seller, (b) to a Product with removed or altered serial numbers, (c) to a Product damaged by acts of God, sources external to the Product, misuse, accident, abuse, neglect, negligence, or use beyond rated capacity, and (d) if GE authorized field service technician does not commission Digital Energyæ SG Series UPS and SitePro UPS.

If any Product or service fails to meet the foregoing warranties (except title), Seller shall thereupon correct any such failure either, at its option, by (i) repairing any defective or damaged part or Product and/or reperforming any defective service or (ii) making available, F.O.B. at Seller’s facility, place of manufacture or other mutually agreed upon point of shipment, any necessary repaired or replacement parts; provided, however, that prior to repairing any defective or damaged part or Product, Seller shall have received, at Customer’s cost, such part or Product in need of repair or replacement.

OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the GE Uninterruptible Power Supply (LP 33)

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the GE Uninterruptible Power Supply (LP 33)

Be the first to ask — other owners or our team will answer.

Original document

GE Uninterruptible Power Supply (LP 33) manual PDF

57 pages·2.4 MB·Power Supply·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…