EN
Emerson logo
Official user manual

Emerson XDCF

28 pages·2.7 MB·Refrigerator·PDF·ENDEFRITNLJA
Emerson XDCF
Table of Contents 59 sections Important Safety Guidelines · Save These Instructions · Fluorinated Greenhouse Gas Requirements—European Union · 1.0 Liebert XDCF Component Locations and Model Number Nomenclature · … ShowHide
Important Safety Guidelinesp.2Save These Instructionsp.2Fluorinated Greenhouse Gas Requirements—European Unionp.21.0 Liebert XDCF Component Locations and Model Number Nomenclaturep.5Figure 1 Liebert XDCF component locationsp.5Figure 2 Model number nomenclaturep.62.0 General product informationp.72.1 Referencesp.72.2 Parts Included With Liebert XDCFp.72.3 Room Preparationp.72.4 Product / System Descriptionp.8Figure 3 Liebert XDCF hydraulic diagramp.82.5 Equipment Inspectionp.82.5.1 Unit Handlingp.82.6 Unpacking the Liebert XDCFp.92.6.1 Recyclable Packagingp.9Figure 4 Unpacking the Liebert XDCFp.93.0 Mechanical Considerationsp.10Figure 5 Overall dimensionsp.104.0 Installationp.114.1 Referencesp.114.2 Installation Considerationsp.11Figure 6 Liebert XDCF unit mounting locationsp.114.3 Mounting Lower Liebert XDCF Modulep.124.3.1 Preparing the Lower Module for Attachmentp.12Figure 7 Lower Liebert XDCF attachmentsp.124.3.2 Attaching Lower Liebert XDCF Modulep.13Figure 8 Locator hole for lower unit studp.13Attaching Liebert XD Flex Pipe Support Panelp.14Figure 9 Liebert XD Flex Pipe support panel attachmentp.144.4 Attaching Upper Liebert XDCF Modulep.154.4.1 Preparing the Upper Module for Attachmentp.15Figure 10 Upper Liebert XDCF attachmentp.154.4.2 Attaching Upper Liebert XDCF Modulep.16Attaching Liebert XD Flex Pipe Retainers to Upper Liebert XDCF Modulep.16Figure 11 Attaching Liebert XD Flex Pipe retainersp.165.0 Piping Connections and Piping Access Pointsp.175.1 European Union Fluorinated Greenhouse Gas Requirementsp.175.2 Connection Methods and Pointsp.175.2.1 Header Systemp.17Figure 12 Liebert XDCF supply and return piping access pointsp.175.3 Recommended Piping Sizep.18Table 1 Branch piping sizes for refrigerant loopp.185.4 Connecting Liebert XD Flex Pipes to Liebert XDCF Modulesp.185.5 Connecting a Liebert XDCF with Liebert XD Flex Pipe to an Operational Liebert XD Systemp.18Tools Requiredp.18Figure 13 Liebert XD prefabricated piping assemblyp.19Figure 14 Detail view of Liebert XD Flex Pipe and prefabricated piping portp.19Figure 15 Liebert XD system with prefabricated piping assembly and Liebert XD Flex Pipep.205.6 Disconnecting a Liebert XDCF With Liebert XD Flex Pipe From a Liebert XD Systemp.20Tools Requiredp.20Figure 16 Profile view of the Liebert XD systemp.21Figure 17 Piping mains without Liebert XDCF and Liebert XD Flex Pipep.215.7 Insulationp.216.0 Checklist for Proper Installationp.227.0 Maintenancep.237.1 Fluorinated Greenhouse Gas Requirementsp.238.0 Specificationsp.24Table 2 Liebert XDCF specificationsp.24
Page 1 of the Emerson XDCF user manual
Page 1 · click to enlarge
Page 1
Emerson XDCF diagram (page 1)
Fig. 1
Page 2 of the Emerson XDCF user manual — Fluorinated Greenhouse Gas Requirements—European Union
Page 2 · click to enlarge
Page 2

I MPORTANT S AFETY G UIDELINES SAVE THESE INSTRUCTIONS

! CAUTION Risk of piping and component rupture. May cause injury or equipment damage. Closing service valves may isolate liquid refrigerant, causing high pressure and rupture of piping. Do not close valves without follow recommended procedures for repair, maintenance and replacement of components. Installing pressure relief valves in field piping that may become isolated by service valves.

Fluorinated Greenhouse Gas Requirements—European Union

Stationary air conditioning, refrigeration, heat pump equipments and stationary fire protection systems in the European Community market and operating with fluorinated greenhouse gases (f-gas), such as R407C, R134a, R410A, must comply with the F-Gas Regulation: (EC) No. 842/2006 (F-gas). The regulation prohibits, among other actions, venting fluorinated greenhouse gases to the atmosphere.

The F-Gas Regulation also requires operators to use use all measures that are technically feasible and do not entail disproportionate cost to prevent leakage of these gases, to test for leakage regularly and to recover f-gas during equipment service and maintenance and before disposing of equipment.

Refer to the full regulation for additional details.

Page 3 of the Emerson XDCF user manual — Table of contents
Page 3 · click to enlarge
Page 3

Table of contents

Important Safety Guidelinesp.2Save These Instructionsp.2Fluorinated Greenhouse Gas Requirements—European Unionp.21.0 Liebert XDCF Component Locations and Model Number Nomenclaturep.5Figure 1 Liebert XDCF component locationsp.5Figure 2 Model number nomenclaturep.62.0 General product informationp.72.1 Referencesp.72.2 Parts Included With Liebert XDCFp.72.3 Room Preparationp.72.4 Product / System Descriptionp.8Figure 3 Liebert XDCF hydraulic diagramp.82.5 Equipment Inspectionp.82.5.1 Unit Handlingp.82.6 Unpacking the Liebert XDCFp.92.6.1 Recyclable Packagingp.9Figure 4 Unpacking the Liebert XDCFp.93.0 Mechanical Considerationsp.10Figure 5 Overall dimensionsp.104.0 Installationp.114.1 Referencesp.114.2 Installation Considerationsp.11Figure 6 Liebert XDCF unit mounting locationsp.114.3 Mounting Lower Liebert XDCF Modulep.124.3.1 Preparing the Lower Module for Attachmentp.12Figure 7 Lower Liebert XDCF attachmentsp.124.3.2 Attaching Lower Liebert XDCF Modulep.13Figure 8 Locator hole for lower unit studp.13Attaching Liebert XD Flex Pipe Support Panelp.14Figure 9 Liebert XD Flex Pipe support panel attachmentp.144.4 Attaching Upper Liebert XDCF Modulep.154.4.1 Preparing the Upper Module for Attachmentp.15Figure 10 Upper Liebert XDCF attachmentp.154.4.2 Attaching Upper Liebert XDCF Modulep.16Attaching Liebert XD Flex Pipe Retainers to Upper Liebert XDCF Modulep.16Figure 11 Attaching Liebert XD Flex Pipe retainersp.165.0 Piping Connections and Piping Access Pointsp.175.1 European Union Fluorinated Greenhouse Gas Requirementsp.175.2 Connection Methods and Pointsp.175.2.1 Header Systemp.17Figure 12 Liebert XDCF supply and return piping access pointsp.175.3 Recommended Piping Sizep.18Table 1 Branch piping sizes for refrigerant loopp.185.4 Connecting Liebert XD Flex Pipes to Liebert XDCF Modulesp.185.5 Connecting a Liebert XDCF with Liebert XD Flex Pipe to an Operational Liebert XD Systemp.18Tools Requiredp.18Figure 13 Liebert XD prefabricated piping assemblyp.19Figure 14 Detail view of Liebert XD Flex Pipe and prefabricated piping portp.19Figure 15 Liebert XD system with prefabricated piping assembly and Liebert XD Flex Pipep.205.6 Disconnecting a Liebert XDCF With Liebert XD Flex Pipe From a Liebert XD Systemp.20Tools Requiredp.20Figure 16 Profile view of the Liebert XD systemp.21Figure 17 Piping mains without Liebert XDCF and Liebert XD Flex Pipep.215.7 Insulationp.216.0 Checklist for Proper Installationp.227.0 Maintenancep.237.1 Fluorinated Greenhouse Gas Requirementsp.238.0 Specificationsp.24Table 2 Liebert XDCF specificationsp.24
Page 4 of the Emerson XDCF user manual — Table of contents
Page 4 · click to enlarge
Page 4

Table of contents

Important Safety Guidelinesp.2Save These Instructionsp.2Fluorinated Greenhouse Gas Requirements—European Unionp.21.0 Liebert XDCF Component Locations and Model Number Nomenclaturep.5Figure 1 Liebert XDCF component locationsp.5Figure 2 Model number nomenclaturep.62.0 General product informationp.72.1 Referencesp.72.2 Parts Included With Liebert XDCFp.72.3 Room Preparationp.72.4 Product / System Descriptionp.8Figure 3 Liebert XDCF hydraulic diagramp.82.5 Equipment Inspectionp.82.5.1 Unit Handlingp.82.6 Unpacking the Liebert XDCFp.92.6.1 Recyclable Packagingp.9Figure 4 Unpacking the Liebert XDCFp.93.0 Mechanical Considerationsp.10Figure 5 Overall dimensionsp.104.0 Installationp.114.1 Referencesp.114.2 Installation Considerationsp.11Figure 6 Liebert XDCF unit mounting locationsp.114.3 Mounting Lower Liebert XDCF Modulep.124.3.1 Preparing the Lower Module for Attachmentp.12Figure 7 Lower Liebert XDCF attachmentsp.124.3.2 Attaching Lower Liebert XDCF Modulep.13Figure 8 Locator hole for lower unit studp.13Attaching Liebert XD Flex Pipe Support Panelp.14Figure 9 Liebert XD Flex Pipe support panel attachmentp.144.4 Attaching Upper Liebert XDCF Modulep.154.4.1 Preparing the Upper Module for Attachmentp.15Figure 10 Upper Liebert XDCF attachmentp.154.4.2 Attaching Upper Liebert XDCF Modulep.16Attaching Liebert XD Flex Pipe Retainers to Upper Liebert XDCF Modulep.16Figure 11 Attaching Liebert XD Flex Pipe retainersp.165.0 Piping Connections and Piping Access Pointsp.175.1 European Union Fluorinated Greenhouse Gas Requirementsp.175.2 Connection Methods and Pointsp.175.2.1 Header Systemp.17Figure 12 Liebert XDCF supply and return piping access pointsp.175.3 Recommended Piping Sizep.18Table 1 Branch piping sizes for refrigerant loopp.185.4 Connecting Liebert XD Flex Pipes to Liebert XDCF Modulesp.185.5 Connecting a Liebert XDCF with Liebert XD Flex Pipe to an Operational Liebert XD Systemp.18Tools Requiredp.18Figure 13 Liebert XD prefabricated piping assemblyp.19Figure 14 Detail view of Liebert XD Flex Pipe and prefabricated piping portp.19Figure 15 Liebert XD system with prefabricated piping assembly and Liebert XD Flex Pipep.205.6 Disconnecting a Liebert XDCF With Liebert XD Flex Pipe From a Liebert XD Systemp.20Tools Requiredp.20Figure 16 Profile view of the Liebert XD systemp.21Figure 17 Piping mains without Liebert XDCF and Liebert XD Flex Pipep.215.7 Insulationp.216.0 Checklist for Proper Installationp.227.0 Maintenancep.237.1 Fluorinated Greenhouse Gas Requirementsp.238.0 Specificationsp.24Table 2 Liebert XDCF specificationsp.24
Page 5 of the Emerson XDCF user manual — 1.0 Liebert XDCF Component Locations and Model Number Nomenclature
Page 5 · click to enlarge
Page 5

Liebert XDCF Component Locations and Model Number Nomenclature

1.0 LIEBERT XDCF COMPONENT LOCATIONS AND MODEL NUMBER NOMENCLATURE

Figure 1 Liebert XDCF component locations

Emerson XDCF — 1.0 Liebert XDCF Component Locations and Model Number Nomenclature diagram (page 5)
Fig. 2 · 1.0 Liebert XDCF Component Locations and Model Numbe…

Serial Tag Gasket along edge of deflector panel not shown for clarity

Gasket along edge of deflector panel not shown for clarity

Page 6 of the Emerson XDCF user manual — Example: XD-CF10-BP—0 CF
Page 6 · click to enlarge
Page 6

Liebert XDCF Component Locations and Model Number Nomenclature

Figure 2 Model number nomenclature

Example: XD-CF10-BP—0 CF

XD 10 B 0

P

Module for BladeFrame EX

T = Top B = Bottom

- = Domestic Packaging

E = Export Packaging

Show 4 more labels / short text on this page
P = Coupling · level Liebert Xtreme · Model Size Revision · heat density system
Page 7 of the Emerson XDCF user manual — 2.3 Room Preparation
Page 7 · click to enlarge
Page 7

2.0 G ENERAL PRODUCT INFORMATION

The Liebert XDCF™ is a self-contained module designed to cool Egenera’s BladeFrame EX cabinets and equipment without exhausting heat into the room.

Liebert XDCF modules consist of a sheet-metal frame, coil and filter dryer. It has no moving parts and needs no electricity.

The Liebert XDCF system consists of:

  • Liebert XDCF modules—upper and lower models are available
  • Liebert XD Flex Pipe (optional)—connects Liebert XDCF units to supply and return piping (ships with Liebert XDCF)
  • Liebert XD Piping—delivers R-134a refrigerant through flexible piping
  • Liebert XDP or Liebert XDC—supplies R-134a refrigerant to Liebert XDCF modules (see Liebert XDP or Liebert XDC user manual for required chiller or drycooler)

Liebert XDCF modules attach to the rear of the Egenera BladeFrame EX™ cabinet. Heated air from the BladeFrame cabinet is exhausted through the Liebert XDCF, which absorbs the heat. The cooled air passes into the room and the heat is carried away by the Liebert XDCF’s R-134a refrigerant.

2.1 References

This document must be used together with site-specific documentation and documentation for other parts of the system.

2.2 Parts Included With Liebert XDCF

  • Installation manual (this document)
  • Liebert XDCF module
  • Mounting kit parts with the following items:

Lower Module Upper Module

Part Qty Part Qty

Lower mounting bracket 1 Top unit mounting angle 1

Top deflector panel (two-pieces)

1 Bottom deflector panel (two-pieces)

Liebert XD Flex Pipe retainers 3 Liebert XD Flex Pipe retainers 3

10-32 screws 3 10-32 screws 2

10-32 nut 2 10-32 nut 1

Liebert XD Flex Pipe support panel 1

2.3 Room Preparation

The room should be well insulated and must have a sealed vapor barrier. The vapor barrier in the ceiling and walls can be a polyethylene film. Paint on concrete walls and floors should contain either rubber or plastic.

Outside or fresh air should be kept to a minimum when temperature and humidity must be tightly controlled. Outside air adds to the cooling, heating, dehumidifying and humidifying loads of the site. Doors should be properly sealed to minimize leaks and should not contain ventilation grilles.

General product information

Page 8 of the Emerson XDCF user manual — 2.5.1 Unit Handling
Page 8 · click to enlarge
Page 8

2.4 Product/System Description

Upper and lower modules may be mounted on the rear of the Egenera BladeFrame. Each module, when attached to a fully loaded BladeFrame EX rack, has a nominal cooling capacity of 10kW (2.8 tons; 34,000 BTUh). Performance is based on:

  • Entering fluid temperature—55°F (12.8°C) and
  • Dew point—50°F (10°C) or lower.

The complete system consists of Liebert XDCF modules, piping and Liebert XDP or Liebert XDC (see Figure 3 below.

Figure 3 Liebert XDCF hydraulic diagram

Emerson XDCF — 2.4 Product/System Description diagram (page 8)
Fig. 3 · 2.4 Product/System Description

To Chiller, Condenser or Drycooler

Liebert XDC

Liebert XD Cooling Module *

Supply Lines

or Liebert XDP

Pumped Refrigerant

Return Lines

Liebert XD Cooling Module *

To Chiller, Condenser or Drycooler

Liebert XDC

Liebert XD Cooling Module *

or Liebert XDP

Pumped Refrigerant

Liebert XD Cooling Module *

* Liebert XDCF, XDH, XDO or XDV

2.5 Equipment Inspection

Upon arrival of the unit, and before unpacking it, verify that the labeled equipment matches the bill of lading. Inspect all items for either visible or concealed damage. Damage should be immediately reported to the carrier and a damage claim filed with a copy sent to Liebert Corporation or to your sales representative.

! CAUTION Risk of sudden refrigerant discharge! Can cause loss of charge and minor injury. Each Liebert XDCF unit is shipped with a full charge of R-134a refrigerant under pressure. Do not remove the pipe caps or plugs before the unit is attached to an Egenera BladeFrame and ready for connection to Liebert XD Piping. Supply and return fittings on the Liebert XDCF are one-shot connections. Do not disconnect one-shot connections after they have been connected. Disconnection will release pressurized R-134a refrigerant from the Liebert XDCF.

2.5.1 Unit Handling

When unpacking and handling the unit, exercise extra care to prevent damage.

If multiple Liebert XDCF units are delivered, they will be shipped on a pallet. A pallet jack will be required to move these units to the installation location. When using a pallet jack, ensure that it has the size and length needed for safe handling of the pallet.

General product information

Page 9 of the Emerson XDCF user manual — NOTICE
Page 9 · click to enlarge
Page 9

2.6 Unpacking the Liebert XDCF

The unit is shipped in a protective package. Do not remove the packaging from the Liebert XDCF before it is at the installation location.

  • When unpacking and handling the Liebert XDCF, care should be taken to prevent damaging the coils.
  • Remove outer packaging when ready to install the Liebert XDCF.
  • Do not use unit piping to lift or move the Liebert XDCF.

2.6.1 Recyclable Packaging

R

All material used to package this unit is recyclable. Please save for future use or dispose of the material appropriately.

! CAUTION Risk of sharp edges, splinters and exposed fasteners! Can cause personal injury! Only properly trained personnel wearing appropriate safety headgear, gloves, shoes and glasses should attempt to move, lift, remove packaging from, or prepare unit for installation.

NOTICE

Risk of unit damage if improperly stored. Keep the unit indoors and protected from dampness, freezing temperatures and contact damage.

Figure 4 Unpacking the Liebert XDCF

Emerson XDCF — NOTICE diagram (page 9)
Fig. 4

Area indicated on Item #3 (foam insert) is to be used for hardware kit and/or unit manuals for shipping to customer. Coil end mounting assembly is to be wrapped in P/N 123783P1 (bubble) and placed into Item #2 (corrugated insert), only when packaging a specified bottom-mount unit. 3. Ref: Use P/N S-6060, or equivalent adhesive, to seal the top and bottom of Item #1 (box) for shipping to the customer. 4. Refer to manufacturing work instructions for any additional directions regarding packaging of this unit.

General product information

Page 10 of the Emerson XDCF user manual — RIGHT
Page 10 · click to enlarge
Page 10

3.0 M ECHANICAL C ONSIDERATIONS

The Liebert XDCF is engineered to fit on the rear of the Egenera BladeFrame enclosure. Figure 5, below, illustrates the unit’s dimensions and the location of pipes. Figure 6 shows the attachment positions of each module.

Figure 5 Overall dimensions

Emerson XDCF — 3.0 M ECHANICAL C ONSIDERATIONS diagram (page 10)
Fig. 5
Emerson XDCF — 3.0 M ECHANICAL C ONSIDERATIONS diagram (page 10)
Fig. 6

TIGHTEN FLEX PIPE TO UNIT WITH THE SCHRADE R VALVE IN THIS POSITION

ONCE FLE X PIPE CONNECTIONS ARE MADE TO THE UNIT DO NOT DISASSEMBLE FROM THE UNIT . REMOVE CONNECTIONS FROM CEILING HEADERS BY TURNING THE SUPPLY VALVE TO THE OFF POSITION AND THEN TURNING THE RETURN VALVE TO THE OFF P OSITION THE HEADER CONNECTIONS MAY BE REMOVED.

TIGHTEN FLEX PIPE TO UNIT WITH THE SCHRADE R VALVE IN THIS POSITION

both upper and lower units have same dimensions

Emerson XDCF — 3.0 M ECHANICAL C ONSIDERATIONS diagram (page 10)
Fig. 7

Piping is not load-bearing and should never be used to lift or move the Liebert XDCF

RIGHT

SIDE

BACK

Mechanical Considerations · Upper unit shown;

Page 11 of the Emerson XDCF user manual — 4.2 Installation Considerations
Page 11 · click to enlarge
Page 11

4.0 I NSTALLATION

4.1 References

This document must be used together with site-specific documentation and documentation for other parts of the system.

4.2 Installation Considerations

Liebert XDCF modules must be securely mounted to the rear of the Egenera BladeFrame cabinet. No cutting or drilling is required to attach the modules; all mounting holes, slots and pins required are fabricated at the factory.

If only one Liebert XDCF will be attached to an Egenera BladeFrame cabinet, Liebert recommends using the lower Liebert XDCF module. If both an upper and a lower Liebert XDCF module will be attached, attach the lower unit first.

Liebert XDCF modules attach beside the power modules on the rear of the Egenera BladeFrame (see Figure 6).

Figure 6 Liebert XDCF unit mounting locations

Emerson XDCF — 4.2 Installation Considerations diagram (page 11)
Fig. 8 · 4.2 Installation Considerations

Installation

Page 12 of the Emerson XDCF user manual — 4.3 Mounting Lower Liebert XDCF Module
Page 12 · click to enlarge
Page 12

4.3 Mounting Lower Liebert XDCF Module

The lower Liebert XDCF module attaches to the Egenera BladeFrame cabinet with a mounting bracket, four bolts and a metal stud.

Before the Liebert XDCF is mounted, the mounting bracket and a two-piece deflector panel must be attached to its top surface and insulation must be applied to the left side.

4.3.1 Preparing the Lower Module for Attachment 1. Position the mounting bracket over the two mounting holes. The holes are near the center of the top of the Liebert XDCF module (see Figure 7). 2. Use two captive panel fasteners to attach the mounting bracket to the top of the Liebert XDCF module. Tighten the fasteners securely, using a screwdriver, either a blade-type or Phillips. 3. Position the top deflector over the two mounting holes along the front edge of the top of the lower Liebert XDCF module (see Figure 7). The flanges along the edge should be on the bottom. 4. Use two captive panel fasteners to attach the top deflector to the top of the lower Liebert XDCF module.Tighten the fasteners securely, using a screwdriver, either a Phillips or a blade-type. 5. Position the second piece of the top deflector along the front edge of the deflector piece attached in Steps 3 and 4, matching the mounting slots in the two pieces. The flanges along the edge should be on the bottom. 6. Use two captive panel fasteners to connect the deflector pieces. Tighten the fasteners finger-tight, leaving them loose enough to slide for good contact with the Egenera BladeFrame cabinet.

Figure 7 Lower Liebert XDCF attachments

Emerson XDCF — 4.3 Mounting Lower Liebert XDCF Module diagram (page 12)
Fig. 9 · 4.3 Mounting Lower Liebert XDCF Module

Slots in front piece of deflector permit proper positioning

Installation

Page 13 of the Emerson XDCF user manual — 4.3.2 Attaching Lower Liebert XDCF Module
Page 13 · click to enlarge
Page 13

4.3.2 Attaching Lower Liebert XDCF Module

Liebert XDCF modules mount on the rear of the Egenera BladeFrame cabinet, near the power mod- ules. The cabinet and Liebert XDCF have prefabricated mounting holes and studs to ease mounting.

1. Set the lower Liebert XDCF module on the left side of the ledge on the rear of the Egenera BladeFrame cabinet. Make sure the positioning stud on the bottom of the Liebert XDCF fits into the locator hole on the ledge as shown in Figure 8 .

Figure 8 Locator hole for lower unit stud

Emerson XDCF — 4.3.2 Attaching Lower Liebert XDCF Module diagram (page 13)
Fig. 10 · 4.3.2 Attaching Lower Liebert XDCF Module

2. Press the Liebert XDCF against the Egenera BladeFrame cabinet. 3. Insert a panel fastener into the mounting bracket and screw it into the captive panel nut in the rear of the Egenera BladeFrame cabinet. For the hole locations, see Figure 6. Tighten the fasteners securely with a screwdriver, either a blade-type or Phillips. 4. Secure the Liebert XDCF to the cabinet by inserting and tightening four screws along the right side of the Liebert XDCF (see Figure 7). 5. Press the front section of the top deflector against the Egenera cabinet and tighten the panel fasteners joining the two-piece deflector.

Installation

Page 14 of the Emerson XDCF user manual — Attaching Liebert XD Flex Pipe Support Panel
Page 14 · click to enlarge
Page 14

Attaching Liebert XD Flex Pipe Support Panel

Use of only the lower Liebert XDCF module requires attaching a Liebert XD Flex Pipe support panel and three pipe retainers. The retainers keep the refrigerant pipes behind the Egenera cabinet. If an upper Liebert XDCF module will be used, the Liebert XD Flex Pipe retainers will be attached to the upper module.

To attach the Liebert XD Flex Pipe support panel:

1. Position the Liebert XDCF Liebert XD Flex Pipe support panel over the line of four holes above the right edge of the lower Liebert XDCF module 2. Secure the Liebert XD Flex Pipe support panel to the cabinet by inserting and tightening four screws on the panel’s flange. Tighten the fasteners securely with a screwdriver, either a Phillips or a blade-type. 3. Attach the three pipe retainers: a. Slip the front end of a retainer into a slot on the Liebert XD Flex Pipe support panel. b. Insert a panel fastener into the retainer and thread it into the captive panel nut. c. Tighten the fastener securely, using a screwdriver, either a blade-type or Phillips. d. Repeat Steps a and c for the other retainers.

Figure 9 Liebert XD Flex Pipe support panel attachment

Emerson XDCF — Attaching Liebert XD Flex Pipe Support Panel diagram (page 14)
Fig. 11 · Attaching Liebert XD Flex Pipe Support Panel

Installation

Page 15 of the Emerson XDCF user manual — TOP VIEW
Page 15 · click to enlarge
Page 15

4.4 Attaching Upper Liebert XDCF Module

The upper Liebert XDCF module attaches to the Egenera BladeFrame cabinet with a mounting angle and four bolts.

Before the Liebert XDCF is mounted, the mounting angle and a two-piece deflector panel must be attached to the bottom of the Liebert XDCF and insulation must be applied to the left side.

4.4.1 Preparing the Upper Module for Attachment 1. Position the mounting angle over the two mounting holes. The holes are near the center of the bottom of the Liebert XDCF module (see Figure 7). 2. Use two captive panel fasteners to attach the mounting angle to the bottom of the Liebert XDCF module. Tighten the fasteners securely, using a screwdriver, either a blade-type or Phillips. 3. Position the bottom deflector over the two mounting holes along the front edge of the bottom of the upper Liebert XDCF module (see Figure 10). The flanges along the edge should be on the top side. 4. Use two captive panel fasteners to attach the bottom deflector to the bottom of the upper Liebert XDCF module. Tighten the fasteners securely with a screwdriver, either a Phillips or a blade- type. 5. Position the second piece of the bottom deflector along the front edge of the deflector piece attached in Steps 3 and 4, matching the mounting slots in the two pieces. The flanges along the edge should be on the top side. 6. Use two captive panel fasteners to connect the deflector pieces. Tighten the fasteners finger-tight, leaving them loose enough to slide for good contact with the Egenera BladeFrame cabinet.

Figure 10 Upper Liebert XDCF attachment

Pipe support brackets not shown for clarity

TOP VIEW

Gasket not shown for clarity

Show 12 more labels / short text on this page
Installation · 7-5/16" (186mm) · 3-9/16" (90mm) · 3-9/16" (90mm) · 1-7/16" (37mm) · Captive panel fasteners · 1-7/16" (37mm) · Right Side · View · Coil · Bottom Deflector Bracket · Mounting Angle
Page 16 of the Emerson XDCF user manual — Attaching Liebert XD Flex Pipe Retainers to Upper Liebert XDCF Module
Page 16 · click to enlarge
Page 16

4.4.2 Attaching Upper Liebert XDCF Module

The upper Liebert XDCF module mounts on the rear of the Egenera BladeFrame cabinet, above the lower Liebert XDCF module. The cabinet and Liebert XDCF have prefabricated mounting holes and studs to ease mounting.

1. Attach the mounting angle to the bottom of the Egenera BladeFrame cabinet with a 10-32 nut that fits onto the stud on the back of the cabinet, see Figure 6). 2. Hang the upper Liebert XDCF module on the top of the Egenera BladeFrame cabinet, using the overhanging front edge of the Liebert XDCF. The bottom should rest on the mounting angle attached in Step 1. 3. Hold the Liebert XDCF against the Egenera cabinet. 4. Insert a panel fastener into the mounting angle and screw it into the captive panel nut in the rear of the Egenera BladeFrame cabinet. Tighten the fasteners securely with a screwdriver, either a Phillips or a blade-type. 5. Secure the Liebert XDCF to the cabinet four captive panel fasteners along the right side of the Liebert XDCF For the hole locations, see Figure 6. 6. Press the front section of the bottom deflector against the Egenera cabinet and tighten the panel fasteners joining the two-piece deflector.

Attaching Liebert XD Flex Pipe Retainers to Upper Liebert XDCF Module

Liebert XD Flex Pipe retainers must be attached to the upper Liebert Liebert XDCF module to keep the refrigerant pipes positioned behind the Egenera cabinet.

To attach the three retainers to the upper Liebert XDCF module:

1. Slip the front end of a Liebert XD Flex Pipe retainer into a slot on the right side of the Liebert XDCF. 2. Insert a panel fastener into the retainer and thread it into the captive panel nut. 3. Tighten the fastener securely with a screwdriver, either Phillips or a blade-type. 4. Repeat Steps 1 and 3 for the remaining retainers

Figure 11 Attaching Liebert XD Flex Pipe retainers

Slot Bracket for front of flex pipe retainer

Bolt secures Liebert XD Flex Pipe to CF

Liebert XD Flex Pipe retainers

Installation

Page 17 of the Emerson XDCF user manual — 5.2.1 Header System
Page 17 · click to enlarge
Page 17

Piping Connections and Piping Access Points

5.0 P IPING C ONNECTIONS AND P IPING A CCESS P OINTS

Refer to site specific drawings for general locations of the piping connections. For Liebert XDCF con- nection locations, refer also to Figure 12.

5.1 European Union Fluorinated Greenhouse Gas Requirements

Stationary air conditioning, refrigeration, heat pump equipments and stationary fire protection sys- tems in the European Community market and operating with fluorinated greenhouse gases (f-gas), such as R407C, R134a, R410A, must comply with the F-Gas Regulation: (EC) No. 842/2006 (F-gas). The regulation prohibits, among other actions, venting fluorinated greenhouse gases to the atmo- sphere.

The F-Gas Regulation requires operators to use use all measures that are technically feasible and do not entail disproportionate cost to prevent leakage of these gases, to test for leakage regularly and to recover f-gas before disposing of equipment, as well as during service and maintenance.

Refer to the full regulation for additional details.

5.2 Connection Methods and Points

The assembly and connection means used for piping in the Liebert XD system are the same as those used in conventional refrigeration systems. Observe all standard practices during installation and startup to prevent damage and contamination.

Supply piping connection is 1/2" OD copper pipe, and return piping connection is 5/8" OD copper. Both supply and return fittings are one-shot connections. These fittings contain pressurized R-134a refrig- erant inside the Liebert XDCF.

! CAUTION Risk of sudden refrigerant discharge! Can cause loss of charge and minor injury! Do not disconnect one-shot connections after they have been connected. Disconnection will release pressurized R-134a refrigerant from the Liebert XDCF.

The Liebert XDCF has supply and return piping access on the top of each module.

5.2.1 Header System

The Liebert XDCF module system requires use of the Liebert XD prefabricated piping assembly. The prefabricated piping is compatible with the Liebert XD Flex Pipe required to attach to the Liebert XDCF modules.

Figure 12 Liebert XDCF supply and return piping access points

Return Pipe (5/8" diameter)

Pipe locations and dimensions are the same for upper and lower units

Supply Pipe (1/2" diameter)

For additional information, refer to the Liebert Xtreme Density System Design Manual, SL-16655.

7-5/16" (186mm) · 3-9/16" (90mm) · 1-7/16" (37mm)

Page 18 of the Emerson XDCF user manual — Tools Required
Page 18 · click to enlarge
Page 18

Piping Connections and Piping Access Points

5.3 Recommended Piping Size

Connect the main pipes between the Liebert XDCF branch piping and the Liebert XDP or Liebert XDC according to Table 1. Elbows and restrictions must be minimized to get good fluid flow.

Connect the branch pipes between the main piping and the Liebert XDCF according to Table 1.

Table 1 Branch piping sizes for refrigerant loop

Pipe Function Size / Equivalent Pipe Length

Liebert XDP/Liebert XDC supply line, from Liebert XDP/Liebert XDC supply to farthest Liebert XDCF

1-1/8" OD (1.025" ID) for lengths up to 60 feet (18m) 1-3/8" OD (1.265" ID) for lengths over 60 but less than 175 feet (18 to 53m)

Liebert XDP/Liebert XDC return line, from farthest Liebert XDCF to Liebert XDP/Liebert XDC return

2-1/8" OD (1.985" ID) for lengths up to 60 feet (18m) 2-5/8" OD (2.465" ID) for lengths over 60 but less than 175 feet (18 to 53m)

From Liebert XDCF supply to supply line of Liebert XDP/Liebert XDC

1/2" OD (0.430" ID) for lengths up to 6 feet (1.8m) 5/8" OD (0.545" ID) for lengths over 6 feet but less than 35 feet (1.8-10.6m)

From Liebert XDCF return to return line of Liebert XDP/Liebert XDC

5/8" OD (0.545" ID) for lengths up to 6 feet (1.8m) 7/8" OD (0.785" ID) for lengths over 6 feet but less than 35 feet (1.8-10.6m)

5.4 Connecting Liebert XD Flex Pipes to Liebert XDCF Modules 1. Remove the caps on the supply and return lines on the top of the Liebert XDCF. 2. Lubricate the threads, diaphragm and O-ring with one or two drops of mineral oil. 3. Connect the line-set coupling finger-tight. 4. Make sure the Schrader valve is properly oriented; refer to the label on the top of the Liebert XDCF. 5. Hold the backup hex nut with a wrench while tightening the swivel nut. 6. Tighten the swivel nut on the female coupling until it is seated or a definite resistance is felt. 7. Once a definite bottoming resistance is felt (as in metal to metal), place a mark lengthwise from the swivel nut to the backup hex and tighten the swivel nut on the female coupling an additional 1/4 turn. 8. Tighten both the supply fittings and the return fittings to 35-45 ft/lb (47-61Nm). 9. Mark the female and male coupler with for future reference.

5.5 Connecting a Liebert XDCF with Liebert XD Flex Pipe to an Operational Liebert XD System

Check the Liebert XDCF to ensure that the unit has no refrigerant leaks.

Read all instructions before beginning installation.

Tools Required

  • Two adjustable wrenches, with a maximum adjustment size of 2-1/2 inches
  • Screwdriver, Phillips or blade type
1. Determine the port location of the supply and return piping overhead 2. Make sure the service valve for each port is closed 3. Remove cap for only the required ports. Do not remove caps from the unused ports. 4. Once Step 3 has been completed, remove the pipe plugs that are supplied on the Liebert XD Flex Pipe.
Page 19 of the Emerson XDCF user manual — NOTICE
Page 19 · click to enlarge
Page 19

Piping Connections and Piping Access Points

Figure 13 Liebert XD prefabricated piping assembly

Supply Main Service Valve, typical (all ports)

5. Thread the return couplers together, the larger of the two couplers (Liebert XD Flex Pipe and return main). 6. Use one of the adjustable wrenches to hold the fixed side of the female coupler on the Liebert XDCF stationary. With the other adjustable wrench, tighten the collar onto the coupler. Tighten these only until the force required to tighten abruptly increases. See Figure 14 .

NOTICE

Do not overtighten the couplers. Overtightening of couplers will damage the couplers.

Figure 14 Detail view of Liebert XD Flex Pipe and prefabricated piping port

Service Valve Note: Make sure the valve is closed before attaching flex pipe to the system.

Tighten collar with wrench. DO NOT OVERTIGHTEN!

Hold threaded coupler here with a wrench to keep the pipe stationary while tightening collar with another wrench.

Supply Side Torque Range for 1/2" coupler is 22.1 to 25.8 lb/ft (30-35Nm)

Return Side Torque Range for 1" coupler is 59 to 62.7 lb/ft (80-85Nm)

7. Repeat Steps 5 and 6 for the smaller coupler (supply line). 8. Once the supply and return connections are completed, open the return service valve, then open the supply service valve. With the equipment running, cool air is discharged from the back of the Liebert XDCF.

Return Main · Threaded Cap (Typical) · Flex Pipe

Page 20 of the Emerson XDCF user manual — Tools Required
Page 20 · click to enlarge
Page 20

Piping Connections and Piping Access Points

Figure 15 Liebert XD system with prefabricated piping assembly and Liebert XD Flex Pipe

Return Service Valve Make sure valve is open after system leak check

Supply Service Valve Make sure valve is open after system leak check

5.6 Disconnecting a Liebert XDCF With Liebert XD Flex Pipe From a Liebert XD System

Read all instructions before beginning.

Tools Required

  • Two adjustable wrenches, maximum adjustment size of 2-1/2 inches
  • Phillips head #2 screwdriver 1. Close the service valve in the supply line to the Liebert XDCF (smaller coupler). 2. Close the service valve in the return line to the Liebert XDCF (larger coupler). 3. Locate and have at the ready the caps and plugs for both ends of the supply and return couplers. 4. Loosen the female supply coupler from the male supply coupler (smaller coupler). This requires two adjustable wrenches. Refer to Figure 14 . 5. The Liebert XDCF side of the female coupler must be held stationary while the collar on the coupler is being loosened. Refer to Figure 14 . 6. Disconnect the coupler.
Show 4 more labels / short text on this page
Return Main · Supply Main · Return Flex pipe · Supply Flex Pipe
Page 21 of the Emerson XDCF user manual — 5.7 Insulation
Page 21 · click to enlarge
Page 21

Piping Connections and Piping Access Points

Figure 16 Profile view of the Liebert XD system

7. Place the protective dust cap and plug back onto both ends of the coupler on the Liebert XDCF and the port pipe.

Figure 17 Piping mains without Liebert XDCF and Liebert XD Flex Pipe

8. Repeat Steps 5 through 7 for the return coupler (larger coupler). 9. Carefully lay the Liebert XD Flex Pipe aside.

NOTICE

Do not fold or bend Liebert XD Flex Pipe. Kinks in the tubing can cause permanent damage to the Liebert XD Flex Pipes. 10. Carefully unbolt the Liebert XDCF from the cabinet. 11. Place the Liebert XDCF on a stable surface.

5.7 Insulation

To minimize the possibility of condensation, insulate all piping between the Liebert XDCF and the Liebert XDP or Liebert XDC.

Service Valve · Return Line · Supply Line

Page 22 of the Emerson XDCF user manual — 6.0 C HECKLIST FOR P ROPER I NSTALLATION
Page 22 · click to enlarge
Page 22

Checklist for Proper Installation

6.0 C HECKLIST FOR P ROPER I NSTALLATION

___ 1. Liebert XDCF modules are securely attached to the cabinet.

___ 2. Piping from Liebert XDP or Liebert XDC, with isolation valves, properly connected to each Liebert XDCF module.

___ 3. Flex piping connections to prefabricated header assembly are secure and according to specifications.

___ 4. Check the R-134a refrigerant charge.

___ 5. System checked for leakage.

___ 6. Run system and verify that the Liebert XDP or Liebert XDC and the Liebert XDCF modules operate properly.

___ 7. Piping is insulated.

Page 23 of the Emerson XDCF user manual — 7.1 Fluorinated Greenhouse Gas Requirements
Page 23 · click to enlarge
Page 23

7.0 M AINTENANCE

Minimal maintenance is required to keep the Liebert XDCF operating at optimal levels. The unit should be cleaned and checked for damage. Suggested maintenance includes:

  • Cooling fins—Clean any dust and debris from the cooling fins, taking care not to bend them.

7.1 Fluorinated Greenhouse Gas Requirements

Stationary air conditioning, refrigeration, heat pump equipments and stationary fire protection sys- tems in the European Community market and operating with fluorinated greenhouse gases (f-gas), such as R407C, R134a, R410A, must comply with the F-Gas Regulation: (EC) No. 842/2006 (F-gas). The regulation prohibits, among other actions, venting fluorinated greenhouse gases to the atmo- sphere.

The F-Gas Regulation requires operators to use use all measures that are technically feasible and do not entail disproportionate cost to prevent leakage of these gases, to test for leakage regularly and to recover f-gas during equipment service and maintenance and before disposing of equipment.

Refer to the full regulation for additional details.

Maintenance

Page 24 of the Emerson XDCF user manual — XD-CF-10-BP-0, XD-CF BTM
Page 24 · click to enlarge
Page 24

8.0 S PECIFICATIONS

Table 2 Liebert XDCF specifications

XD-CF-10-TPE-0, XD-CF Top EXP

XD-CF-10-TP-0, XD-CF Top XD-CF-10-BPE-0, XD-CF BTM EXP

XD-CF-10-BP-0, XD-CF BTM

Cooling capacity, maximum 10kWH / 2.8 Tons / 34,000 BTUh

Conditions 55°F (13°C) entering fluid temperature, 50°F (10°C) or lower dew point

Height – including pipe connections 31-3/8" (797mm)

Unit only 18 (8.2)

Shipping 30 (13.6)

Refrigerant supply from Liebert XDP/Liebert XDC 1/2" threaded one-shot coupling on the unit

Refrigerant return to Liebert XDP/Liebert XDC 5/8" threaded one-shot coupling on the unit

Cabinet exterior finish Gray

Safety CSA, CE Approved

Show 8 more labels / short text on this page
Specifications · Models · Dimensions, inches (mm) · Width 13-7/16" (341mm) · Depth 7-5/16" (186mm) · Weight, lb (kg) · Pipe connections · Agency
Page 25 of the Emerson XDCF user manual — NOTES
Page 25 · click to enlarge
Page 25

NOTES

Specifications

Page 26 of the Emerson XDCF user manual — 8.0 Specifications
Page 26 · click to enlarge
Page 26

Specifications

Page 27 of the Emerson XDCF user manual — 8.0 Specifications
Page 27 · click to enlarge
Page 27
Page 27 of the Emerson XDCF user manual — 8.0 Specifications
Page 28 of the Emerson XDCF user manual — SL-16678_REV05_05-08
Page 28 · click to enlarge
Page 28

Ensuring The High Availability Of Mission-Critical Data And Applications.

Emerson Network Power, the global leader in enabling business-critical continuity, ensures network resiliency and adaptability through a family of technologies—including Liebert power and cooling technologies—that protect and support business-critical systems. Liebert solutions employ an adaptive architecture that responds to changes in criticality, density and capacity. Enterprises benefit from greater IT system availability, operational flexibility and reduced capital equipment and operating costs.

Technical Support / Service

Web Site www.liebert.com

Monitoring 800-222-5877 monitoring@emersonnetworkpower.com

Outside the US614-841-6755

800-222-5877 upstech@emersonnetworkpower.com

Outside the US614-841-6755

800-543-2378 powertech@emersonnetworkpower.com

800-543-2778 Outside the United States

614-888-0246 Locations United States 1050 Dearborn Drive P.O. Box 29186 Columbus, OH 43229

Europe Via Leonardo Da Vinci 8 Zona Industriale Tognana 35028 Piove Di Sacco (PD) Italy +39 049 9719 111 Fax: +39 049 5841 257

While every precaution has been taken to ensure the accuracy and completeness of this literature, Liebert Corporation assumes no responsibility and disclaims all liability for damages resulting from use of this information or for any errors or omissions. © 2008 Liebert Corporation All rights reserved throughout the world. Specifications subject to change without notice. ® Liebert is a registered trademark of Liebert Corporation. All names referred to are trademarks or registered trademarks of their respective owners.

Asia 7/F, Dah Sing Financial Centre 108 Gloucester Road, Wanchai Hong Kong 852 2572220 Fax: 852 28029250

SL-16678_REV05_05-08

EmersonNetworkPower.com Emerson Network Power. The global leader in enabling Business-Critical Continuity.

Embedded Computing Embedded Power Power Switching & Controls

Services Racks & Integrated Cabinets Outside Plant

Business-Critical Continuity, Emerson Network Power and the Emerson Network Power logo are trademarks and service marks of Emerson Electric Co.

©2008 Emerson Electric Co.

Show 8 more labels / short text on this page
Single-Phase UPS · Three-Phase UPS · Environmental Systems · AC Power Connectivity · DC Power · Monitoring · Precision Cooling · Surge Protection
Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the Emerson XDCF

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson XDCF

Be the first to ask — other owners or our team will answer.

Original document

Emerson XDCF manual PDF

28 pages·2.7 MB·Refrigerator·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…