EN
Emerson Process Management logo
Official user manual

Emerson Process Management Rosemount 396PVP

40 pages·8.1 MB·Stud Sensor·PDF·ENDEFRITNLJA
Emerson Process Management Rosemount 396PVP
Table of Contents 13 sections Submersion/Insertion pH/ORP Sensors · Specifications · WARNING · CAUTION SENSOR/PROCESS APPLICATION COMPATIBILITY · … ShowHide
Page 1 of the Emerson Process Management Rosemount 396PVP user manual — ATEX DIRECTIVE
Page 1 · click to enlarge
Page 1

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Submersion/Insertion pH/ORP Sensors

Specifications

Sensor TypeTUpH 396P, 396 PVP; GPLR hemi or flat glass
Minimum Conductivity75 µS/cm, min; 100 µS/cm nominal
Range*pH: 0–14 ORP: -1500 to 1500 mv
Flow Rateup to 2 ft/sec
Wetted MaterialsTitanium, Polypropylene, EPDM, glass; platinum (ORP only)
Percent Linearity* pH RangeGPLR hemi bulbGPLR flat bulb 0 – 2 pH94%– 2 – 12 pH97%98% 12 – 13 pH98%95% 13 – 14 pH98%–
Emerson Process Management Rosemount 396PVP — Submersion/Insertion pH/ORP Sensors diagram (page 1)
Fig. 1 · Submersion/Insertion pH/ORP Sensors
Process Connection1 in. MNPT front and rear facing threads
Integral Cable396P: (-01) -25 ft; (02) -15 ft coaxial
VP8 Cableuse PN 24281-00 15ft VP8 cable
Preamplifier Options396P: Remote or Integral SMART (-01) 396PVP: Remote or Integral SMART (-70)
Pressure Range-Hemi bulb100–1136 kPa [abs] (0–150 psig)
Temperature Range0–100 °C (32-212 °F)
Weight/Shipping Weight0.45 kg/0.9 kg (1 lb/2 lb)
Pressure Range-Flat bulb100–790 kPa [abs] (0–100 psig)

WARNING

Before removing the sensor, be absolutely certain that the process pressure is reduced to 0 psig and the process

temperature is lowered to a safe level!

WARNING

Glass electrode must be wetted at all times (in storage and in line) to maximize sensor life.

CAUTION SENSOR/PROCESS APPLICATION COMPATIBILITY

The wetted sensor materials may not be compatible with process composition and operating conditions. Application

compatibility is entirely the responsibility of the user.

CAUTION

The buffer in the protective boot may cause skin or eye irritation.

ATEX DIRECTIVE

Special Conditions for safe use

1. All pH/ORP sensors have a plastic enclosure which must only be cleaned with a damp cloth to avoid the danger due to a

build up of an electrostatic charge.

2. All pH/ORP sensor Models are intended to be in contact with the process fluid and may not meet the 500V r.m.s. a.c. test

to earth. This must be taken into consideration at installation.

Emerson Process Management Rosemount 396PVP — ATEX DIRECTIVE diagram (page 1)
Fig. 2
Page 2 of the Emerson Process Management Rosemount 396PVP user manual — Maintenance for pH Electrode
Page 2 · click to enlarge
Page 2

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Storage

1. It is recommended that electrodes be stored in their original shipping containers until needed. 2. Do not store at temperatures below -5 °C (23 °F). 3. Electrodes should be stored with a protective cap containing KCI solution. 4. For overnight storage, immerse the sensor in tap water or 4 pH buffer solution. 5. A pH glass electrode does have a limited shelf life of one year. Electrode preparation
1. Remove electrode from shipping container. 2. Remove the protective boot covering the electrode bulb. 3. For pH electrode, rinse away salt film with clean water, then shake the electrode so that the internal solution fills the bulb, thus removing any air trapped there.

Installation

For sensor dimensions, see Figure 1. For sensor orientation, see Figure 2. For VP sensor or -02 sensor (no preamp) wiring, see Figures 3 thru 22. For -01 sensor (with preamp) wiring, see Figures 23 thru 28. Two Point Buffer Calibration

Select two stable buffer solutions, preferably pH 4.0 and 10.0 (pH buffers other than pH 4.0 and pH 10.0 can be used as long as the pH values are at least two pH units apart).

1. Immerse sensor in the first buffer solution. Allow sensor to equilibrate to the buffer temperature (to avoid errors due to temperature differences between the buffer solution and sensor temperature) and wait for reading to stabilize. Value of buffer can now be acknowledged by analyzer/transmitter. 2. Once the first buffer has been acknowledged by the analyzer/transmitter, rinse the buffer solution off of the sensor with distilled or deionized water. 3. Repeat steps 1 and 2 using the second buffer solution. 4. The theoretical slope value, according to the Nernst equation for calculating pH, is approximately 59.17 mV/pH. Over time the sensor will age, both in the process and in storage, and will result in reduced slope values. To ensure accurate readings, it is recommended that the electrode be replaced when the slope value falls below 47 to 49 mV/pH.

Recommended pH Sensor Standardization

For maximum accuracy, the sensor can be standardized on-line or with a process grab sample after a buffer calibration has been performed and the sensor has been conditioned to the process. Standardization accounts for the sensor junction potential and other interferences. Standardization will not change the sensor’s slope but will simply adjust the analyzer’s reading to match that of the known process pH.

Maintenance for pH Electrode

Electrodes should respond rapidly. Sluggishness, offsets, and erratic readings are indicators that the electrodes may need cleaning or replacement.

1. To remove oil deposit, clean the electrode with a mild non-abrasive detergent. 2. To remove scale deposits, soak electrodes for 30 to 60 minutes in a 5% hydrochloric acid solution. 3. Temperature effect on life expectancy: If glass electrode life expectancy is 100% @ 25 °C (77 °F), then it will be approximately 25% @ 80 °C (176 °F).
Page 3 of the Emerson Process Management Rosemount 396PVP user manual — Maintenance for ORP Electrode
Page 3 · click to enlarge
Page 3

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

ORP Calibration

1. After making an electrical connection between the sensor and the instrument, obtain a standard solution of saturated quinhydrone. This can also be made quite simply by adding a few crystals of quinhydrone to either pH 4 or pH 7 buffer. Quinhydrone is only slightly soluble, therefore only a few crystals will be required. 2. Immerse the sensor in the standard solution. Allow 1–2 minutes for the ORP sensor to stabilize. 3. Adjust the standardize control of the instrument to the solution value shown in the table below. The resulting potentials, measured with a clean platinum electrode and saturated KCl/AgCl reference electrode, should be within ±20 millivolts of the value shown in the table below. Solution temperature must be noted to ensure accurate interpretation of results. The ORP value of saturated quinhydrone solution is not stable over long periods of time. Therefore, these standards should be made up fresh each time they are used. 4. Remove the sensor from the buffer, rinse, and install in the process.

Maintenance for ORP Electrode

Electrodes should respond rapidly. Sluggishness, offsets, and erratic readings are indicators that the electrodes may need cleaning or replacement.

1. To remove oil deposit, clean the electrode with a mild non-abrasive detergent. 2. To remove scale deposits, soak electrodes for 30 to 60 minutes in a 5% hydrochloric acid solution. 3. ORP (metallic) electrodes should be polished with moistened baking soda.
pH 4 SolutionpH 7 Solution Temp °C202530202530 mV Potential268264260948780

Figure 1. Dimensional Drawing

Emerson Process Management Rosemount 396PVP — Maintenance for ORP Electrode diagram (page 3)
Fig. 3 · Maintenance for ORP Electrode
Emerson Process Management Rosemount 396PVP — Maintenance for ORP Electrode diagram (page 3)
Fig. 4 · Maintenance for ORP Electrode
Page 4 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 4 · click to enlarge
Page 4

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 2. Flow Through and Insertion Installation

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 4)
Fig. 5 · ORP Calibration

Figure 3. Wiring for 81 Figure 4. Wiring for 1181

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 4)
Fig. 6 · ORP Calibration
Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 4)
Fig. 7 · ORP Calibration
Page 5 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 5 · click to enlarge
Page 5

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 5. Wiring 81 through Remote Junction Box Figure 6. Wiring 1181, 1050/1060, and 1003/1023 through Remote Junction Box

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 5)
Fig. 8 · ORP Calibration
Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 5)
Fig. 9 · ORP Calibration
Page 6 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 6 · click to enlarge
Page 6

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 7. Wiring Details of 396P-01-50 for use with and without Junction Box (PN 22719-02) for 1181, 1050, and 1060.

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 6)
Fig. 10 · ORP Calibration

Figure 8. Wiring for 2081 Figure 9. Wiring for 3081, 4081

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 6)
Fig. 11 · ORP Calibration
Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 6)
Fig. 12 · ORP Calibration
Page 7 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 7 · click to enlarge
Page 7

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 10. Wiring 2081 through Remote Junction Box Figure 11. Wiring 3081, 4081 through Remote Junction Box

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 7)
Fig. 13 · ORP Calibration
Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 7)
Fig. 14 · ORP Calibration

Figure 12. Wiring for 1054 A/B and 2054

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 7)
Fig. 15 · ORP Calibration
Page 8 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 8 · click to enlarge
Page 8

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 13. Wiring 1054 A/B and 2054 Through a Remote Junction Box

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 8)
Fig. 16 · ORP Calibration
Page 9 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 9 · click to enlarge
Page 9

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 14. Wiring 54 through Remote Junction Box

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 9)
Fig. 17 · ORP Calibration

Figure 15. Wiring for 54

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 9)
Fig. 18 · ORP Calibration
Page 10 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 10 · click to enlarge
Page 10

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 16. Wiring Details of 396P-01-54 for use with and without Junction Box (PN 22719-02) for 1054, 1054A, 1054B, 2054, 2081, and Extension Cable (9200254).

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 10)
Fig. 19 · ORP Calibration
Page 11 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 11 · click to enlarge
Page 11

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 17. Wiring of 396P-01-55 for use with 54, 81, 3081, and 4081.

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 11)
Fig. 20 · ORP Calibration

Figure 18. Junction Box (PN 23550-00) for 54, 3081, 4081, and 81.

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 11)
Fig. 21 · ORP Calibration
Page 12 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 12 · click to enlarge
Page 12

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 19. Wiring Details of 396P-01 Gray Cable for use with 54e pH/ORP-01-09

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 12)
Fig. 22 · ORP Calibration

If present, reove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT and

1056, terminate Inner Drain with a wire nut.

Figure 20. Wiring Details of 396P-01 Blue Cable for use with 54e pH/ORP-01-09

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 12)
Fig. 23 · ORP Calibration

If present, reove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT

and 1056, terminate Inner Drain with a wire nut.

Page 13 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 13 · click to enlarge
Page 13

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 21. Wiring Details of 396P-02 Gray Cable for use with 54e pH/ORP-01-09

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 13)
Fig. 24 · ORP Calibration

If present, reove shrink sleeve from gray reference wire before connecting wire to terminal.

For XMT and 1056, terminate Inner Drain with a wire nut.

Figure 22. Wiring Details of 396P-02 Blue Cable for use with 54e pH/ORP-01-09

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 13)
Fig. 25 · ORP Calibration

If present, reove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT and

1056, terminate Inner Drain with a wire nut.

Page 14 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 14 · click to enlarge
Page 14

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 23. Wiring Details of 396PVP Gray Cable for use with 54e pH/ORP-01-09

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 14)
Fig. 26 · ORP Calibration

For XMT and 1056 terminate Inner Drain with a wire nut. VP8 Cable part number 24281-xx shown.

Figure 24. Wiring Details of 396PVP Blue Cable for use with 54e pH/ORP-01-09

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 14)
Fig. 27 · ORP Calibration

For XMT and 1056 terminate Inner Drain with a wire nut. VP8 Cable part number 24281-xx shown.

Page 15 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 15 · click to enlarge
Page 15

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 25. Wiring Details of 396P-01 for use with 1055-01-10-22

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 15)
Fig. 28 · ORP Calibration

Figure 26. Wiring Details of 396P-01 for use with 1055-01-10-22-32

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 15)
Fig. 29 · ORP Calibration
Page 16 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 16 · click to enlarge
Page 16

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 27. Wiring Details of 396P-02 for use with 1055-01-10-22-32

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 16)
Fig. 30 · ORP Calibration

Figure 28. Wiring Details of 396PVP for use with 1055-01-10-22-32

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 16)
Fig. 31 · ORP Calibration
Page 17 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 17 · click to enlarge
Page 17

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 29. Wiring Details of 396P-01 Gray Cable for use with XMT-P-HT-10

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 17)
Fig. 32 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal.

For XMT and 1056 terminate Inner Drain with a wire nut.

Figure 30. Wiring Details of 396P-01 Blue Cable for use with XMT-P-HT-10

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 17)
Fig. 33 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal.

For XMT and 1056 terminate Inner Drain with a wire nut.

Page 18 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 18 · click to enlarge
Page 18

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 31. Wiring Details of 396P-02 Gray Cable for use with XMT-P-HT-10

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 18)
Fig. 34 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT

and 1056 terminate Inner Drain with a wire nut.

Figure 32. Wiring Details of 396P-02 Blue Cable for use with XMT-P-HT-10

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 18)
Fig. 35 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT

and 1056 terminate Inner Drain with a wire nut.

Page 19 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 19 · click to enlarge
Page 19

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 33. Wiring Details of 396PVP Gray Cable for use with XMT-P-HT-10

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 19)
Fig. 36 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT

and 1056 terminate Inner Drain with a wire nut.

Figure 34. Wiring Details of 396PVP Blue Cable for use with XMT-P-HT-10

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 19)
Fig. 37 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT

and 1056 terminate Inner Drain with a wire nut.

Page 20 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 20 · click to enlarge
Page 20

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 35. Wiring through j-box for 1056

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 20)
Fig. 38 · ORP Calibration

Figure 36. Wiring Details of 396P-01 Gray Cable for 1056/56

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 20)
Fig. 39 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT

and 1056 terminate Inner Drain with a wire nut.

Page 21 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 21 · click to enlarge
Page 21

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 37. Wiring Details of 396P-01 Blue Cable for 1056/56

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 21)
Fig. 40 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT

and 1056 terminate Inner Drain with a wire nut.

Figure 38. Wiring Details of 396P-02 Blue Cable for 1056/56

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 21)
Fig. 41 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT

and 1056 terminate Inner Drain with a wire nut.

Page 22 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 22 · click to enlarge
Page 22

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 39. Wiring Details of 396P-02 Gray Cable for 1056/56

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 22)
Fig. 42 · ORP Calibration

If present, remove shrink sleeve from gray reference wire before connecting wire to terminal. For XMT

and 1056 terminate Inner Drain with a wire nut.

Figure 40. Wiring Details of 396PVP Gray Cable for 1056/56

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 22)
Fig. 43 · ORP Calibration

For XMT and 1056 terminate inner Drain with a wire nut. VP8 Cable part number 24281-xx shown

Page 23 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 23 · click to enlarge
Page 23

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 41. Wiring Details of 396PVP Blue Cable for 1056/56

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 23)
Fig. 44 · ORP Calibration

For XMT and 1056 terminate inner Drain with a wire nut. VP8 Cable part number 24281-xx shown

Figure 42. pH/ORP Sensor Wiring for 1056/1057/56/396VP-70 (Blue Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 23)
Fig. 45 · ORP Calibration
Page 24 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 24 · click to enlarge
Page 24

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 43. Wiring Details of 396P-01 Gray Cable for 1057

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 24)
Fig. 46 · ORP Calibration

Figure 44. Wiring Details of 396P-01 Blue Cable for 1057

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 24)
Fig. 47 · ORP Calibration
Page 25 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 25 · click to enlarge
Page 25

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 45. Wiring Details of 396P-02 Gray Cable for 1057

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 25)
Fig. 48 · ORP Calibration

Figure 46. Wiring Details of 396P-02 Blue Cable for 1057

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 25)
Fig. 49 · ORP Calibration
Page 26 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 26 · click to enlarge
Page 26

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 47. Wiring Details of 396PVP Gray Cable for 1057

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 26)
Fig. 50 · ORP Calibration

Figure 48. Wiring Details of 396PVP Blue Cable for 1057

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 26)
Fig. 51 · ORP Calibration
Page 27 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 27 · click to enlarge
Page 27

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 49. pH/ORP Sensor Wiring for 1066/396P-01 (Gray Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 27)
Fig. 52 · ORP Calibration

Figure 50. pH/ORP Sensor Wiring for 1066/396P-01 (Blue Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 27)
Fig. 53 · ORP Calibration
Page 28 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 28 · click to enlarge
Page 28

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 51. pH/ORP Sensor Wiring for 1066/396P-02 (Gray Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 28)
Fig. 54 · ORP Calibration

Figure 52. pH/ORP Sensor Wiring for 1066/396P-02 (Blue Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 28)
Fig. 55 · ORP Calibration
Page 29 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 29 · click to enlarge
Page 29

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 53. pH/ORP Sensor Wiring for 1066/396PVP (Gray Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 29)
Fig. 56 · ORP Calibration

Figure 54. pH/ORP Sensor Wiring for 1066/396PVP (Blue Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 29)
Fig. 57 · ORP Calibration
Page 30 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 30 · click to enlarge
Page 30

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 55. pH/ORP Sensor Wiring for 1066/396PVP-70 (Blue Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 30)
Fig. 58 · ORP Calibration

Figure 56. Wiring Details of 396P-01 Gray Cable for 5081-P-HT

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 30)
Fig. 59 · ORP Calibration
Page 31 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 31 · click to enlarge
Page 31

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 57. Wiring Details of 396P-01 Blue Cable for 5081-P-HT

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 31)
Fig. 60 · ORP Calibration

Figure 58. Wiring Details of 396P-02 Gray Cable for 5081-P-HT

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 31)
Fig. 61 · ORP Calibration
Page 32 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 32 · click to enlarge
Page 32

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 59. Wiring Details of 396P-02 Blue Cable for 5081-P-HT

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 32)
Fig. 62 · ORP Calibration

Figure 60. Wiring Details of 396PVP Gray Cable for 5081-P-HT

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 32)
Fig. 63 · ORP Calibration
Page 33 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 33 · click to enlarge
Page 33

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 61. Wiring Details of 396PVP Blue Cable for 5081-P-HT

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 33)
Fig. 64 · ORP Calibration

Figure 62. pH/ORP Sensor Wiring for 5081/398RVP-70 (Blue Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 33)
Fig. 65 · ORP Calibration
Page 34 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 34 · click to enlarge
Page 34

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 63. Wiring Details of 396P-01 Gray Cable for use with 6081

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 34)
Fig. 66 · ORP Calibration

Figure 64. Wiring Details of 396P-01 Blue Cable for use with 6081

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 34)
Fig. 67 · ORP Calibration
Page 35 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 35 · click to enlarge
Page 35

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 65. Wiring Details of 396P-02 Gray Cable for use with 6081

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 35)
Fig. 68 · ORP Calibration

Figure 66. Wiring Details of 396P-02 Blue Cable for use with 6081

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 35)
Fig. 69 · ORP Calibration
Page 36 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 36 · click to enlarge
Page 36

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Figure 67. Wiring Details of 396PVP Gray Cable for use with 6081

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 36)
Fig. 70 · ORP Calibration

Figure 68. Wiring Details of 396PVP Blue Cable for use with 6081

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 36)
Fig. 71 · ORP Calibration
Page 37 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 37 · click to enlarge
Page 37

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Figure 69. pH/ORP Sensor Wiring for 6081/3400HTVP-70 (Blue Cable)

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 37)
Fig. 72 · ORP Calibration
Page 38 of the Emerson Process Management Rosemount 396PVP user manual — ORP Calibration
Page 38 · click to enlarge
Page 38

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP

Emerson Process Management Rosemount 396PVP — ORP Calibration diagram (page 38)
Fig. 73 · ORP Calibration

Part Number 1700716

Page 39 of the Emerson Process Management Rosemount 396PVP user manual — Accessories
Page 39 · click to enlarge
Page 39

Instruction Sheet TUpH 396P and 396PVP Sensors LIQ_MAN_ABR_396P_396PVP July 2013

Accessories

22698-00 Preamplifier plug-in for junction box, for 1003

22698-02 Preamplifier plug-in for junction box, for 1181, 1050

22698-03 Preamplifier plug-in for junction box for 1054 A/B, 2054, 2081

22743-01 Pt100 preamplifier for 1181

22744-01 3K Preamplifier for 1181

23557-00 Preamplifier for junction box for 54, 3081, 81, 4081

9210012 Buffer solution, 4.01 pH, 16 oz.

9210013 Buffer solution, 6.86 pH, 16 oz.

9210014 Buffer solution, 9.18 pH, 16 oz

R508-80X ORP solution, 460 mv ± 10 at 20 °C

12707-00 Jet Spray Cleaner

25645-07 15 ft. VP6 Cable

24281-00 15 ft. VP8 Cable

24281-01 25 ft. VP8 Cable

24281-02 2.5 ft. VP8 Cable

24281-03 50 ft. VP8 Cable

24281-04 100 ft. VP8 Cable

24281-05 4 ft. VP8 Cable

24281-06 10 ft. VP8 Cable

24281-07 20 ft. VP8 Cable

24281-08 30 ft. VP8 Cable

Part Description

Page 40 of the Emerson Process Management Rosemount 396PVP user manual — Accessories
Page 40 · click to enlarge
Page 40

TUpH 396P and 396PVP Sensors Instruction Sheet July 2013 LIQ_MAN_ABR_396P_396PVP Rev. J

facebook.com/EmersonRosemountAnalytical

AnalyticExpert.com

Credit Cards for U.S. Purchases Only.

twitter.com/RAIhome

youtube.com/user/RosemountAnalytical

Emerson Process Management 2400 Barranca Parkway Irvine, CA 92606 USA Tel: (949) 757-8500 Fax: (949) 474-7250 rosemountanalytical.com

©2013 Rosemount Analytical, Inc. All rights reserved.

The Emerson logo is a trademark and service mark of Emerson Electric Co. Brand name is a mark of one of the Emerson Process Management family of companies. All other marks are the property of their respective owners.

The contents of this publication are presented for information purposes only, and while effort has been made to ensure their accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our terms and conditions, which are available on request. We reserve the right to modify or improve the designs or specifications of our products at any time without notice.

© Rosemount Analytical Inc. 2013

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the Emerson Process Management Rosemount 396PVP

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson Process Management Rosemount 396PVP

Be the first to ask — other owners or our team will answer.

Original document

Emerson Process Management Rosemount 396PVP manual PDF

40 pages·8.1 MB·Stud Sensor·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…