EN
Emerson logo
Official user manual

Emerson E2

283 pages·10.9 MB·Refrigerator·PDF·ENDEFRITNLJA
Emerson E2
Table of Contents 603 sections 1 Introduction · 1.1 The E2 Refrigeration Controller (RX) · 1.2 The E2 Building Controller (BX) · 1.3 The E2 Convenience Store Controller (CX) · … ShowHide
1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 1 of the Emerson E2 user manual — E2 Installation and Operation Manual for RX Refrigeration,
Page 1 · click to enlarge
Page 1

026-1614 Rev 4 5-JAN-2013

Emerson E2 — 026-1614 Rev 4 5-JAN-2013 diagram (page 1)
Fig. 1 · 026-1614 Rev 4 5-JAN-2013

E2 Installation and Operation Manual for RX Refrigeration,

BX HVAC, and CX Convenience Store Controllers

Emerson E2 — E2 Installation and Operation Manual for RX Refrigeration, diagram (page 1)
Fig. 2 · E2 Installation and Operation Manual for RX Refriger…
Emerson E2 — E2 Installation and Operation Manual for RX Refrigeration, diagram (page 1)
Fig. 3 · E2 Installation and Operation Manual for RX Refriger…

Applicable to E2 firmware versions 4.0 and above

Page 2 of the Emerson E2 user manual
Page 2 · click to enlarge
Page 2
Page 2 of the Emerson E2 user manual
Page 3 of the Emerson E2 user manual — CE COMPLIANCE NOTICE
Page 3 · click to enlarge
Page 3

Emerson Climate Technologies Retail Solutions

1065 Big Shanty Road NW, Suite 100 Kennesaw, GA 30144, USA

E2 FIRMWARE VERSION

4.05F01

FCC COMPLIANCE NOTICE

This device complies with Part 15 of the FCC Rules. Operation is subject to the fol lowing two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

CE COMPLIANCE NOTICE

Class A Product Information for E2 Controllers:

The Emerson Retail Solutions Einstein and E2 controllers are Class A products. In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures. This covers:

  • All E2 family product types: RX - Refrigeration Controller (845-xxxx), BX - Building/HVAC Controller (845-xxxx), CXConvenience Store Controller (845-xxxx), and all version models: (300, 400, 500).

Phone 770-425-2724 · Fax 770-425-9319

Page 4 of the Emerson E2 user manual
Page 4 · click to enlarge
Page 4
Page 4 of the Emerson E2 user manual
Page 5 of the Emerson E2 user manual — Table of contents
Page 5 · click to enlarge
Page 5

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 6 of the Emerson E2 user manual — Table of contents
Page 6 · click to enlarge
Page 6

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 7 of the Emerson E2 user manual — Table of contents
Page 7 · click to enlarge
Page 7

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 8 of the Emerson E2 user manual — Table of contents
Page 8 · click to enlarge
Page 8

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 9 of the Emerson E2 user manual — Table of contents
Page 9 · click to enlarge
Page 9

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 10 of the Emerson E2 user manual — Table of contents
Page 10 · click to enlarge
Page 10

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 11 of the Emerson E2 user manual — Table of contents
Page 11 · click to enlarge
Page 11

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 12 of the Emerson E2 user manual — Table of contents
Page 12 · click to enlarge
Page 12

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 13 of the Emerson E2 user manual — Table of contents
Page 13 · click to enlarge
Page 13

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 14 of the Emerson E2 user manual — Table of contents
Page 14 · click to enlarge
Page 14

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 15 of the Emerson E2 user manual — Table of contents
Page 15 · click to enlarge
Page 15

Table of contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 16 of the Emerson E2 user manual
Page 16 · click to enlarge
Page 16
Page 16 of the Emerson E2 user manual
Page 17 of the Emerson E2 user manual — 1.1 The E2 Refrigeration Controller (RX)
Page 17 · click to enlarge
Page 17

1 Introduction

The E2 controller is a microprocessor-based control system designed to provide complete control of compres sor groups, condensers, refrigerated cases, and other com ponents related to refrigeration and building control. The E2 is the controlling component of a three-network config uration (RS485 I/O, Echelon® Lonworks™ Networks, and Ethernet) that includes input and output communication boards, remote communication software, and a variety of sensors, probes, and transducers.

fewer capabilities and a monochrome display.

The E2 RX is primarily designed to control tempera ture and defrost in refrigerated cases using either direct control (connected to the E2 via I/O boards or ESR8 lineup control boards) or by using CC-100 case control boards (connected via the LonWorks Network).

Table 1-1 shows the differences between capabilities for the RX-300 and RX-400.

The E2 efficiently operates all systems that support refrigeration (including compressor racks and condensers) and other components not directly related to refrigeration control, such as HVAC systems, anti-sweat heaters, and sensor control modules.

Capabilities RX-

100 RX-

300 RX-

Analog Combiner 0 128 128

Analog Import Point 0 64 64

Emerson E2 — Capabilities RX- diagram (page 17)
Fig. 4 · Capabilities RX-

Analog Sensor Control 24 64 72

Anti-Sweat 8 16 64

Case Control Circuit 0 48 64

CC100 Case Suction 0 99 99

CC100 Liquid Control 0 99 99

CCB 0 99 99

Condenser 1 1 2

Control Link ACC 16 63 63

Control Link Case Disp 0 99 99

Control Link RSC 0 99 99

CS100 Ckt Suction 0 99 99

Figure 1-1 - E2 Controller

CT Drive 0 16 16

1.1 The E2 Refrigeration Controller (RX)

Digital Combiner 0 128 128

Digital Sensor Control 24 64 72

Discus 0 63 63

The E2 RX is available in three models: the RX-300, RX-400, and RX-100. The E2 RX-300 is capable of con trolling a single refrigeration system (including one con denser and up to four suction groups). The E2 RX-400 is capable of controlling two separate refrigeration systems (including two condensers and up to four suction groups). The RX-100 is a low-cost alternative to the RX-300 with

E2 Alarm Panel 7 7 7

Energy Meter 30 30 30

Enhanced Suction Group 4 4 4

Table 1-1 - RX-100, RX-300, and RX-400 Comparison

The E2 Refrigeration Controller (RX) Introduction • 1-1

Page 18 of the Emerson E2 user manual — 1.2 The E2 Building Controller (BX)
Page 18 · click to enlarge
Page 18

(AHUs), rooftop units (RTUs), and other systems related to environment control. In addition, the BX provides extensive sensor control, logging, and graphing features that allow the user to view accurate real-time information about system conditions. The BX is equipped with many power monitoring and demand control features that give you the information you need to keep your site’s energy consumption low.

Capabilities RX-

100 RX-

300 RX-

ESR8 ESR Control 0 99 99

Flexible Combiner 64 128 128

Heat/Cool Control 0 16 16

The E2 BX is available in two models: the BX-300 and BX-400. The only significant difference between the E2 BX-300 and the E2 BX-400 is the total number of building control devices that may be operated by a single controller. Table 1-2 shows the differences between capabilities for the BX-300 and BX-400.

Holiday Schedule 4 64 64

Impulse 0 48 64

Infrared Leak Detection 1 16 16

K5 Ref Scroll 0 31 31

Capabilities BX-300 BX-400

Logging Group 8 32 32

Loop/Sequence Control 4 16 24

Modular Chiller Control 0 1 2

AHU 6 8

MultiFlex ESR 0 31 31

Analog Combiner 128 128

MRLDS 24 24 24

Analog Import Point 64 64

Performance Alert 0 63 63

Analog Sensor Control 64 72

Power Monitoring 1 16 16

Pulse Accumulator 0 16 16

Control Link ACC 16 48

RMS Asset 99 99 99

Control Link Case Disp 99 99

Standard Circuit 48 48 64

Control Link RSC 99 99

Suction Group 4 4 4

TD Condenser Fan Con trol

CT Drive 16 16

TD3 Controller 0 99 99

Demand Control 2 2

Time Schedule 4 64 64

Digital Combiner 128 128

Table 1-1 - RX-100, RX-300, and RX-400 Comparison

Digital Sensor Control 64 72

1.2 The E2 Building Controller (BX)

E2 Alarm Panel 7 7

Energy Meter 30 30

Flexible Combiner 128 128

The counterpart to the E2 RX is the E2 BX, which con trols HVAC systems for low-rise retail, industrial, and commercial buildings. The BX’s primary function is to provide energy-efficient control of air handling units

Heat/Cool Control 16 32

Table 1-2 - BX-300 vs. BX-400 Comparison

Show 4 more labels / short text on this page
Advanced Rooftop Control · Anti-Sweat 16 48 · Copeland CoreSense Communications · 4 64 64
Page 19 of the Emerson E2 user manual — 1.3 The E2 Convenience Store Controller (CX)
Page 19 · click to enlarge
Page 19

the CX-300 and CX-400.

Capabilities BX-300 BX-400

Holiday Schedule 64 64

Capabilities CX-

100 CX-

300 CX-

HVAC Zone 32 40

Infrared Leak Detec tion

Lighting Control 24 48

AHU 4 6 8

Logging Group 32 32

Analog Combiner 64 128 128

Loop/Sequence Control 16 28

Analog Sensor Control 12 24 48

MRLDS 24 24

Anti-Sweat 4 8 16

Power Monitoring 32 64

Case Control Circuit 0 12 24

Pulse Accumulator 32 64

CC100 Case Suction 0 99 99

RCB/RCB-P Controller 64 64

CC100 Liquid Control 0 99 99

RMS Asset 99 99

CCB 0 99 99

TD Condenser Fan Control

Condenser 0 0 1

Control Link ACC 8 16 16

Time Schedule 64 64

Control Link Case Disp 6 99 99

Table 1-2 - BX-300 vs. BX-400 Comparison

Control Link RSC 10 99 99

1.3 The E2 Convenience Store Controller (CX)

CS100 Ckt Suction 0 99 99

The E2 CX controls HVAC, lighting, and refrigeration systems for convenience store and small-box retail facili ties. The CX’s primary function is to provide energy-effi cient control of rooftop units as well as refrigeration and defrost control of display cases and walk-in boxes. In addition, the CX provides extensive sensor control, log ging, and graphing features that allow the user to view accurate real-time information about system conditions. The CX is equipped with many power monitoring and demand control features that give you the information you need to keep your site’s energy consumption low.

CT Drive 0 16 16

Demand Control 1 1 1

Digital Combiner 64 128 128

Digital Sensor Control 12 24 48

Discus 0 0 63

E2 Alarm Panel 7 7 7

The E2 CX is available in three models: the CX-300, CX-400, and CX-100. The only significant difference between the E2 CX-300 and the E2 CX-400 is the amount of C-Store equipment that may be operated by a single controller. The CX-100 is a low-cost alternative to the CX- 300 with fewer capabilities and a monochrome display. Table 1-3 shows the differences between capabilities for

Energy Meter 30 30 30

Table 1-3 - CX-100, CX-300, and CX-400 Comparison

The E2 Convenience Store Controller (CX) Introduction • 1-3

Show 5 more labels / short text on this page
Advanced Rooftop Control · 0 32 32 · Copeland CoreSense Communication · 0 31 31 · Enhanced Suction Group
Page 20 of the Emerson E2 user manual — E2 RX & BX RS485 I/O NETWORKS
Page 20 · click to enlarge
Page 20

1.4 Networking Overview

Capabilities CX-

100 CX-

300 CX-

1.4.1 E2 I/O Network

ESR8 ESR Control 0 99 99

Most of the general purpose input and output commu nications devices required by the E2 to control refrigera tion systems are connected to the E2 via the I/O Network. The I/O Network is a simple RS485 three-wire connection that allows data interchange between input boards (which read sensor values and digital closures), output boards (which carry out commands from E2’s control applica tions), and the E2 itself.

Flexible Combiner 64 128 128

Heat/Cool Control 4 6 8

Holiday Schedule 8 16 32

HVAC Zone 4 6 12

The I/O Network is the same thing as the COM A and COM D Networks found on Emerson Retail Solutions’ previous generation of controllers, REFLECS. This allows current owners of Emerson Retail Solutions’ Refrigeration Monitor and Control (RMC) or Refrigeration Monitor and Case Control (RMCC) controllers to easily retrofit with an E2 RX without need for re-wiring.

Infrared Leak Detec tion

Irrigation 2 2 2

Lighting Control 6 24 48

K5 Ref Scroll 0 0 31

RX E2 E2

Logging Group 8 32 32

Loop/Sequence Control 8 16 28

MultiFlex ESR 0 31 31

MRLDS 24 24 24

CS-100

Performance Alert 0 0 63

I/O

CS-100

I/O

Power Monitoring 2 8 16

I/O

I/O

Pulse Accumulator 4 8 16

I/O

I/O

RCB/RCB-P Controller 0 32 32

I/O

I/O

RMS Asset 99 99 99

Standard Circuit 6 12 32

Suction Group 0 0 4

E2 RX & BX RS485 I/O NETWORKS

TD Condenser Fan Control

Figure 1-2 - E2 RX/BX I/O Network Diagram

TD3 Controller 0 99 99

Figure 1-2 shows the peripherals that make up the I/O Network:

Time Schedule 8 16 32

  • MultiFlex - The MultiFlex line of control system boards provide a wide variety of input, output, and smart control solutions, all of which are based on a single universal hardware platform.

Table 1-3 - CX-100, CX-300, and CX-400 Comparison

  • 8ROSMT - Relay output board - activates and deac tivates up to eight devices.
Show 10 more labels / short text on this page
1 16 16 · MultiFlex · MultiFlex · MultiFlex · CC-100 MultiFlex · MultiFlex · MultiFlex · MultiFlex · MultiFlex · 8 16 28
Page 21 of the Emerson E2 user manual — 1.4.2 The E2 Echelon Lonworks Network
Page 21 · click to enlarge
Page 21

1.4.2 The E2 Echelon Lonworks Network

side mounted electronic evaporator pressure regula tors (EEPRs).

  • TD3 - Temperature display - has three inputs that monitor case temperature, product temperature and defrost status.

The E2 is also compatible with a network platform called Lonworks. This is most commonly referred to as “the Echelon Network,” after the company who invented the platform, the Echelon Corporation.

  • Third Party Echelon Devices - Echelon ® LON MARK ® devices communicate with E2 through its “Open Echelon” networking feature, and require a license key and a description file that is loaded into the E2 that enables communication. 1.4.3 Interconnection With Other E2s

In general, peripherals with control functions — such as case controllers, rooftop HVAC controllers, and other E2 RX and BX units — are interconnected on the Echelon Network. These controllers do most of their own computa tion and system control, but they communicate with other E2s to provide logging, alarm control, and other functions. In addition to these, Emerson Retail Solutions also offers Echelon-compatible input and output boards similar to those available for the RS485 Network.

In large installations where more than one refrigeration system is present, or where E2s are controlling both refrig eration and building HVAC systems in the same site, the E2s share information with each other across either the Echelon Network or via Ethernet.

Emerson E2 — 1.4.2 The E2 Echelon Lonworks Network diagram (page 21)
Fig. 5 · 1.4.2 The E2 Echelon Lonworks Network
Emerson E2 — 1.4.2 The E2 Echelon Lonworks Network diagram (page 21)
Fig. 6 · 1.4.2 The E2 Echelon Lonworks Network

Figure 1-3 - E2 RX Echelon Network Diagram

Figure 1-3 shows the E2 RX peripherals that commu nicate across the Echelon Network:

Figure 1-4 - E2 RX/BX Network

  • CC-100 - Case control board - controls all lights, fans, defrost, and refrigeration for a single case. The CC-100 controls pulse or stepper valves to provide precise evaporator control, resulting in better tem perature maintenance and energy efficiency.
  • ESR8 - Evaporator stepper regulator - the analog outputs on this board allow the E2 to control circuit temperature in up to eight circuits using suction-

Networking Overview Introduction • 1-5

Page 22 of the Emerson E2 user manual — 1.5 Documentation Overview
Page 22 · click to enlarge
Page 22

1.5 Documentation Overview

  • MultiFlex I/O Board Installation and Operation Manual (P/N 026-1704) - Installation and opera tion manual for the MultiFlex 16 and all versions of the MultiFlex combination input/output board, excluding unit controllers such as the CUB and RTU.

The E2 RX and BX controllers are among the most versatile and customizable control system products avail able on the market. Because of the enhanced capabilities of the E2s, programming, installation, and operation of E2 and its accompanying peripherals are supported by several different Emerson Retail Solutions publications. All of the publications listed below can be ordered by contacting Emerson Retail Solutions:

  • MultiFlex CUB/CUB II Condensing Unit Board Installation and Operation Manual (P/N 0261705) - Installation and operation manual for the MultiFlex CUB (old style) and the MultiFlex CUBII family, which includes the CUB-II and CUB-TD.
  • MultiFlex RTU Rooftop Controller Installation and Operation Manual (P/N 026-1706) - Installa tion and operation guide for the MultiFlex RTU (replacement for ARTC).
  • E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllers (026-1610) - The manual you are currently reading. The Installation and Operation Manual covers hardware installation, network setup, and important operator functions such as viewing status screens or logs, and performing manual defrosts.
  • MultiFlex RCB Rooftop Controller Installation and Operation Manual (P/N 026-1707) - An improved version of the MultiFlex RTU, the RCB has 16 fully configurable analog and digital input points. The RCB also has four analog outputs for use in controlling variable speed fans, economizers, or modulating heating and/or cooling valves. The RCB also features a more sophisticated HHT inter face and updated algorithms for controlling heating, cooling, dehumidification, and air quality. Refer to this manual for more information on the MultiFlex RCB Rooftop Controller.

The Quick Start section (Section 10) is designed to guide you quickly through setup of the most simple and vital refrigeration control applications (such as suction groups and condensers). More detailed information is included in the online help.

  • Router and Repeater Installation Guide (P/N 0261605) - If you have a large site with 64 or more devices on the Echelon Network, you might require the use of a router or repeater to properly set up your Echelon Network. The Router and Repeater Installation Guide will help you determine when a router or repeater should be used, how and where to set it up, and how to configure the E2(s) on the net work to interact with the router or repeater.
  • E2 User’s Manual Supplement for Flexible Com biner Programming ( P/N 026-1620 ) - The Flexible Combiner application is an advanced I/O control program used to combine multiple analog and digi tal input values using programmed equations simi lar to those used in spreadsheets, and is a new feature of E2 versions 2.20 and above. Refer to this manual for more information on the Flexible Com biner application.
  • Emerson Retail Solutions Product Technical Sheet Binder (P/N 026-1904) - The product sheet binder gives important installation information about sensors, transducers, thermostats, and other essential items that are a part of every Emerson Retail Solutions control network. The product sheet binder is not necessary for field installation instruc tions; however, it may be a useful reference for con tractors and OEMs who require more information about a specific peripheral.
  • Facility Status Display (FSD) Installation and Operation Manual (P/N 026-1400) - The FSD reports alarm information and more, (such as tem peratures, occupancy, case status, and setpoints) and provides a centralized device for store person nel to review information by communicating with the E2 via Ethernet connectivity (minimum E2 firmware rev. 2.68F01). Refer to this manual for more information on the Status Display application.
  • MultiFlex ESR Installation and Operation Man ual (P/N 026-1720) - From general information to details on mounting, wiring, and heat dissipation, the MultiFlex ESR manual provides the informa tion you need to install and operate the MultiFlex ESR board, in addition to valuable information on software setup and valve control.
  • Square D Smart Breaker Control Manual (P/N 026-1711) - The Smart Breaker products are designed to allow the Emerson Retail Solutions family of site controllers to command control pan els (minimum E2 firmware rev. 2.71F01). A breaker panel generally consists of a series of cir
Page 23 of the Emerson E2 user manual — 1.7 Software Licensing
Page 23 · click to enlarge
Page 23

1.6 On-Line Help System Overview

cuit breakers that are flipped from OFF to ON and from ON to OFF by commands sent from E2 through MODBUS or a Square D Smart Breaker Gateway board. Refer to this manual for more information on the Square D Breaker Panel applica tion.

The E2 On-Line Help is the primary source front- panel/interface users will have to consult when seeking instruction on properties, screens, menus, and trouble shooting of hardware/software problems. The on-line help topics are designed to minimize the time the user would otherwise have to spend searching through the manual to find information. Press + keys to open the General Help menu.

  • Eaton Breaker Control Manual (P/N 026-1709) - E2 can communicate directly with Eaton's Breaker Control Bus (BCB) modules. Communication with the E2 (minimum E2 firmware rev. 2.82) will enable users to access features such as Time Sched ules, Enhanced Lighting, and Logging, with the added capabilities of dial-out on failure and offsite remote connection, specifically with UltraSite32 and Site Manager to the breaker panel. The Eaton Breaker Panel controller is a licensed application available in the E2 300 and 400 model controllers. Refer to this manual for more information on the Square D Breaker Panel application.

To use on-line help from any screen in the E2 front panel interface, simply press the E2’s permanent Help key. This opens a pop-up window containing either information about the screen or menu you are currently on, or information about the input, output, or setpoint you have highlighted with the cursor (if available). After the Help key has been pressed, will open the Gen eral Help menu containing Troubleshooting options.

  • Energy Meter Manual (P/N 026-1726) - The Energy Meter provides a solution for measuring energy data with a single device. Inputs include Control Power, CT, and 3-phase voltage. The Energy Meter supports multiple output options, including solid state relay contacts, Modbus (with or without data logging), and pulse. The LCD screen on the faceplate allows instant output view ing .

1.7 Software Licensing

Some applications in the E2 are available only when activated with a unique license key that is obtained through Emerson Retail Solutions. Software licensing (see Section 10.15, License Management) allows the user to activate certain features in the E2, such as Web Services and third-party controllers. Call your Emerson Retail Solutions sales representative at 770-425-2724 for more information about software licensing.

  • iPro DAC (P/N 026-1727) - The iPro DAC is a packaged HVAC control board for use either as a stand-alone controller or in zone control applica tions using a Emerson Retail Solutions E2 BX building control system. The iPro DAC is capable of controlling heat and cool stages, fans, humidifi cation and dehumidification devices and economiz ers using on-board I/O and control algorithms, as well as monitor and interact with other building control systems and peripherals (such as smoke alarms and CO2 sensors).
  • MRLDS (P/N 026-1307) - Modular Refrigerant Leak Detection Sensor (MRLDS) continuously monitors for low levels of refrigerants most com monly used in commercial refrigeration systems. The MRLDS communicates with the E2 controller via MODBUS. The E2 provides an interface while the MRLDS will provide the leak monitoring func tionality.

On-Line Help System Overview Introduction • 1-7

Page 24 of the Emerson E2 user manual — 1.6 On-Line Help System Overview
Page 24 · click to enlarge
Page 24
Page 24 of the Emerson E2 user manual — 1.6 On-Line Help System Overview
Page 25 of the Emerson E2 user manual — 5% - 100% RH
Page 25 · click to enlarge
Page 25

2 Hardware Overview

This section gives an overview of the E2, the hard ware, and how it communicates across the I/O and Eche lon Networks to control an entire system.

Emerson E2 — 2 Hardware Overview diagram (page 25)
Fig. 7 · 2 Hardware Overview

2.1 E2 Hardware

The E2 controller is programmed to monitor and com mand all aspects of a refrigeration or building environ mental control system. The E2 uses both an RS485 I/O Network and a LonWorks Network to gather data from input devices, communicate with other E2s, and activate or deactivate loads.

In general, an E2 control network will consist of the following components:

1. E2 - The “brain” of the control network, which performs all necessary computations and sends commands to the output devices that control the system.

Figure 2-1 - E2 Front Panel

2. Input Boards - Transfer readings to the E2.
Dimensions Standard Mount9.06” W x 12.06” H x 3.75” D
3. Output Boards - Banks of relays, digital pulse outputs, or analog outputs, which the E2 may use to control loads.

Recessed Mount: 9.06” W x 10.56” H x 2.0” D Base: 10.56” W x 10.56” H x 3.75” D

4. Smart Boards - Boards such as case controllers (for refrigeration) or rooftop controllers (for building control) that perform control functions for an individual case or rooftop unit, and send the data to the E2 for logging and alarm purposes.

-40°F to 149°F (-40°C to 65°C)

Storage Temp -40°F to 158°F (-40°C to 70°C)

5. Modem - For remote communication via phone, if necessary.

5% - 95% RH non-condensing at 90°F

6. Network Wiring - Wiring that connects the E2 to other E2s, and all the input, output, and smart boards.

5% - 100% RH

Power 24 VAC ±20%, 50/60 Hz, Class 2

7. Sensors and Loads - The “eyes” and “hands” of the control network. Sensors “see” what needs to be controlled on the network, and Loads are what can be controlled, or more specifically, be turned on and off, such as compressors, condensers, lights, and fans.

Table 2-1 - E2 Specifications

E2 Hardware Hardware Overview • 2-1

Show 4 more labels / short text on this page
Operating Temp · Operating Humidity · Storage Humidity · VA Load 50
Page 26 of the Emerson E2 user manual — 2.1.1 E2 Main Processor Board (CPU)
Page 26 · click to enlarge
Page 26

2.1.1 E2 Main Processor Board (CPU)

2.1.3 E2 Keypad

Emerson E2 — 2.1.1 E2 Main Processor Board (CPU) diagram (page 26)
Fig. 8 · 2.1.1 E2 Main Processor Board (CPU)
Emerson E2 — 2.1.1 E2 Main Processor Board (CPU) diagram (page 26)
Fig. 9 · 2.1.1 E2 Main Processor Board (CPU)

Figure 2-4 - E2 Keyboard

The E2 has a QWERTY style keyboard layout with two rows of function keys. The first row (-) is comprised of screen-specific function keys, and the sec ond row has designated icon keys. The five icon keys are Help , Alarms , Home , Menu , and Back . 2.1.4 LEDs

Figure 2-2 - E2 CPU

The E2 CPU or main processor board (Figure 2-2) contains the CPU, Ethernet port, and memory used for log ging. The coin battery for the E2 is located on this board and protects log and alarm data during power loss. The main processor board connects to the PIB via a ribbon cable. The RX- and CX-100 versions support mono chrome display only. For optimum viewing, backlight and contrast adjusts are available for customizing the mono chrome display depending on the user’s needs. 2.1.2 E2 Processor Interface Board (PIB)

The PIB, main processor board, and keyboard (located behind the main board) LEDs can be used to determine the status of normal operating parameters for the unit.

Green (14) ONPower is being applied to the PIB
Yellow (RX1) ONCommunication is being re ceived on RS485 Port 1A
Yellow (RX2) ONCommunication is being re ceived on RS485 Port 1B
Emerson E2 — 2.1.1 E2 Main Processor Board (CPU) diagram (page 26)
Fig. 10 · 2.1.1 E2 Main Processor Board (CPU)
Red (TX) ONCommunication is being sent on RS485 Port 1A and 1B

Table 2-2 - PIB LED’s Status

Figure 2-3 - E2 PIB

The E2 Processor Interface Board (PIB) interfaces the power and most all communications with the main proces sor board, and contains all field wiring connections. The PIB allows you to connect an external keyboard, accessory cards, and an external computer. All RS485 connectors are located on the PIB.

PIB LEDs Status

Page 27 of the Emerson E2 user manual — 2.2.1 The Gateway Board
Page 27 · click to enlarge
Page 27

2.2 I/O Network Boards and Peripherals

Emerson E2 — 2.2 I/O Network Boards and Peripherals diagram (page 27)
Fig. 11 · 2.2 I/O Network Boards and Peripherals

Green (D1 General Status LED for E2 and Blank Face E2)

1 blink every two seconds (1 second ON, 1 second OFF): Main board is operating normally. Solid ON: E2 is booting up. Faster blinks per second: Indicates an error condition with the hardware or firmware.

2.2.1 The Gateway Board

Emerson E2 — 2.2.1 The Gateway Board diagram (page 27)
Fig. 12 · 2.2.1 The Gateway Board

Table 2-3 - Main Board (CPU) LED’s Status

Emerson E2 — 2.2.1 The Gateway Board diagram (page 27)
Fig. 13 · 2.2.1 The Gateway Board

1 blink every two seconds (1 second ON, 1 second OFF): Status is nor mal. 4 blinks per second: A flash and/or crystal problem has been detected. Board should be replaced.

Table 2-4 - Keyboard LED’s Status

Figure 2-5 - Gateway Board

The Gateway board is an RS485 to RS485 converter. One side of the Gateway is always connected to the Emer son Retail Solutions I/O Network. The other side of the Gateway is the receiver bus (RS485). The receiver bus is connected to one or more RS485 devices depending on which type of Gateway is being used. The Gateway inter faces devices to the Einstein/E2 and legacy Emerson Retail Solutions controller (REFLECS) by simulating 16AI and 8RO boards using Emerson Retail Solutions standard I/O board protocol. The Gateway can also con vert third-party controller protocols to Emerson Retail Solutions protocol for custom cells created in the Einstein/ E2 to interface with third-party controllers (Danfoss, Woodley, etc.).

The Gateway performs one of two basic functions:

1. It allows control of and/or status of a device using I/O board simulation
2. Converts a third-party protocol to Emerson Retail Solutions I/O Net protocol and interfaces to a

I/O Network Boards and Peripherals Hardware Overview • 2-3

Page 28 of the Emerson E2 user manual — 2.2.2.2 MultiFlex Combination Input/ Output Boards
Page 28 · click to enlarge
Page 28

custom cell in Einstein/E2

The MultiFlex 16 is designed to be 100% compatible with the previous generation of Emerson Retail Solutions input boards (the 16AI), communicates with the site con troller via an RS485 connection to a REFLECS COM A&D Network or an E2 I/O Network. Dip switches on the board set the network ID (board number) and baud rate.

Emerson E2 — 2.2.2 MultiFlex Boards diagram (page 28)
Fig. 14 · 2.2.2 MultiFlex Boards

The board also provides both +5VDC and +12VDC output voltage points for use in powering transducers or other input devices that require power.

The MultiFlex 16 has a Hand-held Terminal interface Section 2.2.4, Hand-held Terminal (P/N 814-3110) that may be used by technicians to view the input voltage and engineering unit values for each input point without need of a voltmeter or front panel controller display.

Table 2-5 - Gateway Board Models

Table 2-6 shows the part number of the MultiFlex 16.

2.2.2 MultiFlex Boards

P/N Model Name Description

The MultiFlex line of control system boards provides a wide variety of input, output, and smart control solutions, all of which are based on a single universal hardware plat form. The board design uses flash-uploadable firmware and plug-in expansion boards to configure the base plat form board and apply it for use as an input board, relay output board, analog output board, or a combination I/O board. 2.2.2.1 MultiFlex 16 Input Board

810-3013 MultiFlex 16 16 analog/digital in puts, no outputs

Table 2-6 - MultiFlex 16 Input Board Model

The MultiFlex 16 is designed with several features that make it easy to install, wire, and configure. These main user interface features are shown in Figure 2-6.

2.2.2.2 MultiFlex Combination Input/ Output Boards

Emerson E2 — 2.2.2.2 MultiFlex Combination Input/ Output Boards diagram (page 28)
Fig. 15 · 2.2.2.2 MultiFlex Combination Input/ Output Boards
Emerson E2 — 2.2.2.2 MultiFlex Combination Input/ Output Boards diagram (page 28)
Fig. 16 · 2.2.2.2 MultiFlex Combination Input/ Output Boards

Figure 2-6 - MultiFlex 16 Input Board

The MultiFlex 16 input board offers sixteen combina tion analog/digital input points for use by Emerson Retail Solutions E2, Einstein, and REFLECS control systems. The MultiFlex 16 may be used in retrofits with no addi tional hardware or software setup or upgrades.

Figure 2-7 - MultiFlex Combination Input/Output Board (Side View)

Page 29 of the Emerson E2 user manual — 2.2.2 MultiFlex Boards
Page 29 · click to enlarge
Page 29

Table 2-7 shows the available models of MultiFlex combination input/output boards with description and part numbers.

Emerson E2 — 2.2.2 MultiFlex Boards diagram (page 29)
Fig. 17 · 2.2.2 MultiFlex Boards

810-3063 MultiFlex 88AO 8 analog/digital inputs, 8 re lay outputs, 4 analog out puts

810-3064 MultiFlex 88 8 analog/digital inputs, 8 re lay outputs

810-3065 MultiFlex 168AO 16 analog/digital inputs, 8 relay outputs, 4 analog out puts

810-3066 MultiFlex 168 16 analog/digital inputs, 8 relay outputs.

810-3067 MultiFlex 168DO 16 analog/digital inputs, 8 relay outputs, 4 digital out puts

Figure 2-8 - MultiFlex Combination Input/Output Board (Top View)

810-3072 MultiFlex 1616L 16 analog/digital inputs, 16 low-voltage (24VAC rated) relay outputs

There are several models of the MultiFlex board that combine the functionalities of input boards, relay output boards, digital output boards, and analog output boards. The MultiFlex combination input/output boards are designed to be replacements for the 8IO Combination Input/Output Board, but the MultiFlex board provides sev eral new hardware options and software features.

810-3073 MultiFlex 1616LAO 16 analog/digital inputs, 16 low-voltage (24VAC rated) relay outputs, and 4 analog outputs.

810-3077 MultiFlex 1616LDO 16 analog/digital inputs, 16 low-voltage (24VAC rated) relay outputs, and 4 pulse- width modulating digital outputs

The MultiFlex combination I/O boards consist of up to 16 combination digital/analog inputs, and a combina tion of relay outputs, digital outputs, and analog outputs.

All boards feature both +5VDC and +12VDC output voltage points for use in powering transducers or other input devices that require power.

Table 2-7 - MultiFlex Combination Input/Output Board Models

On the RS485 Network, the MultiFlex combination input/output boards present themselves to Einstein, E2, or REFLECS site controllers as 16AI Analog Input Boards, 8RO Relay Output Boards, 8DO Digital Output Boards, and/or 4AO Analog Output Boards, depending on what type of inputs or outputs are equipped. Dip switches are used to assign network ID numbers to each board type.

The MultiFlex combination input/output boards also support a Hand-held Terminal interface, Section 2.2.4, Hand-held Terminal (P/N 814-3110) which allows techni cians to view input values, check relay and analog output states, and override output points with fixed digital or ana log values. For more information on MultiFlex I/O boards, refer to the MultiFlex I/O Board Installation and Opera tion Manual (P/N 026-1704).

I/O Network Boards and Peripherals Hardware Overview • 2-5

P/N Model · Name Description

Page 30 of the Emerson E2 user manual — 2.2.2.6 MultiFlex PAK Board
Page 30 · click to enlarge
Page 30

2.2.2.3 MultiFlex CUB

control system. The MultiFlex RCB is capable of con trolling heat and cool stages, fans, humidification and dehumidification devices, economizers using on-board I/O and control algorithms, as well as monitor and interact with other building control systems and peripherals (such as smoke alarms and CO2 sensors).

The MultiFlex Condensing Unit Board (CUB) is a “smart” input/output board designed to control single con densing units. A single condensing unit is a self-contained compressor and condenser bearing unit which controls refrigeration in a single case line-up or walk-in cooler.

The MultiFlex CUB uses the same general hardware configuration as a MultiFlex 168AO. It is equipped with a processor and extra memory to allow it to control com pressors, condensers, refrigeration, and defrost for a single condensing unit using on-board I/O and control algo rithms.

The RCB is an improved version of the MultiFlex RTU. The RCB has sixteen fully configurable analog and digital input points, whereas the RTU has only eight inputs, two of which are configurable. The RCB has four analog outputs for use in controlling variable speed fans, economizers or modulating heating and/or cooling valves, whereas the RTU has only two analog outputs for use only with VS fans and economizers. The RCB also features a more sophisticated HHT interface and updated algorithms for controlling heating, cooling, dehumidification, and air quality.

The MultiFlex CUB has its own installation and opera tion manual, (P/N 026-1705). 2.2.2.4 MultiFlex RTU (BX and CX Only)

Similar in design to the MultiFlex combination input/ output boards, the MultiFlex RTU board is designed spe cifically for operating package rooftop HVAC units as part of an E2 BX or REFLECS BCU building control system. The MultiFlex RTU is designed to be a replacement for the previous generation ARTC, and is 100% compatible with all legacy E2 BX and BCU systems.

The MultiFlex RCB-P (pulse control board P/N 810- 3076) uses an alternate control strategy that incorporates logic for controlling heating and cooling functions.

The MultiFlex RCB has its own installation and opera tion manual, (P/N 026-1707).

The MultiFlex RTU board has 16 analog inputs, 8 relay outputs and 4 analog outputs. Most of these I/O points are reserved for sensors and input devices required to read environmental data (such as space and supply air temperature) and control all output devices that control the environment (such as heat/cool stages and dampers). Both auxiliary inputs can be configured for a variety of sensor types including any type of linear sensor. For linear sen sors, the auxiliary inputs can be configured as Satellites. By doing this, the minimum and maximum voltage and minimum and maximum Engineering Unit parameters are user configurable for these inputs. The RTU relay outputs are rated for line voltage (240VAC).

Emerson E2 — 2.2.2.3 MultiFlex CUB diagram (page 30)
Fig. 18 · 2.2.2.3 MultiFlex CUB

1 Input Power (24VAC) 2 RS485 I/O Network 3 RCB Inputs 1-8 4 RCB Inputs 9-16 5 Network ID Dip Switches (S3, S4)

12 Relay Output Fuses (2A Rated, 250V Slow-blow 13 Relay Status LEDs 14 Output Fail-Safe Switches 15 Analog Outputs

The RTU board controls the rooftop unit directly with its built-in heating, cooling, and humidity control algo rithms. It may operate in stand-alone mode, or it may interface with an E2 BX or BCU to control the store envi ronment in zones and pass along logging and alarm infor mation.

7 Board Status LEDs (Code A, Code B, General Status)

8 DC Power Outputs (3 at +5VDC, 1 at +12VDC) 9 RS485 Termination Jumpers

Figure 2-9 - MultiFlex RCB

The MultiFlex RTU has its own installation and opera tion manual, (P/N 026-1706). 2.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)

2.2.2.6 MultiFlex PAK Board

The PAK is a distributed pack (rack) controller that controls compressors and condenser fans. The PAK can control up to 8 compressor groups containing up to 16 compressors. The compressor control strategy is Fixed Steps with setpoint/deadband using ON and OFF delays. Up to 20 Fixed Steps can be configured.

The MultiFlex Rooftop Control Board (RCB) (P/N 810-3062) is a rooftop HVAC control board for use either as a stand-alone controller or in zone control appli cations using a Emerson Retail Solutions E2 BX building

Page 31 of the Emerson E2 user manual — 2.2.3 The MultiFlex ESR Board
Page 31 · click to enlarge
Page 31

The PAK can control up to 4 condenser fan groups containing up to 8 total condenser fans. The PAK con denser control strategy is sequential TD control with set point/deadband using ON and OFF delays.

control temperature.

Emerson E2 — 2.2.3 The MultiFlex ESR Board diagram (page 31)
Fig. 19 · 2.2.3 The MultiFlex ESR Board

The PAK has a compressor/condenser interlock fea ture that will override TD control and force the condenser fans to stage off using the TD control OFF delay when all compressors are off. This feature can be disabled with an Enable/Disable setpoint or when the discharge pressure is above a configurable setpoint.

The MultiFlex PAK boards consist of two circuit boards: a bottom layer with 16 combination digital/analog inputs, and a plug-in top layer which contains a combina tion of 8 relay outputs and 4 digital DC voltage outputs.

24VAC CT 75 VAC Power Input Valve Connectors (8)

The analog outputs on the Multiflex PAK drive solid state relays to control the fan stages. The relays control the compressor groups.

The communication interface is RS485 I/O using the Standard Extended Address Form for Emerson Retail Solutions Distributed Controllers. Currently, the PAK is designed to interface with the Emerson Retail Solutions E2 controller.

Figure 2-11 - MultiFlex ESR Board Layout

The MultiFlex ESR uses suction side variable-position evaporator regulators (ESRs) to vary evaporator pressure for an entire circuit and is an alternative to mechanical EPR control.

The MultiFlex ESR receives input data from a Emer son Retail Solutions E2 controller (via the I/O Network) and then regulates the stepper valves according to the data from the E2.

Emerson E2 — 2.2.3 The MultiFlex ESR Board diagram (page 31)
Fig. 20 · 2.2.3 The MultiFlex ESR Board

Each MultiFlex ESR board requires a Class 2, 80VA 24VAC center-tapped transformer for power. Emerson Retail Solutions transformer (P/N 640-0080) is a multi- tapped primary transformer that may be used with the MultiFlex ESR board. 2.2.4 Hand-held Terminal (P/N 814-3110)

1 Input Power (24VAC) 2 RS485 I/O Network 3 PAK Inputs 1-8 4 PAK Inputs 9-16 5 Network ID Dip Switches (S3) 6 Network Type Dip Switches (S1, S2) 7 Board Status LEDs (Code A, Code B, General Status)

9 RS485 Termination Jumpers 10 Hand-Held Terminal Jack 11 Relay Output Connectors 12 Relay Output Fuses (2A Rated, 250V Slow-blow)

The Hand-held Terminal (HHT) is used by manufac turers and service technicians to diagnose and test several of Emerson Retail Solutions' existing and legacy products. The HHT can be used on any Emerson Retail Solutions product with an RJ-11 connector. The most common appli cations include:

15 PAK Analog Outputs 1-4 16 Network Status LED

8 DC Power Outputs (3 at +5VDC, 1 at +12VDC)

  • All MultiFlex I/O boards and the 8ROSMT

Figure 2-10 - MultiFlex PAK

  • All Gateway boards
  • Stand-alone MultiFlex boards (RTU, RCB, PAK, CUB)

2.2.3 The MultiFlex ESR Board

The MultiFlex ESR Valve Regulator board (P/N 810- 3199), shown in Figure 2-11, is an RS485 I/O Network electronic stepper valve regulator capable of driving up to eight stepper motor valves, which are typically used to

  • CCB and CC-100 case controllers

The HHT does not require a separate power source. The unit is powered from the RJ-11 connector on the peripheral equipment. The HHT includes a standard male

I/O Network Boards and Peripherals Hardware Overview • 2-7

Page 32 of the Emerson E2 user manual — 2.2.5 The 8RO and 8ROSMT Relay Boards
Page 32 · click to enlarge
Page 32

RJ-11 to male RJ-11 cable.

troller from the input boards is checked against current stored setpoints. If differences in the received input data and the setpoint information are detected, a signal is either sent to the proper 8RO relay, or an existing signal is dis continued. Through the use of this relay signal, control functions that can be properly maintained by a simple con tact closure sequence are effectively operated by the E2.

The 8RO board is easily installed and operated within the Emerson Retail Solutions Network environment because of its straightforward design. Several of these fea tures are shown in Figure 2-13.

Emerson E2 — 2.2.5 The 8RO and 8ROSMT Relay Boards diagram (page 32)
Fig. 21 · 2.2.5 The 8RO and 8ROSMT Relay Boards
Emerson E2 — 2.2.5 The 8RO and 8ROSMT Relay Boards diagram (page 32)
Fig. 22 · 2.2.5 The 8RO and 8ROSMT Relay Boards

LEGEND

The power switch determines if the HHT is in self-powered mode (BATT), ext power (EXT), or if powered from a target device (HOST)

Scrolls list selections and scrolls through ASCII characters if in a text field

External Power Connector (9-12 VDC)

Cancel - clears/erases text in editable field; cancels overrides

Figure 2-13 - 8RO Relay Output Board

Up Arrow - moves to previous screen, editable field, or top of screen

Down Arrow - moves to next screen, editable field, end of screen, or advances

Right Arrow - selects last editable field starting from bottom of screen; selects last editable field from bottom to top

Left Arrow - selects first editable field from top of screen, and next editable field from top to bottom

Enter - save into memory

F1 - Home Screen

Emerson E2 — LEGEND diagram (page 32)
Fig. 23

LCD - four lines of 16 characters Numeric keypad

Figure 2-12 - Hand-held Terminal (814-3110)

2.2.5 The 8RO and 8ROSMT Relay Boards

The 8RO (P/N 810-3005) board is a general-purpose board used to connect an E2 to any of eight standard con trol relay outputs, but is now obsolete and has been replaced by the 8ROSMT (P/N 810-3006) board.

To function, the 8RO board must be connected through either the Echelon Network or the RS485 I/O Network to the E2. When properly installed, the 8RO receives an elec trical impulse from the E2, which either opens or closes any of eight contact relays. Output definitions within the E2 allow the user to configure the 8RO board to interact with any refrigeration system or environmental control component.

Figure 2-14 - 8ROSMT Relay Output Board

The 8RO board is the direct link between the E2 and component operation. Information gathered by the con

RS-485 Connector · F2- Main Menu

Page 33 of the Emerson E2 user manual — 2.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controller
Page 33 · click to enlarge
Page 33

2.2.6 4AO Analog Output Board

Emerson E2 — 2.2.6 4AO Analog Output Board diagram (page 33)
Fig. 24 · 2.2.6 4AO Analog Output Board

The 4AO Analog Output Board (P/N 815-3030) (Fig ure 2-15) is configured with four analog output connec tions that provide a variable voltage signal to any of four analog devices that may be controlled by a single E2. Two 4-20mA outputs are provided for channels 1 and 2. The 4-20mA outputs provide a variable current for applications that are either externally powered or that require power from the 4AO board.

Emerson E2 — 2.2.6 4AO Analog Output Board diagram (page 33)
Fig. 25 · 2.2.6 4AO Analog Output Board

Figure 2-16 - 8 DO Digital Output Board

Emerson E2 — 2.2.6 4AO Analog Output Board diagram (page 33)
Fig. 26 · 2.2.6 4AO Analog Output Board

Figure 2-15 - 4AO Analog Output Board (P/N 815-3030)

2.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controller

Figure 2-17 - PMAC II Anti-Sweat Control Panel

For control of anti-sweat heaters, Emerson Retail Solu tions supplies the 8DO Digital Output board (P/N 810- 3050). The 8DO has eight outputs which may pulse up to 150mA at 12VDC.

Since the 8DO is primarily designed to control anti- sweat heaters, the 8DO is the heart of Emerson Retail Solutions’ Pulse Modulated Anti-Sweat Control (PMAC II) panel. The PMAC II (P/N 851-1000) provides 16 chan nels of anti-sweat control circuitry. The PMAC II panel combines the 8DO with high-capacity relays in a single enclosure, providing 256 total amps of anti-sweat heater operation.

The 8DO is shown in Figure 2-16. The PMAC II is shown in Figure 2-17.

I/O Network Boards and Peripherals Hardware Overview • 2-9

Page 34 of the Emerson E2 user manual — 2.3.1 The 16AIe (Discontinued)
Page 34 · click to enlarge
Page 34

2.3 Echelon Network Boards and Peripherals

2.3.2 The 8ROe (Discontinued)

Emerson E2 — 2.3.2 The 8ROe (Discontinued) diagram (page 34)
Fig. 27 · 2.3.2 The 8ROe (Discontinued)

2.3.1 The 16AIe (Discontinued)

Emerson E2 — 2.3.1 The 16AIe (Discontinued) diagram (page 34)
Fig. 28 · 2.3.1 The 16AIe (Discontinued)

Figure 2-19 - 8ROe

The 8ROe (P/N 810-4010) is an Echelon-based input board similar in function to its I/O Network counterpart, the 8RO. The 8ROe board is the direct link between the E2 and component operation. Information gathered by the controller from the input boards is checked against current stored setpoints. If differences in the received input data and the setpoint information are detected, a signal is either sent to the proper 8ROe relay, or an existing signal is dis continued. Through the use of this relay signal, control functions that can be properly maintained by a simple con tact closure sequence are effectively operated by the E2.

Figure 2-18 - 16AIe

The 16AIe (P/N 810-4000) is an Echelon-based input board similar in function to its I/O Network counterpart, the MultiFlex 16 (see Section 2.2.2). The 16AIe receives input signals through any of 16 two-wire connections. The board receives either digital or analog data from sensors wired to any of the 16 input connections located on the board.

The 8ROe features Form C contacts for wiring outputs as either normally open or normally closed. Fail-safe dip switches on the 8ROe allow the installation technician to specify the desired state of each relay in case of communi cations loss.

This board has been discontinued and is no longer available for sale.

This board has been discontinued and is no longer available for sale.

Page 35 of the Emerson E2 user manual — 2.3.3 EC-2s
Page 35 · click to enlarge
Page 35

2.3.3 EC-2s

2.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllers

Emerson E2 — 2.3.3 EC-2s diagram (page 35)
Fig. 29 · 2.3.3 EC-2s

A CC-100 case control board is a “smart” board capa ble of controlling all functions for a single case, including lights, fans, defrost, anti-sweat, and suction side or liquid side valve control. CC-100s perform these functions inde pendently from the E2 RX controllers, but it does rely on a parent E2 for logging, alarming, providing supplemental I/ O values, and coordinating defrost times among circuits.

There are four different models of the CC-100, each of which controls a different type of valve.

1. CC-100P (P/N 810-3160)— Case controller for liquid-side pulse valves (also called electronic expansion valves, or EEVs). This model is capa ble of controlling up to two pulse valves simulta neously (for use in dual-evaporator applications such as walk-in boxes).

Figure 2-20 - EC-2

The EC-2 is an advanced refrigerated case controller that doubles as a temperature and case status indicator. During refrigeration and defrost, the EC-2 controls most typical case functions, including fans, defrost, and a pulse valve on the liquid side of the evaporator to regulate super heat.

2. CC-100LS (P/N 810-3170) — Case controller for liquid-side stepper valves (EEVs).
3. CS-100 (P/N 810-3177) — Case circuit controller for suction-side stepper valves (also called elec tronic evaporator pressure regulators, or EEPRs).

The EC-2 29x version controls the refrigeration sole noid valve to allow the passage of refrigerant to the TXV valve. The EC-2 39x version controls a pulse valve on the liquid side of the evaporator to regulate Superheat control.

4. CC-100H (P/N 810-3171)— A special version of the CC-100 that is used by a particular manufac turer. This board controls temperature in a case using suction-side stepper valves that regulate pressure in the evaporator.

The EC-2 relies on a parent E2 to handle logging, alarm control, defrost scheduling, and other case control functions.

The CC-100/CS-100 board is shown in Figure 2-21.

The EC-2 is designed to be mounted on the front of a refrigerated case. The LED display shows the current case temperature with one-tenths of a degree's accuracy. The display can also show alarm codes to immediately notify floor managers of alarms and notices. Other lights on the display show the ON/OFF status of refrigeration, defrost, and fans.

Emerson E2 — 2.3.3 EC-2s diagram (page 35)
Fig. 30 · 2.3.3 EC-2s

The EC-2 can be easily programmed using either the four front-panel buttons or an optional infrared remote control. For security, the buttons can be disabled to pre vent tampering.

Figure 2-21 - Case Controller (CC-100P shown)

Echelon Network Boards and Peripherals Hardware Overview • 2-11

Page 36 of the Emerson E2 user manual — 2.3.5 TD3 Temperature Display
Page 36 · click to enlarge
Page 36

2.3.5 TD3 Temperature Display

2.3.6 Facility Status Display (FSD)

The TD3 is a digital display unit designed to show both case temperature and product temperature for a refriger ated store case or walk-in freezer. The TD3 mounts on the front of a case and connects to up to three input devices (a case temperature sensor, a product temperature probe, and either a defrost termination probe or thermostat). The real- time input values of these probes can be viewed on the TD3’s digital display by pressing the function button on the front panel to cycle through the temperatures.

Emerson E2 — 2.3.5 TD3 Temperature Display diagram (page 36)
Fig. 31 · 2.3.5 TD3 Temperature Display

The TD3 is connected to a central E2 RX controller via the Echelon Network. Input values are sent to the E2 from the TD3 for use in case circuit control.

A diagram of the TD3 layout is shown in Figure 2-22.

Emerson E2 — 2.3.5 TD3 Temperature Display diagram (page 36)
Fig. 32 · 2.3.5 TD3 Temperature Display

Figure 2-23 - Facility Status Display

The FSD reports alarm information and more, (such as temperatures, occupancy, case status, and setpoints) and provides a centralized device for store personnel to review information by communicating with the E2 via Ethernet connectivity (minimum E2 firmware rev. 2.68F01).

Figure 2-22 - TD3 Temperature Display Layout

The FSD has a touch screen color display for quick navigation and can be mounted in a separate, remote loca tion from the E2 controller, which enables alarms and other relevant store information to be viewed from where it is most convenient for the user.

The FSD can be configured to filter out notices and/or return-to-normal alarms, and provides a quick review of all advisories and detailed advisory information. The FSD also receives alerts and provides annunciated alarms and alarm information directly to store and department manag ers. This compact unit can be installed virtually anywhere with a standard Ethernet connection and 120V power source.

If more than one E2 controller is at a site, one E2 must be set up as the alarm annunciator for that site. The FSD will receive alarms from that alarm-annunciator E2 for the entire site. The FSD will point only to a single E2 at a site (it will not poll multiple controllers for alarms).

For more information, refer to the FSD Manual (P/N 026-1400).

Page 37 of the Emerson E2 user manual — 3.1 Mounting the E2
Page 37 · click to enlarge
Page 37

3 Mounting

This section gives mounting instructions and dimen sions for all controllers and peripherals in the E2 system.

Emerson E2 — 3 Mounting diagram (page 37)
Fig. 33 · 3 Mounting

9.0"

3.1 Mounting the E2

The E2’s box body style is designed to be mounted against or inside a wall or panel. If mounted against a sur face, the controller will be 3.75” off the mounting surface. If mounted inside a surface, the door and front section of the back panel will rest 2.0” off the mounting surface. See Figure 3-1, and Figure 3-2. 3.1.1 Standard Mount

10.5"

The standard mount is meant for the controller to be mounted against a wall using the four mounting holes at the rear of the enclosure shown in Figure 3-3. These holes are accessible without any removal of boards inside the enclosure. 3.1.2 Recessed Mount

12.0"

The recessed mount is meant for the controller to be bolted against a surface using the eight mounting holes. The unit may be mounted with the recessed back portion of the unit inside the wall, and the front portion of the unit visible through the hole in the wall (Figure 3-1 and Fig ure 3-4).

Figure 3-1 - E2 Front and Top Dimensions

Emerson E2 — 3.1 Mounting the E2 diagram (page 37)
Fig. 34 · 3.1 Mounting the E2

3.75"

For a recessed mount, you will need to cut a rectangu lar hole into the mounting surface 9.0” wide by 10.5” high (22.86 cm wide by 26.67 cm high). Once this hole is cut, mount the unit as desired using the eight outer mounting holes shown in Figure 3-1 and Figure 3-4.

1.75"

10.5"

Figure 3-2 - E2 Side Dimensions

Mounting the E2 Mounting • 3-1

Page 38 of the Emerson E2 user manual — 3.1.3 Retrofit Mounting
Page 38 · click to enlarge
Page 38

to the cut out (four screws and four nuts are included), but the plate is equipped with a total of 14 holes for the best possible fit.

Emerson E2 — 3.1.3 Retrofit Mounting diagram (page 38)
Fig. 35 · 3.1.3 Retrofit Mounting
Emerson E2 — 3.1.3 Retrofit Mounting diagram (page 38)
Fig. 36 · 3.1.3 Retrofit Mounting

Figure 3-3 - Standard Mount (Inside Rear of Enclosure)

Figure 3-5 - Conversion Plate for Flush Mount

Emerson E2 — 3.1.3 Retrofit Mounting diagram (page 38)
Fig. 37 · 3.1.3 Retrofit Mounting
Emerson E2 — 3.1.3 Retrofit Mounting diagram (page 38)
Fig. 38 · 3.1.3 Retrofit Mounting

Figure 3-6 - Conversion Bracket for REFLECS Side Mount

Figure 3-4 - E2 Recess Mount Hole Locations

Figure 3-6 shows the conversion bracket that allows a side-mounted REFLECS to be converted to a side- mounted E2. The conversion bracket is attached to the back of the E2 using the two holes at the top and bottom of the bracket, and aligning the oval openings with the oval cut-outs in the back of the E2 case. Once the E2 is attached to the conversion bracket, use the two holes in either side of the conversion bracket (depending on which side is needed) to mount the E2 to the wall and replace the REFLECS controller.

3.1.3 Retrofit Mounting

The retrofit mounting plate and bracket allow the E2 to be mounted where previous generation controllers (Ein stein or REFLECS) were. These two options allow con version of the flush-mounted Einstein and the side- mounted REFLECS.

Figure 3-5 shows the low-profile conversion mount plate that allows a flush-mounted Einstein to be converted to a low-profile mount. The plate slides over the back of the E2 and is attached using the four holes pictured closest

Page 39 of the Emerson E2 user manual — 3.2 Mounting I/O Boards
Page 39 · click to enlarge
Page 39

3.1.4 Blank Face

for the MultiFlex, 16AI, 8RO, and the 8DO.

Emerson E2 — 3.1.4 Blank Face diagram (page 39)
Fig. 39 · 3.1.4 Blank Face

Blank face control is designed to be used in a system with more than one E2. It has no screen or keyboard and is logged into remotely from another E2 on the Echelon net work. The green General Status LED transmits status information to the user. See Table 2-3 on page 2-3 for more information on main board (CPU) status LEDs. Blank face mounting dimensions are identical to the stan dard and recessed mount boxes. See Figure 3-3 and Fig ure 3-4.

3.2 Mounting I/O Boards

The 16AI, 8RO, 8DO, 4AO, 8IO, and MultiFlex boards are usually installed by the refrigeration or building equipment manufacturer. Therefore, the installer need only make the necessary connections between the E2 and the cases, condenser boards, and/or HVAC units.

Figure 3-7 - Single Enclosure Mounting Dimensions

In some instances, an installer may be required to mount an I/O board. There are no restrictions on the loca tion of these boards; however, for ease of network config uration, it is recommended that the boards be located adjacent to the E2. I/O boards may be mounted without an enclosure, but they should be mounted in a location that is not easily accessible to avoid tampering or damage. 3.2.1 Single/Double Enclosures

Emerson E2 — 3.2 Mounting I/O Boards diagram (page 39)
Fig. 40 · 3.2 Mounting I/O Boards

The Single enclosure and Double enclosure are sup plied with four mounting holes in the rear panel of the enclosure. The mounting holes can be accessed without removing any of the boards inside the enclosure. Figure 3- 7 shows the dimensions and weight for the Single enclo sure. Figure 3-8 shows mounting dimensions for the Dou ble enclosure. When mounting boards inside the enclosure, refer to Figure 3-9 for mounting dimensions

Figure 3-8 - Double Enclosure Mounting Dimensions

Mounting I/O Boards Mounting • 3-3

Page 40 of the Emerson E2 user manual — 3.2.2 Boards Without Enclosures (Snap Track)
Page 40 · click to enlarge
Page 40

3.2.2 Boards Without Enclosures (Snap Track)

Emerson E2 — 3.2.2 Boards Without Enclosures (Snap Track) diagram (page 40)
Fig. 41 · 3.2.2 Boards Without Enclosures (Snap Track)

16AI, 8RO, 8DO, and Gateway boards not supplied with an enclosure are supplied with a snap-track for easy installation. The insulation sheet and I/O board must be removed from the track before the track is mounted. The snap-track is mounted using the 0.1875” mounting slots. Figure 3-10 shows this installation procedure.

Figure 3-9 provides mounting dimensions for the Mul tiFlex, 16AI, 8RO, and the 8DO boards. Figure 3-11 pro vides mounting dimensions for the 4AO.

Emerson E2 — 3.2.2 Boards Without Enclosures (Snap Track) diagram (page 40)
Fig. 42 · 3.2.2 Boards Without Enclosures (Snap Track)

Figure 3-11 - 4AO Mounting Dimensions

The Gateway is typically mounted in the same area as the site controller, near the controller’s 16AI, 8RO, and other RS485 Network peripherals. The Gateway is designed to fit into a standard 3" snap track (supplied with the board) or may be mounted in a panel or on stand-offs. Follow the dimensions in Figure 3-12 for panel mounting.

Emerson E2 — 3.2.2 Boards Without Enclosures (Snap Track) diagram (page 40)
Fig. 43 · 3.2.2 Boards Without Enclosures (Snap Track)

Figure 3-9- 16AI/8RO/8DO Mounting Dimensions

Emerson E2 — 3.2.2 Boards Without Enclosures (Snap Track) diagram (page 40)
Fig. 44 · 3.2.2 Boards Without Enclosures (Snap Track)

Figure 3-12 - Gateway Board Mounting Dimensions

The Gateway should be mounted in an environment with ambient temperature between -40°F and 150°F, with a non-condensing relative humidity between 5% and 95%.

Figure 3-10 - 4AO, 8RO, or MultiFlex Snap-Track Installation

Page 41 of the Emerson E2 user manual — 3.3.3 TD3
Page 41 · click to enlarge
Page 41

3.3 Echelon Devices

into the case and connect to the network, the power source, and the case-mounted probes. Figure 3-15 shows the mounting dimensions of the TD3.

3.3.1 CC-100 Case Controller and CS-100 Case Circuit Controller

Emerson E2 — 3.3.1 CC-100 Case Controller and CS-100 Case Circuit Controller diagram (page 41)
Fig. 45 · 3.3.1 CC-100 Case Controller and CS-100 Case Circuit…

Generally, the case controller will be mounted within the raceway or on top of the case. If a controller must be replaced or installed in the field, it should be located based on the specific design of the case.

Emerson E2 — 3.3.1 CC-100 Case Controller and CS-100 Case Circuit Controller diagram (page 41)
Fig. 46 · 3.3.1 CC-100 Case Controller and CS-100 Case Circuit…

Figure 3-15 - TD3 Mounting Dimensions

3.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)

The E2’s COM3 Plug-In card mounts on the PIB (Figure 3-16). For more information on the modem/com munication expansion card, see Section 4.3.3, COM3 Internal Modem Plug-In Card (P/N 638-3362).

Figure 3-13 - CCB Mounting Dimensions

3.3.2 MultiFlex ESR

The MultiFlex ESR is supplied with a snap-track. If the ESR8 is supplied without an enclosure, it is supplied with 0.500” long metal stand-off dowels that are pressed into the mounting holes in the board.

Emerson E2 — 3.3.2 MultiFlex ESR diagram (page 41)
Fig. 47 · 3.3.2 MultiFlex ESR
Emerson E2 — 3.3.2 MultiFlex ESR diagram (page 41)
Fig. 48 · 3.3.2 MultiFlex ESR

Figure 3-16 - COM3 Internal Modem in E2

Figure 3-14 - Mounting Dimensions for the MultiFlex ESR

3.3.3 TD3

The TD3 temperature display is almost always mounted by the OEM as part of the construction of the refrigerated cases. As such, field installations of TD3s are rare.

TD3s are typically flush mounted on the front of a refrigerated case in such a way as to be fully visible from the sales floor. A hole one inch in diameter must be drilled into the case to allow the TD3’s wiring harness to extend

Echelon Devices Mounting • 3-5

Page 42 of the Emerson E2 user manual — 3.4.1.1 Mounting Repeaters Overview
Page 42 · click to enlarge
Page 42

3.4.1 Two-Channel and FourChannel Repeaters

3.4.1.3 Mounting the Four-Channel Repeater

The four-channel repeater (P/N 638-4830) serves the same basic function as the two-channel repeater: boosting signal strength. However, the four-channel repeater is also useful as a means of connecting the E2 to its associated devices using more than one daisy chain.

3.4.1.1 Mounting Repeaters Overview

Repeaters are used to extend the maximum length of a segment of Echelon cable, or to act as a bridge between two devices that are farther apart than the cable’s maxi mum node-to-node distance. Emerson Retail Solutions offers two versions of repeaters for the E2 controller: an external two-way repeater that comes in an enclosure (P/N 832-1010), and a four-channel repeater mounted in the E2 (P/N 638-4830).

With a four-channel repeater mounted in the E2, you can run as many as three daisy chain segments out into the field, each of which can be as long as the prescribed Eche lon maximum wire length. The fourth channel of the repeater can be used to connect other E2s in a separate daisy-chain, eliminating the need to run cable from the field back to the next E2.

For more information about installing repeaters and routers, please refer to the Repeater and Router Installa tion and Networking Guide (P/N 026-1605). 3.4.1.2 Mounting the Two-Channel Repeater

The standoffs and mounting holes are located above the PIB in the back of the enclosure box. Use the mounting screws and standoffs to secure the four-channel repeater in place, and connect the repeater to the PIB with the two-pin power connector located next to the battery.

The external repeater (P/N 832-1010) is externally mounted within its own enclosure.

Emerson E2 — 3.4.1.1 Mounting Repeaters Overview diagram (page 42)
Fig. 49 · 3.4.1.1 Mounting Repeaters Overview
Emerson E2 — 3.4.1.1 Mounting Repeaters Overview diagram (page 42)
Fig. 50 · 3.4.1.1 Mounting Repeaters Overview

Figure 3-17 - External Repeater Mounting

For external repeaters, the mounting bracket at the bot tom of the enclosure has two 0.156” bolt holes on either side. Use the bolt holes to mount these repeaters in the field as necessary (see Figure 3-17).

Figure 3-18 - E2 Repeater Mounting

When mounting external repeaters, keep in mind that they require a 24VAC Class 2 power source in order to operate. This will likely require a transformer such as P/N 640-0041 (110V) or P/N 640-0042 (220V) to be mounted near the external repeater enclosure. Make sure there will be enough space next to the repeater to mount the trans former.

Page 43 of the Emerson E2 user manual — 3.5.3.1 Location
Page 43 · click to enlarge
Page 43

3.5 Sensors and Transducers

Emerson E2 — 3.5 Sensors and Transducers diagram (page 43)
Fig. 51 · 3.5 Sensors and Transducers

3.5.1 Pressure Transducers

Emerson Retail Solutions transducers convert pressure readings to proportional electrical signals between 0.5 and 4.5 volts. The transducer is designed with a 1/8-inch male FPT fitting for connection to a standard access fitting. If the fitting is configured with a Schrader valve, this fitting will have to be removed and replaced with a 1/8-inch female fitting. Each pressure transducer is supplied with 20 feet of cable for connection to a 16AI input board. 3.5.1.1 Mounting

The pressure transducers should be mounted in a verti cal position (pressure port down) above crank case oil level to prevent drainage of oil into transducer port. 3.5.2 Inside Temperature Sensor

Figure 3-19 - Inside Temperature Sensor Mounting 3.5.3 Outside Temperature Sensor

3.5.2.1 Location

Inside temperature sensors are supplied within a wall- mounted enclosure for attachment to a standard switch plate.

3.5.3.1 Location

The outside or ambient temperature sensor should be located on the north side of the building, preferably under an eave to prevent sun-heated air from affecting the tem perature of the sensor. 3.5.3.2 Mounting

The temperature sensor should be located in a central location—within the zone to be measured—away from doors, windows, vents, heaters, and outside walls that could affect temperature readings. In addition, the sensor should not be mounted above other sensors that generate heat during operation (such as relative humidity sensors).

The temperature sensor may be mounted using any standard tubing clamp. Emerson Retail Solutions also offers an aluminum cover and clamp (P/N 303-1111) which may be mounted as shown in Figure 3-20 (fasteners are not provided).

The indoor temperature sensor should be between four and six feet from the floor. 3.5.2.2 Mounting

Mount the sensor using the screws provided as shown in Figure 3-19.

Emerson E2 — 3.5.3.1 Location diagram (page 43)
Fig. 52 · 3.5.3.1 Location

Figure 3-20 - Outside Temperature Sensor with Cover and Clamp

Sensors and Transducers Mounting • 3-7

Page 44 of the Emerson E2 user manual — 3.5.6.1 Location
Page 44 · click to enlarge
Page 44

3.5.4 Insertion Temperature Probe

typical sensor applications and the sensor or probe most suited for that purpose.

3.5.4.1 Location

The 12-inch insertion temperature probe may be used to monitor temperature in either the supply or return air ducts of the AHU or RTU. 3.5.4.2 Mounting

Emerson E2 — 3.5.4.1 Location diagram (page 44)
Fig. 53 · 3.5.4.1 Location

The insertion probe may be mounted in any orientation within the duct as long as the probe is in the air flow of the duct. The probe housing should be secured using self-tap ping screws. A 0.250” diameter hole is required for the probe. Figure 3-21 shows the installation of the insertion probe (self-tapping screws are not provided).

Emerson E2 — 3.5.4.1 Location diagram (page 44)
Fig. 54 · 3.5.4.1 Location

Table 3-1 - Sensor Application and Type

3.5.6.2 Mounting Bullet and Pipe Mount Sensors

Bullet or pipe mount sensors mounted on refrigerant lines should be secured with a Panduit low temperature cable tie, number PLT2S-M120, or equivalent. For pipe mount sensors, the curved surface should be placed against the pipe and the tie should be positioned in the groove on the top surface of the sensor. A second tie should be used to secure the lead to the pipe for additional support.

Figure 3-21 - 12-Inch Insertion Probe Mounting 3.5.5 Supply and Return Air Sensors

Sensors located on refrigerant lines should be insulated to eliminate the influence of the surrounding air. A self- adhering insulation that will not absorb moisture is recom mended to prevent ice logging at the sensor location.

In addition to the 12-inch insertion temperature probe, Emerson Retail Solutions uses the same temperature sen sor used for outside and inside temperature to monitor sup ply and return air temperature. When used in this application, the sensors are supplied without enclosure covers. The sensors should be mounted directly in the air stream of the supply or return air duct. The sensors are not supplied with any mounting hardware for this application. 3.5.6 Refrigeration System Temperature Probes and Sensors

The sensor should be positioned on the side of the line as shown in Figure 3-22.

Emerson E2 — 3.5.6.2 Mounting Bullet and Pipe Mount Sensors diagram (page 44)
Fig. 55 · 3.5.6.2 Mounting Bullet and Pipe Mount Sensors

3.5.6.1 Location

Emerson Retail Solutions supplies several temperature monitoring devices including bullet sensors, pipe mount sensors, immersion probes, insertion probes, and sensors for high temperature applications. Each of these sensors is generally installed on the system by the equipment manu facturer. If a device must be added to the system, refer to the information supplied with the device and consult the refrigeration equipment manufacturer. Table 3-1 lists some

Figure 3-22 - Sensor Orientation

Page 45 of the Emerson E2 user manual — Figure 3-23 - Indoor RH Mounting Dimensions 3.5.8.2 Outdoor RH Sensors
Page 45 · click to enlarge
Page 45

3.5.7 Product Temperature Probes

Emerson E2 — 3.5.7 Product Temperature Probes diagram (page 45)
Fig. 56 · 3.5.7 Product Temperature Probes

The product temperature probe is designed to be used alongside food products in a refrigeration case or freezer. The product probe uses a thermistor type temperature sen sor in a sealed, cylindrical container (approximately 16 oz.). A magnet is contained at the bottom the probe’s enclosure to allow easy attachment to a side or bottom of a refrigeration case. 3.5.8 Humidity Sensors and Humidistats

3.5.8.1 Indoor RH Sensor

The indoor relative humidity sensor should be mounted in a central location within the zone to be mea sured, away from doors, windows, vents, heaters, and out side walls that could affect temperature readings. The sensor should be between four and six feet from the floor. Note that this sensor generates a small amount of heat; therefore, do not mount temperature sensors directly above RH sensors.

Figure 3-23 - Indoor RH Mounting Dimensions 3.5.8.2 Outdoor RH Sensors

The outdoor RH sensor (P/N 203-5761)

The outdoor RH sensor (P/N 203-5761) should always be mounted on the north side of the building if in the Northern Hemisphere, or on the south side if in the South ern Hemisphere. The sensor should be mounted under an overhang or otherwise out of direct sunlight (if possible).

Mount RH sensor (P/N 203-5751) as follows:

1. With a flat-head screwdriver, push down the middle tab on the top of the sensor case and pop the lid off to expose the circuit board.
2. Insert the flat-head screwdriver into the two slots on either side of the top of the sensor case and twist to separate the back plate from the case.

Mount the RH sensor (P/N 203-5761) as follows:

1. Secure the rear side of the enclosure to the out side wall using the two mounting brackets, as shown in Figure 3-24 . The tube holding the sen sor element should point straight down.
3. Remove the knock-outs from the back plate before mounting so wires may be threaded through.
2. If you will be running the sensor cable through the wall behind the sensor, cut or drill a hole in the wall through the hole in the enclosure.
4. Mount the back plate to the wall using the two open mounting holes on the top and bot tom of the plate.
5. Replace the cover on top of the back plate by lining up the tabs, and snap the lid back into place.

Sensors and Transducers Mounting • 3-9

Page 46 of the Emerson E2 user manual — 3.5.10.1 Location
Page 46 · click to enlarge
Page 46

3.5.9 Dewpoint Probe

Emerson E2 — 3.5.9 Dewpoint Probe diagram (page 46)
Fig. 57 · 3.5.9 Dewpoint Probe

3.5.9.1 Location

The Dewpoint Probe (P/N 203-1902) should be located 4 to 6 feet from the floor with the probe pointing up. It is recommended that the Dewpoint Probe be mounted in an area where it will be exposed only to minimal amounts of dust. 3.5.9.2 Mounting

Mount the probe using the standard switch cover sup plied with the unit as shown in Figure 3-26.

Emerson E2 — 3.5.9.1 Location diagram (page 46)
Fig. 58 · 3.5.9.1 Location

Figure 3-24 - Outdoor RH Sensor - Exploded View

3.5.8.3 Duct-mounted Insertion RH Probe

Emerson Retail Solutions specs a duct-mounted rela tive humidity (RH) sensor (P/N 203-5771) with a 0-5VDC output for use in building control and anti-sweat control applications using Emerson Retail Solutions input boards.

1. Cut a small circular hole in the duct large enough for the sensor tube to fit through.
2. Bolt the sensor enclosure against the outside of the duct wall so that the sensor element fits through the hole and into the duct. The enclosure may be mounted horizontally, as shown in Fig ure 3-25 or vertically. The screws should be tight enough for the foam gasket around the bottom of the sensor to form an airtight seal between the hole in the duct wall and the outside air.

Figure 3-26 - Dewpoint Probe Mounting

. 3.5.10 Light Level Sensor

Emerson E2 — . 3.5.10 Light Level Sensor diagram (page 46)
Fig. 59 · . 3.5.10 Light Level Sensor

3.5.10.1 Location

The Light Level Sensor (P/N 206-0002) should be located facing away from direct sunlight, preferably facing north in the Northern Hemisphere or south in the Southern Hemisphere. 3.5.10.2 Mounting

The light level sensor is not supplied with mounting hardware. The sensor should be mounted horizontally through the knockout of a standard weather-resistant junc tion box. Figure 3-27 shows a typical mounting configu ration.

Figure 3-25 - Duct-mounted RH Sensor - Exploded View

Page 47 of the Emerson E2 user manual — 3.5.11 Liquid Level Sensors
Page 47 · click to enlarge
Page 47

3.5.11 Liquid Level Sensors

Emerson E2 — 3.5.11 Liquid Level Sensors diagram (page 47)
Fig. 60 · 3.5.11 Liquid Level Sensors

Emerson Retail Solutions probe type liquid level sen sor (P/N 207-1000 – discontinued) is usually installed by the refrigeration and equipment manufacturer. If a replace ment sensor must be installed in the field, refer to the instructions supplied with the device, or consult the equip ment manufacturer. 3.5.12 Refrigerant Leak Detectors

Emerson Retail Solutions supplies the Refrigerant Leak Detector System as a stand-alone unit that monitors refrigeration leaks in up to sixteen zones. Consult the Refrigerant Leak Detector Installation and Operation Manual (P/N 026-1309) for mounting and installation instructions.

Figure 3-27 - Light Level Sensor Typical Mounting

Sensors and Transducers Mounting • 3-11

Page 48 of the Emerson E2 user manual — 3.5.11 Liquid Level Sensors
Page 48 · click to enlarge
Page 48
Page 48 of the Emerson E2 user manual — 3.5.11 Liquid Level Sensors
Page 49 of the Emerson E2 user manual — 4.1.2 Main Processor Board
Page 49 · click to enlarge
Page 49

4 E2 Hardware Setup

4.1 Setting up the E2

4.1.2 Main Processor Board

4.1.1 Enclosure

Emerson E2 — 4.1.2 Main Processor Board diagram (page 49)
Fig. 61 · 4.1.2 Main Processor Board
Emerson E2 — 4.1.2 Main Processor Board diagram (page 49)
Fig. 62 · 4.1.2 Main Processor Board

Figure 4-1 - E2 Inside Enclosure

Open the door and expose the main processor board. The main processor board and power interface board (PIB) are mounted side by side, one on each side of the box enclosure.

Figure 4-2 - E2 Main Board

The main processor board is mounted on the hinged door part of the enclosure, directly behind the keyboard.

Setting up the E2 E2 Hardware Setup • 4-1

Page 50 of the Emerson E2 user manual — 4.3 Add-On E2 Peripherals
Page 50 · click to enlarge
Page 50

4.1.3 Power Interface Board (PIB)

should be set to the UP position. For MODBUS, the jump ers should all be in the top-most position (MOD). For I/O Net, the jumpers should be in the middle position (I/O). For no termination, set the jumpers to the down position (NO).

Emerson E2 — 4.1.3 Power Interface Board (PIB) diagram (page 50)
Fig. 63 · 4.1.3 Power Interface Board (PIB)

4.2.3 Echelon Network Connect

The next connector is the Echelon Network plug. The one connector handles both input and output connections. The input and output cables are connected directly to the Echelon plug. This plug is the connection to the Case Con troller (CC-100), the Evaporator Stepper Regulator board (ESR8), TD3s, and other E2s. 4.2.4 Echelon Jumper

There is one Echelon jumper (J2) located on the Eche lon board that plugs into the main processor board.

Figure 4-3 - Power Interface Board

Additional information about Echelon Networking and terminating the network can be found in Section 8.3, Ech elon Network Structuring (Daisy-Chains).

The PIB interfaces the power and most all communica tions with the main board, and contains all field wiring connections.

4.3 Add-On E2 Peripherals

4.2 Powering the E2

The E2 has many plug-in card options to choose from:

Starting at the lower right side of the PIB, the first plug is the 24VAC input. This must terminate into the power supply transformer.

  • Plug-in Echelon card with mounting screw
  • RS485 Modem/communication expansion card

E2 requires 24VAC Class 2 power, which is supplied by a non-center-tapped Class 2 transformer.

  • Plug-in digital I/O Network card
  • Plug-in Four-Channel Internal Repeater 4.3.1 Echelon Plug-In Card Kit (P/N 638-4860)

Emerson Retail Solutions supplies two transformers that may be used to power E2s: one for use with 110VAC (P/N 640-0041), and one for use with 220VAC (P/N 640- 0042). Both transformers are rated at 50VA, and each will power one E2 unit. 4.2.1 RS485 Ports

Emerson E2 — 4.3 Add-On E2 Peripherals diagram (page 50)
Fig. 64 · 4.3 Add-On E2 Peripherals

On the lower left side of the PIB are two RS485 Net work connector ports. This is where all I/O boards (except the case controllers, TD3, ESR8, and Echelon I/O boards) are connected. 4.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)

There is one set of RS485 jumpers for each RS485 port (COM2A-2B; COM6; and COM4A-B). Jumpers J8-J10 are located directly above the COM2A connector port, and jumpers J11-J13 are located directly above the COM2B port. The RS485 termination jumpers (J8-J22) are used to terminate the devices at the beginning and end of an RS485 Network. If the E2 is the beginning of all RS485 I/O or MODBUS Networks, all three of these jumpers

Figure 4-4 - Echelon Card

Echelon is a two-conductor network that interconnects E2s and other associated devices. All Echelon devices are wired together using the daisy-chain method of network structuring. For the E2 to communicate on the Echelon

Page 51 of the Emerson E2 user manual — 4.3.5 Plug-In Four-Channel Internal Repeater
Page 51 · click to enlarge
Page 51

Network, the plug-in card must be connected. No Echelon Network communication can occur without the card. The plug-in Echelon card connects to the main processor board. 4.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)

The plug-in Digital I/O Network card connects to the power interface board to the right of the two fixed RS485 I/O Network connectors.

Emerson E2 — 4.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875) diagram (page 51)
Fig. 65 · 4.3.2 COM3 RS232 Plug-In for External Modem (P/N 638…
Emerson E2 — 4.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875) diagram (page 51)
Fig. 66 · 4.3.2 COM3 RS232 Plug-In for External Modem (P/N 638…

Figure 4-7 - E2 Digital I/O Network Card Install and Wiring

4.3.4.1 LEDs

The plug-in Digital I/O Network card LEDs can be used to determine the status of normal operating parame ters for the card.

Figure 4-5 - COM3 External Modem

Modem/com expansion card with an RS232 plug-in (COM3) that can interface with an external modem, and an RS485 serial communication port plug-in. 4.3.3 COM3 Internal Modem Plug- In Card (P/N 638-3362)

Red D1 (Out 1) ONRelay Output 1 is On
Red D4 (Out 2) ONRelay Output 2 is On
Emerson E2 — 4.3.4.1 LEDs diagram (page 51)
Fig. 67 · 4.3.4.1 LEDs

Table 4-1 - LED Status for Plug-In Digital I/O Card

4.3.5 Plug-In Four-Channel Internal Repeater

The four-channel repeater (P/N 638-4830) boosts sig nal strength on Echelon Networks. However, the four- channel repeater is also useful as a means of connecting the E2 to its associated devices using more than one daisy chain.

With a four-channel repeater mounted in the E2, you can run as many as three daisy chain segments out into the field, each of which can be as long as the prescribed Eche lon maximum wire length. The fourth channel of the repeater can be used to connect other E2s in a separate daisy-chain, eliminating the need to run cable from the field back to the next E2.

Figure 4-6 - COM3 Internal Modem

E2’s Serial Configuration is the centralized location where all communication ports (COM ports) may be set up in the E2 controller. To support the increasing number of third-party devices that E2 can communicate with, E2 has the expanded flexibility of dynamic COM ports that will support different types of communication protocols to meet the specific needs of the user. 4.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)

The plug-in Four Channel Internal Repeater card con nects above the power interface board on the case mounts using standoffs and screws.

See Section 3.4.1.3, Mounting the Four-Channel Repeater for more information.

This card adds two user-programmable digital outputs and two digital inputs to enable connection of switches and relays (relay contacts are rated at 3A up to 24 VAC).

Add-On E2 Peripherals E2 Hardware Setup • 4-3

Plug-In Digital I/O · Card LEDs Status

Page 52 of the Emerson E2 user manual — OBSERVE WIRE COLOR POLARITY
Page 52 · click to enlarge
Page 52

E2 INSTALLATION GUIDE

1.Connect the I/O or MODBUS Network to one or all of the E2 RS485 I/O or MODBUS Network ports. (A maximum of 31 devices can be wired to each I/O or MODBUS Network port.) 2. If the E2 is the beginning of all RS-485 I/O or MODBUS Networks, set all three jumpers to the UP position. For MODBUS, set the jumpers in the top-most position (MOD). For I/O Net, set the jumpers in the middle position (I/O). For no termination, set the jumpers to the DOWN position (NO). 3. Connect earth ground to one of the two ground terminals provided. Use 12 AWG (preferred) or 14 AWG wire and keep as short as possible (less than 12 inches preferred). 4. Connect 24VAC to the power terminals. 5. Flip the power switch to the ON position. When 24VAC has been applied to the board, the green LED will illuminate.

RS485 I/O or MODBUS Net

MOD

MOD

MOD

I/O NO

I/O NO

I/O NO

NOT TERMINATED TERMINATED

TERMINATED FOR MODBUS NET

FOR I/O NET

I/O or MODBUS Network

_ 0V +

Can be any COM port on the board

SHIELD

BLACK

WHITE

TO OTHER RS485 DEVICES

12 or 14 AWG

OBSERVE WIRE COLOR POLARITY

AC1

AC1

24VAC 24VAC

AC2

AC2

Show 4 more labels / short text on this page
[ [ [ · [ [ [ · [ [ [ · Earth Ground Connector
Page 53 of the Emerson E2 user manual — COM2 COM6 COM4
Page 53 · click to enlarge
Page 53

5 Serial

5.3 Serial Device and Software Setup

Configuration

After the COM card has been connected to the E2, set up the associated COM port in the Serial Connection Man ager:

5.1 Overview

E2’s Serial Configuration is the centralized location where all communication ports (COM ports) may be set up in the E2 controller. To support the increasing number of third-party devices that E2 can communicate with, E2 has the expanded flexibility of dynamic COM ports that will support different types of communication protocols to meet the specific needs of the user.

Emerson E2 — 5.1 Overview diagram (page 53)
Fig. 68 · 5.1 Overview

Previously, all COM ports were pre-defined to support a specific type of serial device. E2 now has five configu rable COM ports that can communicate with different devices on the network.

5.2 COM Ports

Figure 5-1 - Serial Configuration Screen

The Serial Connection Manager is located in General Setup under the Serial tab. To access Serial connections to set up the COM ports, press Alt + M, or from the E2 Main Menu:

E2 PIB COM PORT ASSOCIATIONS

1. - System Configuration

E2 Enclosure (Right Side)

2. - System Information

3. - General Controller Info

COM1

4. C3: Serial tab

To begin, first select the COM port you wish to set up, choose the protocol, and set the baud rate.

Serial Device RS232 Port

COM3

The user associates the various hardware devices with the COM ports listed under the Serial tab. Five COM ports have user-configurable values such as baud rate and con nection type settings.

POWER INTERFACE BOARD (PIB)

Serial Device RS485 COM Ports

COM2 COM6 COM4

COM1 is pre-set for serial connection. COM3 is pre- set with a modem-only connection type. The COM5 con nection is a non-configurable E2 keyboard port.

Figure 5-2 - Associated Device Connections and COM Ports

Overview Serial Configuration • 5-1

Plug-In Modem Card · Pre-Sets

Page 54 of the Emerson E2 user manual — COM4
Page 54 · click to enlarge
Page 54

E2COM# ASSOCIATIONS CONNECTOR

COM1 COM1 is a pre-set serial connection type (for a PC or laptop) and is located on the RS232 port on the PIB. The baud rate is configurable.

COM1

Serial Device RS232 Port

COM2 COM2 may be configured to the type of serial devices you are connecting: I/O Net 1-3 (default), ISD 1.0, IMC/Prodigy, or MODBUS 1-3. These devices are connected via the RS485 connectors (for wiring convenience, two connectors are available) on the PIB. The connection type and baud rate are configurable.

Serial Device RS485 COM Port (2 Connectors)

COM2

COM3 COM3 is a pre-set connection type for modems only (optional). The E2 modem/ expansion communication card (P/N 638-3362) has a plug-in modem that uses the phone line jack (RJ-11). The 638-4875 version has a plug-in for an external modem. Configure the baud rate and modem type for either the internal modem or the external modem.

COM3

COM4 COM4 ports are located on the PIB board. Configure COM4 to the type of device you are connecting: I/O Net 1-3, ISD 1.0 (RX unit default), IMC/Prodigy (BX/CX unit default), or MODBUS 1-3. The connection type is configurable.

COM4

COM6 The COM6 port is located on the PIB board. Configure COM6 to the type of device you are connecting: I/O Net 1-3, ISD 1.0 (RX unit default), IMC/Prodigy (BX/CX unit default), or MODBUS 1-3. Both connectors cannot be used at the same time. Configure the connection type, baud rate, and parity. COM6

Table 5-1 - COM Ports with Associated PIB and Card Connections - Refer to Figure 5-2

Plug-In Modem Card(s)

Page 55 of the Emerson E2 user manual — 5 Serial Configuration
Page 55 · click to enlarge
Page 55
Page 55 of the Emerson E2 user manual — 5 Serial Configuration
Page 56 of the Emerson E2 user manual — 5 Serial Configuration
Page 56 · click to enlarge
Page 56
Page 56 of the Emerson E2 user manual — 5 Serial Configuration
Page 57 of the Emerson E2 user manual — ARTC/ RTU
Page 57 · click to enlarge
Page 57

6 The RS485 Network and Hardware Setup

Previous versions of E2 hardware and firmware before version 2.30F01 only supported one I/O network port, with an optional expansion card that could be used for connection to Copeland ISD compressors or IMC/Prodigy S-Bus rooftop unit controllers. Beginning with E2 version 2.30F01, E2s now have up to three RS485 network ports, each of which may be configured as an I/O network, IMC/ Prodigy, ISD, or ECT MODBUS port.

Type Max # Translation Boards That Match

16AI 16 Any I/O board that has digital and ana log inputs. The inputs of a combi nation I/O board (8IO or MultiFlex combo board) are by themselves treated as one 16AI.

  • 16AI (discontinued)
  • 8IO (discontinued)
  • MultiFlex 16

Section 5, Serial Configuration of this manual covers how to assign COM ports COM2, COM4, and COM6 to different RS485 network types. Section 6 (this section) explains the network types, the hardware that may be con nected to each type, and how to configure the devices.

  • The inputs on all Mul tiFlex combo boards (88, 88AO, 168, 168AO, and 1616)
  • All versions of the Gateway board (some versions behave like as multiple 16AIs)

6.1 The I/O Network

8RO 31 Any I/O board with relay outputs. The relay outputs of a combination I/O board (8IO or Mul tiFlex combo board) are by themselves treated as one 8RO.

  • 8RO

All boards and controllers manufactured by Emerson Retail Solutions for communication with E2 via RS485 are generally referred to as I/O boards, and the network they are connected to is referred to as the I/O network (or I/O Net).

  • 8ROSMT
  • The relay outputs on all MultiFlex combo boards (88, 88AO, 168, 168AO, and 1616 (which behaves as two 8RO boards)

A COM port configured as I/O Net may connect with up to 127 I/O boards. This network is used by the E2 to read data from the input boards and to send commands to the analog and digital output boards. Some unit control lers, such as CCB case controllers and MultiFlex RCBs, also communicate with the E2 via the I/O Network. 6.1.1 I/O Board Names and Terminology

  • 8IO (discontinued)

4AO 16 Any I/O board with analog outputs. The analog out puts of a combina tion I/O board (8IO or MultiFlex combo board) are by themselves treated as one 8RO.

  • 4AO
  • 8IO (discontinued)
  • The analog outputs on the MultiFlex 88AO and 168AO

There are many input, relay output, analog output, and combination I/O boards available from Emerson Retail Solutions for use with the E2. However, separate from the various MultiFlex unit controller models, E2 only recog nizes four different types of I/O boards: 16AI, 8RO, 4AO, and 8DO. All E2-compatible I/O boards communicate with E2 as if they are one or more of these types of boards.

8DO 16 Any I/O board with +12VDC digital pulse outputs.

  • 8DO (including all versions of the PMAC and PMAC II anti-sweat control ler)

In this manual and in the E2 interface, when you encounter these board names, bear in mind that they are terms that represent many types of boards. Table 6-1 describes all the actual boards or board components for each E2 “board type.”

  • Digital outputs on the MultiFlex 168DO

ARTC/ RTU

32 Rooftop HVAC controller board

MultiFlex RTU and ARTC (discontinued)

Table 6-1 - Board Types and Boards Included in Each Type

The I/O Network The RS485 Network and Hardware Setup • 6-1

Board · Board Type

Page 58 of the Emerson E2 user manual — 6.1.2.1 Board Designation
Page 58 · click to enlarge
Page 58

6.1.2.2 Board Calculations

Type Max # Translation Boards That Match

With X as the number of plus boards and Y as the num ber of non-plus boards, use the following equation to ensure that the number of devices on your network has not exceeded the maximum load limitation of the network. For example, if the total number of devices is less than 256, the maximum load limitation has not been exceeded.

RCB 32 MultiFlex RCB advanced rooftop unit controller

RCB-P 32 MultiFlex RCB-P (Pulse) advanced rooftop unit con troller

PAK 32 MultiFlex PAK rack controller

X + (Y • 8) < 256

CCB 99 CCB case control lers

6.1.3 Wiring Types

ESR 31 MultiFlex ESR valve controller

Emerson Retail Solutions specifies all RS485 I/O and MODBUS wiring used by the E2 must be Belden 8641 (24AWG, 300V, Emerson Retail Solutions P/N 135-8641); Belden 8761 (22 AWG, 300V not stocked by Emerson Retail Solutions); or a 600V-shielded 22AWG equivalent stocked by Emerson Retail Solutions (P/N 135-0600). These are two-connector shielded twisted pair cables that support a maximum daisy chain cable distance of 4000 feet (1219 m) between the E2 and the end device on the network. 6.1.4 The I/O Network Structure (Daisy Chains)

CUBII

32 Single condensing unit controller (one compressor and up to 4 condenser fans)

Table 6-1 - Board Types and Boards Included in Each Type

6.1.2 MultiFlex-Plus (+) Board

The MultiFlex-plus board contains a replacement RS485 transceiver chip that presents less of a load on the network than a non-plus board. This increases the maxi mum number of devices that can be placed on the network, but not the number of board types an Einstein controller can communicate with.

The RS485 Input/Output (I/O) Network connects all input and output communication boards together in a sin gle open communications loop. This loop, or “daisy chain,” connects the E2 to multiple input and output com munication boards, and terminates at the last input or out put board on the network. A diagram of this network arrangement is shown in Figure 6-1.

The MultiFlex-plus board now accounts for only 1/8 the load of a non-plus board with 32 total devices on the network (one Einstein controller + 31 boards). This new conversion allows for the placement of 256 devices on the network (one Einstein controller + 255 boards). The num ber of boards an Einstein controller can support is increased from 31 up to 255 using MultiFlex-plus boards only. In other words, the number of I/O net devices are no longer restricted by the I/O net 31-node limitation.

6.1.2.1 Board Designation

Plus boards are always identified with a plus (+) sign that appears on the plastic insulating cover on the top of the board, after the board name.

Figure 6-1 - I/O Network Configurations

Show 8 more labels / short text on this page
Board · Board Type · MultiFlex RCB · MultiFlex RCB-P · MultiFlex PAK · CCBs · MultiFlex ESR · MultiFlex CUB II
Page 59 of the Emerson E2 user manual — 6.1.5 Network Noise Minimization
Page 59 · click to enlarge
Page 59

6.1.5 Network Noise Minimization

For all boards, except 8IO and 8DO boards, the net work dip switch labeled S1 (or S3 for the 16AI board) is used to set the unique board number of the unit and the baud rate. The 8IO and 8DO uses rotary dials to set the board number of the unit.

Site environments will frequently have numerous sources of high EMI, or “noise,” that must be accounted for when routing RS485 network cable. Although the cable is shielded against noise, the installer must follow best practices for minimizing network noise.

Numbering the MultiFlex Combination I/O Boards

When it comes to network numbering, the MultiFlex Combination Input/Output boards (88, 88AO, 168, 168AO, and 168DO) are special cases. They are actually a combination of three types of Emerson Retail Solutions boards: the inputs are configured like a 16AI, the relay outputs are configured like an 8RO, and the analog outputs are configured like a 4AO.

In general, installers should follow these guidelines when installing RS485 networks:

  • Avoid running cable next to noise-generating devices, such as motor starters, contactors, invert ers, fluorescent light ballasts, arc welders, etc. If possible, keep cable less than 1 foot away from noise-generating devices (ideally, at least 5 feet).

When a MultiFlex combo board is present on the net work, it must be addressed like all three board types. Therefore, when numbering these boards, you must set a unique number for both the 16AI, 8RO, and 4AO compo nents of the board.

  • Do not run RS485 cable in the same conduit as high-voltage wiring, such as 120VAC or 240VAC power wiring. Keep RS485 cable a minimum of 3 inches away from high-voltage wiring (ideally, at least 12 inches). If RS485 must cross paths with high-voltage wiring, cross them perpendicular — running RS485 and high-voltage wire in parallel increases the amount of noise induced on the net work.

Addressing the MultiFlex Boards

For MultiFlex boards, set positions 1 to 5 on S3 for the 16AI component and positions 1 to 5 on S4 for the 8RO component. Set positions 6 to 8 on S4 for the 4AO or 4DO segment. For MultiFlex board controllers, use positions 1 to 5 on S3 to set the address.

  • Ensure you are grounding each input device’s 0V power terminal to a separate earth ground, and set ting the termination and biasing jumpers as instructed in Section 6.1.8, Setting the Terminating and Biasing Jumpers .

Addressing the MultiFlex ESR Boards

The MultiFlex ESR uses standard Emerson Retail Solutions I/O Network addressing. Set positions 1 to 5 on S1 to set the network ID (address) of the MultiFlex ESR from 1 to 31. 6.1.7 Setting the Baud Rate

For more instructions on best practices for minimizing noise, refer to publication 026-1903, E2 Controller Wir ing Practices, available in the Product Manuals section of the Emerson Climate Technologies Web site: www.emersonclimate.com 6.1.6 Network ID Numbers (Board Numbers)

All I/O boards have dip switches that determine the baud rate at which they communicate. Currently, the baud rate dip switch in network components may be set at either 4800, 9600, 19200, and 38400. Setting of the baud rate is accomplished using dip switches (refer to the board’s installation sheets at the end of this section for specific dip switch settings).

Each device on an RS485 segment has either a network dip switch or rotary dials that must be used to assign the board a unique network ID number.

Baud Rate for the E2

The baud rate default for E2 is 9600.

The network ID number makes a board unique from other boards on the network of the same type. This allows E2 to find it and communicate with it easily.

Baud Rate for the Gateway

The Gateway can be set to either 9600 baud or 19.2K baud by dip switch #6. “ON” places the rate at 9600 baud while “OFF” sets it at 19.2K baud.

Boards of the same type should be numbered in sequence, starting with one and continuing with two, three, and so forth. For example, if a segment contains four 16AI boards and five 8RO boards, you should num ber the 16AIs one, two, three, and four; and the 8ROs one, two, three, four, and five. The same should be done with multiple 4AO and 8DO boards, and IRLDS leak detection units.

Dip switches 6 and 7 control the baud rate at which the Gateway communicates with the site controller on the RS485RS485 Network. These switches must be set to the same baud rate setting as the E2 or REFLECS (usually 9600 baud).

The I/O Network The RS485 Network and Hardware Setup • 6-3

Page 60 of the Emerson E2 user manual — 6.1.9 Powering the I/O Boards
Page 60 · click to enlarge
Page 60

three jumpers set to the DOWN or NO position. Figure 6-2 shows the proper terminating jumper settings for the E2 and for all I/O boards.

Dip switch 8 controls the baud rate at which the Gate way communicates with the other devices on the Receiver Bus Network. This baud rate may only be set to either 9600 baud (switch DOWN) or 19200 baud (switch UP). All Gateways and receivers on the Receiver Bus Network must have the same baud rate dip switch setting. It is rec ommended you use 9600 baud as the Receiver Bus Net work baud rate.

Emerson E2 — 6.1.8 Setting the Terminating and Biasing Jumpers diagram (page 60)
Fig. 69 · 6.1.8 Setting the Terminating and Biasing Jumpers

THE TERMINATING JUMPERS MUST BE IN THE UP OR I/O POSITION IF AT THE BEGINNING OR END OF THE NETWORK.

Baud Rate for the 8IO, 8DO, and ARTC

There are three I/O devices that do not have baud rates determined by dip switches. They are as follows:

1. The 8IO - this board automatically detects the baud rate being used by the I/O devices on the network, and adjusts to match their baud rate.
2. The 8DO - this board automatically detects the baud rate being used by the I/O devices on the network, and adjusts to match their baud rate.

THE TERMINATING JUMPERS MUST BE IN THE DOWN OR NO POSITION IF NOT AT THE BEGINNING OR END OF THE NETWORK.

3. The ARTC - this board is fixed at 9600 baud.

Baud Rate for MultiFlex Boards

On all MultiFlex boards, switches 6 and 7 on S3 are used to set the baud rate. To communicate at 9600 baud, set switch #6 to the UP position and #7 to DOWN. For 19200 baud, set switch #6 to the DOWN position and #7 to UP.

Figure 6-2 - I/O Network Termination Jumper Settings

6.1.9 Powering the I/O Boards

All models of E2-compatible I/O boards require 24VAC Class 2 input power. Some boards such as the 16AI, 8RO, 4AO, 8DO, MultiFlex ESR, and MultiFlex 16 use a center-tapped power source. All other models, such as the 8IO and MultiFlex Combination I/O boards, may use non-center tapped power sources.

Baud Rate for the MultiFlex ESR

Set the baud rate on the MultiFlex ESR board by set ting switches 6 and 7 on the network address terminal (labeled S1).

To communicate at 9600 baud, set switch #6 to the UP position, and switch #7 to DOWN. For 19200 baud, set switch #6 to the DOWN position and switch #7 to UP. (Currently, 9600 baud is recommended).

The baud rate should be set to 9600 baud in all cases. 6.1.8 Setting the Terminating and Biasing Jumpers

The I/O Network connector, for all I/O boards and the E2, has a set of three terminating jumpers. They are the jumpers positioned closest to the I/O Network connector. The E2 has jumpers next to each of the COM ports that can be configured as an I/O network (COM2, COM4, and COM6).

The purpose of the jumpers is to provide network ter mination resistance and network biasing to the two ends, or termination points, of the daisy chain. One device at the beginning and one device on the end must be terminated and biased by placing all three jumpers in the UP or I/O position. All other devices on the daisy chain must have all

Recommended Baud Rate

Page 61 of the Emerson E2 user manual — 1616L, 1616LAO, 1616LDO
Page 61 · click to enlarge
Page 61

Emerson Retail Solutions supplies a wide variety of 24VAC transformers with varying sizes and either with or without center taps. Table 6-2 shows the transformer sizes and whether they are center-tapped or non-center-tapped.

Table 6-3 lists each board, the board’s rating, and whether or not the board must use center-tapped power.

Xformer P/N VA Rating Input Voltage Center Tap?

640-0041 50 VA 110 VAC No

640-0042 50 VA 220 VAC No

640-0056 56 VA Multi-tap (120/208/240 VAC) Yes

640-0050 75 VA 110 VAC No

640-0045 75 VA 220 VAC No

640-0080 80 VA Multi-tap (120/208/240 VAC) Yes

Table 6-2 - Transformers Compatible with I/O Network Boards

2 15VA 1 18VA + 48VA =

Unit Amps VA VAC Center- tapped?

2. Use a transformer that has a power rating higher than the total calculated VA (see Table 6-2 ). Example: For boards totalling 48VA, a 56VA trans former is sufficient, since 56VA is greater than 48VA.

16AI 0.25 5.0 24 Yes

8RO/SMT 0.75 15.0 24 Yes

4AO 0.5 10.0 24 Yes

8DO 1.5 18 24 Yes

I/O Board Transformers should be located within 10 feet of the board it is powering, preferably within the board enclosure. 6.1.9.1 Wiring Types

8IO/ARTC 0.75 18 24 No

IRLDS N/A N/A 120/240 N/A

RLDS N/A N/A 120/240 N/A

For powering I/O boards, use only the listed wire types from Table 6-4. Three-conductor non-shielded cables are the recommended wire for connecting between the center tapped transformer and the I/O boards. The third conduc tor should be connected to earth ground. If boards use a center-tapped transformer, also connect the center tap to the earth grounded third conductor.

3.3 80 24 Yes

ESR

16 0.25 6 24 Yes

MultiFlex 88, 88AO, 168, and 168AO

0.75 15 24 No

1.0 20 24 No

14 AWG Belden 9495

1616L, 1616LAO, 1616LDO

18 AWG Belden 9493

Table 6-4 - Power Wiring Types

Table 6-3 - Device Power Requirements

The wire length from the transformer and the number of boards connected to the same wire determines the type wire gauge used. In most cases, the distance between the I/ O boards and the transformer that supplies power to them is not enough to be concerned with. But it is very import ant not exceed this maximum wire length or the boards will malfunction.

To select a power transformer for a board or a series of boards:

1. Determine what the total VA is for the boards that will be powered by the transformer (see Table 6-3 ) .

Example: Two MultiFlex 168AOs (15 VA each), and one 8DO (18 VA) boards are to be powered by one transformer. The total VA is:

The I/O Network The RS485 Network and Hardware Setup • 6-5

Show 4 more labels / short text on this page
MultiFlex · MultiFlex · Power Wiring Types · MultiFlex
Page 62 of the Emerson E2 user manual — 6.2 IMC/Prodigy Rooftop Unit Controllers
Page 62 · click to enlarge
Page 62

6.3 MODBUS

Use these formulas to determine if the wire gauge you are using fits within specification:

E2 controllers version 2.30F01 or greater may select MODBUS as a network type. The E2 supports connection to certain MODBUS devices including but not limited to Control Link CD, Control Link RSC, Control Link ACC, XR, XM and XEV series controllers.

14 AWG:

18 AWG:

(VA is the total VA rating of the I/O boards)

For example, if you had an 80 VA load:

14 AWG24 ft
18 AWG9 ft (rounded down)

Figure 6-3 - Power Wire Lengths

6.3.1 Control Techniques Drive (VSD)

Sensors requiring 24VAC can be powered from the same transformer powering the input board as long as the resulting total load of both the input board(s) and the sen sor(s) connected to the transformer does not exceed the transformer’s VA rating. Consult Section 6.1.9, Powering the I/O Boards, and Section 8.6.1, Powering Echelon Devices for more information. 6.1.10 Board Installation

Using the MODBUS network type, E2 controllers can communicate with the Control Techniques variable-speed drive (VSD). There are three different VSD models the E2 communicates with: Commander SE, Commander SK, and Unidrive SP drive types.

The following pages give step-by-step graphical instructions on all steps necessary to install each I/O Net work device so that it is powered up and able to communi cate with E2. If these devices have not yet been mounted, refer to Section 3.2, Mounting I/O Boards for mounting instructions for these devices.

Configure the COM port the CT drive will connect to by pressing Alt + M to open the serial configuration man ager. Set the COM port to MODBUS and the baud rate (match the baud rate on the CT drive). For more informa tion on setting up serial ports, go to Section 5, Serial Con figuration.

6.2 IMC/Prodigy Rooftop Unit Controllers

The Control Techniques VSD has its own technical bulletin that explains interfacing with E2 (P/N 026-4122). The installation and operation manual explaining the VSD is maintained by Control Techniques. Contact your Con trol Techniques representative for a copy of this manual.

All E2 Building Controller (BX) versions 2.21F01 and above may communicate with IMC/Prodigy rooftop units equipped with IMC/Prodigy control boards version M4-1 or higher. E2 controllers version 2.30F01 and above may use any of the RS485 I/O ports (COM2, COM4, or COM6) as a IMC/Prodigy communication port. Version 2.21F01 E2 units may only connect IMC/Prodigys to an RS485 Expansion Card. Connectivity to IMC/Prodigy is a licensed feature and must be purchased from Emerson Retail Solutions.

The IMC/Prodigy interface has its own technical bulle tin explaining installation, network setup, and E2 configu ration. Refer to Technical Bulletin 026-4117.

Feet = 1920/VA · Feet = 739/VA

Page 63 of the Emerson E2 user manual — 6.3.5.1 Overview
Page 63 · click to enlarge
Page 63

6.3.2 Copeland Discus with CoreSense Diagnostics (ISD)

6.3.4 iPro DAC

E2 controllers version 2.21F01 and above may com municate with Copeland ISD compressors using the ECT MODBUS network. E2 controllers version 2.30F01 and above may use any of the RS485 I/O ports (COM2, COM4, or COM6) as a Copeland ISD communication port. Version 2.21F01 E2 units may only connect Cope land ISD compressors to an RS485 Expansion Card.

Emerson E2 — 6.3.2 Copeland Discus with CoreSense Diagnostics (ISD) diagram (page 63)
Fig. 70 · 6.3.2 Copeland Discus with CoreSense Diagnostics (IS…

The installation and operation manual explaining the Copeland ISD interface is maintained by Copeland. Con tact your Copeland representative for a copy of this man ual. 6.3.3 XR35CX, XR75CX, and XEV22 Case Controllers

Figure 6-4 - iPro DAC

The iPro DAC is a packaged HVAC control board for use either as a stand-alone controller or in zone control applications using a Emerson Retail Solutions E2 BX building control system. The iPro DAC is capable of con trolling heat and cool stages, fans, humidification and dehumidification devices and economizers using on-board I/O and control algorithms, as well as monitor and interact with other building control systems and peripherals (such as smoke alarms and CO2 sensors). 6.3.5 Energy Meter

E2 controllers version 2.84 or greater communicate with the XR and XEV controller. The XR and XEV con trol compressor regulation, defrost, light, and evaporator fans in refrigeration systems on normal, low, or medium temperatures, control a wide variety of stepper electronic expansion valves and anti-sweat heaters (if present), and measure and regulate the superheat of the refrigerant in the system.

If the case controller is configured with a Real Time Clock (RTC), it can be programmed with up to 6 daily defrosts and an energy saving function. Without the RTC, the E2 can coordinate defrost cycles and the energy-saving function.

Emerson E2 — 6.3.2 Copeland Discus with CoreSense Diagnostics (ISD) diagram (page 63)
Fig. 71 · 6.3.2 Copeland Discus with CoreSense Diagnostics (IS…

Several parameters of the Emerson controllers (such as inputs, outputs, setpoints, and alarms) can be configured directly in E2 and sent to the appropriate Emerson control ler, depending on the controller model. 6.3.3.1 XR75CX-Case Display

E2 controllers version 4.02 or greater communicate with the XR75CX-Case Display controller. The XR75CX- Case Display is a microprocessor-based controller, suit able for applications on medium or low temperature venti lated refrigeration units. It has up to four (4) analog inputs: discharge air temperature, product temperature, defrost temperature and coil out temperature, four (4) relay out puts, and up to two (2) digital inputs. For more informa tion on the XR75CX-Case Display, refer to the XR75CX- Case Display manual P/N 026-1217.

Figure 6-5 - Energy Meter

6.3.5.1 Overview

The Energy Meter provides a solution for measuring energy data with a single device. Inputs include Control Power, CT, and 3-phase voltage. The Energy Meter sup ports multiple output options, including solid state relay contacts, Modbus (with or without data logging), and pulse. The LCD screen on the faceplate allows instant out put viewing.

MODBUS The RS485 Network and Hardware Setup • 6-7

Page 64 of the Emerson E2 user manual — 6.3.7 Copeland Discus with CoreSense Protection
Page 64 · click to enlarge
Page 64

6.3.7 Copeland Discus with CoreSense Protection

The meter is housed in a plastic enclosure suitable for installation on T35 DIN rail according to EN50022. The Energy Meter can be mounted with any orientation over the entire ambient temperature range, either on a DIN rail or in a panel. The meter is not sensitive to CT orientation to reduce installation errors. 6.3.5.2 Supported System Types

Emerson E2 — 6.3.7 Copeland Discus with CoreSense Protection diagram (page 64)
Fig. 72 · 6.3.7 Copeland Discus with CoreSense Protection

The Energy Meter Series has a number of different possible system wiring configurations. To configure the meter, set the System Type via the User Interface or Mod bus register 130 (if so equipped). The System Type tells the meter which of its current and voltage inputs are valid, which are to be ignored, and if neutral is connected. Set ting the correct System Type prevents unwanted energy accumulation on unused inputs, selects the formula to cal culate the Theoretical Maximum System Power, and deter mines which phase loss algorithm is to be used. The phase loss algorithm is configured as a percent of the Line-to- Line System Voltage (except when in System Type 10) and also calculates the expected Line to Neutral voltages for system types that have Neutral (12 & 40).

Figure 6-7 - Copeland Discus Compressor

The Discus application can monitor semi-hermetic compressors using the MODBUS network on E2 versions 3.01 and above. The E2 monitors and records semi-her metic compressor information. The Discus application has extensive logging capabilities that record a compressor’s Run History, Fault History, and Alarm Status.

For more information about this application, see the Energy Meter manual (P/N 026-1726). 6.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)

The Copeland Discus is supported on E2 RX-300, CX- 400 and above. 6.3.8 Copeland CoreSense Communications

Emerson E2 — 6.3.7 Copeland Discus with CoreSense Protection diagram (page 64)
Fig. 73 · 6.3.7 Copeland Discus with CoreSense Protection
Emerson E2 — 6.3.7 Copeland Discus with CoreSense Protection diagram (page 64)
Fig. 74 · 6.3.7 Copeland Discus with CoreSense Protection

Figure 6-6 - MRLDS

Figure 6-8 - Copeland CoreSense Communications

The Modular Refrigerant Leak Detection Sensor (MRLDS) continuously monitors for low levels of refrig erants most commonly used in commercial refrigeration systems.

CoreSense Communications is used on A/C scroll compressors in the E2. The CoreSense Communications application provides the user interface requirements for configuration setup, status display, and alarm handling. CoreSense monitors information on the compressor's operation and sends it to the controller, and can also moni tor conditions inside the compressor to prevent compres

The MRLDS communicates with the E2 controller via MODBUS. The E2 will provides an interface while the MRLDS will provide the leak monitoring functionality.

Page 65 of the Emerson E2 user manual — 6.3.9 Light Commercial Thermostat
Page 65 · click to enlarge
Page 65

sor failures.

  • Minimum Damper Position

Device configuration of the CoreSense Communica tions can be set at either 9600 or 19200 baud, with either No parity, or Even parity.

  • Outside Air Temperature
  • Inside Humidity

If these inputs are connected to valid values, they are sent to the thermostat to be used in place of any locally connected sensors of the same type. If local sensors are present and meant to be used, the associated inputs on the E2 application should be left disconnected. 6.3.9.2 Advisory and Alarms

The Copeland CoreSense Communications is sup ported on the E2 CX-300, 400, and BX-300, 400. 6.3.9 Light Commercial Thermostat

The thermostat communicates with the E2 using the MODBUS network. The Light Commercial Communicat ing Thermostat will enable the E2 to read status informa tion from the device as well as send operational setpoints to the device. The thermostat is available on E2 versions 3.02 and above. 6.3.9.1 Thermostat Inputs

The Light Commercial Thermostat also supports diag nostic functions. When a diagnostic code is sent to the E2 from the thermostat, the E2 application will identify the code and generate the corresponding advisories in the advisory log.

Each of these configurable diagnostic alarms in the E2 can be set to Disabled, Failure, Alarm, or Notice with an accompanying priority setting.

The E2 application will provide support for external real time inputs to the thermostat. These inputs are:

  • Zone Temperature

The diagnostic alarms supported are:

Diagnostic Alarm Descriptions E2 Advisory

Heating Two Hours Thermostat did not see a rise in supply temperature when heating was called for.

Heat Continuous In heat or backup heat mode, thermostat opens latching relay contacts if temperature is over 10°F above setpoint.

Heat Shutdown – Temp too high

Temperature Sensor Fail If heating or cooling is engaged, and either the indoor temperature sensor reading or the supply air temperature sensor reading starts moving the opposite way faster than it was before the heating or cooling was engaged, the thermostat reports a diagnostic message, and shuts down the operation.

Stuck Key A stuck key (closed) has been detected on the thermostat. Stuck Key Detected

Thermostat has detected a failure of the internal space temperature sensor, or the O/B wiring is incorrect.

Failed Sensor or Bad Wiring

Cool Eight Hours If cool runs for over 8 hours continuously, the thermostat sets anticipator to zero until call for cool is satisfied.

Fan Not Detected If the fan is activated and if the Fan Detect input is enabled, the thermostat checks its status 15 seconds after the fan is energized, and if the fan is not on, it disables any active heat or cool calls, and reports an alarm.

Frost Protection Activated The thermostat allows a frost protection menu option. When enabled, frost

protection is enabled in all system modes including OFF, when temperature drops below 42°F (5.5°C). All other heat / cool calls are disabled, and indoor heat is activated until the temperature rises above the frost protec- tion threshold.

Table 6-5 -Diagnostic Alarm Outputs

can access this information. On some specific alerts, it will discontinue compressor operation if active protection is enabled. The Comfort Alert codes are sent separately from the diag nostic codes. Just like the diagnostic codes, the Comfort Alert codes are entered as advisories in the E2 advisory

The thermostat supports the Emerson Climate Tech nologies Comfort Alert system. On any alert present on Comfort Alert terminal, the thermostat keeps the informa tion on the fault available over the network so that the E2

MODBUS The RS485 Network and Hardware Setup • 6-9

Show 8 more labels / short text on this page
Diagnostic Alarms · Heating Problem Detected · Incorrect Sensor Wiring · Unexpected Temperature Rise · Cooling Problem Detected · Proof Fail · Frost Protection · Comfort Alert Codes
Page 66 of the Emerson E2 user manual — 6.3.9 Light Commercial Thermostat
Page 66 · click to enlarge
Page 66

log.

Comfort Alert Descriptions Cause E2 Advisory

Long Run Time Compressor is running extremely long run cycles (typi cally more than 18 hours).

Low refrigerant charge. Evaporator blower is not running. Evaporator coil is frozen. Faulty metering device Condenser coil is dirty Thermostat is malfunctioning Compressor Second Stage Cooling Wiring

Compressor run time is long

Discharge or pressure out of limits or compressor over loaded.

High head pressure. Condenser coil poor air circulation (dirty, blocked, damaged)

Condenser fan is not running Return air duct has substantial leakage.

Short Cycling Compressor is running only briefly.

Thermostat demand signal is intermittent. Time delay relay or control board is defective. If high pressure switch present, check if there is a System Pressure Trip problem.

Locked Rotor Locked rotor. Run capacitor has failed. Low line voltage (contact utility if voltage at dis connect is low).

Excessive liquid refrigerant in compressor. Compressor bearings have seized.

Open Circuit Compressor open circuit. Outdoor unit power disconnect is open. Compressor circuit breaker or fuse(s) is open. Compressor contactor has failed open. High pressure switch is open and requires manual reset.

Open circuit in compressor supply wiring or con nections.

Unusually long compressor protector reset time due to extreme ambient temperature.

Compressor windings are damaged.

Open Start Circuit Compressor current only in run circuit.

Run capacitor has failed Open circuit in compressor start wiring or connec tions.

Compressor open start circuit

Compressor start winding is damaged.

Open Run Circuit Compressor current only in start circuit.

Open circuit in compressor run wiring or connec tions.

Compressor open run circuit

Compressor run winding is damaged.

Table 6-6 -Comfort Alert Outputs

Show 5 more labels / short text on this page
System Pressure Trip · System pressure trip · Compressor short cycling · Locked Rotor Trip · Compressor open circuit
Page 67 of the Emerson E2 user manual — 6.3.10 Refrigerant Leak Detection System (RLDS)
Page 67 · click to enlarge
Page 67

Comfort Alert Descriptions Cause E2 Advisory

Welded Contactor Compressor always runs. • Compressor contactor has failed closed

  • Thermostat demand signal is not connected to module.

Low Voltage Control circuit < 17VAC. • Control circuit transformer is overloaded

Compressor Low Volt Trip

  • Low line voltage (contact utility if voltage at disconnect is low)

Protector Trip Thermostat demand signal Y is present, but the compressor is not running.

  • Compressor protector is open.
  • Outdoor unit power disconnect is open.
  • Compressor circuit breaker or fuse(s) is open.
  • Broken wire or connector is not making contact.
  • High pressure switch open if present in system.
  • Compressor contactor has failed open.

Table 6-6 -Comfort Alert Outputs

The Comfort Alert diagnostic alarms are configurable in the E2 as Disabled, Failure, Alarm, or Notice with an accompanying priority setting. All Comfort Alert codes will share the same advisory type and priority parameters.

previous readings that can be accessed for analysis.

Emerson E2 — 6.3.10 Refrigerant Leak Detection System (RLDS) diagram (page 67)
Fig. 75 · 6.3.10 Refrigerant Leak Detection System (RLDS)

High/Low Occ/Unocc Space Temperature Alarms

The thermostat does not provide alarming information on either high or low temperatures for the Space tempera ture sensor. Therefore, the E2 application will provide this functionality.

Supply Sensor Fail Alarm

The thermostat does not provide alarm information on a failure of the supply temperature probe (if installed). The E2 application will provide this functionality. Advisory type, priority, and delay is provided for the supply sensor fail advisory.

Conditions for Return to Normal (RTN) on Diag nostic Codes

The E2 application will issue an RTN on an active advisory when the corresponding bit of the diagnostic code goes to zero. If multiple diagnostic advisories are active simultaneously, they will all return to normal when the code reads zero. 6.3.10 Refrigerant Leak Detection System (RLDS)

Figure 6-9 - RLDS

The RLDS has alarm level configuration parameters that are synchronized. These will be read first from the device. The E2 will be master of all other parameters. An audible alarm and front panel indicators are provided to signal alarm and fault conditions, and relay contacts are provided that can be used to trigger external alarm devices in the event of a system fault, or if a leak (small), spill (medium), or evacuation (large) level of gas is detected. The system also may be fitted with an optional two-chan nel 4-20mA current loop board for connection to remote monitoring equipment.

The RLDS provides for the continuous monitoring of refrigerant gas levels in up to 16 separate test zones or channels. The instrument is programmed to monitor a variety of gases and independent leak (small), spill (medium), and evacuation (large) levels may be desig nated for each zone. The instrument also retains a log of

MODBUS The RS485 Network and Hardware Setup • 6-11

Welded Contactor · Protector Trip

Page 68 of the Emerson E2 user manual — 6.3.11 Copeland Scroll — K5 Refrigeration Compressor
Page 68 · click to enlarge
Page 68

The RLDS features full two-way communications via an RS485 interface. MODBUS RTU is the communication protocol standard and can be connected directly to an E2 controller version 3.02 and above. The RLDS is dynami cally licensed for 15 devices for RX/BX/CX 300-500 and 1 for RX100 and CX100 (Same as IRLDS). 6.3.10.1 Diagnostic Alarms

Emerson E2 — 6.3.10.1 Diagnostic Alarms diagram (page 68)
Fig. 76 · 6.3.10.1 Diagnostic Alarms

Box Temp Fault Chassis temperature is out of range

Bench Temp Fault Sensor temperature is out of range

Manifold Pressure Fault Pressure readings out of range

Figure 6-10 - Compressor Association screen

RS-485 Fault Communication Error

6.3.12 XM Series of Case Controllers

Loop Fault Current loop is open

Config. Fault No zones are enabled

Zero Filter Fault Charcoal filter needs repl.

The XM series is a set of digitalcase controllers for low to medium units. The XM series control refrigeration sole noids and defrost (electric or hot gas), evaporator fans, lights and have an auxiliary output. These devices are available on E2 version 3.02 and above. 6.3.12.1 XM670

Gain Set Fault Gain setting is out of range

A2D Fault A/D converter is not working

Zone Flow Fault No flow during sample cycle

Purge Flow Fault No flow during purge cycle

Over Range Fault Conc. above measurable range

The XM670 is high level microprocessor based con trollers for multiplexed cabinets suitable for applications on medium or low temperature. It can be inserted in a LAN of up to 8 different sections which can operate, depending on the programming, as stand alone controllers or following the commands coming from the other sec tions. The XM670 is provided with 6 relay outputs to con trol the solenoid valve, defrost (which can be either electrical or hot gas) the evaporator fans, the lights, an auxiliary output and an alarm output. The devices are also provided with four probe inputs, one for temperature con trol, one to control the defrost end temperature of the evaporator, the third for the display, and the fourth can be used for application with virtual probe or for inlet/outlet air temperature measurement. Finally, the XM670 is equipped with the three digital inputs (free contact) and are fully configurable. 6.3.12.2 XM679

Zero Range Fault Sensor voltage outside limits

Clipping Fault Sensor output voltage too high

Table 6-7 -Diagnostic Alarm Outputs

6.3.11 Copeland Scroll — K5 Refrigeration Compressor

The Copeland Scroll — K5 Refrigeration Compressor (Lrg Ref Scroll) application can monitor large type com pressors using the MODBUS network on E2 versions 3.02 and above. The Copeland Scroll — K5 Refrigeration Compressor is supported on E2 CX-400, CX-100 and above. The E2 monitors and records compressor informa tion, configuration setup, status display, and alarm han dling. The Copeland Scroll — K5 Refrigeration Compressor will be associated with the suction group from the Compressor Association screen. The scroll can be associated by pressing - Controller Associa tions then - Compressor.

The XM679 is similar to the XM670, but with one relay output to drive pulsed electronic expansion valves. The XM679 also contains two probes that are dedicated for superheat measurement and regulation. 6.3.12.3 XM678

The XM678 is similar to the XM670, but with one stepper valve output to drive an electronic expansion valve. The XM678 also contains two probes that are dedi cated for superheat measurement and regulation.

Diagnostic Alarm Descriptions

Page 69 of the Emerson E2 user manual — 6.4.2 BACnet Communication
Page 69 · click to enlarge
Page 69

6.4 BACnet

Emerson E2 — 6.4 BACnet diagram (page 69)
Fig. 77 · 6.4 BACnet

BACnet is a communications protocol for building automation and control networks available for E2 versions 4.02 and above. Any of the three serial ports (COM2, COM4, and COM6) can be used to communicate with devices over BACnet. E2 supports BACnet devices that communicate using MS/TP and IP. 6.4.1 BACnet Overview

BACnet is defined by three basic concepts:

  • Object - The general reference to sensors, actua tors, and other functional elements that make up a BACnet device. The objects fall into categories specified by BACnet protocol. Analog Input object and Analog Output object are two of the most com monly used objects. BACnet devices are defined on the network as a collection of “objects”.

Figure 6-11 - BACnet Objects

6.4.2 BACnet Communication

  • Object Property – Each object has several proper ties required by BACnet protocol. The most com monly used property is Present Value. Other common properties include reliability and status flags. Optional properties for objects such as analog input include minimum and maximum range, high and low limits, etc.

BACnet supports MS/TP or IP based communication. 6.4.2.1 Master Slave Token Passing

Master Slave Token Passing or MS/TP is the protocol used over RS-485 for BACnet. Each device on the link is considered the “master” when it has the token. If it does not have immediate need to use the token, it is required to pass the token along to the next device. All devices on the link that do not currently have the token are regarded as slaves, and are expected to listen to any messages the cur rent master may have for it. Because some devices take turns being master, the link is effectively peer to peer (not all MS/TP devices can be master).

  • Services – Along with the definition of objects, BACnet protocol defines “services”. These include object access services, alarm and event services, file access services, and a few more. Object access services are the most commonly used since these provide the fundamental “read/write” access to object properties.

It is possible for a device to be a constant slave, though it is uncommon, because in this case a device cannot send such request as I-Am, notifications, etc.

Data inside a BACnet device is organized as a series of objects. Each object has a type and a set of properties. There is always at least one object in a device – it is used to represent the device itself. This is called the Device Object. The other objects represent the device’s data.

MS/TP devices differentiate themselves with a MAC address. MAC addresses are unique identifiers set per device and must be unique on the MS/TP line.

It should be noted that MS/TP BACnet devices do not use their unique identifier for accessing them. Instead, a second identifier called a Device ID is used. This is because BACnet traffic can be routed across IP or MS/TP (i.e., the physical layer is different). The Device ID has a much larger addressable range.

MS/TP requires only the baud rate to be specified and consistent. All other line disciplines are specified by the standard and are therefore not configurable. MS/TP also requires that the E2 to have a MAC address. This is con figurable per MS/TP route (serial port).

BACnet The RS485 Network and Hardware Setup • 6-13

Page 70 of the Emerson E2 user manual — 4. Press to return to the Network Setup
Page 70 · click to enlarge
Page 70

6.4.2.2 BACnet IP (Internet Protocol)

The E2 also supports connecting to devices through IP (Internet Protocol). The device ID is used to identify the devices. 6.4.2.3 Discovery

Emerson E2 — 6.4.2.2 BACnet IP (Internet Protocol) diagram (page 70)
Fig. 78 · 6.4.2.2 BACnet IP (Internet Protocol)

BACnet supports discovery of the devices on a net work and interrogation of the devices so they report what data objects they contain and what properties each object supports. 6.4.2.4 Client-Server

To describe which role the device plays during com munication we will use the term: client-server. The client is the side that actively initiates the request. The server is the side that passively responds to the client reply. BACnet devices can act both as client and server.

Figure 6-12 - BACnet Tab

Most simple MS/TP and IP devices are passive serv ers. They wait passively for a system to poll them for data and only then do the devices respond. The E2 will mostly be an active client (although it does have to support some server aspects). 6.4.3 MS/TP Network Connection to E2

  • Object ID - This is the ID used by the E2 when participating on a BACnet network. The E2 sup ports only the Device Object.
  • Max Master - This is the highest number of MS/TP MAC addresses that will be searched for on an MS/TP network. This number must be higher than the controller with the highest MS/TP MAC address. Lowering this number will improve throughput of data from the E2.

Before setting up a BACnet, the port on the E2 that has the MODBUS cable connected must be set up as a MOD BUS port.

  • ADPU timeout - This is the length of time that the E2 will wait for a response from a controller.
1. Log in to the E2 with Level 4 access.
2. Press followed by - General Controller Info .
  • ADPU retries - This is the number of times the E2 will attempt to communicate to a controller before attempting another message. 6.4.3.1 Add and Connect a BACnet Device
3. Press + to open the Serial tab of the Gen eral Controller Info setup screens.
4. This screen will have a “Connection” field for all COM ports on the E2. Highlight the COM port and choose which route it represents such as “BACnet MSTP-1”.

To enable communications between E2 and the BAC net, the devices must be added and addressed in E2.

1. Log in to the E2 with Level 4 access.
5. Input the MAC address in the MSTP MAC field that the E2 will use for the COM port connection.
2. Press - Connected I/O Boards and Controllers .
6. Under the BACnet tab, several parameters can be changed on the device object.
3. On the Third Party tab, enter the number of BACnet devices in the BACnet number field.

To commission the device:

4. Press to return to the Network Setup

menu, then select - Network Summary.

Page 71 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 71 · click to enlarge
Page 71
5. Locate the device you added to the network list (press and to scroll through the list) and highlight with the cursor. Press for Com missioning.
Emerson E2 — 6.4.2.2 BACnet IP (Internet Protocol) diagram (page 71)
Fig. 79 · 6.4.2.2 BACnet IP (Internet Protocol)

Figure 6-13 - Commissioning Screen

If there is more than one route, select which route the device is on. The route may be MS/TP or IP.

6. If this is the first commission after a reboot of the E2 (or a new BACnet route is created), the E2 will display a “search dialog” showing the E2 is searching for BACnet devices on that route.
7. The E2 will present a list of device IDs for a set of devices found during the scan when the search is complete. Choose which device (and subse quent device ID) to associate with that E2 BAC net application.
8. The same list will appear for subsequent commis sioning to associate new devices quickly.

A rescan is needed if a new BACnet device is con nected on the route. Initiate the scan by pressing - Rescan.

BACnet The RS485 Network and Hardware Setup • 6-15

Page 72 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 72 · click to enlarge
Page 72
Emerson E2 — 6.4.2.2 BACnet IP (Internet Protocol) diagram (page 72)
Fig. 80 · 6.4.2.2 BACnet IP (Internet Protocol)
Page 73 of the Emerson E2 user manual — YELLOW
Page 73 · click to enlarge
Page 73

MULTIFLEX COMBINATION I/O BOARD

INSTALLATION GUIDE

MULTIFLEX BOARD

Connect board to the RS485 I/O Network.

2. Set the network address on the first five rockers of dip switch S3 for the 16AI, and S4 for the 8RO sections of the MultiFlex.
3. Set the network address on rockers 6-8 on S4 for the 4AO or 8DO sections of the MultiFlex if applicable (88AO and 168AO have a 4AO section). The 168DO has an 8DO section.
4. Set the network baud rate using rockers 6 and 7 of dip switch S3. For 9600 baud, set #6 UP and #7 DOWN. For 19200 baud, set #6 DOWN and #7 UP.
5. Set RS485 termination jumpers OUT (term) if at either end of a daisy chain. Otherwise, set jumpers IN (no term).

If replacing an old 8IO or 16AI, use MultiFlex input adapters (P/N 335-2301) to plug input connectors from old board into the MultiFlex input sockets. One for inputs 1-4, and one for inputs 5-8. Otherwise, polarity-sensitive inputs will have to be rewired. (No adapter is needed for inputs 9-16.)

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

7. Connect board to power transformer. If a center tap is present, use the center tap! Instead, connect 0V terminal to a separate Earth ground. DO NOT

S4

S3

S2

S1

+12V

+5V

+5V

+5V

0v SIG INPUT 1

0v SIG INPUT 13 0v SIG INPUT 2

0v SIG INPUT 16 0v SIG INPUT 14 0v SIG INPUT 3

0v SIG INPUT 4

0v SIG INPUT 7 0v SIG INPUT 5

0v SIG INPUT 6

0v SIG INPUT 9 0v SIG INPUT 8

0v SIG INPUT 11 0v SIG INPUT 10

0v SIG INPUT 12

0v SIG INPUT 15

2 3 4 5 6 7 8 1 S3: INPUT (16AI)

2 3 4 5 6 7 8 1 S4: RELAY (8RO)

SHIELDED TWISTED PAIR BELDEN #8761. FOR PLENUM, USE BELDEN #82761 OR #88761 OR EQUIV.

ADDRESS

ADDRESS

BOARD 1 BOARD 2 BOARD 3 BOARD 4 BOARD 5 BOARD 6 BOARD 7 BOARD 8

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

BOARD 9 BOARD 10 BOARD 11 BOARD 12 BOARD 13 BOARD 14 BOARD 15 BOARD 16

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

BOARD 17 BOARD 18 BOARD 19 BOARD 20

BOARD 21 BOARD 22 BOARD 23

BOARD 24

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

BOARD 25 BOARD 26 BOARD 27 BOARD 28 BOARD 29

2 3 4 5 6 7 8 1 ON BOARD 30 BOARD 31

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

S4ANALOG (4AO) ADDRESS (or 8DO ADDRESS OF THE 168DO BOARD)

2 3 4 5 6 7 8 1

2 3 4 5 6 7 8 1 S3: BAUD RATE

BOARD 1 BOARD 2 BOARD 3

BOARD 4

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

WIRE + to + (same color) WIRE 0V to 0V WIRE - to - (same color)

BOARD 5 BOARD 6

BOARD 7

2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

19200 BAUD 9600 BAUD

OUT IN

JP2

JP2

PLUG INPUT CONNECTOR

PLUG CABLE CONNECTOR INTO MULTIFLEX 16 INPUT SOCKET

JP3

JP3

FROM 16AI

JP4

JP4

INTO THIS

END

NO TERMINATION TERMINATION

MULTIFLEX INPUT ADAPTER

P/N 335-2301

Acceptable CPC Transformers:

  • P/N 640-0041, 120VAC Primary, 50VA
  • P/N 640-0050, 120VAC Primary, 75VA

YELLOW

0V 24 VAC

  • P/N 640-0042, 220VAC Primary, 50VA

120/208/240 VAC

  • P/N 640-0080, Multi-tap 120/208/240VAC Primary, 80VA

YELLOW

24 VAC

  • P/N 640-0056, Multi-tap 120/208/240VAC Primary, 56VA

BACnet The RS485 Network and Hardware Setup • 6-17

Show 8 more labels / short text on this page
# 1 · # 4 · # 2 · # 3 · # 3 · # 2 · # 4 · # 1
Page 74 of the Emerson E2 user manual — (HOT)
Page 74 · click to enlarge
Page 74

1. Connect the 4AO board to the RS485 I/O Network. 2. Set the network address on the first five rockers of dip switch S1. 3. Set the network baud rate using rockers 6 and 7 of dip switch S1. 4. If the E2 is the beginning of all RS-485 I/O or MODBUS Networks, set all three jumpersto the UP position. For MODBUS, set thejumpers in the top-most position (MOD). ForI/O Net, set the jumpers in the middle position(I/O). For no termination, set the jumpers tothe DOWN position (NO). 5. Optionally, connect the 4-20mA outputs in either a 2-wire or 4-wire hookup as illustrated in Step 5, or if a 4-20mA is not used, it may be left unconnected. 6. Connect board to the 24VAC secondary of the power transformer.

V IN

15-K

+ V OUT

15-K

BAUD RATE

SHIELDED TWISTED PAIR BELDEN #8761. FOR PLENUM, USE BELDEN #82761 OR #88761 OR EQUIV.

I/O NET

WIRE + to + (same color) WIRE 0V to 0V WIRE - to - (same color)

MOD

MOD

I/O NO

I/O NO

MOD

I/O NO

NOT TERMINATED TERMINATED

TERMINATED FOR MODBUS NET

FOR I/O NET

“4-wire” 4-20mA (Internally Powered) Hookup example. (Not Isolated) +12V +4-20 4-20 OUT 0V _+ 250 ohms

“2-wire” 4-20mA (Externally Powered) Hookup example. (Isolated)

+12V +4-20 4-20 OUT 0V

Three-conductor non-shielded cables are the recommended wire for connecting between the center-tapped transformer and I/O boards. Power Wiring Types: 14 AWG Belden 9495 18 AWG Belden 9493

120/208/240 VAC

WIRING FOR 640-0056, 56VA Transformer,

AC1

and 640-0080, 80VA Transformer 24VAC Center-Tapped Transformer

(HOT)

(NEUTRAL)

AC2

AC1

AC2

240 208 C

24V CT 24V

PRIMARY SIDE

SECONDARY SIDE

Show 17 more labels / short text on this page
center-tapped · + · [ [ [ · [ [ [ · [ [ [ · (Term) (Term) · 4-20mA Analog Output · 4-20mA Analog Output · + · Jumper · Not Used · _ · + · _ · Not Used · 250 ohms · Grounded
Page 75 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 75 · click to enlarge
Page 75
Emerson E2 — 6.4.2.2 BACnet IP (Internet Protocol) diagram (page 75)
Fig. 81 · 6.4.2.2 BACnet IP (Internet Protocol)

BACnet The RS485 Network and Hardware Setup • 6-19

Page 76 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 76 · click to enlarge
Page 76
Emerson E2 — 6.4.2.2 BACnet IP (Internet Protocol) diagram (page 76)
Fig. 82 · 6.4.2.2 BACnet IP (Internet Protocol)
5. If the E2 is the beginning of all RS-485 I/Oor MODBUS Networks, set all three jumpersto the UP position. For MODBUS, set thejumpers in the top-most position (MOD). ForI/O Net, set the jumpers in the middle position(I/O). For no termination, set the jumpers tothe DOWN position (NO).

SHIELDED TWISTED PAIR BELDEN #8761. FOR PLENUM, USE BELDEN #82761 OR #88761 OR EQUIV.

WIRE + to + (same color) WIRE 0V to 0V WIRE - to - (same color)

  • P/N 640-0041, 120VAC Primary, 50VA
  • P/N 640-0050, 120VAC Primary, 75VA
Page 77 of the Emerson E2 user manual — DAISY CHAIN CONFIGURATION
Page 77 · click to enlarge
Page 77

16AI INSTALLATION GUIDE

1 1. 2. Connect 16A1 to the RS485 I/O Network. 3. Set the network address on the first five rockers of dip switch S3. 4. Set the network baud rate using rockers 6 and 7 of dip switch S3.

Connect board to power transformer.

5. If the E2 is the beginning of all RS-485 I/O or MODBUS Networks, set all three jumpers to the UP position. For MODBUS, set the jumpers in the top-most position (MOD). For I/O Net, set the jumpers in the middle position(I/O). For no termination, set the jumpers tothe DOWN position (NO).
6. If you change any dip switch settings while the board is powered, disconnect the power and re-power the board to reset.

1 WIRING FOR 640-0056, Three Board Xformer,

and 640-0080, Five Board Xformer WIRING FOR 640-0048, Ten Board Xformer

120/208/240 VAC

(NEUTRAL)

BLUE

BROWN

(HOT)

PINOUT

AC1

AC2

AC1

AC1

240 208 C

120 VAC

208/230 VAC

24V CT 24V

AC2

AC2

24 VAC OUTPUT CENTER TAP

24 VAC OUTPUT CENTER TAP

PRIMARY SIDE SECONDARY SIDE

FOR 120 VAC POWER SOURCE

FOR 208/230 VAC POWER SOURCE

2 SHIELDED TWISTED PAIR BELDEN #8761 OR EQUIV.

ADDRESS 4 2

BAUD RATE

TO OTHER

RS485 DEVICES

BOARD 1 BOARD 2 BOARD 3 BOARD 4

ON

2 3 4 5 6 7 8 1 ON 2

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 5 BOARD 6 BOARD 7 BOARD 8

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

TO OTHER RS485 DEVICES

BOARD 9 BOARD 10 BOARD 11 BOARD 12

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

WIRE + to + WIRE 0V to 0V WIRE - to -

BOARD 13 BOARD 14 BOARD 15 BOARD 16

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

DAISY CHAIN CONFIGURATION

MOD

SET TERMINATING JUMPERS:

MOD

MOD

I/O NO

I/O NO

I/O NO

NOT TERMINATED TERMINATED

TERMINATED FOR MODBUS NET

FOR I/O NET

UP DOWN DOWN UP

BACnet The RS485 Network and Hardware Setup • 6-21

Show 5 more labels / short text on this page
9600 baud · 19200 baud · [ [ [ · [ [ [ · [ [ [
Page 78 of the Emerson E2 user manual — SECONDARY SIDE
Page 78 · click to enlarge
Page 78

MultiFlex ESR INSTALLATION GUIDE

POWER

1. Connect the MultiFlex ESR to the I/O Network.

VALVE 1 VALVE 2 VALVE 3 VALVE 7 VALVE 4 VALVE 5 VALVE 6 VALVE 8

AC2 AC1 GND

2. Set the network address on the first five rockers of the dip switch (labeled S1) on the MultiFlex ESR board. 3. Set the network baud rate using rockers 6 and 7.
4. If the E2 is the beginning of all RS-485 I/O or MODBUS Networks, set all three jumpers to the UP position. For MODBUS, set the jumpers in the top-most position (MOD). ForI/O Net, set the jumpers in the middle position(I/O). For no termination, set the jumpers tothe DOWN position (NO).

I/O NET

5. Wire each stepper valve by connecting the stepper valve harness to one of the eight connectors along the top of the board.

JP2 JP3 JP4

S1

6. Connect the MultiFlex ESR to a Class 2, 80VA 24VAC power transformer. (One MultiFlex ESR board per transformer.) For more information on transformer wiring, refer to the MultiFlex ESR manual ( ).

NETWORK 2

P/N 026-1720

Set the network address using the first 5 rockers of dip switch S1. Valid address range 1-31.

SHIELDED TWISTED PAIR BELDEN #8761. FOR PLENUM, USE BELDEN #82761, 88761, OR EQUIV.

S1

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 1 BOARD 2 BOARD 3 BOARD 4

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 5 BOARD 6 BOARD 7 BOARD 8

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

I/O NET

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 9 BOARD 10 BOARD 11 BOARD 12

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 13 BOARD 14 BOARD 15 BOARD 16

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 17 BOARD 18 BOARD 19 BOARD 20

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 21 BOARD 22 BOARD 23

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

BOARD 24

BOARD 25 BOARD 26 BOARD 27 BOARD 28

2 3 4 5 6 7 8 1 ON BOARD 30 BOARD 31

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

BOARD 29

2 3 4 5 6 7 8 1 ON

WIRE + to + (same color) WIRE SHIELD TO CENTER PIN WIRE - to - (same color)

RS485 I/O NET

MOD

I/O NO

MOD

I/O NO

MOD

I/O NO

NOT TERMINATED TERMINATED

TERMINATED FOR MODBUS NET

FOR I/O NET

Valve 1 connector enlarged to show harness wire color orientation:

Use the cable harnesses that are supplied with the valves. (A valve cable harness may not be longer than 150 feet)

(Match wire colors to silk screen legend on valve connectors)

Wire color legend silk screened on each valve connector (8)

ECT Flow ESR 12 or ESR 20 Valve

For Sporlan valves match all wire colors the green wire. Instead, connect the green wire to the silk screen blue wire legend.

Valve connectors on the MultiFlex ESR board (1-8)

BLU R BLK W

VALVE 4 VALVE 5 VALVE 6 VALVE 7 VALVE 8 VALVE 3 VALVE 2

GND 6

120/208/240 VAC

WIRING FOR 640-0080, 80VA, 24VAC Center-Tapped Transformer

(NEUTRAL)

AC1

(HOT)

AC2

Three-conductor non-shielded cables are the recommended wire for connecting between the center-tapped transformer and MultiFlex ESR boards.

AC1

GND

AC2

Earth ground the GND (center-tapped) terminal of each board

240 208 C

24V CT 24V

Power Wiring Types14 AWG Belden 9495 18 AWG Belden 9493 PRIMARY SIDE

SECONDARY SIDE

Show 8 more labels / short text on this page
center-tapped · +485 · [ [ [ · [ [ [ · [ [ [ · Stepper valve harness · except · 24VAC Center-Tapped
Page 79 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 79 · click to enlarge
Page 79
Emerson E2 — 6.4.2.2 BACnet IP (Internet Protocol) diagram (page 79)
Fig. 83 · 6.4.2.2 BACnet IP (Internet Protocol)

BACnet The RS485 Network and Hardware Setup • 6-23

Page 80 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 80 · click to enlarge
Page 80
Emerson E2 — 6.4.2.2 BACnet IP (Internet Protocol) diagram (page 80)
Fig. 84 · 6.4.2.2 BACnet IP (Internet Protocol)
Page 81 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 81 · click to enlarge
Page 81
Page 81 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 82 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 82 · click to enlarge
Page 82
Page 82 of the Emerson E2 user manual — 6.4.2.2 BACnet IP (Internet Protocol)
Page 83 of the Emerson E2 user manual — Specifications
Page 83 · click to enlarge
Page 83

7 E2 Ethernet Peer Communications

Communication between E2 controller version 2.10 or greater may now be implemented through an Ethernet net work using TCP/IP protocol. To utilize peer connections over Ethernet, the following tasks must be performed:

7.2.1 Components

  • Upgrade the E2 controller firmware to version 2.10 or greater.

Ethernet Five- or Nine-port Switch (may require an additional power supply)

* Industrial grade * Operating/storage temp range: -40°F to 185°F * Vibration: IEC68-2-6 * RH: 5 to 95% * UL 508A, CE approved * Supports 10Base-T crossover cable * Supports all IEEE 802.3 proto col * Supports Auto Crossover MDI/MDI-X * Screw-terminal power connec tors

  • Install an industry-standard Ethernet switch(es) or hub(s) in an area or areas nearby the E2 controllers.
  • Install Ethernet straight-through cabling at the site from each E2 to the switch or hub. Installation of RJ-45 connectors may be necessary to achieve this goal. The recommended cabling is CAT 5.

7.1 Ethernet IP Configurations

If using an open network configuration (see Section 7.4.2, Open Network Layout), contact your IT Network Administrator for all IP configuration information (IP Address, Subnet Mask, Primary and Default Gateway set tings).

Ethernet Surge and Lightning Protector (recom mended)

* Industrial grade * Surge capacity: 1 kA / line *Operating temp range: -40°F to 185°F *Max frequency: 155 MHz *Clamp and rated: 10V and 5V

7.2 Hardware

Room Temperature (0 to 50 C) P/N 570-0100

Specifications

Extended Temperature (-40 to 65 C) P/N 570-0200

Standard industry-accepted practices for wiring of Ethernet networks are expected. E2 controllers use a star topology, identical to PC deployment. This includes a unique “point-to-point” run from a switch or hub to the controller (see Table 7-1 for hub part numbers for order ing). This is done with Category5 (or better) cable. Maxi mum distance for a run of 10BaseT is 328 feet (100 meters) (11.5 dB loss max).

Table 7-1 - Equipment for E2 Ethernet Peer Communications

  • The maximum number of controllers allowed on an IP subnet is 20. All E2 controllers that must com municate with each other must be on the same sub net.
  • Recommended Ethernet cabling is CAT 5 (straightthrough cable).
  • 328 feet (100 meters) is the maximum distance allowed between devices before a switch or hub must be added.

Ethernet IP Configurations E2 Ethernet Peer Communications • 7-1

Equipment Type Specifications · 10-Base-T/100- Base-TX Hub · 10-Base-T/100- Base-TX Hub

Page 84 of the Emerson E2 user manual — 7.4.1 Closed Network Layout
Page 84 · click to enlarge
Page 84

7.3 Software Specifications

TCP/IP

E2 controller versions 2.10 and later communicate between controllers using the TCP/IP protocol. TCP Port 7238 is the default for connections established between the controllers. All peer communications occur over this port.

7.4.1 Closed Network Layout

7.4 Ethernet Network Layouts

Emerson E2 — 7.4.1 Closed Network Layout diagram (page 84)
Fig. 85 · 7.4.1 Closed Network Layout

The two types of network options for E2 controllers using Ethernet communications are:

1. “Closed Network” - E2 devices are not connected to a store’s LAN. (The only devices on the net work are the E2 controllers themselves.) This network type is used if there is no need to inte grate the network into the company’s intranet.
2. “Open Network” - E2 devices are connected to the store’s LAN. (Devices on the network include E2s and other Ethernet-TCP/IP devices.) This network type is used if the network will be con nected to the store’s LAN.

Figure 7-1 - Closed Network Layout

The E2 peer Ethernet network facilitates communica tions between E2 controllers. These include at least the following:

  • Routing of messages between external entities such as UltraSite, InSite, Site Manager, and non-gateway E2 controllers.
  • Distribution of global data and other network variables such as system time, controller iden tification, etc.
  • Communication between E2 controller applica tions such as Remote Login and Remote File Services.
Page 85 of the Emerson E2 user manual — 7.5 Software Setup
Page 85 · click to enlarge
Page 85

7.4.2 Open Network Layout

Emerson E2 — 7.4.2 Open Network Layout diagram (page 85)
Fig. 86 · 7.4.2 Open Network Layout
Emerson E2 — 7.4.2 Open Network Layout diagram (page 85)
Fig. 87 · 7.4.2 Open Network Layout

Figure 7-3 - TCP/IP Setup Screen

3. Tab over to the Peer Netwrk tab:
Emerson E2 — 7.4.2 Open Network Layout diagram (page 85)
Fig. 88 · 7.4.2 Open Network Layout

Figure 7-2 - Open Network Layout

7.5 Software Setup

1. Log on to the E2 controller
2. Navigate to the TCP/IP setup screen ( Alt + T )

NOTE: DHCP does not have to be enabled if you have the IP Address, Subnet Mask, and Primary Gateway settings. (Contact your IT Network Administrator for all IP configuration infor mation.) If you do not have the IP configuration set tings, and there is a DHCP server on the network, set DHCP Enabled to Yes and it will retrieve the informa tion from the server and populate those fields. E2 con trollers must all have the same Ethernet Subnet in order to communicate box-to-box.

Figure 7-4 - Peer Network Tab - Set Network Type

4. Change Network Type to: Ethernet (ETH) and press Enter. The Group Name field is now visi ble.
5. Once the Ethernet network type is enabled, enter a unique site name in the Group Name field.

Software Setup E2 Ethernet Peer Communications • 7-3

Page 86 of the Emerson E2 user manual — 7.6 Troubleshooting
Page 86 · click to enlarge
Page 86
Emerson E2 — 7.6 Troubleshooting diagram (page 86)
Fig. 89 · 7.6 Troubleshooting

Figure 7-5 - Peer Network Tab - Set Group Name

All controllers that you would like to appear in this group must all have the same group name and must be using the same network type.

7.6 Troubleshooting

Network troubleshooting is outside the scope of this section (Section 7, E2 Ethernet Peer Communications). Consult your IT Network Administrator for any additional information needed.

Page 87 of the Emerson E2 user manual — 8.3 Echelon Network Structuring (Daisy-Chains)
Page 87 · click to enlarge
Page 87

8 Echelon Network and Hardware Setup

8.1 Overview

Echelon is an optional, two-conductor network that interconnects E2s and other associated devices, such as CC-100 case controllers, TD3 temperature displays, and ESR8 evaporator stepper regulator boards. All Echelon devices are wired together using the daisy-chain method of network structuring. If an Echelon network-enabled E2 is required, it must be specifically ordered from Emerson Retail Solutions as an Echelon-enabled E2, and equipped with an Echelon plug-in card. See Section 4.3.1, Echelon Plug-In Card Kit (P/N 638-4860).

8.2 Wiring Type

Emerson Retail Solutions specifies one type of cable for Echelon Network wiring. This cable type’s properties are listed in Table 8-1.

Cable Type Level 4, twisted pair, stranded, shielded

Wire Diam./AWG 0.65mm/22AWG

Table 8-1 - Echelon Network Cable Specifications

Cable Type Emerson Retail Solutions Part

1 pair, non-plenum 135-2300

1 pair, plenum 135-2301

Table 8-2 - Recommended Wiring

8.3 Echelon Network Structuring (Daisy-Chains)

all chains are connected so that the entire network forms a large unbroken chain, called a daisy chain (see Figure 8-2). This allows for all devices in the Eche lon Network to be hard wired together for trouble free communication.

Echelon devices are networked together into configu rations called segments. A segment is a group of up to 64 Echelon devices that are connected together on an unbro ken series of wires.

The recommended way of constructing an Echelon Network is called daisy-chaining. In the daisy-chain net work configuration, devices are arranged by subnets, which consist of one E2 and all Echelon devices associ ated with the E2.

First, all devices in a subnet are connected in an unbro ken chain without branches or “star configurations” (see Figure 8-1). Then, if more than one E2 is present on-site,

Overview Echelon Network and Hardware Setup • 8-1

Loop Resistance 106(ohms/km) · Capacitance 49(nF/km) · Number

Page 88 of the Emerson E2 user manual — 8.3.1 Maximum Number of Echelon Devices
Page 88 · click to enlarge
Page 88

multiple routers can be used to extend the network indefi nitely.

Emerson E2 — 8.3.1 Maximum Number of Echelon Devices diagram (page 88)
Fig. 90 · 8.3.1 Maximum Number of Echelon Devices

More information about routers and how they are used in a daisy-chain Echelon Network can be found in the Router and Repeater Installation Guide (P/N 026-1605).

8.4 Device Termination

In a daisy-chain configuration, both ends of the net work segment must be terminated. Terminate the E2 by setting jumper J2 to the UP position, as shown in Figure 8-3. Other devices on the Echelon Network are terminated either by jumpers on the control board or by connecting a 102-ohm “terminator block” at the end of the network seg ment (see Section 8.4.1, Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chain). Refer to the installation guide references at the end of this section for specific device termination instructions.

All other E2s and Echelon devices that aren’t at the end of a daisy-chained network segment must be untermi nated.

Figure 8-1 - Echelon Wiring - Subnets

If a router or repeater is being used in a network, termi nation becomes more complicated, because routers and repeaters join multiple daisy-chain segments together. Refer to the Router and Repeater Installation Guide (P/N 026-1605), for specific termination instructions.

Emerson E2 — 8.4 Device Termination diagram (page 88)
Fig. 91 · 8.4 Device Termination
Emerson E2 — 8.4 Device Termination diagram (page 88)
Fig. 92 · 8.4 Device Termination

Figure 8-2 - Echelon Wiring, pt. 2

8.3.1 Maximum Number of Echelon Devices

A daisy-chained segment may contain no more than 63 total Echelon devices (also called "nodes"). If there are 64 or more Echelon devices at your site, an Echelon-compati ble router (P/N 572-4200) will be required. A router placed on the Echelon Network allows you to add another 63-node daisy-chain network. For larger installations,

Figure 8-3 - E2 Termination - Daisy Chain

Page 89 of the Emerson E2 user manual — 8.5 Wire Restrictions
Page 89 · click to enlarge
Page 89

8.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chain

a maximum of 63 more nodes.

Repeaters boost signal strength and are only used in instances where a segment of 63 nodes or less uses more than 4592 feet of Echelon cable.

Some Echelon Network devices, notably TD3s, have no on-board means of terminating. For some other devices, it is inconvenient to use the jumpers supplied for termination (the CC-100/CS-100 case controllers, for example, require the enclosure to be removed to set the jumper).

Refer to the Router and Repeater Installation Guide (P/N 026-1605), for information about router and repeater placement.

8.6 Installing Echelon Devices

To remedy these problems, Emerson Retail Solutions supplies termination blocks that can be wired to the end of an Echelon cable segment. This termination block uses the same three-pin connector as all other Echelon devices. Wire the two signal wires to the outside terminals, and connect the shield to the middle terminal (see Figure 8-4).

The E2 control system has several types of peripheral control boards that communicate using the Echelon Net work: the 16AIe analog input board, the 8ROe relay out put board, the CC-100/CS-100 series of case control and case circuit control boards, and the ESR8 board. 8.6.1 Powering Echelon Devices

Emerson E2 — 8.6 Installing Echelon Devices diagram (page 89)
Fig. 93 · 8.6 Installing Echelon Devices
Emerson E2 — 8.6 Installing Echelon Devices diagram (page 89)
Fig. 94 · 8.6 Installing Echelon Devices

All Echelon devices require 24VAC Class 2 power. Emerson Retail Solutions specs several sizes of transform ers to accommodate the full range of Emerson Retail Solu tions’ Echelon-compatible products. Table 8-3 lists each transformer’s part number and rating.

Emerson E2 — 8.6 Installing Echelon Devices diagram (page 89)
Fig. 95 · 8.6 Installing Echelon Devices

Figure 8-4 - Placement and Wiring of the Termination Block

8.5 Wire Restrictions

Table 8-3 - Class 2 Transformers for Echelon Devices

Maximum Total Segment Length

The total amount of wire used to connect all E2s and associated controllers in a single segment (not including devices on the other side of routers) cannot be longer than 4592 feet (1400 meters). If the total length of cable used is longer than 4592 feet, a repeater or router will be required.

To select a power transformer for one or more Echelon devices:

1. Determine what the total VA is for the boards and controllers that will be powered by the transformer (see Table 8-4 ) .

Routers act as communication gateways that reduce the amount of network traffic. They are used when net works exceed their 63-node limit. Adding a router allows you to add another daisy-chain segment of 4592 feet with

Example: Two TD3 boards (4 VA each), and one E2 (40 VA) board are to be powered by one transformer. The total VA is:

Wire Restrictions Echelon Network and Hardware Setup • 8-3

Page 90 of the Emerson E2 user manual — 1. Select (System Configuration)
Page 90 · click to enlarge
Page 90

2 4VA 1 40VA + 48VA =

2. Use a transformer that has a power rating equal to or higher than the total calculated VA (see Table 8-3 ). Example: Boards totaling 48VA can be connected to either a 50VA or 75VA transformer.

Red (D1) (Reset) ON: The Echelon port is being held in reset or if momentary it means the board has gone through reset

Red (Service) During normal operation this LED should be off. If the Service Pin is pressed, this LED will come on.

Unit amps VA VAC Center tapped?

E2 1.66 40 24 No

ESR8 2.4 75 24 No

If the LED is blinking, the node does not have its Subnet/Node address set. (E2 should set this during the first power -up se quence where the user will be asked in which Subnet to put the controller (E2 will always be Node = 1 on the network).

TD3 0.11 4 24 No

CC-100/

Power supplied by Power Module

CS-100

Table 8-4 - Device Power Requirements

Refer to the installation guides on the next few pages for instructions on how to install these boards on the Eche lon Network.

If the LED is blinking, then try resetting the E2. If this does not correct the problem, replace the Echelon board.

8.7 LEDs

The Echelon Board LEDs can be used to determine the status of normal operating parameters for the board.

ON (no blinking): Replace the Echelon board. The Neuron pro cessor has lost its application program.

Table 8-5 - Echelon LED Status

8.8 Open Echelon Device Connectivity

Open-Echelon E2s must be ordered pre-configured from Emerson Retail Solutions. Open-Echelon licenses must be purchased and enabled on units, and are not trans ferrable to other units without assistance from Emerson Retail Solutions. Call 770-425-2724 for technical assis tance or your sales representative. Your sales representa tive will know which devices your unit will connect to. 8.8.1 Configuring Echelon Devices

Login to the controller and enter the desired number of Echelon devices to be added in the Connected I/O screen. From the Main Menu:

1. Select (System Configuration)

2. Select (Network Setup)

3. Select (Connected I/O Boards and Control

Echelon Board Status

Page 91 of the Emerson E2 user manual — Network setup menu and select (Controller Setup). Or, from the Main Menu:
Page 91 · click to enlarge
Page 91

Highlight the LonMark device on the screen you wish to commission and follow the steps in Section 10.14.2, Commissioning a Device to commission the device. 8.8.1.1 Troubleshooting

Enter the number of Echelon devices you wish to add on the Connected I/O screen:

After commissioning has been completed, check to make sure the device has been added successfully. From

Emerson E2 — 8.8.1.1 Troubleshooting diagram (page 91)
Fig. 96 · 8.8.1.1 Troubleshooting

the Main Menu, select (Configured Applications) to open the Configured Applications list. If the device you have commissioned does not appear in this list, the Description File has failed to upload correctly onto the E2. An alarm of No Description File will be generated and can be found in the Alarm Advisory Log. Call Emerson Retail Solutions at 770-425-2724 to contact your sales rep resentative or technical assistance to obtain the Descrip tion File.

Figure 8-5 - Connected/IO Setup Screen (RX Unit Shown)

Navigate to the Open Echelon field under the Third Party Tab section of the Connected I/O setup screen and enter the number of Echelon devices to be added.

Next, commission the Echelon device. Commissioning is done at the Controller Setup screen. If still on the Con nected I/O screen, hit the back button to go back to the

Network setup menu and select (Controller Setup). Or, from the Main Menu:

1. Select (System Configuration)

2. Select (Network Setup)

3. Select (Network Summary)

Commission the device on the Network Summary screen:

Emerson E2 — Network setup menu and select (Controller Setup). Or, from the Main Menu: diagram (page 91)
Fig. 97 · Network setup menu and select (Controller Setup). Or…

Figure 8-6 - Network Summary Screen (RX Unit Shown)

Open Echelon Device Connectivity Echelon Network and Hardware Setup • 8-5

lers)

Page 92 of the Emerson E2 user manual — 8.8.1.1 Troubleshooting
Page 92 · click to enlarge
Page 92
Emerson E2 — 8.8.1.1 Troubleshooting diagram (page 92)
Fig. 98 · 8.8.1.1 Troubleshooting
Page 93 of the Emerson E2 user manual — ECHELON CABLE TYPE
Page 93 · click to enlarge
Page 93
1. Connect the ESR8 to the Echelon Network.
2. Set the termination jumper on the ESR8. For daisy chain configurations, the device will need to be terminated only if at either end of a daisy chain.
3. Wire each Emerson Flow Controls ESR12 or ESR20 valve to one of the four-pin connectors on the ESR8. (Refer to the Emerson Flow Controls Valve Field Wiring Guide.) Use Belden #9418 18AWG or equivalent.
4. Connect the ESR8 to a Class 2, 75 VA 24VAC transformer.
5. Use the Service Button to commission the ESR8. Refer to section 8.14.4 in this manual for more information on commissioning a device. Note that dip switches (S2 & S3) are not implemented.

Emerson Flow Controls Valve Field Wiring Guide

1 2 3 4

Red Blue Black White

A1 A2 B1 B2

To other Einsteins/E2s, or Echelon devices

ECHELON CABLE TYPE

Level IV, 22 AWG, Shielded Max Daisy Chain Length: Feet: 4592 Meters: 1400 P/N 135-2300 Non-Plenum

(1 Pair, 1000 Feet)

(1 Pair, 1000 Feet)

Emerson Flow Controls ESR12 or ESR20 Valve #4

(Refer to the Emerson Flow Controls Valve Field Wiring Guide)

Use cable harness supplied with valve OR use 18AWG wire (no longer than 75 ft.) OR 14AWG wire (no longer than 200 ft.)

Open Echelon Device Connectivity Echelon Network and Hardware Setup • 8-7

Pin# Color Phase · P/N 135-2301 Plenum · Pin 1

Page 94 of the Emerson E2 user manual — 8.8.1.1 Troubleshooting
Page 94 · click to enlarge
Page 94
Emerson E2 — 8.8.1.1 Troubleshooting diagram (page 94)
Fig. 99 · 8.8.1.1 Troubleshooting
Page 95 of the Emerson E2 user manual — 9.1.1 Connecting Sensors to Input Boards
Page 95 · click to enlarge
Page 95

9 Input and Output Setup

9.1 The 16AI, 8IO, and MultiFlex Inputs

“+” terminal.

On the ARTC board, the input and output points are predefined and are labeled accordingly. 9.1.1.2 Sensor Wiring Types

9.1.1 Connecting Sensors to Input Boards

Specific wiring types are required for each type of sen sor used with E2.

There are five I/O Network boards that may accept inputs: the MultiFlex, the 16AI, the ARTC, and the 8IO Combination Input/Output Board. Wiring an input to these boards requires three steps:

All Analog Temperature Sensors and Air Flow Sen sors

Temperature and air flow sensors are to be wired with shielded, 2 conductor, at least 22 GA wire (Belden # 8761 or equivalent).

1. Connect the sensor’s signal wires to the two ter minals of an input point.

All Pressure Transducers, Humidity Sensors, and Refrigeration Transducers

2. Set the input type dip switch that corresponds to the point being connected.

Pressure and refrigeration transducers and humidity sensors are to be wired with shielded, 3 conductor, at least 22 GA wire (Belden #8771 or equivalent).

3. If necessary, connect the power lead of the sensor to one of the 5V or 12V power terminals. 9.1.1.1 Wiring

Dewpoint and Light Level Sensors

These sensors are to be wired with shielded, 4 conduc tor at least 22 GA wire (Belden # 8729 or equivalent). 9.1.1.3 Input Type Dip Switches

An input point connector on a MultiFlex, 16AI, and 16AIe board consists of two terminals, as shown in Figure 9-1. One of these terminals, labeled “SIG”, reads the sig nal from the sensor, while the other, labeled “0v” is where sensor’s ground and/or cable shield wire is connected.

An input type dip switch must be set for each input point. Input type dip switches are located in the switch banks labeled S1 and S2 on the MultiFlex, 16AI, and switch bank S4 on the 8IO.

The input type dip switch tells the input board whether or not the sensor connected to the point requires a DC sup ply voltage in order to operate. If the sensor requires DC voltage, the dip switch should be set to the DOWN posi tion. If the sensor does not require power, or if it uses AC power, the dip switch should be set to the UP position. Dip switches for unused points should be set to the UP posi tion.

Figure 9-1 - Input Board Points

The dip switch positions for each specific sensor type is shown in Figure 9-2.

On a 16AI, terminals are numbered 1-32, starting with the first terminal of point 1 and ending with the last termi nal of point 16. The even-numbered terminals of a 16AI are always where the signal voltages are connected. The sensor grounds and cable shields are connected to the odd- numbered terminals.

8IO and ARTC Boards

On an 8IO board, the two terminals of every point are labeled “-” or “+”. The ground wire is always connected to the “-” terminal, and the signal wire is connected to the

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-1

MultiFlex Boards · 16AI Boards

Page 96 of the Emerson E2 user manual — 9.1.2 Power Connection
Page 96 · click to enlarge
Page 96

9.1.2 Power Connection

Emerson E2 — 9.1.2 Power Connection diagram (page 96)
Fig. 100 · 9.1.2 Power Connection

If power is needed to operate the sensor, several termi nals exist on the 16AI, Multiflex boards, 8IO, that may be used to supply DC power (see Figure 9-3 for 16AI and MultiFlex power connections).

Figure 9-2 - Input Type Dip Switches for MultiFlex 16 and 16AI Boards

Emerson E2 — 9.1.2 Power Connection diagram (page 96)
Fig. 101 · 9.1.2 Power Connection

Figure 9-3 - Input Board Power Sources

Input boards may supply 12VDC or 5VDC. To connect to one of the DC power sources, simply connect the sen sor’s power wire to one of the terminals.

The maximum current that may be drawn from the +12VDC terminal is 100 milliamps. The maximum cur rent that can be drawn from all three +5VDC terminals COMBINED is 50 milliamps.

Specific wiring instructions for each type of sensor are given in Table 9-1 on page 9-3.

Page 97 of the Emerson E2 user manual — 9.1.2 Power Connection
Page 97 · click to enlarge
Page 97

P/N Sensor Input Type Dip Switch Wiring

various Temp Sensors and Probes

Up 1. Connect one lead to the odd numbered terminal and the other lead to the even num bered terminal (polarity insensitive).

various Digital Sensors (Klixons, Sail Switches, etc.)

Up 1. Connect one lead to the odd numbered terminal and the other lead to the even numbered terminal (polarity insensitive).

Pressure Trans ducers (Emer son Retail Solutions) 100, 200, 500 lb. rat ings

1. Connect RED power wire to +5VDC sup ply on input board.
2. Connect WHITE sig nal wire to even num bered terminal.

(0.5-4.5VDC output, 5VDC input voltage)

3. Connect BLACK ground wire to odd numbered terminal.
4. Connect the bare SHIELD wire to odd numbered terminal.

203-5750 Relative Humid ity Sensor

1. Wire the “P” sensor terminal to 12VDC sup ply on board.
2. Wire the “GND” sensor terminal to odd numbered ter minal.
3. Wire the “OUT” sensor terminal to even numbered ter minal.
4. Jumper sensor terminal “N” to sensor terminal “GND”.

Table 9-1 - Sensor Wiring

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-3

Show 5 more labels / short text on this page
800-2100 · Up · 800-2200 · 800-2500 · Down
Page 98 of the Emerson E2 user manual — MULTIFLEX INPUT BOARD (BOTTOM LEFT CORNER SHOWN)
Page 98 · click to enlarge
Page 98

P/N Sensor Input Type Dip Switch Wiring

203-5751 Wall-mounted relative humidity (RH) sensor

Down 1. Use Belden #8771 shielded three-conductor cable or equivalent.

2. Connect the RED, BLACK, and WHITE wires to the screw terminals the sensor’s con nector as shown in Figure 2 . Clip the SHIELD wire.
3. Connect the SHIELD and BLACK wires to the 0V terminal of the input board. Connect the WHITE wire to the SIG terminal of the input board.
4. Connect the RED wire to the +12V power terminal on the input board.
5. Locate the input dip switch for the sensor point, and set to the OFF position (LEFT for MultiFlex, DOWN for 16AI). Refer to the input board’s user manual for locations of the input dip switches.

210-2002 Wall-mounted dewpoint sensor

Down 1. For wiring the sensor to a Emerson Retail Solutions input board, use Belden #8761 shielded two-conductor cable or equivalent.

2. Connect the BLACK and WHITE wires to the screw terminals on the sensor’s connector as shown in Figure 3 (connect BLACK to Signal Ground and WHITE to 0-5V Output). Clip the SHIELD wire.
3. Connect the SHIELD and BLACK wires to the 0V terminal of the input board. Connect the WHITE wire to the SIG terminal of the input board.
4. Connect 24VAC (a separate 120VAC/24VAC transformer must be used P/N 640-0039 ) to the power terminal on the dewpoint sensor back plate using the BLACK and WHITE wires. (This 24VAC transformer must only be used to power this dewpoint sensor. Do not use this transformer to power additional devices.)
5. Locate the input dip switch for the sensor point, and set to the OFF position (LEFT for MultiFlex, DOWN for 16AI). Refer to the input board’s user manual for locations of the input dip switches.

MULTIFLEX INPUT BOARD (BOTTOM LEFT CORNER SHOWN)

WALL-MOUNT DEWPOINT SENSOR

BACK PLATE (FRONT VIEW)

(P/N 640-0039)

24 VAC

BELDEN #8761 OR EQUIVALENT

120 VAC

SHIELD (CLIP)

WHITE

BLACK

SHIELD

BLACK

WHITE

8 7 6 5 4 3 2 1 1 2

206-0002 Light Level Down

1. Wire GREEN ground wire to odd numbered terminal.
2. Wire YELLOW and RED signal wires to even num bered terminal.
3. Wire the POWER wire to a +12VDC source on input board.

Table 9-1 - Sensor Wiring

Separate Transformer · 0-5V Output · Signal Ground

Page 99 of the Emerson E2 user manual — 9.1.2 Power Connection
Page 99 · click to enlarge
Page 99
Emerson E2 — 9.1.2 Power Connection diagram (page 99)
Fig. 102 · 9.1.2 Power Connection
1. Connect RED power wire to +12VDC source on input board.
2. Connect BLACK ground wire to odd numbered ter minal.
3. Connect GREEN signal wire to even numbered terminal.
1. Wire BLACK ground wire from “GND” sensor terminal to odd numbered board ter minal.
2. Wire GREEN signal wire from “SIGNAL” sensor terminal to even numbered board terminal.
3. Wire RED power wire from “POWER” sen sor terminal to +12VDC terminal on board.
1. Connect the WHITE and GREEN wires to AC1 and AC2 power terminals.
2. Connect BLACK ground wire to odd numbered board termi nal.
3. Connect RED signal wire to even numbered board terminal.

Table 9-1 - Sensor Wiring

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-5

Page 100 of the Emerson E2 user manual — Press if the input is analog, press if the input is dig
Page 100 · click to enlarge
Page 100
Emerson E2 — 9.1.3 Input Setup in E2 diagram (page 100)
Fig. 103 · 9.1.3 Input Setup in E2
1. Wire positive transducer terminal to positive 24VDC supply.
2. Wire negative transducer termi nal to odd numbered input termi nal.
3. Wire negative 24VDC supply to even numbered input terminal.
4. Place 250 resistor across odd and even numbered input termi nals.
1. If the input board is an 8IO or a 16AI version E.02 or greater, connect the two KWh terminals to the input point (polarity insensitive)
2. If the input board is a 16AI version less than E.02, connect the KWh terminals to board point 1. Set input switch #1 DOWN, and set input switch #8 UP.
3. If the input board is a 16AIe, connect the two KWh terminals to input # 1, 2, 3, or 4 ONLY.

Table 9-1 - Sensor Wiring

9.1.3 Input Setup in E2

Emerson E2 — 9.1.3 Input Setup in E2 diagram (page 100)
Fig. 104 · 9.1.3 Input Setup in E2

At this point in the setup process, you should have all sensors, transducers, and other input devices wired to points on MultiFlexes, 16AIs, and all output devices con nected to 8ROs, 8DOs, or 4AOs outputs. Once the physi cal wiring is complete, you will need to tell E2 the types of sensors or devices that are connected to each I/O point. This is achieved in the Input and Output Definitions screens. 9.1.3.1 Configuring a Point from the Input Definitions/Status Screen

To configure a point, go to the Input Definitions/Status screen by pressing Alt + I or:

1. Press to open the Main Menu

Figure 9-4 - Input Status Screen

2. Press (System Configuration)

Use the up and down arrow keys to move the cursor to the point you wish to set up, and press (SETUP).

3. Press (Input Definitions)

A pop-up menu such as the one shown in Figure 9-5 will prompt you to specify the point as analog or digital.

The Input Status screen opens:

Press if the input is analog, press if the input is dig

Page 101 of the Emerson E2 user manual — 9.1.3.3 Setting Up Analog Inputs
Page 101 · click to enlarge
Page 101

ital, or press to cancel setup.

4. Type (read-only)

The Type field shows the output’s data type. Possible Types are: A (Analog) or D (Digital). If the point has not been identified, a “-” will appear in the field instead.

Emerson E2 — 9.1.3.2 Using the Input Definitions/ Status Screen diagram (page 101)
Fig. 105 · 9.1.3.2 Using the Input Definitions/ Status Screen
5. Application

Select which application you wish to set up inputs to. Pressing (LOOK UP) when on a defined point will open the Application Selection menu--a list of application types currently existing in the box. (CANCEL) will cancel this menu.

Figure 9-5 - Data Type Pop-Up Menu

6. Association

Depending upon what type of input you selected, the Analog Input or the Digital Input screen will appear. The analog screen is described in Section 9.1.3.3, while the digital screen is described in Section 9.1.3.4. 9.1.3.2 Using the Input Definitions/ Status Screen

If a point has already been defined and is currently being used by an application, the name of the input to which the point is connected will be displayed in the Asso ciation field.

Association is the application’s user-defined property that is associated with the point. Multiple applications attached to single input will all be displayed in the Associ ation field. Pressing (LOOK UP) on a set applica tion will bring up a list of property selections. (CANCEL) will cancel this menu.

In order for the E2 to properly read an input value from a sensor or transducer hooked to an I/O board, you must first tell the E2 what kinds of devices are hooked into each input board point. This is achieved by using the Input Definitions/Status screen. (SETUP), (DEL/ MOD), (OFFSET), (LOOK UP), and (CANCEL) are the function keys along the bottom of the screen available for the Input Definitions/Status screen.

7. Value (read-only)

Value shows the sensor value in the units you select for the input type.

Each record in this screen contains the following infor mation about a point:

1. Type (read-only)

The Type column will read 16AI regardless of whether the input board is a 16AI, MultiFlex 16, 8IO, or MultiFlex Combination I/O board.

9.1.3.3 Setting Up Analog Inputs

Open the Analog Input screen by selecting an Analog (A) input from the Input Status screen Figure 9-4 and pressing (SETUP).

This is also true of 168DOs and 1616DOs. The Multi- Flex 168DO’s and 1616DO’s digital output’s position appears as an 8DO, but only the first four outputs are usable.

The Analog Input screen Figure 9-4 is where sensor types, units, and default values are specified for analog input points.

2. Board (read-only)

The point’s board number will appear in its point record under the Board column. All input boards on a controller will be displayed.

3. Point (read-only)

The point number of each point appears in its record under the Point column.

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-7

Page 102 of the Emerson E2 user manual — 9.1.3.2 Using the Input Definitions/ Status Screen
Page 102 · click to enlarge
Page 102
Emerson E2 — 9.1.3.2 Using the Input Definitions/ Status Screen diagram (page 102)
Fig. 106 · 9.1.3.2 Using the Input Definitions/ Status Screen

12V-100 PSI 12VDC 100 PSI trans ducer (1-6VDC output) (Discontinued)

12V-200 PSI 12VDC 200 PSI trans ducer (1-6VDC output) (Discontinued)

12V-500 PSI 12VDC 500 PSI trans ducer (1-6VDC output) (Discontinued)

Refrig. Leak Refrigerant Leak Detector (not IRLDS)

Figure 9-6 - Analog Input Screen

Board/Point # The Board/Point number will auto

Refrig. Level Refrigerant Liquid Level Probe

matically be defined if you are configuring the point from the Input Status screen, and indicates the physi cal address of the board.

Liquid Level Liquid Level Float Sensor

Point Name The Point Name is simply a name for

Light Level Light Level Sensor

the point that may be used as a reference.

Linear General purpose linear output sensor

Assigning a descriptive name to a point makes set

ting up inputs for applications much easier. For example, if you have an inside temperature sensor located in Zone 1 of your building, you may name it “ZONE 1 TEMP”. Then, when programming your HVAC applications, you may easily define Zone 1’s temperature sensor input by tying it to ZONE 1 TEMP. This keeps you from having to keep track of which sensors are tied to which point numbers.

Humidity Relative Humidity sensor

Pulse Accum. Kilowatt value from KW transducer pulse accumu lation readings (see Units Per Pulse on page 9-9)

KW Transducer Kilowatt transducer using 4-20ma/0-5V signal

You are required to enter a point name in the Point Name field. The default name is “:{BOARD NAME}:{UNIT NUMBER}:{BOARD NUM BER}:{POINT NUMBER}.”

LM235 Temp Linear voltage output temperature sensor

Sensor Type The analog input may come from a

number of different sensor types.

PT2 Temp Danfoss PT2 temperature sensor

CDK Temp CDK 2097MC tempera ture sensor

Temperature Emerson Retail Solutions Standard Temp Sensor

20K Pot Adjust Standard temperature sen sor with offset adjust ment (potentiometer)

5V-100 PSI 5VDC 100 PSI transducer (0.5-4.5VDC output)

Table 9-2 - Sensor Input Types

5V-200 PSI 5VDC 200 PSI transducer (0.5-4.5VDC output)

5V-500 PSI 5VDC 500 PSI transducer (0.5-4.5VDC output)

Table 9-2 - Sensor Input Types

Sensor Type Description · Dewpoint Dewpoint probe · Sensor Type Description

Page 103 of the Emerson E2 user manual — 9.1.3.4 Setting Up Digital Inputs
Page 103 · click to enlarge
Page 103

added or subtracted to the calculated value, enter the

number here. The value can be positive or negative. Sensors sometimes have to have offsets. The offset that you enter in this field is in the units you selected in the Eng Units field, NOT in millivolts.

ATP Hi Temperature Emerson Retail Solu tions’ 100K High Tem perature Sensor (Range 0 - 500 DegF)

Output This field displays the link between the input

and the application(s) they feed into. You do not need to enter anything in this field. You will be able to link applications to this point during the application setup process. 9.1.3.4 Setting Up Digital Inputs

86K Temp Copeland’s integral dis charge temperature sensor

2.60V Temp Danfoss voltage-output temp sensor (2.6V@ 77DegF)

Open the Digital Input screen by selecting a Digital (D) input from the Input Status screen Figure 9-4 and pressing (SETUP).

Table 9-2 - Sensor Input Types

Select Eng. Units The engineering units of the

Set up digital inputs in order to assign digital input points, point names, engineering units, and other import ant parameters.

sensor value are entered in the Select Eng. Units field. This value is set automatically to an appropri ate default unit whenever the Sensor Type is changed. To select a different engineering unit, press or to scroll through the options or select the unit from the (LOOK-UP).

Emerson E2 — 9.1.3.4 Setting Up Digital Inputs diagram (page 103)
Fig. 107 · 9.1.3.4 Setting Up Digital Inputs

Units Per Pulse The Units Per Pulse field appears

only when “Pulse Accum” is entered in the Sensor Type field.

The E2 is capable of generating an analog KW value by counting the number of pulses from the pulse accumulation outputs of a KW transducer. Each pulse from the transducer signifies that a fixed num ber of KW has been used.

The number of KWs per pulse varies depending upon the type of transducer being used. Consult the trans ducer’s documentation for the exact number of KWs per pulse and enter it in this field.

Figure 9-7 - Digital Input Screen

Board/Point # The Board/Point Number will auto

Default on Open The value placed here will deter

matically be defined if you are configuring the point from the Input Summary Screen, and indicates the physical address of the board.

mine the value the unit reports if there is an “open” condition detected in the sensor input connection. An “open” condition could be the result of a broken wire to the sensor or a sensor failure.

Point Name The Point Name is simply a name for

the point that may be used as a reference.

Default on Short The numeric entry in this param

Assigning a descriptive name to a point makes set ting up inputs for applications much easier. For example, if you are setting up a push-button switch to reset compressor 1 after an oil failure shut down, you may choose to name it “OIL RESET 1”. Then, when programming your Pressure Control applica tion, you may easily define compressor 1’s reset input by tying it to OIL RESET 1. This keeps you from having to keep track of which contacts are tied to which point numbers.

eter is the default value the analog input would report if a “short” is detected on the sensor input connec tion. A “short” could be the result of a damaged wire or a sensor failure.

Default Other The value placed in Default Other is

the value reported if the input is not updated after a certain amount of time. If there is a failure that will not allow the input board to report the value of the sensor, the value placed in this parameter will be reported.

You are required to enter a point name in the Point Name field. The default name is “:{BOARD

Sensor Offset If a sensor needs a numeric value

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-9

Sensor Type Description

Page 104 of the Emerson E2 user manual — 9.2.2 MultiFlex Relay Outputs
Page 104 · click to enlarge
Page 104

9.2 The 8RO, 8IO, and MultiFlex Outputs

NAME}:{UNIT NUMBER}:{BOARD NUM BER}:{POINT NUMBER}.”

Select Eng. Units The Select Eng. Units field is

where you may select how the ON and OFF states of this point are displayed and represented in E2’s setup fields and status screens. By default, digital inputs have ON-OFF engineering units, meaning when the input is ON or OFF, the input will be represented as “ON” or “OFF” in the system software.

The 8RO, 8IO, and MultiFlex combination I/O boards have relay outputs that close when called to be ON and open when called to be OFF. When an output point is closed (ON), the LED directly above the output terminal glows red. These boards use Form C contacts that deter mine if the connection will be open or closed during power failure. A fail-safe dip switch is used to determine connection status during network failure. 9.2.1 Wiring Form C Contacts

Since the controller looks at only the actual state of the point when it uses the input for control purposes, it is not necessary to define engineering units for dig ital inputs. However, selecting units that are appro priate to the input’s function (such as BYP or NO_BYP for inputs that initiate bypasses) will make the input’s state easier to read and understand.

Figure 9-8 shows how to wire the three-terminal Form C contact.

One wire of the two-wire connection should always be connected to the middle terminal. The second wire must be connected to the N.C. terminal (if you want the relay to be closed (ON) during power failure) or the N.O. terminal (if you want the relay to be (OFF) during power failure).

To choose an engineering unit, press (LOOK UP) to select.

Push Button Mode? Digital inputs may be set up

as “push button” inputs by changing this field to “YES”. Push Button Mode is used to detect when a push button (Momentary) switch has been pressed. When a button press is detected, the input will turn ON for one second, and then turn OFF. If the push button is pressed multiple times, the input will turn ON and back OFF for the same number of times that the button was pressed. The pushbutton input is designed to be connected to any application that has a BYPASS input. It may also be connected to the input of the Pulse Accumulator application to track the number of times the button has been pressed.

RELAY IS

RELAY IS OPEN ON

CLOSED ON POWER

POWER FAILURE

FAILURE

N.C. N.O. N.C. N.O.

Figure 9-8 - Form C Contact Wiring

9.2.2 MultiFlex Relay Outputs

The MultiFlex boards that have relay outputs (all mod els except the MultiFlex 16) each have eight relays that energize and de-energize to control output loads.

If the pushbutton input is connected to an applica

tion’s BYPASS input, a single button push will cause the application to go into bypass. If the push button is pressed three times within ten seconds, the applica tion will then cancel the bypass. An application must be in bypass mode for at least one minute before it may be cancelled.

When setting up an output on one of these relays, you must make two important decisions:

1. Do you want an ON command from your control ler to mean “energize the relay” or “de-energize the relay,” and

Output This field displays the link between the input

and its application(s). You do not need to enter any thing in this field. You will be able to link applica tions to this point during the application setup process.

2. When the relay is de-energized, as is the case when the 8RO or 8IO goes off-line or loses power, do you want the contacts to be OPEN or CLOSED?

Decision #1 is made by setting the fail-safe switch. This is a bank of eight switches labeled S2 on the 8RO, and 8RO-FC, S3 on the 8IO, and S1 on the MultiFlex plug-in output board. Each switch corresponds to an out put on the board (switch #1 = output #1, etc.).

Decision #2 is made either by setting a fail-safe jumper (for old-style 8ROs) or by wiring the load to either the N.O. or N.C. terminals on the Form C contact

Page 105 of the Emerson E2 user manual — 9.2.3 Setting the Fail-Safe Dip Switch
Page 105 · click to enlarge
Page 105

(all other output boards).

product versions:

Table 9-3 shows how the fail-safe switch, jumpers, and/or Form C contacts should be configured based on how you want the output to perform during both normal operation and during network/power loss.

8RO-SMT output board 1.20F01 and above

MultiFlex 168, 88, 168AO, and 88AO combination input/ output boards

1.60F01 and above

Controller Command vs.

or Wire Form C Contacts

MultiFlex 168DO combina tion input/output boards with digital outputs

1.60F01 and above

To:

To:

ON=CLOSED OFF=OPEN

ON UP N.C.

MultiFlex 1616LAO and 1616LDO combination input/ output board

1.30F01 and above

ON=CLOSED OFF=OPEN

OFF UP N.O.

MultiFlex 1616L combina tion input/output board w/o analog outputs

1.20F01 and above

ON=OPEN OFF=CLOSED

ON DOWN N.O.

To activate Relay Output Test Mode for MultiFlex, set switches 1-8 on DIP Switch banks S3 and S4 to the OFF (LEFT) position. For 8ROSMT, set switches 1-8 on DIP Switch bank S1 (NETWORK) to the OFF (DOWN) posi tion. The board will enter Relay Output Test Mode.

ON=OPEN OFF=CLOSED

OFF DOWN N.C.

Table 9-3 - Output Board Fail-Safe and Switch Settings

9.2.3 Setting the Fail-Safe Dip Switch

In Relay Output Test Mode, fail-safe dip switches 1-8 (located on the output board layer of MultiFlex I/O boards, and next to switch bank S1 on the 8ROSMT) can be used to change the state of the relays.

The fail-safe dip switch determines the sate of the relay when communication is lost between the board and E2. The fail-safe dip switches are labeled S2 on the 8RO, and switch S3 on the 8IO. Each of the eight rockers on the fail- safe dip switch corresponds to an output on the board. Set the rocker UP to close the relay and turn the output ON during network failure. Set the switch DOWN to open the relay and turn the output OFF during network failure. 9.2.4 Relay Output Test Mode

A fail-safe switch in the ON position will cause the corresponding relay to be energized (i.e., OPEN on the N.C. terminals, and CLOSED on the N.O. terminals). A fail-safe switch in the OFF position will cause the relay to be de-energized (i.e., CLOSED on the N.C. terminals and OPEN on the N.O. terminals).

The LED that shows the output state will also be ON when the switch is ON and OFF when the switch is OFF.

To exit Relay Output Test Mode, set the address switches S3 and S4 to any position other than “all OFF.” The fail-safe switches will resume normal operation.

Newly released versions of the MultiFlex I/O board family and the 8ROSMT have a new feature that allows relays to be manually energized and de-energized without use of an override from a Hand-Held Terminal when the board is offline. When a MultiFlex is in Relay Output Test Mode, the output fail-safe dip switches may be used to cycle the states of the relay outputs. The feature is designed to help manufacturers of panels test output wir ing quickly and easily without need for a site controller or HHT.

Relay Output Test Mode is available in the following

The 8RO, 8IO, and MultiFlex Outputs Input and Output Setup • 9-11

Show 5 more labels / short text on this page
Board Type Version · Set Jumper · Set Switch · Fail State · Contact State
Page 106 of the Emerson E2 user manual — 9.2.5 Wiring Outputs to Points
Page 106 · click to enlarge
Page 106

9.2.7 Output Setup in E2

Emerson E2 — 9.2.7 Output Setup in E2 diagram (page 106)
Fig. 108 · 9.2.7 Output Setup in E2

In order for the E2 to properly control devices that are hooked to an I/O board, you must first tell the E2 what type of output the devices require. This is achieved from the Output Definitions/Status screen. 9.2.7.1 Configuring a Point from the Output Definitions/Status Screen

To configure a point, go to the Output Definitions/Sta tus screen by pressing Alt + O or:

1. Press to open the Main Menu

2. Press (System Configuration)

3. Press (Output Definitions)

The Output Status screen opens:

Emerson E2 — 2. Press (System Configuration) diagram (page 106)
Fig. 109 · 2. Press (System Configuration)

Figure 9-9 - Relay Output Test Mode for MF I/O Board

9.2.5 Wiring Outputs to Points

The old design of 8RO (P/N 810-3002) used points with two terminals on them. To connect output devices to these points, wire the point terminals in series with the load, so that the path is closed when the 8RO relay is CLOSED and open when the 8RO relay is OPEN.

New 8ROs and 8RO-FCs

All other E2-compatible output boards, including the new design of 8RO (P/N 810-3005), the 8RO-FC, and have Form C contacts. Figure 9-8 shows how to wire the three-terminal Form C contact.

Figure 9-10 - Output Status Screen

To configure a point, use the up and down arrow keys to move the cursor to the point you wish to set up, and press (SETUP).

One wire of the two-wire 8RO-FC connection should always be connected to the middle terminal. The second wire must either be connected to the N.C. terminal (if you want the path to be closed when the relay is de-energized) or the N.O. terminal (if you want the path to be open during power failure. 9.2.6 The Output LED

If you press to set up a 4AO output point, the E2 will automatically transfer you to the Analog Output screen Figure 9-6. For all other output board types, press ing will bring up a pop-up menu such as the one shown in Figure 9-11. This menu will prompt you to spec ify the output as either Digital, Pulse, or One Shot. Press if the output is Digital, press if the output is Pulse,

Each output point on an output board has an indicator LED that shows the status of the output. This LED is lit to show the output is ON, and unlit to show the output is OFF.

press if the output is One Shot, or press to cancel setup.

The definition of ON and OFF in this case is deter mined by the position of the fail-safe dip switch (see Table 9-3). Therefore, if the output’s switch is UP, an illuminated LED means the path is CLOSED, but if the switch is DOWN, an illuminated LED means the path is OPEN.

Old 8ROs

Page 107 of the Emerson E2 user manual — 9.2.7.2 Using the Output Definitions/ Status Screen
Page 107 · click to enlarge
Page 107
3. Point (read-only)

The point number of each point appears in its record in the Point field.

Emerson E2 — 9.2.7.2 Using the Output Definitions/ Status Screen diagram (page 107)
Fig. 110 · 9.2.7.2 Using the Output Definitions/ Status Screen
4. Type (read-only)

The Type field shows the output’s data type. Possible Types are: A (Analog), D (Digital), O (One Shot), or P (Pulse). If the point has not been identified, a “-” will appear at the end of the field instead.

5. Application

Figure 9-11 - Output Data Type Pop-Up Menu

Select which application you wish to set up inputs to. Pressing (LOOK UP) when on a defined point will open the Application Selection menu--a list of application types currently existing in the box. (CANCEL) will cancel this menu.

Depending upon what type of output you selected, the Digital Output, (see Section 9.2.7.3, Setting Up Digital Outputs) Pulse Digital Output, or One Shot Digital Output screen will appear. 9.2.7.2 Using the Output Definitions/ Status Screen

6. Association

If a point has already been defined and is currently being used by an application, the name of the input to which the point is connected will be displayed in the Asso ciation field.

The Output Definitions/Status screen serves a dual purpose. It is both an at-a-glance summary of all points on each output board and a menu where output points may be selected and configured.

Association is the application’s user-defined property that is associated with the point. Multiple applications attached to single input will all be displayed in the Associ ation field. Pressing (LOOK UP) when on a set application will bring up a list of property selections. (CANCEL) will cancel this menu.

In order for the E2 to properly control devices that are hooked to an I/O board, you must first tell the E2 what type of output the devices require. This is achieved by using the Output Definitions/Status screen.

(SETUP), (DEL/MOD), (LOOK UP), and (CANCEL) are the function keys along the bottom of the screen available for the Output Definitions/ Status screen.

7. Value (read-only)

Value shows the sensor value in the units you select for the output type. 9.2.7.3 Setting Up Digital Outputs

The Output Definitions/Status screen serves a dual purpose. It is both an at-a-glance summary of all points on each output board and a menu where output points may be selected and configured.

Open the Digital Output screen by selecting a Digital (D) input from the Output Status screen Figure 9-10 and pressing (SETUP).

Each record in this screen contains the following infor mation about a point:

Digital Outputs are ON when the E2 calls for them to be ON, and OFF whenever the E2 calls for them to be OFF. Most outputs that directly activate and deactivate output devices will need to be set up as the Digital output type.

1. Type (read-only)

Board Type shows which kind of output board the point is on. The Board Type field will read either 8RO, 8DO, or 4AO for I/O Network 16AI boards, E16AI, and 8ROE for Echelon Network 16AIe boards.

The last character of the Board Type field also shows what type of input the point is defined as. If a point has already been defined as an analog or digital input, this field will signify its input type with an “A” (for analog) or “D” (for digital).

2. Board (read-only)

The point’s board number appears under the Board field.

The 8RO, 8IO, and MultiFlex Outputs Input and Output Setup • 9-13

Page 108 of the Emerson E2 user manual — 9.2.7.4 Setting Up Analog Outputs
Page 108 · click to enlarge
Page 108

Default Value The value that the relay output

should go to if the output is not associated to an application. The default value of the Default Value field is OFF.

Emerson E2 — 9.2.7.4 Setting Up Analog Outputs diagram (page 108)
Fig. 111 · 9.2.7.4 Setting Up Analog Outputs

Physical On Specifies whether the physical relay

output should energize or de-energize its coil when the logical output is on.

Physical Off Specifies whether the physical relay

output should energize or de-energize its coil when the logical output is off.

Physical Null Specifies whether the physical relay

output should energize or de-energize its coil when there is no application associated with the output.

Figure 9-12 - Digital Output Screen

Minimum Physical On Time Specifies the mini

mum time the physical output must remain on regardless of the logical output state.

Board/Point # The Board/Point Number will auto

matically be defined if you are configuring the point from the Output Status screen, and indicates the physical address of the board.

Minimum Physical Off Time Specifies the mini

mum time the physical output must remain off regardless of the logical output state.

Point Name The Point Name is simply a name for

the output point that may be used as a reference.

PRIORITY OVR When an input is overridden to an

Assigning a descriptive name to a point makes set ting up outputs for applications much easier. For example, if you are setting up condenser fan #3 for condenser #2, you may choose to name it “CND #2 FAN #3”. Then, when programming your Condenser Control application, you may easily define the fan output by tying it to CND #2 FAN #3. This keeps you from having to keep track of which contacts are tied to which point numbers.

output cell. If this input is not set to NONE, it will be used for the output value instead of the input value, but only for the override timeout period.

Priority Override Timeout When an input goes

on it will override to a value for the timeout period.

INPUT This field links the output to an application.

You do not need to enter anything in this field. You will be able to link applications to this point during the application setup process. 9.2.7.4 Setting Up Analog Outputs

You are required to enter a point name in the Point Name field. The default name is “:{BOARD NAME}:{UNIT NUMBER}:{BOARD NUM BER}:{POINT NUMBER}”.

Open the Analog Output screen by selecting an Analog (A) output from the Output Status screen Figure 9-10 and pressing (SETUP).

Select Eng. Units The Select Eng. Units field is

where you may select how the ON and OFF states of this point are displayed and represented in the E2’s setup fields and status screens. By default, digital outputs have ON-OFF engineering units, meaning when the output is ON or OFF, the input will be rep resented as “ON” or “OFF” in the system software.

This is where output types, units, and default values are specified for analog output points.

In most cases, only the point name will need defining in this screen, unless you wish to change the 0-10V output range or configure a priority override.

Engineering units are only a visual representation of the state of the output point (energized or de-ener gized). Therefore, it is not necessary to define engi neering units for digital inputs. However, selecting units that are appropriate to the output’s function (such as BYP or NO_BYP for inputs that initiate bypasses) will make the output’s state easier to read and understand.

To choose an engineering unit, press (LOOK UP) to select.

Page 109 of the Emerson E2 user manual — 9.2.7.4 Setting Up Analog Outputs
Page 109 · click to enlarge
Page 109

Modify Output Equation Enables the value to be

translated into an output.

Emerson E2 — 9.2.7.4 Setting Up Analog Outputs diagram (page 109)
Fig. 112 · 9.2.7.4 Setting Up Analog Outputs

Low End Point The output voltage when the

INPUT is at the value specified in the Low Eng. Units field.

High End Point The output voltage when the

INPUT is at the value specified in the High Eng. Units field.

Low Eng. Units The value of the input (in Engi

neering Units) that will produce the output voltage specified in the Low End Point field.

High Eng. Units The value of the input (in Engi

neering Units) that will produce the output voltage specified in the High End Point field.

Figure 9-13 - Analog Output Screen

Board/Point # The Board/Point Number will auto

PRIORITY OVR When an input is overridden to an

matically be defined if you are configuring the point from the Output Definitions screen, and indicates the physical address of the board.

output cell. If this input is not set to NONE, it will be used for the output value instead of the input value, but only for the override timeout period.

Point Name The Point Name is simply a name for

Priority Override Timeout When an input goes

the output point that may be used as a reference.

on it will override to a value for the timeout period.

Assigning a descriptive name to a point makes set ting up outputs for applications much easier. For example, if you are setting up fan #3 for Zone 1, you may choose to name it “FAN#1 HT#3”. Then, when programming your Condenser Control application, you may easily define the fan output by tying it to FAN#1 HT#3. This keeps you from having to keep track of which contacts are tied to which point num bers. You are required to enter a point name in the Point Name field. The default name is “:{BOARD NAME}:{UNIT NUMBER}:{BOARD NUM BER}:{POINT NUMBER}”.

INPUT This field links the output to an application.

You do not need to enter anything in this field. You will be able to link applications to this point during the application setup process.

Output Type The analog output may be either of

two types: Linear and VSComp.

Linear means that the output is a standard 0-10VDC

linear output.

VSComp means that the output is a percentage (0% -

100%) that is driving an inverter that controls a vari able-speed device such as a compressor or fan.

If the output will be driving a variable-speed device,

choose VSComp in this field; otherwise, select Lin ear. Use (LOOK UP) to select.

Select Eng. Units The engineering units of the

output value are entered in the Select Eng. Units field. This value is defaulted to percent (PCT). Use (LOOK UP) to select.

Default Value The value that the relay output

should go to if the output is not associated to an application. The default value of the Default Value field is OFF.

The 8RO, 8IO, and MultiFlex Outputs Input and Output Setup • 9-15

Page 110 of the Emerson E2 user manual — 9.3.1 Inputs
Page 110 · click to enlarge
Page 110

9.3 CC-100 Case Controllers

Emerson E2 — 9.3 CC-100 Case Controllers diagram (page 110)
Fig. 113 · 9.3 CC-100 Case Controllers

9.3.1 Inputs

The input connections to the CC-100 are made on the left-hand side of the controller. Figure 9-14 shows the CC-100 input connections.

Emerson E2 — 9.3.1 Inputs diagram (page 110)
Fig. 114 · 9.3.1 Inputs

Table 9-4 - Default Input Assignments

If your case has sensors or switches that are not listed in the defaults above, or if it is otherwise impossible to use all the defaults for the CC-100, the input type can be changed in the system software.

Figure 9-14 - Temperature, Auxiliary and HHT Inputs

Temperature and Digital Sensors

The six two-pin Molex connectors on the left-hand side of the unit (numbered 1 through 6) are where the case’s temperature probes, coil inlet/coil outlet sensors, and other digital switches and contacts are connected. Emerson Retail Solutions temperature sensor leads are equipped with male connectors that plug in to these recep tacles.

Emerson E2 — 9.3.1 Inputs diagram (page 110)
Fig. 115 · 9.3.1 Inputs

For digital switches and sensors such as dual-temp and clean switches, Emerson Retail Solutions supplies a digital output harness (P/N 335-3264) that consists of a connector with a two-wire pigtail. These wires may be spliced on to the switch or digital sensor leads. The connector is designed to snap in to one of the six inputs.

Figure 9-15 - Auxiliary Analog Input

In order to function correctly, the CC-100 needs to know the function of each of the sensors plugged into inputs 1 through 6. For example, a CC-100P liquid pulse controller needs to know which of the six sensors is the coil in sensor, which is the coil out sensor, etc.

The four-pin analog input is designed to be connected to a Relative Humidity Sensor (P/N 203-5750). The wiring harness (P/N 335-3252) designed specifically for the input must be used. Wiring for this device is shown in Figure 9-15.

Each of the six inputs have a default input type assign ment based on the type of CC-100 (either Liquid, or Suc tion). If the sensors in your case match the default sensor types, plug each sensor into the appropriate receptacle.

The Hand-held Terminal jack on the left side of the CC-100 is where a Emerson Retail Solutions Hand-held Terminal (HHT) may be connected. The HHT may be used to program setpoints and change settings in a CC- 100. In addition, you may use an HHT to send a case into defrost (or terminate an existing defrost), force a case into wash mode, and bypass or override numerous case func

Auxiliary Analog Input · Connection · Hand-held Terminal Jack

Page 111 of the Emerson E2 user manual — 9.3.3 Valve Cable
Page 111 · click to enlarge
Page 111

tions.

the appropriate cable type.

The Hand-held Terminal jack also doubles as a service pin, used when commissioning a CC-100. Plugging the Hand-held Terminal into a CC-100 sends the special Eche lon ID number to the E2. 9.3.2 Power Module Wiring

P/N 335-3263 (Pulse Valve)

Figure 9-17 shows the connections for pulse valve 1 and pulse valve 2. The pulse valve 2 leads (BLACK/ GREEN) may be clipped if a second evaporator is not present on the case.

CC-100s are powered by 24VAC Class 2 power, which is supplied by a Emerson Retail Solutions power module.

Emerson E2 — 9.3.2 Power Module Wiring diagram (page 111)
Fig. 116 · 9.3.2 Power Module Wiring

The case power module should be connected to either a 120 VAC or 240 VAC single phase power source (which ever is necessary for the model ordered). Complete wiring of the case controller power module, including lights, fans, defrost, and anti-sweat heaters, is diagrammed in Figure 9-16. Follow all local, NEC, and UL wiring practices.

Power is supplied to the CC-100 via the output cable harness.

Emerson E2 — 9.3.2 Power Module Wiring diagram (page 111)
Fig. 117 · 9.3.2 Power Module Wiring

Figure 9-17 - Wiring the 335-3263 Valve Cable

P/N 335-3261 (Sporlan SEI and Emerson Flow Con trols ESR Stepper Valve)

The 335-3261 valve cable is equipped with a four-pin male connector that plugs into a four-pin female connector on the valve. Plug the valve cable connector into the valve connector.

P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)

The 335-3260 valve cable has six flying leads for con nection to a stepper valve. Four of these leads connect to the stepper motors, while the other two serve as the power wiring (+12VDC and ground).

The pinout for this valve cable is shown in Figure 9-18. Table 9-5 shows how to hook the flying leads to Emerson Flow Controls ESR, Emerson Flow Controls ESV, and Sporlan SEI & CDS valves.

Figure 9-16 - Case Controller and Defrost Power Module Wiring Schematic

9.3.3 Valve Cable

Emerson E2 — 9.3.3 Valve Cable diagram (page 111)
Fig. 118 · 9.3.3 Valve Cable

The six-pin connector on the right-hand side of the CC-100 is where the liquid stepper or suction stepper must be connected. The CC-100 uses this connection to control the stepper motors and change the position of the valve aperture.

All valve cable harnesses have a six-pin male connec tor that plugs into the CC-100’s VALVE port. Plug this connector in so that the tab on the top of the connector is facing up.

For instructions on connecting the valve cable to the pulse or stepper valve, refer to the instructions below for

Figure 9-18 - Wiring the 335-3260 Generic Stepper Valve

CC-100 Case Controllers Input and Output Setup • 9-17

Page 112 of the Emerson E2 user manual — 9.5 ESR8 and MultiFlex ESR Valve Output Wiring
Page 112 · click to enlarge
Page 112
Emerson E2 — 9.4 CCB Case Controllers diagram (page 112)
Fig. 119 · 9.4 CCB Case Controllers

Table 9-5 - 335-3260 to Valve Connection Information

Figure 9-19 - ESR8 Valve Wiring

9.4 CCB Case Controllers

For information on retrofitting E2s in RMCC stores with CCBs, refer to Technical Bulletin #026-4119. For other information about CCB wiring, hand-held terminal programming and operation, refer to the CCB Installation Manual (P/N 026-1110).

The stepper valves are wired to the board by connect ing the stepper valve harness to one of the eight screw ter minal connectors along the top of the board (Figure 9-20) and matching the wire colors to the legend on the connec tors. Use the cable and cable harnesses that are supplied with the valves.

9.5 ESR8 and MultiFlex ESR Valve Output Wiring

Emerson E2 — 9.5 ESR8 and MultiFlex ESR Valve Output Wiring diagram (page 112)
Fig. 120 · 9.5 ESR8 and MultiFlex ESR Valve Output Wiring

For ESR8 boards, the stepper valves are wired to the board by connecting the four-conductor wire from the stepper valve to a connector plug and then plugging in to one of eight jacks along the top of the board Figure 9-19. Use the cable harnesses supplied with the valves or use Belden #9418 four-conductor 18AWG wire.

Match wire colors to silk screen legend on board terminals

If the stepper valves have block-style connectors, cut the ends off and attach the terminal plugs supplied with the ESR8 to the wire ends.

ECT Flow Stepper Valve MultiFlex ESR Board w/ Eight Screw Terminal Connectors (P/N 810-3199)

Figure 9-20 - ECT Flow Valve and MFlex ESR Board Wiring

MultiFlex ESR Board · ESR8 Boards (Discontinued)

Page 113 of the Emerson E2 user manual — 9.4 CCB Case Controllers
Page 113 · click to enlarge
Page 113

For Sporlan valves, match all wire colors except the green wire. Instead, connect the green wire to the (silk screened) blue wire legend on the board terminals.

For more information on the MultiFlex ERS board, refer to the MultiFlex ESR Installation and Operation manual (P/N 026-1720).

ESR8 and MultiFlex ESR Valve Output Wiring Input and Output Setup • 9-19

Page 114 of the Emerson E2 user manual — 9.4 CCB Case Controllers
Page 114 · click to enlarge
Page 114
Page 114 of the Emerson E2 user manual — 9.4 CCB Case Controllers
Page 115 of the Emerson E2 user manual — 10.2 Cleaning Out the Controller
Page 115 · click to enlarge
Page 115

10 Quick Start

This section covers what to do when you are program ming a new E2 for the first time. The section includes log ging on, specifying information about I/O boards and application types, and other topics related to E2 program ming and navigation.

Open the E2 controller panel. There are two buttons located midway down on the main board (see Figure 2-2). These buttons are used to perform various hardware func tions.

Reset Button - The button labeled "RESET" on the main board resets the controller. Pressing and holding this button for one second will cause the E2 to reset and retain all pro grammed applications, logs, and other data stored in memory.

10.1 Logging On

Emerson E2 — 10.1 Logging On diagram (page 115)
Fig. 121 · 10.1 Logging On

Clean Out Button - The button labeled CLEAN OUT on the controller is used to perform a function called clean out. Using this button in conjunction with the Reset But ton will cause a clean out, which is a reset that erases all data from memory. The E2 will re-boot after a clean out with all programmed applications, logs, and other data erased.

Clean outs are also commonly called Blue “R” resets, named for the key presses required to clean out Emerson Retail Solutions’ previous generation of controllers, REFLECS.

Figure 10-1 - User Login Dialog Box

When the E2 is powered up for the first time, the first screen displayed after initialization is the User Login screen.

Performing a Clean Out

1. Enter “USER” in the Username field.
2. Press .
Emerson E2 — 10.1 Logging On diagram (page 115)
Fig. 122 · 10.1 Logging On
3. Enter “PASS” in the Password field.
4. Press .

Logging into and out of the E2 controller can be done at any time by pressing the key on the E2 keypad. If

you are currently logged out, pressing will bring up the User Login dialog box. If you are already logged in, pressing will immediately log you out and return you to the E2 home screen.

1. Press and RELEASE the Reset Button quickly. The screen will clear.
2. Press and Hold the Clean Out button.

3.When “CLEANOUT” appears in large text across the screen, RELEASE the Clean Out but ton.

10.2 Cleaning Out the Controller

Cleaning out the E2 controller needs to be done if:

  • If you are programming your E2 controller for the first time.
  • If all of the settings need to be cleared.
  • If the program settings are unknown.

Logging On Quick Start • 10-1

Page 116 of the Emerson E2 user manual — 10.3 Setting Number of Network Devices
Page 116 · click to enlarge
Page 116

10.3 Setting Number of Network Devices

Liquid Ctrls (CC100P/CC100LS) Enter the com

bined number of pulse valve case controllers (CC100Ps) and liquid-side stepper valve case con trollers (CC100LSs) in this field.

Emerson E2 — 10.3 Setting Number of Network Devices diagram (page 116)
Fig. 123 · 10.3 Setting Number of Network Devices

Suction Controllers (CC100H) Enter the num

ber of suction stepper case controllers (CC100Hs) in this field.

Circuit Suction (CS100) Enter the number of suc

tion lineup circuit controllers (CS100s) in this field.

ESR8 Line Up Boards Enter the number of ESR

suction lineup circuit boards (SR100s) in this field.

TD3 Temperature Displays Enter the number of

TD3 temperature display units in this field.

EC-2 Case Controllers Enter the number of EC-2

Figure 10-2 - Connected I/O Setup Screen

refrigerated case controllers in this field.

After logging in for the first time, the Connected I/O screen will ask you to specify how many of each type of device will be connected to the E2 you are currently pro gramming. (Options will vary depending on the type of controller used.)

Echelon 16AI Enter the number of 16AIe analog

input boards in this field.

Echelon 8RO Enter the number of 8ROe analog

input boards in this field.

Unit Number (Echelon Subnet) Each E2 on the

Echelon Network must have a different unit number. This can be any number from 1 to 255, but each E2’s number must be unique. No two E2s on the network may have the same unit number.

When finished, press (NEXT) to move to the next screen.

Enter this number in the Unit Number field. It is rec

ommended you number the first E2 “1” and number the other E2s on the network sequentially (2, 3, 4, etc.).

Unit Name Type a name for the E2 in the Unit

Name field.

Boards on the I/O Network

16AI Boards Enter the number of 16AIs or Multi Flex I/O boards on this E2’s I/O Network. If you have any special MultiFlex or Gateway boards that emulate 16AI, also include their total number of boards in this field.

8RO Boards Enter the number of 8ROs and Multi Flex 168AOs/168s/88AOs relay output boards on this E2’s I/O Network.

8DO Boards Enter the number of 8DO digital out put boards on this E2’s I/O Network.

4AO Boards Enter the number of 4AOs, MultiFlex 168AOs, and MultiFlex 88AO analog output boards on this E2’s I/O Network.

IRLDS Controllers Enter the number of IRLDS/

RLDS leak detection units on this E2’s I/O Network.

Unit Controllers (Echelon)

Page 117 of the Emerson E2 user manual — 10.4 Setting Number of Applications
Page 117 · click to enlarge
Page 117

10.4 Setting Number of Applications

10.5 The Main Status (Home) Screen

Emerson E2 — 10.4 Setting Number of Applications diagram (page 117)
Fig. 124 · 10.4 Setting Number of Applications
Emerson E2 — 10.4 Setting Number of Applications diagram (page 117)
Fig. 125 · 10.4 Setting Number of Applications

Figure 10-3 - Application Setup (RX version shown)

Figure 10-4 - Home Screen (RX version shown)

The Application Setup screen is where you will enter information about the types of devices on the E2’s control system. If you know how many applications will be needed, this step will save you time and will keep you from having to create new applications during the setup process. (Options will vary depending on the type of con troller used.)

The Main Status screen is the “home” screen for the E2. When no one is logged in to the controller, this is the screen that will be shown in the display. When a user is logged into the controller, the Home screen is displayed when the user is not performing any actions such as appli cation setup, viewing other status screens, etc.

The Home screen will vary depending on the configu ration of the controller. In most cases, the Home screen will show the real-time status of the most fundamental sys tems being controlled by the E2.

The Home screen is a good place to point out three important common elements of all E2 screens: the screen header, the function key descriptions, and the help line.

When finished, press (NEXT) to go straight to

the Main Status (Home) screen.

Options will vary depending on the type of controller used. For more information on the E2 Home screen including options for both RX and BX versions, see Sec tion 12.1, The E2 Home Screen. 10.5.1 Customizing the Home Screen

The Home screen can be customized to show different information depending on the user’s needs. There are eight different screen options available. The Device Summary screen is the Default screen. See Section 12.5, Customiz ing the Home Screen for the steps to customize the Home screen.

Setting Number of Applications Quick Start • 10-3

Page 118 of the Emerson E2 user manual — 10.6.1 The Header
Page 118 · click to enlarge
Page 118

10.6 Common Screen Elements

Single user is logged in

Emerson E2 — 10.6 Common Screen Elements diagram (page 118)
Fig. 126 · 10.6 Common Screen Elements

Multi-users are logged in

Terminal mode in use

HEADER

E2 is connected to Ethernet

Wait, or system is busy

Disk activity, or saving to disk

HELP LINE

Caps lock is ON

Table 10-1 - Header Icons and Descriptions

FUNCTION KEY DESCRIPTIONS

10.6.2 The Function Keys

Figure 10-5 - Common Screen Elements (RX version shown)

10.6.1 The Header

The first two lines at the top of the E2 screen are referred to as the screen header. This area of the screen contains the time and date, controller name, subnet and node number, and alarm and failure notifications. In addi tion, it contains highlighted indicators and icons to show when a user is operating in a particular mode, such as full options, edit, macro record, or insert mode.

Figure 10-7 - Home Screen Function Keys (RX version shown)

At the very bottom of every screen in the E2, there are five boxes labeled through . These boxes are the function key descriptions. The function key descrip tions show what each of the five function keys do when pressed. (Options will vary depending on the type of con troller being used.)

If the E2’s Global Data feature is being used to supply outside air temperature and outside relative humidity val ues, these values will also be displayed in the header. 10.6.1.1 Header Icons

Function key usage often varies depending on which screen or field E2 is currently in. 10.6.3 The Help Line

At the very top of every screen in the E2, there are icons that indicate various stages of activity, number of users logged into the controller, battery alerts, connectivity status, and more.

The line directly above the function button menu is called the help line. The help line displays information about the currently selected field, such as general descrip tions, possible ranges, and other information to help a user maneuver around and/or configure the field.

Figure 10-6 - Header Icons

Icon Description

Page 119 of the Emerson E2 user manual — BX
Page 119 · click to enlarge
Page 119

10.7 Screen Types

Each status screen is specially designed to provide a concise at-a-glance view of how one or more systems are functioning.

10.7.1 The Main Menu

TIP: To view the Suction Group Status screen in the RX controller, start from the Home screen. Press the function key (SUC TION GRP). If more than one Suction Group has been set up, the Suction Group Summary screen opens. Choose which application you wish to view with the cursor and press. The current status, runtime, and HP rating for each compressor are displayed in this screen.

Emerson E2 — 10.7.1 The Main Menu diagram (page 119)
Fig. 127 · 10.7.1 The Main Menu

To view other application types, use the function keys , , and (see Table 10-2) to see the condenser, circuits, and sensor control status screens.

Figure 10-8 - The Main Menu (RX version shown)

The Main Menu is accessed by pressing the key. This menu gives you direct access to applications such as Suction Groups, Condensers, Circuits, Air Han dling Units, Zones, Light Schedules, and Sensor Controls applications, (depending on which controller type you are using) as well as all configured applications in the control ler. The Main Menu also allows you to add and delete applications, gives system configuration abilities, and shows status information for inputs and outputs, network, graphs and logs. 10.7.2 Status Screens

Key Function for RX Function for

BX

! Suction Group AHU AHU

@ Condensers Zones Lighting

# Standard and Case Circuits

% Setup Setup Setup

Emerson E2 — BX diagram (page 119)
Fig. 128

Table 10-2 - Status Screen Function Keys

Status screen functions are explained in more detail in Section 12, Operator’s Guide to Using the E2 of the man ual. For now, press to access another important screen: the Actions menu.

Figure 10-9 - Status Screen (RX version shown)

Status screens are real-time views of application func tions. They show the current status of all outputs, the cur rent values of all inputs, and other important data such as control setpoints, run times, and whether or not bypasses or overrides are active.

Screen Types Quick Start • 10-5

Show 7 more labels / short text on this page
Function for · Lighting Circuits · $ Sensor Control · Sensors Sensors · and · Power Monitor · ing
Page 120 of the Emerson E2 user manual — 10.7.3 The Actions Menu
Page 120 · click to enlarge
Page 120

10.7.3 The Actions Menu

Actions Menu Item Description

Setup Opens the setup screen for the

Emerson E2 — 10.7.3 The Actions Menu diagram (page 120)
Fig. 129 · 10.7.3 The Actions Menu

selected value.

Detailed Status Special status screen that shows detailed setpoints and input/out

put information with complete

summary of inputs, outputs.

Manual Defrost For circuits only. Opens the Cir cuit Bypass screen to force a man ual or emergency defrost, or wash

mode.

Allows Service Start/End for Irri

gation and Pulse Accumulation

applications.

Figure 10-10 - The Actions Menu

  • Opens various log and graph screens for Antisweat and Pulse Accumu lation applications.

The Actions Menu is available from any status screen by pressing Enter , and may be used to do just about any task in the E2 system software. This screen lists a number of options that can be used to affect a selected field, an entire application, or the E2 in general.

  • Opens the Circuit Report screen for standard circuits only.

Table 10-3 - Actions Menu Options and Descriptions

Actions Menu Item Description

One of the more important features of the Actions

Graph Opens graph view for the selected

Menu is the Setup screen (Setup). The actual setup screen will vary, depending on where the cursor is placed in the Main Status (Home) screen before is pressed. This is the easiest way to edit an existing application.

value.

Log Opens the Log screen of the

selected value.

Override Opens the Override Update win

dow where the selected input or

For more information on usage of the Setup screen and how to implement its functions, see Section 12.11.1.2, Setup Screens. 10.7.4 The Setup Screens

output can be overridden to a

user-defined value or state.

Expanded Information Displays detailed information

about the selected value.

Table 10-3 - Actions Menu Options and Descriptions

Emerson E2 — 10.7.3 The Actions Menu diagram (page 120)
Fig. 130 · 10.7.3 The Actions Menu

Figure 10-11 - Typical Setup Screen

Setup screens are the interface used to change settings and setpoints, and define inputs and outputs in the E2. Figure 10-11 shows a typical Setup screen and its primary

Show 4 more labels / short text on this page
Application Com · mands · Applications Logs/ · Graphs
Page 121 of the Emerson E2 user manual — 2. Press (System Configuration)
Page 121 · click to enlarge
Page 121

elements. For more details on Setup screens, see Section 10.18.2.3, Navigating the Setup Screen. 10.7.5 System Configuration Menu

items:

1. Input Definitions View the status of all input boards, as well as set up indi vidual points on the I/O boards.
Emerson E2 — 10.7.5 System Configuration Menu diagram (page 121)
Fig. 131 · 10.7.5 System Configuration Menu
2. Output Definitions View the status of all output boards, as well as set up indi vidual points on the I/O boards.
3. System Information Menu that gives access to more E2 setup options and information.
4. Remote Communica tions

Gives access to modem infor mation, dial-out setup, and TCP/IP.

5. Alarm Setup Set up dial-outs and alarm reporting for the current E2.

Figure 10-12 - System Configuration Menu

The System Configuration Menu is one of the menus used to set up the E2. Included options are Input/Output Definitions, internal system information, remote commu nications, global data, alarm, logging, and network setup information.

6. Logging Setup Enter information about Log ging Group applications such as the sampling frequency and total number of samples.
7. Network Setup Opens the Network Setup menu, where options to view network status, add or delete boards and controllers, com mission devices, set up a router, and make board asso ciations are available.

To open the System Configuration menu:

1. Press

2. Press (System Configuration)

The System Configuration menu contains nine menu

8. Global Data Configure one or more ana log or digital sensors to be used as “global” values by all E2s.
9. Licensing Opens the Licensing Report page with a list of all licensed features on the current E2, and allows additional fea tures, after a password key has been entered by the user, to be enabled.

Table 10-4 - System Configuration Menu Options

Screen Types Quick Start • 10-7

Menu Option Description

Page 122 of the Emerson E2 user manual — 3. Press (System Information)
Page 122 · click to enlarge
Page 122

10.7.6 The System Information Menu

The System Information menu contains nine items:

1. General Controller Info

Edit general information about the E2, such as engi neering units, and summer/ winter change-over specifica tions.

Emerson E2 — 10.7.6 The System Information Menu diagram (page 122)
Fig. 132 · 10.7.6 The System Information Menu
2. Time and Date Change the current date and time, and specify date for mats.
3. Passwords/User Access

Set up usernames and pass words, and define security level requirements.

4. Firmware Revision Read-only information screen that contains current system version information

Figure 10-13 - System Information Menu

The System Information Menu is another menu used to set up the E2. The options in this menu allow setting up time and date, passwords, toggle full options, general information about the controller, and system administrator functions.

5. Service Actions Set up system diagnostics (memory and execution info), and perform advanced func tions (system resets and firm ware update).

To open the System Information Menu:

6. Note Pad Writable field for technician to make notes about changes made or general information.
1. Press

2. Press (System Configuration)

7. Display Users Enter information about Log ging Group applications such as the sampling frequency and total number of samples.

3. Press (System Information)

8. Toggle Full Options When set to on, FULL will appear at the top right of the screen and gives user full access to options and applica tions.
9. Application Default Value Setup

Choose the default values most appropriate to the refrigeration control compo nents in the system.

Table 10-5 - System Information Menu Options

Menu Option Description

Page 123 of the Emerson E2 user manual — 3. Select (Time/Date)
Page 123 · click to enlarge
Page 123

10.8 Time/Date Setup

10.8.1 Setting the Time and Date

The Time Format field affects how times are displayed and entered throughout the controller. When 24 Hour For mat is selected in this field, the hours are displayed and entered as a number from 0 to 23. When 12 Hour Format is selected, the hours are displayed and entered as a num ber from 1 to 12; an A or a P at the end of the time signi fies whether the time is A.M. or P.M.

Emerson E2 — 10.8.1 Setting the Time and Date diagram (page 123)
Fig. 133 · 10.8.1 Setting the Time and Date

Table 10-6 shows some times as how they would appear in both formats.

Time 12 Hour Format 24 Hour Format

7:15 a.m. 7:15:00A 7:15:00

12:00 noon 12:00:00P 12:00:00

Figure 10-14 - System Information Menu

11:59 p.m. 11:59:00P 23:59:00

The Time/Date Setup screen is where users may change the time, date, date format, Daylight Savings Dates, and special time synchronization features.

12:00

12:00:00A 0:00:00

Table 10-6 - Time Formats (12 and 24 hour)

To get to the Time/Date Setup screen from the Main Menu:

To select a time format, select either 12 or 24 hour using the (LOOK UP) tab.

1. Select (System Configuration)

2. Select (System Information)

The Active Date shows the current Julian date in the format that was chosen in the Date Format field. For secu rity reasons, the Active Date cannot be set to a date earlier in time than the current date without assistance from Emerson Retail Solutions Technical Service (1-800-829- 2724).

3. Select (Time/Date)

The Time/Date Setup screen (Figure 10-15) is where all time and date changes occur.

Emerson E2 — 3. Select (Time/Date) diagram (page 123)
Fig. 134 · 3. Select (Time/Date)

The Active Time is the current time in the controller’s internal clock. This time may be changed by entering the new time in the Active Time field.

When a new time is entered in the Active Time field, it is sent across the network and changed on all device clocks so that all devices can remain synchronized.

Time zone is where the time zone of the E2 is entered. Each time zone is represented by a time zone offset that corresponds to the amount each time zone must add or subtract from Greenwich Mean Time (GMT) to get the correct local time. Choose the time zone by using the (LOOK UP) tab.

Figure 10-15 - Time/Date Setup Screen (User-Defined Shown)

Set this field to Yes or No depending on whether you would like to use SNTP (simple network time protocol) for synchronizing the E2 clock.

SNTP ensures accurate synchronization to the milli second of computer clock times. If the E2 time is off by 5

Time/Date Setup Quick Start • 10-9

Show 5 more labels / short text on this page
midnight · Active Date · Active Time · Time Zone · Time Server
Page 124 of the Emerson E2 user manual — 3. Press (Modem Setup) to advance to the Gen eral Services screen
Page 124 · click to enlarge
Page 124

seconds or greater, the SNTP will update the E2 time if enabled. When the E2 time is updated, an entry in Service Log is added.

Daylight Savings Time uses GMT

This setting is only visible when Daylight Savings Dates is set to User Defined DLT Dates. If set to Yes, Daylight Savings Time uses GMT calculates the time to change from GMT and the current time zone setting. For example, if the start time is at 1:00 AM, and the time zone is +200 GMT, the time change will occur at 3:00 AM local time. Defaults to No.

If this field is set to No, the E2 clock will have to be set manually. If this field is set to Yes, SNTP support is used. Two SNTP servers are supported: Primary Time Server, and an optional Secondary Time Server.

The E2 will call up this primary server first to synchro nize the E2 time. If the primary server fails to respond, the secondary server is used.

Sunrise and sunset times are calculated based on either zip code or latitude/longitude. If US Zip Code is chosen in the Unit Location From field, enter the zip code in which the controller is located. If outside the United States, choose Lat/Long and enter the latitude and longitude val ues in which the controller is located. Once a value has been chosen, the controller is able to calculate the sunrise and sunset times. The Sunset output will turn ON at sun set, and OFF at sunrise and can be connected to a lighting circuit.

Enter the IP address or name of the first server the E2 should use to set the time (up to 40 characters).

The E2 will use this secondary server if no response is received from the primary server, or if the primary server is invalid.

If desired, enter the IP address or name of the second server the E2 should use to set the time (up to 40 charac ters).

Sundown is an output that calculates when the sun sets based on latitude and longitude, and is ON when the sun sets. The user will select the Board/Controller, Point/ Application, and Input values from the (LOOK UP) menu for each field. (When a Lighting Schedule is config ured to use Sundown information, the Lighting Schedule application automatically connects to the Sundown out put.)

Dates may be presented and entered in either of two ways: month-day-year format, and day-month-year for mat. Choose the most appropriate date format by using the (LOOK UP) tab.

The Daylight Savings Dates type determines how the E2 will make date adjustments for daylight savings time. Use the (LOOK UP) tab to cycle through the options in each of the fields. There are four options:

10.9 Set Up Modem

  • STANDARD US DLT DATES - the E2 will use the standard United States’ method of determining Daylight savings time dates. The Daylight savings time will start on the Sunday of the second week of March ever y year, and will end on the Sunday of the first week of November (Note: these are the dates recently enacted by the U.S. Congress, which went into effect in 2007).
Emerson E2 — 10.9 Set Up Modem diagram (page 124)
Fig. 135 · 10.9 Set Up Modem
  • USER DEFINED DLT DATES - when this option is chosen, the user can specify start and end times for daylight savings, including month, week, and day settings.

Figure 10-16 - Modem Select Screen

  • EUROPEAN UNION DLT DATES - the Euro pean Union Daylight rules are the same as the Stan dard US DLT Dates, with the exception that one hour must be added to the time at 1:00AM (GMT), during the last Sunday in March.

From the Main Menu:

1. Press (System Configuration)

2. Press (Remote Communications)

  • DLT Not Used - the E2 does not make any adjust ments to Active Time for Daylight Savings Time.

3. Press (Modem Setup) to advance to the Gen eral Services screen

Show 6 more labels / short text on this page
Primary Time Server · Unit Location From · Secondary Time Server · Sundown · Date Format · Daylight Savings Dates
Page 125 of the Emerson E2 user manual — 1. Press (System Configuration)
Page 125 · click to enlarge
Page 125

You can choose between an internal modem (one that is mounted directly on to the E2 circuit board (via the PC-104 slot in previous generation E2 circuit boards) or an external modem. If you have a modem, navigate to the COM3 Modem Port field and select Internal Modem. Press (LOOK UP) for the Option List Selection screen.

to get the correct subnet mask value, and enter it in this field.

The default value, “255.255.255.0”, is the subnet mask commonly used for small networks.

Primary DNS Contact your network administrator

to see if a Primary DNS value is required for this E2. If so, enter the Primary DNS address supplied by your administrator in this field. If not, leave this field set to “0.0.0.0”.

10.10 Set Up TCP/IP

Secondary DNS Contact your network administra

tor to see if a Secondary DNS value is required for this E2. If so, enter the Secondary DNS address sup plied by your administrator in this field. If not, leave this field set to “0.0.0.0”.

Emerson E2 — 10.10 Set Up TCP/IP diagram (page 125)
Fig. 136 · 10.10 Set Up TCP/IP

Primary Gateway Contact your network adminis

trator to see if a Primary Gateway value is required for this E2. If so, enter the Primary Gateway address supplied by your administrator in this field. If not, leave this field set to “0.0.0.0”.

Secondary Gateway Contact your network

administrator to see if a Secondary Gateway value is required for this E2. If so, enter the Secondary Gate way address supplied by your administrator in this field. If not, leave this field set to “0.0.0.0”.

Figure 10-17 - TCP/IP Addressing

The TCP/IP screen is where you enter the information necessary to allow Ethernet connection to this controller. If this site uses Ethernet box-to-box, you will need to enter a TCP/IP address and a group name to allow all E2s on site to communicate as a group. See Section 7, E2 Ether net Peer Communications for more information.

DHCP Enabled Dynamic Host Communication

Protocol (DHCP) is a protocol that assigns a dynamic IP address to devices on a network. With dynamic addressing, a device could have a different IP address every time it connects to the network. When set to Yes, DHCP Enabled keeps track of IP addresses and enables a new IP device to be added to a network without having to manually assign it a unique IP address. DHCP supports a mix of static and dynamic IP addresses.

From the Main Menu:

1. Press (System Configuration)

2. Press (Remote Communications)

3. Press (TCP/IP Setup) to advance to the TCP/ IP Setup screen

E2 units may be configured to communicate across an Ethernet computer network using TCP/IP protocol. To enable Ethernet communication, you will need to enter IP address information for the E2 in the Serial IP screen.

IP Address The IP Address field sets the network

address for this E2. Other network devices (such as PCs running UltraSite) will communicate with this E2 by sending information to this specified address. Contact your network administrator to determine what IP address to enter.

The IP Address always consists of four numbers from zero to 255, each of which is separated by a period. Enter the address in this format.

Subnet Mask Contact your network administrator

Set Up TCP/IP Quick Start • 10-11

Page 126 of the Emerson E2 user manual — 2. Press (System Configuration)
Page 126 · click to enlarge
Page 126

10.11 Set Up Network Baud Rates

Emerson E2 — 10.11 Set Up Network Baud Rates diagram (page 126)
Fig. 137 · 10.11 Set Up Network Baud Rates

10.11.1 COM1 Serial (RS232) Baud Rate

To access COM1 Serial (RS232) and I/O Network baud rates:

1. Press to open the Main Menu

Figure 10-18 - COM1 Baud Rate Setup (Serial RS232)

2. Press (System Configuration)

10.11.2 I/O Network Baud Rate

3. Press (System Information)

The I/O Network baud rate is the rate at which the E2 will communicate with input and output boards on the RS485 I/O Network, and is located directly below the RS232 Baud rate field.

4. Press (General Controller Info) and navigate to the COM1 Baud rate field

Press to select the baud rate. The appropriate baud rate is 9600 baud.

The COM1 Baud rate field determines the speed of communications between the E2 and an RS232 device (such as a satellite link or PC).

The baud rate selected in this field should correspond with the baud rate for the RS232 device. For example, if connecting a PC to this port, the PC’s COM port should be set up to communicate at the same rate as what is set in this field.

Emerson E2 — 2. Press (System Configuration) diagram (page 126)
Fig. 138 · 2. Press (System Configuration)

There are multiple options to choose from. Select one of the options below using (LOOK UP) depending on the type of connection.

  • 1200 Baud (devices that operate at 1200)
  • 2400 Baud (devices that operate at 2400)
  • 4800 Baud (devices that operate at 4800)

Figure 10-19 - I/O Network Baud Rate Setup

  • 9600 Baud (recommended for satellite)
  • 19.2 Kbaud (recommended for modem)
  • 38.4 Kbaud (recommended for modem)
  • 57.6 Kbaud (recommended for modem)
  • 115.2 Kbaud (recommended for direct connect)
Page 127 of the Emerson E2 user manual — 2. Press (System Configuration)
Page 127 · click to enlarge
Page 127

10.12 Set Up User Access

the user in at the access level chosen for the user in the user records.

Access the User Access Setup screen from the System Information menu:

The access level determines how many of the E2’s fea tures the user may use. The E2 uses four access levels, one being the lowest, and four being the highest. Table 10-7 gives a description of each level and the capabilities they have access to.

1. Press to open the Main Menu

2. Press (System Configuration)

3. Press (System Information)

Level 1 Read-only access. Users may generally only view status screens, setpoints, and some system settings.

Level 2 Setpoint and bypass access. Users may perform all the tasks a level 1 user may, plus they may change control setpoints and bypass some devices.

Emerson E2 — 2. Press (System Configuration) diagram (page 127)
Fig. 139 · 2. Press (System Configuration)

Level 3 Configuration and override access. Users may perform all the tasks a level 2 user may, plus they may override system set tings, create new cells, and program new applications.

Level 4 System Administrator access. All E2 func tions are accessible by a level 4 user.

Table 10-7 - User Access Levels

Figure 10-20 - System Information Menu

In the User Access Setup screen, you may add user names and passwords to the controller with varying levels of security, and customize user access for each security level.

To access this menu, choose option (Passwords/ User Access) from the System Information Menu.

Emerson E2 — 2. Press (System Configuration) diagram (page 127)
Fig. 140 · 2. Press (System Configuration)

Figure 10-21 - User Access Setup Screen

An E2 may be programmed with up to 25 different users. A user basically consists of a username, a password, and an access level. Whenever a username and password are entered during login, the E2 searches the user records for the username and password. If found, the E2 will log

Set Up User Access Quick Start • 10-13

Page 128 of the Emerson E2 user manual — 7. Press (BACK). 10.12.3 Deleting a User
Page 128 · click to enlarge
Page 128

10.12.1 Changing Required User Access Levels

(controller login required for acknowledging alarms). Refer to Section 12.10.8.1, Acknowledg ing, for the definition of “acknowledging alarms.”

The Level Required For table in this screen is used to customize what access level is required to perform certain actions within the E2 unit. There are four rows in this table, each of which corresponds to a different type of E2 function or application.

For each row and column of the Level Required For table, enter the desired minimum priority level that will be required for users to perform actions on each type of appli cation. E2 will check this table when a user attempts an action to verify the user has the appropriate access level to make the change. If the user’s access level is equal to or above the priority setting in the table, access will be allowed. If not, access will be denied. 10.12.2 Creating a New User Account

  • Refrigeration Control - This category includes changes or actions involving refrigeration applica tions specific to RX controllers (Suction Groups, Condensers, Circuits, CC-100s, etc.).
  • Building Control - This category includes changes or actions involving building control applications specific to BX controllers (AHUs, Zones, Lighting Control, Time Schedule, Demand Control, etc.).

After entering the User Access Setup screen by press

ing Passwords/User Access from the System Infor mation menu:

  • Common Control - This category includes control applications common to both RX and BX control lers (Sensor Control, Time Schedules, Conversion Cells, Analog or Digital Combiners, Global Dataetc.).
1. Move the cursor so that it is somewhere in the Users box at the bottom of the screen.
2. Press (ADD USER) to put a blank record at the bottom of the list.
  • Advanced Control - This category includes applica tions common to both boxes that are only used by advanced users, such as Loop/Sequence Control lers, Refrigeration or HVAC Simulations, etc.
3. Type in the user name ( Username ), and then move to the next field ( Password ) by pressing the right arrow button.
4. Type in a password for the next user, then press the right arrow button to advance to the next field.

Each row has five columns, each of which corresponds to a different category of user actions.

  • Setpoint - This includes all actions that change application setpoints. Also, clearing one or more alarms out of the Alarm Advisory Log is considered a “setpoint” action (refer to Section 12.10.8.3, Clearing , for the definition of “clearing alarms”).
5. The Auto Logout feature determines the maxi mum time user may be inactive before being logged out. Enter the amount of time for the user and press the right arrow button.
6. Enter the appropriate access level for the user. See Table 10-7 .
  • Bypass - This includes all actions that bypass a device to a certain state, such as initiating a manual defrost, or configuring an application input desig nated as a “bypass.” Also, resetting one or more alarms in the Alarm Advisory Log is considered a “bypass” operation (refer to Section 12.10.8.2, Resetting , for the definition of “resetting alarms”).

7. Press (BACK). 10.12.3 Deleting a User

To delete a user from the system:

1. Move the cursor so that it is highlighting the record to delete in the Users box at the bottom of the screen, and press (DELETE USER).
  • Override - This includes any user-ordered override of a setpoint, input, or output.
2. A question box will appear to double check the
  • Config - This includes all actions that change an application setting. This includes configuring inputs and outputs.

deletion of the current record. Press if you are sure about the deletion.

  • Alarm Ack - This includes acknowledging one or more alarms in the Alarm Log. If this field is set to 1, alarms can be acknowledged on the Alarm Advi sory Log without a user logging into the controller first. If set to 2, 3, or 4, login is required before a user can acknowledge alarms. The default is set to 3
Page 129 of the Emerson E2 user manual — 2. Press (System Configuration)
Page 129 · click to enlarge
Page 129

10.13 Set Up I/O Network

3. Press (Network Setup)

4. Press (Connected I/O Boards & Controllers)

Emerson E2 — 3. Press (Network Setup) diagram (page 129)
Fig. 141 · 3. Press (Network Setup)
Emerson E2 — 3. Press (Network Setup) diagram (page 129)
Fig. 142 · 3. Press (Network Setup)

Figure 10-22 - Network Setup Menu

To start the setup on the I/O Network, access the Net work Setup menu:

Figure 10-23 - Connected I/O Screen (RX version)

Boards on the I/O Network

1. Press to open the Main Menu

16AI Boards Enter the number of 16AI analog input boards on this E2’s I/O Network.

2. Press (System Configuration)

3. Press (Network Setup)

8RO Boards Enter the number of 8RO relay output boards on this E2’s I/O Network.

The Network Setup menu displays four options:

8DO Boards Enter the number of 8DO digital out put boards on this E2’s I/O Network.

  • Network Summary

4AO Boards Enter the number of 4AO analog out put boards on this E2’s I/O Network.

  • Connected I/O Boards & Controllers
  • Router Setup

IRLDS Controllers Enter the number of leak detec

  • Controller Associations

tor units on this E2’s I/O Network.

For the total (E2) devices online or offline, status, setup screens, changing board or controller names, config uring and commissioning devices, deleting a device, and viewing detailed status screens of controllers, select Net work Summary.

(Options will vary depending on the type of controller

used.) 10.13.2 Checking Online Status

For the number of I/O Network devices (16AIs,8ROs, etc.) associated with each controller online and offline, select Connected I/O Boards & Controllers.

Emerson E2 — used.) 10.13.2 Checking Online Status diagram (page 129)
Fig. 143 · used.) 10.13.2 Checking Online Status

To set up a router, select Router Setup. For more information on routers and repeaters, refer to the Router and Repeater Installation Guide (P/N 026-1605).

For CC-100 circuit associations, select Controller Associations. 10.13.1 Specify Number of Boards

Specify the number of boards from the Connected I/O screen:

1. Press to open the Main Menu

Figure 10-24 - Network Summary Screen

2. Press (System Configuration)

You can check all boards that are on either the Echelon Network (E2 controllers) or the I/O Network from the Net

Set Up I/O Network Quick Start • 10-15

Page 130 of the Emerson E2 user manual — input boards in this field. 10.14.2 Commissioning a Device
Page 130 · click to enlarge
Page 130

work Status screen (See Figure 10-24). The Network Summary screen displays information such as the Subnet and Node addresses for each board, and the status of Eche lon and I/O boards.

After logging in for the first time, the Connected I/O screen will ask you to specify how many of each type of device will be connected to the E2 you are currently pro gramming. (Options will vary depending on the type of controller used.)

To get to the Network Summary Screen:

Unit Number (Echelon Subnet) Each E2 on the

1. Press to open the Main Menu

Echelon Network must have a different unit number. This can be any number from 1 to 255, but each E2’s number must be unique. No two E2s on the network may have the same unit number.

2. Press (System Configuration)

3. Press (Network Setup)

4. Press (Network Summary)

Enter this number in the Unit Number field. It is rec

ommended you number the first E2 “1” and number the other E2s on the network sequentially (2, 3, 4, etc.).

From the Network Summary screen you can see the total (E2) devices online or offline, status, setup screens, change board or controller names, configure and commis sion devices, delete a device, and view detailed status screens of controllers.

Unit Name Type a name for the E2 in the Unit

Name field.

After determining if a board is offline, turn to Appen dix E: Troubleshooting.

Liquid Ctrls (CC100P/CC100LS) Enter the com

bined number of pulse valve case controllers (CC100Ps) and liquid-side stepper valve case con trollers (CC100LSs) in this field.

10.14 Set Up Echelon Network

Suction Controllers (CC100H) Enter the num

ber of suction stepper case controllers (CC100Hs) in this field.

10.14.1 Specifying Number of Devices

Circuit Suction (CS100) Enter the number of suc

tion lineup circuit controllers (CS100s) in this field.

To specify the number of devices on the Echelon Net work, navigate to the Connected I/O screen:

ESR8 Line Up Boards Enter the number of ESR

suction lineup circuit boards (SR100s) in this field.

1. Press to open the Main Menu

TD3 Temperature Displays Enter the number of

2. Press (System Configuration)

TD3 temperature display units in this field.

3. Press (Network Setup)

EC2- 29x Case Controllers Enter the number of

EC2-29x refrigerated case controllers in this field.

4. Press (Connected I/O Boards & Controllers)

EC2-39x Case Controllers Enter the number of

EC2-39x refrigerated case controllers in this field.

Echelon 16AI Enter the number of 16AIe analog

input boards in this field.

Emerson E2 — 4. Press (Connected I/O Boards & Controllers) diagram (page 130)
Fig. 144 · 4. Press (Connected I/O Boards & Controllers)

Echelon 8RO Enter the number of 8ROe analog

input boards in this field. 10.14.2 Commissioning a Device

Once all records have been created and defined for all devices on the Echelon Network, they must be “commis sioned.” Commissioning is necessary for the E2 to identify and establish communications with all devices on the net work.

To start commissioning, open the Network Summary screen:

1. Press to open the Main Menu

Figure 10-25 - Connected I/O Screen (RX version shown)

Unit Controllers (Echelon)

Page 131 of the Emerson E2 user manual — 3. Press (Network Setup)
Page 131 · click to enlarge
Page 131

2. Press (System Configuration)

If commissioning an I/O Net device and multiple I/O Net ports are available, you will be prompted to select the appropriate network during the commissioning process. Three I/O Net connections can be operational at the same time, and note that duplicate board numbers cannot be set up on different I/O Net connections. For example, only one board can be set to address "1" per board type across all I/ O Net connections. If there is more than one I/O Net con nection defined, select which I/O Net connection the board is on from the Network Summary screen through the F4 Commissioning process. 10.14.2.1 The Service Button Method

3. Press (Network Setup)

4. Press (Network Summary)

To commission a device using the service button, you must first set up the E2 to receive a service button signal, and then press the service button on the device. When the signal is received by the E2, the device will be commis sioned.

To set up the E2 to receive a service button signal, move the cursor to the Controller Name field of the record you wish to set up, and press (SET ADDRESS).

Figure 10-26 - Network Summary Screen

Emerson E2 — 3. Press (Network Setup) diagram (page 131)
Fig. 145 · 3. Press (Network Setup)

How Echelon Commissioning Works

Each device that is capable of communicating on a Echelon Network has a unique 12-digit “Neuron ID” code number that is hard-coded in a chip on the board. In order for the E2 to begin communications with a unit controller or another E2, it must know the device’s ID number.

Figure 10-27 - Commissioning Menu

When a device is commissioned, its 12-digit code is either entered by hand into the E2 (via the front panel key board) or sent across the network to the E2 using the device’s service button. Once the E2 knows the device’s 12-digit ID, it establishes communication and gives the device its user-defined subnet and node address. From that point on, the E2 uses only the subnet and node address to communicate with the device.

A menu will appear on the screen, giving you the option of either pressing the service button, entering the Neuron ID by hand, or canceling and returning to the main

screen. Press to select the service button option.

Emerson E2 — 3. Press (Network Setup) diagram (page 131)
Fig. 146 · 3. Press (Network Setup)

As mentioned above, there are two ways in which a device may be commissioned. No one way is better than the other in terms of effectiveness, but one of the methods may be less difficult than the other depending on the type of installation.

If commissioning a MODBUS device and multiple MODBUS ports are available, you will be prompted to select the appropriate network during the commissioning process.

Figure 10-28 - Service Button Screen

The E2 will prompt you to enter a wait time in the Wait Time field. The Wait Time is the amount of time the E2

Set Up Echelon Network Quick Start • 10-17

I/O Network Commissioning · MODBUS Commissioning

Page 132 of the Emerson E2 user manual — 10.14.2.2 The Manual ID Entry Method
Page 132 · click to enlarge
Page 132

will try to detect a service button press before declaring the attempt unsuccessful and returning to the main screen. To commission the device, the Neuron ID must be sent during the Wait Time duration.

The ESR8’s Service Button

Emerson E2 — 10.14.2.2 The Manual ID Entry Method diagram (page 132)
Fig. 147 · 10.14.2.2 The Manual ID Entry Method

After you enter a wait time in hours:minutes:seconds format and press , the Wait Time duration begins. All that is left to do is to press the service button on the device to be commissioned.

Emerson E2 — 10.14.2.2 The Manual ID Entry Method diagram (page 132)
Fig. 148 · 10.14.2.2 The Manual ID Entry Method

CAUTION: When the E2’s Wait Time dura tion begins, the E2 will accept the first Neuron ID code it receives. Be sure that no other ser vice buttons on any devices on the network are being pressed during the Wait Time. Since the service button on the CC-100 is its Hand-held Terminal jack, be sure that no one has a Hand-held Terminal plugged into a CC-100 other than the one being commissioned.

Figure 10-30 - ESR8 Service Button Location

The service button on the ESR8 is located on the right hand side of the board directly below the termination jumper (Figure 10-30). To send the Neuron ID, press and hold this button down for five seconds.

The location of the service button and the method of pressing it depends on the device or controller being com missioned.

The EC-2 can be commissioned by pressing the UP ARROW key on the EC-2 front panel and holding it for five seconds. 10.14.2.2 The Manual ID Entry Method

The CC-100’s Service Button

Since the CC-100 is meant to remain in an enclosure, the CC100’s Hand-Held Terminal jack has been config ured to act as the service button. Plugging a Hand-Held Terminal into the jack simulates a service button press.

The Manual ID Entry Method involves entering each device’s twelve-digit ID number by hand. When entered, the E2 searches the network and tries to match the ID number to the device. When the E2 finds this device, the commissioning process is completed.

The Hand-Held Terminal Jack is on the left side of the case controller next to the power cable harness connec tion. To send the Neuron ID, plug a Hand-Held Terminal into the jack and hold it in for five seconds.

The easiest way to set up a multiple-node store using the Manual ID Entry Method is to arrange all network devices into a list that shows each device’s name, subnet and node address, controller type, and corresponding Neu ron ID number. Once this list is complete, each device may be commissioned one at a time from the E2 front panel.

The TD3’s Service Button

Emerson E2 — 10.14.2.2 The Manual ID Entry Method diagram (page 132)
Fig. 149 · 10.14.2.2 The Manual ID Entry Method

To make a list of network devices, follow the steps below:

1. For each record set up in the Controller Network Configuration/Status Screen, write down the con tents of each device’s Controller Name, Model, Subnet, and Node fields on a sheet of paper. If desired, you may also include the model or serial numbers of the units that will be controlled, as well as a physical location.

Figure 10-29 - TD3 Service Button Location

2. When step 1 is complete, go to where each device on the list is installed and locate each device’s Neuron ID sticker. Every Echelon-compatible device available from Emerson Retail Solutions has a sticker on its enclosure that shows the unit’s Neuron ID number. Each sticker also has a perfo

The service button on the TD3 is located on the front panel (Figure 10-29). Of the two buttons on the face, the commissioning button is the one on the right. To send the Neuron ID, press and hold this button down for five sec onds.

Commissioning the EC-2

Page 133 of the Emerson E2 user manual — 2. Press (Licensing)
Page 133 · click to enlarge
Page 133

10.15 License Management

rated tag at the bottom that may be removed and affixed to your form. Tear this tag off and stick it in the Neuron ID blank on the sheet of paper. If the perforated tag has already been removed, write the ID number in the blank.

Some applications in the E2 are only available when activated with a license key that is obtained through Emer son Retail Solutions. Licensing allows the user to activate certain features in the E2.

When all Neuron ID numbers have been collected, return to the E2 and enter the Neuron ID numbers for each device. To commission a device, move the cursor to the device to be commissioned and press (Set Address).

To obtain a license for a feature, go to the TCP/IP setup screen and obtain your E2 controller’s MAC Address. Press + T, or from the Main Menu:

1. Press (System Configuration)

2. Press (Remote Communications)

3. Press (TCP/IP Setup) to open the TCP/IP Setup screen and locate your E2’s MAC address (circled in Figure 10-33 ):

Figure 10-31 - Commissioning Menu

Emerson E2 — 1. Press (System Configuration) diagram (page 133)
Fig. 150 · 1. Press (System Configuration)

A menu will appear on the screen, giving you the option of either pressing the service button, entering the Neuron ID by hand, or cancelling and returning to the

main screen. Press to select the manual entry option and bring up the dialog box shown in Figure 10-32.

Emerson E2 — 1. Press (System Configuration) diagram (page 133)
Fig. 151 · 1. Press (System Configuration)

Figure 10-33 - TCP/IP Screen - Locating the Mac Address

4. Call Emerson Retail Solutions Customer Service at 770-425-2724 and have your MAC Address ready in order to obtain your unique license key.

Figure 10-32 - Setting Controller Address - Neuron ID

Enter the device’s Neuron ID as it appears on the form you created, and press . The E2 will then look for the controller with the Neuron ID you entered. If it is found, the E2 commissions the device, and you may move on to commissioning the next device.

Once you have received your unique license key from Customer Service, you can now activate the licensed fea ture(s) from the License Report screen. The License Report screen displays that E2 controller’s unit type and firmware version, the list of all licensed features on that E2, the current number and maximum number of each of those applications allowed, and which additional features, (that require a license key), have been enabled.

If E2 does not find it, the display will read “ERROR - Controller with specified Neuron ID did not respond.” This could be caused by an improperly entered number, or it could be caused by a problem with the device’s network connections or power connections.

From the Main Menu:

1. Press (System Configuration)

When all devices are commissioned, keep the form with the Neuron ID stickers in an easily accessible place so that it may be referred to if necessary for board remov als, replacements, or troubleshooting.

2. Press (Licensing)

3. Press (Add Feature)

License Management Quick Start • 10-19

Page 134 of the Emerson E2 user manual — 3. Press (Alarm Setup)
Page 134 · click to enlarge
Page 134

Enter your license key to activate the desired feature:

mation.

  • Connect to the selected E2 for remote configuration changes.
Emerson E2 — 10.15.1 Web Services diagram (page 134)
Fig. 152 · 10.15.1 Web Services
  • Access Terminal Mode.
  • View Alarms.

To access Web Services:

Open a browser window and enter the IP Address of your E2 controller:

Emerson E2 — 10.15.1 Web Services diagram (page 134)
Fig. 153 · 10.15.1 Web Services

Figure 10-34 - Enter Your Unique License Key

4. Reboot the controller and open the License Report screen again to see the license key appear next to the activated feature ( Figure 10-35 ):
Emerson E2 — 10.15.1 Web Services diagram (page 134)
Fig. 154 · 10.15.1 Web Services

Figure 10-36 - E2 Web Services Page

10.16 Set Up Alarming

To set up alarms, open the Alarm Setup menu:

Figure 10-35 - License Report Screen

1. Press to open the Main Menu

10.15.1 Web Services

2. Press (System Configuration)

Web Services is a licensed feature that allows the user, once the required license has been obtained and entered, to view and adjust certain parameters in the E2 controller through a Web page. The E2 Web Services feature enables the user to:

3. Press (Alarm Setup)

  • View site-specific information such site name, site phone, local date and time.
  • View the current version of the E2. This includes the type of unit (e.g., RX-400) and the version of the firmware.
  • View global data values such as outside air tem perature and humidity.
  • View a list of other networked area controllers at the site, including version and controller type infor
Page 135 of the Emerson E2 user manual — 10.16.1.2 The Alarm Output
Page 135 · click to enlarge
Page 135

10.16.1 Specifying Alarm Reporting Types

Emerson E2 — 10.16.1 Specifying Alarm Reporting Types diagram (page 135)
Fig. 155 · 10.16.1 Specifying Alarm Reporting Types

Apart from storing alarms it generates in its own Alarm Advisory Log, E2 can also report alarms it gener ates or receives in order to notify personnel. E2 can report alarms in several different ways. 10.16.1.1 The Display Line

Alarms that occur within an E2 (or which are received by an Alarm Annunciator from another E2) may be reported to the header display at the top of the screen. When an alarm is reported to the display, the word “*ALARM*” flashes underneath the time at the top of the screen, allowing site managers or supervisors to see that one or more alarms are active for the E2.

Figure 10-37 - Alarm Setup Menu

Figure 10-38 - Display Line

10.16.1.2 The Alarm Output

Each E2 has a single digital output that reacts to alarm reports. An alarm can be reported to this output, in which case the output turns ON and remains on until the alarm condition has returned to normal. 10.16.1.3 Dial-Out

Alarms may be sent to remote alarm receivers via the modem defined for the controller. Possible dial-out devices include a PC running UltraSite, a printer, a fax machine, and a digital pager. Dial-out sites are configured in Section 10.16.3. 10.16.1.4 The Echelon Network (The Alarm Annunciator)

If multiple E2s exist on a network, you may choose to send alarms from all E2s across the Echelon Network so that they may be picked up by the Alarm Annunciator.

The Alarm Annunciator is the primary alarm reporting device in a multiple-device E2 Network. The Alarm Annunciator gathers all alarms posted by all devices on the Echelon Network, records them in its own advisory log, and applies its own set of alarm filters to determine if the alarms should be dialed out, reported to its display, or sent to its Advisory Output.

There are several benefits to having an Alarm Annun ciator:

  • An Alarm Annunciator makes it possible to handle all alarm dial-outs for all controllers with a single modem or network card.

Set Up Alarming Quick Start • 10-21

Page 136 of the Emerson E2 user manual — 2. Press (System Configuration)
Page 136 · click to enlarge
Page 136
  • Users can view alarm notifications and alarm logs for all controllers from the Alarm Annunciator.
  • Only the Alarm Annunciator needs to be pro grammed with alarm filter settings for dial-out, out put, and display. All other controllers may be programmed to simply send all alarms to the Alarm Master via the LonWorks Network. 10.16.2 Setting up an E2 to be an Alarm Annunciator
Emerson E2 — 10.16.2 Setting up an E2 to be an Alarm Annunciator diagram (page 136)
Fig. 156 · 10.16.2 Setting up an E2 to be an Alarm Annunciator

Any E2 on the network that has a modem or Ethernet connection can be set up as an alarm annunciator, but only one alarm annunciator per network is allowed. To set up from the Main Menu:

Figure 10-39 - Alarm Annunciator

1. Press (System Configuration)

2. Press (System Information)

10.16.3 Alarm Dial-Out

3. Press (General Controller Info)

Emerson E2 — 1. Press (System Configuration) diagram (page 136)
Fig. 157 · 1. Press (System Configuration)
4. Set Alarm Annunc field to Yes .

If the target E2 is configured as the Annunciator, the AnnuncIsHomesScrn property becomes available in General Services to select if the Annunciator log is to be the Home screen. The property will default to Yes. If the property is set to No, the Home screen will be either the default Home screen or the user-selected Home screen.

Figure 10-40 - Alarm Setup Menu

One of the E2’s most important alarm reporting fea tures is its ability to dial-out to remote sites whenever a serious alarm condition occurs. Each E2 is capable of dial ing out to up to three sites. The E2 may dial out to a com puter, a fax machine, a digital pager, or a printer. To set up from the Main Menu:

Dial-out devices are set up in the Dial-out Setup screen. To reach this screen:

1. Press (Main Menu)

2. Press (System Configuration)

3. Press (Alarm Setup)

4. Press (Dial-out Setup)

Page 137 of the Emerson E2 user manual — 1. Press (System Configuration)
Page 137 · click to enlarge
Page 137
4. The LonWorks Network (The Alarm Annunciator)

If multiple E2s exist on a network, you may choose to send alarms across the LonWorks Network so that they may be picked up by the Alarm Annunciator.

Emerson E2 — 10.16.4 Introduction: Alarm Reporting diagram (page 137)
Fig. 158 · 10.16.4 Introduction: Alarm Reporting

Refer to Section 10.16.2 for information on how an Alarm Annunciator works.

10.17 Set Up Global Data

Emerson E2 — 10.17 Set Up Global Data diagram (page 137)
Fig. 159 · 10.17 Set Up Global Data

Figure 10-41 - Remote Dialout Setup Screen

This screen and the other screens that follow it are used to set up dial-out sites for both daytime and nighttime operation, including specifying phone numbers and IP addresses. Use the and keys to cycle through the Setup screens. 10.16.4 Introduction: Alarm Reporting

Figure 10-43 - System Configuration Menu

In general, a controller reports alarms to any or all of four different sources:

In a network with multiple E2s, it is often the case that certain sensors or transducer values will need to be used by all E2s. A good example of this is outside air tempera ture. There is no real need for every E2 to have its own outside air temperature sensor, and therefore it would be beneficial if a single sensor could be used by all E2s on the network.

1. The E2 Display Header

Alarms that occur within a E2 may be reported to the header display at the top of the screen. When an alarm is reported to the display, the word “*ALARM*” flashes underneath the time at the top of the screen, as shown in the example below:

Emerson E2 — 10.17 Set Up Global Data diagram (page 137)
Fig. 160 · 10.17 Set Up Global Data

Figure 10-42 - E2 RX Display Header

2. The Advisory Output

Each E2 has a single digital output that reacts to alarm reports. When an alarm is reported to this output, the out put turns ON and remains on until the alarm condition has returned to normal.

3. Dial-Out

Figure 10-44 - Global Data Setup Screen

Navigate to the Global Data screen from the Main Menu:

Alarms may be sent to remote alarm receivers via the modem defined for the controller. Possible dial-out devices include a PC running UltraSite, a printer, a fax machine, and a digital pager.

1. Press (System Configuration)

2. Press (Global Data) to open the Global Data

Set Up Global Data Quick Start • 10-23

Page 138 of the Emerson E2 user manual — 10.17.1 Priority Settings
Page 138 · click to enlarge
Page 138

Status screen.

value in place of the failed primary value.

3. Press (Setup) to open the Global Data Setup screen.

Secondary providers will continue to send the input

value until the primary provider again sends a valid update to the other Global Data applications. The secondary provider would then stop sending the sec ondary value, and all Global Data applications would use the primary value.

The Global Data feature is an enhanced method of effectively distributing commonly used input values between multiple E2s. Sensors such as outdoor tempera ture and outdoor humidity are set up on an E2 as Global Data inputs. This E2 then becomes the “provider” of the global sensor values to all other Global Data applications on the E2.

If using this priority setting, you must enter board and

point settings.

ExampleOut of three E2s, an outside air temperature

As a result, a single sensor can be used by any applica tion in any E2 on the network.

sensor on E2 A’s I/O Network is set up as the primary provider of the global Outside Air Temp input. A sim ilar sensor is set up on E2 C with a secondary prior ity (see Figure 10-45).

Unless you program it otherwise, the E2 always assumes you will be using Global Data in all your applica tions. When you create new applications in the E2, it will always automatically connect the appropriate application inputs (except for the spares) to their corresponding Global Data outputs. 10.17.1 Priority Settings

As long as E2 A is capable of broadcasting a valid

temperature value, all three E2s would use E2 A’s Outside Air Temperature value in their own Global Data applications.

However, if E2 A loses contact with the sensor, E2 A no

longer has a valid temperature value to send to the other Global Data applications. After five minutes of no updates from E2 A, E2 C will consider the pri mary Outside Air Temp source to have failed, and it will begin sending the value of the secondary sensor to the Global Data applications of the other two E2s. All E2s would then use this secondary value as Out side Air Temperature.

When selecting the priority for a global sensor input, there are four settings to choose from.

Primary Primary inputs are the highest priority

inputs. If a sensor is set up with a primary priority, it is recognized by all Global Data applications on the network as the highest priority. The primary provider sends this input value to the other Global Data appli cations in the other E2s, and each E2 immediately sends that value to all of its own applications that use the Global Data input.

Only one input of each type may be designated as a

primary on the E2 Network. In other words, if one E2 is acting as the primary provider of the global Out door Air Temp, no other E2 on the network may have a global Outdoor Air Temp sensor with a “primary” priority.

If using this priority setting, you must enter board and

point settings.

Secondary Sensors that are set up with secondary

priorities are backup sensors that will be used by all Global Data applications if the primary sensor fails.

If a global input is set up on an E2 with a secondary

priority, the E2 will not send its value to the other Global Data applications as long as it is receiving a primary value of that type from another E2 on the network. If a secondary provider does not receive a primary value update at least once every five min utes, the secondary provider will assume the primary sensor has failed, and it will send the secondary value to all other Global Data applications on the net work. These applications will then use the secondary

Page 139 of the Emerson E2 user manual — 10.18 Set Up Applications
Page 139 · click to enlarge
Page 139
ExampleSetting Up an Outdoor Temperature Sen sor
Emerson E2 — 10.18 Set Up Applications diagram (page 139)
Fig. 161 · 10.18 Set Up Applications
1. Press (Global Data) and the Status screen opens.
2. Move the cursor to the Outdoor Air Temperature (OAT) Mode, and then choose the priority by

scrolling with the , keys.

3. Press the down arrow button once to the Board and Point section and enter the board and point locations for the sensor.

PRIMARY USED AS GLOBAL OUTSIDE AIR TEMP BY ALL E2s

4. Press (BACK) to return to the Main Status (Home) screen.

The Outdoor Air Temperature sensor is now set up as a global device in the E2. Other global inputs can be set up using the same method as above.

E2 is now ready to be programmed with applications.

10.18 Set Up Applications

From the Main Status (Home) screen, place the cursor on the application you wish to view and press

(SETUP). You can also press and select (Setup) from the Actions Menu to open the Setup screen for your selected application.

Figure 10-45 - Global Data Priority Example

Just as there may be only one primary provider for

each input type, there may be only one secondary for each input type. It is recommended that secondaries be set up on different E2s than primaries; this way, if a single controller fails or loses communication with the other E2s, there will still be a usable input source for the other E2s.

User This setting means the E2’s global data will

read (or be a “User” of) all values coming from the network. This setting is for E2s that are not con nected to the sensor itself, but read the data that comes from it.

If the application in this E2 will be using primary or

secondary inputs from other E2s, then set the priority to “USER.”

Local Only This setting specifies that the input to

the global data is read and sent only to within the E2 you are programming. Also, this means that this E2 will not read any Primary or Secondary providers from the network.

If using this priority setting, you must enter board and

point settings.

Set Up Applications Quick Start • 10-25

Page 140 of the Emerson E2 user manual — 10.18.1 Add/Delete an Application
Page 140 · click to enlarge
Page 140

10.18.1 Add/Delete an Application

10.18.2 Using and Configuring a Setup Screen

Add an Application:

1. Press the key to open the Main Menu screen.

The Setup screen is application-specific depending on where you place the cursor on the Home screen.

2. Select (Add/Delete Application) to open the Add/Delete Application menu.

Press to open the Actions Menu and select (Setup), or press (SETUP) on the Home screen.

3. Select to add an application.

The Setup screen for your selected application will open.

4. Choose an application by pressing (LOOK UP) to open the Option List Selection menu, and choose the application you wish to add.
5. Press to place the application in the Type field.
6. Select the number of applications you wish to add in the How many? field.
7. Press to add.
8. You are then asked if you would like to edit the application now. Press Y (Yes) or N (No).

Delete an Application:

1. Press the key to open the Main Menu screen.
2. Select (Add/Delete Application) to open the Add/Delete Application menu.
3. Select (Delete Application).
4. Press to delete the application if not dis played by default.
5. If not displayed by default, choose the applica tion you wish to delete by selecting (LOOK UP). The Option List Selection menu opens. Choose the application you wish to delete from this list.
6. Press and the application appears in the Type field.
7. Press to delete the application.
8. A dialog box opens asking if you are sure you want to delete the application you have selected. Press Y (Yes) or N (No).
Page 141 of the Emerson E2 user manual — 10.18.2.3 Navigating the Setup Screen
Page 141 · click to enlarge
Page 141

10.18.2.1 The Edit Menu

10.18.2.2 Entering Setpoints

An application setpoint is a user-defined control parameter stored inside the controller. Setpoints can be programmed from any application setup screen.

Emerson E2 — 10.18.2.1 The Edit Menu diagram (page 141)
Fig. 162 · 10.18.2.1 The Edit Menu

To enter setpoints from a Setup screen:

1. Press (SETUP) from the desired applica tion’s Status screen. (If starting from the Home screen, move the cursor to the desired applica tion’s value and press to open the Actions Menu. Choose Setup . This will take you to the Setup screen.)
2. Once inside the application’s Setup screen, look for the Setpoints option in the index tabs along the top of the screen.
3. Use (NEXT TAB) to tab over and the Set points box of your application will open.

Figure 10-46 - Edit Menu

The Edit menu becomes available when you are on a Setup screen and can be opened by pressing (EDIT). Depending on which Setup option (index tabs) is high lighted, the Edit menu allows you to change field format ting using these options:

Emerson E2 — 10.18.2.1 The Edit Menu diagram (page 141)
Fig. 163 · 10.18.2.1 The Edit Menu
  • Alternate I/O Formats - setting up pointers can change a field to expect a Board:Point , Fixed Value , or Area Ctrl:Application:Property .
  • Set Multiple Outputs - allows you to connect an output pointer to multiple input pointers.
  • Output Change Delta - the +/- change that must occur at the output before the new value is used.
  • Generic Alarm Setup - enables the user to customassign alarming parameters in the controller.

Figure 10-47 - Setpoints Box

  • Logging Setup - enables the user to turn logging on for a particular parameter. Note that if “L” appears next to the parameter, default logging has already been enabled for the Logging Group Cell.

10.18.2.3 Navigating the Setup Screen

Emerson E2 — 10.18.2.3 Navigating the Setup Screen diagram (page 141)
Fig. 164 · 10.18.2.3 Navigating the Setup Screen
  • Bypass Setup - Opens screen for bypass input types, which are “Momentary” or “Level” triggered and remain active for a “Bypass Duration”. For example, Time Schedules have two such inputs.
  • I/O Mode - toggles between displaying board names and board numbers.
  • Setup I/O - allows user to enter an input or output point setup screen.

Figure 10-48 - Typical Setup Screen (RX version shown)

The Setup utility is the interface used to change set tings and setpoints, and define inputs and outputs in the

Set Up Applications Quick Start • 10-27

Page 142 of the Emerson E2 user manual — $ STATUS, OVERRIDE,
Page 142 · click to enlarge
Page 142

E2. Figure 10-11 and Figure 10-48 show a typical Setup screen and its primary elements.

Blank tabs are inaccessible. There are several reasons why a tab may be inaccessible (i.e., without a name next to the number):

  • The tab (and the corresponding screen) is unused and reserved for later revisions.

The ten boxes at the top of the screen labeled C1 through C0 are known as the index tabs. These tabs pro vide a short index of the screens that are used to set up the current application. The numbers C1 through C0 represent the screen numbers (C1 being screen 1, C2 being screen 2, and so on).

  • The screen may only be accessed when running in Full Options mode.
  • The screen may require one or more fields to be set to certain values before the screen may be accessed. For example, a screen containing nothing but com pressor proof input definitions might be hidden if there is a field on another screen that tells the sys tem there are no proof checking devices on the group’s compressors. To access this screen, you would have to set this field to “YES”.

Each of the Setup screens that you may access will have a name beside its number. But as in Figure 10-11 and Figure 10-48 for example, you will notice some tabs have names, while others are blank.

As you move through these screens within the Setup Editor, the highlight will move to different tabs to indicate which screen is being displayed.

The screen you are currently in is always highlighted in the screen’s index tab. For example, in Figure 10-11 and Figure 10-48, because Screen 1 is displayed, tab C1 is highlighted.

  • Pressing (PREV TAB) will back-up the order of the screens.
  • Pressing (HOME) at any point will take you to the Main Status (Home) screen.

The line near the bottom of the screen above the func tion key menu is the help line. The help line this time pro vides a short description of the selected field, along with important information such as minimum and maximum value ranges, and setup instructions.

The Function Keys For Setup

1. Position the cursor somewhere inside the Suc

tion Groups section and press and (Setup), or just (SETUP) from the Home screen. The General Setup screen will be dis played.

The five boxes at the very bottom of the screen show the function of keys through . Most of these keys retain the same function no matter which field, screen, or application is selected in a Setup screen. Table 10-8 shows what each key is used for.

2. Press (NEXT TAB) to move the cursor to Setpoints. The Setpoints Setup screen is dis played.

! PREV TAB Moves backward one

3. Press again and the Inputs Setup screen comes up.

@ NEXT TAB Moves forward one

4. Press a few more times to see the rest of the Setup menu screens. When the C0 tab (MORE) is highlighted, there may be more

# EDIT Opens the Edit Menu

than one extra Setup screen. Press + (zero) to see a list of all Setup screens for that application.

$ STATUS, OVERRIDE,

Opens the Detailed Sta

tus screen, Opens the Override Update screen,

5. Keep pressing while taking note of the extra screens until C1 is highlighted once more.

or Look Up Tables

% CANCEL Cancels the operation

Table 10-8 - Function Keys for Setup Screens

These screens (C1 through C0) contain all of the set up information that is associated with the selected suction group.

After all of the functions of E2 are set up, the next step is to set the System Configuration, which is basically how the system is used.

Show 7 more labels / short text on this page
Index Tabs · The Help Line · Key Function Description · screen · screen · box · or LOOKUP
Page 143 of the Emerson E2 user manual — 10.18.3 Using the Help Key to get Property Help
Page 143 · click to enlarge
Page 143

10.18.3 Using the Help Key to get Property Help

Property Help gives an explanation of the parameter, input, or output the user has selected.

Pressing the key while the cursor is pointing to a parameter, input, or output opens the Property Help win dow. The Property Help window displays documentation specific to the parameter, input, or output the cursor is cur rently pointing to.

Set Up Applications Quick Start • 10-29

Page 144 of the Emerson E2 user manual — 10.18.3 Using the Help Key to get Property Help
Page 144 · click to enlarge
Page 144
Page 144 of the Emerson E2 user manual — 10.18.3 Using the Help Key to get Property Help
Page 145 of the Emerson E2 user manual — 11.1.2.1 Overview of PID Control Strategy
Page 145 · click to enlarge
Page 145

11 Software Overview

11.1 Suction Groups

should be switched ON or OFF to best fulfill the require ment. For example, if the application says that 60% of the total compressor rack’s power should be active, and the rack has compressors totaling 50 HP, then E2 will try to switch on compressors totaling 30 HP.

11.1.1 Introduction

The E2 RX refrigeration controller uses suction group applications to cycle compressors in an effort to maintain a constant suction pressure or temperature in a refrigeration system. A suction group may contain up to 16 compressor stages (standard, variable-speed, or unloader).

For more information on PID, see Appendix D: PID Control. 11.1.2.2 Variable-Speed Compressors

Suction Group applications are compatible with vari able-speed compressors. VS compressors allow Suction Group applications to “fine-tune” the amount of total active rack horsepower to react to small changes in suction pressures or temperatures. As a result, the rack does a bet ter job of controlling suction, requiring less compressor switches.

There are two different types of suction group applica tions:

  • Suction Group - The “standard” suction group application that has existed since the first version of E2 firmware. The Suction Group uses PID Control and with proper optimization it can achieve very tight suction pressure or temperature control, but compressor cycling is not based on load analysis and can be inefficient, especially in larger racks. All versions of E2 support the standard Suction Group application.

When a variable-speed compressor is present, it will generally be treated as the primary pressure controlling device, and any other standard compressors in the rack are secondary devices used only if the VS compressor is unable to fully handle the required horsepower. The vari able-speed compressor will be the first compressor on and the last compressor off. 11.1.2.3 Floating Setpoint Control

  • Enhanced Suction Group - Introduced in E2 version 2.30F01, the Enhanced Suction Group has all of the important features of the older Suction Group appli cation, but instead of employing user-configured PID constants to optimize operation, the Enhanced Suction Group determines optimum control by “learning” the effect each compressor and circuit load has on the suction input. The Enhanced Suc tion Group is easier to configure and more conser vative with compressor cycling than the standard Suction Group. In addition, the Enhanced Suction Group also supports use of the Copeland Digital Scroll and Copeland Digital Discus compressors. 11.1.2 The (Standard) Suction Group Application

The Floating Setpoint strategy within the E2 RX pro vides a method for varying the suction setpoint of the group based on the temperature within a circuit. When Floating Setpoint Control is enabled, the E2 RX monitors either a circuit temperature or a case temperature from a CC-100 and adjusts the suction setpoint if the temperature is too low or too high.

The user establishes a range outside of which the E2 RX is instructed to make a one PSI adjustment to the suc tion pressure setpoint to either reduce or increase the case temperature. If the temperature continues to remain out side of the range for a user-defined period of time, the E2 RX continues to make pressure setpoint adjustments until the temperature is within the established range.

11.1.2.1 Overview of PID Control Strategy

By varying the suction pressure setpoint to match the temperature requirements of the circuit, the E2 RX is able to ensure product integrity while achieving maximum rack efficiency. 11.1.3 The Enhanced Suction Group Application

A Suction Group application looks at suction pressure or suction temperature to determine how many compressor stages should be ON or OFF. The application compares the suction pressure or temperature to its control setpoint using PID control. The result of this comparison is a per centage from 0% to 100% that corresponds to the total capacity of the compressor rack that should be active.

The Suction Group application then takes that percent age and determines what combination of compressors

A Suction Group application looks at suction pressure or suction temperature and compares it to the suction set point to determine whether compressor stages should be

Suction Groups Software Overview • 11-1

Page 146 of the Emerson E2 user manual — 11.1.3.1 Learning Mode
Page 146 · click to enlarge
Page 146

cycled ON or OFF. Unlike the Suction Group application, which uses a PID percentage to determine how many stages to turn ON or OFF, the Enhanced Suction Group keeps historical data of the effects each compressor stage has on the suction pressure or temperature, and analyzes that data to determine which stages to cycle.

trol” or “Tightest Control” will increase the application’s reaction to suction changes, resulting in tighter control (usually at the expense of more frequent cycling). If fewer compressor cycles are desired, setting the field to “Less Cycling” or “Least Cycling” will decrease the number of cycles but also increase the amount of fluctuation in the suction pressure. 11.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Support

The Enhanced Suction Group application is designed to balance tight control of suction pressure with economic management of compressor cycling to reduce power usage and compressor wear. 11.1.3.1 Learning Mode

The Enhanced Suction Group supports variable-speed compressors similar to the Suction Group application. When a variable-speed compressor is present, it is the first compressor stage ON and the last stage OFF, and its capacity is varied to attempt to correct small fluctuations in the suction pressure or temperature.

When an Enhanced Suction Group application runs for the first time, it undergoes a “Learning Mode” period to collect data on the compressor stages. During Learning Mode, the Enhanced Suction Group will control suction pressure, but it will purposely cycle the compressor stages in different combinations to measure the effect they have on the suction input value.

In addition, the Enhanced Suction Group application supports use of one or multiple Copeland Digital Scroll or Digital Discus compressors for use as a variable-capacity compressor. With several Digital Scroll or Digital Discus compressors, the Enhanced Suction Group will modulate one of those compressors at a time to control suction pres sure. As compressor capacity is added or removed, the Enhanced Suction Group may modulate another Digital Scroll compressor to distribute compressor resources and solenoid wear.

The Learning Mode lasts for several minutes. After Learning Mode ends, the Enhanced Suction Group will require up to 24 hours of operation before compressor cycling is operating at maximum efficiency. If compressor cycling seems too frequent after 24 hours of operation, you may reduce compressor cycling by changing the Con trol/Cycles parameter (see Section 11.1.3.3, The Control/ Cycles Parameter). 11.1.3.2 Circuit Load Analysis

The operating capacities of the Copeland Digital Scroll and Copeland Digital Discus compressors are determined in the same way as a variable-speed compressor, except the Copeland Digital Scroll and Copeland Digital Discus controlled by pulse-width modulation (PWM). 11.1.3.5 Floating Suction Control

Unlike the standard Suction Group algorithm, the Enhanced Suction Group includes Circuit Setup where you associate all circuits connected to the suction group. Once the circuits are set up, the suction group will use the circuit states to help determine current loads on the suction group. For example, when one or more circuits go into defrost, the Enhanced Suction Group determines that there is less of a load on the suction group than if all circuits were in refrigeration. With the appropriate circuits associ ated, the Enhanced Suction Group tailors its capacity to meet the load. Over time, the Enhanced Suction Group will build and store a profile for all the different combina tions of circuit states encountered in the algorithm. 11.1.3.3 The Control/Cycles Parameter

Floating suction control in the Enhanced Suction Group behaves identically to the way it works in the Suc tion Group application. Refer to Section 11.1.2.3, Floating Setpoint Control. 11.1.4 Hardware Overview

An overview of the input and output devices that make up a Suction Group is shown in Figure 11-1. These devices should be wired to input and output boards in the manner outlined in Table 11-1 and Table 11-2.

Unlike the standard Suction Group, which used PID constants as a means of optimizing suction control and had limited features for controlling compressor cycle counts, the Enhanced Suction Group has one parameter with five preset settings to allow users to alter suction control per formance or compressor cycling frequency.

The default setting, “Moderate Control,” seeks to bal ance good suction pressure control with efficient cycling. If tighter control is needed, setting the field to “Tight Con

Page 147 of the Emerson E2 user manual — 11.2 Condenser Control
Page 147 · click to enlarge
Page 147
Emerson E2 — 11.2 Condenser Control diagram (page 147)
Fig. 165 · 11.2 Condenser Control
Emerson E2 — 11.2 Condenser Control diagram (page 147)
Fig. 166 · 11.2 Condenser Control

Table 11-1 - Suction Group Inputs

Figure 11-1 - Diagram of a Suction Group

Emerson E2 — 11.2 Condenser Control diagram (page 147)
Fig. 167 · 11.2 Condenser Control

Compressor N.C. N.C. (up) If you want a compressor to be OFF during network/ power loss, use N.O. failsafes instead.

Unloader N.C. N.O. (down) These fail-safe settings are specifically for unloaders.

N.C. N.C. (up) Keeps solenoid energized during network/power loss.

Electric Defrost N.O. N.O. (down) Keeps contacts de-energized during network/power loss.

Table 11-2 - Suction Group Outputs

11.2 Condenser Control

that compares a single Control In input to a PID setpoint. The resulting percentage is used to activate the condenser fan(s) necessary to bring the input value down below the setpoint.

An E2 RX is capable of controlling air-cooled or evap orative condensers. The E2 RX-300 may control a single condenser, while the RX-400 may control up to two con densers. 11.2.1 Air Cooled Condensers

Control inputs for air cooled strategies most commonly come from a pressure transducer mounted on either the discharge line, the condenser inlet, or the condenser outlet. However, temperature sensor values will also be accepted. 11.2.1.2 Temperature Differential Strategy

An air-cooled condenser consists of one or more fans that blow air across a manifold of tubing to cool heated refrigerant and condense it into a liquid. The E2 controls condensers by activating or deactivating fans in order to maintain discharge pressure or temperature at or below a chosen setpoint.

The temperature differential strategy attempts to keep a minimum amount of difference between the temperature of the refrigerant and the ambient outside temperature.

A Condenser Control application may use either of two strategies to operate air cooled condensers: an air-cooled strategy, or a temperature differential (T-D) strategy. 11.2.1.1 Air Cooled Strategy

This strategy begins by determining the temperature of the refrigerant coming into the condenser. This can be sup plied by either a temperature sensor or pressure transducer located near the condenser inlet; if it’s a pressure trans ducer, its value will automatically be converted to a tem perature value based upon the type of refrigerant.

The air cooled strategy uses a simple PID control loop

Condenser Control Software Overview • 11-3

Page 148 of the Emerson E2 user manual — 11.2.2 Evaporative Condensers
Page 148 · click to enlarge
Page 148

The refrigerant temperature is subtracted from the value of an ambient air temperature sensor. The result is the temperature differential. It is this differential value that is compared to the PID setpoint for the purpose of determining the amount of total fan capacity to activate. 11.2.2 Evaporative Condensers

ation system is being used as reclaim heat by an HVAC unit.

The most common way E2 achieves split mode in an air-cooled condenser with single-speed fans is to lock OFF 50% of the total number of fans. You may choose to lock OFF all odd-numbered fans, even-numbered fans, the first half of all fans, or the last half of all fans.

In an evaporative condenser, water is sprayed across a condenser coil, which cools the refrigerant as water is evaporated. Control of the evaporative condenser is simi lar in ways to the air cooled strategy in that the Condenser Control application uses PID control to activate or deacti vate fans (thus increasing or decreasing the amount of evaporative cooling).

Split mode can also be achieved by activating a valve that bypasses a portion of the tubing in the condenser man ifold. The resulting decrease in surface area results in reduced cooling. 11.2.5 Fast Recovery

Under certain conditions the system pressure may increase too quickly above the condenser setpoint to be reduced effectively by normal condenser control. The E2 provides a user-definable fast recovery rate setpoint at which all the condenser fans are turned ON to reduce sys tem pressure.

Like air-cooled condensers, evaporative condensers may be controlled by discharge pressure or temperature. They may also be controlled by water sump temperature. In addition, each evaporative condenser may have up to 16 “override” sensors (either temperature or pressure) that allow the condenser to be overridden to fast recovery mode (See Section 11.2.5, Fast Recovery). 11.2.3 Fan Control

For air-cooled and temperature-differential condenser strategies, discharge pressure is always used as the control value that determines fast recovery. You may choose to enable or disable fast recovery, and also to include a delay when transitioning from one mode to the other.

Condenser Control applications can control three dif ferent kinds of fans: single-speed fans (up to 12 stages), two-speed fans, and variable-speed fans. All fan types are controlled by PID control; in other words, the Condenser Control application generates a percentage from 0% to 100% that corresponds to the amount of total fan power that should be active.

For evaporative condensers, up to 16 “override” tem perature sensors may be combined to yield a single over ride value that is used for fast recovery. Fast Recovery is always used in an evaporative condenser. 11.2.6 Hardware Overview

Single-speed fans translate the PID percentage into a percentage of total fan capacity. For example, if the PID percentage is 75%, then 75% of all condenser fan stages will be ON.

An overview of the input and output devices that make up a typical Condenser Control application is shown by Figure 11-2 and Figure 11-3. Figure 11-2 shows the typi cal layout of an air-cooled condenser. Figure 11-3 shows the typical layout of an evaporative condenser.

Two-speed fans use Cut In/Cut Out setpoints to trans late the percentage into an OFF, LO, or HI fan state.

Variable-speed fans simply use the percentage to determine the fan speed. Thus, a 51% PID percentage will result in the fan running at 51% maximum speed.

Emerson E2 — 11.2.2 Evaporative Condensers diagram (page 148)
Fig. 168 · 11.2.2 Evaporative Condensers

VS-SS combined fan setup is for the combination of a variable-speed fan with single-speed fans. First, under PID control, the variable-speed (VS) fan turns on. Then as the PID percentage rises above VS fan’s maximum speed, the E2 switches on additional single-speed fan stages. 11.2.4 Condenser Split Mode

The E2 is capable of operating condensers in a special mode that reduces its condensing capacity. This special mode is called split mode.

Split mode is most often used in cold climates during periods of low outside air temperature. Split mode is also sometimes used when heated refrigerant from the refriger

Figure 11-2 - Air Cooled Condenser Diagram

Page 149 of the Emerson E2 user manual — 11.3 Standard Circuits
Page 149 · click to enlarge
Page 149
Emerson E2 — 11.3 Standard Circuits diagram (page 149)
Fig. 169 · 11.3 Standard Circuits
Emerson E2 — 11.3 Standard Circuits diagram (page 149)
Fig. 170 · 11.3 Standard Circuits

Ambient Temp Temperature see Table 9-1 on page 9-3

Table 11-3 - Suction Group Inputs

Figure 11-3 - Evaporative Condenser Diagram

Output Device Wire Output Board

Switch toNotes

Contacts to:

N.C. N.C. (up) To ensure condensing during network and power failure, condenser fans should all be configured normally closed (N.C.)

Condenser Fan Relay (Variable- Speed)

N.C. N.C. (up) The fan should operate at 100% during loss of communi cation with E2.

Dampers (Evap. only)

N.C. N.C. (up) Dampers should be open during communication loss (N.C.).

Evaporator Pumps (Evap. only)

N.C. (see note) N.C. (see note) Some condensers have dual pumps that cycle at even intervals. One pump should be wired N.C. and the other N.O., so that only one pump runs during communication loss.

Variable-Speed Fan Output (to inverter)

This 4AO or 8IO analog point sends the 0-100% fan speed signal to the inverter.

Table 11-4 - Suction Group Outputs

11.3 Standard Circuits

Emerson E2 — 11.3 Standard Circuits diagram (page 149)
Fig. 171 · 11.3 Standard Circuits

Refrigerated cases that do not use case controllers are controlled by Standard Circuit applications. In a Standard Circuit application, the E2 is responsible for all case mon itoring and control; it uses the RS485 I/O Network to both gather case temperature inputs and activate or deactivate the liquid line solenoids, defrost modes, and fans. Also, circuits that use ESR8s and MultiFlex ESRs are controlled using Standard Circuits.

Standard Circuits Software Overview • 11-5

Show 4 more labels / short text on this page
Set Fail-safe Dip · Condenser Fan (Single-Speed) · None (analog point) · None (analog point)
Page 150 of the Emerson E2 user manual — 11.3.2.1 Defrost States
Page 150 · click to enlarge
Page 150

11.3.1 Refrigeration Control

11.3.2.1 Defrost States

A Standard Circuit application may apply one of four different control methods to a case circuit: the Tempera ture Monitor method, the Temperature Control method, and the Line Up(ESR)/Defrost method, and the Lineup(MFESR)/Defrost method. 11.3.1.1 Temperature Monitor

The defrost cycle for a Standard Circuit application consists of three steps.

1. Pump Down (Elec & Hot Gas only) - The defrost cycle begins with this step immediately after the refrigeration solenoid is turned OFF. During the Pump Down phase, the application waits for a user-specific amount of time to elapse before turning on the defrost heat. This allows refriger ant in the evaporator to be evacuated before defrost heat is activated. The compressor(s) remain ON during Pump Down.

The Temperature Monitor method does not control case temperature. The application will read and record case temperature inputs, but it will not make any attempt to control temperature. The application will still initiate and control defrost, cycle fans, and perform other neces sary functions. 11.3.1.2 Temperature Control

2. Defrost - During the defrost phase, refrigeration is disabled. If using electric defrost heaters will be ON. If using hot gas, heated refrigerant will be pumped through the coil. This phase will con tinue until the defrost is terminated (see Section 11.3.2.3 for information on how defrost is termi nated).

A Standard Circuit application using the Temperature Control method will pulse the refrigeration liquid line solenoid OPEN and CLOSED so as to control the case temperature to the user-defined setpoint. The application monitors up to six different temperature sensors in the cir cuit and combines them into a single value that is com pared to the setpoint. 11.3.1.3 Line Up(ESR)/Defrost

3. Run-Off (Elec & Hot Gas only)- After defrost heat is deactivated, the application waits for the Run-Off time to pass before re-entering refrigera tion mode. This allows melted frost on the evapo rator to drain from the coil so that it will not refreeze when refrigeration begins again. After the user-specified Run-Off time has passed, the defrost cycle has ended. 11.3.2.2 Defrost Types

In Line Up ESR, circuit temperature is controlled by an electronic evaporator pressure regulator (EEPR). The EEPR is controlled by a PID algorithm that steps the valve open from 0% to 100% based on how far away the circuit temperature is from the setpoint.

There are many different ways used to defrost a refrig erated case. A Standard Circuit application is capable of employing five different strategies to accommodate five different types of defrost.

This strategy requires the use of the Echelon-based ESR8 stepper regulator output board, which has been dis continued and replaced by the I/O Network-based Multi Flex ESR. 11.3.1.4 Line Up(MFESR)/Defrost

Timed and Reverse Air

Timed defrost and Reverse Air defrost are two differ ent defrost strategies, but both are alike in the way they are controlled by a Standard Circuit application. In both defrost types, no heat is applied to the evaporator. The application simply turns the refrigeration solenoid OFF for the duration of the defrost cycle.

In Line Up MFESR, circuit temperature is controlled by an electronic evaporator pressure regulator (EEPR). The EEPR is controlled by a PID algorithm that steps the valve open from 0% to 100% based on how far away the circuit temperature is from the setpoint.

This new strategy requires the use of the I/O Network- based MultiFlex ESR and should not be used with the Echelon-based MultiFlex ESR. 11.3.2 Defrost Control

When these defrost types are used, Pump Down and Run-Off times are not necessary; therefore, they will not be part of the defrost cycle.

Hot Gas and Reversed Cycle Hot Gas

Defrost cycles in a Standard Circuit application may be initiated in either of three ways: by schedule (at specific times of the day, programmed by the user), by external trigger (a user-initiated signal such as a switch or button), or by manual command (initiated on the E2 front panel by the user).

Hot Gas and Reversed Cycle Hot Gas require the use of hot gas from the refrigeration lines. During these types of defrost, the application will open the circuit’s liquid line solenoid AND will send a command to the refrigeration rack to open the Master Liquid Line Solenoid. As a result, heated refrigerant will be pumped through the evaporator coil.

Page 151 of the Emerson E2 user manual — 11.3.3.1 Clean Switches
Page 151 · click to enlarge
Page 151

Any user-defined Pump Down and Run-Off times will be observed as normal.

tinue heating.

Figure 11-4 illustrates what happens in a pulsed defrost cycle. In this example, the case reaches its termina tion temperature approximately 2/3 of the way into its defrost cycle. Defrost continues, but defrost heat is turned OFF until the temperature falls below the setpoint, at which point the heat is turned back ON.

Electric defrost uses electric heaters to defrost the evaporator coil. During electric defrost, the application will turn the Defrost output ON to activate the heaters con nected to the output.

Any user-defined Pump Down and Run-Off times will be observed as normal. 11.3.2.3 Defrost Termination

Defrost heat will continue to be pulsed in this manner until the defrost time has passed. The defrost cycle will then begin the Run-Off period, and then restart refrigera tion. 11.3.2.4 Emergency Defrost

Both the start and the end times of a defrost cycle are determined by the user. The Pump Down, Defrost, and Run-Off stages all have fixed durations, and when the last stage of the cycle is complete, defrost is terminated.

When necessary, a user can initiate an emergency defrost cycle in a circuit. Emergency defrost cycles are similar to normal defrost cycles, except an emergency defrost cycle will ignore all calls for termination and remain in defrost for the entire programmed defrost time. For cases using a pulsed defrost strategy, this means the defrost heat will not be pulsed during emergency defrost.

However, a Standard Circuit application may be pro grammed to terminate the Defrost stage of the defrost cycle early if the temperature inside the case rises above a fail-safe temperature setpoint (called the termination set point). For certain defrost types, defrost heat may also be “pulsed” in order to keep the temperature below the set point without terminating defrost.

Emergency defrosts are initiated by the user from the Standard Circuit Bypass screen (see Section 12.6, Manual Defrost and Clean Mode). 11.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESR

Emerson E2 — 11.3.2.3 Defrost Termination diagram (page 151)
Fig. 172 · 11.3.2.3 Defrost Termination

If an ESR8 or MultiFlex ESR is used on a circuit that uses hot gas defrost, values for circuits in defrost are forced OPEN (100%) to allow hot gas to flow through the evaporators. 11.3.3 Clean and Door Switches

11.3.3.1 Clean Switches

A Standard Circuit application may be configured to entirely shut down a case circuit so that it may be cleaned or serviced. A case circuit enters clean mode when it receives a signal from an input called the clean switch.

Clean switches may be set up as either “Switched” or “Timed.” If a clean switch is configured as “switched,” the circuit enters clean mode when the switch is turned ON, and it remains in clean mode until the switch is turned OFF. If a clean switch is configured as “timed,” the circuit enters clean mode when the switch is turned ON, and it remains in clean mode for a fixed user-defined amount of time.

Figure 11-4 - Defrost Termination (Pulsed)

Pulsed Defrost is only available if the circuit is using heated defrost, such as Electric or Hot Gas defrost.

Pulsed Defrost is similar to the Temperature Termina tion strategy outlined in Section 11.3.2.3, except a defrost cycle always continues for the full programmed duration.

During clean mode, the Fan, Defrost, and Refrigera tion Solenoid outputs are all turned OFF, and the liquid line solenoid is CLOSED.

When the termination temperature rises above the set point, defrost does not end. Instead, the defrost heat is turned OFF until the case temperature falls below the set point, at which time the output will come back ON to con

If desired, a notice may be sent to the E2’s Alarm Log so that the E2 can keep track of clean modes and times.

Standard Circuits Software Overview • 11-7

Electric Defrost · Pulsed Defrost

Page 152 of the Emerson E2 user manual — Fans are locked OFF during clean mode. 11.3.5 The TD3 Temperature Display
Page 152 · click to enlarge
Page 152

11.3.3.2 Door Switches

11.3.7 Wiring

Walk-In Box freezers are often equipped with door switches that disable the evaporators when the door is open. The E2 is capable of reading a digital door switch input and controlling the freezer appropriately.

Wiring a case circuit so that it may be controlled by a Standard Circuit application primarily involves wiring all temperature sensors to 16AI Analog Input Boards and wir ing the valves and other devices on the case to a relay out put board such as an 8RO Relay Output Board.

When a door switch opens, the E2 will shut off the refrigeration solenoid and the fans (if active) and turn the lights ON. 11.3.4 Fan Control

Figure 11-5 shows a typical case in a circuit and the devices that must be wired for each. Follow the guidelines below to wire the circuit to the E2 I/O Network:

A circuit’s circulation fan is always ON when the cir cuit is in refrigeration mode. Its state during defrost is determined entirely by how the application is programmed by the user. You may choose to set the fan either ON or OFF for each phase of a defrost cycle (Pump Down, Defrost, and Run Off). If you choose to keep fans off for the entire defrost cycle, you may also choose to program a delay that will keep the fan from activating for a fixed amount of time after the cycle ends.

Fans are locked OFF during clean mode. 11.3.5 The TD3 Temperature Display

The TD3 is a case display that is designed to monitor three types of temperature sensors. The compact unit is mounted on the face of a refrigeration case and displays, by default, the discharge air temperature. Pressing the function button repeatedly allows you to view the tem perature of EmersoRetail Solutions’ product probe, the defrost termination value, and then back to the discharge air temperature.

The TD3 has a status light that is controlled by the E2 controller. A green status light means that the status is okay while a red status light indicates alarm.

This case display can be configured to show either the discharge air temperature (default), the product probe tem perature, or the defrost termination temperature.

The TD3 communicates with the E2 controller via the Echelon Network and in turn the E2 adjusts the circuit’s temperature or defrost status. 11.3.6 The Control Link CD Case Display

The Control Link CD is mounted inside the refrigera tion case and serves as a point to which the sensors are wired. A single RS485 communication cable links the case display back to the E2 controller. Additionally, an optional remote display can be added to the control module to pro vide a local indication of case temperature and operational mode that is remote from the control module.

Page 153 of the Emerson E2 user manual — 11.3.3.2 Door Switches
Page 153 · click to enlarge
Page 153
Emerson E2 — 11.3.3.2 Door Switches diagram (page 153)
Fig. 173 · 11.3.3.2 Door Switches

Figure 11-5 - Typical Case in a Standard Circuit

Emerson E2 — 11.3.3.2 Door Switches diagram (page 153)
Fig. 174 · 11.3.3.2 Door Switches

Table 11-5 - Suction Group Inputs

Standard Circuits Software Overview • 11-9

Page 154 of the Emerson E2 user manual — 11.4.2 Case Circuit Control Software Overview
Page 154 · click to enlarge
Page 154

Output Device Wire Output Board

Switch toNotes

contacts to:

Case Fans N.C. N.C. (up) Wire fans to remain ON during comm. loss

N.C. N.C. (up) Wire solenoid to remain energized (OPEN) during comm. loss

Defrost N.O. N.O. (down) Defrost heaters (electric and hot gas) will remain de-ener gized (CLOSED) during comm. loss

Liquid Line Sole noid (Hot Gas defrosts only)

N.O. N.O. (down) The liquid line solenoid will remain de-energized (CLOSED) during comm. loss.

EEPR (ESR8 controlled cir cuits only)

The evaporator stepper regulator valve should be plugged in to a point on the ESR8 board.

Table 11-6 - Suction Group Outputs

11.4 Case Control Circuits

11.4.2 Case Circuit Control Software Overview

11.4.1 Overview

There are six different versions of case control soft ware in the Emerson Retail Solutions case control family:

Case circuits that use CC-100s, CS-100s, EC-2s, or CCBs for case control rely on Case Circuit Control appli cations in the E2 to provide them the necessary setpoints, defrost scheduling, and other control parameters. Unlike Standard Circuit applications, Case Control Circuits do not directly control temperature in the case circuits; instead, the case controller controls temperature for each individual case based on the setpoint(s) supplied to them by their associated E2s.

  • CC-100P - This version controls temperature in a case using a pulse modulated valve, which is pulsed ON for a percentage of a fixed amount of time to achieve the necessary refrigerant flow.
  • CC-100LS - This version controls temperature in a case using a liquid-side stepper valve. This valve is capable of various positions in between 0% and 100%. As a result, the CC-100 is capable of supply ing the exact refrigerant flow necessary to achieve the case setpoint.

Setup of a case-controlled refrigerated case system is a two-fold process:

1. For each case circuit in the refrigeration system, a separate Case Control Circuit application is cre ated with its own set of control parameters.
  • CC-100H - This version controls temperature in a case using a suction-side evaporator pressure regu lator (EEPR). This valve is capable of various posi tions in between 0% and 100%. As a result, the CC100 is capable of providing the exact suction pres sure necessary to achieve the case setpoint.
2. Each CC-100, CS-100, EC-2, and CCB is associ ated with a Case Control Circuit application in the E2. Association creates a network link between the case controller and the application which supplies the information necessary to con trol temperature, defrost, lights, fans, and antisweat heaters.
  • CS-100 - This controller uses suction-side evapora tor suction regulators (ESRs) to control suction pressure for an entire circuit. Unlike the CC-100, which controls only one case, the CS-100 controls all cases on an entire circuit.

This section of the manual covers both the program ming of a Case Circuit Control application and the process of associating a CC-100, CS-100, EC-2, or CCB with a Case Circuit Control application.

  • EC-2s - The EC-2 is a liquid-side pulse valve case controller that doubles as a case temperature and information display. Unlike the CC-100, it is designed to be mounted on the front of the case, and has a push-button front panel interface for program
Show 4 more labels / short text on this page
Set Fail-safe Dip · Refrigeration Solenoid · None (ESR8 point) · None (ESR8 point)
Page 155 of the Emerson E2 user manual — 11.4.2.1 Valve Control
Page 155 · click to enlarge
Page 155

11.4.3 Refrigeration Control

ming and viewing status. (The EC-2 29x version controls the refrigeration solenoid valve to allow the passage of refrigerant to the TXV valve, whereas the 39x version controls a pulse valve on the liquid side of the evaporator to regulate super heat.)

11.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)

In CC-100P, CC-100LS, EC2, and CCB (liquid and pulse stepper) case controllers, there are two different con trol systems that work together to regulate refrigeration: temperature control and superheat control.

  • CCBs - Version 2.3 and above of the E2 software is backward-compatible with the CCB, an I/O Net work-based controller used primarily in old RMCC installations. Like the CC-100 family, the CCB was available in several different models that controlled liquid pulse, liquid stepper, suction stepper, and suction lineup.

Temperature Control measures the case temperature and turns refrigeration ON or OFF as required to keep the case within a certain proximity of the user-specified tem perature setpoint.

The user supplies Temperature Control with the set point and a deadband, which is the range of case tempera tures equally above and below the setpoint within which the case temperature will be considered acceptable. When the case temperature is above the setpoint plus one-half the deadband, refrigeration will be turned ON. It will remain ON until the temperature drops to below the temperature setpoint minus one-half the deadband, at which point refrigerant flow will be turned OFF.

11.4.2.1 Valve Control

The CC-100 is capable of supporting two types of valves: pulse and stepper. The CC-100 uses PID control to vary the aperture rates of both valves between 0% and 100% as required by their temperature control algorithms (see Section 11.4.3, below).

Case temperature may be supplied to Temperature Control by a supply air sensor, a return air sensor, or a mixture of both the supply and return air sensor values.

Temperature Control itself does not vary the opening percentage of the pulse or stepper valve; it simply addresses the case’s need for refrigerant flow to maintain its setpoint. Once refrigeration is started, control of the valve is handled by Superheat Control.

A pulse valve is a device capable of being in only two states: fully open or fully closed. To achieve the necessary percentage of refrigerant flow, CC-100s repeatedly “pulse” these valves open for a percentage of an interval called the valve period (which defaults to six seconds).

For example, to achieve a 20% valve output in a CC- 100 with a valve period of six seconds, a pulse valve would be opened for 20% of six seconds (or 1.2 seconds) and closed for the remaining 80% of the valve period (4.6 seconds). This same six-second sequence will repeat for as long as the CC-100 calls for a 20% valve output.

The difference between the temperature of the refriger ant going in to the evaporator inlet (the coil in tempera ture) and the refrigerant leaving the evaporator outlet (the coil out temperature) is called Superheat. When refriger ant is flowing through an evaporator, Superheat Control uses PID Control to keep the Superheat at a user-defined Superheat setpoint. Superheat Control positions the valve to increase or decrease refrigerant flow in an effort to keep the Superheat equal to a user-defined Superheat setpoint.

Stepper valves are devices that may opened to many different positions between fully closed (0%) and fully open (100%). Stepper valves usually have hundreds or thousands of “steps” in between fully closed and fully open. To achieve the desired opening percentage, the CC- 100 moves the valve the required number of steps.

Recovery Mode is a special part of Superheat Control that occurs at the beginning of every refrigeration cycle. When refrigeration has been OFF and Temperature Con trol calls for refrigeration to be ON, a Recovery Mode begins, during which the valve is fixed to a user-defined percentage (usually 70%) for a fixed amount of time. This floods the previously empty evaporator with refrigerant and gradually establishes a differential between the coil in and coil out temperatures. When the Recovery Mode ends, the superheat will be relatively close to the setpoint; at this

To properly control a stepper valve, the CC-100 must know the operating characteristics of the valve, such as its maximum steps per second change rate, the total number of steps between 0% and 100%, and its hysteresis rate (the number of steps required for the valve to change direc tion).

Case Control Circuits Software Overview • 11-11

Show 5 more labels / short text on this page
Temperature Control · Pulse Valves · Superheat Control · Stepper Valves · Recovery Mode
Page 156 of the Emerson E2 user manual — 11.4.4.1 Defrost States
Page 156 · click to enlarge
Page 156

11.4.4.1 Defrost States

time, Superheat Control will begin.

Recovery Mode always lasts for a specific number of seconds. The case controller determines the duration based on past performance of the evaporator during previous Recovery Modes.

The defrost cycle for a Case Circuit application con sists of three steps. Of these three, steps #1 and #3 apply only to cases with heated defrosts:

1. Pump Down - The defrost cycle begins with this step immediately after the refrigeration solenoid is turned OFF. During the Pump Down phase, the application waits for a user-specific amount of time to elapse before turning on the defrost heat. This allows refrigerant in the evaporator to be evacuated before defrost heat is activated. The compressor(s) remain ON during Pump Down.

Thermostatic Expansion Valves (TXVs)

As an alternative to regulating superheat using EEVs, case controllers also support cases that use mechanical thermostatic expansion valves (TXVs). When TXVs are being used, the case controllers use only Temperature Control to turn refrigeration ON and OFF. Superheat Control is disabled, since it is assumed the TXV is tak ing care of the superheat. 11.4.3.2 EEPRs (Suction Stepper)

Pump Down times may only be used for hot gas

and electric type defrosts.

The CC-100H, CS-100, and CCB (suction stepper and lineup) control case temperature from the suction side of the evaporator by using an EEPR to regulate suction pres sure.

2. Defrost - During the defrost phase, refrigeration is disabled. If using electric defrost heaters will be ON. If using hot gas, heated refrigerant will be pumped through the coil. This phase will con tinue until the defrost is terminated (see Section 11.3.2.3 for information on how defrost is termi nated).

Suction-side control differs from liquid-side control in that Superheat Control is not used. In liquid-side control, the valve aperture is controlled in order to achieve a super heat setpoint. In suction-side control, the CC-100 changes the valve aperture to achieve the case temperature set point.

3. Run-Off - After defrost heat is deactivated, the application waits for the Run-Off time to pass before re-entering refrigeration mode. This allows melted frost on the evaporator to drain from the coil so that it will not re-freeze when refrigeration begins again. After the user-speci fied Run-Off time has passed, the defrost cycle has ended.

Case temperature may be supplied by a supply air sen sor, return air sensor, or a mixture of the two values.

Temperature Control uses PID control to operate the valve and keep the case temperature input value equal to the case temperature setpoint.

Run-Off times may only be programmed for hot gas and electric type defrosts. 11.4.4.2 Defrost Types

Recovery Mode for suction-side case controllers is slightly different than Recovery Mode for liquid-side controllers. Suction-side case controllers enter Recovery Mode only after a defrost or cleaning cycle, and it does so in order to bring the case temperature down to a level that is controllable by Temperature Control.

There are many different ways used to defrost a refrig erated case. A case controller is capable of using three dif ferent types of defrost.

During Recovery Mode, the valve is opened to a fixed percentage until the case temperature falls below the case setpoint. When this occurs, the case controller exits Recovery Mode and begins normal Temperature Con trol. 11.4.4 Defrost Control

Off Cycle defrost (also known as Timed defrost) is simply a period of time during which refrigeration is sus pended. No heat is applied to the evaporator. The applica tion simply turns refrigerant flow OFF for the duration of the defrost cycle.

When these defrost types are used, Pump Down and Run-Off times are not necessary; therefore, they will not be part of the defrost cycle.

The physical aspects of defrost control, such as shut ting off valves and turning on defrost heat sources, is han dled by the case controller. When operating on its own, a case controller initiates defrost cycles at programmed time intervals. When connected to a Case Circuit application, the case controllers’ defrost times are coordinated and scheduled by the E2.

Hot Gas and Reversed Cycle Hot Gas

Hot Gas and Reversed Cycle Hot Gas require the use of hot gas from the refrigeration lines. During these types of defrost, the application will open the valve and pump heated refrigerant through the evaporator coil. Any user-

Recovery Mode · Off Cycle (Timed)

Page 157 of the Emerson E2 user manual — 11.4.4.3 Defrost Termination
Page 157 · click to enlarge
Page 157

defined Pump Down and Run-Off times will be observed as normal.

are not high enough to require a defrost.

The optical demand defrost sensor may be either an analog or digital type sensor. When this sensor detects no major build-up of frost, the Case Circuit application ignores all scheduled calls for defrost and continues in refrigeration mode. When the sensor detects frost, the defrost inhibit is cancelled, and the case circuit will enter defrost at the next scheduled time.

Electric defrost uses electric heaters to defrost the evaporator coil. During electric defrost, the application will turn the Defrost output ON, which will likewise acti vate the heaters connected to the power module’s defrost relay.

Any user-defined Pump Down and Run-Off times will be observed as normal. 11.4.4.3 Defrost Termination

A demand defrost inhibit only keeps scheduled defrosts from occurring. Any manual calls for a defrost cycle will occur as normal. CCB demand defrost is cur rently not supported in E2. Demand sensors, if present on the circuit, will be ignored.

Both the start time and the end time of a defrost cycle are determined by the user. The Pump Down, Defrost, and Run-Off stages all have fixed durations, and when the last stage of the cycle is complete, defrost is terminated.

To protect against demand defrost sensors that may not be working properly, a demand fail-safe time may be set up. Demand fail-safe times limit the amount of time a defrost inhibit may last. If a demand defrost sensor does not detect frost for an amount of time equal to the Demand Fail-Safe Time, the defrost inhibit is lifted and the circuit will enter defrost at the next scheduled time. 11.4.4.5 Emergency Defrost

However, a case controller may be programmed to ter minate the Defrost stage of the defrost cycle early if the temperature inside the case rises above a fail-safe tempera ture setpoint. For certain defrost types, defrost heat may also be “pulsed” in order to keep the temperature below the setpoint without terminating defrost.

When necessary, a user can initiate an emergency defrost cycle from a circuit. Emergency defrost cycles are similar to normal defrost cycles, except an emergency defrost cycle will ignore all calls for termination and remain in defrost for the entire programmed defrost time.

One or more temperature sensors in the case circuit may be designated as termination temperature sensors. The values of these sensors are combined into a single control value, and this value is compared to the setpoint. If the termination control value is greater than the user- defined setpoint, defrost will end, and the defrost cycle will begin the Run-Off period (if applicable).

Emergency defrosts are initiated by the user from the Case Control Circuit Bypass screen (see Section 12.6, Manual Defrost and Clean Mode). 11.4.4.6 The WAIT State

Termination sensors may be either analog temperature sensors or digital closures (Klixons). Also, Case Circuit applications may use the value of the analog case tempera ture sensors for use in temperature termination.

When a Case Control Circuit application enters defrost mode, it sends a message out to all case controllers in the circuit to begin defrost at the same time. However, since each case in a circuit will have its own termination sen sors, it is possible for some cases to terminate defrost while defrosts in other cases continue.

Pulsed Defrost is only available if the circuit is using Electric or Hot Gas defrost.

Pulsed Defrost is similar to Temperature Termination, except when the termination temperature rises above the setpoint, defrost does not terminate. Instead, the output that applies defrost heat is turned OFF. The output will remain OFF until the temperature falls below the setpoint, at which time the output will come back ON.

When a case controller terminates defrost, it enters a state of operation called “the WAIT state.” While in the WAIT state, all refrigeration and defrost heat will remain OFF. When the Case Control Circuit application detects that all case controllers have entered the WAIT state, the application will consider the defrost cycle completed, and refrigeration will restart. 11.4.5 Anti-Sweat Control

The Case Circuit application will continue to pulse defrost in this manner until the defrost time has passed. The defrost cycle will then begin the Run-Off period. 11.4.4.4 Demand Defrost

A case controller manages its anti-sweat heaters by monitoring the dewpoint in and around the case area. The dewpoint input value is compared to the anti-sweat appli cation’s control setpoints (the Full ON setpoint and the

If a case is configured with a demand defrost sensor, a case controller may use their inputs as a means of keeping scheduled defrost cycles from occurring when frost levels

Case Control Circuits Software Overview • 11-13

Show 4 more labels / short text on this page
Electric Defrost · Demand Fail-Safe Time · Temperature Termination · Pulsed Defrost
Page 158 of the Emerson E2 user manual — 11.4.5.1 Dewpoint Input Sources
Page 158 · click to enlarge
Page 158

11.4.6 Dual Temp Control

Full OFF setpoint). Based on this comparison, the anti- sweat heaters will do one of three things:

A case controller can be configured to change its case temperature, alarm, and superheat setpoints when an exter nal digital input is switched ON or OFF.

  • If the input is equal to or above the Full ON set point, the heaters remain ON 100% of the time.
  • If the input value is equal to or below the Full OFF setpoint, the heaters will be ON 0% of the time (fully OFF).

The user simply connects the digital switch to an input point on the RS485 I/O Network and configures the case controller to read that input as a dual temp switch. When the dual temp switch is ON, the case controller overrides its normal case temperature, alarm, and superheat set points with a set of user-specified alternate setpoints. 11.4.7 Fan Control

  • If the input value is between the Full ON and Full OFF setpoint, the heaters will be pulsed ON for a percentage of the specified time interval. The per centage is determined by proportionately measuring where the dewpoint falls between the range of val ues formed by the two setpoints.

A relay on the power module activates the case fans. The fans will be ON while in refrigeration mode, and they may be programmed to be either ON or OFF when the temperature setpoint is satisfied and refrigerant is not flowing.

Figure 11-6 shows an example of how anti-sweat con trol works. The setpoints (Full ON dewpoint= 80°F, Full OFF dewpoint = 20°F) form the range of dewpoints across which the heaters will be pulsed. When the measured dew point is 45°F (directly in between both setpoints), the per centage will be 50%, and the heaters will be pulsed ON for 5 seconds of the defined 10-second interval. If the dew point drops to 30°F, the percentage will lower to 20%, and the heaters will be on only 2 seconds out of every 10.

When in defrost mode, the fans default to OFF, but they may be programmed by the user to be either ON or OFF.

When a liquid-side CCB is in Recovery Mode (see Recovery Mode, page 9-10), Fan Control may be config ured to delay the activation of fans for a user-specified amount of time. This delay helps keep the fans from splashing excess moisture that may still be on the coil. 11.4.8 Light Control

Emerson E2 — 11.4.6 Dual Temp Control diagram (page 158)
Fig. 175 · 11.4.6 Dual Temp Control

Lights are activated and deactivated by a relay on the power module.

The case controller itself does not have any special control algorithm for the case lights other than to leave the lights ON during normal operation. There are only two cases where the lights are not always ON:

1. An override from an E2 takes over control of the case lights. This override may take the form of a manual switch or a schedule output.
2. If the case controller is set up to use Walk-In Box Control, the case lights default to OFF and only come ON when the door switch is tripped. See Section 11.4.10, Walk-In Freezer Control . 11.4.9 Clean/Wash Mode

Figure 11-6 - Illustration of Anti-Sweat Control

11.4.5.1 Dewpoint Input Sources

Dewpoint control inputs for the case controller’s Anti- Sweat algorithms must come from a dewpoint probe set up on the E2 I/O Network.

Clean Mode is a special kind of case deactivation designed specifically for washing or performing mainte nance on the case.

Clean Mode is initiated by activation of a cleaning switch input or by a command sent from a Hand-held Ter minal or an E2. During Clean Mode, refrigerant flow is turned OFF, all fans and anti-sweat heaters are deacti vated, and the lights are turned either ON or OFF as pro grammed by the user.

Page 159 of the Emerson E2 user manual — 11.4.11.1 Recoverable Sensor Failures
Page 159 · click to enlarge
Page 159

Clean Modes may be either fixed or timed. Fixed Clean Modes begin when the clean switch is turned ON and end when the clean switch is turned OFF. Timed Clean Modes begin when the clean switch is turned ON and ends a specific time afterwards. The user specifies how long the wash mode will last.

Pulse Valve, Stepper Valve Controller will fix the position to the last known good out put percentage

End of Mode Warning

To warn service personnel that wash mode is about to end, the case controller will blink the case lights for five seconds. After five seconds of blinking, the case fan will activate and refrigeration will restart. 11.4.10 Walk-In Freezer Control

Anti-Sweat Pulse at 50%

CC-100 and CS-100 Alarm LEDs (red)

Flashes at a rate of 2 per second

The CC-100P and CCB (dual-pulse valve model) case controller is used to control walk-in boxes, since it is the only model capable of controlling two valves.

Dual Temp Output Off

Walk-in boxes are controlled the same way as for other cases. The primary difference between walk-in boxes and other cases is the use of the door switch.

Suction Solenoid Valve Open

Liquid Solenoid Valve Open

When the case controller’s door switch input is turned ON, refrigeration is suspended (all pulse valves go to 0%), the fans turn OFF, and the lights turn ON. The walk-in box remains in this state until the door switch turns OFF again.

Table 11-7 - Fail-Safe States

11.4.11.1 Recoverable Sensor Failures

Alarm times can be assigned to the door switch input so that an alarm can be generated when the door is left open for too long.

The CC-100 and CS-100 will be able to cope with some sensor failures without having to enter Fail-Safe Mode.

Also, when temperature alarm setpoints are configured for the case, the case controller will begin refrigeration if a temperature alarm trips with the door open. 11.4.11 Fail-Safe Mode

Coil In or Coil Out Failure

A coil inlet temperature or coil outlet temperature sen sor will be considered failed if one of two conditions occur:

1. The sensor gives a value outside of its minimum and maximum temperature range (that is, below - 50°F or above 120°F) for two consecutive read ings, or

When major system malfunctions occur, the case con troller enters a Fail-Safe Mode. The Fail-Safe Mode is designed to keep the case functioning as normally as pos sible under system conditions that would otherwise make case control impossible.

2. The sensor value is 20°F above the control set point for longer than ten minutes.

A case controller will enter Fail-Safe Mode whenever one of three conditions occur:

If the coil inlet or coil outlet temperature sensor has failed, the case controller will compensate by “guessing” the inlet or outlet temperature based on the values of the remaining functional coil sensor and the case temperature sensor(s). The case controller will continue to guess the value until the coil inlet or outlet sensor can be fixed.

1. The superheat and/or temperature control set point(s) are corrupted (i.e., outside of its pro grammed minimum/maximum range).
2. The software is corrupted.
3. An unrecoverable sensor failure has occurred (see Operation with Failed Sensors, below).

If both the coil inlet and coil outlet sensors have failed, or if one coil sensor and the case temperature sensor(s) have failed, the case controller will not be able to make the required calculations, and they will go into Fail-Safe Mode.

Actions Taken During Fail-Safe Mode

When a case controller enters Fail-Safe Mode, each output will be set to the fail-safe state described in Table 11-7.

If the sensor or combination of sensors supplying the case temperature to the case controller have failed (i.e., the

Case Control Circuits Software Overview • 11-15

Show 6 more labels / short text on this page
Output Fail-Safe State · Fans ON · Lights ON · Defrost OFF · Satellite Output(s) OFF · Discharge/Return Air
Page 160 of the Emerson E2 user manual — 11.5 Logging Groups
Page 160 · click to enlarge
Page 160

case controller has no usable case temperature input value), the case controller will keep the valve percentage at its last known good value and continue operation as nor mal. For instance, if the valve was at 75% when the case temp sensor(s) failed, the valve will remain at 75% until it the failure is corrected. All other case control functions will continue functioning as normal. 11.4.12 Wiring

Control Circuit application you will be programming.

To access the CC/CS-100 Case Control Association Screen:

1. Press for the Main Menu.
2. Press for System Configuration.
3. Press for the Network Setup menu.
4. Press for Case Control Associations. The Case Control Association screen should look like Figure 11-7 :

Input and output wiring for a case controller is dis cussed in detail in Section 4, E2 Hardware Setup. Before a Case Control Circuit application may begin functioning, all case controllers must be properly connected to its case inputs and outputs, and each case controller must be com missioned and properly communication on the Echelon Network (see Section 4, E2 Hardware Setup for instruc tions on how to do this). 11.4.13 Setting Up An Individual Case Controller

Emerson E2 — 11.4.12 Wiring diagram (page 160)
Fig. 176 · 11.4.12 Wiring

Most of the data required for a case controller to begin operation are supplied to it by associating the controller with an E2. However, in some cases, it will be necessary to change some of the parameters in an individual case con troller. Some instances where it will be necessary are:

  • When the configuration for the inputs needs to be changed (i.e., when the case has a sensor or switch configuration that cannot be satisfied by the default configuration).

Figure 11-7 - CC/CS100 Circuit Association Screen (RX-400)

This screen lists all of the CC-100s, CS-100s, EC-2s, and CCBs defined in this E2. Each one is listed with its name, its node number, the application name of the case controller’s application, and the associated circuit name.

  • When a valve other than an Emerson Flow Con trols ESR-12, ESR-20, or ESV is being used. Each case controller is programmed by default to operate Emerson Flow Controls brand valves. If the valve type is different, the valve control parameters must be changed in the case controller software.

To associate a case controller with its circuit, move the cursor into the Circuit field of the controller you wish to associate, and press the key. The Application Selec tion menu will list all of the Case Control Circuit applica tions in the E2. Choose the desired circuit and press or to select. Repeat this process until all case con trollers are associated with Case Control Circuit applica tions.

  • When the PID settings that determine the valve aperture or closure require alteration.

When necessary, the case controller can be altered in either of two ways. You can change settings in a case con troller application in E2 via the front screen. Or, you can use a Hand-held Terminal to log in to the CC-100 or CS- 100 directly, and make temporary changes that will not be saved. 11.4.14 Associating Case Controllers with Case Circuit Control Applications

11.5 Logging Groups

A logging group is a set of application property inputs and outputs whose values are recorded (logged) with the same parameters. Parameters include the interval, how often the property values are logged (for example, every 30 seconds, every 5 minutes, etc.), the duration of the log (for example, 2 days, 30 days, 100 days, etc.), and the res olution (how precisely the analog values are recorded).

Before you can program a Case Control Circuit with the necessary parameters, you must associate the appropri ate CC-100s, CS-100s, EC-2s, and CCBs with the Case

Page 161 of the Emerson E2 user manual — 11.5.3 Base Log Group
Page 161 · click to enlarge
Page 161

11.5.1 Possible Data Errors

11.5.2.1 Clipping

For point log groups, regardless of the resolution, the following applies when errors occur in log data:

Clipping occurs whenever the conversion process results in a sample value that falls outside the range of the selected log resolution. For example, converting a value of 750 PSI to low resolution would result in a compressed sample value of 609 PSI (refer to Appendix E: Com pressed Point Log Sample Limits and Precision Tab). Low resolution only allows values up to 609 PSI; there fore, the sample is said to be “clipped.” If the value that will be logged is anticipated to exceed the high or low range for a particular log resolution, a higher resolution should be chosen.

NO DATA

(LOG_DATA_

Actual data value of the output is NO_VALUE but output status is not CELL_OUT_FAIL or CELL_OUT_INACT

NONE)

PT FAIL (LOG_PT_FAIL) Data is NO_VALUE and status of output is CELL_OUT_FAIL -- could occur when point cell has passed one min ute update

High Clipping occurs when a compressed sample value is above the range allowed by the set resolution. In this case the sample value is considered “high-clipped” and the data recorded will be the high-clipped value and logged at the highest possible valid value.

Low Clipping occurs when a compressed sample value is below the range allowed by the set resolution. In this case the sample value is considered “low-clipped” and the data recorded will be the low-clipped value and logged at the lowest possible valid value. 11.5.2.2 Incompressible Data Types

PT INACT

(LOG_PT_DIS

Status of output is CELL_OUT_INACT and this appears regard less of the value of the data – this may occur at startup

ABLED)

Points of certain data types cannot be compressed due to the nature of their data values. These points are called Incompressible Points. Refer to the following table for the data types that are considered to be incompressible at cer tain resolutions:

ERROR Indicates log error type could not be determined but the LOG_ERROR_ FLAG was set in the data (this is display only and might indicate cor rupted data)

Data Type Incompressible at Resolution

Table 11-8 - Data Errors

PULSE_TYPE Low and Medium

A displayed value of DATA N/A (LOG_DATA_NA) is used in medium and low resolution logs when that particu lar type of data cannot be logged in that resolution. Pulse, one shot, and system list types cannot be logged in medium and low resolution log groups. 11.5.2 Data Compression

ONE_SHOT_ TYPE

SYS_LIST_TYPE Low and Medium

Table 11-1 - Incompressible Data Types and Their Resolutions

Because the user may need to log more data than the default logging of the E2 can hold in memory, the user can set the resolution type in the log manager to determine how the desired points will be logged. E2 converts these analog sample values to this lower resolution (Low or Medium) by:

11.5.3 Base Log Group

The Base Log group is a permanent logging group and cannot be deleted. When a new application is added to the system, the inputs and outputs that are logged by default are associated with the Base Log group.

  • Adding/subtracting an offset

Points are pre-configured to be logged for newly added applications. Many of the most important inputs and out puts within an application are already pre-configured to be logged, and all of these inputs belong to the Base Log Group. Simply define the inputs and outputs to enable log ging; no special set up is required. Logging is done auto

  • Multiplying by a scaling factor
  • Rounding to the nearest integer value of the size appropriate for the desired resolution

Logging Groups Software Overview • 11-17

Show 4 more labels / short text on this page
Displayed · Logged Value Description · Value · Low and Medium
Page 162 of the Emerson E2 user manual — 11.5.4 Setting Up Logging
Page 162 · click to enlarge
Page 162

matically.

When you first create an application in the E2, you can tell which inputs and outputs belong to the Base Log Group: an “L” will be displayed at the right-hand side of their definitions. The “L” is a marker that signifies that the input or output is currently part of a logging group (either the Base Log Group or another group as assigned by the user). If there is no “L” beside the definition, the value is not part of a logging group and therefore will not be logged. 11.5.4 Setting Up Logging

Emerson E2 — 11.5.4 Setting Up Logging diagram (page 162)
Fig. 177 · 11.5.4 Setting Up Logging

To begin logging setup, go to the Logging Setup menu:

1. Press for the Main Menu.

Figure 11-9 - Summary Screen for Logging Groups

2. Press System Configuration.

The summary screen for Logging Groups will open where a variety of log parameters can be viewed. Log group name, configured resolution setting, number of days to keep logs, the amount of available logging resources, number of analog and digital points associated with this logging group, status, and more can all be seen from this summary screen. Highlight the desired logging group and press to open the setup screen for that log group:

3. Press Logging Setup.
Emerson E2 — 11.5.4 Setting Up Logging diagram (page 162)
Fig. 178 · 11.5.4 Setting Up Logging

Figure 11-8 - Logging Setup Menu

Emerson E2 — 11.5.4 Setting Up Logging diagram (page 162)
Fig. 179 · 11.5.4 Setting Up Logging

From this menu, you can control different logging aspects:

  • Access Log Group summary screen (or Base Log if no additional log groups exist) to set logging parameters
  • Add a new log group and automatically enter edit mode
  • Delete a log group
  • Displays a report of all logged points for the entire system

Figure 11-10 - Logging Setup

For Base Log setup, select 1. Log Groups from this menu:

From this screen, logging group configuration can be specified. Group name, interval between log records, mode, start date and time, duration of logs, log resolution, points, percentage used, status, and enable/disable logging can be configured. (See the online help for each property for more information on what individual parameters do.)

Page 163 of the Emerson E2 user manual — 11.5.6.2 Application Log Report
Page 163 · click to enlarge
Page 163

11.5.5 Logging Group Status Screen

2. Press 8. Application Logs/Graphs to bring up the APPLICATION SPECIFIC LOGS AND GRAPHS menu.

From the Logging Group Summary screen, you can also access the Status screen for any logging group in the list by highlighting the desired group and pressing Enter:

3. Press 1. Logging Group Report .
Emerson E2 — 11.5.5 Logging Group Status Screen diagram (page 163)
Fig. 180 · 11.5.5 Logging Group Status Screen
Emerson E2 — 11.5.5 Logging Group Status Screen diagram (page 163)
Fig. 181 · 11.5.5 Logging Group Status Screen

Figure 11-12 - Logging Group Report Example

Figure 11-11 - Status Screen for Logging Groups

11.5.6.2 Application Log Report

From the Status screen you can:

The Application Log report provides a summary of all logged points for the current application and a complete list of all the logged points that belong to that current application. To display the Application Log report:

  • View configuration and usage information for the selected logging group.
  • Display the Logging Group Report (press Enter , 8 , 1 ).
1. Press the Enter key to bring up the Actions menu from the desired application Status screen.
  • Display the Application Log Report (press Enter , 8 , 2 ).
2. Press 8. Application Logs/Graphs to bring up the APPLICATION SPECIFIC LOGS AND GRAPHS menu.
  • Turn off logging for all points associated with that logging group (press Enter , 9 , 1 ).
3. Choose Application Log Report .
  • Go back to the Setup screen (press ). 11.5.6 Log Reports

A selection of log reports are available that indicate system resource usage (how much disk space logging con figurations use), resolution settings, the duration logs are stored, number of analog and digital points, and all the types of logged points that belong to groups, specific applications, or the entire system. 11.5.6.1 Logging Group Report

Emerson E2 — 11.5.6.2 Application Log Report diagram (page 163)
Fig. 182 · 11.5.6.2 Application Log Report

The Logging Group Report provides a summary of the logging group configuration and a complete list of all points associated with that group. To display the Logging Group report:

1. From the Status screen of the desired Logging Group application, press the Enter key to bring up the Actions menu.

Figure 11-13 - Application Log Report Example

Logging Groups Software Overview • 11-19

Page 164 of the Emerson E2 user manual — 11.6.1 Overview
Page 164 · click to enlarge
Page 164

11.5.6.3 System Log Report

Unlike rooftop control units (RTUs), AHUs are con trolled directly by the E2 itself and not by a separate unit control board.

The System Log report provides a summary of all logged points for all applications in the system and a com plete list of logged points for all applications in the sys tem. Note that depending on the size of the configuration and the number of points logged, this may take a few sec onds.

An AHU Control application actually consists of three separate control algorithms. The main control algorithm monitors the indoor temperature and activates heating and cooling stages when necessary to maintain the user- defined temperature setpoint. Another algorithm monitors the indoor humidity and uses a desiccant wheel or addi tional AHU cool stages to reduce the humidity level. The third loop controls either a two-position (digital) or vari able-position (analog) economizer damper based on the outside air conditions. 11.6.2 Temperature Control

To display the System Log Report:

1. Press for the Main Menu.
2. Press for System Configuration.
3. Press Logging Setup.
4. Press Display Logged Points.

In its most basic form, Temperature Control simply reads a control input value, compares it to the active tem perature setpoint, and activates or deactivates heating or cooling stages in an effort to satisfy the setpoint. The majority of user setup that must be done in Temperature Control involves specifying which input is to be used as the control source, defining different setpoints for use in occupied, unoccupied, summer, and winter modes, and setting up the operating characteristics of the heating and cooling stages. 11.6.3 Alternate Setpoints

Emerson E2 — 11.5.6.3 System Log Report diagram (page 164)
Fig. 183 · 11.5.6.3 System Log Report

For both the heating and cooling setpoints, you may choose to use different setpoints during occupied or unoc cupied building times, and different setpoints for summer and winter seasons. In other words, AHU Control may have four different pairs of heating and cooling setpoints, as shown in Table 11-9.

SUMMER COOL OCC SUMMER HEAT OCC

SUMMER COOL UOC SUMMER HEAT UOC

WINTER COOL OCC WINTER HEAT OCC

Figure 11-14 - System Log Report Example

WINTER COOL UOC WINTER HEAT UOC

Table 11-9 - Possible Heating/Cooling Setpoints

11.6 Air Handling Units (AHU)

AHU Control looks at the E2’s Global Data parameters to determine whether it should run in summer or winter mode. Refer to Section 10.17, Set Up Global Data, for information on how to set up summer/winter control parameters.

11.6.1 Overview

The E2 BX supports the simultaneous control of up to six air handling units (AHU). AHU Control applications govern all aspects of an AHU’s operations, including heat ing and cooling, dehumidification, fans, and economizer control.

The AHU chooses occupied or unoccupied mode by reading an occupied state input, which is most commonly tied to the output of a Time Schedule application.

Cooling Heating

Page 165 of the Emerson E2 user manual — 11.6.4.3 Variable-Speed Fans
Page 165 · click to enlarge
Page 165

11.6.4 Fan Control

11.6.4.3 Variable-Speed Fans

The E2 BX can control three different types of AHU fans. However, only one fan can be controlled per AHU. The fan types include: single-speed, two-speed, and vari able-speed. Controls for all fans are similar in that they operate in either of three modes:

Variable-speed fans may operate at any percentage of its maximum speed. The method AHU Control uses to determine the speed percentage is dependent on whether the heat and cool outputs are staged or modulating.

  • Continuous - The fan is always on, even when the AHU is not in heating, cooling, or dehumidification mode.

For staged AHU outputs, each stage must be pro grammed with its own speed percentage setpoint. The AHU Control application looks at all of the active stages, takes the highest speed percentage setpoint, and operates the fan at this speed.

  • Auto - The fan is only on when the AHU is in heating, cooling, or dehumidification mode.

For example, if cool stage 1 is active with a 30% speed percentage setpoint, the fan will likewise operate at 30% speed. If a second stage with a setpoint of 50% were to become active, the fan speed would increase to 50%.

  • Summer ON, Winter Auto - This mode allows the AHU fan to operate in Continuous mode during the summer months and in Auto mode during the winter months.

For each heating and cooling stage, you may specify both occupied and unoccupied speed percentage setpoints.

The operation of the fans during Continuous and Auto modes is largely dependent on the fan type. 11.6.4.1 Single-Speed Fans

Dehumidification with VS Fans

When in dehumidification mode, a user-defined slow- down percentage is subtracted from the variable-speed fan percentage. This percentage will continue to be subtracted until the AHU exits dehumidification mode.

Single-speed fans require no advanced control parame ters. Whether in Continuous or Auto mode, the fan will be ON when Fan Control calls for it to be ON, and OFF when it calls for it to be OFF. 11.6.4.2 Two-Speed Fans

Two-speed fans have a LOW and a HIGH speed set ting. You must specify the number of the stage that, when activated, will switch the fan from LOW to HIGH.

For example, if there are four cooling stages and you wish to have the fan switch from LOW to HIGH when stage 3 becomes active, enter a “3” as the switch-over set point. This will cause the fan to switch to HIGH speed when stage 3 is activated. Likewise, when stage 3 is deac tivated, the fan speed will switch from HIGH to LOW.

You may choose a different switch-over setpoint for occupied heating, occupied cooling, unoccupied heating, and unoccupied cooling modes.

When the AHU is in dehumidification mode, the AHU Control application will ignore the fan speed settings of the active stages and switch to a user-specified dehumidi fication speed (usually LOW).

Continuous Two-Speed Fan Operation When All Stages Are OFF

When the fan is operating in Continuous mode and all heating and cooling stages are OFF, the fan speed will default to a user-specified speed. You may choose a differ ent default speed for both occupied and unoccupied opera tion.

Air Handling Units (AHU) Software Overview • 11-21

Variable-Speed Fan Operation

Page 166 of the Emerson E2 user manual — 11.6.5 Economizer Control
Page 166 · click to enlarge
Page 166

11.6.5 Economizer Control

economization is enabled.

6. In vs. Out Enthalpy - This strategy requires indoor and outdoor humidity sensors and also indoor and outdoor temperature sensors. The enthalpy of the outdoor air is calculated and com pared to the enthalpy of the indoor air. If the out door air enthalpy is less than the indoor air enthalpy, economization is enabled. Otherwise, economization is disabled.

Economizer dampers on AHUs are used to bring out side air into the building for use in cooling. When tem perature and humidity conditions are favorable, the economization dampers are opened, and outside air is allowed to flow into the AHU. Economization is generally used by the AHU just as a cool stage would be in Tem perature Control; if cooling is needed, and conditions are favorable for economization, the dampers will open and economization will begin. If more cooling is needed, the cooling stages would then cycle on as normal.

You may choose a different economization checking method for use in summer and winter months. 11.6.5.2 Economization Lockout Features

The E2 supports control of both two-position (digital) and variable-position (analog) economizer dampers. 11.6.5.1 Economization Enable

In addition to the methods listed above, there are two economization lockout features that apply to all AHUs using economization.

Before the AHU Control application may open econo mization dampers, it must first determine if the outdoor air conditions are favorable for economization. There are six possible ways the AHU Control may do this:

Max Outside Air Humidity

The Max Outside Air Humidity is the highest allow able humidity level for the outside air. If the outside rela tive humidity is higher than this setpoint, economization will not be allowed to occur.

1. Enthalpy Switch - An enthalpy switch is a digital device that is pre-set to detect when the tempera ture and humidity levels are favorable for econo mization. When the conditions are favorable, this switch sends an OK (ON) signal to the AHU Control application. Otherwise, the switch sends a NOT OK (OFF) signal, and economization is disabled.

The Minimum Supply Temp is a user-defined setpoint that locks out economization if the supply air temperature falls below a minimum supply temperature setpoint. This feature ensures that the air coming from outside is not too cold. 11.6.6 Digital Economizer Control

2. Dewpoint Setpoint - A dewpoint probe measur ing the dewpoint of the outside air is compared to a setpoint. If the outside air dewpoint is less than the setpoint, economization is enabled. If it is higher than the setpoint, economization is dis abled.

Control of digital or two-position economizers is rela tively simple. When conditions are favorable for econo mization, the dampers will be opened when cooling is needed. If not favorable, the dampers will be closed. 11.6.7 Analog Economizer Control

3. Calculated Enthalpy - The AHU Control appli cation calculates the outside air enthalpy by read ing the value of a relative humidity sensor and an outdoor air temperature sensor. If the enthalpy is lower than the setpoint, economization is enabled. If the enthalpy is greater than the set point, economization is disabled.

For variable-position dampers, economization is gen erally used by the AHU just as a cool stage would be in Temperature Control. If cooling is needed, and conditions are favorable for economization, the dampers will open and economization will begin. If more cooling is needed, the cooling stages would then cycle on as normal.

4. Dewpoint Fail-Safe - This is similar to method #2, except an outdoor temperature sensor value is compared to the setpoint instead of a dewpoint probe’s value. This comparison is a poor substi tute for actual dewpoint readings and is recom mended for use as a fail-safe only. When possible, use humidity or dewpoint sensors.

The position of the analog economizer damper is important only for the purposes of keeping the mixed air temperature (a combination of the outdoor air coming through the dampers and the return air temperature) near the user-specified setpoint. The damper is controlled using PID control. 11.6.8 Dehumidification Control

5. Temperature Comparison - The AHU Control application simply compares the temperature of the inside air with the temperature of the outside air. If the outside air is cooler than the inside air,

Dehumidification control uses the AHU’s existing cool stages (and a separate dehumidification device such as a desiccant wheel, if available) to remove moisture from the

Minimum Supply Temp

Page 167 of the Emerson E2 user manual — 11.6.9 Curtailment
Page 167 · click to enlarge
Page 167

air.

comfortably within the range of the new setpoint.

The dehumidification setpoint is placed at the 0% end of the dehumidification PID throttling range. In other words, the dehumidification output will start at 0% when the humidity is equal to the setpoint and increase to 100% when the humidity is equal to or above the setpoint plus the throttling range.

Figure 11-15 shows an example of how pre-starts and pre-stops work in a heating application. From unoccupied mode, the pre-start period ramps the temperature up slowly so that when the scheduled change from unoccu pied to occupied mode occurs, the temperature will already be at or near the occupied heating setpoint. During the pre-stop, which occurs before AHU Control goes from occupied to unoccupied mode, heating is suspended and the temperature is allowed to “coast” down to the unoccu pied setpoint.

The dehumidification output percentage is used much like a heating or cooling output percentage is used in Tem perature Control. The percentage represents the percent age of total dehumidification capacity available to the AHU (including cool stages and other dehumidification devices). 11.6.9 Curtailment

Emerson E2 — 11.6.9 Curtailment diagram (page 167)
Fig. 184 · 11.6.9 Curtailment

Some power companies offer curtailment programs that allow participating stores to disable user-defined loads during peak power times in return for discounts on utility rates.

If you are participating in a curtailment program, the power company will supply you with a digital curtailment device that must be wired to an input on the RS485 I/O Network.

Figure 11-15 - Diagram of Pre-Start and Pre-Stop Operation

Intelligent Pre-Starts and Pre-Stops

OSS is designed to handle pre-starts and pre-stops in the most energy-efficient manner possible. Every time a pre-start or pre-stop occurs, OSS measures the amount of time it takes to bring the temperature from the previous setpoint to within the “comfort zone” of the new setpoint (a user-defined range of values above and below the set point within which the temperature is considered accept able). This duration is used to determine the average rate of temperature change, called the K factor.

To set up curtailment in the system software, you must designate which specific heating and cooling stages will be subject to curtailment.

When the power company sends a curtail command (i.e., the value of the curtailment device switches to “CLOSED”), all stages that are set up to be curtailed will be shut off and locked out.

Fan control is not directly affected by a call for curtail ment. The AHU fan will still run at a speed based on the number of active, non-curtailed stages (or, if using modu lated outputs, the curtailed modulating percentage). If this causes the fan to slow down or shut off during curtailment, there will be energy savings from the fans. 11.6.10 Optimum Start/Stop (OSS)

The K factor is stored in the memory along with the average value of the outdoor air temperature during the pre-start or pre-stop. Over time, collected K factor data will be sorted and combined into a table. As a result, by constantly observing and recording the results of previous pre-starts and pre-stops, OSS will be able to intelligently guess how much time a pre-start or pre-stop mode should last based on the outside temperature.

Emerson E2 — 11.6.9 Curtailment diagram (page 167)
Fig. 185 · 11.6.9 Curtailment

AHU Control keeps track of three different kinds of K factors:

  • Heat K factor - used to guess pre-start dura tions for AHUs operating in heating mode.
  • Cool K factor - used to guess pre-start dura tions for AHUs operating in cooling mode.

Optimum Start/Stop (OSS) is a feature that works alongside the AHU Control application’s occupied and unoccupied temperature control modes. OSS takes control of heating and cooling several minutes before the building is scheduled to change occupancy states, and prepares the building for the upcoming change in setpoints. As a result, when the occupancy state changes, the temperature will be

  • Coast K factor - a measurement of the change in temperature when no heating or cooling is active. This is used to determine pre-stop durations for both heating and cool ing AHUs.

Air Handling Units (AHU) Software Overview • 11-23

Page 168 of the Emerson E2 user manual — 11.6.11 Separate Setpoints
Page 168 · click to enlarge
Page 168

11.6.11 Separate Setpoints

Inputs Sensor Type Wiring Instructions

The Separate Setpoints strategy for AHU allows a Cut In/Cut Out setpoint to be set up for each heat and cool stage instead of just one cool and one heat setpoint set up for each stage (Normal strategy). Dehumidification con trol can be performed while controlling with separate set points. 11.6.12 AHU Zone Control

Outdoor Air Humid Humidity Set up as Out door Humidity Provider in Global Data (see Section 10.17).

Curtailment Device Digital Set up as Curtail ment in Global Data (see Sec tion 10.17).

Unlike MultiFlex RTU rooftop controller applications, AHU applications are not required to be grouped into Zone applications (AHUs are usually large enough to be “zones” in and of themselves).

Fan Proof Digital See Table 9-1 on page 9-3

However, if desired, you may associate an AHU Con trol application with a Zone application. The AHU will then use the Zone’s Temperature Control setpoints, occu pancy state, summer/winter state, and economization and dehumidification enable signals. More information on Zone control is available in Section 11.7, Zone Control. 11.6.13 Hardware Overview

Fan Proof Reset Digital See Table 9-1 on page 9-3

VS Inverter Alarm Digital See Table 9-1 on page 9-3

Enthalpy Switch (Indoor and/or Out door)

Digital See Table 9-1 on page 9-3

Dewpoint Probe (for Economization)

Dewpoint See Table 9-1 on page 9-3

To set up an AHU for control by an E2, numerous tem perature and humidity sensors for several different appli cations must be connected to the I/O Network, as well as fan and cool proof checking devices, economization checking devices, curtailment devices, and all of the heat ing, cooling, and dehumidification outputs.

Mixed Air Temp (ana log economizers only)

Temperature See Table 9-1 on page 9-3

Table 11-10 - Suction Group Inputs

Listed below are wiring instructions for some of the inputs and outputs that are part of a typical AHU setup.

Inputs Sensor Type Wiring Instructions

Space Temperature Temperature See Table 9-1 on page 9-3

Space Humidity Humidity See Table 9-1 on page 9-3

Supply Air Temp Temperature See Table 9-1 on page 9-3

Return Air Temp Temperature See Table 9-1 on page 9-3

Outdoor Air Temp Temperature Set up as Out door Air Provider in Global Data (see Section 10.17).

Table 11-10 - Suction Group Inputs

Page 169 of the Emerson E2 user manual — 11.7.1 Overview
Page 169 · click to enlarge
Page 169

Output Device Wire 8RO contacts

Switch toNotes

to:

Heat / Cool Staged Outputs

see note see note Set up any stages you want ON when the controller is off- line as N.C. Stages you want OFF should be set as N.O.

see note see note If one or more heat or cool stages will be ON, wire fan N.C. so it will be active during controller off-line times. Otherwise, wire N.O.

Two-Speed Fans (LOW, HIGH, and fan contac tor)

see note see note If any heat or cool stages are configured to be ON (N.C.), set the wiring and the switch to N.C., and set either the LOW or HIGH stage output to N.C. (whichever speed you want active). If no heat or cool will be active, set LOW, HIGH, and the fan contactor to N.O.

N.O. N.O.

Table 11-11 - Suction Group Outputs

11.7 Zone Control

values.

  • A signal to enable or disable economization (based on the Zone application’s own econo mization checking method).

11.7.1 Overview

An HVAC Zone is a collection of up to sixteen rooftop units or air handling units that work together to maintain the same temperature and humidity throughout a particular volume of space. The primary function of an HVAC Zone is to “manage” the operation of each individual HVAC unit by providing the temperature setpoints that will be used in Temperature Control. Zones are also responsible for ordering HVAC units to dehumidify and determining when outside air conditions are favorable to economize. 11.7.2 How Zones Work

  • A signal to begin or end dehumidification (based on the Zone application’s own humid ity reading and dehumidification setpoint).
  • A signal indicating the current season is either SUMMER or WINTER.
  • The combined Zone Temperature and Zone humidity (based on a combination of each HVAC unit’s space temperature and space humidity).
  • The fallback temperature and humidity set points to use in case the unit loses contact with its Zone application.

A Zone is built by first creating a Zone application in the E2 BX. Then, all HVAC unit applications that will be a part of the Zone must be connected with the Zone applica tion. This connection process is known as association.

When a rooftop unit or AHU is associated with a Zone, the E2 automatically makes a series of I/O connections between the Zone application and the individual MultiFlex RTU or AHU application. From that point on, the Zone is responsible for passing along the following information to the individual unit:

  • The heating and cooling setpoints it will use during occupied and unoccupied building times.
  • A command to operate in either occupied or unoccupied mode (based on the Zone appli cation’s own time schedule input).
  • Outdoor air and outdoor relative humidity

Zone Control Software Overview • 11-25

Set Fail-safe Dip · Single-Speed Fans · Digital Econo mizer

Page 170 of the Emerson E2 user manual — 11.7.3.2 MultiFlex RCB Board
Page 170 · click to enlarge
Page 170

11.7.3 Applications That May Be Connected To Zones

11.7.3.2 MultiFlex RCB Board

The MultiFlex Rooftop Control Board (RCB) (P/N 810-3062) is a rooftop HVAC control board for use either as a stand-alone controller or in zone control applications using a Emerson Retail Solutions E2 BX building control system. The MultiFlex RCB is capable of controlling heat and cool stages, fans, humidification and dehumidification devices, economizers using on-board I/O and control algo rithms, as well as monitor and interact with other building control systems and peripherals (such as smoke alarms and CO2 sensors).

There are three different HVAC applications that may be associated with a Zone application: a MultiFlex RTU application, a MultiFlex RCB application, and an AHU application. The MultiFlex RTU and RCB applications interface with the MultiFlex RTU and RCB I/O Network boards that control rooftop units. AHU applications use input and output points on the I/O Network to control air handling units. 11.7.3.1 MultiFlex RTU Board

The MultiFlex RTU is a control board on the E2’s I/O Network that controls the operation of a single rooftop HVAC unit. This board has an on-board processor with numerous inputs, relay outputs, and 0-10VDC analog out puts, and is designed for controlling advanced rooftop units with a large number of heat/cool stages, variable- position economizers, variable-speed fans, etc.

The MultiFlex RCB-P (pulse control board P/N 810- 3076) uses an alternate control strategy that incorporates logic for controlling the heating and cooling function. Instead of staging heats or cools On/Off based solely on the space temperature, the stages follow a pulse modula tion scheme to maintain an average supply temperature, resulting in smaller space temperature swings and poten tially increasing energy efficiency.

The E2’s MultiFlex RTU applications serve only two purposes: to act as an interface between the user and the MultiFlex RTU processor, and to allow communications between the MultiFlex RTU board and the Zone applica tion. The MultiFlex RTU depends on the Zone application to provide temperature setpoints, dehumidification and economization enabling, and other information.

The MultiFlex RCB application must be configured to communicate with an RCB-P by setting the RCB Type parameter to Pulse. If the RCB Type parameter is set incorrectly, Type Mismatch will be shown in the network summary screen for the device.

Differences Between the MultiFlex RCB and the Mul tiflex RTU:

The MultiFlex RTU board also has the ability to act in stand-alone mode without help from the Zone application. The MultiFlex RTU has its own fallback temperature con trol strategy, and even has a seven-day fallback occupancy schedule that may be substituted when communications with the Zone is lost.

The RCB is an improved version of the MultiFlex RTU. The RCB has sixteen fully configurable analog and digital input points, whereas the RTU has only eight inputs, two of which are configurable. The RCB has four analog outputs for use in controlling variable speed fans, economizers or modulating heating and/or cooling valves, whereas the RTU has only two analog outputs for use only with VS fans and economizers. The RCB also features a more sophisticated HHT interface and updated algorithms for controlling heating, cooling, dehumidification, and air quality.

MultiFlex RCB-P Board

Page 171 of the Emerson E2 user manual — 11.7.5 Zone Temperature
Page 171 · click to enlarge
Page 171

11.7.3.3 AHUs

Zone’s HVAC applications. 11.7.6 Economizer Control

An AHU controls all aspects of an air handling unit, including up to eight stages of auxiliary or reclaim heat, six cooling stages, dehumidification, analog or digital economization, and support for single-, two-, or variable- speed fans.

A Zone application is responsible for analyzing the outside air conditions and determining if the conditions are favorable for bringing in outside air. If the air condition is favorable, the Zone sends a signal to its associated HVAC units telling them economization is OK. If not, it sends a signal to disable economization.

Normally, since AHUs are designed to cover a wide area of space, AHU Control applications operate on their own and are not associated with Zone applications (they are large enough to be “zones” within themselves). How ever, if desired, an AHU may be associated with a Zone application, which will allow the AHU to use the Zone’s setpoints, occupancy state, summer/winter state, and dehu midification and economization enabling. 11.7.4 Temperature Control

It is up to the associated HVAC unit to process the economization information and open the dampers. 11.7.7 Economization Enable

There are five possible ways a Zone application may determine when conditions are favorable for economiza tion:

As mentioned, Zone applications do not “control” tem perature themselves. Zone applications simply pass along the setpoints an HVAC unit will use, and the individual unit is responsible for controlling to the setpoint using its own temperature input.

1. Enthalpy Switch - An enthalpy switch is a digital device that is pre-set to detect when the tempera ture and humidity levels are favorable for econo mization. When the conditions are favorable, this switch sends an OK (ON) signal to the Zone application. Otherwise, the switch sends a NOT OK (OFF) signal.

The Zone application passes along eight different set points, which are shown in Table 11-12. Of these set points, the application receiving the setpoints will only use one cooling and one heating setpoint. The pair the applica tion will use is determined by whether the current season is SUMMER or WINTER and whether the building is OCCUPIED or UNOCCUPIED (both of which is supplied by the Zone).

2. Dewpoint Setpoint - A dewpoint probe measur ing the dewpoint of the outside air is compared to a setpoint. If the outside air dewpoint is less than the setpoint, economization is enabled. If it is higher than the setpoint, economization is dis abled.
3. Calculated Enthalpy - The Zone application cal culates the outside air enthalpy by reading the value of a relative humidity sensor and an out door air temperature sensor. This calculated enthalpy is compared to a setpoint. If the enthalpy is less than the setpoint, economization is enabled. If greater, economization is disabled.

SUMMER COOL OCC SUMMER HEAT OCC

SUMMER COOL UOC SUMMER HEAT UOC

WINTER COOL OCC WINTER HEAT OCC

WINTER COOL UOC WINTER HEAT UOC

4. Dewpoint Fail-Safe - This is similar to method #2, except an outdoor temperature sensor value is compared to the setpoint instead of a dewpoint probe’s value. This comparison is a poor substi tute for actual dewpoint readings and is recom mended for use as a fail-safe only. When possible, use humidity or dewpoint sensors.

Table 11-12 - Possible Heating/Cooling Setpoints

11.7.5 Zone Temperature

Each MultiFlex RTU and AHU application has a space temperature output that is equal to the unit’s current Con trol Temperature. When associated with a Zone applica tion, this space temperature output is connected to one of sixteen Zone Temperature inputs in the Zone application. These sixteen inputs are then combined using a user- defined combination method to yield the Zone Tempera ture.

5. Temperature Comparison - The AHU Control application simply compares the temperature of the inside air with the temperature of the outside air. If the outside air is cooler than the inside air, economization is enabled.

Zone Temperature provides an at-a-glance view of how well the units within the Zone are doing in heating and cooling. If desired, Zone Temperature may also be used as a temperature control input by one or all of the

6. In vs. Out Enthalpy - This strategy requires indoor and outdoor humidity sensors and also indoor and outdoor temperature sensors. The

Zone Control Software Overview • 11-27

Cooling Heating

Page 172 of the Emerson E2 user manual — DEHUM SET POINT
Page 172 · click to enlarge
Page 172

enthalpy of the outdoor air is calculated and com pared to the enthalpy of the indoor air. If the out door air enthalpy is less than the indoor air enthalpy, economization is enabled. Otherwise, economization is disabled.

Note that unlike Zone Temperature, which has 16 inputs that combine into a single value, Zone humidity is designed to be provided by a single input. However, there may be some instances where one or more relative humid ity sensors exist within a Zone (such as an installation where each MultiFlex RTU has its own humidity sensor for use in Stand-Alone mode). If you have multiple humidity sensors in a Zone and you wish to combine these humidity sensor values to calculate Zone Humidity, use an Analog Combiner application to make the combination, and tie the Zone application’s Zone Humidity input to the output of the combiner. Refer to Section 11.18, Analog and Digital Combiners for Analog Combiner application programming instructions. 11.7.11 The Effect of Enabling Dehumidification

You may choose a different method for use in summer and winter months. Also, an alternate method may be specified that will be used as a fail-safe when the primary method is not available (due to sensor failure, etc.). 11.7.8 The Effect of Enabling Economization

Both MultiFlex RTU and AHU applications support the use of both two-position (digital) and variable-position (analog) economizers. Digital economizers, when enabled, behave like a first stage of cool. When analog economizers are enabled, the MultiFlex RTU or AHU will modulate the opening percentage of the dampers based on its own mixed air temperature measurements. 11.7.9 Dehumidification Control

When a Zone application determines that dehumidifi cation is needed, it sends an ON signal to all its associated controllers, signaling them to begin dehumidification. It is up to the individual MultiFlex RTU, RCB, or AHU to per form the dehumidification. 11.7.11.1 MultiFlex RTUs and RCBs

A Zone application is responsible for reading the rela tive humidity level within the Zone, comparing it to a dehumidification setpoint, and sending a command to dehumidify when the humidity is above the setpoint.

Once the MultiFlex RTU and RCB applications acknowledge the signal to begin dehumidification, it will search its outputs for a dehumidification device. If one is configured, this device will be turned ON. Afterwards, cool stages will be cycled ON (up to a user-defined maxi mum number of stages) until all stages are ON or until the Zone application signals dehumidification is complete. When dehumidification is complete, the stages will cycle OFF followed by the dehumidification device. 11.7.11.2 AHUs

Once the Zone humidity level rises above the setpoint, dehumidification will be active in all the Zone applica tion’s associated HVAC units until the indoor relative humidity falls below the setpoint minus the dehumidifica tion hysteresis value. An example of this is shown in Fig ure 11-16.

AHUs use a special dehumidification algorithm based on the Proportional loop in PID control. When dehumidifi cation is enabled by the Zone application, the AHU appli cation will activate a percentage of its total cool stage capacity, the amount of which depends on how close the current relative humidity is to the setpoint. See Section 11.6, Air Handling Units (AHU), for more information. 11.7.12 Optimum Start/Stop (OSS)

DEHUM SET POINT

DEHUM ON

DEHUM HYSTERESIS

Figure 11-16 - Dehumidification Setpoint Control

The need for dehumidification may also be determined by a digital humidistat. In this case, dehumidification is active only when the humidistat input is ON. 11.7.10 The Zone Humidity Input

Optimum Start/Stop (OSS) is a feature that works alongside the Zone application’s occupied and unoccupied temperature control modes. OSS takes control of heating

Show 5 more labels / short text on this page
100% · Relative Humidity (%) · 0% · Time (s) · 26512040
Page 173 of the Emerson E2 user manual — 11.7.8 The Effect of Enabling Economization
Page 173 · click to enlarge
Page 173

and cooling several minutes before the Zone application is scheduled to change occupancy states, and prepares the area for the upcoming change in setpoints. As a result, when the occupancy state changes, the temperature will be comfortably within the range of the new setpoint.

cooling is active. This is used to determine pre-stop durations for both heating and cool ing AHUs.

Figure 11-15 shows an example of how pre-starts and pre-stops work in a heating application. From unoccupied mode, the pre-start period ramps the temperature up slowly so that when the scheduled change from unoccu pied to occupied mode occurs, the temperature will already be at or near the occupied heating setpoint. During the pre-stop, which occurs before the Zone application goes from occupied to unoccupied mode, heating is sus pended and the temperature is allowed to “coast” down to the unoccupied setpoint.

Emerson E2 — 11.7.8 The Effect of Enabling Economization diagram (page 173)
Fig. 186 · 11.7.8 The Effect of Enabling Economization

Figure 11-17 - Diagram of Pre-Start and Pre-Stop Operation

Intelligent Pre-Starts and Pre-Stops

OSS is designed to handle pre-starts and pre-stops in the most energy-efficient manner possible. Every time a pre-start or pre-stop occurs, OSS measures the amount of time it takes to bring the temperature from the previous setpoint to within the “comfort zone” of the new setpoint (a user-defined range of values above and below the set point within which the temperature is considered accept able). This duration is used to determine the average rate of temperature change, called the K-factor.

The K-factor is stored in the memory along with the average value of the outdoor air temperature during the pre-start or pre-stop. Over time, collected K-factor data will be sorted and combined into a table. As a result, by constantly observing and recording the results of previous pre-starts and pre-stops, OSS will be able to intelligently guess how much time a pre-start or pre-stop mode should last based on the outside temperature.

AHU Control keeps track of three different kinds of K- factors:

  • Heat K-factor - used to guess pre-start dura tions for AHUs operating in heating mode.
  • Cool K-factor - used to guess pre-start dura tions for AHUs operating in cooling mode.
  • Coast K-factor - a measurement of the change in temperature when no heating or

Zone Control Software Overview • 11-29

Page 174 of the Emerson E2 user manual — 11.8 MultiFlex CUB Board
Page 174 · click to enlarge
Page 174

11.7.13 Losing Contact With Zone Applications

Emerson E2 — 11.7.13 Losing Contact With Zone Applications diagram (page 174)
Fig. 187 · 11.7.13 Losing Contact With Zone Applications

When a MultiFlex RTU or AHU loses contact with the Zone application to which it was assigned, it is forced to operate in Stand-Alone Mode. Each of the different appli cations have different stand-alone capabilities. 11.7.14 Stand-Alone MultiFlex RTUs

The MultiFlex RTU uses its own occupied and unoccu pied heating and cooling setpoints when it operates in Stand-Alone Mode. These values are programmed through the MultiFlex RTU application and stored in the memory on the MultiFlex RTU board itself. During Stand-Alone Mode, the MultiFlex RTU uses its space temperature sen sor value as the control input.

Figure 11-18 - Zone Association Screen (BX-400 Unit Shown)

The Zone Association screen lists all RTUs/ARTCs, and AHUs that are set up on the current E2. To make an association, move the cursor to the HVAC Zone field of the RTU/ARTC or AHU you wish to associate, and press (LOOK UP) to open the Application Selection menu and use the arrow keys to scroll to find the desired Zone name. When this menu is open, use and to move quickly to the beginning or end of the list respec tively.

The MultiFlex RTU also has a seven-day fallback occupancy schedule that it may use to determine occupied or unoccupied building status. Different times may be pro grammed in the MultiFlex RTU application for Sunday through Saturday. Holiday scheduling is not supported.

Economization control is available if the sensor pro viding the economization checking is connected to an input on the MultiFlex RTU. Otherwise, economization is disabled.

From this screen, you may also choose to jump to the Setup screen to configure an individual RTU/ARTC, AHU or Zone application by using the (SETUP AHU) key or the (SETUP ZONE) key.

As it does in Temperature Control, the MultiFlex RTU stores its own occupied and unoccupied dehumidification setpoints. If the MultiFlex RTU has its own humidity sen sor, it will continue dehumidification using the stored fall back setpoints. 11.7.15 MultiFlex RTU/ARTC and AHU Zone Association

11.8 MultiFlex CUB Board

The MultiFlex Condensing Unit Board (CUB) is a “smart” input/output board designed to control single con densing units. A single condensing unit is a self-contained compressor and condenser bearing unit which controls refrigeration in a single case line-up or walk-in cooler.

MultiFlex RTUs and AHUs are assigned to Zone appli cations using the Zone Association screen. To access this screen:

1. Press for the Main Menu.

The MultiFlex CUB uses the same general hardware configuration as a MultiFlex 168AO. It is equipped with a processor and extra memory to allow it to control com pressors, condensers, refrigeration, and defrost for a single condensing unit using on-board I/O and control algo rithms.

2. Press for System Configuration.
3. Press the Network Setup menu.
4. Press for Associations.

The MultiFlex CUB has its own installation and opera tion manual, (P/N 026-1706).

Page 175 of the Emerson E2 user manual — 11.10 Lighting Schedules
Page 175 · click to enlarge
Page 175

11.9 MultiFlex PAK Board

setpoints, and overrides the schedule as the real-time light ing conditions warrant. As a result, the light level sensor and schedule both work to provide adequate light when needed AND saving energy by keeping lights OFF when they are not necessary.

The PAK is a distributed pack (rack) controller that controls compressors and condenser fans. The PAK can control up to 8 compressor groups containing up to 16 compressors. The compressor control strategy is Fixed Steps with setpoint/deadband using ON and OFF delays. Up to 20 Fixed Steps can be configured.

The PAK can control up to 4 condenser fan groups containing up to 8 total condenser fans. The PAK con denser control strategy is sequential TD control with set point/deadband using ON and OFF delays.

The PAK has a compressor/condenser interlock fea ture that will override TD control and force the condenser fans to stage off using the TD control OFF delay when all compressors are off. This feature can be disabled with an Enable/Disable setpoint or when the discharge pressure is above a configurable setpoint.

The MultiFlex PAK boards consist of two circuit boards: a bottom layer with 16 combination digital/analog inputs, and a plug-in top layer which contains a combina tion of 8 relay outputs and 4 digital DC voltage outputs.

The analog outputs on the Multiflex PAK drive solid state relays to control the fan stages. The relays control the compressor groups.

The communication interface is RS485 I/O using the Standard Extended Address Form for Emerson Retail Solutions Distributed Controllers. Currently, the PAK is designed to interface with the Emerson Retail Solutions Einstein and E2 controllers.

The MultiFlex PAK has its own installation and opera tion manual, P/N 026-1712.

11.10 Lighting Schedules

This section explains the function of E2’s Lighting Schedule application. It includes an overview of how the application works and instructions on how to program it. 11.10.1 Overview

The Lighting Schedule application provides an inter face for Cut In/Cut Out control based on light level, simple time scheduling with or without use of external Time Schedule applications, proofing, minimum on/off times, solar control, and output dimming control.

Generally, the Lighting Schedule application is designed to follow a digital command from a time sched ule to determine when the lights should be ON or OFF. At the same time, Lighting Schedule looks at the value of a light level sensor, compares it to a set of Cut In/Cut Out

MultiFlex PAK Board Software Overview • 11-31

Page 176 of the Emerson E2 user manual — DV
Page 176 · click to enlarge
Page 176

11.10.2 Functions of the Lighting Schedule Application

DV

AV

DV

DV

DV

LLEV In Logic In

DV

DV

DV

DV

DV

Logic In Sched In

Min On/Off with Delay

DV

DV DV

Use Alt LLEV Comb

DV

DV

DV DV Extern Sched

DV DV

Desired Value Proof Fail

Use Alt Sched Comb

DV

DV

DV

Figure 11-19 - Lighting Schedule Module Cell Diagram

Figure 11-19 shows a flowchart diagram of the Light ing Schedule application and the eight cells that work together to control the lights. A description of each cell and the functions they perform are given below. 11.10.3 Control Method Select

will be an ON state. When the light level rises above the cut-out setpoint, the state will transition from ON to OFF.

The ON/OFF state determined by the light level can be logically combined with LOGIC IN, a digital input from an input point or another application in E2. The result of this comparison will be the final ON/OFF light state com mand that is sent from the Light Level Interface cell to the Schedule Interface cell (explained below).

Control Select determines whether the Multi-Logic Combiner is used or the Light Level Interface and Sched ule Interface are used for Lighting Control. When Use Alt Control is set to Yes, the Light Level Interface and Sched ule Interface combination strategies are disabled and are not visible. When Use Alt Control is set to No, the Multi- Logic Combiner matrix is disabled and not visible. 11.10.4 Standard Control

There are several different strategies for combining the light level ON/OFF state with the value of the LOGIC IN input:

  • Logic Only - The cell will read only the LOGIC IN input and ignore the light level sensor reading.

Standard control comprises Light Level Interface and Schedule Interface strategies. 11.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)

  • LLEV Only - The cell will read only the light level sensor and ignore the value of the LOGIC IN input.
  • Both ON/Both OFF - From an output=OFF state, when both the light level state and the LOGIC IN input are ON, the resulting output command will be ON. The output command will remain ON until both the light level state and the LOGIC IN input turn OFF.

The Light Level Interface cell of the Lighting Schedule application translates the value of the light level sensor into an ON or OFF command by comparing the analog light level to a set of Cut In/Cut Out setpoints.

From an OFF state, when the light level falls below the Cut In setpoint, the result of the light level comparison

  • Both ON/LLEV OFF - Like the Both ON/
Show 49 more labels / short text on this page
Lighting Control Module · Use Alt Comb · Multi Logic · Combiner · DV Offset Control · Sunset Today · Use Alt · Rise/Set Offset · Out · Logic1 · Logic2 Logic3 Logic4 · Light Level LLEV · Control Method · LLev Interface AV · Select · Logic In · Out · Schedif · Use Alt Control · LLEV Occup · Use Alt DV · Occup · Out · Invert Output DV · In Out · Output DV · Invert Output DV · Use Alt · Comb Type · Alt Comb · Min On/Off · Cutin/out SPs · On/Off Delay · Comb Type · Alt Comb · Basic Sched · Light Schedule · Out · Proof · Events · Proof DV · Active Days · Use Ext Sched · Actual Value DV · Delay · Latch Time · Bypass · Proof · Logical Combination Strategies
Page 177 of the Emerson E2 user manual — 11.10.4.2 The Schedule Interface Cell (SCHEDIF)
Page 177 · click to enlarge
Page 177

Both OFF strategy, except only the light level state must turn OFF in order to turn the output from ON to OFF.

  • Both ON/Both OFF - From an output=OFF state, when both the Light Level Interface input and the Basic Schedule input are ON, the resulting output command will be ON. The output command will remain ON until both the Light Level and Basic Schedule inputs turn OFF.
  • LLEV ON/Both OFF - Like the Both ON/ Both OFF strategy, except only the light level state must turn ON in order to turn the output from OFF to ON.
  • Both ON/Sched OFF - Like the Both ON/ Both OFF strategy, except when the Sched ule Interface output is ON, it will turn off only when the Basic Schedule input turns OFF.
  • Both ON/Any OFF - Like the Both ON/Both OFF strategy, except any of the two states that turn from ON to OFF will result in the output turning OFF.

The LOGIC IN input should not be used to compare the light level state to a Time Schedule output or a similar digital state that represents OCCUPIED/UNOCCUPIED. Schedule comparisons are handled by the Schedule Inter face cell. If a schedule input value is the only digital value you will be using to combine with the light level sensor value, choose the “LLEV ONLY” combination for this cell.

  • Sch ON/Both OFF - Like the Both ON/Both OFF strategy, except when the Schedule Interface output is OFF, it will turn ON only when the Basic Schedule input turns ON.
  • Both ON/Any OFF - Like the Both ON/Both OFF strategy, except when the Schedule Interface output is ON, it will turn OFF if any input turns OFF. If desired, the final result of any of the above combina tions can be inverted by setting a parameter.

Occupied/Unoccupied and Alternate Settings

If desired, the Light Level Interface cell can be set up with a set of unoccupied Cut In/Cut Out setpoints. To do this, the Light Level Interface cell relies on a separate dig ital input to tell it when to use occupied or unoccupied set points.

Alternate Schedule Interface Combinations

If desired, you can specify an alternate means of com bining the Schedule Interface cell inputs that is used only when the Use Alt Sched Comb input is ON. 11.10.5 Alternate Control

The Light Level Interface cell can also be set up with a set of alternate occupied and unoccupied setpoints, used only when the value of the input called USE ALT LLEV COMB is ON. 11.10.4.2 The Schedule Interface Cell (SCHEDIF)

Alternate control comprises Multi-Logic Combiner and Offset Solar Control strategies. 11.10.5.1 Multi-Logic Combiner

When the Alternate Lighting Control (Use Alt Con trol) parameter under the General tab in Setup of the application is set to Yes, an alternate lights on/off combi nation method is then used to turn lights ON and OFF. The user is then presented with a logical matrix where they can select which inputs will turn lights ON and OFF. This matrix is located under the Alt Control tab in Setup of the application.

The Schedule Interface cell is similar in function to the Light Level Interface cell, except it is used to logically combine the output of the Light Level Interface cell with that of the Basic Schedule cell. The Schedule Interface cell allows you to choose how the light level sensor and the time schedule work together to control the lights.

The output of the Schedule Interface cell represents the final ON/OFF state of the lights. It determines this state by performing one of the logical combinations listed below:

The Number of Inputs parameter (Num Inputs), located under General tab in Setup of the application, specifies the number of input sources made available in the matrix. Up to four input sources may be used: Sched ule, Solar, Light Level, and Logic.

  • LLEV/Logic Only - The Schedule Interface cell uses the input from the Light Level Interface cell as its output, ignoring the value passed to it from the Basic Schedule cell.
  • Sched Only - The Schedule Interface cell uses the input from the Basic Schedule cell as its output, ignoring the value passed to it from the Light Level Interface cell.

Lighting Schedules Software Overview • 11-33

Logical Combinations

Page 178 of the Emerson E2 user manual — 11.10.5.2 Offset Solar Control
Page 178 · click to enlarge
Page 178

11.10.5.2 Offset Solar Control

tion, you can designate the Basic Schedule cell’s schedule as a slave schedule.

The Offset Solar Control cell of the Lighting Schedule application uses the Sunrise Offset and Sunset Offset parameters to determine how many minutes before or after sunrise the sun is considered to be risen, or how many minutes before or after sunset the sun is considered to be set. The resulting offset for sunrise and sunset is used by Lighting Control in its logical equations for the Solar state.

A slave schedule differs from a master schedule in that its events are relative to the events of a master schedule. A master schedule’s events are absolute times (like 08:00 ON, 23:00 OFF). A slave schedule contains a set of times that are added to or subtracted from its master schedule’s events (like +00:30 ON, -01:00 OFF). As a result, the behavior of the output of the slave schedule is altered slightly from that of the master schedule.

A positive value is entered if adding to the sunrise time, and a negative value entered if offsetting the sunrise to an earlier time. For example, if the user wanted to turn the lights OFF one hour before sunrise, Sunrise Offset would be set to -60, and if the user wanted to turn the lights ON 45 minutes after sunset, Sunset Offset would be set to 45. 11.10.6 The Basic Schedule Cell

Slave scheduling is most often used in cases where the master schedule represents the occupied/unoccupied times of a building, and slave schedules are used to control loads that need activation or deactivation earlier or later than the occupied/unoccupied times. 11.10.7 The Min ON/OFF Cell

The Minimum ON/OFF cell has three important func tions:

The Basic Schedule cell has two main functions:

  • If a Time Schedule application is set up in E2 to provide ON/OFF times for the lights, the Basic Schedule cell passes the occupied/ unoccupied state from this time schedule to the Schedule Interface or Multi-Logic Com biner cell.
  • It receives the light state requested by the Schedule Interface cell, and applies this state to a set of minimum ON and OFF times. If the requested light state turns ON the lights before the prescribed minimum ON time, or turns OFF the lights before the prescribed minimum OFF time, the Minimum ON/OFF cell will delay the command until the mini mum ON or minimum OFF time has elapsed.
  • If no Time Schedule application is set up in E2 for light scheduling, the Basic Schedule allows you to configure a schedule for the Lighting Schedule application. This custom schedule will pass along a digital occupied/ unoccupied state to the Schedule Interface or Multi-Logic Combiner cell. If an external Time Schedule will be used, you will only need to configure the Basic Schedule by linking the schedule output to the input of the Basic Schedule cell and setting the Use External Schedule parameter to “Yes.”
  • If ON and OFF delays are specified, the cell delays ON/OFF commands it receives from the Schedule Interface cell.
  • It processes commands for manual bypass ing of the light state. When the Bypass input is any value other than NONE, the cell ignores the light state command input, all minimum ON/OFF times, and all ON/OFF delays, and bypasses the light state to the digital value of the Bypass input. The digital output of this cell controls the I/O board output point that activates and deactivates the lights. 11.10.8 The Proof Cell

If no external Time Schedule is being used, you may configure a set of schedule events and date ranges to be used by the Lighting Schedule application. Up to 15 ON/ OFF schedule events can be programmed, as well as up to 12 date ranges. Schedule events and date ranges programmed into the Basic Schedule cell are used only by the Lighting Sched ule application. If more than one Lighting Control applica tion will be using the same schedule, it is recommended you configure an external Time Schedule application so you won’t have to re-enter event and date information for each lighting application. 11.10.6.1 Slave Scheduling

The Proof cell verifies that the lights are turning ON and OFF as commanded by the Lighting Schedule applica tion. The Proof cell compares the digital command sent to the I/O output that controls the lights with a digital input from a proof checking device (like a digital light level sen sor). If the two inputs are not equal for an amount of time longer than the programmed proof delay, the Proof cell turns its Proof output ON to signify a failure has occurred.

If you have an external Time Schedule application pro viding occupied/unoccupied times, but you want to alter this schedule slightly for the Lighting Schedule applica

The Proof cell will deactivate the Proof output if the proof failure has been cleared longer than the programmed

Page 179 of the Emerson E2 user manual — 11.11 Demand Control
Page 179 · click to enlarge
Page 179

proof latch time. 11.10.9 Output Light Dimming

determining when the power company will start a demand window, they simply assume that the demand window can begin at any time. As new values of the KW input are gathered, Demand Control applications “roll” their demand windows forward and recalculate their load shed ding algorithms as if the power company were measuring the average power of the new window.

The dimming feature allows the lighting output to be varied based on a light level sensor. Dimming capability can work with both Standard Control and Alternate Con trol configuration. For setup, the user can:

For example, if the power company’s demand window lasts for 15 minutes, the Demand Control applications will keep a constant real-time average of all recorded KW val ues from the previous 15 minutes. If a Demand Control application determines from its calculations that the cur rent KW usage might cause its demand limit to be exceeded for the current or a future demand window, it will begin shedding loads to bring the KW usage down. A graphic example of the “rolling demand window” used by the Demand Control application is shown in Figure 11-20.

  • Specify the light levels for the minimum and maxi mum light output.
  • Specify the ramp speed that the indoor lighting out put changes.

11.11 Demand Control

Demand Control applications are used by E2 to keep the total power usage of the building environmental sys tem below a specific demand setpoint dictated by the power company. Demand Control applications achieve this by reducing power consumption in one or more appli cations in the other E2 applications as necessary until the total KW is below the setpoint. This process is called load shedding.

Emerson E2 — 11.11 Demand Control diagram (page 179)
Fig. 188 · 11.11 Demand Control

The Demand Control application is designed to calcu late power usage in much the same way power companies do, which ensures that it will be able to meet the power company’s demand limit accurately. The Demand Control application is also designed with a large amount of flexi bility in the way load shedding is prioritized, which allows users to maximize power economization with a minimal amount of interference into the normal operations of the building’s HVAC systems. 11.11.1 Introduction to Demand Limit Control

Figure 11-20 - Example of “Rolling Demand Window”

Power companies supply power to consumers at a fixed rate per kilowatt hour until a pre-defined level of energy consumption is reached. This level is called the demand limit. When the demand limit is exceeded, the rate is greatly increased as a penalty for high power demand by the consumer. Typically, once the demand limit is exceeded, the increased rate is charged for the remain der of the year.

In short, the primary goal of a Demand Control appli cation is to make sure that every possible interval of time that might be used by the power company as a demand window will be under the set demand limit. This ensures the demand setpoint will never be exceeded. 11.11.2 Demand Monitoring

The E2 either monitors power using an analog KW transducer (which sends the current KW usage via analog signal), or monitors energy consumption using a digital watt-hour transducer (which pulses to signify a fixed amount of watt-hours have been used).

To determine if a consumer has reached the demand limit, the power company arbitrarily monitors a con sumer’s energy consumption for a fixed period of time (usually anywhere from 15 to 30 minutes with most power companies, although it may be as short as 5 minutes). This monitoring period is called the demand window. Demand windows are always the same length of time, but they may be measured at any time the power company chooses to.

As mentioned in Section 11.11.1, Introduction to Demand Limit Control, all KW input values are gathered together and averaged together in a demand window. The demand setpoint is then subtracted from this average. The result of this calculation is called the integral error (or

Since Demand Control applications have no way of

Demand Control Software Overview • 11-35

Page 180 of the Emerson E2 user manual — 11.11.4 Shedding Levels
Page 180 · click to enlarge
Page 180

integral) of the demand window. The integral error rep resents how far below or above the setpoint the input has been for the entire demand window.

DEMAND SHED) that, when ON, sheds the application. Each application is programmed with a specific “demand bump” value that is added or subtracted from the control setpoints when this input comes ON.

Under non-demand conditions, the integral error will be below zero, since the average KW or watt-hour value will be below the setpoint.

Other applications, notably HVAC applications, have two inputs: a primary and a secondary (usually called PRI DEMAND SHED and SEC DEMAND SHED). Each input has its own “demand bump” value, so that when the primary is ON, the primary demand bump is in effect, and when the secondary is ON, the secondary demand bump is in effect. When both of these inputs are ON, the demand bump values are added/subtracted together and applied to the setpoint(s). As a result, two levels of shedding are pos sible for a single application.

The current value of the integral error and the current value of the KW input are what determine when the Demand Control application will begin load shedding. 11.11.3 Load Shedding

11.11.3.1 Definition

Load shedding is the process of curbing the amount of kilowatt usage within one or more target applications. Most applications that drive mechanical or electronic devices, such as lights, heaters, air conditioners, compres sors, etc., are configured with special inputs that, when active, “shed” the application.

Example: An air conditioner with a cooling setpoint of 70°F has a primary demand bump value of 2 and a sec ondary demand bump value of 2. In a typical Demand Control application setup, the PRI DEMAND SHED input would be one of the first inputs to go into shed; when this occurs, the bump value is added to the cooling setpoint, raising it to 72°F.

Physically, when a device is “shed,” its control set points are altered by a specified amount in a direction that will save energy. For instance, an HVAC unit with heating and cooling stages that is commanded to shed will have its heating setpoints lowered and its cooling setpoints raised. This will cause the HVAC unit to operate at a lower capac ity, thus saving energy.

The SEC DEMAND SHED would be set up to shed later (if necessary) as a second level of shedding for the air conditioner. When this input is turned ON, the setpoint is raised by the secondary demand bump value. Since the PRI DEMAND SHED input is still ON, both values are added to the setpoint, raising the setpoint to 74°F. 11.11.5 Priority Levels

Table 11-13 lists a number of E2 RX-300 and BX-300 applications and how load shedding affects them.

Each application that you wish to set up for shedding must be assigned a priority level in the Demand Control application. When a Demand Control application sheds loads, it does so by shedding all applications that are in the first priority level, and then continuing to shed higher pri ority levels until the demand is at an acceptable level or until all levels are shed.

All HVAC applica tions (RT-100s, MultiFlex RTUs, AHUs, Heat/Cools)

Raises cooling setpoints, low ers heating setpoints

Sensor Control and Analog Input I/O Modules

Raises or lowers Cut In/Cut Out setpoints (whichever direc tion saves energy)

Priority levels are simply outputs that connect to the demand shedding inputs of one or more applications. When a level is shed, the output comes ON and all appli cations connected to the output are shed.

Raises case temperature set points

Suction Groups Raises suction setpoint

There are three types of priority levels:

Condenser Raises discharge setpoint

1. First Shed

Analog Output I/O Modules

Raises or lowers PID setpoint (whichever will save energy)

First Shed levels are the first ones to be shed when demand shedding begins. The Demand Control applica tion first begins shedding by activating level #1 of the First Shed levels. As needed, each level thereafter is shed in succession (#2, #3, and so on to #20).

Digital Output I/O Modules

Control output is locked OFF.

Table 11-13 - Shedding Effect on Applications

Applications that are part of the First Shed priority lev els should be non-vital applications that would have no significant effect on the system if it were to be shed for a prolonged period of time. Examples: motor room exhaust fans, satellite HVAC units and/or lights in low-occupancy

11.11.4 Shedding Levels

Some applications have a single input (usually called

Application Shedding Effect · Refrigeration Cir cuits

Page 181 of the Emerson E2 user manual — 11.11.3 Load Shedding
Page 181 · click to enlarge
Page 181

rooms.

2. Rotational Shed
Emerson E2 — 11.11.3 Load Shedding diagram (page 181)
Fig. 189 · 11.11.3 Load Shedding

The Rotational Shed levels are shed in sequence only if all defined First Shed levels have already been shed and the Demand Control application needs more shedding to lower demand.

Unlike the First Shed priority levels, Rotational Shed levels do not always begin shedding by activating level #1. Instead, it shares the burden of being the first to activate among all the Rotational Shed levels. If, during one demand condition, Rotational Shed level #1 is the first of all the Rotational Shed levels to activate, it “rotates” first activation status to the next level in sequence (in this case, level #2). Thus, the next time a demand condition occurs, level #2 will activate first, and further levels will activate in sequence until it reaches level #1, which will be the last to activate.

Applications that are Rotational Shed priority should be more vital to system performance than the ones config ured as First Shed priority levels. In addition, all applica tions assigned to Rotational Shed levels should all be of relatively equal importance, since they each will spend about the same total amount of time in shed.

Figure 11-21 - Shedding Priority Levels

Other Notes About Priority Levels

All priority levels, whether they be First, Rotational, or Last, should be shedding relatively the same number of kilowatts. When the Demand Control application is shed ding in a non-emergency situation, it usually sheds one or two levels at a time. Therefore, Demand Control would do a much better job of reducing demand quickly if each acti vated level were reducing the KW by an equivalent amount.

Also, if you will be shedding a small amount of loads that are relatively equal in priority, you may choose to define them all under Rotational Shed levels, leaving the First Shed levels blank. Demand Control would then skip directly to the Rotational Shed levels during load shed ding, and all loads would share shed time equally.

Also, each priority level has three important user- definable parameters that affect the level’s time in shed:

3. Last Shed

The Last Shed priority levels are shed in sequence only if all First Shed and Rotational Shed levels have been shed and the Demand Control application still requires demand reduction.

  • Minimum Shed Duration - the minimum amount of time a level must remain in shed. Demand Control will not restore the level until this minimum time has passed.

Like the First Shed priority levels, level #1 is always the first Last Shed level to be activated, followed by #2, #3, #4, and so on up to #20.

  • Maximum Shed Duration - the maximum amount of time a level will remain in shed. When the level has been shed longer than this duration, it will automat ically be restored regardless of the current need for demand shedding.

Applications that are assigned to this priority should be the most vital applications to system performance. These applications will be shed only as a last resort, and there fore will spend the least amount of time in shed.

  • Minimum Restore Duration - the minimum amount of time a level must be restored from shed before it may be shed again. Demand Control will not reshed this level until this minimum time has passed.

A diagram of how Demand Control cycles through all of the three different types of priority levels are shown in the diagram in Figure 11-21.

Emerson E2 — 11.11.3 Load Shedding diagram (page 181)
Fig. 190 · 11.11.3 Load Shedding

Demand Control Software Overview • 11-37

Page 182 of the Emerson E2 user manual — 11.11.6 How Demand Control Uses Load Shedding
Page 182 · click to enlarge
Page 182

11.11.6 How Demand Control Uses Load Shedding

requirement. Demand Control does this by reading the KW levels of all applications (which have been defined by the user when the applications were set up) in all the prior ity levels that have not yet been shed. It then sheds as many levels as necessary to bring the KW input value down (thus saving the demand window from exceeding the setpoint).

Demand Control uses three parameters to perform load shedding: the current KW input value, the current integral error (described in Section 11.11.2, Demand Monitoring), and the active KW setpoint. The active setpoint is chosen from four different setpoint values depending on the sea son (summer or winter) and occupancy (occupied or unoc cupied).

Note that though each application has a user-defined Application KW parameter that represents how much total power the application uses, the actual amount of KW used by the application may be significantly lower (especially if it is OFF when Demand Control sheds it). Demand Con trol compensates for this fact by assuming shedding an application will only lower the KW input value by 75% of the application’s designated KW value. For example, if a priority level contains a single AHU with a user-assigned KW value of 250, Demand Control will only expect to save 75% of this value (187.5 KW) by shedding it.

The Demand Control application is programmed with three different “modes” of operation. Under normal condi tions, Demand Control operates in the first mode, then proceeds to the second or third mode if the demand is not adequately lowering.

Mode 1KW Input Is Greater Than Setpoint

Mode 1 is usually the first stage of demand shedding used by Demand Control. It begins when the KW input rises above the setpoint.

Example of a Mode 3 operation: A Demand Control application reads an integral error near zero and a KW input 300 KW above the setpoint. Mode 3 begins by deter mining how many levels it will need to shed to bring the KW input down to the setpoint.

When this occurs, Demand Control begins by shedding one level at a time, starting with First Shed #1, and con tinuing sequentially through all First, Rotational, and Last levels (as shown in Figure 11-21).

First, since Demand Control assumes it will only save 75% of an application’s KW rating by shedding it, the application determines that it must shed 400 KW worth of levels to achieve the setpoint.

The Demand Control application will continue to shed levels in this sequence until the KW goes below the set point minus a user-defined hysteresis value and the inte gral error is less than zero. When both these conditions are met, the shed levels will be restored in last-shed-first- restore order.

Second, Demand Control looks at all the applications in the next few priority levels (assume for purposes of this example that all First and Rotational Shed levels are already shed, and there are six defined Last Shed levels). The applications in the remaining levels are as follows:

Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Up

Mode 2 begins when the KW input has been above the setpoint for an amount of time equal to 1/4 the demand window duration, and the KW input has not begun to come down. In short, if Mode 1 is not working to lower demand, Mode 2 will take over.

Last Shed 1Total 80 KW
Last Shed 2Total 90 KW
Last Shed 3Total 75 KW
Last Shed 4Total 80 KW

When Mode 2 begins, Demand Control sheds two lev els at a time, using the same sequence of priorities as Mode 1. Demand Control continues to shed in this manner until the KW goes below the setpoint minus a user-defined hysteresis value and the integral error is less than zero. When both these conditions are met, the shed levels will be restored in last-shed-first-restore order.

Last Shed 5Total 95 KW
Last Shed 6Total 75 KW

Mode 3 will immediately shed stages 1, 2, 3, 4, and 5 for a total of 420KW. If 75% of this total is actually saved by this action, the total KW reduction will be 315 KW, which will bring the input 15KW below the setpoint.

After Mode 3 makes its emergency adjustment, Demand Control will recalculate. If the KW input is still above the setpoint and the integral error is still near zero, it will make another Mode 3 adjustment. If the KW is below the setpoint but not below the setpoint minus the user- defined hysteresis value, it will go back to operating in Mode 1 (shedding levels sequentially). If the KW is below the setpoint minus the hysteresis value and the integral error is below zero, Demand Control will begin restoring

Mode 3Integral Error Approaching Zero

If the integral error is getting too close to zero, this sig nifies the demand window may soon be above the power company’s demand setpoint. When this occurs, Demand Control switches to Mode 3.

Mode 3 simply calculates the amount of KW differ ence between the current KW input and the setpoint, and sheds enough levels to meet or exceed the KW shedding

Page 183 of the Emerson E2 user manual — 11.12.1 Overview
Page 183 · click to enlarge
Page 183

11.12.3 Cut In/Cut Out Setpoint Con trol

loads. 11.11.6.1 Power Monitoring Input

The Input Type Selection parameter defines the way the Power Monitoring input (INPUT under the Inputs tab in application Setup) will be used. The parameter can be set to: KW Analog, or Pulse KWH.

Cut In/Cut Out setpoints work differently depending upon whether the Cut In/Cut Out setpoint is higher.

Cut In Higher Than Cut Out

Emerson E2 — loads. 11.11.6.1 Power Monitoring Input diagram (page 183)
Fig. 191 · loads. 11.11.6.1 Power Monitoring Input

When KW Analog is selected, verify the input is con nected to a board and point that is set up with Engineering Units of KW. When Pulse KWH has been selected, verify the input is connected to a board and point that is set up with Engineering Units of KW.

11.12 Sensor Control

11.12.1 Overview

The E2 is equipped with numerous generic control modules that may be used both for simple monitoring of an analog or digital sensor and for simple Cut In/Cut Out control of a digital output. These modules are called Sen sor Control modules.

Figure 11-22 - Cut In Setpoint Higher than Cut Out

When the Cut In setpoint is higher than the Cut Out setpoint, the Sensor Control output turns ON when the sensor input goes higher than the Cut In setpoint. The Sen sor Control output remains ON until the input falls below the Cut Out setpoint, at which time the output turns OFF. (See Figure 11-22 for an illustration).

There are two different Sensor Control Module types. Analog Sensor Control modules read the values from one or more analog sensors, compare them to a set of Cut In/Cut Out setpoints, and operate a digital output (such as a relay) based on the analog input in relation to the set points.

Cut/In Lower Than Cut/Out

Digital Sensor Control modules read the values from one or more digital sensors, combine them using a series of logical commands, and operate a digital output (such as a relay) based on the result of the logical combination. 11.12.2 Analog Sensor Control

Emerson E2 — 11.12.1 Overview diagram (page 183)
Fig. 192 · 11.12.1 Overview

On a basic level, an Analog Sensor Control module performs three functions:

  • COMBINER: Up to four analog inputs are com bined into a single analog value.
  • CUT IN/CUT OUT CONTROL: The combined input value is compared to a Cut In/Cut Out set point. Based on this comparison, a digital output will be turned ON or OFF.

Figure 11-23 - Cut/In Setpoint Lower Than Cut/Out

When the Cut In setpoint is lower than the Cut Out set point, the Sensor Control output turns ON when the sensor input goes lower than the Cut In setpoint. The Sensor Con trol output remains ON until the input rises above the Cut Out setpoint, at which time the output turns OFF. (See Figure 11-23 for an illustration).

  • ALARMING: Alarms and notices can be generated based on the combined value of the inputs and its relation to a set of high and low alarm and notice setpoints.

Sensor Control Software Overview • 11-39

Settings

Page 184 of the Emerson E2 user manual — 11.12.4 Digital Sensor Control
Page 184 · click to enlarge
Page 184

11.12.4 Digital Sensor Control

11.13 Loop/Sequence Control

The Digital Sensor Control module performs three basic functions:

  • LOGICAL COMBINATION: Up to four inputs may be combined using standard logical combina tion methods (such as AND, OR, XOR, etc.) The result is the command output value , which can be used to operate a relay.

The Loop Sequence Control application’s main func tion is to read the value of an analog input, compare the value to a setpoint, and generate a single analog output value. This output value is represented in three different forms: a single analog value from 0% to 100%, up to eight digital stage outputs, and a digital pulse width modulation output.

  • BYPASS: The command output may be configured to be bypassed to a fixed value by a switch or but ton press.

The output value(s) are generated by a PID Control cell, which takes into account both the input’s instanta neous value and its rate and direction of change. The PID Control algorithm is similar to the PID algorithm used by Pressure Control, except the Loop Sequence Control application is designed to be used in a wider array of applications. 11.13.1 Layout of the Loop/ Sequence Control Application

  • ALARMING: Alarms and notices can be generated based on the command value of all the digital inputs of the cell, plus occupancy, and schedules. 11.12.5 Logical Combination

A Digital Sensor Control module has four inputs num bered 1 through 4. The logical combination of the Digital Sensor Control modules follows one of the following strat egies:

There are two different types of cells in the Loop/ Sequence Control Application: control cells and output cells. The control cells have a part in determining the PID output percentage. The output cells convert this PID per centage to staged digital and pulse width modulation acti vations. 11.13.1.1 Control Cells

  • FIRST - The first of the four digital inputs received will be used as the logical input value. This combi nation first looks at input #1. If the value of this input is undefined, it looks for other valid inputs, starting with #2 and descending in numerical order to #4.
  • SELECT - The sensor module reads an analog input, which provides a numerical value from 1 to 4. This number determines

The five control cells in the Loop/Sequence Control application act as “steps” in determining the final PID per centage.

  • AND - The logical input value will be ON only when all sensor control inputs are ON. If one or more of them are OFF, then the logical input value will also be OFF.
1. Select - The Select cell determines whether the occupied setpoint or the unoccupied setpoint will be used by the PID cell. This cell reads in values for both set points, chooses the one to use based on the value of an Occupancy input, and sends the appropriate setpoint value to the next cell in line, the Setpt Float cell.
  • OR - The logical input value will be ON if one or more sensor control inputs are ON. If all of them are OFF, the logical input value will also be OFF.
2. Setpt Float - The Setpt Float cell allows alter ation of the control setpoint provided by the Select cell based on comparison of a “float” input to a range of val ues. The floating setpoint is then sent to the next cell in line, the PID Control cell.
  • XOR - This combination strategy is exactly the same as OR, except when all sensor control inputs are ON, the logical input value will be OFF instead of ON.
3. PID Control
  • VOTE - If more than half of the sensor control inputs are ON, the logical input value will be ON. Otherwise, if 50% or less of the sensor control inputs are OFF, the logical input value will be OFF.

This cell makes the PID percentage calculation based on the value of the setpoint (received from the Setpt Float cell) compared to the control input, which is fed directly into the PID Control cell. The resulting percentage is sent to the next cell in line, the Filter cell.

4. Filter - The Filter cell limits the rate of change of the PID percentage over time, and is typically used to keep the PID cell from over-compensating when inputs
Page 185 of the Emerson E2 user manual — 11.13.2.1 The Select Cell
Page 185 · click to enlarge
Page 185

change drastically. The filtered PID percentage is sent to the final control cell, the Override cell.

stages and/or with pulse width modulation.

Sequencer - The Sequencer cell will use the percent age to activate an equivalent percentage of its defined stage outputs. The Sequencer supports up to eight cells, and also provides for minimum on/off times and first-on/ last-off sequencing.

5. Override - Once the PID percentage is figured, the Override cell provides for overrides of the PID per centage. The Override cell, when activated by a user-initi ated manual override, will block the PID percentage from being sent to the outputs, replacing it with a fixed value specified by the user.

PWM - The PWM cell drives a digital output whose ON time per pulse width modulation period is equal to the PID percentage. In other words, if the PWM cell is set with a pulse width of 10 seconds, a PID percentage of 60% turns the output ON for 6 seconds, OFF for 4 seconds, ON for 6 seconds, etc. 11.13.1.3 Diagram

The value from the Override cells is then sent to the Loop/Sequence Control’s PID output, and also to the two output cells for conversion to stages and PWM. 11.13.1.2 Output Cells

The two output cells make no alteration of the PID per centage determined by the control cells, but re-interpret them in a way that can be used for systems with multiple

An abstract diagram of the control and output cells is shown in Figure 11-24.

SELECT CELL

FILTER OVERRIDE

Analog PID/PWM Loop Output

AV

In Out In Out

AV

AV AV

AV

DV

AV

SEQUENCER

Digital Stage 1-8 Output

SETPT FLOAT

AV

Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8

DV

DV

DV

AV

DV

DV

DV

DV

PID CONTROL

AV

DV

AV AV

PWM

AV

DV

DV AV DV = Digital Value AV = Analog Value

Figure 11-24 - Loop/Sequence Control Application Diagram

11.13.2 Loop/Sequence Control Cell Descriptions

occupancy.

To determine whether to use the occupied setpoint or the unoccupied setpoint, the Select cell reads a digital input. If this input is ON (OCC), the occupied setpoint is used. If this input is OFF (UNO), the unoccupied setpoint is used.

11.13.2.1 The Select Cell

The Select cell’s function is to provide the control set point to the PID Control cell, and to switch between occu pied and unoccupied setpoints based on the current state of

If the occupancy input is NONE, the Select cell will

Loop/Sequence Control Software Overview • 11-41

Show 16 more labels / short text on this page
Occ SP · In 1 · Unoc SP · In 2 · Occupied · Occup · SP In · Input · SP Out · Float · Float · Setpoint · Control Value · Input PID Out · Digital PWM Output · In Out
Page 186 of the Emerson E2 user manual — 11.13.2.2 The Setpoint Float Cell
Page 186 · click to enlarge
Page 186

assume this application will not use occupancy-based set points, and will use the occupied setpoint only (no switch ing).

For users who simply wish to convert an analog output to a pulse width modulation or sequenced (staged) output, a Loop/Sequence Control application can be programmed to bypass PID Control altogether. If this option is selected, the Loop/Sequence Control application completely ignores the Select, Setpoint Float, and PID Control cells, and passes on the value of the control input directly to the Filter cell.

Note the Select cell does not have any on-board sched ule function to determine for itself whether the building is occupied or unoccupied. It relies solely on the digital state of the Occupancy input. If you wish to follow a schedule for occupancy, this input must be tied to the output of a Time Schedule application. 11.13.2.2 The Setpoint Float Cell

The Setpoint Float cell provides users to raise and lower the control setpoint based on the value of a sensor (called the “float” sensor). The float sensor can be any type of analog sensor, but is typically a temperature sen sor, since most of the applications for floating setpoints involve HVAC and floating the setpoint based on outdoor air temperature.

The Filter cell’s primary function is to slow the rate of change of the PID cell’s output. The filter reads the differ ence between the current output value and the value x sec onds ago, where x = a user-specified period of time. The difference between these two values is multiplied by the filter ratio, which is a percentage between 0% and 100%. The result of this multiplication is the output value. Note that if the filter ratio is at 100%, or if the Filter cell is dis abled, the input is not modified by the Filter cell. 11.13.2.5 The Override Cell

To set up the Setpoint Float cell, you must provide three values: a High Float Value, a Low Float Value, and an Output Range.

The Output Range is the maximum amount that the PID Setpoint may vary. An Output Range of 4, for exam ple, means that the control setpoint may only be increased by a maximum of 2 and decreased by a maximum of 2.

The Override cell’s function is to provide a method of overriding the analog output going to the Sequencer and PWM cells to a user-specified value instead of the value called for by the Filter cell. The Override cell can override the output to any value between 0% and 100%, and may be either fixed or timed. A fixed override remains overrid den until the user deactivates the override, while a timed override remains in effect until a user-specified time has elapsed. 11.13.3 Output Cell Descriptions

The High Float Value and Low Float Value form a range of values that determine what portion of the Output Range is applied to the final control setpoint. For example, suppose a Setpoint Float cell is given a High Float Value of 100, a Low Float Value of 0, and an Output Range of 4. When the float sensor value is at the high float value, the setpoint will be increased by its maximum amount (2). When the float sensor value is at the low float value, the setpoint will be decreased by its minimum amount (2). For all float sensor values in between the High Float and Low Float values, the amount added or subtracted to the control setpoint will vary linearly.

The Loop/Sequence Control application has three con trol outputs: a standard 0-100% analog output, a set of up to eight staged outputs, and a pulse width modulation (PWM) output. The analog control output comes directly from the Override cell. However, the same control output is fed into the Sequencer and PWM cells for translation into digital staged outputs and pulse width modulation. 11.13.3.1 The Sequencer Cell

If floating setpoint control is not desired, this cell can be effectively disabled by setting the value of the Float Output Range to 0. 11.13.2.3 The PID Control Cell

The PID Control cell uses a PID algorithm to compare the control input value with the control setpoint value. The result of this comparison is a percentage from 0-100%. The PID Control cell repeats this sequence ever few sec onds, and the result is a PID percentage that adjusts over time to provide the optimum amount of output to achieve the setpoint.

The Sequencer cell simply activates a certain percent age of the Digital State 1-8 outputs based on the percent age of the control output. For example, if the control output is 50%, the Sequencer cell will activate 50% of the total number of stages. The Sequencer cell will always round DOWN; that is, if there are four stages in a Sequencer cell and the output is 74%, the Sequencer cell will only activate two stages (or 50% of the stages). When the output climbs above 75%, the third stage will activate.

The 0-100% output from the PID Control cell is passed along to the Filter cell.

Bypassing PID

Page 187 of the Emerson E2 user manual — 11.14.1.1 Events
Page 187 · click to enlarge
Page 187

If desired, delays may be specified for stage activation and deactivation. Also, the definitions of OFF and ON may be redefined as either ON, OFF, or NONE. 11.13.3.2 The PWM Cell

Although holiday schedules are used exclusively by Time Scheduling applications, they are set up as individual applications separate from Time Scheduling. See Section 11.14.2, Holiday Schedules for more information.

Temporary schedules are technically not schedules but temporary override functions that may be made to exist within an individual master or slave schedule. Tem porary schedules are used to temporarily override the ON/ OFF instructions of an individual master or slave sched ule. Generally, temporary schedules are only used for one- shot applications, such as keeping the lights on an extra hour for a single night. Temporary schedules override all other events within a master or slave schedule, including holidays. 11.14.1 How Schedules Work

The PWM cell converts the control output percentage into a periodic ON pulse. A “pulse” in this cell is a con stant period of time that consists of one ON event and one OFF event. The PWM cell takes the PID percentage and turns the output ON for an equivalent percentage of the total pulse period. In other words, if the PID output is 60% and the pulse period is 30 seconds, every 30 seconds the PWM output will be ON for 60% of 30 seconds (18 sec onds) and OFF for the remaining portion of the 30-second period. Once the period has ended, the PWM Cell reads the PID output again and the process is repeated.

11.14.1.1 Events

11.14 Time Scheduling and Holidays

Master schedules and slave schedules consist of up to 15 pairs of events. Events are simple commands to turn the schedule output either ON or OFF at a particular time within a range of days. Events are usually programmed in pairs, so that during a specified range of days the schedule output can be turned ON and OFF at a particular time within the same day. However, events may be pro grammed singularly (on OFF or one ON command per day). Events may be programmed to take place on any or all days from Sunday to Saturday. In addition, events may take place on any or all of four holiday (or “special”) dates, called HD1, HD2, HD3, and HD4. Holiday sched ules are used to tell the master or slave schedules when these special dates occur. 11.14.1.2 Absolute and Relative Events

Time Schedules are used for timed activation and deactivation of loads and for providing occupied and unoccupied building times for occupancy-driven systems (such as Sensor Control, Lighting, and HVAC).

There are four different types of schedules used by the E2. Brief description of each of these are given below:

Master schedules are the main scheduling unit used by the E2. A master schedule consists of up to 15 sched uled ON/OFF event pairs, which may be programmed to occur on any individual date and time or series of dates and times. Master schedules may also drive slave sched ules.

Master schedule events always occur at specific times of the day. In other words, when you program an event pair in a master schedule, you must specify two specific times of the day the events will occur. These types of events are called absolute events.

Slave schedules are similar to master schedules, except their operation is driven by a master schedule. Slave schedules, generally, are alterations of the master schedule’s event times. The ON/OFF times in a slave schedule may take place either at specific defined times of the day or relative to the times given in the master sched ule. For example, a master schedule may say: “The build ing is occupied from 8:00 a.m. to 9:00 p.m.” while one of its slave schedules says “Dim the building lights 15 min utes before the store closes.”

However, when programming event times in slave schedules, you may choose to enter event times that are relative to its master schedule’s ON and OFF times. These types of events are called relative events. They are pro grammed not as absolute times but as amounts of time before or after its master schedule’s events.

Slave schedules may also be mastered by other slave schedules to create a series of stacked schedules.

For example, suppose a master schedule is set up to be ON at 8 a.m. and OFF at 9 p.m. every day of the week, and you wish to set up a slave schedule so that its output comes ON 15 minutes before the master comes ON and OFF 15 minutes after the master goes OFF. To do this, you would set up the slave schedule to come ON at -00:15 and OFF at +00:15 every day of the week. The slave schedule will automatically determine the correct ON and OFF times.

Holiday schedules are used to tell master and slave schedules that a special day or event is occurring. For example, master schedules and their corresponding slave schedules may be programmed with special holiday events, such as “Keep all lights off during Holiday x.” The holiday schedule’s job is to inform the schedules to which it is connected, “Today is Holiday x.”

Time Scheduling and Holidays Software Overview • 11-43

Page 188 of the Emerson E2 user manual — 9. Standard events within the schedule itself. 11.14.1.5 Ranges
Page 188 · click to enlarge
Page 188

11.14.1.3 Temporary Schedule Events

11.15 Power Monitoring

Each schedule may also be given up to three pairs of temporary schedule events. These events start and end at specific days and times and do not continue past those dates (in other words, temporary events cannot be made to occur weekly or annually). 11.14.1.4 Overlapping

A Power Monitoring application is used primarily for monitoring, recording, and to a lesser degree controlling KW usage in a building. 11.15.1 Overview

Events may, and often do overlap within a schedule. When events overlap, the E2 uses the following priority structure, from highest to lowest:

Power companies supply power to consumers at a fixed rate per kilowatt hour until a pre-defined level of energy consumption is reached. This level is called the demand limit. When the demand limit is exceeded, the rate is greatly increased as a penalty for high power demand by the consumer. Generally, once the demand limit is exceeded, the increased rate is charged for the remainder of the year.

1. Temporary Schedule Event #1
2. Temporary Schedule Event #2
3. Temporary Schedule Event #3
4. Events that occur on HD1 (Holiday #1)
5. Events that occur on HD2 (Holiday #2)

To determine if you have reached the demand limit, the power company arbitrarily monitors a consumer’s energy consumption for a fixed period of time. This monitoring period is called a demand window. Power companies can generally tell you how long a demand window period lasts, but you’ll never know when the measurement will take place.

6. Events that occur on HD3 (Holiday #3)
7. Events that occur on HD4 (Holiday #4)
8. Temporary Schedule Events of a slave schedule’s master schedule (if applicable).

9. Standard events within the schedule itself. 11.14.1.5 Ranges

How Power Monitoring Calculates Demand

In addition to the 15 events within a master or slave schedule, up to 12 standard ranges may be specified. Ranges are sets of dates that specify which days within the year the schedule’s events will be applied. The E2 checks the list of ranges to see if the current date falls within any of the twelve possibilities; if the date does not fall within a range, none of the schedule’s events will occur.

To help you make sure you do not use more power than the demand limit, the E2’s Power Monitoring applications determine your current KW usage in much the same way as your power company. Power Monitoring uses a watt- hour transducer input to determine the current KW usage. Multiple KW values are averaged together into “demand windows,” much like the ones power companies use.

When no date ranges are specified, the schedule is con sidered to be active. All scheduled events will occur nor mally. 11.14.2 Holiday Schedules

Then, depending on how the application is configured, the most current KW value is compared to a demand set point. The “current KW value” in this case may be either the instantaneous value read by the power transducer, or it may be the average of all KW transducer readings taken over 1-minute intervals. This setpoint should be equal to or slightly lower than the demand limit set by your power company.

A Holiday Schedule application’s primary function is to pass along the day of the week to one or more master or slave schedules, and to tell these schedules when it is a holiday (HD1 - HD4). A holiday schedule determines hol idays by cross-referencing the current date with its user- programmed list of holiday date ranges. During the time periods of these date ranges, the holiday schedule tells the schedules to perform the events programmed for one of the four holiday dates (HD1, HD2, HD3, or HD4).

In short, since E2 doesn’t know when the power com pany’s demand window will begin, the E2 measures power as if the demand window could happen at any time. This way, E2 can more accurately determine when your site is approaching or exceeding the demand limit.

Because multiple E2s on a network would likely use the same holiday schedules for determining special occu pied and unoccupied building hours, holiday scheduling is handled by Global Data. This means the holiday schedule can be set up in one E2 and shared with all other E2s that use time scheduling.

If the KW usage is higher than the demand setpoint, Power Monitoring goes into Shed Mode. During Shed Mode, Power Monitoring turns on a digital output called SHED OUT. This output may be connected to the demand shed inputs of one or more E2 applications, which will in turn shut down or otherwise curb the power usage of the

Explanation of “Demand” · Shed Mode

Page 189 of the Emerson E2 user manual — 11.15.2 Logging
Page 189 · click to enlarge
Page 189

overall system. The SHED OUT output remains ON until the KW usage falls below the demand setpoint.

  • The KWh for that month
  • The maximum average KW within any demand window for that month

In short, the purpose of Shed Mode is to get the total KW usage below the demand setpoint as soon as possible.

  • The highest instantaneous KW reading taken for that month, and the date and time the reading was taken
  • The total number of minutes the Power Monitoring application was in Shed Mode
  • The Heat Degree Days for that month

11.15.2 Logging

  • The Cool Degree Days for that month

Definition of Heat and Cool Degree Days

Power Monitoring applications are pre-programmed with extensive logging capabilities that record the hourly, daily, and monthly power usage statistics.

Heat degree-days and cool degree-days are standard industry measurements of the demand for heating and cooling. This measurement is based on the daily average outdoor air temperature.

The hourly log contains a list of power usage summa ries of the previous 48 hours. An hourly log entry con tains:

If the daily average temperature is below 65°F, then the number of heat degree-days for that day is equal to 65 minus the day’s average temperature in degrees Fahren heit. Example: if the day’s average temperature is 54°F, the number of heat degree-days for that day is 65-54 = 9 heat degree-days.

  • The time and date of the entry
  • The KWh for that hour
  • The maximum average KW that occurred within any demand window for that hour

If the daily average temperature is above 65°F, then the number of cool degree-days for that day is equal to the day’s average temperature in degrees Fahrenheit minus 65. Example: if the day’s average temperature is 71°F, the number of cool degree-days for that day is 71-65= 6 cool degree-days.

  • The highest instantaneous KW reading taken for that hour, and the time that reading was taken

The daily log contains a list of power usage summaries for the previous 48 days. A daily log entry contains:

Larger degree-day numbers indicate a larger demand for heating or cooling. Degree-day totals may be added together to indicate heating and cooling demand for weeks, months, or years. E2 does this to keep monthly logs of heat and cool degree-days. 11.15.2.1 Power Monitoring Input

  • The date of the entry
  • The KWh for that day
  • The maximum average KW within any demand window for that day
  • The highest instantaneous KW reading taken for that day, and the time that reading was taken

The Input Type Selection parameter defines the way the Power Monitoring input (INPUT under the Inputs tab in application Setup) will be used. The parameter can be set to: KW Analog, Pulse KWH, Current (Amps), or Current 3-phase.

  • The total number of minutes the Power Monitoring application was in Shed Mode
  • The Heat Degree Days for that day
  • The Cool Degree Days for that day

When KW Analog is selected, verify the input is con nected to a board and point that is set up with Engineering Units of KW. When Pulse KWH has been selected, verify the input is connected to a board and point that is set up with Engineering Units of KW. When Current (Amps) has been selected, verify the input is connected to a board and point that is set up with Engineering Units of Amps. When Current (3-phase) has been selected, verify the input is connected to a board and point that is set up with Engineering Units of Amps. Note that for 3-phase, three

For monthly logging, the day of month can be user- specified so the day of the month on which the utility bill ing period starts can be accurately compared to the utility bill. The monthly log contains a list of power usage sum maries for the previous 24 months. A monthly log entry contains:

  • The month and year of the entry

Power Monitoring Software Overview • 11-45

Show 4 more labels / short text on this page
Hourly · Daily · Settings · Monthly
Page 190 of the Emerson E2 user manual — 11.16 Anti-Sweat Setup
Page 190 · click to enlarge
Page 190

11.17 Heat/Cool Control

power monitoring inputs will appear under the Inputs tab of the application. All inputs must be connected to board and points set up with Engineering Units of Amps.

Heat/Cool Control is a special kind of sensor control that applies to heating and cooling devices. Heat/Cool Control applications use PID control to vary the amount of heating and cooling based on the current temperature and its relation to the heating or cooling setpoint. Both staged and modulated (0-100%) heating and cooling outputs are supported by Heat/Cool Control.

11.16 Anti-Sweat Setup

An anti-sweat application controls one anti-sweat zone. An anti-sweat zone is defined as one or more anti- sweat heaters that use the same dewpoint (or RH and tem perature) sensors and the same control setpoints. If all the outputs on a 20-channel PMAC panel are going to use the same setpoints and dewpoint device(s), then all the heaters may be set up in a single zone.

Heat/Cool controls are available in RX units, allowing small installations with simple HVAC systems to use one controller for all refrigeration and HVAC systems. 11.17.1 Temperature Control

Zones are set up in a single screen called the Anti- Sweat Control Setup screen. 11.16.1 How Anti-Sweat Works

Heat/Cool applications use PID control to vary the out put of heating and cooling devices. As is the case with all applications that use PID control, Heat/Cool control makes use of a PID setpoint and a throttling range. Refer to Appendix D: PID Control for more information.

Anti-sweat applications control anti-sweat heaters by monitoring the dewpoint. A dewpoint value may come from a dewpoint probe mounted within the Zone, or it may be calculated automatically by the E2 using a combination of a relative humidity sensor and a temperature sensor.

Unlike normal PID loops that assume a 50% output is required to keep the temperature stabilized on the setpoint, Heat/Cools strive to stabilize the temperature on the set point with the output at 0%. Thus, when the temperature goes below a heating setpoint or above a cooling setpoint, the heating or cooling outputs climb from 0% to 100% as determined by the throttling range (see Figure 11-25).

The dewpoint value is used to pulse the heaters ON for a certain percentage of a user-defined time interval. The dewpoint is compared to the anti-sweat application’s con trol setpoints (the Full ON Dewpoint and the Full OFF Dewpoint). Based on this comparison, the anti-sweat heat ers will do one of three things:

Emerson E2 — 11.16 Anti-Sweat Setup diagram (page 190)
Fig. 193 · 11.16 Anti-Sweat Setup
  • If the dewpoint is equal to or above the Full ON Dewpoint, the heaters remain ON 100% of the time.
  • If the dewpoint is equal to or below the Full OFF Dewpoint, the heaters will be ON 0% of the time (fully OFF).
  • If the dewpoint is between the Full ON and Full OFF Dewpoint, the heaters will be pulsed ON for a percentage of the specified time interval. The per centage is determined by proportionately measuring where the dewpoint falls between the range of val ues formed by the two setpoints.

Figure 11-6 shows an example of an anti-sweat appli cation. The setpoints (Full ON = 80°F, Full OFF = 20°F) form the range of dewpoints across which the heaters will be pulsed. When the measured dewpoint is 45°F (directly in between both setpoints), the percentage will be 50%, and the heaters will be pulsed ON for five seconds of the defined 10-second interval. If the dewpoint drops to 30°F, the percentage will lower to 20%, and the heaters will be on only two seconds out of every 10.

Figure 11-25 - Example of Heat/Cool PID Control

By default, only the proportional and integral modes of PID control are enabled for Heat/Cools. The user may choose to add the Derivative mode or to get rid of the Inte gral mode and use strictly Proportional control.

Page 191 of the Emerson E2 user manual — 11.17.3 Optimum Start/Stop (OSS)
Page 191 · click to enlarge
Page 191

11.17.2 Unoccupied Hysteresis

pied setpoint.

Emerson E2 — 11.17.2 Unoccupied Hysteresis diagram (page 191)
Fig. 194 · 11.17.2 Unoccupied Hysteresis

When the Heat/Cool receives an indication that the building is unoccupied, the control mode changes from the PID method described previously, and uses simple ON/ OFF control of the heating and cooling outputs.

The Heat/Cool application in unoccupied mode makes use of a hysteresis value to form a range of temperature values across which the heating and/or cooling will be applied. As shown in Figure 11-26, when the temperature drops to the Unoccupied Heating Setpoint or rises to the Unoccupied Cooling Setpoint, the heat or cool outputs go to 100% ON. They remain in this state until the tempera ture rises above the heating setpoint plus the hysteresis, or below the cooling setpoint minus the hysteresis, at which time the outputs will go to 0% ON.

Figure 11-27 - Diagram of Pre-Start and Pre-Stop Operation

Intelligent Pre-Starts and Pre-Stops

OSS is designed to handle pre-starts and pre-stops in the most energy-efficient manner possible. Every time a pre-start or pre-stop occurs, OSS measures the amount of time it takes to bring the temperature from the previous setpoint to within the “comfort zone” of the new setpoint (a user-defined range of values above and below the set point within which the temperature is considered accept able). This duration is used to determine the average rate of temperature change, called the K factor.

Emerson E2 — 11.17.2 Unoccupied Hysteresis diagram (page 191)
Fig. 195 · 11.17.2 Unoccupied Hysteresis

The K factor is stored in the memory along with the average value of the outdoor air temperature during the pre-start or pre-stop. Over time, collected K factor data will be sorted and combined into a table. As a result, by constantly observing and recording the results of previous pre-starts and pre-stops, OSS will be able to intelligently guess how much time a pre-start or pre-stop mode should last based on the outside temperature.

Figure 11-26 - Unoccupied Hysteresis Mode

11.17.3 Optimum Start/Stop (OSS)

Emerson E2 — 11.17.3 Optimum Start/Stop (OSS) diagram (page 191)
Fig. 196 · 11.17.3 Optimum Start/Stop (OSS)

Heat/Cools keep track of three different kinds of K fac tors:

  • Heat K factor - used to guess pre-start durations for Heat/Cools operating in heating mode.
  • Cool K factor - used to guess pre-start durations for Heat/Cools operating in cooling mode.

Optimum Start/Stop (OSS) is a feature that works alongside the Heat/Cool’s occupied and unoccupied tem perature control modes. OSS takes control of heating and cooling several minutes before the building is scheduled to change occupancy states, and prepares the building for the upcoming change in setpoints. As a result, when the occu pancy state changes, the temperature will be comfortably within the range of the new setpoint.

  • Coast K factor - a measurement of the change in temperature when no heating or cooling is active. This is used to determine pre-stop durations for both heating and cooling Heat/Cools. 11.17.4 Setpoint Reset

Figure 11-15 shows an example of how pre-starts and pre-stops work in a heating application. From unoccupied mode, the pre-start period ramps the temperature up slowly so that when the scheduled change from unoccu pied to occupied mode occurs, the temperature will already be at or near the occupied heating setpoint. During the pre-stop, which occurs before the Heat/Cool goes from occupied to unoccupied mode, heating is suspended and the temperature is allowed to “coast” down to the unoccu

If desired, Heat/Cools may be configured with a Set point Reset that varies the value of the heating and/or cooling setpoints based on an analog value from a reset sensor. This is most often used to vary the value of a heat ing or cooling setpoint based on the outside air tempera ture.

To set up a setpoint reset for heating or cooling, the user must specify the minimum and maximum range of reset sensor values, and the maximum range of setpoint

Heat/Cool Control Software Overview • 11-47

Page 192 of the Emerson E2 user manual — 11.18 Analog and Digital Combiners
Page 192 · click to enlarge
Page 192

adjustment.

setpoint and the setpoint delta, the Lead loop alone will control cooling. However, when the temperature is above the setpoint delta, the Lag loop will come on-line, and both Lead and Lag loops will work to bring the tempera ture down.

As the value of the reset sensor varies within the mini mum and maximum range, an equivalent portion of the maximum setpoint adjustment will be added or subtracted from the heating or cooling setpoint. When the reset sen sor value is directly in between the minimum and maxi mum range values, nothing will be added or subtracted from the setpoint. Between the halfway point and the min imum value, part of the setpoint adjustment will be sub tracted from the setpoint. Between the halfway point and the maximum value, part of the setpoint adjustment will be added to the setpoint. An example of this is shown in Fig ure 11-28.

The Lead/Lag arrangement works similarly in Heating mode, except that the setpoint delta is below the Heating setpoint, and Lead and Lag are both on when the tempera ture is below the setpoint delta.

TEMPERATURE

SETPT DELTA

SET POINT

LEAD AND

RESET SENSOR

SET POINT CHANGE

LAG ON LEAD AND

LAG ON LEAD ON ONLY LEAD ON ONLY

TIME

RANGE

MAX RANGE

MAX CHANGE

Figure 11-29 - Lead/Lag Arrangement

Heat/Cools in a Lead/Lag arrangement take turns act ing as the Lead loop. The user designates the maximum amount of time a Heat/Cool will act as a Lead loop; after this duration, the current Lead loop will switch places with its Lag loop.

ADD SUBTRACT

Lead/Lag arrangements only work when both Heat/ Cools are in Occupied mode.

MIDPOINT

Dehumidification control uses the AHU’s existing cool stages (and a separate dehumidification device such as a desiccant wheel, if available) to remove moisture from the air.

The dehumidification setpoint is placed at the 0% end of the dehumidification PID throttling range. In other words, the dehumidification output will start at 0% when the humidity is equal to the setpoint and increase to 100% when the humidity is equal to or above the setpoint plus the throttling range.

MAX CHANGE

MIN RANGE

Figure 11-28 - Setpoint Reset Diagram

The dehumidification output percentage is used much like a heating or cooling output percentage is used in Tem perature Control. The percentage represents the percent age of total dehumidification capacity available to the AHU (including cool stages and other dehumidification devices).

11.17.5 Lead/Lag

A Heat/Cool application may be linked with another Heat/Cool application in what is called a “Lead/Lag” arrangement. In this arrangement, one Heat/Cool is desig nated as the Lead loop and used as the primary space tem perature control device. The other Heat/Cool, the Lag loop, becomes active only to support the Lead loop when it is unable to keep the space temperature within a certain proximity of the setpoint (called the setpoint delta).

11.18 Analog and Digital Combiners

Figure 11-29 shows how a pair of Heat/Cool applica tions using a Lead/Lag arrangement would operate in Cooling mode. When the temperature is in between the

Instead of using a single output source as an applica tion input, you may use a combination of up to sixteen input sources. To use multiple inputs, a Multiple Input cell

26512037 · +0

Page 193 of the Emerson E2 user manual — 11.19.1 Overview
Page 193 · click to enlarge
Page 193

11.19.3 TD Control Fail-Safes

must be used.

A Multiple Input cell is a simple application that reads data values from its inputs, combines them using a user- defined combination strategy, and sends the combined value to the desired application input.

TD Control operates as long as plenum and drop leg temperature inputs are available and the drop leg tempera ture remains within a minimum/maximum range config ured by the user. Otherwise, TD control uses various fail- safe modes to control the condenser fans.

A common application for this is in HVAC control, where a single heating control value might come from an average of a number of temperature sensors throughout the building.

In the event drop leg temperature is not available (due to probe failure), all fans will be staged on.

Two different types of Multiple Input cells may be used, depending upon whether the inputs to be combined are analog or digital sources.

Drop Leg Temperature Above Maximum Drop Leg Setpoint

If the Drop Leg temperature (Drop Leg Temp) rises above the maximum drop leg temperature setpoint (Drop Leg Max), an increase will be called for until Drop Leg Temp drops below Drop Leg Max. This protects against the possibility of the Drop Leg Temp rising too high as a result of high plenum temperature.

11.19 TD Control

11.19.1 Overview

The TD Control application controls fans sequentially based on the temperature differential (TD) of the con denser. When an increase is called for, the next fan will turn on when the time since the last fan state change is greater than the Fan On Delay Time setpoint (or will turn on immediately if the last change was more than the Fan On Delay). Additional fans will be staged on at Fan On Delay intervals while an increase in capacity is called for. When a decrease is called for, the next fan will stage off when the time since the last fan state change is greater than the Fan Off Delay Time setpoint (or will turn off immediately if the last change was more than Fan Off Delay). Additional fans will be staged off at Fan Off Delay intervals while a decrease in capacity is called for. 11.19.2 Temperature Differential (TD) Strategy

Drop Leg Temperature Below Minimum Drop Leg Setpoint

If the Drop Leg temperature drops below the mini mum drop leg temperature setpoint (Drop Leg Min) a decrease will be called for until Drop Leg Temp rises above Drop Leg Min. This protects against the possibility of the Drop Leg Temp falling too low as a result of low plenum temperature.

Plenum Temperature Not Available

If plenum temperature is not available (due to probe or communication failure), control will be based on the Drop Leg Min and Max setpoints. 11.19.4 Configuration

TD Control allows the user to operate a condenser at its designed temperature differential and saves energy by maintaining optimal condenser TD with the least amount of fans on as possible.

TD strategy attempts to maintain a constant difference (i.e., TD setpoint) between the temperature of the refriger ant and the ambient temperature. The TD setpoint allows you to set the constant that is to be maintained.

Standard discharge pressure control may attempt to operate the condenser below its designed TD and turn on more fans than necessary.

TD strategy uses drop leg temperature for the refriger ant temperature and plenum temperature for the ambient temperature. The formula for determining the TD control value is:

Set the number of condenser fans to be controlled in the Num Cond Fans field under Setup (4 is the default value). 11.19.5 Setpoints

TD = (dropleg temp) + (dropleg offset*) - plenum temp.

TD setpoints are configured to allow control of the condenser at its designed TD during swings in ambient temperature.

* DropLeg Offset is a user-configured parameter to allow fine-tun

ing of the drop leg temperature measurement.

In TD condenser control operation, when the TD rises above TD setpoint + (TD deadband / 2), an increase in fan capacity is called for. Similarly, when the TD drops below TD setpoint - (TD deadband / 2), a decrease in fan capac ity is called for. TD can control up to four condenser fans.

For the Drop Leg Minimum setpoint, if the drop leg temperature falls below this setpoint, condenser fans will be cycled OFF regardless of the value of the TD setpoint.

For the Drop Leg Maximum setpoint, it is the maxi mum allowable value of the drop leg temperature. If the

TD Control Software Overview • 11-49

Page 194 of the Emerson E2 user manual — 11.20.3 Outputs
Page 194 · click to enlarge
Page 194

drop leg temperature rises above this setpoint, the con denser fans are cycled ON regardless of the value of the TD.

For TD High alarm, the TD alarm setpoint is the value of the TD calculation that, if exceeded, will cause an alarm to be generated. If you wish to generate an alarm for high TD, enter the desired setpoint. Otherwise, to disable this alarm, leave the value set to NONE.

The Drop Leg Offset setpoint is an adjustment entered, if needed, after measuring liquid subcooling during operation of an individual condensing unit.

For TD Delay, if the TD alarming feature is used, enter the amount of time the TD must be higher than the setpoint before an alarm will be generated (HHH:MM)

The TD setpoint is the optimal difference between the refrigerant drop leg temperature and the ambient (plenum) temperature. When the TD (i.e., drop leg temp + drop leg offset - plenum temp) begins to climb above this setpoint, fans will be cycled ON to bring down the drop leg tem perature, thus lowering the TD measurement.

11.20 Pulse Accumulation

11.20.1 Overview

The TD deadband setpoint is a range of values around the TD Setpoint within which the value of the TD calcula tion is acceptable. When the TD rises above the setpoint plus 1/2 the deadband value, fans will begin cycling ON. When the TD falls below the setpoint minus 1/2 the dead band value, fans will cycle OFF.

The Pulse Accumulation application counts incoming pulses and converts that consumption value into a rate value once per minute. Pulses are user-specified by the Input Type parameter (power, gas, liquid, or volume) to represent what is being measured.

For the Condenser Fan On Delay setpoint, fans are cycled ON when the TD is above the setpoint at the rate set for Condenser Fan On Delay. For example, if this field is set to 30 seconds, each fan is staged ON in 30-second intervals until all fans are ON, or until the TD falls back below the setpoint.

The Pulse Accumulator input can support many types of pulse counting applications, such as flow meters for water and gas applications. In addition, application-spe cific logging, such as hourly, daily and monthly usages are supported for pulse type inputs. 11.20.2 Configuration

For the Condenser Fan Off Delay setpoint, fans are cycled OFF when the TD is below the setpoint at the rate set for Condenser Fan Off Delay. In other words, if this field is set to 30 seconds, each fan is staged OFF in 30-sec ond intervals until all fans are OFF, or until the TD rises back above the setpoint. 11.19.6 Inputs

Set the Input Type parameter to the desired measure ment (power, gas, liquid, or volume).

The Drop Leg Temperature input is the current drop leg temperature used for TD control.

The Plenum Temperature input provides the current value of the ambient temperature used for TD calculation. 11.19.7 Alarms

The analog input connected to the board and point number must be configured as a Pulse Accumulator Type input. The engineering unit of the analog input must match the engineering unit that is being used in the Pulse Accu mulation application.

For Drop Leg High alarm, the alarm setpoint is the drop leg temperature that, if exceeded, will cause an alarm to be generated. If you wish to generate an alarm for high drop leg temperature, enter the desired setpoint. Other wise, to disable this alarm, leave the value set to NONE.

For Drop Leg Delay, if the drop leg alarming feature is used, enter the amount of time the drop leg temperature must be higher than the setpoint before an alarm will be generated (HHH:MM).

11.20.3 Outputs

All output information is available from the main Sta tus screen or from under the Outputs tab in application Setup. Current output status, average output, high trip,

Page 195 of the Emerson E2 user manual — 11.21.1 Overview
Page 195 · click to enlarge
Page 195

total accumulation, and the last accumulated total informa tion can be viewed.

trip point output can be controlled by any of three input sources. The output will be turned ON when the input source is equal to or greater than a user-specified value. The total amount of time the application has been in a high trip condition is shown in the Time In Trip Today output.

The current output shows the rate of consumption of the quantity represented by pulses. Average output shows the average rate value accumulated over the period set in the Average Window parameter. The High Limit Trip out put will turn on if the total accumulation exceeds a user- specified high limit. Total accumulation shows the total accumulated value since the last reset. Last Total output shows the total accumulated value when the last reset occurred. 11.20.4 Accumulator Reset Types

11.21 Irrigation Control

11.21.1 Overview

Irrigation control is an application used for the con trolling of sprinkler systems. This application controls watering by duration of time or water usage parameters. Days of the week and times for watering are set by the user with a maximum of two Irrigation applications allowed in the CX controller.

The Pulse Accumulator is a register that is increased by the value of each update of the Quantity Accumulation input. Each time the Accumulator is reset, before clearing, its value is saved to a Last Total output. The type of reset the Accumulator uses can be user-specified with the Accu mulator Reset Type parameter. The Accumulator can be set to reset at a certain time of day, day of the month, when a high-limit trip occurs, or not to reset at all. 11.20.5 Logging

The master water valve is turned ON and OFF as water is needed for a zone. When disabled, no application con trol of any outputs will be possible and the System Status output will indicate Disabled.

Under normal control only one zone will be active at a time. 11.21.2 Zones and Cycles

Rate and usage data is logged and stored using applica tion logging. Data is stored in hourly, daily, and monthly formats. All logged data can be erased from memory by using the Applications Command menu. In addition, appli cation logs show the total and peak rates of consumption for the last day, hour, and month.

A zone is defined as a single line of irrigation fed from a main water supply valve (i.e., a group of sprinklers that are attached to the same line of irrigation). Up to 16 zones of irrigation per application are supported with six start times for watering. The user will be able to configure each zone to function on different days of the week or odd or even days of the month.

The Hourly log will be updated every hour at the top of the hour and contain data for the last 48 hours. Time, date, total accumulation for that hour, maximum average for that hour, maximum peak value, and time of peak value, are stored in this log.

Zones are turned ON one at a time starting from the first enabled zone. The zone that is ON is considered to be the active zone. Its state is set to ON and its valve output is also set to ON. When the active zone completes its time duration, its state will be set to Done and its valve output set to OFF.

The Daily log will contain data for the last 48 days. Date, total accumulation for that day, maximum average for that day, maximum peak value, time of peak value, and minutes tripped are stored in this log.

For enabled zones that are not active or complete, the states will be set to Pending and the valve output set to OFF.

The Monthly log will contain data for the last 24 months. The log will be updated on a user-specified day of the month. Date, total accumulation for that month, maxi mum average for that month, maximum peak value, time of peak value, and date of peak value are stored in this log.

A cycle is the sequence of all defined zones irrigating one at a time. A cycle is considered complete when the last defined zone finishes irrigating and shuts OFF. Each zone turns ON one at a time, starting with the first defined zone until the last defined zone in the list turns OFF.

Application graphing generates hourly, daily, and monthly graphs from the application log data. All graphs show the total and max average.

The Number of Zones parameter (with a default value of 4) specifies how many zones the application will use. No two zones are ever ON at the same time; each zone starts and stops independently and waits for the other to finish before another zone starts.

On the main Status screen, consumption for the current hour, day, and month are displayed. 11.20.6 High Trip

A high-trip output can be triggered if the Accumula tor’s total quantity exceeds a user-defined setpoint. The

Irrigation Control Software Overview • 11-51

Page 196 of the Emerson E2 user manual — 11.21.2.1 Cycle Control Types
Page 196 · click to enlarge
Page 196

11.21.2.1 Cycle Control Types

11.21.4 Zone Inhibit

By default, Timed cycles are always used unless the user has configured a flow sensor (optional). If a flow sen sor is configured, a control type parameter will become visible where the user can select either a Timed or Volume cycle control type.

Inhibiting sensors enable a zone to terminate irrigation early when enough water has been dispensed for the cur rent cycle, or completely removes a zone from the cycle. Each zone is equipped with a digital inhibit input called Zone Inhibit.

During any cycle, the disabled zone states and valve outputs will be set to OFF.

If the inhibit input is ON, the zone status will be set to Inhibit and the valve output will be set to OFF. 11.21.4.1 Timed

For midnight crossover times, a cycle will be com pleted if the duration extends into the next day. 11.21.2.2 Timed

If the zone is inhibited for Timed control types, it will be excluded from the cycle. If Zone Inhibit turns ON during the cycle, control will transfer to the next defined zone. 11.21.4.2 Volume

Instead of start and stop times entered to define the length of time a zone is on, the user enters a duration of time. The default parameter called On Time (with a default value of 2 hours entered in HHH:MM format) is used when a certain length of time is desired for watering. Irrigation begins per cycle start time and lasts for all zone durations that are active for the current day. For example, if a time of 30 minutes (0:30) is entered, that zone will stay ON for 30 minutes and then shut OFF. 11.21.2.3 Volume

For Volume control types, the inhibited zone will be excluded from the cycle only while the inhibit input is ON. If the inhibit input turns off and the cycle is still in prog ress, the zone’s state will again be set to Pending and will again be included in the cycle. 11.21.4.3 Rain Delay

Under volume control, enabled zones will be cycled until the set volume of water for each zone has been dis pensed for the current cycle or an amount of time has elapsed equal to the duration parameter. (This is a feature to prevent water runoff.) When irrigation is stopped for a zone due to elapsed time, control will cycle to the next active zone. 11.21.3 Cycle Scheduling

The rain inhibit input should be connected to a rain sensor and will only function during the ON season. In the event of rain, a programmable rain delay of 0-7 days will prevent irrigation cycles for the user-defined number of days from when the rain sensor has detected rain. Active cycles will not be terminated if the input turns ON; how ever, Rain Inhibit will begin when the active cycle ends.

An entry of 0 days will disable this parameter. 11.21.4.4 Freeze Lockout

Irrigation cycles can only be started during a user- defined irrigation “season.” The Season Source parameter allows the user to select how to determine the season by either using the Dates parameters or the Summer/Winter input.

An irrigation cycle should be terminated if the current environmental conditions will result in freezing of dis pensed water. This is to prevent the sheeting of ice on any adjacent paved surfaces or sidewalks, which could create hazardous conditions for motorists and/or pedestrians.

If the user selects Dates, start and stop day and month parameters will become visible and are used to specify the season. Each zone will have parameters to configure what days of the month it should participate in irrigation cycles. If the user selects Summer/Winter, an input of the same name will become visible under the Inputs tab. The sea son will be active when this input indicates Summer.

Zones are inhibited from watering if the outside air temperature falls below the entered setpoint for Freeze Lockout. 11.21.4.5 Alarm

If the zone is inhibited for more than the number of days specified in the Inhibit Alarm setpoint, an Inhibit alarm will be generated for the zone. This alarm will return to normal when the zone is no longer inhibited. 11.21.5 Zone Bypass Inputs

The Summer/Winter input is automatically connected to the Global Data output of the same name.

If the season is not active, the System status will be set to Off Season and no normal or manual cycles will be possible. This prevents accidental cycles from occurring after the system has been “winterized.”

Each zone has a digital bypass input called Zone Bypass Inputs. A zone can be bypassed to ON at any time while the application is enabled. A zone cannot be bypassed to OFF.

Page 197 of the Emerson E2 user manual — 11.21.6.1 Leak Test
Page 197 · click to enlarge
Page 197

11.21.8 Heat Cut In/Cut Out Setpoints For Each Stage

When a zone is bypassed to ON, the main water valve will be turned ON immediately. 11.21.5.1 Bypass Failsafe

If the current space temperature is greater than or equal to the heat stage Cut Out setpoint, or the individual cool ing stage is currently ON due to a call for cooling (Cut In setpoint or dehumidification), and the current space tem perature is greater than the individual COOL stage Cut In setpoint, then begin turning the stage OFF by starting the heat stage Off Delay countdown timer.

While each zone is bypassed to ON, a timer is checked. If time has elapsed equal to or greater than the zone’s cycle duration parameter, the bypass input will be ignored and the zone will return to normal operation.

For a zone in Bypass Failsafe, its bypass input must be set to OFF or NONE to reset the Bypass Failsafe and to use the bypass input again. 11.21.6 Flow Sensor-Related Tests

Or if the current space temperature is less than or equal to the heat stage Cut In setpoint, begin turning the stage ON by starting the heat stage On Delay countdown timer. 11.21.9 Cool Cut In/Cut Out Setpoints For Each Stage

11.21.6.1 Leak Test

For both Timed and Volume control types, if a flow sensor is configured, water flow will be checked via a leak test that is performed at the beginning of the cycle. During the leak test the main water valve will be turned ON and all zone valves will be set to OFF. After an amount of time has elapsed equal to the Flow Alarm Delay, the Water Flow input will be compared to the Minimum Flow for Alarm setpoint. If the water flow is greater than the set point, the flow alarm output will be set to ON and a Leak alarm will be generated. If a Leak alarm occurs the cycle will terminate. While a Leak alarm is active, no normal cycles will run and the system status will be set to Leak Detected.

If the current space temperature is less than or equal to the cool stage Cut Out setpoint, begin turning the cool stage OFF by starting the cool stage Off Delay countdown timer. If the current space temperature is greater than or equal to the Cut In setpoint, begin turning the cool stage ON by starting the cool stage On Delay countdown timer. 11.21.10 Dehumidification Control

Dehumidification control is implemented on an AHU basis, not individual cooling or heating stages. Because of implementation on an AHU basis, dehumidification con trol is “woven” throughout the cool Cut In/Cut Out as well as the heating Cut In/Cut Out control algorithms by calling for increases or decreases in heating and cooling capaci ties. The dehumidification algorithm does not directly change the states of the heating or cooling, instead it “influences” the staging process by calling for more, less, or the same amount of cooling, and limit the amount of heat used if a call for heating is necessary during dehumid ification.

A Leak alarm must be cleared by the user or the alarm will return to normal after passing a leak test run by a manual cycle. If an enabled zone is overridden to ON during a leak test, it will cause the test to fail, resulting in a false alarm. 11.21.6.2 Obstructed Zone Test

When a zone becomes active during a cycle, a timer is reset. After time has elapsed equal to the flow alarm delay, the water flow input will be compared to the Min Flow alarm setpoint. If the water flow is less than the setpoint, the flow alarm setpoint output will be set to ON, an Obstructed alarm generated, and the zone will be removed from the current cycle. 11.21.7 Service Modes

If the current space temperature is less than the dehu midification minimum space temperature, call for the end of dehumidification.

If the current control value used for dehumidification is greater than the dehumidification setpoint plus the dead band divided by two (2), call for an increase in dehumidi fication capacity.

The Service Check cycle allows a service technician to visually look for malfunctioning valves and leaks by cycling each zone ON one at a time, starting with the first zone. The active zone uses the Service On Time parame ter and remains ON for the programmable time period entered for Service On Time.

If the current control value used for dehumidification is less than the dehumidification setpoint minus the dehu midification deadband divided by two (2), call for a decrease in dehumidification capacity. 11.21.11 Two Speed Fan Control

While in the Service Check cycle, any active irrigation cycles will be terminated. The Service Check cycle will continue looping until stopped by the user or the program mable value in the Suspnd Failsafe field is reached.

To determine proper fan speed, determine which heat ing and cooling stages are ON and if the user has set any of the fan speeds for those stages to High. If any of the

Irrigation Control Software Overview • 11-53

Page 198 of the Emerson E2 user manual — 11.22 Flexible Combiner
Page 198 · click to enlarge
Page 198

stages have been set to High, then the fan speed should be set to High; otherwise, the fan speed should be set to Low.

biner manual (P/N 026-1620).

If for any reason the algorithm thinks that the high speed and the low speed should both be ON, the high- speed fan should be turned ON only.

11.23 Modular Chiller Control (MCC)

Proper fan speed should be set when there are no heat ing or cooling stages ON, and the Fan Always On Setpoint is enabled. 11.21.12 Configuration

The Modular Chiller Control is available for the E2 RX model controllers version 2.82 and above. In the RX- 300, a maximum of one MCC is allowed. In the RX-400, a maximum of two MCCs are allowed. 11.23.1 Overview

Set the Strategy type under application Setup under the General tab to Separate Setpoints. Enter the desired val ues for heating and cooling stages. Cooling, heating, alarm, and miscellaneous setpoints can be edited under additional tabs. Press Control + zero (0) while the More tab is highlighted to bring up the list of additional tabs.

A Modular Chiller is made up of a single compressor connected to a brazed plate heat exchanger that provides a chilled water and glycol mixture for cooling display cases and coolers. Multiple Modular Chillers are connected together to meet the capacity requirements of the system. Modular Chillers are designed to provide cooling by paral leling the hydronics side of the secondary system instead of the refrigeration side of the system. These units also use a water and glycol mixture as a condensing fluid for com pressor heat of rejection. This design eliminates the long refrigerant piping runs thereby significantly reducing re frigerant charge.

11.22 Flexible Combiner

The Flexible Combiner application, a new feature of E2 versions 2.20 and above, is a highly advanced and ver satile I/O control program used to combine multiple ana log and digital input values using programmed equations similar to those used in spreadsheets.

A Flexible Combiner application may have up to eight analog outputs and four digital outputs, each of whose val ues are determined by user-programmed equations that mathematically combine up to eight analog inputs and eight digital inputs. Four of the analog outputs have the ability to remember their output state over an E2 power cycle. Additionally, up to four alarms can be set up whose trigger and alarm delays are equations. Alarm type, prior ity, and the message for each alarm are user-configurable.

Equations used to calculate output values and time delays may use mathematical combinations of any of the Flexible Combiner's analog and digital inputs, as well as numeric and named constants, operators, functions, and even rudimentary if-then logic functions. For control of digital outputs, the Flexible Combiner also supports sepa rate equations that determine ON and OFF delays.

For E2 versions 2.40 and above, the user can set up to four alarms whose trigger and alarm delays are equations. The user may also choose the alarm type, priority, and the message for each alarm.

The Flexible Combiner may also be programmed to operate a digital output as a PWM (pulse width modula tion) output. In this instance, the equation written for a PWM output determines its period and pulse width. A typ ical Flexible Combiner application consists of three types of components: inputs, equations, and outputs. For more information about this application, see the Flexible Com

Page 199 of the Emerson E2 user manual — 11.23.2 Learning Mode
Page 199 · click to enlarge
Page 199
Emerson E2 — 11.23.2 Learning Mode diagram (page 199)
Fig. 197 · 11.23.2 Learning Mode

Figure 11-1 - Compact Chiller System

11.23.2 Learning Mode

11.23.4 Compressor Control

When an MCC application runs for the first time, it undergoes a "Learning Mode" period to collect data on the chiller stages. During Learning Mode, the MCC will con trol the chilled water temperature, but it will purposely cycle the chiller stages in different combinations to mea sure the effect they have on the temperature input value.

MCC can utilize up to 32 compressors for maintaining the chilled supply temperature at a user specified setpoint. This is accomplished by either turning on or off any of the compressors defined in the application. As Supply Tem perature rises above setpoint, compressors will be turned ON. As Supply Temperature falls below setpoint, com pressors will be turned OFF. The Chilled Supply Tempera ture sensor should be located very close to the Compressor Control Unit so no minimal control lag is expected to be present.

The Learning Mode lasts for several minutes. After Learning Mode ends, the MCC will require up to 24 hours of operation before compressor cycling is operating at maximum efficiency. If compressor cycling seems too fre quent after 24 hours of operation, you may reduce com pressor cycling by changing the Control/Cycles parameter. 11.23.3 The Control/Cycles Parameter

When a compressor has been shut down on an alarm, the compressor will remain out of the active rotation until the alarm has been cleared. Additionally, the user will have the option of specifying that the alarmed compressor be re-tried the next time it comes up in the rotation. To prevent damage to a compressor, the user will have the option of specifying a number of trips per day before the compressor is permanently locked out. Once this condition has occurred, the compressor alarm will require a manual reset to bring it back into the active rotation.

The MCC has one parameter with five preset settings to allow users to alter temperature control performance or compressor cycling frequency. The default setting, "Mod erate Control," seeks to balance good temperature control with efficient cycling. If tighter control is needed, setting the field to "Tight Control" or "Tightest Control" will increase the application's reaction to temperature changes, resulting in tighter control (usually at the expense of more frequent cycling). If fewer compressor cycles are desired, setting the field to "Less Cycling" or "Least Cycling" will decrease the number of cycles but also increase the amount of fluctuation in the temperature control.

The controller will monitor the Chilled Differential Pressure and if it falls below a user specified threshold, the controller will start to shut down compressors one at a time based on a user specified time delay. This shutdown operation will be suspended if the Chilled Differential Pressure rises above a user defined setpoint.

Modular Chiller Control (MCC) Software Overview • 11-55

Page 200 of the Emerson E2 user manual — 11.23.4.1 Digital Scroll Compressor
Page 200 · click to enlarge
Page 200

11.23.4.1 Digital Scroll Compressor

11.24 Boiler

MCC can also utilize a single Digital Scroll Compres sor. The assumption is that one of the Compressor Control Modules in the system may have a digital scroll instead of a standard scroll compressor installed. The Digital Scroll Compressor may not be the same size as the fixed scroll compressors. When a Digital Scroll Compressor is defined in the application, MCC will utilize the compressor con trol modules with the digital scroll at all times, modulating the capacity of the compressor to maintain the Chilled Supply Temperature setpoint. All other compressor con trol modules will be turned ON or OFF based on the rota tion sequence defined above. Based on this strategy, the digital scroll compressor will have the fewest cycle counts and the most runtime of all the compressors in the system. 11.23.4.2 Variable Frequency Drive Compressor

The BX-300 and BX-400 will default to a maximum of two Boiler applications. Other models will have to license the Boiler Application. The Boiler will be available only for E2 versions 2.85 and higher. 11.24.1 Overview

The Boiler can be controlled two ways, via the boiler temperature or the boiler pressure. The E2 uses the current outside air temperature to calculate a new boiler control setpoint. If the boiler temperature (or boiler pressure) is less than the setpoint value then the boiler is turned ON. Otherwise it is turned OFF. The algorithm will work in an inverted fashion if the Minimum Outside Air Temperature is greater than the Maximum Outside Air Temperature.

MCC can utilize one compressor with a variable fre quency drive. The method of control will be similar to the digital compressor strategy. The application will continue to allow only one variable capacity device to be defined in the system, making the Variable Frequency Drive and Dig ital compressor options mutually exclusive.

Emerson E2 — 11.23.4.1 Digital Scroll Compressor diagram (page 200)
Fig. 198 · 11.23.4.1 Digital Scroll Compressor

If a Variable Frequency Drive compressor is to be used and it is a Control Techniques drive using the Modbus communication interface, the Control Techniques Drive association menu will support associating the drive to an MCC. 11.23.4.3 Unequal Capacity Compressors

Figure 11-1 - Temperature Ranges

Optionally, the MCC can support different capacity compressors. When this option is selected, the capacity of each defined compressor will be user specified. The con troller will evaluate the capacities of all the compressors to determine the appropriate compressor to switch on or off in order to maintain the Supply Temperature at setpoint.

An Outside Air Temperature Boiler On and an Outside Air Temperature Boiler Off can be defined. If the outside air temperature is lower than the Outside Air Temperature Boiler On the boiler is turned ON. If the outside air tem perature is higher than the Outside Air Temperature Boiler Off the boiler is turned OFF.

When unequal capacity compressors are defined, the controller will not use a simple round robin approach to switching compressors on or off (as with equal capacity compressors) and therefore compressor runtimes may vary significantly over time. However, for those compressors defined with identical capacity, the algorithm will attempt to keep both runtimes and cycle counts as even as possi ble. 11.23.5 Bypass Valve Control

If defined, the Outside Air Temperature Boiler Off must be greater than the Outside Air Temperature Boiler On. 11.24.2 Alarms

There are four advisory generated by the Boiler Appli cation:

  • High Temperature
  • Low Temperature

MCC can utilize the Chilled and Condenser Bypass Valves. These valves will be modulated to maintain user defined differential setpoints. For each valve, as the differ ential pressure rises above the setpoint, the valve will modulate open. When the differential pressure falls below setpoint, the valve will modulate closed.

  • High Pressure
  • Low Pressure

Each advisory will have an associated type, priority, and delay.

Page 201 of the Emerson E2 user manual — 11.26 Detailed Setpoint Change Logging
Page 201 · click to enlarge
Page 201

11.25 Refrigerant Monitoring System (RMS)

  • Close Ticket - Select to confirm charging, reclaim ing or changing refrigerant. An ending weight, and the total accumulated weight will be displayed. If an RMS Scale is not present, manually input the ending weight and the starting weight of the cylin ders. Close Ticket will open the Charge Asset or Reclaim Refrigerant Ticket screen depending on which action is being performed. If adding or removing refrigerant, the refrigerant ticket screen should be filled out. Press F1 to send.

The RMS enables the E2 ability to measure the refrig erant used to add, remove and repair an asset that has a refrigerant charge. RMS is available for E2 versions 3.01 and above. The RMS comes with two components that are installed together, the RMS asset and the RMS scale. A total of 99 RMS applications can be supported by the E2. The RMS is a licensed application. For licensing instruc tions, refer to the software licensing section (see Section 10.15, License Management).When an RMS Asset is licensed, this automatically includes one RMS Scale. 11.25.1 RMS Asset

  • Cancel Ticket - Select to cancel the process. An entry for a reason for cancelling the ticket will be required. An entry will be written to the log.
  • Refrigerant Ticket - When changing, adding, or removing refrigerant, the RMS Ticket screen for charges or reclaims (depending on whether refriger ant is added or removed) is filled out. Press F1 to send. 11.25.2 RMS Scale

There will be one E2 RMS asset instance for each refrigerant charged asset. A refrigerant-charged asset can include HVAC, Rack, and Small Appliance.

The RMS asset can perform the following functions;

  • Charge Asset - The asset will be filled with refrig erant. The Cylinder Accumulated Weight and the Total Accumulated Weight will be reset to 0.0. If an RMS Scale is not present, manually input the end ing weight and the starting weight of the cylinders. (This applies during charging or reclaim, if more than one cylinder is needed.) (Note to cancel charging, press Enter from the Sta tus screen and select Application Commands, 3. Close Ticket . Enter a reason in the Tech Comment field and press F10 to cancel the charge.)

The RMS scale used for weighing the refrigerant tank for a specific asset. The RMS scale communicates using MODBUS. The RMS scale will appear as a device in the device summary list and will be consistent with other devices and their online/offline status. 11.25.2.1 Device Constraints

The RMS scale communicates using the ASCII MOD BUS protocol. It can exist on the same MODBUS route as RTU MODBUS devices as long as the baud rate, and serial settings are the same ( # of bits, Parity, # of Stop Bits). On a mixed network (RTU and ASCII MODBUS) address 58 is not supported. 58 is the ASCII value for a “:”

  • Reclaim Refrigerant - The refrigerant will be removed from the asset. The Cylinder Accumulated Weight and the Total Accumulated Weight will be reset to 0.0. If an RMS Scale is not present, manu ally input the ending weight and the starting weight of the cylinders. (This applies during charging or reclaim, if more than one cylinder is needed.) (Note to cancel charging, press Enter from the Sta tus screen and select Application Commands, 3. Close Ticket . Enter a reason in the Tech Comment field and press F10 to cancel the charge.)

11.26 Detailed Setpoint Change Logging

Detailed Setpoint Change Logging stores in a log any setpoints that change, when the setpoint was changed, what the original value was, and what the value was changed to.

  • Change Cylinder/New Cylinder - The container of refrigerant will be removed and replaced with a new one. If an RMS Scale is not present, manually input the ending weight and the starting weight of the cylinders. (This applies during charging or reclaim, if more than one cylinder is needed.) (Note to cancel charging, press Enter from the Sta tus screen and select Application Commands, 3. Close Ticket . Enter a reason in the Tech Comment field and press F10 to cancel the charge.)

The log is always enabled except for start-up and restore and cannot be disabled by the user. This data is retrieved and displayed on the E2 front panel. 11.26.1 Log Information

The following information will be stored for detailed setpoint change logging:

  • Time Stamp – the time and date of the setpoint change in local time.

Refrigerant Monitoring System (RMS) Software Overview • 11-57

Page 202 of the Emerson E2 user manual — 11.26.3 Unlogged Changes
Page 202 · click to enlarge
Page 202
  • Port – the port the change was made through.
  • User – the user name.
  • Application Name – the name of the cell that was changed.
  • Property Name – The name of the property that was changed.
  • FromValue – The value of the setpoint
  • To Value – The new value of the setpoint 11.26.2 Logged Changes

A log will be appended with changes as they occur:

  • Any setpoints that are directly changed by a user.
  • Custom property values that are changed. These properties are changed by the system as a result of a user changing a value. These will be logged as changed by the user.
  • Application inputs that are set as fixed values and changed by user.
  • User Associations
  • Changes in input/output pointers.

11.26.3 Unlogged Changes

There are some kinds of changes that occur that will not have logs created for them:

  • User overrides – Overrides are input/output changes to the value outside of the setup screen or application control.
  • Real-time value on cell inputs that are connected to other application outputs.
Page 203 of the Emerson E2 user manual — 11.26.2 Logged Changes
Page 203 · click to enlarge
Page 203
Page 203 of the Emerson E2 user manual — 11.26.2 Logged Changes
Page 204 of the Emerson E2 user manual — 11.26.2 Logged Changes
Page 204 · click to enlarge
Page 204
Page 204 of the Emerson E2 user manual — 11.26.2 Logged Changes
Page 205 of the Emerson E2 user manual — 12 Operator’s Guide to Using the E2
Page 205 · click to enlarge
Page 205

12 Operator’s Guide to Using the E2

12.1 The E2 Home Screen

To the right of the Suction Groups section is the Circuit Status section. Both the Standard Circuits and the Case Controllers are listed in this screen. The circuit names, their current status, and temperatures are listed.

The Main Status or Home screen (Figure 12-1 and Figure 12-2) is divided into sections that display the cur rent status in areas of importance in the system (i.e., for RX: suction groups, compressor stages active, circuits, condensers, sensor control, and for BX: OAT, demand control, power monitoring, light schedules, zones, AHUs, and sensor control). Time, date, and alarm status are dis played along the top of the screen. The display is backlit, but turns off to save energy after a determined amount of time. Press any key to bring the display back up.

This section is located at the bottom left of the screen and contains information on the status of the condenser, such as the discharge setpoint and individual fan states.

Below the Circuits section at the bottom right of the screen is the Sensor Control section where Control Value and Command information are displayed. 12.1.2 BX Home Screen

The Home screen acts as a master and default screen for all the functions of E2 and can be customized accord ing to the user’s needs (see Section 12.5, Customizing the Home Screen).

The RX Home screen can be displayed on CX model controllers. 12.1.1 RX Home Screen

Emerson E2 — 12 Operator’s Guide to Using the E2 diagram (page 205)
Fig. 199 · 12 Operator’s Guide to Using the E2
Emerson E2 — 12 Operator’s Guide to Using the E2 diagram (page 205)
Fig. 200 · 12 Operator’s Guide to Using the E2

Figure 12-1 - RX Home Screen

Figure 12-2 - BX Home Screen

The first section of the RX Home screen is the Suction Groups section located in the top left corner. The large let ters have the name of Suction Group 1 along with infor mation on compressor stages active, and the current pressure setpoint. Setpoints, status, percentages of capaci ties, and which stages are active for each suction group are displayed as well. The suction group that is displayed in the large block at the top left of the screen is the group that is named alphabetically first of the suction groups.

The upper-left hand section of the BX Home screen contains status information for four different values, including outside air temperature, humidity percentage, season, and light level.

Directly below the OAT section is demand control sta tus information, which shows the number of applications and number of loads being shed.

The E2 Home Screen Operator’s Guide to Using the E2 • 12-1

Show 6 more labels / short text on this page
Circuit Status Section · Condenser Section · Sensor Control · Suction Groups Section · OAT Section · Demand Control Section
Page 206 of the Emerson E2 user manual — 12.2 Logging On and Access Levels
Page 206 · click to enlarge
Page 206

current temperature of standard circuits.

In the lowest left-hand corner of the BX Home screen is the power monitoring section, containing active KW and average power information.

The top right-hand corner of the screen shows the sta tus of the Demand Control application.

In the center of the BX Home screen is ON and OFF status information for light schedules.

The middle right-hand section of the screen shows name and percent ON information for each anti-sweat application.

Air Handling Units Section

Located at the top right-hand corner of the BX Home screen, the AHU section shows the number of AHUs, tem perature, state, and ASP information for each.

The bottom center section of the screen shows both analog and digital sensor control, name, and command output.

Directly below the AHU section is the Zones section, which shows the number of zones, temperature, whether or not the application is in occupied mode, CSP and HSP.

The lower right-hand section of the screen shows the name and current status of time schedules.

Sensor Control is at the bottom right-hand corner of the BX Home screen and contains analog and digital sen sors, value, command, and status information. 12.1.3 CX Home Screen

12.2 Logging On and Access Levels

An E2 may be programmed with up to 25 different users. A user basically consists of a username, a password, and an access level. Whenever a username and password are entered during login, the E2 searches the user records for the username and password. If found, the E2 will log the user in at the access level configured for the user in the user records.

Emerson E2 — 12.2 Logging On and Access Levels diagram (page 206)
Fig. 201 · 12.2 Logging On and Access Levels

The access level determines how many of the E2’s fea tures the user may use. The E2 uses four access levels, one being the lowest, and four being the highest. Table 12-1 gives a description of each level and the capabilities they have access to.

Level 1 Read-only access. Users may generally only view status screens, setpoints, and some system settings.

Network Information Anti-Sweat Controller Information

10 9 Time Schedules

Level 2 Setpoint and bypass access. Users may perform all the tasks a level 1 user may, and they may also change control setpoints and bypass some devices.

Advisory Information Sensor Control 5

Figure 12-3 - CX Home Screen

Level 3 Configuration and override access. Users may perform all the tasks a level 2 user may, and they may also override system settings, create new cells, and program new applications.

The lower left-hand corner of the screen shows name and bypass output for the lighting circuits.

The top left-hand corner of the screen shows whether the fans are ON or OFF, state, and dehumidification status of the first two air handlers in the sequence.

Level 4 System Administrator access. All E2 func tions are accessible by a level 4 user.

Table 12-1 - User Access Levels

The top center of the screen shows the name, state, and

Show 14 more labels / short text on this page
Power Monitoring Section · Demand Control Section · Light Schedules Section · Anti-Sweat Control Section · Sensor Control Section · Zones Section · Time Schedules Section · Sensor Control Section · Lighting · HVAC Control Refrigeration · Demand Control · Lighting Control Section · HVAC Control Section · Refrigeration Control Section
Page 207 of the Emerson E2 user manual — 2. Press ( System Configuration )
Page 207 · click to enlarge
Page 207

12.3 Toggling Full Options

The System Configuration Menu

Toggling Full Options on allows you to have full access to programming applications. To Toggle Full Options on:

1. Press the key

2. Select ( System Configuration )

3. Select ( System Information )

4. Select ( Toggle Full Options )

FULL will appear in the top right corner of the screen

when Full Options is enabled. Pressing toggles Full Options on and off.

12.4 Navigation

Figure 12-5 - System Configuration Menu

The System Configuration Menu is one of the menus used to set up the E2. Included options are Input/Output Definitions, internal system information, remote commu nications, global data, alarm, logging, and network setup information.

12.4.1 Menus

The Main Menu is accessed by pressing the key. This menu gives you direct access to applications such as Suction Groups, Condensers, Circuits, Air Han dling Units, Zones, Light Schedules, and Sensor Controls applications, (depending on which controller type you are using) as well as all configured applications in the control ler. The Main Menu also allows you to add and delete applications, gives system configuration abilities, and shows status information for inputs and outputs, network, graphs and logs.

To open the System Configuration menu:

1. Press

2. Press ( System Configuration )

The System Configuration menu contains nine menu items:

1. Input Definitions View the status of all input boards, as well as set up indi vidual points on the I/O boards.
2. Output Definitions View the status of all output boards, as well as set up indi vidual points on the I/O boards.
3. System Information Menu that gives access to more E2 setup options and information.
4. Remote Communica tions

Gives access to modem infor mation, dial-out setup, and TCP/IP.

Figure 12-4 - Main Menu

Table 12-2 - System Configuration Menu Options

Toggling Full Options Operator’s Guide to Using the E2 • 12-3

Main Menu · Menu Option Description

Page 208 of the Emerson E2 user manual — 2. Press ( System Configuration )
Page 208 · click to enlarge
Page 208

passwords, toggle full options, general information about the controller, and other important data.

5. Alarm Setup Set up dial-outs and alarm reporting for the current E2.

The System Information Menu is another menu used to set up the E2. The options in this menu allow setting up time and date, passwords, toggle full options, general information about the controller, and other important data.

6. Logging Setup Enter information about Log ging Group applications such as the sampling frequency and total number of samples.

To open the System Information Menu:

1. Press
7. Network Setup Accesses the Network Setup menu where you can view and/or change the configura tion of the Echelon and RS485 I/O Networks, set up boards, controllers, routers, and make controller associa tions.

2. Press ( System Configuration )

3. Press ( System Information )

The System Information menu contains nine menu items:

8. Global Data Configure one or more ana log or digital sensors to be used as “global” values by all E2s.
1. General Controller Info

Edit general information about the E2, such as engi neering units, and summer/ winter change-over specifica tions.

9. Licensing Select this option to access the License Report screen that lists all the applications in E2 that are currently licensed and the number of each type of applications that are in use. You can also add additional licenses by press ing F1.
2. Time and Date Change the current date and time, and specify date for mats.
3. Passwords/User Access

Set up usernames and pass words, and define security level requirements.

Table 12-2 - System Configuration Menu Options

4. Firmware Revision Read-only information screen that contains current system version information

The System Information Menu

Table 12-3 - System Information Menu Options

Figure 12-6 - System Information Menu

The System Information menu is used to set up the E2. The options in this menu allow setting up time and date,

Menu Option Description · Menu Option Description

Page 209 of the Emerson E2 user manual — 12.4.2 Screen Types
Page 209 · click to enlarge
Page 209
5. Service Actions Set up system diagnostics (memory and execution info), and perform advanced func tions (system resets and firm ware update).
Emerson E2 — 12.4.2 Screen Types diagram (page 209)
Fig. 202 · 12.4.2 Screen Types
6. Note Pad Writable field for technician to make notes about changes made or general information.

Figure 12-8 - Example Actions Menu for Suction Group Value

7. Display Users Enter information about Log ging Group applications such as the sampling frequency and total number of samples.

12.4.2 Screen Types

8. Toggle Full Options When set to on, FULL will appear at the top right of the screen and gives user full access to options and applica tions.

Summary screens let you view status information for multiple applications of the same type. For example, (Figure 12-9) is the Circuits Summary screen in the E2 RX controller. This screen shows the name, state, tem perature, setpoint, alarm, refrigeration, and defrost infor mation for all defined standard and case control circuits displayed. To see a more detailed status when on an appli cation summary screen, highlight the desired application from the list with the arrow keys and press . This will take you to the Status screen.

9. Application Default Value Setup

Choose the default values most appropriate to the refrigeration control compo nents in the system.

Table 12-3 - System Information Menu Options

Functions such as graphing, point logging, overriding, expanded information, setup, detailed status, and manual defrosting can be initiated from the Actions Menu box by pressing the key from the Home screen or any sta tus screen. When you press the Enter key, only the options that are appropriate to the current field and application will be displayed; all others will be hidden.

Emerson E2 — 12.4.2 Screen Types diagram (page 209)
Fig. 203 · 12.4.2 Screen Types

For example, if Enter is pressed when a circuit is high lighted, the Actions Menu would display all available options for that circuit, such as Manual Defrost, meaning that by selecting Manual Defrost the Manual Defrost screen would come up for that particular circuit.

Figure 12-9 - Summary Screen (RX-400 Version Shown)

Emerson E2 — 12.4.2 Screen Types diagram (page 209)
Fig. 204 · 12.4.2 Screen Types

Status screens are real-time views of application func tions. They show the current status of all outputs, the cur rent values of all inputs, and other important data such as control setpoints, run times, and whether or not bypasses or overrides are active.

Figure 12-7 - Example Actions Menu for Standard Circuit

Each status screen is specially designed to provide a concise at-a-glance view of how one or more systems are functioning.

Navigation Operator’s Guide to Using the E2 • 12-5

Show 4 more labels / short text on this page
Menu Option Description · Summary Screens · Actions Menu · Status Screens
Page 210 of the Emerson E2 user manual — 12.4.2 Screen Types
Page 210 · click to enlarge
Page 210
  • The screen may require one or more fields to be set to certain values before the screen may be accessed. For example, a screen containing nothing but com pressor proof input definitions might be hidden if there is a field on another screen that tells the sys tem there are no proof checking devices on the group’s compressors. To access this screen, you would have to set this field to YES .

The screen you are currently in is always highlighted in the screen’s index tab. For example, because Screen 1 is displayed, tab C1 is highlighted.

As you move to other screens within Setup, the high light will move to different tabs to indicate which screen will be displayed.

Figure 12-10 - Status Screen (RX-400 Version Shown)

Header Icons:

The Setup utility is the interface used to change set tings and setpoints, and define inputs and outputs in the E2. Figure 10-11 shows a typical Setup screen and its pri mary elements.

Figure 12-12 - Header Icons

At the very top of every screen in the E2, there are icons that indicate various stages of activity, number of users logged into the controller, battery alerts, connectivity status, and more.

Index Tabs:

Single user is logged in

Figure 12-11 - Index Tabs (RX-400 Version Shown)

Multi-users are logged in

The 10 boxes at the top of the screen labeled C1 through C0 are known as the index tabs. These tabs pro vide you with a short index of the screens that are used to set up an application. C1 through C0 represent the screen numbers (C1 being screen 1, C2 being screen 2, and so

Terminal mode in use

E2 is connected to Ethernet

Wait, or system is busy

on.) Press the key and the number of the index tab (next to the C) and the cursor highlights that index tab.

Disk activity, or saving to disk

Caps lock is ON

Each of the Setup screens that you may access will have a name beside its number. In Figure 10-11, for exam ple, you will notice some tabs have names, while others are blank. This is because there are only four screens in the Setup for this particular application; C3 is not an accessi ble screen.

Table 12-4 - Header Icons and Descriptions

There are several reasons why a tab may be inaccessi ble (i.e., without a name next to the number):

  • The tab (and the corresponding screen) is unused and reserved for later revisions.
  • The screen may only be accessed when running in Full Options mode (see Section 12.2, Logging On and Access Levels ).

Setup Screens · Icon Description

Page 211 of the Emerson E2 user manual — $ SENSOR CONTROL,
Page 211 · click to enlarge
Page 211
Emerson E2 — 12.4.3 The E2 Keypad diagram (page 211)
Fig. 205 · 12.4.3 The E2 Keypad

Key RX and BX Function Description

! PREV TAB Moves backward one

@ NEXT TAB Moves forward one

# EDIT Opens the Edit Menu

$ STATUS, OVERRIDE,

Opens the Detailed Sta

tus screen, Opens the Override Update screen,

Figure 12-13 - Setup Screen (RX-400 Version Shown)

or Look Up Tables

12.4.3 The E2 Keypad

Opens the Setup screens, or Cancels an

CANCEL

The cursor highlights individual fields on the E2 screen, allowing you to change their contents and/or select them to perform other functions like viewing logs/graphs or setting alarm parameters. The E2 includes arrow keys for the user to easily navigate the cursor around each screen. Areas can be accessed for detailed information and certain functions by guiding the cursor with the arrow keys.

Table 12-5 - Function Keys for Setup Screens

Key RX Function BX Function

! SUCTION GROUP AHU

@ CONDENSERS ZONES

# STANDARD and CASE

LIGHTING

When an E2 screen is split into multiple areas (like the

CIRCUITS

default Main Status screen), the Tab key moves the cursor to each section of the current screen. The border around each section is highlighted by the cursor so the user will know which section the cursor is on.

$ SENSOR CONTROL,

SENSORS

POWER MONITORING

% SETUP, CANCEL SETUP, CAN

CEL

Table 12-6 - Function Keys for Status Screens

Pressing the key from the Home screen or any application status screen will pop up the Actions Menu. If an option is highlighted when is pressed, that high

lighted option is selected. Pressing on an applica tion summary screen will bring you to the status screen of that application.

^ The Help key opens the Help menu

& The Alarms key opens the Alarms Advisory

* The Home key opens the Home screen

( The Menu key opens the Main Menu

) The Back key moves you back to the previ

Table 12-7 - Icon Function Keys

  • The Help key opens a pop-up window con taining either information about the screen or menu

Navigation Operator’s Guide to Using the E2 • 12-7

Show 13 more labels / short text on this page
Keypad · screen · screen · box · or LOOK UP · % SETUP, or · The Cursor · operation · The Tab Key · The Enter Key · Key Function · Log · ous screen
Page 212 of the Emerson E2 user manual — + Time Schedule Summary
Page 212 · click to enlarge
Page 212

you are currently on, or information about the input, output, or setpoint you have highlighted with the cursor (if available). After the Help key has been pressed, will open the General Help menu containing Troubleshooting options. Press the and keys together at any time to open General Help.

front panel and an external keyboard.

Hot Keys are quick and easy shortcuts to frequently used functions and applications. For a complete menu screen that lists all Hot Keys and how to access them, press the key and the key together.

Use the control keys to access Insert Mode, Edit

  • The Alarms key displays the alarm advisory log that shows all the current alarms in the E2.

Mode, and Names. Pressing and (INS will appear on the top right of the screen) activates Insert Mode. Insert Mode toggles between Insert and Overwrite edit modes.

  • When the Home key is pressed from any location, the Home screen opens.

Pressing and (ED will appear on the top right of the screen) activates Edit Mode. Edit Mode allows you to change the name of the application to something besides

  • When the Menu key is pressed from any location, the Main Menu opens.
  • The Back key will take you to the previous screen.

the name of the application and the number. Pressing

and (NAMES will appear on the top right of the screen) switches from a Point number to a Point Name when setting up Board and Points in a Setup screen.

Pressing from an application status screen, Home screen, or Input/Output Status screen brings up the Actions Menu and gives the user access to controller func tions such as graphing, logging, setup, and detailed status.

The Log In/Out Key

The Log In/Out key brings up the current E2 User Login Screen when logging in. If the Log In/Out key is pressed in order to log out and there is data on the screen that has been edited and not saved, a dialog box opens asking if the data should be saved. If Yes is selected, the data is saved, the user is logged out and returned to the Home screen. If No is selected, the dialog box closes and the screen is refreshed as necessary. Press ing the Log In/Out key in order to log out when no data needs to be saved simply logs the user out and returns to the Home screen.

Application + All Applications

+ AHU Summary

+ Time Schedule Summary

+ Sensor Control Summary

+ Lighting Control

+ Power Monitoring

Four Directional Arrow Keys

+ ARTC/RTU Summary

Directional arrow keys move the cursor in the direction of the arrow pressed. The arrow keys are always func tional on menus and can be used to move from section to section on the Home and Status screens.

+ HVAC Zones Summary

+ Suction Summary

+ Case Control Summary

Page Up/Page Down Keys

The Page Up and Page Down keys scroll the user through menus, application summary screens, and setup screens too large to fit on one screen.

+ TD3 summary

+ Case Control Summary

+ Condenser Summary

Ctrl Page Up/Ctrl Page Down Keys

The Ctrl Page Up or Ctrl Page Down keys on an application setup screen take the user to the next or previous application on the same screen.

+ Time Schedule Summary

+ Sensor Control Summary

+ Power Monitoring

The numeric keypad is fully functional from both the

Table 12-8 - Shortcut Keys

Hot Keys · Keys Function · Numeric Keypad

Page 213 of the Emerson E2 user manual — Edit + Edit Mode
Page 213 · click to enlarge
Page 213

12.5 Customizing the Home Screen

+ Suction Summary

+ Circuit Summary

The Home screen can be customized to show different information depending on the user’s needs. If you wish to change the Home screen from the default screen, follow the steps below. There are eight different screen options available with the Device Summary screen as the default choice.

General + Global Data Status

+ Expanded Info

+ Graph Current Application

+ Input Definitions

+ Output Definitions

+ Log Current Application

Options, press the key and together.

+ Maintenance Log

System + Add/Delete Application

1. Press the button to open the Main Menu screen.
2. Press for the System Configuration screen.

+ Toggle Full Options

3. Press for the System Information screen.

+ Serial Setup

+ Network Status

4. Press for General Controller Info and scroll down to RX Home Screen or BX Home Screen depending on which controller you are using.

+ TCP/IP setup

+ Firmware Version

5. Press ( LOOK UP ) to open the Option List Selection menu.

+ System Logs and Stats

6. Choose the desired Home screen from the list.

+ Switch language

7. Log off to save changes.

Edit + Edit Mode

12.6 Manual Defrost and Clean Mode

+ Insert Mode

+ Names Mode

A circuit can be placed in manual defrost from the RX Home screen or a Circuit Status screen. If a refrigeration circuit needs to be placed in manual defrost, follow these steps:

Table 12-8 - Shortcut Keys

1. Press ( CIRCUITS ) to go to the Circuits Sta tus screen, or place the cursor on the desired cir cuit from the Home screen and press to open the Actions Menu. Select Manual Defrost .
2. Once inside a Circuits Status screen, press to open the Actions menu.
3. Select Manual Defrost from the list and the Cir

Customizing the Home Screen Operator’s Guide to Using the E2 • 12-9

Keys Function

Page 214 of the Emerson E2 user manual — 12.7 Overrides
Page 214 · click to enlarge
Page 214

cuit Bypass screen opens.

Emerson E2 — 12.7 Overrides diagram (page 214)
Fig. 206 · 12.7 Overrides
  • End Manual Mode - Selecting this command will end any defrost cycle or the Clean Mode initiated manually.

If the defrost time needed is shorter than what the nor mal programmed defrost time allows or if in Clean Mode, follow the procedures to the Option List menu and select End Manual Mode.

Figure 12-14 - Circuit Bypass Screen (RX-400 Version Shown)

4. The Circuit Bypass screen (see Figure 12-14 ) will display the circuit name, its current state, and the bypass state. The Bypass Command field will be highlighted.

12.7 Overrides

If a compressor stage or a fan on the condenser needs to be bypassed, follow these instructions:

1. From the default Home screen, arrow to either the COMPRESSOR STGS or FAN STAGES sections and highlight the stage or fan to be bypassed. Press Enter to access the override option from the menu.
Emerson E2 — 12.7 Overrides diagram (page 214)
Fig. 207 · 12.7 Overrides
Emerson E2 — 12.7 Overrides diagram (page 214)
Fig. 208 · 12.7 Overrides

Figure 12-15 - Option List Selection Screen

5. Press ( LOOK UP) . The Option List Selec tion screen (see Figure 12-15 ) will give you five choices of defrost modes.
  • No Action - Normal (no manual defrost) state.

Figure 12-16 - Override Update Screen (RX Version Shown)

  • Defrost - This is the normal defrost mode. The defrost ends according to the terminating device (sensor) or fail-safe time, whichever occurs first.
2. The Override Update screen appears

(see Figure 12-16). Press the or to enter Yes to place the stage in override. Scroll down one space to enter the Override Time.

  • Emergency Defrost - The defrost time goes the full duration of programmed defrost time and ignores any defrost termination sensors.
3. Choose the Override Value of either OFF or ON
  • Clean - This mode disables all refrigeration and defrost so that the case can be cleaned or serviced.

using or .

The compressor stage or condenser fan stage in over ride mode will be marked with a cyan blue background in the Main Status screen indicating that the override is in effect.

Page 215 of the Emerson E2 user manual — 12.8 Checking Boards Online
Page 215 · click to enlarge
Page 215

12.8 Checking Boards Online

12.9 Checking Status Screens

Figure 12-18 - RX Function Button Menu

The E2 RX controller has four status screens that are each accessible (from the Home screen) by pressing the corresponding function key (see Figure 12-18). The Suc tion Group status screen, the Condenser status screen, the Circuits status screen, and the Sensors status screen can all be accessed by pressing one of the function keys (- ) if the application has been added to the E2.

Suction Group Status Screen

Figure 12-17 - Network Summary Screen

Press . The suction group selected will be dis played with information such as active stages, discharge temperature, current setpoint, associated condenser, and other general information.

You can check all boards that are on either the Echelon Network (E2 controllers) or the I/O Network from the Net work Summary screen (See Figure 12-17). This screen displays information such as board status, name of the device, type of device (board, controller, etc.), firmware revision, the network address for each device, the number of Echelon controllers (E2s) that are online or offline, and the number of I/O boards online or offline. After determin ing which board is offline, turn to Appendix F: Trouble shooting for more information.

Press . Information on the condenser such as con trol setpoints, detailed fan status, and other general infor mation will be displayed.

Press . Select which circuit status to view with the arrow buttons and press . Information such as current temperature, current state, individual case informa tion, and other information are given.

To access the Network Summary screen:

1. From the Main Menu screen, press ( Status ) for the Status menu.
2. Press ( Network Summary ) and the Network Summary screen will be displayed.

Press . Select an analog or digital sensor and press . Information such as control value, and com mand values will be displayed. The analog sensor will have Cut In/Cut Out temperature values.

The Network Summary screen can also be accessed by:

1. From the Main Menu screen, press ( System Configuration ).
2. Press ( Network Setup ) for the Network Setup menu.

Figure 12-19 - BX Function Button Menu

3. Select ( Network Summary ) and the Network Summary screen opens.

The E2 BX controller has four status screens that are each accessible (from the Home screen) by pressing the corresponding function key.

Press . The AHU information such as control temperature, season mode, space humidity, apparent tem perature, heat/cool mode, fan state, economization status, dehumidification, and humidity status are all included on this screen.

Checking Boards Online Operator’s Guide to Using the E2 • 12-11

Show 4 more labels / short text on this page
Condenser Status Screen · Circuit Status Screen · Sensor Status Screen · AHU Status Screen
Page 216 of the Emerson E2 user manual — 12.10 Alarms
Page 216 · click to enlarge
Page 216

12.10.2 Viewing the Controller Advisory Log

Press . Zone information including outdoor and zone temperature, outdoor humidity, season mode, occu pied state, and economization status are displayed in the Zone Status screen.

The current number of advisory log entries (the log that is highlighted) is displayed at the top right of the Advisory Log Screen. The total number of alarms and/or notices in the Advisory Log is displayed below the current field. To move between Advisory Log entries, press the up or down arrow key.

Press . Lighting status information can be found on this screen. Check light level, bypass, and other modes from here.

Press . Select an analog or digital sensor and press . Information such as control value, and com mand values will be displayed. The analog sensor will have Cut In/Cut Out temperature values.

Emerson E2 — 12.10.2 Viewing the Controller Advisory Log diagram (page 216)
Fig. 209 · 12.10.2 Viewing the Controller Advisory Log

Other status screens in the E2 controller may be

accessed by selecting (Configured Applications) from the Main Menu. This menu gives you access to Summary and Status screens such as Anti-Sweat, Power Monitoring, Time Schedules, Holidays, and many more. To gain access to any of the given applications, select the corresponding number and press .

Figure 12-20 - Alarm Advisory Log

The Advisory Log is divided these categories:

12.10 Alarms

  • Date
  • Time

This section describes how to view and use the Alarm Advisory Log. 12.10.1 Accessing the Alarm Advi sory Log

  • State
  • Area Ctrl: Application: Property
  • Message 12.10.3 Date and Time

The Alarm Advisory Log can be accessed by pressing the alarm icon key on the controller.

The Date and Time columns simply display the date and time when the alarm or notice was generated and logged into the controller. 12.10.4 State

The State column describes the alarm type, the current alarm state, and whether or not the alarm has been acknowledged. There are three possible alarm states:

  • ALARM - A high-priority warning, usually signify ing a condition that requires attention.
  • NOTICE - A low-priority message, usually signify ing a condition or a system change that requires no attention or may require attention in the future.
  • FAIL - A failure is a special message that signifies a failure in an E2 system, an application, or in an input or output device controlled by an application (such as a sensor or fan).Returned-To-Normal and
Show 4 more labels / short text on this page
Zones Status Screen · Lighting Status Screen · Sensors Status Screen · Other Status Screens
Page 217 of the Emerson E2 user manual — 12.10.5 Ack/Reset State
Page 217 · click to enlarge
Page 217

12.10.7 Advisory Message

For as long as the condition that caused the alarm mes sage exists, the State field will show either ALARM, NOTICE, or FAIL as appropriate to the alarm type. How ever, if the condition that caused the alarm, notice, or fail ure is corrected, the message shown in the State field will change to signify the correction.

The Advisory Message column is a brief description of the alarm, notice, or failure. Because of screen size con straints, it is often the case that the full advisory message will not be displayed in the Message field. To view the full advisory message, as well as the alarm priority and other important alarm information, press (EXPD INFO) for Expanded Information.

There are two ways an alarm, notice, or failure condi tion may be corrected:

  • Return-To-Normal - “Return-To-Normal” means the condition that generated the alarm, notice, or failure has returned to normal on its own, or the E2 has automatically corrected the condition. If an alarm returns to normal, a “N-” will appear in front of the alarm state in the State field.
Emerson E2 — 12.10.7 Advisory Message diagram (page 217)
Fig. 210 · 12.10.7 Advisory Message
  • Reset (Forced)-To-Normal - “Reset-To-Normal” means the E2 has been forced by a user to consider the condition “normalized” for purposes of alarm control. A Reset-To-Normal occurs when an alarm is reset using the Alarm Reset button (ALARM RST). If an alarm is forced to normal, an “R-” will appear in front of the alarm state in the State field.

Figure 12-21 - Expanded Info Screen

12.10.8 Acknowledging, Resetting, and Clearing Log Entries

Table 12-9 lists the nine possible state messages as they appear in the State field.

12.10.8.1 Acknowledging

When an alarm, notice, or failure is acknowledged, the alarm stays in the Alarm Log, but all annunciation of the alarm is suspended until the alarm is reset or cleared. As stated in Section 12.10.5, the state of the alarm or notice will also change to a dash “—” indicating acknowl edgement.

Advisory Type Condition Still Exists

Alarms ALARM N-ALM R-ALM

When you acknowledge an alarm, you prevent it from ever annunciating again in any way until you manually reset or clear the alarm. A condition that causes an alarm will never automatically return to normal when it is acknowledged.

Failures FAIL N-FL R-FL

Table 12-9 - Alarm States

12.10.5 Ack/Reset State

For setting acknowledging permissions, see Section 10.12.1, Changing Required User Access Levels.

The State field also shows whether or not an advisory record has been acknowledged or reset by a user. If an alarm has been acknowledged or reset, a dash “—” will appear at the end of the State field. If an alarm has not been acknowledged or reset, an asterisk “*” will appear at the end of the State field. 12.10.6 Area Ctrl: Application: Property

This column describes where the alarm, notice, or fail ure was generated from. Alarms and notices can either be generated within the E2 system or from an input value that is higher or lower than an alarm or notice setpoint defined during the system configuration process.

Alarms Operator’s Guide to Using the E2 • 12-13

Show 6 more labels / short text on this page
Forced-To-Normal Alarms · Condition Returned To · Condition · Reset to · Normal · Normal
Page 218 of the Emerson E2 user manual — 12.10.8.3 Clearing
Page 218 · click to enlarge
Page 218

prompting the user to either clear the selected advisory, clear all advisories or to cancel the operation.

TIPS: ACKNOWLEDGEMENT VS. RESETTING

1. Press to clear the selected advisory.
  • Reset an alarm if you believe the condition that caused it is fixed, but you wish for a new alarm to occur if the problem happens again.
2. Press to clear all advisories.

3. Press to cancel the operation.Expanded Advi sory Information

  • You MUST reset an alarm that has been previ ously acknowledged to re-enable alarming for the alarm. Failure to do so will cause the alarm to remain in ACK, and the alarm will not be gen erated again. AN ACKNOWLEDGED ALARM WILL NOT AUTOMATICALLY RESET.
  • Acknowledge an alarm to silence alarm panel horns or lights, ONLY IF technicians have been notified of the problem and have been dis patched. Technicians, after fixing the problem, MUST reset or clear the alarm to re-enable alarming.

Figure 12-22 - Expanded Info Screen

To acknowledge an alarm or notice, highlight the desired log entry and press (ALARM ACK). A screen will come up prompting the user to either acknowl edge the selected advisory, acknowledge all advisories, or to cancel the operation.

To view expanded information on a log entry, highlight the desired log and press (EXPD INFO). A screen will come up telling the user what advisory is being viewed out of a total number of advisories.

  • Press to acknowledge the selected advisory.

This message shows the location where the advisory was generated. This will be a board and point address or an application input or output (in Area Ctrl:Applica tion:Property) format.

  • Press to acknowledge all advisories.
  • Press to cancel the operation.

12.10.8.2 Resetting

The advisory message is displayed below the Property or Board/Point. The Advisory Message describes the advi sory log entry (what went wrong in the system).

When a log entry is reset, it is forced to a normal con dition and the log entry remains in the Controller Advisory Log.

An alarm, notice, or failure can be reset by highlight ing a log entry and pressing (ALARM RST) while at the Advisory Log screen. A screen will come up prompt ing the user to either reset the selected advisory, reset all advisories or to cancel the operation.

Acknowledge Status describes the state of the advi sory. If an advisory has been acknowledged or reset, the user name or the person who acknowledged or reset the alarm will appear below the acknowledge status. The date and time when the advisory was acknowledged or reset will also be displayed below the user’s name.

1. Press to reset the selected advisory.

If the advisory has not been acknowledged or reset, this field will display an asterisk “*” along with the word “UNK.”

2. Press to reset all advisories.
3. Press to cancel the operation.

12.10.8.3 Clearing

The report priority fields describe the priority level of the advisory, as well as the date and time the advisory occurred.

The option to clear logs completely removes a log entry from the Advisory Log.

Advisory Log entries may be cleared by highlighting the log entry and pressing (ALARM CLR) while viewing the Advisory Log screen. A screen will come up

If the advisory has returned to a normal state, either on its own or because of a user-ordered alarm reset, the date

Show 5 more labels / short text on this page
Property or Board/Point · Advisory Message · Acknowledge Status · Report Priority · Return To Normal
Page 219 of the Emerson E2 user manual — 12.11 Viewing Logs and Graphs
Page 219 · click to enlarge
Page 219

and time on which the reset occurred will be shown beside the report priority. 12.10.9 Facility Status Display (FSD) Alarms

graph. 12.11.1 Locating Logged Inputs/ Outputs

12.11.1.1 Home/Status Screens

The FSD can be used to handle alarms. Information such as time stamp, alarm ID string, current status, the rea son an alarm was triggered, (if a case temp limit was exceeded) configured priority of the advisory, Return-To- Normal information, and if available, the limit that was exceeded can be viewed through the FSD. Alarms cannot be configured from the FSD unit.

Emerson E2 — 12.11.1.1 Home/Status Screens diagram (page 219)
Fig. 211 · 12.11.1.1 Home/Status Screens

If more than one E2 controller is at a site, one E2 must be set up as the alarm annunciator for that site. The FSD will receive alarms from that alarm-annunciator E2 for the entire site. The FSD will point only to a single E2 at a site (it will not poll multiple controllers for alarms). For more information, refer to the FSD Manual (P/N 026-1400).

Figure 12-24 - Sample Actions Menu From RX Home Screen

The easiest way to access a log or graph is from the Actions menu while on the Home screen or an applica tion’s Status screen. These screens contain a number of different input and output values from the application. If a particular input or output is being logged by the E2 and has log data stored in the system, you can view the log or graph by following the instructions below:

Emerson E2 — 12.11.1.1 Home/Status Screens diagram (page 219)
Fig. 212 · 12.11.1.1 Home/Status Screens
1. Use the arrow keys to highlight the desired input or output on the Home or a Status screen.

2. Press to call up the Actions Menu, and

select either option to view a graph or to view a log.

Figure 12-23 - FSD General Setup

If Graph and Log options are not listed in the Actions Menu, this means the property you have selected is not set up to be logged.

12.11 Viewing Logs and Graphs

It may also be the case that there are currently no logged values to be viewed (this often happens when a controller is first set up or after a log has been cleared). If this is the case, E2 will tell you that no logged samples exist. For a complete list of items in the Actions Menu, refer to Section 10.7.3, The Actions Menu.

There are two basic forms used by the E2 to display data: logs and graphs.

A log is simply a list of sampled values for a particular input or output along with the sampling times and dates. When you view logged data in this form, it is usually listed with the most recent sample at the top of the list, and the other samples listed below it in reverse chronological order.

A graph is a graphical representation of these log entries that shows how the sampled value has changed over time. Graphing is a quick, easy way to get an idea of how the application has been behaving. Special graphing features also allow you to zoom in on specific areas of the

Viewing Logs and Graphs Operator’s Guide to Using the E2 • 12-15

Page 220 of the Emerson E2 user manual — 12.11.1.2 Setup Screens
Page 220 · click to enlarge
Page 220

12.11.1.2 Setup Screens

To set up pointers from a Setup screen:

1. Press ( SETUP ) from the desired applica tion’s Status screen. (If starting from the Home screen, move the cursor to the desired applica tion’s value and press to open the Actions Menu. Choose Setup . This will take you to the Setup screen.)
Emerson E2 — 12.11.1.2 Setup Screens diagram (page 220)
Fig. 213 · 12.11.1.2 Setup Screens
2. Once inside the application’s Setup screen, use the and keys to highlight the Inputs and Outputs index tabs.
3. Press ( EDIT ) to open the Edit menu.
4. Choose Alternate I/O Formats to open the for mat menu.

Figure 12-25 - Example Setup Screen (Setpoints)

5. Choose one of the pointer formats.

If you are in the Inputs setup and have selected Area Ctrl: Application: Property as the pointer format, the third column (the Output field) is the output that you are pointing (connecting) the input to. If you are in the Out puts setup and have selected Area Ctrl: Application: Property as the pointer format, the third column (the Input field) is the input that you are pointing (connecting) the output to.

When setting up an application using a Setup screen (see Section 10.7.2, Status Screens) all inputs and outputs that are set up to be logged will be marked with an L on the right-hand side. From the Setup screen, you may access the logs of these inputs by pressing . 12.11.1.3 Setting Up Input and Output Pointers

Changing the format to a Fixed Value will give you the option of entering a value in the field that will be read by the input instead of being hooked to a board:point or another cell.

Emerson E2 — 12.11.1.2 Setup Screens diagram (page 220)
Fig. 214 · 12.11.1.2 Setup Screens

For information on naming conventions for E2 control lers, applications, and points, see Section 12.12, Naming Conventions for E2 Controllers, Applications, and Points. 12.11.2 Log View

Emerson E2 — 12.11.1.2 Setup Screens diagram (page 220)
Fig. 215 · 12.11.1.2 Setup Screens

Figure 12-26 - Pointer Format Box

Pointers allow a property to get or send its value to another property, and are a way to transfer information or values (input and outputs) from one application to another within a controller.

For example, if you are setting up a Suction Pressure pointer, you are specifying the location of where the Suc tion Pressure is coming from. Note that:

Figure 12-27 - Sample Log View

  • An output pointer can be connected to multiple input pointers

The Log view shows logged data in a tabular format arranged by the date/time of sample.

  • A single input pointer cannot be connected to mul tiple output pointers
1. Highlight a value from any screen and press to open the Actions Menu.
  • Pointers can be set up for all applications
Page 221 of the Emerson E2 user manual — 12.12 Naming Conventions for E2 Controllers, Applications, and Points
Page 221 · click to enlarge
Page 221
2. Select Log , and the Log screen opens.

Upon first entering the Graph view for a logged value, all available samples are displayed. The X axis (sample time) ranges from the time and date of the earliest avail able sample relative to the time and date of the latest sam ple. The Y axis (sample value) ranges from the minimum sensor reading to the maximum sensor reading.

Several function keys may be used to navigate the Log view and provide additional information:

  • BEGINNING - Move the cursor to the top of the table (the most recently recorded sample).
  • END - Move the cursor to the bottom of the table (the oldest sample).

In the case of an input point log, (e.g., suction pres sure) assume the Log Group setup specifies Samples as 1000 and Log Interval as 0:03:00. Also assume that the system has been running continuously with no interrup tions for one week. The X axis would span a time interval starting approximately six days and six hours ago all the way up to the present.

  • GRAPH - Displays logged data in a graph format (see Sample Graph View Figure 12-28 ).
  • UPDT DATA - Pressing this key updates the Log View by adding all newly recorded samples to the top of the table.

If suction pressure ranged from 18 psi to 25 psi during the time period of the log, the Y axis of the graph would be just large enough to show all samples in the log. 12.11.4 Zooming In and Out

  • EXPD INFO - Pressing this key will display the board/point address or the controller/applica tion/property address for the point that is being logged.
  • Page Up - Scrolls up one page.

For a more detailed view of a graph, zoom in by press ing . This results in half of the samples of the current view being redrawn to fill the entire view. Using the above example, the graph would now shows three days and three hours of samples from the middle of the original graph. Pressing again zooms in even farther.

  • Page Down - Scrolls down one page.

12.11.3 The Graph View

Pressing zooms out, resulting in a graph whose time scale spans twice that of the previous view. This dou bles the number of displayed samples.

Emerson E2 — 12.11.3 The Graph View diagram (page 221)
Fig. 216 · 12.11.3 The Graph View

Navigating a Zoomed View

While zoomed in on a graph, only a subset of the total number of samples are visible. To view samples that were recorded earlier or later than those in the current view, press the left and right cursor keys. The availability of ear lier or later samples is indicated by the presence of arrows at either end of the X (time) axis.

12.12 Naming Conventions for E2 Controllers, Applications, and Points

  • Do not name applications, controllers, or points with all numeric characters.

Figure 12-28 - Sample Graph View

The Graph view shows logged data in a graphical for mat with sample times as the X (horizontal) coordinate and sample values as the Y (vertical) coordinate. To access a graph view:

  • Do not use colons (:) in the names of applications, controllers, or points.
1. Highlight a value from any screen and press to open the Actions Menu.
2. Select Graph , and a graphed view of the selected value opens.

Naming Conventions for E2 Controllers, Applications, and Points Operator’s Guide to Using the E2 • 12-17

Page 222 of the Emerson E2 user manual — 12.13 Multiple Languages
Page 222 · click to enlarge
Page 222

12.13 Multiple Languages

The multiple language feature allows the UI to be switched between English and other languages using the Ctrl+S Hot Key on the E2 front panel.

Page 223 of the Emerson E2 user manual — Appendix A: Case Type Defaults
Page 223 · click to enlarge
Page 223

Appendix A: Case Type Defaults

The table below lists the sixty-four default case types that may be used in Standard Circuit or Case Control Cir cuit applications along with the recommended defaults for each case type.

High Alarm, Low Alarm, and Delay

The High Alarm, Low Alarm, and Delay columns are the suggested high and low case temperature alarm set points and the report delay. To set up these alarm setpoints and delays, locate the Case Temperature control input and select the Generic Alarm Setup action from the Actions Menu. Enter the High and Low setpoints in the Normal Hi and Normal Low fields respectively. Enter the Delay in the Report Delay field.

When one of these sixty-four case types is selected, the E2 automatically enters the following information from the table into the Circuit application:

  • The setpoint
  • The number of defrosts per day and the defrost time length from the “Elec” column under Defrost types

The E2 assumes by default that all cases have electric defrost. If this is not the case, you will have to enter new values for the Number of Defrosts and the Defrost Time in the circuit. The suggested defaults are listed under the Hot Gas, Elec, Rev. Air, and Timed columns. The number to the left of the slash indicates the suggested number of defrost times per day, and the number to the right of the slash indicates the recommended Defrost Time length.

For example, if you select #14 “RIFF” (reach-in frozen food), the E2 sets the circuit’s setpoint at -10, the number of defrosts at 1, and the defrost time at 60 minutes.

The other columns in this table, such as the High and Low Alarm/Dly columns and the Hot Gas, Rev. Air, and Timed columns, are suggested values that are not automat ically entered into the Circuit application.

Elec. (DEF) Rev. Air Timed 0 **** Undefined 1 SDIC Single deck ice cream -25 -5° -30° 01:00 2/18 1/45 1/60 1/60 2 MDIC Multi-deck ice cream -25 -5° -30° 01:00 3/22 3/45 2/60 2/60 3 SDFJ Single deck freezer juice -18 0° -30° 01:00 2/18 1/45 1/60 1/60 4 MDFJ Multi-deck freezer juice -10 5° -25° 01:00 3/22 3/45 2/60 2/60 5 RIIC Reach-in ice cream -15 -5° -25° 01:00 2/22 1/45 1/60 1/60 6 ICBX Ice cream freezer box -20 -5° -30° 01:00 3/20 2/45 2/60 2/60 7 SDFF Single deck freezer food -15 5° -25° 01:00 2/18 1/60 1/60 1/60 8 RIFJ Reach-in freezer juice -15 -5° -20° 00:15 2/22 1/45 1/60 1/60 9 FRBX Frozen food box -12 -5° -20° 00:15 3/18 3/45 2/60 2/60 10 FFBX Frozen fish box -12 -5° -20° 00:15 3/18 3/45 2/60 2/60 11 FJBX Frozen juice box -12 -5° -25° 01:00 3/18 3/45 2/60 2/60 12 MDFF Multi-deck freezer food -10 0° -20° 01:00 2/22 1/45 2/60 2/60 13 FZBK Multi-deck freezer bakery -10 0° -20° 01:00 2/22 1/45 2/60 2/60 14 RIFF Reach-in freezer food -10 5° -15° 01:00 1/20 1/60 1/60 1/60 15 SDMT Single deck meat 22 32° 12° 01:00 3/18 3/45 3/60 3/60 16 SDPF Single deck prepared 22 32° 12° 01:00 3/18 3/45 3/60 3/60 17 PZZA Single deck pizza 22 32° 12° 01:00 3/18 3/45 3/60 3/60 18 KOSH Single deck kosher 22 32° 12° 01:00 3/18 3/45 3/60 3/60 19 SDFH Single deck fish 22 32° 12° 01:00 3/18 3/45 3/60 3/60 20 MDMT Multi-deck meat 23 34° 18° 01:00 4/18 4/45 4/60 4/60 21 MDPO Multi-deck poultry 23 34° 18° 01:00 4/18 4/45 4/60 4/60 22 MDFH Multi-deck fish 23 34° 18° 01:00 4/18 4/45 4/60 4/60 23 RIMC Reach-in meat 25 35° 15° 01:00 2/18 2/45 2/60 2/60 24 SVMT Service meat 22 35° 15° 01:00 2/18 2/45 2/60 2/60 25 SVFH Service fish 22 35° 15° 01:00 2/18 2/45 2/60 2/60 26 MTBX Meat cooler 30 42° 22° 01:00 3/18 3/45 2/60 2/60

Low Alarm Delay Hot Gas

Type Abbr. Description

Table A-1 - Case Type Default Settings

Appendix ACase Type Defaults • A - 1
Show 4 more labels / short text on this page
Defrost Type · Defrost Type · Set Point · High Alarm
Page 224 of the Emerson E2 user manual — Appendix A: Case Type Defaults
Page 224 · click to enlarge
Page 224

Low Alarm Delay Hot Gas

Elec. (DEF) Rev. Air Timed

Type Abbr. Description

27 HDBX Meat holding box 30 44° 22° 01:00 3/18 3/45 2/60 2/60 28 DYCS Multi-deck dairy 35 44° 24° 01:00 4/20 4/45 2/60 4/60 29 RFDY Rear load dairy 28 38° 18° 01:00 4/20 4/45 2/60 4/45 30 RIDY Reach-in dairy 30 40° 20° 01:00 4/20 4/45 2/60 2/60 31 DYBX Dairy cooler 34 44° 24° 01:00 2/22 2/45 2/60 2/60 32 BKBX Bakery Cooler 36 46° 26° 01:00 2/22 2/45 2/60 2/60 33 PRBX Produce cooler box 36 50° 30° 01:00 2/22 2/45 2/60 2/60 34 MILK Milk case 34 40° 20° 01:00 4/20 4/45 2/60 2/60 35 PKDL Packaged deli 32 38° 18° 01:00 4/20 4/45 2/60 2/60 36 DLDS Deli display case 34 38° 18° 01:00 4/20 4/45 2/60 2/60 37 CHEZ Cheese case 34 40° 20° 01:00 3/18 3/45 2/45 2/60 38 POBX Poultry box 36 42° 22° 01:00 4/20 4/45 2/45 2/60 39 BEER Beer/Beverage 34 44° 24° 01:00 2/18 2/45 2/45 2/60 40 BVCS Beverage case 34 44° 24° 01:00 2/18 2/45 2/45 2/60 41 DLBX Deli cooler box 36 46° 26° 01:00 3/18 3/45 2/45 2/60 42 FHBX Fish cooler box 36 46° 26° 01:00 3/18 3/45 2/45 2/60 43 SVDL Service deli 32 42° 22° 01:00 2/16 2/45 2/60 1/40 44 PRCS Produce case 35 45° 25° 01:00 2/16 2/45 2/60 3/40 45 ISPR Produce case (island) 35 45° 25° 01:00 2/16 2/45 2/60 1/60 46 SALD Salad table 36 50° 30° 01:00 2/16 2/45 2/60 1/60 47 FLBX Flower cooler box 40 54° 34° 01:00 2/16 2/45 2/60 2/40 48 FLWR Flower cooler 40 54° 34° 01:00 2/16 2/45 2/60 2/40 49 CTBX Controlled temp box 50 75° 40° 00:15 2/16 2/45 2/60 2/45 50 SDPO Single deck poultry 24 38° 18° 01:00 2/16 2/45 2/45 2/60 51 CAKE Bakery cake case 40 55° 35° 01:00 2/16 2/45 2/45 2/60 52 BART Bakery retarder 35 60° 40° 01:00 2/16 2/45 2/45 2/60 53 RTDR Bakery retarder 35 60° 40° 01:00 2/16 2/45 2/45 2/60 54 MTPK Meat packaging room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 55 MTCU Meat cutting room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 56 MTPR Meat prep room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 57 MTWR Meat wrapping room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 58 FHPR Fish prep room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 59 SBCL Subcooler 55 60° 45° 00:15 2/16 2/45 2/60 2/45 60 PRPR Produce prep room 55 65° 45° 01:00 2/16 2/45 2/45 2/90 61 SDFM Single deck freezer meat -10 0° -20° 01:00 2/18 2/40 1/35 1/45 62 RIFM Reach-in freezer meat -10 2° -18° 01:00 2/18 2/40 1/35 1/45 63 MDFM Multi-deck freezer meat -10 0° -20° 01:00 2/18 2/40 2/60 2/45 64 BKFZ Bakery freezer box -12 -2° -22° 01:00 2/18 2/30 2/60 2/45

Table A-1 - Case Type Default Settings

A-2 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Defrost Type · Set- Point · High Alarm

Page 225 of the Emerson E2 user manual — (VDC)
Page 225 · click to enlarge
Page 225
Appendix BPressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensors

Emerson Retail Solutions Temperature Sensors

Resistance (ohms) Temperature (F)

(VDC)

100 lb. xducer

200 lb. xducer

500 lb. xducer

0.5 0 0 0

0.7 5 10 25

0.9 10 20 50

1.1 15 30 75

1.3 20 40 100

1.5 25 50 125

1.7 30 60 150

1.9 35 70 175

2.1 40 80 200

2.3 45 90 225

2.5 50 100 250

2.7 55 110 275

2.9 60 120 300

Table B-1 - Temp Sensor Temperature/Resistance Chart

3.1 65 130 325

3.3 70 140 350

3.5 75 150 375

3.7 80 160 400

3.9 85 170 425

4.1 90 180 450

4.3 95 190 475

4.5 100 200 500

Table B-2 - Eclipse Voltage to Pressure Chart

Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensors • B-1

Show 17 more labels / short text on this page
Eclipse Transducers · Voltage · Pressure (PSI) · 336,450 -40 · 234,170 -30 · 165,210 -20 · 118,060 -10 · 85,399 0 · 62,493 10 · 46,235 20 · 34,565 30 · 26,100 40 · 19,899 50 · 15,311 60 · 11,883 70 · 9,299 80 · 7,334 90
Page 226 of the Emerson E2 user manual — Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensors
Page 226 · click to enlarge
Page 226
Page 226 of the Emerson E2 user manual — Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensors
Page 227 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 227 · click to enlarge
Page 227

Appendix C: Alarm Advisory Messages

The table below is a list of all alarm messages that may appear in E2’s Alarm Advisory Log. Each alarm message is listed by its Alarm Name, which is the text recorded in the Alarm Advisory Log when the error occurs, and the Default Priority, which is the default priority value for the alarm. A Default Priority of “User” indicates the alarm type’s priority is programmed by the user during application setup.

Alarm Name Default Priority Definition

# Of Events Exceeded Limit User A digital value has transitioned ON more times than its defined Number of Events setpoint. 50/60 Hz Line Clock Is Bad 20 E2 is not successfully synchronizing its clock with the 50/60 Hz pulse of its incoming power. A FreezeStat Input Is Too Low User A temperature sensor on an HVAC cooling stage is lower than the programmed freezestat setpoint, indi cating possible coil freeze. Access Log Lost - CRC Error 20 An internal error has caused the loss of E2’s user access log. Advisory Log Lost - CRC Error 20 An internal error has caused the loss of E2’s alarm advisory log. Alarm Limit Exceeded User An Analog Sensor or a Suction Group has an input value greater than one of its high limit setpoints. Alarm(s) Were Cleared 99 A user has erased one or more alarms from the alarm advisory log. Alarm(s) Were Reset 99 A user has reset one or more alarms from the alarm advisory log. All Config/Logs Were Cleared 30 A user has performed a clean out on this E2, remov ing all programming and stored data. All Lights On User A Global Data application’s All Lights On input has turned ON to switch on all the lights. All network connections used 50 Echelon controller has reached its limit of bound NVs Alternate Hi Limit Exceeded User An analog value in an application using “alternate” setpoints has risen above its programmed Hi Limit setpoint. Alternate Low Limit Exceeded User An analog value in an application using “alternate” setpoints has risen above its programmed Lo Limit setpoint. Appl Not Keeping Setpoint User An Air Handling Unit or Heat/Cool Heat/Cool appli cation has not achieved setpoint for a prolonged period of time. Application Cell Is Lost 15 An internal error has caused the loss of an entire application cell. Application Config Has Changed 99 A user has changed the configuration of one of E2 applications.

Appendix CAlarm Advisory Messages • C - 1
Page 228 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 228 · click to enlarge
Page 228

Alarm Name Default Priority Definition

Application Setpoint Has Changed 99 A user has changed a setpoint in one of E2’s applica tions. Application Was Created 99 A user has created a new application in this E2. Application Was Deleted 99 A user has deleted an existing application in this E2. ARTC/MultiFlex RTU Override Switch Stuck

20 An override switch on an ARTC/ MultiFlex RTU has been ON for a prolonged period of time, suggesting a possible switch failure. ARTC/MultiFlex RTU Reset From Power Failure

50 An ARTC/MultiFlex RTU lost power and reset when power was restored. Attempt To Write Past Mem. EOB 50 The E2 attempted to write data to memory, but the memory was full. Average Log Stuck-No Memory 15 The Average Log cannot be written because there is not enough memory. Bad Modem 20 The modem on this E2 is not functioning properly. Battery backed memory lost 30 Battery backed memory loss not due to cleanout. Batt Runtime Limit 99 Battery runtime has exceeded 80% of the battery life time. Binding Input To Output Failed 20 A valid connection could not be made between an input and an output. BIOS/BIOS Ext. Update Failed 20 An update to the E2’s BIOS has failed. BIOS/BIOS Extension Updated 50 The E2’s BIOS was successfully updated. Can’t Set Hardware Clock 20 The E2 is unable to change the time on its hardware clock. Case Cleaning Was Started User A case circuit has entered clean mode. Case Temp Hi Limit Exceeded User A single temperature sensor in a Standard Circuit or Case Control Circuit is recording a temperature higher than its defined case temperature high set point. Case Temp Low Limit Exceeded User A single temperature sensor in a Standard Circuit or Case Control Circuit is recording a temperature lower than its defined case temperature low setpoint. Cell Config Not Restored 15 E2’s attempt to restore configuration data to its appli cations has failed. Cell Create Failed For Restore 20 E2 attempted to create new applications as part of the configuration restoration process and failed to do so successfully. Checkit Sensor Has Failed User A Checkit sensor is returning an invalid temperature value, indicating a sensor failure. Checkit Sensor Is Alarming User A Checkit sensor on a Suction Group application is recording a high temperature. Checkit Sensor Is In Notice User A Checkit sensor’s temperature is above its pro grammed notice setpoint.

C-2 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 229 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 229 · click to enlarge
Page 229

Alarm Name Default Priority Definition

Comb Temp Hi Limit Exceeded User The combined temperature of an entire Standard Cir cuit or Case Control Circuit has risen above its pro grammed high temperature setpoint. Comb Temp Low Limit Exceeded User The combined temperature of an entire Standard Cir cuit or Case Control Circuit has fallen below its pro grammed low temperature setpoint. Commission failed-chk network 50 Commission of Echelon controller failed; binding of NV was not successful. Check the Echelon network. Communication Port 1 Is Down 20 E2 cannot communicate with the RS232 port on the E2 main board. The E2 main board likely needs repair or replacement. Communication Port 2 Is Down 20 E2 cannot communicate with the RS485 network port on the E2 main board. The E2 main board likely needs repair or replacement. Communication Port 3 Is Down 20 E2 cannot communicate with the modem slot on the E2. The E2 main board likely needs repair or replace ment. Communication Port 4 Is Down 20 COM4 is used by service personnel to attach hard ware used in test or debug functions. This alarm indi cates the port that allows E2 to communicate with these devices is faulty. The E2 board likely needs repair or replacement. Communication Port 6 is down 20 E2 cannot communicate with port 6 on the E2 main board. Completed Firmware Update 50 The E2’s firmware was successfully updated. Config Loss - Chg In Tmpl Rev. 15 Due to a difference between configuration templates in a previous E2 version and templates in the current version, configuration data could not be restored. Config Loss-CRC Error 15 Due to an internal error, E2 has lost configuration data. Config Loss-File CRC Error 15 Due to an internal error, E2 has lost configuration data. Config Not Saved To Flash 20 E2 could not save configuration data to flash mem ory. Controller (or Device) Absent From Network

20 The current E2 could not find the specified E2, I/O board, or Echelon controller Controller Reset 50 An ARTC/MultiFlex RTU has gone through a reset. Controller Shutdown 50 The E2 has gone through a shutdown. Controller Startup 50 The E2 has re-started after a shutdown.

Appendix CAlarm Advisory Messages • C - 3
Page 230 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 230 · click to enlarge
Page 230

Alarm Name Default Priority Definition

Controller Type Mismatch 20 A device on the Echelon network is of a different type than the user has specified. In other words, a user might have wired a device such as a CC-100P to the network but set it up in the E2 software as a CC- 100LS. Check your network setup and if necessary reconfigure the device with the correct type. Controller Was Warm-booted 50 A user has reset the E2 using the “reset” button on the main board. Couldn’t Get File Handle 20 E2 tried to get a file from its memory and failed to do so. This alarm likely indicates one or more templates in the E2 software have been corrupted. Contact Emerson Retail Solutions service for further assis tance. Curtail On User A Curtailment device set up in Global Data has acti vated to begin curtail. DFMC Standby Mode 20 A DFMC is put into standby by a service technician; it indicates the unit is not actually controlling. DFMC Check Clock Settings 99 Sent by the DFMC when it has lost its internal time- of-day, E2 will resend the time upon receipt and this alarm should return-to-normal without user interac tion. DFMC Over Max Defrost 20 A defrost duration was in excess of the maximum limit defined. For example, the case is not defrosting within spec. DFMC Over Max Fan Delay 30 Maximum fan delay time has been exceeded. DFMC Inject Alarm 30 Related to the case's ability to get refrigerant into the coil. For example, this alarm may occur if the case is not being supplied with the proper temperature refrigerant. DFMC Door Alarm 99 Door to a case has been left open too long. Defrost terminated on Time 30 EC2, EC3 Defrost terminated on Temp. 30 EC2, EC3 Dest. Mem. Not Allocated Block 50 An internal error has occurred in the E2. Dest. Mem. Out Of Stack Bounds 50 An internal error has occurred in the E2. Device Absent From Network 20 The current E2 could not find the specified E2, I/O board, or Echelon controller Diagnostic Rate Change Failed 20 A user tried to change the update rate of a CC-100, RT-100, or similar Echelon device, but the change was not accepted. Try the update rate change again. If this alarm persists, call Emerson Retail Solutions ser vice. Dial To Day Time Site 1 Failed 20 E2 tried to dial out to the site listed as Day Time Site 1 and was unsuccessful.

C-4 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 231 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 231 · click to enlarge
Page 231

Alarm Name Default Priority Definition

Dial To Day Time Site 2 Failed 20 E2 tried to dial out to the site listed as Day Time Site 2 and was unsuccessful. Dial To Day Time Site 3 Failed 20 E2 tried to dial out to the site listed as Day Time Site 3 and was unsuccessful. Dial To Night Site 1 Failed 20 E2 tried to dial out to the site listed as Night Site 1 and was unsuccessful. Dial To Night Site 2 Failed 20 E2 tried to dial out to the site listed as Night Site 2 and was unsuccessful. Dial To Night Site 3 Failed 20 E2 tried to dial out to the site listed as Night Site 3 and was unsuccessful. Did Not Defrost User A case circuit did not enter defrost at its scheduled time. Did Not Exit Defrost User A CC-100 or CS-100 that entered defrost did not ter minate or exit defrost at its programmed time. Did Not Exit Wait User A CC-100 or CS-100 terminated defrost and entered the WAIT state, but did not exit the WAIT state when refrigeration re-started. Did Not Exit Wash User A CC-100 or CS-100 did not exit Clean Mode. Did Not Respond To command User A CC-100 or CS-100 did not respond to an E2 com mand. Did Not Terminate Defrost User Defrost in a standard circuit lasted for its entire pro grammed time duration and did not terminate. Usu ally this means the termination sensor did not record a temperature higher than its setpoint, but it could also mean sensor failure has occurred. Did Not Wash User A case circuit that was ordered to go into cleaning mode did not successfully enter Clean Mode. Differential Limit Exceeded User The difference between the supply air temperature and the return air temperature in an HVAC applica tion was less than the programmed heating or cooling differential setpoint. This might indicate a problem with cooling or heating. Dirty Filter Detected 30 A filter-checking device connected to an ARTC/ MultiFlex RTU is detecting a dirty filter. Discharge Trip User A high discharge pressure detected by a Suction Group application has caused an emergency shut down of the compressor rack. Door Open 30 EC2, EC3 Duplicate Controller Names 20 Two controllers on the network have the same names. One of them will need to be renamed to prevent com munications problems. Events Per Hour Exceeded Limit User A digital value has transitioned ON more times in the past hour than its defined Events Per Hour setpoint.

Appendix CAlarm Advisory Messages • C - 5
Page 232 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 232 · click to enlarge
Page 232

Alarm Name Default Priority Definition

External Fault 30 An external fault input defined in a Multiflex PAK controller has indicated a failure. External fault inputs in the PAK are used to detect a Rack (Pack) failure produced by some device out of the PAK's control. Failed Attempt To Bind Input 50 A valid link could not be made between an E2 appli cation and an input assigned to it. Failed Sensor Or Bad Wiring 20 E2 is unable to get a valid sensor value due to a possi ble hardware problem. Failed To Create logging 20 E2 is unable to create logs for the input or output shown. Failed to Obtain DHCP Lease 20 Failed to obtain a DHCP lease from the DHCP Server, when a lease is requested. This happens at system startup, if a DHCP lease is requested, or if the user switches to using DHCP. Failed to Renew DHCP Lease 20 DHCP Lease failed to renew altogether. DHCP Leases are renewed at an interval of half the time of the requested lease. If the lease is for 5 days, then a renewal will happen at 2.5 days. If this fails, it will retry at the ¾ of the lease time. If both attempts fail, the alarm is generated. Fax Init String Is Not Valid 30 The fax initialization string for the E2’s modem is incorrect and may need editing. Features denied during restore 99 License manager has denied permission to access a feature during a restore. Either the license for that feature is invalid or it does not exist, or the number of licenses for that feature is less than the number needed for the configuration. Further information may be found in the service log. Features denied during startup 99 License manager denied permission to access a fea ture during startup. Either the license for that feature is invalid or it does not exist, or the number of licenses for that feature is less than the number needed for the configuration. Further information may be found in the service log. File Not Found 50 An internal error has occurred in the E2. Firmware File Bad - AI200 15 A 16AIe has corrupted firmware. Firmware File Bad - RO200 15 An 8ROe has corrupted firmware. Firmware File Bad - CC100 Liq 15 A CC-100P or CC-100LS has corrupted firmware. Firmware File Bad - CC100 Suct 15 A CC-100H has corrupted firmware. Firmware File Bad - CS100 Ckt 15 A CS-100 has corrupted firmware. Firmware File Bad - ESR8 15 An ESR8 has corrupted firmware. Firmware File Bad - RT100 15 An RT-100 has corrupted firmware.

C-6 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 233 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 233 · click to enlarge
Page 233

Alarm Name Default Priority Definition

Firmware Is Not Compatible 20 The firmware in a unit controller is not compatible with the current version of E2. Firmware Update Failed 10 The firmware on a unit controller was not success fully updated. Flash File Has A Bad CRC Error 50 An internal error has occurred in the E2. Flow obstructed 30 Irrigation pipe obstruction detected. Fuse Is Blown - ESR8 20 A fuse has blown on an ESR8 board and will require replacement. Global Spare Dig1 On User The Spare Dig 1 input in Global Data has switched ON. Gradual Change Limit Exceeded User An analog value has undergone a gradual change greater than its programmed Minimum Change set point. Heap Memory Corrupted - Reboot 30 A problem with memory has resulted in a reset of the E2. High Discharge Limit Exceeded User A high discharge pressure detected by a Suction Group application is causing the suction group to operate at a reduced capacity. High Limit Alarm User An HVAC application (AHU, Zone, RT-100, or ARTC/MultiFlex RTU) has a temperature above one of its cooling setpoints. High Limit Notice 50 Network variable high limit exceeded. High Suction Limit Exceeded User The suction pressure has risen above a Suction Group’s high suction setpoint. HVAC Phase Loss User A phase loss device connected to Global Data has switched ON to shut down all HVAC systems. HVAC Shutdown User A Global Data application’s HVAC Shutdown input has turned ON to shut down all HVAC systems. Incomplete Advisory Setup 15, 99 An important setting used in advisory and/or dial-out set up were not configured correctly. Inhibit Sensor Failed User A Demand Defrost Inhibit sensor on a case circuit is not functioning correctly. Input Bypass Failure 15 A command to bypass an input was not successfully carried out. Input Sensor Is Open 20 An analog input sensor is OPEN, possibly due to a severed connection or sensor failure. Input Sensor Is Short 20 An analog input sensor is CLOSED, possibly due to a short-circuit or sensor failure. Instance limit exceeded 20 Maximum number of a particular type of licensed Open Echelon controllers has been reached. A new instance cannot be commissioned. Invalid Cell ID In Scratch Pad 30 An internal error has occurred in the E2. Invalid Nxt Ptr In Scratch Pad 30 An internal error has occurred in the E2. Invalid Scratch Pad Block Size 30 An internal error has occurred in the E2.

Appendix CAlarm Advisory Messages • C - 7
Page 234 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 234 · click to enlarge
Page 234

Alarm Name Default Priority Definition

IRLDS: Absorption Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Emerson Retail Solutions service. IRLDS: ADC Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Emerson Retail Solutions service. IRLDS: Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Emerson Retail Solutions service. IRLDS: Detector Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Emerson Retail Solutions service. IRLDS: Drift Fault 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Emerson Retail Solutions service. IRLDS: General Fault 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Emerson Retail Solutions service. IRLDS: Line/Filter Flow Fault 20 A zone on an IRLDS unit has a dirty filter or a crimped tube. IRLDS: Pressure Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Emerson Retail Solutions service. IRLDS: Self-Test Failure 20 An IRLDS has failed its self-test procedure. IRLDS: Temperature Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Emerson Retail Solutions service. IRLDS: Unknown Error 20 The IRLDS has experienced an error not recognized by the E2. IRLDS: Voltage Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Emerson Retail Solutions service. ISD Missing Phase Lockout 20 After 10 consecutive missing phase trips, the com pressor is locked out on missing phase lockout. ISD Missing Phase Trip 99 If any of the 3 phases of power is missing after the compressor is called to be on, this advisory is gener ated. ISD Oil Pressure Lockout 20 If we have been in Low Oil warning for 2 minutes we will lock out the compressor. ISD Welded Contactor 20 If there is voltage on the 3 phase sense inputs 0.5 sec onds after the compressor is called to be off, this advisory is generated. ISD Compressor Module Failure 20 A hardware failure has occurred in the ISD module.

C-8 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 235 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 235 · click to enlarge
Page 235

Alarm Name Default Priority Definition

ISD Discharge Pressure Lockout 20 The discharge pressure has gone above the high dis charge cut out, and this condition is set to only gener ate a lock out. ISD Discharge Temp Lockout 20 A lock out has occurred on the compressor because the discharge temperature sensor has gone above its alarm set point. ISD Supply Voltage Trip 99 If the supply voltage to the ISD falls below 170V, this advisory is generated. ISD Motor Temp Trip 99 The motor winding temperature sensor has gone above their preset value on compressors equipped with them. ISD Low Oil Warning 99 Low oil pressure is sensed on starting the compres sor. ISD Internal Line Break 99 The internal line breaks have opened on compressors equipped with them. ISD Discharge Pressure Trip 99 The discharge pressure has gone above the high dis charge cut out, and this condition is set to only gener ate a trip. ISD Discharge Temp Trip 99 A trip has occurred on the compressor because the discharge temperature sensor has gone above its alarm setpoint. ISD Suction Pressure Trip 99 The suction pressure has fallen below the low pres sure cut out. ISD No 3 Phase On Start 99 If there is no 3 phase power on the 3 phase sense inputs when the compressor is called to be on. ISD No Command Communica tions

99 The ISD will only accept run commands from the Einstein when the communications jumper is installed. If this jumper is not installed, an advisory will be generated. KW Demand Limit Exceeded User The power measurement taken by a Power Monitor ing or Demand Control application is higher than the programmed demand setpoint. Link To Output Bad-No Output 50 A valid link could not be made between an E2 appli cation and an output assigned to it. Last Off Time Expired 99 Notice or alarm generated in digital generic alarming. Last On Time Expired 99 Notice or alarm generated in digital generic alarming. Leak detected 30 Irrigation pipe leak detected. Log Data Loss-SRAM Data Bad 50 A memory error has resulted in lost log data. Log Stamp Loss-Flash Data Bad 50 A memory error has resulted in lost log time stamp data. Log Stamp Loss-SRAM Data Bad 50 A memory error has resulted in lost log time stamp data. Logging Group Stuck-No Memory 15 A Logging Group is unable to save logging data because there is not enough memory.

Appendix CAlarm Advisory Messages • C - 9
Page 236 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 236 · click to enlarge
Page 236

Alarm Name Default Priority Definition

Lost Log Data-CRC Error 30 An internal error has occurred in E2, resulting in lost log data. Low Battery Voltage 99 The backup battery that keeps the time and date resi dent on the E2 main board may need to be replaced. Low Limit Alarm User An HVAC application (AHU, Zone, RT-100, or ARTC/MultiFlex RTU) has a temperature below one of its heating setpoints. Low Limit Notice 50 Network variable low limit exceeded. Low Pack Superheat 11 Multiflex Pak ProAct superheat low limit exceeded. Low Suction Limit Exceeded User The suction pressure has fallen below a Suction Group’s low suction setpoint. MIP Receive Buffer Overflow 20 Messages from the Echelon network are coming into E2 too fast for the controller to process. This might be caused by an E2 having too many applications and/or logs running, or there may be too many Eche lon devices on the same segment as the E2 (i.e., more than 63). If this message persists, call Emerson Retail Solutions service. Modem Didn’t Initialize 20 E2 attempted to initialize the modem but failed. Modem Init String Is Not Valid 30 The dial-out initialization string for the E2’s modem is incorrect and may need editing. Neuron Not Responding 20 The chip that handles Echelon networking on the E2 is either defective or in a mode that makes it non- responsive. Contact Emerson Retail Solutions service for assistance. No Configuration Template 15 There is an internal error in the E2 software. Notify Emerson Retail Solutions service. No Description File 20 The Description File has failed to load onto the E2 when the Echelon device was commissioned. No description file exists for the Open Echelon controller being commissioned. No Refrigerant flowing Varies depend ing on applica tion type

Low or no refrigerant flowing.

No update has been received Varies depend ing on applica tion type

No update has been received from the output point connected to.

Normal Hi Limit Exceeded User An analog value has risen above its programmed Hi Limit setpoint.

C-10 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 237 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 237 · click to enlarge
Page 237

Alarm Name Default Priority Definition

Normal Low Limit Exceeded User An analog value has fallen below its programmed Low Limit setpoint. Not Enough Backed Memory 10 The E2 tried to save data to the battery-backed mem ory, but the memory was full. Not Enough Flash Memory 20 The E2 tried to save data to the flash memory, but the memory was full. Not Enough Memory 10 The E2 tried to save data to unbacked memory, but the memory was full. Not Enough Scatch Pad Memory 50 The E2 tried to save data to the scratch pad memory, but the memory was full. Notice Limit Exceeded User An analog sensor’s programmed notice limit has been exceeded. Num. Of Events Exceeded Limit User A digital value has transitioned ON more times than its defined Number of Events setpoint. Occupied Hi Limit Exceeded User An analog value has risen above its defined high limit setpoint during OCCUPIED mode. Occupied Low Limit Exceeded User An analog value has fallen below its defined low limit setpoint during the OCCUPIED mode. Off Time Exceeded Limit User A digital value has been OFF longer than its defined Time Off Last setpoint. Oil Failure Occurred User An oil sensor for a compressor has detected a failure. On Time Exceeded Limit User A digital value has been ON longer than its defined Time On Last setpoint. Open Wire 30 MultiFlex ESR controller has detected an open wire on the valve input. Overcurrent 30 MultiFlex ESR controller has detected an overcurrent condition on the valve. Override Log lost - CRC Error 20 An internal error in the E2 has resulted in a loss of the override log. Override Lost Output Cleared 20 A user tried to override an output on a CC-100, RT- 100, or similar Echelon device, but the override was not performed successfully. Try the override com mand again. If this alarm persists, call Emerson Retail Solutions service. Override Operation Didn’t Take 20 The E2 tried to carry out an override and was unsuc cessful. Override State Not Restored 50 An overridden input or output has remained in the override state longer than its programmed time. Pad Memory Corrupted - Reboot 30 A problem with memory has resulted in a reset of the E2. Part Cnfg Loss-Ptr 15 Due to an internal error, part of E2’s configuration data has been lost.

Appendix CAlarm Advisory Messages • C - 11
Page 238 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 238 · click to enlarge
Page 238

Alarm Name Default Priority Definition

Point Log Cleared-Stamps Ahead 50 After a power failure or reset, E2 tried to recover log data from its memory, but the log data was corrupted. E2 cleared all data from its point logs and started over. Point Log Stuck-No Memory 15 A Point Log is unable to save new values because there is not enough memory. Point Logs Not Restored 15 The point logs stored in memory were not restored after the last reset or upgrade. Pressure Table Lost-Being Rblt 50 A Suction Group’s internal list of possible compres sor combinations became temporarily invalid, requir ing a rebuild. Product Temp Hi Limit Exceeded User A product temperature probe in a standard or case- controlled circuit has measured a product tempera ture above the low limit setpoint. Product Temp Lo Limit Exceeded User A product temperature probe in a standard or case- controlled circuit has measured a product tempera ture below the low limit setpoint. Program ID mismatch 20 Open Echelon controller Program ID does not match expected Program ID. Proof Fail User A proof checking device is registering a failure in one of the Application’s control devices. Proof Failure Occurred User A proof checking device is registering a failure in one of the Application’s control devices. Proof Reset-Stage In retry 50 Due to a FAIL signal from a proof checking device, the E2 is attempting to reset the proof failure. Rack Failure Occurred User A Suction Group application is registering a total rack failure. REFR Phase Loss User A phase loss device connected to Global Data has switched ON to shut down all refrigeration systems. REFR Shutdown User A Global Data application’s REFR Shutdown input has turned ON to shut down all suction groups, con densers, and circuits. Relativ Adv: No Active Setpt 99 An application that is supposed to be generating an alarm for a specified input has no active setpoint to use for alarming. This usually occurs when alarm set points are supplied by other applications or inputs, and the application or input fails. Resize bad! Logging Terminated 10 The number of samples was changed in a log group and the resizing of the file storing data was not suc cessful. Check memory. Runtime Log Stuck-No Memory 15 A Runtime Log is unable to save new data because there is not enough memory. Runtime Logs Not Restored 15 The runtime logs stored in memory were not restored after the last reset or upgrade.

C-12 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 239 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 239 · click to enlarge
Page 239

Alarm Name Default Priority Definition

RX/BX Firmware Update Failed 20 The E2’s firmware update was not successful. RX/BX Firmware Was Updated 50 The E2’s firmware was successfully updated. Smoke Detected 30 A smoke detector input on an ARTC/MultiFlex RTU has detected smoke. SRAM Memory Corrupted - Reboot

30 A problem with memory has resulted in a reset of the E2. State Switched ‘On’ User A digital value that has been set up to alarm when ON has switched ON. Status Config Loss-CRC Error 30 An internal error has occurred in the E2. Stuck 30 MultiFlex ESR controller has detected a stuck valve. System date needs manual reset 20 The date/time of the box is not valid. System In Pump Down User The suction pressure has fallen below the pump down setpoint for a Suction Group, causing shutdown of the rack. Template File Bad - CC100 Liq 15 A template file in E2 for a CC-100P or CC-100LS is bad. Template File Bad - CC100 Suct 15 A template file in E2 for a CC-100H is bad. Template File Bad - CS100 Ckt 15 A template file in E2 for a CS-100 is bad. Test Dial Successful 50 E2 performed a test dial-out with its modem, and the dial-out was successful. Time Updated By A User 99 A user changed the time in the current E2. Time Updated Over Network 99 The time in the current E2 was updated by another controller or user on the network. Timed Out Waiting For FW Updt. 50 The E2 waited for a firmware update to begin, and it never did. Too Many Reboots: Flash erased 50 A number of successive reboots has erased the Flash RAM. Too Many Reboots: SRAM erased 50 A number of successive reboots has erased the SRAM. Total On Time Exceeded Limit User A digital value’s total ON time has exceeded its defined Time ON Total setpoint. Trip Alarm 30 Generic pulse trip alarm. Tripped 20 WPK condenser fan or compressor trip. Unit Ctlr Cell Create Failed 20 The E2 unsuccessfully tried to create a unit controller cell. Unknown FW Update Attempted 50 An error has occurred during a firmware update of E2. Call Emerson Retail Solutions service for assis tance. Unknown Heap Operation Error 50 There is an internal error in the E2 software. Notify Emerson Retail Solutions service. Unoccupied Hi Limit Exceeded User An analog value has risen above its defined high limit setpoint during UNOCCUPIED mode. Unoccupied Low Limit Exceeded User An analog value has fallen below its defined low limit setpoint during UNOCCUPIED mode.

Appendix CAlarm Advisory Messages • C - 13
Page 240 of the Emerson E2 user manual — Alarm Name Default Priority Definition
Page 240 · click to enlarge
Page 240

Alarm Name Default Priority Definition

User Cleared All Applications 50 A user has cleared out all data from all applications in this E2. User/Appl. Forced Reset 50 A user or an application has forced a reset of this E2. VS Alarm 20 Multiflex PAK variable speed device alarm. VS Inverter Fail User A variable-speed inverter driving a variable-speed fan or compressor has failed. WCC Controller Alarm 20 Woodley case controller alarm. WPK Controller Alarm 20 Woodley Pack Amps Fail alarm. Watchdog Countdown Hit Zero 20 E2 locked up while trying to perform a task. If this alarm occurs often, there may be a problem with your system. Contact Emerson Retail Solutions service. Watchdog Reset Timer Failed 20 E2 tried to reset itself to clear a hung task, but the “watchdog” feature on the E2 was disabled. Check the jumper J19 labeled “Watch Dog” on the E2 main board. This jumper should be either be set to “ENABLE” or it should not be present at all. X300X300 Links Lost-CRC Err 20 An internal error has caused a loss of communication between E2s.

C-14 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 241 of the Emerson E2 user manual — E2 Advisory
Page 241 · click to enlarge
Page 241

Copeland CoreSense E2 Alarms

E2 Advisory

E2 Advisory Text

E2 Display Code Text E2 Associated Alarm

CoreSense Device

(Advisory Log)

Priority (default)

Property

Display (LCD)

ISD 2.0/2.1 CoreSense Diagnostics LCD Failure 99 LCD Failure LCD FAILURE “Control Module EEPROM Failed” Fault Discharge Temp Sens 99 Off-Fault Disch Temp DISCH TEMP OPN “Normal OFF Fault Temp Probe” Unld2 Sol Open Circuit 99 Off-Unloader 2 Open UNLD2 OPN WARN “Normal OFF Unloader2 Open” Unld1 Sol Open Circuit 99 Off-Unloader 1 Open UNLD1 OPN WARN “Normal OFF Unloader1 Open” Unld2 Sol Short Circuit 99 Off-Unloader 2 Short UNLD2 SC WARN “Normal OFF Unloader2 Short Unld1 Sol Short Circuit 99 Off-Unloader 1 Short UNLD1 SC WARN Normal OFF Unloader1 Short Fault Discharge Temp Sens 99 Run-Fault Disch Temp DISCH TEMP OPN Normal Running Fault Temp Probe Unld2 Sol Open Circuit 99 Run-Unloader 2 Open UNLD2 OPN WARN Normal Running Unloader2 Open Unld1 Sol Open Circuit 99 Run-Unloader 1 Open UNLD1 OPN WARN Normal Running Unloader1 Open Unld2 Sol Short Circuit 99 Run-Unloader 2 Short UNLD2 SC WARN Normal Running Unloader2 Short Unld1 Sol Short Circuit 99 Run-Unloader 1 Short UNLD1 SC WARN Normal Running Unloader1 Short No Comm Sensor to CT 20 Comm Loss Sensor - CT NO COMM CT Connection Lost CT To Sensor Low Oil Warning 99 Run-Low Oil Prs Warn LOW OIL WARN Normal Running Low Oil Pressure No Comm Sensor to ID 20 Comm Loss Sensor - ID NO COMM ID Connection Lost ID To Sensor Comp ID Module Failure 20 Comp ID Module Fail COMP ID FAIL Compressor ID Mod ule Failed No Comm Sensor Modul 20 Comm Loss Sensor Mod NO COMM SENSOR No Communication To Sensor Module Sensor Module Failure 20 Sensor Module Fail SENS MOD FAIL Sensor Module Failure

Device Absent 20 No Communications E2 NO COMM E2 No Communication

Discharge Temp Trip 20 Disch Temp Trip DISCH TEMP TRIP Discharge Temp Trip

Brown Out Trip 20 Comp Brown Out Trip BROWN OUT TRIP Power BrownOut Trip

Compressor Low Volt Trip 20 Comp Low Voltage Trip LOW VLT TRIP Compressor Low Volt age Trip Supply Voltage Trip 20 Comp Mod Supply V Trp SUPPLY VLT TRIP Module Low Voltage Trip Part Winding Trip 20 Part Winding Trip PART WIND TRIP Part Winding Trip

Voltage Imbalance 20 Voltage Imbalance VOLT IMBALANCE Vol Imbalance Trip

Copeland CoreSense E2 Alarms • C-15

Page 242 of the Emerson E2 user manual — E2 Advisory
Page 242 · click to enlarge
Page 242

E2 Advisory

E2 Advisory Text

E2 Display Code Text E2 Associated Alarm

CoreSense Device

(Advisory Log)

Priority (default)

Property

Display (LCD)

No 3 Phase Power 20 No 3Phase Power NO 3PHASE PWR No 3-Phase Power Trip

Contact Coil Opn Circuit User Con Coil Open Circuit CON COIL OP WRN Contactor Coil Open Circuit Current Overload Trip 20 Current OvrLoad Trip CURRNT OVR TRIP Current OverloadTrip

Phase Loss Trip 20 Phase Loss Trip PHASE LOSS TRIP Phase Loss Trip

Welded Contactor 20 Welded Contactor Warn WELD CNTCT WARN Welded Contactor Warning Suction Pressure Trip User Low Sct Prs Cutout SUCT PRT TRIP Low suction Pressure Trip Locked Rotor Trip 20 Locked Rotor Trip LCKD ROTOR TRIP Locked Rotor Trip

Motor Temperature Trip 20 Motor Temp Trip MOT TEMP TRIP Motor Temp Trip Con trol Module Protector Trip 20 Protector Trip PROTECTOR TRIP Protector Trip

Discharge Pressure Trip 20 High Disch Prs Trip DISCH PRS TRIP High Discharge Pres sure Trip Rack Control Lockout 20 Controller Lockout RACK CNTRL LOCK Rack Controller Lock out Part Wind Lockout 20 Part Winding Lockout PART WIND LOCK Part Winding Lockout

Low Oil Pressure Lockout 20 Low Oil Prs Lockout LOW OIL LOCK Low Oil Pressure Lock out Discharge Pressure Lockout 20 High Disch Prs Lock DISCH PRES LOCK High Discharge Pres sure Lockout Discharge Temp Lockout 20 Disch Temp Lockout DISCH TEMP LOCK Discharge Temp Lock out Contact Coil Opn Cir Lock 20 Con Coil Open Lockout CON COIL OP LCK Contactor Coil Lock out Locked Rotor Lockout 20 Locked Rotor Lockout LOCK ROTOR LOCK Locked Rotor Lockout

Part Wind Phase Lockout 20 Phase Loss Lockout PART PHASE LOCK Phase Loss Lockout

Compressor Module Failure 20 Comp Module Failure COMP MOD FAIL Control Module Fail ure Lockout Running DLT Fault 99 Normal - DLT Fault RUN DLT FAULT Normal Running DLT xxx F xxx AMPS Running Injector Open 99 Inject Fault Open RUN INJ FLT OPN Inj Coil Open DLT xxx F xxx AMPS Running Injector Short 99 Inject Fault Short RUN INJ FLT SHR Inj Coil Short DLT xxx F xxx AMPS DLT Fault 20 DLT Fault DLT FAULT Fault Temp ProbeTrip

DLT Fault/Injector Open 20 DLT Fault Inject Open DLT FLT INJ OPN Inj Coil Open Fault Temp Probe DLT Fault/Injector Short 20 DLT Fault Inject Shrt DLT FLT INJ SHR Inj Coil Short Fault Temp Probe Comp Low Voltage Lockout 20 Comp Low Volt Lockout CMP LOWVLT LOCK Compressor Low Volt age Lockout

C-16 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 243 of the Emerson E2 user manual — REV PHASE ALERT
Page 243 · click to enlarge
Page 243

E2 Advisory

E2 Advisory Text

E2 Display Code Text E2 Associated Alarm

CoreSense Device

(Advisory Log)

Priority (default)

Property

Display (LCD)

Other Advisories Wrong device at specified addr

Incompatible device firm ware

Stand Alone Mode 99

Performance Alert CoreSense Diagnostics

Discharge Temp Trip 99 Discharge Temp. Trip HIGH DISCH ALERT

System Trip 99 System Trip SYSTEM ALERT

Short Cycling 99 Short Cycling SHRT CYCL ALERT

Locked Rotor 20 Locked Rotor LCKED RTR ALERT

Open Circuit 20 Open Circuit OPN CIRC ALERT

Missing Phase 20 Missing Phase (Three Phase

MISS PHASE ALERT

Refer to the CoreSense

Perf Alert Open Start 20 Open Start (Single Phase) OPN START ALERT

Reverse Phase 20 Reverse Phase (Three PhaseScroll )

REV PHASE ALERT

Perf Alert Open Run 20 Open Run (Single Phase) OPN RUN ALERT

Welded Contactor 20 Welded Contactor WELD CONT ALERT

Low Voltage 99 Low Voltage LOW VOLT ALERT

Device Absent Alarm 20 Lost Communications

Perf Alert DLT Sensor Fail ure

99 DLT Sensor Failure DLT SENS ALERT

Wrong device at specified addr

Incompatible device firm ware

Copeland CoreSense E2 Alarms • C-17

operating manual for · this device · Other Advisories

Page 244 of the Emerson E2 user manual — E2 Advisory
Page 244 · click to enlarge
Page 244

E2 Advisory

E2 Advisory Text

E2 Display Code Text E2 Associated Alarm

CoreSense Device

(Advisory Log)

Priority (default)

Property

Display (LCD)

Discus (P470) CoreSense Protection

Fault Discharge Temp Sens 99 Off-Fault Disch Temp FLT TEMP PROBE

Fault Discharge Temp Sens 99 Run-Fault Disch Temp FLT TEMP PROBE

No Comm to CT 99 Comm Loss CT NO COMM CT

Low Oil Warning 99 Run-Low Oil Prs Warn LOW OIL WARN

No Comm Sensor Module 99 Comm Loss Sensor Mod NO COMM SENSOR

Sensor Mod Config Mis match

99 SensMod Cnfg Mismtch SENS MOD CNFG

Device Absent 20 No Communications E2 NO COMM E2

Discharge Temp Trip 20 Disch Temp Trip DISCH TEMP TRIP

Compressor Low Volt Trip 20 Comp Low Voltage Trip LOW VLT TRIP

Voltage Imbalance 20 Voltage Imbalance VOLT IMBALANCE

Refer to the CoreSense

Phase Loss Trip 20 Phase Loss Trip PHASE LOSS TRIP

Locked Rotor Trip 20 Locked Rotor Trip LCKD ROTOR TRIP

Motor Temperature Trip 20 Motor Temp Trip MOT TEMP TRIP

Protector Trip 20 Protector Trip PROTECTOR TRIP

Low Oil Pressure Lockout 20 Low Oil Prs Lockout LOW OIL LOCK

Discharge Temp Lockout 20 Disch Temp Lockout DISCH TEMP LOCK

Locked Rotor Lockout 20 Locked Rotor Lockout LOCK ROTOR LOCK

Phase Loss Lockout 20 Phase Loss Lockout PHASE LOSS LOCK

Compressor Module Failure 20 Comp Module Failure MODULE FAIL

Comp Low Voltage Lockout 20 Comp Low Volt Lockout CMP LOWVLT LOCK

Other Advisories Wrong device at specified addr

Incompatible device firm ware

C-18 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

operating manual for · this device

Page 245 of the Emerson E2 user manual — E2 Advisory
Page 245 · click to enlarge
Page 245

E2 Advisory

E2 Advisory Text

E2 Display Code Text E2 Associated Alarm

CoreSense Device

(Advisory Log)

Priority (default)

Property

Display (LCD)

K5 Ref Scroll (P510) Copeland Scroll

Discharge Temp Trip 20 DLT Trip DLT TRIP ALERT

System Trip 20 System Trip SYS TRIP ALERT

Short Cycling 99 Short Cycling SHRT CYCL ALERT

Locked Rotor 20 Locked Rotor LCKED RTR ALERT

Open Circuit 20 Open Circuit OPN CIRC ALERT

Missing Phase 20 Missing Phase MISS PHASE ALRT

Reverse Phase 20 Reverse Phase Lock REV PHASE ALRT

Welded Contactor 20 Welded Contactor WELD CONT ALERT

Low Voltage 20 Low Voltage LOW VOLT ALERT

Refer to the CoreSense

Device Absent Alarm 20 No Communications E2

Discharge Temp Fault 20 DLT Fault DLT FAULT ALERT

CT Fault 20 CT Fault CT FAULT ALERT

Discharge Temp Lockout 20 DLT Lockout DLT LOCK ALERT

Locked Rotor Lockout 20 Locked Rotor Lockout LCKED RTR LOCK

Missing Phase Lockout 20 Missing Phase Lock MISS PHSE LOCK

System Fault 20 System Fault SYS FAULT ALERT

Wrong device at specified addr

Incompatible device firm ware

Copeland CoreSense E2 Alarms • C-19

operating manual for · this device · Other Advisories

Page 246 of the Emerson E2 user manual — E2 Advisory
Page 246 · click to enlarge
Page 246

E2 Advisory

E2 Advisory Text

E2 Display Code Text E2 Associated Alarm

CoreSense Device

(Advisory Log)

Priority (default)

Property

Display (LCD)

CoreSense Comm(P47) CoreSense Comm

Device Absent Alarm 20 No Communications E2

Spare Sensor Warning 99 Opn/Shr Spare Warn SPARE TEMP WARN

Scroll Sensor Warning 99 Opn/Shr Scroll Warn SCROLL TMP WARN

Short Cycling 99 Short Cycle Warn SHRT CYCL WARN

Low Voltage 20 Low Voltage Trip LOW VOLT TRIP

Spare High Temp Trip 20 Spare Hi Temp Trip SPR HI TMP TRIP

Missing Phase Trip 20 Missing Phase Trip MISS PHASE TRIP

Scroll High Temp Trip 20 Scroll Hi Temp Trip SCR HI TMP TRIP

Motor Sensor Trip 20 Opn/Shr Motor Temp MOTOR SENS TRIP

Refer to the CoreSense

Motor Temperature Trip 20 Motor Hi Temp Trip MOTOR TEMP TRIP

Short Cycle Lockout 20 Short Cycle Lockout SHRT CYCL LOCK

Spare High Temp Lockout 20 Spare Hi Temp Lock SPR HI TMP LOCK

Motor Sensor Lockout 20 Opn/Shr Motor Lock MOTOR SENS LOCK

Reverse Phase Lockout 20 Reverse Phase Lock REV PHASE LOCK

Missing Phase Lockout 20 Missing Phase Lock MISS PHSE LOCK

Scroll High Temp Lockout 20 Scroll Hi Temp Lock SCR HI TMP LOCK

Motor Temp Lockout 20 Motor Hi Temp Lock MTR HI TMP LOCK

Module Failure 20 Module Failure MODULE FAILURE

Wrong device at specified addr

Incompatible device firm ware

C-20 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

operating manual for · this device · Other Advisories

Page 247 of the Emerson E2 user manual — Throttling Range
Page 247 · click to enlarge
Page 247

Appendix D: PID Control

Introduction to PID Control

output after each update are made by three different modes of control: Proportional (“P”) Mode, Integral (“I”) Mode, and Derivative (“D”) Mode. Each mode of control makes its own adjustment to the output percentage, and the three adjustments are added to the previous output percentage to determine the new output percentage. In mathematical terms, every update will affect the output percentage as follows:

PID Control is a specialized method of closed-loop control that strives to maintain equality between an input value and a user-defined setpoint by operating a device or a number of devices at somewhere between 0% and 100% of full capacity.

PID Control works by making adjustments to the out put at a constant rate called the update rate (usually 2-6 seconds). For every update that occurs, PID Control takes a reading from the input sensor or transducer, measures the distance between the input and the setpoint (also called the error), makes a series of calculations, and adjusts the out put percentage in such a way as to move the input towards the setpoint in the most efficient manner.

NEW OUT% = OLD OUT% + (“P” mode adjustment) + (“I” mode

adjustment) + (“D” mode adjustment)

Each of the three modes (P, I, and D) serves a different and important purpose, as described below:

The “calculations” that determine the new value of the

P Proportional Mode

Tries to stop the error from changing. Measures difference between current and previous error, and adjusts output per centage to prevent any further movement. I Integral Mode

Tries to bring the error to zero (input = setpoint).

D Derivative Mode

Tries to slow or stop a rapidly changing error so P and I Modes may effectively work to eliminate it.

Proportional (“P”) Mode

of input value units between a 0% output and a 100% out put. For example, in a Case Control application, the Throt tling Range would be the number of degrees between the input temperature that would result in a 0% output and the temperature that would cause a 100% output. Therefore, the Throttling Range essentially determines the percentage of the output adjustment that will be added to the previous percentage when a change in input occurs.

The Proportional Mode in PID determines the system’s immediate reaction to a change in the error. Proportional Mode simply analyzes the difference between the current error and the previous error. Based on the size of this dif ference, Proportional Mode will make a change to the out put in an attempt to stabilize the input value and keep it from changing any further.

PID Control places this Throttling Range around the setpoint. As a result, Proportional Mode works to keep the temperature near the setpoint and within the throttling range. In most cases, the Throttling Range straddles the setpoint evenly on both sides, as shown in Figure D-1. However, in some applications such as Condenser Con trol, the Throttling Range may be placed elsewhere see

Mathematically, the following equation determines the “P” Mode adjustment for a single update:

“P” mode adjustment = Kp (E – E-1)/TR

Kp = proportional constant

E = current error E-1 = error during last update

TR = throttling range

Throttling Range

In simplest terms, the Throttling Range is the number

Introduction to PID Control Appendix D: PID Control • D-1

Page 248 of the Emerson E2 user manual — CONTROL INPUT
Page 248 · click to enlarge
Page 248

Throttling Range on page D-1.

If Proportional Mode is functioning incorrectly in your system, it may be more appropriate for you to change the Throttling Range value to a more appropriate value. Kp is designed as a fine-tuning constant (for example, it might be used to speed up reaction slightly by setting it to 1.04, or to slow down reaction by setting it to 0.98). Integral Mode

THROTTLING

OUTPUT AT SETPOINT (shown here as 50%)

RANGE

The Integral Mode (also called “I” Mode) is the por tion of PID control that seeks to make the input equal to the setpoint. When an update occurs, the Integral Mode measures the difference between the current input value and the setpoint. The size of this difference determines Integral Mode’s output percentage adjustment. Why “I” Mode is Necessary

CONTROL INPUT

Figure D-1 - Throttling Range

Example 1: Suppose a Case Control application has a throttling range of 10 degrees. Also, for simplicity’s sake, assume only the Proportional Mode is active and the pro portional constant Kp is one. The system begins with a 0% output at the bottom of the Throttling Range and with an input value of 24F. Because the throttling range is 10 degrees, Proportional Mode will gradually add 100% to the output percentage as the input changes to 34 over time.

Though Proportional Mode handles the majority of the workload during PID control, there are two major short comings that make the “I” Mode necessary.

Proportional Mode, if left to operate all by itself, is only capable of stopping the error from changing. When the error is not changing, neither is the “P” portion of the output. This means the system may reach stability at any value, regardless of whether it is above or below the set point (see Figure D-2). Proportional Mode alone has no mechanism that can bring the error to zero after stability has occurred. The “I” Mode is necessary in order to move the input in the direction of the setpoint.

Suppose, for example, the input increases by one degree every time an update occurs. The following adjust ment would then likewise occur after every update:

“P” mode adj. = (1.0)(1 degree) / 10 degrees = 0.1 = 10%

After 10 updates, the input value would be 34F and the output would be 100%. The same would happen if it were five updates at two degrees each or one hundred updates at 0.1 degrees each. In every case, the tempera ture travels a total of 10 degrees, and because the throt tling range is also 10 degrees, the output travels from 0% to 100% proportionally.

Higher Throttling Range values will result in a wider 0-100% range, and therefore will result in smaller reaction to changes in input values. Proportional Constant (Kp)

The Proportional Constant is simply a multiplier that can be used to fine-tune the size of the Proportional Mode adjustment. Raising the value of Kp results in a greater reaction to input value changes, while lowering it results in a smaller reaction.

Changing Kp is essentially the same thing as changing the value of the throttling range. For example, having a TR of 10 and a Kp of 2 is the same as having a TR of 5 and a Kp of 1. Mathematically speaking, the effective propor tional range is calculated by dividing the Throttling Range by Kp.

D-2 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

0% 100% · 26512028 · Proportional Offset

Page 249 of the Emerson E2 user manual — The “I” Mode Calculation
Page 249 · click to enlarge
Page 249
Emerson E2 — The “I” Mode Calculation diagram (page 249)
Fig. 217 · The “I” Mode Calculation

S E T P O I N T S E T P O I N T

Figure D-2 - Comparison of “P” Mode vs. “P” + “I” Mode

setpoint, Proportional Mode will reduce the 100% output percentage in an attempt to stop the movement and stabi lize the temperature.

Once the input value has wandered outside Propor tional Mode’s throttling range, the output percentage will be at 0% (if below the Throttling Range) or at 100% (if above the Throttling Range). At this point, PID is consid ered to be in saturation, meaning it is operating at full (or zero) capacity and is not able to react any further to changes that occur beyond the throttling range.

To put it another way, when a system is saturated, the input changes the placement of the Throttling Range. As shown in Figure D-2, as the input rises above the Throt tling Range, the top end of the Throttling Range rises with it. When the input finally changes direction, the Throttling Range remains at its new position.

Proportional Mode cannot distinguish between a satu rated and an unsaturated system; it simply makes propor tional adjustments to the output percentage. Therefore, once an input value in a saturated system changes direc tion, Proportional Mode reacts to correct the movement, regardless of how much error exists. As the temperature changes direction and again moves in the direction of the

The “I” Mode covers for Proportional Mode’s inability to account for saturation. When the input value is outside the throttling range, “I” Mode will continue to adjust the output percentage to bring the input value towards the set point

Emerson E2 — The “I” Mode Calculation diagram (page 249)
Fig. 218 · The “I” Mode Calculation

AS INPUT IN SATURATED SYSTEM CHANGES DIRECTION, THROTTLE RANGE REMAINS CHANGES DIRECTION, THROTTLE RANGE REMAINS

“I” CORRECTS ERROR AND BRINGS THROTTLING RANGE BACK TO NORMAL

S E T P O I N T S E T P O I N T

TIME TIME “P” MODE ONLY “P” + “I” MODES

Figure D-3 - Saturation in “P” vs. “P” + “I” Modes

The “I” Mode Calculation

When changing the value of Ki, it should be noted that small adjustments yield large results. For this reason, it is suggested that Ki should remain close to 1.0 and certainly no less than 0.5 and no greater than 2.0. Derivative Mode

To determine the “I” Mode adjustment for each update, the following calculation occurs:

“I” mode adjustment = Ki * (current error)

The Proportional and Integral Modes provide a good method of controlling a closed-loop system. However, in special circumstances where the input value is changing rapidly, there may be a lag time between when the error is noted and the length of time it takes the system to compen

Ki in this equation is called the integral constant. It is simply a multiplier that increases or decreases the speed at which the “I” Mode will increase or decrease the percent age.

Introduction to PID Control Appendix D: PID Control • D-3

Saturation

Page 250 of the Emerson E2 user manual — How Condenser Control and HVAC PID Differs From The Others
Page 250 · click to enlarge
Page 250

sate for error.

the case temperature equal to the temperature setpoint.

To reduce this lag time, Derivative Mode is used. Derivative Mode constantly analyzes the rate of change of the error, makes a prediction about what the future error will be, and makes an adjustment to the output in an attempt to reduce the rate of change in the error.

Condenser Control and HVAC Control seek only to keep pressure or temperature values below or above their setpoints. Thus, the system is only concerned when the input value is on the wrong side of the setpoint (e.g., above the setpoint in Condenser Control and Cooling Control, or below the setpoint in Heating Control). Any value on the other side of the setpoint is considered an acceptable value for the purposes of controlling, and therefore the output will be at or near 0%.

In layman’s terms, Derivative Mode causes PID con trol to “overshoot” the amount of output percentage to compensate for the slow reaction times of the P and I Modes. As a result, Derivative Mode slows the rate error change down to a level the P and I Modes can handle. The “D” Mode Calculation

Condenser PID and HVAC Cooling Control only react to pressure or temperature levels that climb above the set point. Likewise, in HVAC Heating Control, the tempera ture level must be below the heating setpoint in order to begin heating. The 0-100% output percentage is then determined based on the distance between the input and setpoint, and the rate of change. Output at Setpoint

To determine the “D” Mode adjustment for each update, PID performs the following calculation:

“D” mode adjustment = Kd * (E – (2E-1/t-1)+(E-2/t-2))

Kd = derivative gain E = current error E-1=error from the previous update t-1=the amount of time elapsed since the previous exe

Mathematically, the only difference between PID for Condenser and HVAC Control and PID for other systems is the Output at Setpoint value.

cution E-2=error from the update before the previous update t-2=the amount of time elapsed between 2 executions

The Output at Setpoint value is simply the percentage the output will be when the input value is stabilized at the setpoint. In other words, when the PID input equals the PID setpoint, the PID output percentage will be fixed at the Output at Setpoint value.

ago and the previous execution The factors E-1/t-1 and E-2/t-2 are the rates of change of the error (in units per minute). The rate of change for the previous error (E-1) weighs twice as much in the

Output at Setpoint is the value that determines where the throttling range is placed. As mentioned in “Throttling Range” on page 1, the Throttling Range is the range of input values across which Proportional Mode will gradu ally move the output percentage from 0% to 100% (excluding effects by the Integral and Derivative Modes). The Output at Setpoint value basically tells the RMCC where to place the Throttling Range in relation to the set point (this is explained in further detail below). Output at Setpoint for Non-Condenser/ HVAC PID

Derivative Mode calculation as the 2nd previous error (E-

2), since E-1 is closer to the current rate of change than E-2.

The derivative gain Kd is a multiplier that changes the total size of the Derivative Mode adjustment. If Derivative Mode is causing PID control to react too quickly or too slowly, the derivative gain may be adjusted to correct the problem. Higher values of Kd result in quicker reactions; lower values result in slower reactions.

How Condenser Control and HVAC PID Differs From The Others

For all non-condenser and non-HVAC PID control, the Output at Setpoint is fixed at 50% (except for Analog Out put Modules, which may be programmed with any value from 0-100%). As mentioned before, this means that PID control will constantly strive to achieve a stable system where the input is equal to the setpoint and the output is 50%.

The RMCC approaches condenser control and HVAC control from a different angle than other PID-controlled systems such as Pressure Control and Case Control. PID control for Pressure Control and Case Control seeks to maintain a constant equality between the input and the set point. Specifically, in Pressure Control, the RMCC tries to keep the suction pressure or temperature equal to the suc tion setpoint, and in Case Control, the RMCC tries to keep

The throttling range in a PID Control application with a 50% Output at Setpoint is placed in such a way as to put the setpoint right in the middle of the throttling range, as shown in Figure D-3.

D-4 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 251 of the Emerson E2 user manual — Other PID Features
Page 251 · click to enlarge
Page 251

point, the output percentage is dropped from 50% (it is assumed this will result in the input rising back to the set point). Likewise, when the input is higher than the set point, the output percentage is raised. For Condenser Control PID, no reaction is made to an input that is lower than the setpoint, since the output percentage is already 0%. Changing the Output at Setpoint

Emerson E2 — Output at Setpoint for Condenser/HVAC PID Control diagram (page 251)
Fig. 219 · Output at Setpoint for Condenser/HVAC PID Control

Advanced users may wish to change the Output at Set point in order to change the stabilization characteristics of their system(s). In most cases, the default values of the Output at Setpoint (0% for Condenser Control and HVAC, 50% for all others) are appropriate and recommended. Changing the value of the Output at Setpoint may have some beneficial results, but at the same time it may also hamper the system’s ability to react to changing condi tions, and it may also result in decreased energy efficiency.

Figure D-4 - Centered Setpoint PID Control (Output @ Setpoint = 50%)

Therefore, as the input value gradually drops below the setpoint, the Proportional Mode of PID will gradually bring the output percentage down. When the input drops below the low end of the throttling range, the output will be zero.

Other PID Features

The opposite happens with the input value begins to rise above the setpoint. The output percentage is gradually brought up from 50% until, when the input is at or above the throttling range, Proportional Mode will bring the out put to 100%. Output at Setpoint for Condenser/HVAC PID Control

The following section lists other PID-related constants or control structures that are a part of some PID control algorithms. Many of these features are advanced features that are accessible only by service personnel or advanced users. As a general rule, it is best to contact Emerson Retail Solutions before changing any of these values. Output at Minimum / Output at Maximum

For Condenser and HVAC PID Control, the Output at Setpoint defaults to 0%. This places the 0% end of the Throttling Range at the setpoint value, and it generally means Proportional Mode will strive to pull the input back down below the setpoint and attain a 0% output percent age. As the input climbs from the setpoint to the top of the Throttling Range, Proportional Mode likewise increases the output percentage to 100%.

The Output at Minimum and Output at Maximum val ues are used to change the range of possible output per centages. The default values (0% for minimum, 100% for maximum) allow the output to vary from fully off to fully on; changing these values, therefore, would only be neces sary if you desire a limited output range.

Emerson E2 — Other PID Features diagram (page 251)
Fig. 220 · Other PID Features

Two things occur when the Output at Minimum or Output at Maximum values are changed:

1. The throttling range is shortened as dictated by the new values. For example, if you specified a 20% minimum, the portion of the throttling range that would usually represent the range of outputs from 0% to 20% is cut off. Any input value that falls within the previous 0% to 20% portion of the throttling range will cause the Proportional Mode to move the output towards 20%.

Figure D-5 - End Setpoint PID Control (Output @ Setpoint = 0%) The differences between the two PIDs can be seen by observing the throttling ranges. For non-Condenser Con trol applications, PID reacts to error that exists on either side of the setpoint. If the input goes lower than the set

2. The Output at Minimum or Output at Maximum value replaces any calculated adjustment that would normally call for the output to be outside of the specified range. In other words, if the Out put at Minimum and Output at Maximum values
Other PID Features Appendix DPID Control • D - 5
Page 252 of the Emerson E2 user manual — Minimum Accumulated Error
Page 252 · click to enlarge
Page 252

are 20% and 100% respectively, the output per centage will never be below 20%, even if the P, I, and D Mode adjustments call for the output to be below 20%. The output will remain in saturation at 20% until a higher output percentage is called for.

trolled by PID control. Valve filtering is active in this CC- 100, with the filter period set to six seconds and the filter percentage set to 75%.

During one sample taken during a period interval, the CC-100 calls for a valve position of 50%. One period (six seconds) later, the CC-100 asks for a 58% valve opening.

In short, PID works as it normally does, except the out put never goes below Output at Minimum or above Output at Maximum. Minimum Accumulated Error

The total difference between the current sample and the previous sample is +8% (58 - 50%). To determine the actual amount the valve will change, the CC-100 multi plies the filter percentage (75%) with the total amount of valve position change (8%). As a final result, the new PID output value for the CC-100 will be 56%.

The Minimum Accumulated Error setting disables error accumulation in the “I” Mode when the current error is equal to or less than a certain amount. For example, if the PID setpoint is 30 and the Minimum Accumulated Error is 1, the “I” Mode will not adjust the PID output per centage as long as the input is between 29 and 31.

To demonstrate this, suppose in the example above the CC-100 continues to call for a 58% output during the period immediately after the 6% adjustment. Since the total difference between the asked-for percentage and the current actual percentage is 2% (58 - 56), valve filtering will make the new adjustment for that period 1.5% (75% of 2). As a result, the new valve output would be 57.5%. Future filter periods will bring the actual output even closer to the asked-for output.

Because “I” Mode does not accumulate error within the Minimum Accumulated Error range, the control input is allowed to settle on a value other than the setpoint. It is possible in the example given above for the system to achieve stability at any value between 29 and 31 without the “I” Mode trying to bring the error to zero.

The practical use of Minimum Accumulated Error is to set up a “close enough” zone around your PID setpoint. When the control input is within the zone, PID will not worry about making any “I” adjustments to attempt to equalize the input and the setpoint. Proportional Mode will handle any minor input changes that occur within this zone. Filtering

PID filtering is used for systems that appear to be over reacting to changes in the control input. If filtering is to be used at all, it is recommended to use caution, since even a small amount of filtering may cause the PID loop to become underreactive.

Filtering is a feature commonly used by CC-100s in valve control (and it thus sometimes called “valve filter ing”). The primary purpose of filtering is to dampen the rate of change of the PID percentage in an effort to make the PID control loop less reactive.

The filtering feature takes samples of the PID output percentage at regular intervals (which are determined by a parameter called the filter period). Every time a new filter period interval occurs, the PID percentage sampled during the last period interval is subtracted from the current PID percentage from the current period interval.

The result of this subtraction is multiplied by a param eter called the filter percentage (0 - 100%) to yield the actual amount the PID percentage will change.

Over time, the application of the filter percentage to the change in PID position will result in a PID control loop with a smaller amount of reaction to changes in the input.

ExampleA stepper EEV valve on a CC-100 is con

D-6 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Application · Application

Page 253 of the Emerson E2 user manual — Minimum Accumulated Error
Page 253 · click to enlarge
Page 253
Page 253 of the Emerson E2 user manual — Minimum Accumulated Error
Page 254 of the Emerson E2 user manual — Minimum Accumulated Error
Page 254 · click to enlarge
Page 254
Page 254 of the Emerson E2 user manual — Minimum Accumulated Error
Page 255 of the Emerson E2 user manual — Appendix E: Compressed Point Log Sample Limits and Precision Table
Page 255 · click to enlarge
Page 255

Appendix E: Compressed Point Log Sample Limits and Precision Table

Medium Resolution Low Resolution Engineering Unit Low Clip High Clip Precision Low Clip High Clip Precision Temperature Degrees Centigrade* -200 1,500 0.0259427 -40 97.7778 0.555556 Degrees Fahrenheit -328 2,732 0.0466969 -40 208 1 Differential Temperature Delta Degrees Centigrade* -200 200 0.00610417 -68.889 68.889 0.555556 Delta Degrees Fahrenheit -360 360 0.0109875 -124 124 1 Temperature Change Rate Degrees Centigrade Per Minute* -50 50 0.00152604 -6.889 6.889 0.055556 Degrees Fahrenheit Per Minute -90 90 0.00274688 -12 12 0.1 Degrees Centigrade Per Hour -3,000 3,000 0.0915625 -413.333 413.333 3.3333 Degrees Fahrenheit Per Hour -5,400 5,400 0.164813 -744 744 6 Pressure Pascals* -100,000 20,000,000 306.734 -100,000 4,200,000 17339 Kilopascals -100 20,000 0.306734 -100 4,200 17.3387 Pounds Per Square Inch -14.50 2,901 0.0444881 -14.5038 609.160 2.51477 Bars -1 200 0.00306734 -1 42 0.173387 Pascals (low readings)* -1,250 5,000 0.0953776 -1,250 3,500 19.1532 Inches of Water -5.02 20.0732 0.000382906 -5.018 14.0512 0.0768931 Centimeters of Water -12.75 50.9870 0.000972604 -12.7468 35.6909 0.195313 Differential Pressure Delta Pascals -2,000,000 2,000,000 61.0417 -500,000 500,000 4032.26 Delta Kilopascals -2,000 2,000 0.0610417 -500 500 4.03226 Delta Pounds Per Square Inch -290.08 290.076 0.00885336 -72.5190 72.5190 0.584831 Delta Bars -20 20 0.000610417 -5 5 0.0403226 Delta Pascals (low readings)* -3,000 3,000 0.0915625 -1,000 1,000 8.06452 Delta Inches of Water -12.04 12.0439 0.000367590 -4.01463 4.01463 0.03237606 Delta Centimeters of Water -30.59 30.5922 0.000933700 -10.1974 10.1974 0.08223710 Humidity Relative Humidity* 0 100 0.00152604 0 100 0.403226 Light Level Lux* 0 25,000 0.381510 0 10,000 40.3226 Foot-Candles 0 2,323.5 0.0354576 0 929.400 3.74758 Electrical Voltage Volts* -3,276.8 3,276.1 0.1 0 496 2 Electrical Current Amps* 0 6,552.90 0.1 0 4,960 20 Milliamps 0 6,552,900 100 0 4,960,000 20000 Electrical Resistance Ohms* 0 655,290 10 0 496,000 2000 Power Watts* 0 6,552,900 100 0 496,000 2000

Appendix ECompressed Point Log Sample Limits and Precision Table • E - 1
Page 256 of the Emerson E2 user manual — Appendix E: Compressed Point Log Sample Limits and Precision Table
Page 256 · click to enlarge
Page 256

Kilowatts* 0 6,552.9 0.1 0 496 2 Energy Watt-Hours* 0 131,058,000 2000 0 9,920,000 40000 Kilowatt-Hours* 0 131,058 2 0 9,920 40 Parts Per Million Parts Per Million* 0 32,764.5 0.5 0 2,480 10 Percentage Percentage* 0 200 0.00305208 0 124 0.5 Revolutions Per Minute Revolutions Per Minute* 0 65,529 1 0 2,480 10 RPM Change Rate Revolutions Per Minute Per Minute* 0 6,552.9 0.1 0 4,960 20 Time Milliseconds* 0 65,529 1 0 248 1 Seconds* 0 65,529 1 0 248 1 Minutes* 0 65,529 1 0 248 1 Hours* 0 6,552.9 0.1 0 248 1 Days* 0 6,552.9 0.1 0 248 1 Months* 0 6,552.9 0.1 0 248 1 Years* 0 6,552.9 0.1 0 248 1 Time (seconds display)* 0 65,529 1 0 248 1 Time (minutes display)* 0 6,552.9 0.1 0 248 1 Time (hours display)* 0 6,552.9 0.1 0 248 1 Volume Liters* 0 248,056 3.78544 0 9,387.894 37.8544 Gallons 0 65,529 1 0 2,480 10 Cubic Meters* 0 1,855.57 0.0283168 0 70.2258 0.283168 Cubit Feet 0 65,529 1 0 2,480 10 REU_CCF* 0 65,529 1 0 248 1 Volume Change Rate (liquid) Liters Per Second* 0 65.529 0.001 0 7.82319 0.0315451 Gallons Per Minute 0 1,038.66 0.0158503 0 124 0.5 REU_CCFH* 0 655.29 0.01 0 25 0 Volume Change Rate (gas) Cubit Meters Per Second* 0 30.9262 0.000471947 0 1.17043 0.00471948 Cubic Feet Per Minute 0 65,529 1 0 2,480 10 Distance Meters* 0 65,529 1 0 248 1 Feet 0 214,990 3.28084 0 813.648 3.28084 Inches 0 65,529 1 0 248 1 Centimeters 0 65,529 1 0 248 1 Distance Change Rate (speed) Meters Per Second* 0 332.89 0.005080 0 248 1 Feet Per Minute 0 65,529 1 0 48,818.9 196.850 Meters Per Minute 0 19,973 0.304800 0 14,880 60 Frequency Hertz* 0 6,552.9 0.1 0 248 1 Weight Pounds (lb) 0 1,444.6 0.2 0 546.7 2.2 Kilograms (kg) 0 655.3 0.1 0 248 1

E-2 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 257 of the Emerson E2 user manual — Appendix E: Compressed Point Log Sample Limits and Precision Table
Page 257 · click to enlarge
Page 257
Page 257 of the Emerson E2 user manual — Appendix E: Compressed Point Log Sample Limits and Precision Table
Page 258 of the Emerson E2 user manual — Appendix E: Compressed Point Log Sample Limits and Precision Table
Page 258 · click to enlarge
Page 258
Page 258 of the Emerson E2 user manual — Appendix E: Compressed Point Log Sample Limits and Precision Table
Page 259 of the Emerson E2 user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 259 · click to enlarge
Page 259

Appendix F: Troubleshooting

The chart below describes symptoms and solutions if troubleshooting the system or equipment is needed. For further information, contact Emerson Retail Solutions Service at 1-800-829-2724.

SYMPTOM POSSIBLE PROBLEM SOLUTION

I/O Network Problems I/O board not getting power. Check I/O board power--is the green STATUS light on? If not, check power wiring connections, and use a multimeter to verify the board is getting 24VAC. Reset power to board.

I/O board not communicating or won’t come online.

Check I/O network connections: 1. Check wire polarity (positive to positive/negative to negative) 2. Check for broken or loose wires.

Dip switches are set incorrectly. Check I/O board network dip switches. Verify network ID number is not a duplicate and that baud rate switches are set to 9600. (If switches are wrong, make changes and then reset the controller.) Refer to Section 6.1.6, Network ID Numbers (Board Numbers).

Terminating resistance jumpers are set incorrectly.

Check for proper setting of ter minating resistance jumpers. Network segment should be ter minated on the two endpoints of the daisy chain and unterminated everywhere else. Refer to Sec tion 6.1.8, Setting the Terminat ing and Biasing Jumpers.

Boards are not powered. Check Network/Power voltages. Refer to Section 6.1.9, Powering the I/O Boards.

Appendix FTroubleshooting • F - 1
Page 260 of the Emerson E2 user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 260 · click to enlarge
Page 260

SYMPTOM POSSIBLE PROBLEM SOLUTION

Echelon Network Problems Faulty wiring. Check connections. Are wires broken or loose? Check network polarity (positive to positive/ negative to negative). Check for wire damage.

Termination jumpers are set incorrectly.

Check for proper setting of ter minating resistance jumpers. Network segment should be ter minated on the two endpoints of the daisy chain and unterminated everywhere else. Refer to Sec tion 8.4, Device Termination.

Subnet (unit #) is set incorrectly. Each controller must have its own subnet address. Refer to Section 8.3, Echelon Network Structuring (Daisy-Chains).

F-2 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 261 of the Emerson E2 user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 261 · click to enlarge
Page 261

SYMPTOM POSSIBLE PROBLEM SOLUTION

Compressor will not Operate Compressor is not programmed properly.

Verify that E2 was programmed for correct number of compres sor stages. Highlight the General tab (C1) in the Suction Group Setup screen. Is the correct num ber of stages in the “Number of Stages” field?

Compressor types are set up incorrectly.

Make sure that compressor stages were properly set up as VS (variable speed), C (com pressor), or U (unloader).

Compressor programmed with incorrect rating.

Verify that compressors were assigned the proper rating (HP/ AMP, or BTU).

Pressure setpoints are set up incorrectly.

Set proper pressure setpoints. If you are controlling the rack using suction pressure, enter the pressure setpoint in the SUC PRES SETPT field. If you are controlling by temperature, enter the temperature setpoint in the CTRL TEMP SETPT field. Note: Pressure setpoints are located under the Setpoints tab (C2) in the Suction Group Setup screen.

Board and point addresses are incorrect.

Set proper board and point set tings for input, output, and com pressor outputs. Board and point settings are located under the Inputs tab (C4), Outputs tab (C5), and Comp Outs tab (C7) in the Suction Group Setup screen.

Appendix FTroubleshooting • F - 3
Page 262 of the Emerson E2 user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 262 · click to enlarge
Page 262

SYMPTOM POSSIBLE PROBLEM SOLUTION

Compressor will not Operate (Cont.)

8RO fail-safes are not wired cor rectly.

Verify fail-safe wiring on 8RO board for N.O./N.C. positions. One wire of the two-wire con nection should always be con nected to the middle terminal. The second wire must be either connected to the N.C. terminal (if you want the relay to be closed (ON) during power fail ure) or the N.O. terminal (if you want the relay to be open (OFF) during power failure.)

Compressor in override. Highlight compressor stage and cancel the override by pressing Enter to open the Actions Menu. Select 3 for Override options, or go to the Override/Bypass Log to view and cancel overrides: 1. From the Main Menu, press 8 to open the Status menu. 2. From the Status menu, press 4 for the Graphs/Logs menu. 3. Press 3 for the Override/ Bypass Log. (This screen gives you quick access to all overrides/ bypasses in the system)

Rack is in Phase Fail. Verify correct phase and verify correct input for phase loss. If you specified that phase pro tection would be used on this rack, the Phase Loss input is dis played. The Phase Loss input is automatically configured to use E2’s Global Data phase loss pro tection source. If you wish to define a different source, re- define this input definition. To point this input to a board and point address: press (EDIT) and then 1 to change the definition format.

Oil sensors are set up but are not in use.

Remove oil sensors from indi vidual compressors. 1. Highlight the Comp Setup tab (C6) in the Suction Group Setup screen. 2. Use the arrow keys to select the OIL SENSOR field. 3. Choose “None” from the LOOK UP menu.

F-4 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 263 of the Emerson E2 user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 263 · click to enlarge
Page 263

SYMPTOM POSSIBLE PROBLEM SOLUTION

Problems with Condenser Condenser will not operate. Verify that E2 is programmed with proper number of fans. 1. Highlight the General tab (C1) in the Condenser Setup screen. 2. Is the correct number of fans in the Number of Fans field?

Incorrect board and point set tings.

Confirm proper board and point settings: Go to the Inputs tab (C3) in the Condenser Setup screen to check PRES CRTL IN and DISCH TRIP IN.

Fail-Safe wiring on 8RO is incorrect.

Verify proper fail-safe switch positions on the 8RO board. The fail-safe dip switches are labeled S2 on the 8RO and S3 on the 8ROe and 8IO. Set the rocker UP (ON) to close the relay and turn the output ON during net work failure. Set the switch DOWN (OFF) to open the relay and turn the output OFF during network failure.

Condenser will not split. Enable the condenser to split. Go to the General tab (C1) in the Condensers Setup screen and set the Split Enable field to Yes.

Unsplit setpoint is set too low. Unsplit setpoint value is com pared with discharge pressure value instead of temperature. Enter the value in terms of dis charge pressure. Go to the Setpoints tab (C2) in the Condensers Setup screen and check that the UNSPLIT STPT field value has been entered as a pressure value.

Half of the fans are not running. Check the split fan relay output: 1. Go to the Other Outs tab (C7) in the Condensers Setup screen and check that SPLIT FAN has a board and point assignment. 2. Verify Split is enabled: Go to General tab (C1) in the Condens ers Setup screen and set the Split Enable field to Yes. 3. Verify output is ON.

Appendix FTroubleshooting • F - 5
Page 264 of the Emerson E2 user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 264 · click to enlarge
Page 264

SYMPTOM POSSIBLE PROBLEM SOLUTION

Problems with Cases Case will not go into hot gas or cool gas defrost.

Check Group LLSV in Suction Group setup: 1. Go to the Outputs tab (C5) on the Suction Groups Setup screen and check GROUP LLSV. 2. Verify that the case(s) is assigned to the correct group.

Case will not terminate out of defrost mode.

1. Verify the termination type (Term Type) in the Defrost tab (C4) in the Standard Circuits Setup screen. 2. Check the defrost termination input location on circuit input. 3. Go to the Inputs tab (C6) and check DEFROST AV TERM.

Problems with Global Actions Information cannot be read from another E2 controller.

Verify that the controller with the sensor is set up as the Pri mary and the controller receiv ing the information is set up as the User (both controllers default as local).

F-6 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 265 of the Emerson E2 user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 265 · click to enlarge
Page 265

SYMPTOM POSSIBLE PROBLEM SOLUTION

Problems with Temp Sensor or Pressure Transducer Displaying Proper Value

16AI input dip switches are set improperly.

The 16 dip switches on the 16AI board correspond to each of the inputs: Dip Switches Up = Temperature Sensor Dip Switches Down = Pressure Transducer

Incorrect board and point address.

Set proper board and point set tings for both input and output: Go to the Inputs tab in the appli cation’s Setup screen and check Board and Point.

Incorrect sensor type. 1. Verify that the sensor type in E2 is the same as the sensor installed. (For example, “5V- 200PSI” is a 5-volt powered 200PSI pressure transducer, and “Temperature” is the standard Emerson Retail Solutions tem perature sensor.

2. From the Main Menu, select System Configuration (7) and Input Definitions (1). 3. Highlight the desired input and press (SETUP) to check Sensor Type.

No Heat or Air Will Come On Incorrect board and points assignment.

Make sure that your board and points are assigned to the correct compressors and heat stages

Check the Heat and Cool OAT lockout temps.

From the Home screen, press (AHU), (SETUP). Move cursor to C5 (HT/CL Setup) to check the Lockout temperatures.

Appendix FTroubleshooting • F - 7
Page 266 of the Emerson E2 user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 266 · click to enlarge
Page 266

SYMPTOM POSSIBLE PROBLEM SOLUTION

Dehumidification Problems Number of stages are not set up or set up incorrectly.

From the Home screen, press (AHU), (SETUP). Move cursor to C9 (Dehum) to check Dehum Stages.

Dehumidifier source not set up. From the same screen, verify what the sensor source is.

Temperature setting for DEHUM OCC or DEHUM UOC is set too high.

From the same screen, check the minimum temperature setting.

Lighting Control Problems Lights will not come on. Make sure you have a Time Schedule set up. A Time Sched ule is not Lighting Control. You can use the same Time Schedule for several Lighting Controls. Set up the Time Schedule first and then assign it to a Lighting Control.

Set up a Time Schedule and got to Lighting Control. Choose the desired application and press (SETUP). Move the cursor to C7 (Inputs) and highlight the Board field. Press (LOOK UP), choose the input device and press . Highlight the Point field and press (LOOK UP). Select the type of schedule and press .

Make sure Lighting Control out put is assigned.

Lights Will Not Come On With The Photocell

Photocell is not recognized by controller.

Make sure the photocell is con figured as an analog input.

Verify that the type of light sen sor is correct.

If using a light level sensor from another E2 controller, set it up on the controller it is associated with in the Global Data section.

F-8 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Page 267 of the Emerson E2 user manual — Appendix F: Troubleshooting
Page 267 · click to enlarge
Page 267
Page 267 of the Emerson E2 user manual — Appendix F: Troubleshooting
Page 268 of the Emerson E2 user manual — Appendix F: Troubleshooting
Page 268 · click to enlarge
Page 268
Page 268 of the Emerson E2 user manual — Appendix F: Troubleshooting
Page 269 of the Emerson E2 user manual — Appendix G: Revision Log
Page 269 · click to enlarge
Page 269

Appendix G: Revision Log

What's New in the E2 Manual Rev 4:

  • Multiple I/O Net ports available. Allows more than one I/O Network per controller.
  • Multiple Languages - The multiple language feature allows the UI to be switched between English and other languages using the Ctrl+S Hot Key on the E2 front panel.
  • RX Home Screen
Appendix GRevision Log • G - 1
Page 270 of the Emerson E2 user manual — Appendix G: Revision Log
Page 270 · click to enlarge
Page 270
Page 270 of the Emerson E2 user manual — Appendix G: Revision Log
Page 271 of the Emerson E2 user manual — Table of Contents
Page 271 · Contents
Contents

Contents

1 Introductionp.171.1 The E2 Refrigeration Controller (RX)p.171.2 The E2 Building Controller (BX)p.181.3 The E2 Convenience Store Controller (CX)p.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.211.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.232 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.282.2.2.3 MultiFlex CUBp.302.2.2.4 MultiFlex RTU (BX and CX Only)p.302.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.302.2.2.6 MultiFlex PAK Boardp.302.2.3 The MultiFlex ESR Boardp.312.2.4 Hand-held Terminal (P/N 814-3110)p.312.2.5 The 8RO and 8ROSMT Relay Boardsp.322.2.6 4AO Analog Output Boardp.332.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.332.3 Echelon Network Boards and Peripheralsp.342.3.1 The 16AIe (Discontinued)p.342.3.2 The 8ROe (Discontinued)p.342.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.352.3.5 TD3 Temperature Displayp.362.3.6 Facility Status Display (FSD)p.363 Mountingp.373.1 Mounting the E2p.373.1.1 Standard Mountp.373.1.2 Recessed Mountp.373.1.3 Retrofit Mountingp.383.1.4 Blank Facep.393.2 Mounting I/O Boardsp.393.2.1 Single/Double Enclosuresp.393.2.2 Boards Without Enclosures (Snap Track)p.403.3 Echelon Devicesp.413.3.1 CC-100 Case Controller and CS-100 Case Circuit Controllerp.413.3.2 MultiFlex ESRp.413.3.3 TD3p.413.4 COM3 Internal Modem Plug-In Card (P/N 638-3362)p.413.4.1 Two-Channel and FourChannel Repeatersp.423.4.1.1 Mounting Repeaters Overviewp.423.4.1.2 Mounting the Two-Channel Repeaterp.423.4.1.3 Mounting the Four-Channel Repeaterp.423.5 Sensors and Transducersp.433.5.1 Pressure Transducersp.433.5.1.1 Mountingp.433.5.2 Inside Temperature Sensorp.433.5.2.1 Locationp.433.5.2.2 Mountingp.433.5.3 Outside Temperature Sensorp.433.5.3.1 Locationp.433.5.3.2 Mountingp.433.5.4 Insertion Temperature Probep.443.5.4.1 Locationp.443.5.4.2 Mountingp.443.5.5 Supply and Return Air Sensorsp.443.5.6 Refrigeration System Temperature Probes and Sensorsp.443.5.6.1 Locationp.443.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.443.5.7 Product Temperature Probesp.453.5.8 Humidity Sensors and Humidistatsp.453.5.8.1 Indoor RH Sensorp.453.5.8.2 Outdoor RH Sensorsp.453.5.8.3 Duct-mounted Insertion RH Probep.463.5.9 Dewpoint Probep.463.5.9.1 Locationp.463.5.9.2 Mountingp.463.5.10 Light Level Sensorp.463.5.10.1 Locationp.463.5.10.2 Mountingp.463.5.11 Liquid Level Sensorsp.473.5.12 Refrigerant Leak Detectorsp.474 E2 Hardware Setupp.494.1 Setting up the E2p.494.1.1 Enclosurep.494.1.2 Main Processor Boardp.494.1.3 Power Interface Board (PIB)p.504.2 Powering the E2p.504.2.1 RS485 Portsp.504.2.2 RS485 Termination Jumpers (MODBUS or I/O Net)p.504.2.3 Echelon Network Connectp.504.2.4 Echelon Jumperp.504.3 Add-On E2 Peripheralsp.504.3.1 Echelon Plug-In Card Kit (P/N 638-4860)p.504.3.2 COM3 RS232 Plug-In for External Modem (P/N 638-4875)p.514.3.3 COM3 Internal Modem PlugIn Card (P/N 638-3362)p.514.3.4 Plug-In Digital I/O Network Card (P/N 638-4880)p.514.3.4.1 LEDsp.514.3.5 Plug-In Four-Channel Internal Repeaterp.515 Serial Configurationp.535.1 Overviewp.535.2 COM Portsp.535.3 Serial Device and Software Setupp.536 The RS485 Network and Hardware Setupp.576.1 The I/O Networkp.576.1.1 I/O Board Names and Terminologyp.576.1.2 MultiFlex-Plus (+) Boardp.586.1.2.1 Board Designationp.586.1.2.2 Board Calculationsp.586.1.3 Wiring Typesp.586.1.4 The I/O Network Structure (Daisy Chains)p.586.1.5 Network Noise Minimizationp.596.1.6 Network ID Numbers (Board Numbers)p.596.1.7 Setting the Baud Ratep.596.1.8 Setting the Terminating and Biasing Jumpersp.606.1.9 Powering the I/O Boardsp.606.1.9.1 Wiring Typesp.616.1.10 Board Installationp.626.2 IMC/Prodigy Rooftop Unit Controllersp.626.3 MODBUSp.626.3.1 Control Techniques Drive (VSD)p.626.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.636.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.636.3.3.1 XR75CX-Case Displayp.636.3.4 iPro DACp.636.3.5 Energy Meterp.636.3.5.1 Overviewp.636.3.5.2 Supported System Typesp.646.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.646.3.7 Copeland Discus with CoreSense Protectionp.646.3.8 Copeland CoreSense Communicationsp.646.3.9 Light Commercial Thermostatp.656.3.9.1 Thermostat Inputsp.656.3.9.2 Advisory and Alarmsp.656.3.10 Refrigerant Leak Detection System (RLDS)p.676.3.10.1 Diagnostic Alarmsp.686.3.11 Copeland Scroll – K5 Refrigeration Compressorp.686.3.12 XM Series of Case Controllersp.686.3.12.1 XM670p.686.3.12.2 XM679p.686.3.12.3 XM678p.686.4 BACnetp.696.4.1 BACnet Overviewp.696.4.2 BACnet Communicationp.696.4.2.1 Master Slave Token Passingp.696.4.2.2 BACnet IP (Internet Protocol)p.706.4.2.3 Discoveryp.706.4.2.4 Client-Serverp.706.4.3 MS/TP Network Connection to E2p.706.4.3.1 Add and Connect a BACnet Devicep.707 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.959.1.1.2 Sensor Wiring Typesp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/ Status Screenp.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1059.2.4 Relay Output Test Modep.1059.2.5 Wiring Outputs to Pointsp.1069.2.6 The Output LEDp.1069.2.7 Output Setup in E2p.1069.2.7.1 Configuring a Point from the Output Definitions/Status Screenp.1069.2.7.2 Using the Output Definitions/ Status Screenp.1079.2.7.3 Setting Up Digital Outputsp.1079.2.7.4 Setting Up Analog Outputsp.1089.3 CC-100 Case Controllersp.1109.3.1 Inputsp.1109.3.2 Power Module Wiringp.1119.3.3 Valve Cablep.1119.4 CCB Case Controllersp.1129.5 ESR8 and MultiFlex ESR Valve Output Wiringp.11210 Quick Startp.11510.1 Logging Onp.11510.2 Cleaning Out the Controllerp.11510.3 Setting Number of Network Devicesp.11610.4 Setting Number of Applicationsp.11710.5 The Main Status (Home) Screenp.11710.5.1 Customizing the Home Screenp.11710.6 Common Screen Elementsp.11810.6.1 The Headerp.11810.6.1.1 Header Iconsp.11810.6.2 The Function Keysp.11810.6.3 The Help Linep.11810.7 Screen Typesp.11910.7.1 The Main Menup.11910.7.2 Status Screensp.11910.7.3 The Actions Menup.12010.7.4 The Setup Screensp.12010.7.5 System Configuration Menup.12110.7.6 The System Information Menup.12210.8 Time/Date Setupp.12310.8.1 Setting the Time and Datep.12310.9 Set Up Modemp.12410.10 Set Up TCP/IPp.12510.11 Set Up Network Baud Ratesp.12610.11.1 COM1 Serial (RS232) Baud Ratep.12610.11.2 I/O Network Baud Ratep.12610.12 Set Up User Accessp.12710.12.1 Changing Required User Access Levelsp.12810.12.2 Creating a New User Accountp.12810.12.3 Deleting a Userp.12810.13 Set Up I/O Networkp.12910.13.1 Specify Number of Boardsp.12910.13.2 Checking Online Statusp.12910.14 Set Up Echelon Networkp.13010.14.1 Specifying Number of Devicesp.13010.14.2 Commissioning a Devicep.13010.14.2.1 The Service Button Methodp.13110.14.2.2 The Manual ID Entry Methodp.13210.15 License Managementp.13310.15.1 Web Servicesp.13410.16 Set Up Alarmingp.13410.16.1 Specifying Alarm Reporting Typesp.13510.16.1.1 The Display Linep.13510.16.1.2 The Alarm Outputp.13510.16.1.3 Dial-Outp.13510.16.1.4 The Echelon Network (The Alarm Annunciator)p.13510.16.2 Setting up an E2 to be an Alarm Annunciatorp.13610.16.3 Alarm Dial-Outp.13610.16.4 Introduction: Alarm Reportingp.13710.17 Set Up Global Datap.13710.17.1 Priority Settingsp.13810.18 Set Up Applicationsp.13910.18.1 Add/Delete an Applicationp.14010.18.2 Using and Configuring a Setup Screenp.14010.18.2.1 The Edit Menup.14110.18.2.2 Entering Setpointsp.14110.18.2.3 Navigating the Setup Screenp.14110.18.3 Using the Help Key to get Property Helpp.14311 Software Overviewp.14511.1 Suction Groupsp.14511.1.1 Introductionp.14511.1.2 The (Standard) Suction Group Applicationp.14511.1.2.1 Overview of PID Control Strategyp.14511.1.2.2 Variable-Speed Compressorsp.14511.1.2.3 Floating Setpoint Controlp.14511.1.3 The Enhanced Suction Group Applicationp.14511.1.3.1 Learning Modep.14611.1.3.2 Circuit Load Analysisp.14611.1.3.3 The Control/Cycles Parameterp.14611.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14611.1.3.5 Floating Suction Controlp.14611.1.4 Hardware Overviewp.14611.2 Condenser Controlp.14711.2.1 Air Cooled Condensersp.14711.2.1.1 Air Cooled Strategyp.14711.2.1.2 Temperature Differential Strategyp.14711.2.2 Evaporative Condensersp.14811.2.3 Fan Controlp.14811.2.4 Condenser Split Modep.14811.2.5 Fast Recoveryp.14811.2.6 Hardware Overviewp.14811.3 Standard Circuitsp.14911.3.1 Refrigeration Controlp.15011.3.1.1 Temperature Monitorp.15011.3.1.2 Temperature Controlp.15011.3.1.3 Line Up(ESR)/Defrostp.15011.3.1.4 Line Up(MFESR)/Defrostp.15011.3.2 Defrost Controlp.15011.3.2.1 Defrost Statesp.15011.3.2.2 Defrost Typesp.15011.3.2.3 Defrost Terminationp.15111.3.2.4 Emergency Defrostp.15111.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.15111.3.3 Clean and Door Switchesp.15111.3.3.1 Clean Switchesp.15111.3.3.2 Door Switchesp.15211.3.4 Fan Controlp.15211.3.5 The TD3 Temperature Displayp.15211.3.6 The Control Link CD Case Displayp.15211.3.7 Wiringp.15211.4 Case Control Circuitsp.15411.4.1 Overviewp.15411.4.2 Case Circuit Control Software Overviewp.15411.4.2.1 Valve Controlp.15511.4.3 Refrigeration Controlp.15511.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.15511.4.3.2 EEPRs (Suction Stepper)p.15611.4.4 Defrost Controlp.15611.4.4.1 Defrost Statesp.15611.4.4.2 Defrost Typesp.15611.4.4.3 Defrost Terminationp.15711.4.4.4 Demand Defrostp.15711.4.4.5 Emergency Defrostp.15711.4.4.6 The WAIT Statep.15711.4.5 Anti-Sweat Controlp.15711.4.5.1 Dewpoint Input Sourcesp.15811.4.6 Dual Temp Controlp.15811.4.7 Fan Controlp.15811.4.8 Light Controlp.15811.4.9 Clean/Wash Modep.15811.4.10 Walk-In Freezer Controlp.15911.4.11 Fail-Safe Modep.15911.4.11.1 Recoverable Sensor Failuresp.15911.4.12 Wiringp.16011.4.13 Setting Up An Individual Case Controllerp.16011.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.16011.5 Logging Groupsp.16011.5.1 Possible Data Errorsp.16111.5.2 Data Compressionp.16111.5.2.1 Clippingp.16111.5.2.2 Incompressible Data Typesp.16111.5.3 Base Log Groupp.16111.5.4 Setting Up Loggingp.16211.5.5 Logging Group Status Screenp.16311.5.6 Log Reportsp.16311.5.6.1 Logging Group Reportp.16311.5.6.2 Application Log Reportp.16311.5.6.3 System Log Reportp.16411.6 Air Handling Units (AHU)p.16411.6.1 Overviewp.16411.6.2 Temperature Controlp.16411.6.3 Alternate Setpointsp.16411.6.4 Fan Controlp.16511.6.4.1 Single-Speed Fansp.16511.6.4.2 Two-Speed Fansp.16511.6.4.3 Variable-Speed Fansp.16511.6.5 Economizer Controlp.16611.6.5.1 Economization Enablep.16611.6.5.2 Economization Lockout Featuresp.16611.6.6 Digital Economizer Controlp.16611.6.7 Analog Economizer Controlp.16611.6.8 Dehumidification Controlp.16611.6.9 Curtailmentp.16711.6.10 Optimum Start/Stop (OSS)p.16711.6.11 Separate Setpointsp.16811.6.12 AHU Zone Controlp.16811.6.13 Hardware Overviewp.16811.7 Zone Controlp.16911.7.1 Overviewp.16911.7.2 How Zones Workp.16911.7.3 Applications That May Be Connected To Zonesp.17011.7.3.1 MultiFlex RTU Boardp.17011.7.3.2 MultiFlex RCB Boardp.17011.7.3.3 AHUsp.17111.7.4 Temperature Controlp.17111.7.5 Zone Temperaturep.17111.7.6 Economizer Controlp.17111.7.7 Economization Enablep.17111.7.8 The Effect of Enabling Economizationp.17211.7.9 Dehumidification Controlp.17211.7.10 The Zone Humidity Inputp.17211.7.11 The Effect of Enabling Dehumidificationp.17211.7.11.1 MultiFlex RTUs and RCBsp.17211.7.11.2 AHUsp.17211.7.12 Optimum Start/Stop (OSS)p.17211.7.13 Losing Contact With Zone Applicationsp.17411.7.14 Stand-Alone MultiFlex RTUsp.17411.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17411.8 MultiFlex CUB Boardp.17411.9 MultiFlex PAK Boardp.17511.10 Lighting Schedulesp.17511.10.1 Overviewp.17511.10.2 Functions of the Lighting Schedule Applicationp.17611.10.3 Control Method Selectp.17611.10.4 Standard Controlp.17611.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.17611.10.4.2 The Schedule Interface Cell (SCHEDIF)p.17711.10.5 Alternate Controlp.17711.10.5.1 Multi-Logic Combinerp.17711.10.5.2 Offset Solar Controlp.17811.10.6 The Basic Schedule Cellp.17811.10.6.1 Slave Schedulingp.17811.10.7 The Min ON/OFF Cellp.17811.10.8 The Proof Cellp.17811.10.9 Output Light Dimmingp.17911.11 Demand Controlp.17911.11.1 Introduction to Demand Limit Controlp.17911.11.2 Demand Monitoringp.17911.11.3 Load Sheddingp.18011.11.3.1 Definitionp.18011.11.4 Shedding Levelsp.18011.11.5 Priority Levelsp.18011.11.6 How Demand Control Uses Load Sheddingp.18211.11.6.1 Power Monitoring Inputp.18311.12 Sensor Controlp.18311.12.1 Overviewp.18311.12.2 Analog Sensor Controlp.18311.12.3 Cut In/Cut Out Setpoint Controlp.18311.12.4 Digital Sensor Controlp.18411.12.5 Logical Combinationp.18411.13 Loop/Sequence Controlp.18411.13.1 Layout of the Loop/ Sequence Control Applicationp.18411.13.1.1 Control Cellsp.18411.13.1.2 Output Cellsp.18511.13.1.3 Diagramp.18511.13.2 Loop/Sequence Control Cell Descriptionsp.18511.13.2.1 The Select Cellp.18511.13.2.2 The Setpoint Float Cellp.18611.13.2.3 The PID Control Cellp.18611.13.2.4 The Filter Cellp.18611.13.2.5 The Override Cellp.18611.13.3 Output Cell Descriptionsp.18611.13.3.1 The Sequencer Cellp.18611.13.3.2 The PWM Cellp.18711.14 Time Scheduling and Holidaysp.18711.14.1 How Schedules Workp.18711.14.1.1 Eventsp.18711.14.1.2 Absolute and Relative Eventsp.18711.14.1.3 Temporary Schedule Eventsp.18811.14.1.4 Overlappingp.18811.14.1.5 Rangesp.18811.14.2 Holiday Schedulesp.18811.15 Power Monitoringp.18811.15.1 Overviewp.18811.15.2 Loggingp.18911.15.2.1 Power Monitoring Inputp.18911.16 Anti-Sweat Setupp.19011.16.1 How Anti-Sweat Worksp.19011.17 Heat/Cool Controlp.19011.17.1 Temperature Controlp.19011.17.2 Unoccupied Hysteresisp.19111.17.3 Optimum Start/Stop (OSS)p.19111.17.4 Setpoint Resetp.19111.17.5 Lead/Lagp.19211.18 Analog and Digital Combinersp.19211.19 TD Controlp.19311.19.1 Overviewp.19311.19.2 Temperature Differential (TD) Strategyp.19311.19.3 TD Control Fail-Safesp.19311.19.4 Configurationp.19311.19.5 Setpointsp.19311.19.6 Inputsp.19411.19.7 Alarmsp.19411.20 Pulse Accumulationp.19411.20.1 Overviewp.19411.20.2 Configurationp.19411.20.3 Outputsp.19411.20.4 Accumulator Reset Typesp.19511.20.5 Loggingp.19511.20.6 High Tripp.19511.21 Irrigation Controlp.19511.21.1 Overviewp.19511.21.2 Zones and Cyclesp.19511.21.2.1 Cycle Control Typesp.19611.21.2.2 Timedp.19611.21.2.3 Volumep.19611.21.3 Cycle Schedulingp.19611.21.4 Zone Inhibitp.19611.21.4.1 Timedp.19611.21.4.2 Volumep.19611.21.4.3 Rain Delayp.19611.21.4.4 Freeze Lockoutp.19611.21.4.5 Alarmp.19611.21.5 Zone Bypass Inputsp.19611.21.5.1 Bypass Failsafep.19711.21.6 Flow Sensor-Related Testsp.19711.21.6.1 Leak Testp.19711.21.6.2 Obstructed Zone Testp.19711.21.7 Service Modesp.19711.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19711.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19711.21.10 Dehumidification Controlp.19711.21.11 Two Speed Fan Controlp.19711.21.12 Configurationp.19811.22 Flexible Combinerp.19811.23 Modular Chiller Control (MCC)p.19811.23.1 Overviewp.19811.23.2 Learning Modep.19911.23.3 The Control/Cycles Parameterp.19911.23.4 Compressor Controlp.19911.23.4.1 Digital Scroll Compressorp.20011.23.4.2 Variable Frequency Drive Compressorp.20011.23.4.3 Unequal Capacity Compressorsp.20011.23.5 Bypass Valve Controlp.20011.24 Boilerp.20011.24.1 Overviewp.20011.24.2 Alarmsp.20011.25 Refrigerant Monitoring System (RMS)p.20111.25.1 RMS Assetp.20111.25.2 RMS Scalep.20111.25.2.1 Device Constraintsp.20111.26 Detailed Setpoint Change Loggingp.20111.26.1 Log Informationp.20111.26.2 Logged Changesp.20211.26.3 Unlogged Changesp.20212 Operator’s Guide to Using the E2p.20512.1 The E2 Home Screenp.20512.1.1 RX Home Screenp.20512.1.2 BX Home Screenp.20512.1.3 CX Home Screenp.20612.2 Logging On and Access Levelsp.20612.3 Toggling Full Optionsp.20712.4 Navigationp.20712.4.1 Menusp.20712.4.2 Screen Typesp.20912.4.3 The E2 Keypadp.21112.5 Customizing the Home Screenp.21312.6 Manual Defrost and Clean Modep.21312.7 Overridesp.21412.8 Checking Boards Onlinep.21512.9 Checking Status Screensp.21512.10 Alarmsp.21612.10.1 Accessing the Alarm Advisory Logp.21612.10.2 Viewing the Controller Advisory Logp.21612.10.3 Date and Timep.21612.10.4 Statep.21612.10.5 Ack/Reset Statep.21712.10.6 Area Ctrl: Application: Propertyp.21712.10.7 Advisory Messagep.21712.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21712.10.8.1 Acknowledgingp.21712.10.8.2 Resettingp.21812.10.8.3 Clearingp.21812.10.9 Facility Status Display (FSD) Alarmsp.21912.11 Viewing Logs and Graphsp.21912.11.1 Locating Logged Inputs/ Outputsp.21912.11.1.1 Home/Status Screensp.21912.11.1.2 Setup Screensp.22012.11.1.3 Setting Up Input and Output Pointersp.22012.11.2 Log Viewp.22012.11.3 The Graph Viewp.22112.11.4 Zooming In and Outp.22112.12 Naming Conventions for E2 Controllers, Applications, and Pointsp.22112.13 Multiple Languagesp.222Appendix A: Case Type Defaultsp.223Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Emerson Retail Solutions Temp Sensorsp.225Appendix C: Alarm Advisory Messagesp.227Copeland CoreSense E2 Alarmsp.241Appendix D: PID Controlp.247Introduction to PID Controlp.247Proportional (“P”) Modep.247Throttling Rangep.247Proportional Constant (Kp)p.248Integral Modep.248Why “I” Mode is Necessaryp.248The “I” Mode Calculationp.249Derivative Modep.249The “D” Mode Calculationp.250How Condenser Control and HVAC PID Differs From The Othersp.250Output at Setpointp.250Output at Setpoint for Non-Condenser/ HVAC PIDp.250Output at Setpoint for Condenser/HVAC PID Controlp.251Changing the Output at Setpointp.251Other PID Featuresp.251Output at Minimum / Output at Maximump.251Minimum Accumulated Errorp.252Filteringp.252Appendix E: Compressed Point Log Sample Limits and Precision Tablep.255Appendix F: Troubleshootingp.259Appendix G: Revision Logp.269Indexp.271Numericsp.271-A-p.271-B-p.272-C-p.272-D-p.273-E-p.274-F-p.275-G-p.275-H-p.275-Ip.275-J-p.276-K-p.276-L-p.276-M-p.277-N-p.277-O-p.278-P-p.278-R-p.278-S-p.279-T-p.280-U-p.281-V-p.281-W-p.281-X-p.281-Z-p.281
Page 272 of the Emerson E2 user manual — E2
Page 272 · click to enlarge
Page 272

date and time stamp 12-12 dial-out 10-21

Building Controller 1-2 Buttons

The Alarm Output 10-21 The Display Line 10-21 The Echelon Network 10-21 forced to normal. See Alarms, reset to nor-

cold reset 10-1 reset 10-1 BX Capabilities 1-2 BX Home Screen 12-1 -C- Case Circuits, Standard. See Standard Circuits. Case Control Circuits

mal. resetting 12-14 reset-to-normal 12-13 return-to-normal 12-13 state, in advisory log 12-12 the Alarm Annunciator 10-21 Alternate I/O Formats 10-27 Analog Sensor Control 11-39 Annunciator Home Screen 10-22 Anti-Sweat

associating CC-100s with 11-16 defrost in 11-12 overview 11-10 Case Controllers

anti-sweat control 11-13 associating with Case Control Circuits 11-16 CC-100H

defined 2-11, 11-10 CC-100LS

dewpoint input 11-14 how setpoints work 11-14 how anti-sweat works 11-46 setup 11-46 zones, definition of 11-46 Application Setup 10-25 -B- BACnet 6-13

defined 2-11, 11-10 CC-100P

defined 2-11, 11-10 CCB 9-18 clean mode 11-14 CS-100

defined 2-11, 11-10 defrost 11-12

E2 Connection 6-14 MS/TP 6-13 Overview 6-13 BACnet IP-based communication 6-14 Base Log Group 11-17 Baud Rates 10-12

pump down delay 11-12 defrost types 11-12 digital sensors

installing 9-16 dual temp control 11-14 EEPRs

E2

RS-232 port 10-12 E2, setting for I/O Network 10-12 I/O Network 6-3

recovery mode 11-12 fail-safe mode 11-15 fan control 11-14 humidity sensor installation 9-16 inputs 9-16 installation guide 8-6 light control 11-14 mounting dimensions 3-5 power modules

8DO 6-4 8IO 6-4 ARTC 6-4 E2 6-3 IRLDS 6-3 Blue "R". See Cold Reset. Board Types 6-1 Boards on the I/O Network 10-2, 10-15 Boiler 11-56 Box to Box Communications 7-1 Box-To-Box 1-5

wiring 9-17 wiring schematic 9-17 problems with cases F-6 recovery mode

I-2 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

case-controlled 11-13 · EEPRs 11-12

Page 273 of the Emerson E2 user manual — -D-
Page 273 · click to enlarge
Page 273

EEVs 11-11 sensor default locations 9-16 sensor failures 11-15–11-16 sensors

bypassing fan stages 12-10 evaporative 11-4 fail-safe dip switch setup 11-5 fan control 11-4

default installation locations 9-16 setting up individual CC-100s 11-16 specifying the number of 10-2, 10-16 stand-alone mode 11-15 superheat control 11-11 temperature control 11-11 temperature probes

single-speed 11-4 two-speed 11-4 variable-speed 11-4 fast recovery 11-4 hardware overview 11-4 input types 11-5 output wiring 11-5 overriding compressor stages 12-10 problems with F-5 split mode 11-4 Temperature Differential Strategy 11-3 Control Keys 12-8 Control Techniques VSD 6-6 Convenience Store Controller 1-3 Cool cut in/cut out setpoints 11-53 Copeland CoreSense E2 Alarms C-15 Copeland Digital Discus Compressor 11-1, 11-2 Copeland ISD Compressors 6-7 CPU 2-2 Creating 10-14 CS-100 11-10 CS-100. See Case Controllers, CS-100 CT Drives 6-6 CUB 2-6, 11-30 CX Home Screen 12-2 -D- Daisy Chains

installing 9-16 valve cable 9-17 valves 11-11

EEPRs 11-12 EEVs 11-11 liquid pulse 11-11 liquid stepper 11-11 pulse 11-11 stepper 11-11 suction stepper 11-12 walk-in freezer control 11-15 wash mode. See Clean Mode. 11-14 CC-100H. See Case Controllers. CC-100LS. See Case Controllers. CC-100P. See Case Controllers. CCB Case Controllers 9-18 Checking Boards Online 10-15, 12-11 Checking Status Screens 12-11 Clean Mode 11-14, 12-9

initiating 12-9 Clean Out 10-1 Clean Switches 11-7 Cold Reset

diagram of 6-2 Date and Time 12-12 Date Setup 10-9 Daylight Savings Dates 10-10 Defrost

performing a 10-1 Cold Reset Button 10-1 COM Port Setup 5-1 Commissioning 10-16 Commissioning CC-100s 10-16

defrost cycle 11-6, 11-12 demand 11-13

fail-safe time 11-13 drip time. See Defrost, run-off time. electric 11-13 emergency 11-13

how commissioning works 10-17 Commissioning MODBUS 10-17 Compressors

initiating 12-9 hot gas 11-12 in case controlled circuits 11-12 inhibiting, using demand sensors 11-13

  • I - 3

troubleshooting F-3 Condensers · air cooled 11-3 · strategy 11-3

Page 274 of the Emerson E2 user manual — -E-
Page 274 · click to enlarge
Page 274

Door Switches 11-8 -E- E2 1-1

ending a cycle 12-10 initiating 12-9 off-cycle 11-12 pulsed 11-13 pump down delay 11-12 reverse cycle hot gas 11-12 run-off time 11-12 standard circuits 11-6

blank face 3-3 Box-to-Box 1-5 capabilities 1-1 connection to other 1-5 documentation 1-6 Echelon connectors 4-2 Echelon jumpers 4-2 installation instructions 4-4 mounting

defrost states 11-6 defrost type 11-6 electric defrost 11-7 emergency defrost 11-7 pulsed defrost 11-7 termination 11-7 timed and reverse air 11-6 termination 11-13

blank face 3-3 recessed mount 3-1 retrofit 3-2 standard mount 3-1 networking

pulsed defrost 11-13 temperature 11-13 timed (off-cycle) 11-12 Dehumidification 11-53 Demand

introduction to 1-4 Quick Start 10-1 repeater

part number for manual 1-6 routers

explanation of 11-44 Demand Control 11-35 Demand Defrost. See Defrost, demand. Detailed Setpoint Change Logging 11-57

part number for manual 1-6 RS-232 Baud Rate 10-12 RS485 port 4-2 RS485 termination jumpers 4-2 specifications 2-2 user’s guide 1-6 EC-2 Case Controller

Log Information 11-57 Logged Changes 11-58 Unlogged Changes 11-58 Dewpoint Probe 3-10

defined 2-11 detail 2-11 Echelon Network

location 3-10 mounting 3-10 Dewpoint Probe. See Sensors, dewpoint probe. DHCP Enabled 10-11 Digital Discus Compressor 11-1, 11-2 Digital Scroll Compressor Support 11-2 Digital Sensor Control 11-40 Dip Switches

checking boards online 10-15, 12-11 daisy-chaining 8-1 device wiring 8-1 E2 RX 1-5 installing Echelon devices 8-3 location of connectors on E2 4-2 maximum number of nodes 8-2 Neuron ID number

baud rate 6-3 input type 9-1 network settings 6-3 Discontinued boards

manual entry of 10-18 overview 8-1 peripherals for the 1-5 powering Echelon devices 8-3 problems with F-2 subnets

16AIe 2-10 8ROe 2-10 Discus 6-8 Discus Compressor 11-1, 11-2

I-4 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

manual defrost

Page 275 of the Emerson E2 user manual — -F-
Page 275 · click to enlarge
Page 275

setting the number 10-2, 10-16 termination block installation 8-3 unit controllers 10-2, 10-16 wire length limitations 8-3 wire restrictions 8-3 wiring 8-1 wiring type 8-1 Echelon Network, Setting Up 10-16 Economizers. See AHUs, economizers. ECT MODBUS

Heat cut in/cut out setpoints 11-53 Help Line 10-28 Holiday Schedules 11-44 Home Screens

RX and BX 12-1 Hot Gas Defrost. See Defrost, hot gas. Hot Keys 12-8 Humidistats. See Sensors, humidity. Humidity Sensors. See Sensors, humidity. -I I/O Board Names 6-1 I/O Boards

Energy Meter 6-7 iPro DAC 6-7 MRLDS 6-8 XR, XEV and XEV22D Case Controller 6-7 Edit Menu 10-27 EEPRs. See Valves. EEVs. See Valves. Electric Defrost. See Defrost, electric. Enhanced Lighting

snap-track installation 3-4 I/O Formats

alternate 10-27 I/O Network

baud rate 10-12 Baud Rate Dip Switches 6-3 Baud Rate Settings

combination strategies 11-32 occupied mode 11-33 Enhanced Suction Group 11-1 ESR8 Board

ARTC 6-4 baud rate settings 6-3

8DO 6-4 8IO 6-4 E2 6-3 IRLDS 6-3 boards on the 10-2, 10-15 checking boards online 10-15, 12-11 daisy chains 6-2 dip switches and rotary dials 6-3 E2 RX 1-4 max number of RS485 Boards 6-1 peripherals for the 1-4 problems with F-1 terminating resistance jumpers 6-4 I/O Network, Setting Up 10-15 Icons 10-4 IMC Controllers 6-6 Index Tabs 10-28, 12-6 Inputs

installation guide 8-7 specifying the number of 10-2, 10-16 Ethernet Box to Box 7-1 -F- Flexible Combiner 1-6, 11-54 Full Options On and Off 12-3 Function Buttons

BX controller 12-11 RX controller 12-11 Function Keys 10-4, 10-28 -G- Gateway Board 2-3

models 2-4 Global Data

priority settings 10-24 setup 10-23 Graph View 12-17

zooming 12-17 -H- Hand-held Terminal 2-7

default values on sensor failure 9-9 selecting units 9-9 setup screen 9-7 digital

connection to case controller 9-16 Hardware Overview 2-1 Header Icons 10-4, 12-6

push button mode 9-10 selecting units 9-10

  • I - 5

analog

Page 276 of the Emerson E2 user manual — -J-
Page 276 · click to enlarge
Page 276

E2 4-2 RS485 termination

setting units per pulse 9-9 Insertion Temperature Probe. See Sensors, Inser- tion Probe. Inside Temperature Sensor. See Sensors, Inside Temperature. Installation Guide

settings on I/O boards 6-4 -K- Keyboard 2-2 Keypad 12-7 KW Transducer 9-6 KW Transducer. See also Sensors, KW Trans- ducer. -L- LED Status

16AI 6-21 4AO 6-18 8IO 6-20 CC-100/CS-100 8-6 E2 4-4 ESR8 8-7 MultiFlex 16 6-16 MultiFlex Combo 6-17 MultiFlex ESR 6-22, 6-23, 6-24 TD3 8-8 Internal Modems (New Processor Board) 3-5, 4-3 IRLDS

Keyboard 2-3 Main Board (CPU) 2-3 PIB 2-2 LEDs Plug-In I/O Card 4-3 License Management 10-19 Licensing 1-7 Light Commercial Thermostat 6-9

specifying the number of 10-2, 10-15 Irrigation

Advisory and Alarm 6-9 Input 6-9 Light Level Sensor 3-10 Lighting

cycle control types 11-52 cycle control types

multi-logic combiner 11-33 offset solar 11-34 control method select 11-32 functions 11-32 overview 11-31 separate control

timed 11-52 volume 11-52 cycle scheduling 11-52 flow sensor related tests 11-53

leak 11-53 obstructed zone 11-53 number of zones 11-51 override failsafe 11-53 service modes 11-53 zone inhibit 11-52

min ON/OFF cell 11-34 proof cell 11-34 slave scheduling 11-34 standard control 11-32

light level interface 11-32 schedule interface cell 11-33 unoccupied mode 11-33 Line Up ESR 11-6 Line Up MultiFlex ESR 11-6 Liquid Level Sensors 3-11 Log View 12-16 Logged Inputs and Outputs 12-15 Logging

alarm 11-52 freeze lockout 11-52 rain delay 11-52 timed 11-52 volume 11-52 zone override 11-52 zones and cycles 11-51 -J- Jumpers

power monitoring 11-45 Logging Groups 11-16

I-6 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

Show 5 more labels / short text on this page
pulse type · E2 4-2 termination · zones and cycles · alternate control 11-33 · Echelon termination
Page 277 of the Emerson E2 user manual — RS485 I/O
Page 277 · click to enlarge
Page 277

Base Log Group 11-17 Data Compression 11-17

single enclosure 3-3 light level sensors 3-10 liquid level sensors 3-11 temperature sensors

Clipping 11-17 Incompressible DataTypes 11-17 Log Reports 11-19 Logging Setup 11-18 Logging On 10-1 Logs and Graphs 12-15 LonMark Device 8-5 LonWorks Network. See Echelon Network. -M- Main Board 2-2 Main Processor Board 2-2 Main Status Screen 10-3 Manual Defrost

insertion probe 3-8 inside 3-7 outside 3-7 supply and return air sensors 3-8 MRLDS 6-8 MuliFlex Boards

mounting in enclosure 3-3 plus board 6-2 MultiFlex 16 Board

ending 12-10 initiating from Main Status Screen 12-9 Memory

features 2-4 MultiFlex Boards 2-4

16 2-4 combination input/output 2-5 CUB 2-6, 11-30 PAK 2-6, 11-31 RCB 2-6 RCB,RTU compared 11-26 RCB-P 11-26 RTU 2-6 MultiFlex CUB 2-6, 11-30 MultiFlex ESR Board 2-7 MultiFlex I/O Board

clearing all data from 10-1 Menu

actions 10-6 User Access 10-13 Menus 12-3 Messages

alarm advisory C-1 MODBUS 6-6 MODBUS Commissioning 10-18 Modem

setup 10-10 Modem Board 3-5, 4-3

Relay Output Test Mode 9-11 MultiFlex PAK 2-6, 11-31 MultiFlex Plus Board 6-2 MultiFlex RCB 2-6, 11-26 MultiFlex RTU 2-6, 11-26 MultiFlex RTU Satellite Inputs 2-6 Multiple I/O Net ports 10-17 Multiple Language Feature 12-18 -N- Navigation 12-3 Network

External Modem 4-3 Internal Modem 4-3 Modem Mounting 3-6 Modem/Communication Expansion Board 3-5 Modem/Communication Expansion Card 4-3 Modular Chiller Control 11-54 Mounting

bullet and pipe mount sensors 3-8 CC-100 3-5 dewpoint probe 3-10 E2

RS485 I/O

baud rate dip switches 6-3 daisy chain diagram 6-2 dip switches and rotary dials for board

blank face 3-3 recessed mount 3-1 retrofit 3-2 standard mount 3-1 I/O Boards And Enclosures

numbering 6-3 Network Summary Screen 12-11 Neuron ID

  • I - 7

1616 6-5 MultiFlex

Page 278 of the Emerson E2 user manual — -O-
Page 278 · click to enlarge
Page 278

manual entry of 10-18 No Description File 8-5 Noise Minimization 6-3 -O- Off-Cycle Defrost. See Defrost, off-cycle. Open Echelon 8-4 Operator’s Guide to Using the E2 12-1 OSS. See AHUs, optimum start-stop. Outputs

shed mode 11-44 Pressure Transducers 3-7 Pulse Accumulation 11-50

accumulator reset types 11-51 configuration 11-50 high trip 11-51 logging 11-51 outputs 11-50 Pulse Modulating Anti-Sweat Controller. See PMAC II. Pulsed Defrost. See Defrost, pulsed. -R- RCB 2-6, 11-26 Recovery Mode, for Case Controllers 11-11 Refrigeration Controller 1-1 Relay Output Test Mode 9-11 Repeaters

selecting units 9-14 Outside Temperature Sensor. See Sensors, out- side temperature. Overrides

initiating 12-10 -P- PAK 2-6, 11-31 Part Numbers and Model Descriptions 2-1 Passwords

part number for manual 1-6 two-channel

setting 10-13 Peer Communications 7-1

mounting 3-6 Reset Button 10-1 Resetting 12-14 Resetting the E2 Controller 10-1 Retrofit Mounting 3-2 Returned-To-Normal and Forced-To-Normal Alarms 12-12 Reverse Cycle Hot Gas. See Defrost, reverse cy- cle hot gas. RLDS 6-11

closed network layout 7-2 ethernet IP configurations 7-1 ethernet network layouts 7-2 hardware specifications 7-1 open network layout 7-2, 7-3 software specifications 7-2 troubleshooting 7-4 PIB 2-2 PID Control D-1 Plus Board 6-2 PMAC II

Diagnostic Alarm 6-12 RMS 11-57

RMS Asset 11-57 RMS Scale 11-57 Rotary Dials

input and output 12-16 Points. See Inputs or Outputs. Power

I/O Board Settings 6-3 Settings For 8IO 6-3 Routers

I/O Boards 6-5 Power Modules

part number for manual 1-6 RS-232 Baud Rate 10-12 RS485 Network

wiring 9-17 wiring schematic 9-17 Power Monitoring 11-44

I/O Network 6-1 noise minimization 6-3 RTU 2-6, 11-26 RX Capabilities 1-1 RX Home Screen 12-1

daily logs 11-45 hourly logs 11-45 logging 11-45 monthly logs 11-45

I-8 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

digital · defined 2-9 Pointers

Page 279 of the Emerson E2 user manual — -S-
Page 279 · click to enlarge
Page 279

Hansen probe. See Sensors, liquid level

probe. humidity

function keys 10-4 header 10-4 Help line 10-4 Screen Types 10-5, 12-5

connecting to a case controller 9-16 installation 3-9

indoor RH sensors 3-9 outdoor RH sensor 3-9 insertion probe 3-8

actions menu 10-6 RX and BX Main Menus 10-5 setup screens 10-6 status screens 10-5 system configuration menu 10-7 system information menu 10-8 Screens

location 3-8 mounting 3-8 inside temperature 3-7

location 3-7 mounting 3-7 Klixons

Main Status 10-3 Status 10-5 Sensor Control

wiring to input board 9-3 KW Transducer

wiring to input board 9-6 light level

alarm control 11-39 combiner function 11-39 cut in/cut out control 11-39 analog sensor control modules 11-39 digital

location 3-10 mounting 3-10 wiring to input board 9-4 liquid level

alarm control 11-40 logical combination methods 11-40 digital sensor control modules 11-40 Sensors

mounting 3-11 liquid level probe

wiring to input board 9-5 offsets 9-9 outside temperature 3-7

E2 setup 9-7 analog liquid level indicator

location 3-7 mounting 3-7 power connections on input boards for 9-2 pressure transducers

wiring to input board 9-5 bullet and pipe mount

mounting 3-8 coil in temperature

wiring to input board 9-3 Eclipse voltage-to-pressure chart B-1 mounting 3-7 refrigeration probes and sensors 3-8

location 3-8 mounting 3-8 coil out temperature

location 3-8 mounting 3-8 dewpoint (wall-mounted) 9-4 dewpoint probe 3-10

location 3-8 mounting 3-8 relative humidity

(wall-mounted) 9-4 wiring to input board 9-3 sail switches

location 3-10 mounting 3-10 wiring to input board 9-5 digital

wiring to input board 9-3 supply and return air

selecting units 9-10 wiring to input board 9-3

  • I - 9
Show 5 more labels / short text on this page
-S- Screen Elements 10-4 · analog · analog · Eclipse · mounting 3-8 temperature
Page 280 of the Emerson E2 user manual — -T-
Page 280 · click to enlarge
Page 280

temp-to-resistance chart B-1 wiring to input board 9-3 Wiring To 16AI/8IO Input Points 9-1 Separate Setpoints 11-24

pulsed defrost 11-7 refrigeration control 11-6

line up ESR 11-6 line up MFESR 11-6 temperature control 11-6 temperature monitor 11-6 temperature control 11-6 temperature monitor 11-6 wiring 11-8 State 12-12 Status Screen 12-5 Status Screen, The Main 10-3 Status Screens 10-5

configuration 11-54 Serial Configuration 5-1 Serial Connection Manager 5-1 Serial Tab 5-1 Service Button 10-17

separate 11-24 Setpoints, entering 10-27 Setting Number of Applications 10-3 Setting the Time and Date 10-9 Setup Screen 12-6 Setup Screen Configuration 10-26 Setup Screens 10-6 Single Enclosure Mounting For I/O Boards 3-3 Snap-track Installation For I/O Boards 3-4 SNTP Support 10-9 Software Applications 11-1 Software Licensing 1-7, 10-19 Software Overview

Circuit Status Screens 12-11 Condenser Status Screen 12-11 Home Screen 12-1 navigation of cursor 12-7 Network Summary Screen 10-15, 12-11 Sensor Control Screen 12-11 Suction Group Status Screen 12-11 Subnet

setting the number 10-2, 10-16 Suction Groups 11-1

bypassing compressor stages 12-10 Enhanced 11-1 floating setpoint control 11-1 hardware overview 11-2 Introduction 11-1 overriding compressor stages 12-10 PID control strategy overview 11-1 variable-speed compressors 11-1 Summary Screen 12-5 Superheat Control 11-11 Supply And Return Air Sensors 3-8 System Configuration Menu 10-7 System Information Menu 10-8 -T- Tabs, Index 10-28 TCP/IP

Demand Monitoring 11-35 Specify Number of Boards 10-15 Split Mode 11-4 Standard Circuits

electric defrost 11-7 hot gas 11-6 reversed cycle hot gas 11-6 states 11-6 termination 11-7 timed and reverse air 11-6 types 11-6 emergency defrost 11-7 fan control 11-8 inputs

setup 10-11 TD3 Temperature Display

wiring 11-9 line up ESR Defrost control 11-6 line up MFESR Defrost control 11-6 outputs

defined 2-12 features 2-12 Temperature Control

wiring 11-10 problems with F-6

case controllers 11-11 Temperature Differential (TD) Control 11-49

I-10 • E2 RX/BX/CX I&O Manual 026-1614 Rev 4 5-JAN-2013

CC-100 10-18 Setpoints · Demand Control · defrost 11-6

Page 281 of the Emerson E2 user manual — EEPR
Page 281 · click to enlarge
Page 281

alarms 11-50 configuration 11-49 inputs 11-50 setpoints 11-49 TD failsafes 11-49 TD strategy 11-49 Temperature Differential Strategy 11-3 Termination 8-2

EEPR

cables for CC-100 9-17 EEVs

cables for CC-100 9-17 Emerson Flow Controls ESR

wire colors 9-18 Emerson Flow Controls ESV

block 8-3 Echelon jumpers

wire colors 9-18 Sporlan CDS

E2 4-2 RS485 jumpers

wire colors 9-18 Sporlan SEI

E2 4-2 Termination Block 8-3 Termination Resistance Jumpers I/O Network 6-4 Termination Resistance Jumpers, I/O Network. See Jumpers, termination. Thermostatic Expansion Valves. See TXVs. Time/Date Setup 10-9

wire colors 9-18 -W- Watt-hour Transducer. See Sensors, KW Trans- ducer. Web Services 10-20 Wire Types, Echelon Network 8-1 -X- XM Series of Controllers 6-12 -Z- Zone Control 11-25

Active Date 10-9 Active Time 10-9 Date Format 10-10 Daylight Savings Dates 10-10 Daylight Savings Time uses GMT 10-10 Sundown 10-10 Time Zone 10-9 Unit Location From 10-10 Toggle Full Options 12-3 Transducers, Pressure. See Sensors, pressure transducers. Transformers

AHUs 11-24, 11-27

dehumidification 11-28 dehumidification 11-28 economization 11-27, 11-28

enabling 11-27 MultiFlex RTU 11-26 MultiFlex RTUs

dehumidification 11-28 optimum start-stop (OSS) 11-28 stand-alone mode 11-30

I/O board 6-5 selecting the correct VA rating 6-5, 8-3 six-board 6-5 ten-board 6-5 three-board 6-5 Troubleshooting F-1 Two speed fan control 11-53 TXVs

MultiFlex RTU 11-30 temperature control 11-27 zone humidity 11-28 zone temperature 11-27

control using CC-100s 11-12 -U- Unit Controllers (Echelon) 10-2, 10-16 User Access Menu 10-13 Usernames, Creating 10-13

  • I - 11

-V- Valves

Page 282 of the Emerson E2 user manual — -U-
Page 282 · click to enlarge
Page 282
Page 282 of the Emerson E2 user manual — -U-
Page 283 of the Emerson E2 user manual — -U-
Page 283 · click to enlarge
Page 283

The contents of this publication are presented for informational purposes only and they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. Emerson Climate Technologies Retail Solutions, Inc. and/or its affiliates (collectively “Emerson”), reserves the right to modify the designs or specifications of such products at any time without notice. Emerson does not assume responsibility for the selection, use or maintenance of any product. Responsibility for proper selection, use and maintenance of any product remains solely with the purchaser and end-user.

026-1614 05-JAN-2013 Emerson is a trademark of Emerson Electric Co. ©2013 Emerson Climate Technologies Retail Solutions, Inc. All rights reserved.

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Display codes

Error codes

What the fault codes shown on the display mean and how to clear them.

CodeMeaningFix
EC229x Case Controllers Enter the number of p.130
E2Call Emerson Retail Solutions service for assis­ p.239
CC-100HSee Case Controllers. p.273
CC-100PSee Case Controllers. p.273
CS-100See Case Controllers, CS-100 p.273
Fix-it

Troubleshooting

Common problems, likely causes, and what to do.

ProblemPossible causeRemedy
I/O Network ProblemsCheck I/O board power--is the green STATUS light on? If not, check power wiring connections, and use a multimeter to verify the board is getting 24VAC. Reset power to board. p.259
I/O Network ProblemsCheck I/O network connections: 1. Check wire polarity (positive to positive/negative to negative) 2. Check for broken or loose wires. p.259
I/O Network ProblemsCheck I/O board network dip switches. Verify network ID number is not a duplicate and that baud rate switches are set to 9600. (If switches are wrong, make changes and then reset the controller.) Refer to Section 6.1.6, Network ID Numbers (Board Numbers). p.259
I/O Network ProblemsCheck for proper setting of ter­ minating resistance jumpers. Network segment should be ter­ minated on the two endpoints of the daisy chain and unterminated everywhere else. Refer to Sec­ tion 6.1.8, Setting the Terminat­ ing and Biasing Jumpers. p.259
I/O Network ProblemsCheck Network/Power voltages. Refer to Section 6.1.9, Powering the I/O Boards. p.259
Echelon Network ProblemsCheck connections. Are wires broken or loose? Check network polarity (positive to positive/ negative to negative). Check for wire damage. p.260
Echelon Network ProblemsCheck for proper setting of ter­ minating resistance jumpers. Network segment should be ter­ minated on the two endpoints of the daisy chain and unterminated everywhere else. Refer to Sec­ tion 8.4, Device Termination. p.260
Echelon Network ProblemsEach controller must have its own subnet address. Refer to Section 8.3, Echelon Network Structuring (Daisy-Chains). p.260
Compressor will not OperateVerify that E2 was programmed for correct number of compres­ sor stages. Highlight the General tab (C1) in the Suction Group Setup screen. Is the correct num­ ber of stages in the “Number of Stages” field? p.261
Compressor will not OperateMake sure that compressor stages were properly set up as VS (variable speed), C (com­ pressor), or U (unloader). p.261
Compressor will not OperateVerify that compressors were assigned the proper rating (HP/ AMP, or BTU). p.261
Compressor will not OperateSet proper pressure setpoints. If you are controlling the rack using suction pressure, enter the pressure setpoint in the SUC PRES SETPT field. If you are controlling by temperature, enter the temperature setpoint in the CTRL TEMP SETPT field. Note: Pressure setpoints are located under the Setpoints tab (C2) in the Suction Group Setup screen. p.261
Compressor will not OperateSet proper board and point set­ tings for input, output, and com­ pressor outputs. Board and point settings are located under the Inputs tab (C4), Outputs tab (C5), and Comp Outs tab (C7) in the Suction Group Setup screen. p.261
Compressor will not Operate (Cont.)Verify fail-safe wiring on 8RO board for N.O./N.C. positions. One wire of the two-wire con­ nection should always be con­ nected to the middle terminal. The second wire must be either connected to the N.C. terminal (if you want the relay to be closed (ON) during power fail­ ure) or the N.O. terminal (if you want the relay to be open (OFF) during power failure.) p.262
Compressor will not Operate (Cont.)Highlight compressor stage and cancel the override by pressing Enter to open the Actions Menu. Select 3 for Override options, or go to the Override/Bypass Log to view and cancel overrides: 1. From the Main Menu, press 8 to open the Status menu. 2. From the Status menu, press 4 for the Graphs/Logs menu. 3. Press 3 for the Override/ Bypass Log. (This screen gives you quick access to all overrides/ bypasses in the system) p.262
Compressor will not Operate (Cont.)Verify correct phase and verify correct input for phase loss. If you specified that phase pro­ tection would be used on this rack, the Phase Loss input is dis­ played. The Phase Loss input is automatically configured to use E2’s Global Data phase loss pro­ tection source. If you wish to define a different source, re- define this input definition. To point this input to a board and point address: press  (EDIT) and then 1 to change the definition format. p.262
Compressor will not Operate (Cont.)Remove oil sensors from indi­ vidual compressors. 1. Highlight the Comp Setup tab (C6) in the Suction Group Setup screen. 2. Use the arrow keys to select the OIL SENSOR field. 3. Choose “None” from the LOOK UP menu. p.262
Problems with CondenserVerify that E2 is programmed with proper number of fans. 1. Highlight the General tab (C1) in the Condenser Setup screen. 2. Is the correct number of fans in the Number of Fans field? p.263
Problems with CondenserConfirm proper board and point settings: Go to the Inputs tab (C3) in the Condenser Setup screen to check PRES CRTL IN and DISCH TRIP IN. p.263
Problems with CondenserVerify proper fail-safe switch positions on the 8RO board. The fail-safe dip switches are labeled S2 on the 8RO and S3 on the 8ROe and 8IO. Set the rocker UP (ON) to close the relay and turn the output ON during net­ work failure. Set the switch DOWN (OFF) to open the relay and turn the output OFF during network failure. p.263
Problems with CondenserEnable the condenser to split. Go to the General tab (C1) in the Condensers Setup screen and set the Split Enable field to Yes. p.263
Problems with CondenserUnsplit setpoint value is com­ pared with discharge pressure value instead of temperature. Enter the value in terms of dis­ charge pressure. Go to the Setpoints tab (C2) in the Condensers Setup screen and check that the UNSPLIT STPT field value has been entered as a pressure value. p.263
Problems with CondenserCheck the split fan relay output: 1. Go to the Other Outs tab (C7) in the Condensers Setup screen and check that SPLIT FAN has a board and point assignment. 2. Verify Split is enabled: Go to General tab (C1) in the Condens­ ers Setup screen and set the Split Enable field to Yes. 3. Verify output is ON. p.263
Problems with CasesCheck Group LLSV in Suction Group setup: 1. Go to the Outputs tab (C5) on the Suction Groups Setup screen and check GROUP LLSV. 2. Verify that the case(s) is assigned to the correct group. p.264
Problems with Cases1. Verify the termination type (Term Type) in the Defrost tab (C4) in the Standard Circuits Setup screen. 2. Check the defrost termination input location on circuit input. 3. Go to the Inputs tab (C6) and check DEFROST AV TERM. p.264
Problems with Global ActionsVerify that the controller with the sensor is set up as the Pri­ mary and the controller receiv­ ing the information is set up as the User (both controllers default as local). p.264
Problems with Temp Sensor or Pressure Transducer Displaying Proper ValueThe 16 dip switches on the 16AI board correspond to each of the inputs: Dip Switches Up = Temperature Sensor Dip Switches Down = Pressure Transducer p.265
Problems with Temp Sensor or Pressure Transducer Displaying Proper ValueSet proper board and point set­ tings for both input and output: Go to the Inputs tab in the appli­ cation’s Setup screen and check Board and Point. p.265
Problems with Temp Sensor or Pressure Transducer Displaying Proper Value1. Verify that the sensor type in E2 is the same as the sensor installed. (For example, “5V- 200PSI” is a 5-volt powered 200PSI pressure transducer, and “Temperature” is the standard Emerson Retail Solutions tem­ perature sensor. NOTE: The previous Eclipse and Standard sensors are now 5V and 12V respectively. 2. From the Main Menu, select System Configuration (7) and Input Definitions (1). 3. Highlight the desired input and press  (SETUP) to check Sensor Type. p.265
No Heat or Air Will Come OnMake sure that your board and points are assigned to the correct compressors and heat stages p.265
No Heat or Air Will Come OnFrom the Home screen, press  (AHU),  (SETUP). Move cursor to C5 (HT/CL Setup) to check the Lockout temperatures. p.265
Dehumidification ProblemsFrom the Home screen, press  (AHU),  (SETUP). Move cursor to C9 (Dehum) to check Dehum Stages. p.266
Dehumidification ProblemsFrom the same screen, verify what the sensor source is. p.266
Dehumidification ProblemsFrom the same screen, check the minimum temperature setting. p.266
Lighting Control ProblemsMake sure you have a Time Schedule set up. A Time Sched­ ule is not Lighting Control. You can use the same Time Schedule for several Lighting Controls. Set up the Time Schedule first and then assign it to a Lighting Control. p.266
Lighting Control ProblemsSet up a Time Schedule and got to Lighting Control. Choose the desired application and press  (SETUP). Move the cursor to C7 (Inputs) and highlight the Board field. Press  (LOOK UP), choose the input device and . press Highlight the Point field and press  (LOOK UP). Select the type of schedule . and press p.266
Lighting Control ProblemsMake sure Lighting Control out­ put is assigned. p.266
Lights Will Not Come On With The PhotocellMake sure the photocell is con­ figured as an analog input. p.266
Lights Will Not Come On With The PhotocellVerify that the type of light sen­ sor is correct. p.266
Lights Will Not Come On With The PhotocellIf using a light level sensor from another E2 controller, set it up on the controller it is associated with in the Global Data section. p.266

Ask about the Emerson E2

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson E2

Be the first to ask — other owners or our team will answer.

Original document

Emerson E2 manual PDF

283 pages·10.9 MB·Refrigerator·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…