EN
Bunn logo
Official user manual

Bunn Infusion Series ICBA

13 pages·1.9 MB·Espresso Maker·PDF·ENDEFRITNLJA
Bunn Infusion Series ICBA
Table of Contents 67 sections ICBA, ICBB,ICBC, · ICB-DV, IB Twin · Infusion Series ® · with Smart Section ® · … ShowHide
ICBA, ICBB,ICBC,p.1ICB-DV, IB Twinp.1Infusion Series ®p.1with Smart Section ®p.1Replace operation manuals:p.137077.0000 y 38112.0001p.1INSTALLATION AND OPERATION MANUALp.1BANN-O- MATIC CORPORATIONp.1COMMERCIAL PRODUCT GUARANTEE OF BINN-O- MATICp.2THE CONTENTS OF THE FUNNEL ARE HOTp.4PG: 00658.600GS 02 / 08 © 1985 BINN-O- MATIC CORPORATIONp.4WARNINGp.4FAILURE TO COMPLETE RISKS EQUIPMENTp.4READ THE ENTIRE OPERATING MANUAL BEFOREp.4! CUREp.4! WARNINGp.4FOR USE ONLY ON ANp.4INDIVIDUAL BRANCH CIRCUIT RATED 20 AMPSp.4USERS (CONT.)p.5120/208V 120/240Vp.5SEE INSTRUCTIONSp.5ELECTRICAL REQUIREMENTSp.6I2 RED L3 REG POWER CABLEp.6NEUTRAL WHITEp.6POWER CABLEp.6TARGETp.6NEUTRAL TARGETp.6WHITEp.6NEUTRAL L1 BLACKp.6I1 BLACKp.6GREENp.6120 / 208-240VAC TRIPYLAR + TIERRA 120 BIFILLARA AND SEATLANDp.6L2 ROJOp.6240VAC BIFILAR + GROUNDp.6I2 NAKED REDp.6I1 BLACK LIp.6VOLTAGE SELECTION SWITCHp.6I1 MAROONp.6GREEN / YELLOWp.6DUALp.6230VAC BIFILAR + GROUNDp.6ELECTRIC CONEXion (All models)p.6PIPING REQUIREMENTSp.7OPERATIONS CHECKSp.8D Bp.8INITIAL PREPARATIONSp.9IMPORTANT PROGRAMMING NOTESp.12MAIN SCREENp.12READY TO BREW WATER TEMP: 200 °p.12COFFEE READY FOR PRODUCTIONp.12TEMP. DEL AGUA: 200°p.12P2426p.12UNLOCKp.12MEMORYp.12A LIGHT AND AN ELECTRONIC SYSTEM WITH A HIGH LEVEL OF POWERp.12ANDp.12P3048p.12COFFEE MACHINE PLANNING (CONT.)p.13PROGRAMMING FUNCTIONS - FLOW DIAGRAMp.13BREW LOCKOUT?p.13PROGRAMMING FUNCTIONS - LEVEL 1p.13NO DONE YESp.13POUNDING BLOCK ISN'T READY IFp.13PROGRAMMING FUNCTIONS - LEVEL 2p.13SERVICE TOOLS?p.13FACTORY ADJUSTMENTSp.13NO SIp.13
Page 1 of the Bunn Infusion Series ICBA user manual — 37077.0000 y 38112.0001
Page 1 · click to enlarge
Page 1

ICBA, ICBB,ICBC,

ICB-DV, IB Twin

Infusion Series ®

Before energizing this product please read all the instructions for use and connection.

with Smart Section ®

Replace operation manuals:

Bunn Infusion Series ICBA — Replace operation manuals: diagram (page 1)
Fig. 1 · Replace operation manuals:

37077.0000 y 38112.0001

INSTALLATION AND OPERATION MANUAL

BANN-O- MATIC CORPORATION

POST OFFICE BOX 352 SPRINGFIELD, ILLINOIS 62708-3227 PHONE: (217) 529- 6601 FAX TEMA

To make sure you have the most recent review of our Operation Manual or see an Inested Piece Catalogue, Programming Handbook and Service manual visit Bunn-O@-@ Matic's website. www.bunn.com The site is completely FREE and represents the fastest way to get more recent catalogs or manual updates. To request technical service, call Bunn-O@-@ Matic Corporation at 1 - 800.286 and 6070.

41581.000 C 03 / 09 © 2008 Bunn-O@-@ Matic Corporation

Page 2 of the Bunn Infusion Series ICBA user manual — COMMERCIAL PRODUCT GUARANTEE OF BINN-O- MATIC
Page 2 · click to enlarge
Page 2

COMMERCIAL PRODUCT GUARANTEE OF BINN-O- MATIC

Bunn-O@-@ Matic Corp. ("BUNN ') guarantees equipment that it manufactures as follows: 1. All other products except those specified following are guaranteed with a term of 2 years for parts and an age from one year to the labour force, but have been replaced by more than 3 months after their production date referred To in Article 9 or 4 at least 6 shall be added accordingly if they do so under Section II above 2) The electronic circuit and / or monitoring boards: 3 year guarantee for both parts as well with labor. 3) Compressors of cooling equipment: a guarantee for 5 years and 1 year with respect to the labour force. 4) The abrasive discs of coffee-making equipment to ground the cafe as per its original factory granulometric analysis: for both parts and 3 year or 30 000 pounds jobs, whichever is best met earlier. The above guarantee periods have been valid from the date of installation. BUNN guarantees that the equipment they manufacture will be commercially free from material and manufacturing defects which may exist at production time, as well with their presence within a relevant warranty period. That guarantee does not apply to any equipment, component or piece that was otherwise manufacture by BUNN and which in the opinion of BNNs had been affected with misuse (negligence) as well at an earlier stage but did have bad operation. That guarantee is conditional on the Buyer's 1) promptly informing BUNN about any claim to be made under this phone warrant at (217 and / or in writing with a letter from an authorized bUNCA service place, 352 as soon after his permission by BNC that bad equipment was currently being guaranteed. THE EARLIER SECURITY IS EXCLUSIVE AND INSTEAD OF ANY OTHER, WRITTEN OR ORAL CARE THAT'S EXPLICIT TO BE IMPLIED BUT DOES NOT HAVE BEEN LIMITED WITH AN IMPLICIT MARKETING WARRANT. The agents, distributors or employees of BUNN are not authorized to amend this guarantee and give additional guarantees that hold BONNs accountable. According to this, statements by these individuals and their words or copies do not constitute guarantees but should be put at risk. If BUNN determines at its own discretion that the equipment does not suit his or her warranty, BONNas and while their best choice are currently under guarantee (1) will provide replacement parts with / Or free labour to repair damaged components during security periods for parties but also after a purchase price paid by an authorized service representative of BNONA. THE BUYER'S APPEAL AGAINST BUNN FOR HIS FAILURE TO FULFIL ANY OF THE OBLIGATIONS ARISING FROM ITS SALE, WHETHER AS A RESULT AND OTHERWISE REFERRED WITH AN INTEREST OR OTHER LIABILITY SHALL BE LIMITED AT BEST BY CHOICE BUT ONLY THROUGH THEIR SELECTION UNDER THIS DOCUMENT. No liability will be exercised by BUNN for any other damage or loss, including but without limited to lost gain and sales of equipment that have been missed.

BrewWIRE, breawlogic and beremotit. Braw, Double and EASYclear with an easy Gard as well at the time of their first reading.

Page 3 of the Bunn Infusion Series ICBA user manual — COMMERCIAL PRODUCT GUARANTEE OF BINN-O- MATIC
Page 3 · click to enlarge
Page 3

INTRODUCTION The equipment's coffee pitcher and hot-plate with a light purple or thermo put under it. The pinterbolt can have an auxiliary hot water key. The equipment should be used only interiors onto a backand leveling counter or shelf. Install them in an area with no water jet device. The Flood Series coffee machine, similar to the DBC BrewWise and with its built-in system includes a wireless interface that allows MPG or dlung mill To have some information loaded into his "programming chip 'inside of their funnel handle. That information includes what coffee flavour is being milling and how much of the tanda will be prepared (medium or complete). Once the desired quantity of coffee with a fair taste has been ground, his frying will be loaded into an attic. The information about the handle of a funnel will then be transferred to his coffee machine. The coffee tiere then takes this information and distribute the amount of water preset in a cafe for that taste as well with its volume. The coffee maker can be programmed to regulate different functions of the production process, such as a temperature for manufacturing and processing with some light or high quality products. That allows an operator to program a certain "recipe 'for every type of coffee that has been prepared. The Infusion Series coffee machine can beatboth tea and cafe with recipes, as well to have the following characteristics: Derivation (puro) Flood or Brevg. Other features are the Energy Savings mode, supported by BUNNLink and Smart Reader.

CONTENTS Guarantee 2 Introduction 3 User's warnings 4 Electrical specifications 6 Tube specifics 7 Tank drilling 8 Operation controls 9 Initial preparation and Visualization of assigned recipes with identification nuna.

ICB-DV Double Voltage Machine

ICBA 230 Volt Machine

ICBB 200 Volt Machine

IB Twin 120 / 208-240V or 230VCA Volt machine

41581.8000 032609

Page 4 of the Bunn Infusion Series ICBA user manual — INDIVIDUAL BRANCH CIRCUIT RATED 20 AMPS
Page 4 · click to enlarge
Page 4

The equipment should be established under the International Code of Plums and Food Codes Manual for U.S. Medical Administration (FDA). For models installed outside the US, applicable health and plumbing code should be complied with.

That equipment should be installed to comply with the International Plumbing Code of The international code Council and its Food Section Manual for food or drug Adminis- ration (FDA). For models installed outside the U.S.A., with an applicable Plumbing / Sanitation Code.

#00656.0000

  • TIPSTICK IF:
  • IT'S QUARTERED.
  • RAYED
  • WATER HURLED TO DRY
  • WAS USED ON DIRECT FIRE OR EXPOSED TO ELECTRONIC ELEMENTS

THE CONTENTS OF THE FUNNEL ARE HOT

READ THE WHOLE OPERATION MANUAL BEFORE BUYING OR USING THIS PRODUCT. NON-COMPLIANCE MAY RESULT IN RISKS OF INJURIES

PG: 00658.600GS 02 / 08 © 1985 BINN-O- MATIC CORPORATION

#00658.0000

  • WARNING
  • DO NOT OVERLOAD THE CIRCUIT.
  • FIRE ALSO TO THE RULES OR INCHUFE OF A Dor suit.
  • DO NOT DEFORM THE PLUG OR CORD.
  • Respect national and local electrical code.
  • DON'T PUT HIM UP TO FUEL. THE COMMISSION'S DECISION TO PROPOSE AN INFORMATION AND COMMUNICATION SYSTEM WITH A VIEW TO MONITORING THE PRODUCTION OF NEW TECHNOLOGIES, AS WELL THAT THEY HAVE BEEN PUT INTO PRACTICE BY ITS MEMBERS. READ THE WHOLE OPERATION MANUAL BEFORE USING THIS PRODUCT.

WARNING

  • DO NOT OVERLOAD CIRCUIT.
  • ALWAYS ELECTRICALLY GROUND THE LUNG.
  • DO NOT DEFORM PLUG OR CORD.
  • FOLLOW NATIONAL AND LOCAL ELECTRICAL CODES.
  • KEEP FUELS AWAY.

FAILURE TO COMPLETE RISKS EQUIPMENT

DAMAGE, FIRE OR SHOCK HAZARD.

READ THE ENTIRE OPERATING MANUAL BEFORE

USE production and manufacture of products

#00986.0000

For operation with 120 / 208 V ca. or 120 / 240 V c.a., replace the power cable with only Bunn-O- Matic 01699.8000.

! CURE

For 120 / 208V or 128 and 240 volt operation, replace Power Supply Cord only with Bunn-O- Matic part number 01699.g.

! WARNING

Incorrect programming could result in accidental dispen- ing of HOT LIQUID.

#34072.0000

Training personnel are to follow instructions provided for software programming.

Use of additional graphic layer requires disabled from appropriate switches.

Read all instructions for additional graphic layer prior to installing and programming.

TO BE USED ONLY WITH AN INDIVIDUAL CIRCUIT BRANCH UP TO 20 G

FOR USE ONLY ON AN

320175.00A 05 / 06 © 2006 Bunn-O@-@ Matic Corporation

INDIVIDUAL BRANCH CIRCUIT RATED 20 AMPS

#39175.0000

#00985.0000

The wrong program can cause an accidental distribution of QUIDIUM.

WARNING! To reduce the risk of electrical shocks, do not remove or open a cover. No parts are available for the user to repair inside. Just authorized maintenance personnel. Unplug the power supply unit before repairing.

The trained personnel should follow the instructions provided for software planning.

The use of an additional graphic template requires the disabling and disposal from appropriate switches.

To reduce the risk of electrical shock, do not remove or open cover. Do not us--serviced parts inside. Authorized service personnel only. Disconnect power before servicing.

Read all instructions for additional graphic template before installation and schedule.

#37881.0000

41581.8000 032609

Page 5 of the Bunn Infusion Series ICBA user manual — SEE INSTRUCTIONS
Page 5 · click to enlarge
Page 5

USERS (CONT.)

120/208 o 120/240 V c.a.

120/208V 120/240V

#03408.0000

120 V cg WARNING REMOVE THE FUNNEL ONLY

#34056.0001

#03409.0000

120/208-240 V, 13.8-16.8 A, 2900-4050 W 1PH, 3-Wire + GND, 60HZ

Optional in- situ cabling 120 / 208-240 V ca., 13.8-16.9 A and 2900- 4050 W

#29710.0011

Fire risk. Use a high-end ground connection plug with an UL and specified for 125 / 250 VCA, 30 A monophanic 4 conductors. The plug should select and install only trained service personnel.

Risk of Fire. Use a UL listed ground type attachment plug, rated 125 / 250 Vac and 30 A with 1 phase 4 driver. Plug to be select and installed only by qualified service personnel.

38125.00A 04 / 05 © 2005 Bunn-O- Matic Corporation

#38125.0000

Fire risk. Use a high-end ground connection plug with an UL and specified for 125 / 208 VCA, 30 A monophanic 4 conductors. The plug should select and install only trained service personnel.

Risk of Fire. Use a UL listed ground type attachment plug, rated 125 / 208 Vac and 30 A with 1 phase 4 driver. Plug to be select and installed only by qualified service personnel.

38125.0001A 04 / 05 © 2005 Bunn-O- Matic Corporation

#38125.0001

WARNING

  • WARNING
  • FILL UP THE WATER TANK BEFORE CONNECTING
  • DO NOT OVERLOAD THE CIRCUIT
  • KEEP HIM FROM FLAMMABLE SUBSTANCES
  • DO NOT DEFORM THE PLUG AND CABLE SEE INSTRUCTIONS
  • NON-COMPLIANCE WITH THIS PUTS AT RISK FIRE, ELECTROCUTION AND DAMAGE TO EQUIPMENT.
  • THE PINTERER'S ENERGIZED UNLESS IT ISN'T PLUGGED UP.
  • FILL WATER TANK BEFORE ENERGIZING
  • DO NOT EXCEED CIRCUIT
  • KEEP AWAY FROM FUELS
  • DO NOT DEFORM PLUG OR CORD
  • FAILURE TO COMPLETE RISKS EQUIPMENT DAMAGE, FIRE OR SHOCK
  • BREWER ENERGIZED UNLESS UNPLUGGED

SEE INSTRUCTIONS

#06064.0000

41581.8000 120408

Optional Field Wiring

Page 6 of the Bunn Infusion Series ICBA user manual — L2 ROJO
Page 6 · click to enlarge
Page 6

ELECTRICAL REQUIREMENTS

To determine the circuit's requirements, check with a pinterbox datasplate and local or national electrical codes.

WARNING - The power cable should be SO, JO and SJ to have been tested with a UL-certified or FYN as specified for 90 ° C. The power cable should be at least 91cm (3 feet) long and up to 1,8 m [6 foot] length.

I2 RED L3 REG POWER CABLE

NEUTRAL WHITE

POWER CABLE

TARGET

NEUTRAL TARGET

WHITE

N

N

NEUTRAL L1 BLACK

NEUTRAL L1 BLACK

I1 BLACK

I1 BLACK

G

GREEN

G

GREEN

120 / 208-240VAC TRIPYLAR + TIERRA 120 BIFILLARA AND SEATLAND

Bunn Infusion Series ICBA — I2 RED L3 REG POWER CABLE diagram (page 6)
Fig. 2

L2 ROJO

L2 ROJO

POWER CABLE

I1 BLACK

I1 BLACK

GREEN

G

240VAC BIFILAR + GROUND

I2 NAKED RED

POWER CABLE

N

I1 BLACK LI

VOLTAGE SELECTION SWITCH

I1 MAROON

GREEN / YELLOW

G

DUAL

230VAC BIFILAR + GROUND

ELECTRIC CONEXion (All models)

1. A electrician should provide an electrical service. 2. Determine the available power service at place. 3. (DV models only) Select the desired drive voltage as a function of available power service at place. 4. Using a Voltimeter, check the tension and color coding of each driver at an electrical supply source. 5. Remove the front access panel to get onto a terminal block. 6. Pass the power cable through a pull-and with an end cover or terminal block. 7. Connect the power cable to a terminal block as shown. 8. Before continuing, check the voltage at a cabling terminal block in an area. 9. (DV models only) Replace the voltage selection switch at appropriate position and re-put your access panel. 10. If you have to connect pipes later, make sure that the coffee machine's off-line from an electrical supply. If the pipes have been connected, coffee machine's ready for initial production.

Page 7 of the Bunn Infusion Series ICBA user manual — PIPING REQUIREMENTS
Page 7 · click to enlarge
Page 7
  • DEMAND
  • The device should be put into place at locations where it can been monitored by trained personnel.
  • To be functioning properly, this device should have been installed at a place where the temperature is between 5 and 35 ° C
  • To be sure, the device should have no more than 10 ° tipped.
  • A electrician should provide electrical service as specified in all local and national power codes.
  • That device should be tipple and cleaned with water.
  • The device is not designed to be used by people (including children) with reduced physical, sensory or mental capabilities and / Or inexperienced but without knowledge unless they have been instructed from the person responsible for their safety about using this artifact.
  • Adults are rewarded to care about children's play with their apparatus.
  • If the power cable is damaged, to avoid danger and be replaced by an available special wire from its manufacturer or his authorized service agent.

PIPING REQUIREMENTS

The coffee growers have to be connected with a cold water system at an operation pressure of between 20 and 90 lb / pug2 (138 or 620kPa) from one supply pipe that is ½ "more. A passing valve should be installed at the pipe before coffee machine. Install a pressure regulator at the pipe if more than 6 g / pl (90 lb) and reduce to 365 kPa [50 Ik or br]. The water entrance connection is 0.75-11.5 NH (MAGUERA RASCA). To be more convenient, an adapter with a clamour and its turn into his complete connection of ¼ "is provided. Bunn-O@-@ Matic does not recommend using a water supply of inverse osmosis or deionized waters for this equipment. REQUIere: A flow of 3.78 l / min (1.0 gal) from the water supply pipe.

NOTA - Bunn-O@-@ Matic recommends an 9,5 mm (3 / 8 ") copper tube for installations from the 12.7 cm water supply pipe and ½ '. The inclusion of a compact coil tube in the water line will facilitate coffee machine's movement to clear up its counter. Bunn-O- Matic does not recommend using a mount valve to install the coffee machine. The size and shape of an atoning made at the supply pipe by this type have a potential to restrict water passage.

The equipment should be established under the International Code of Plumbing and Food Codes Manual for Foodstuffs Administration (IAFC) (FDA). For models installed outside the US, applicable health and plumbing code should be complied with.

PIPING CONNECTION 1. Wash the water pipe. 2. Stretch firmly the set of an adapter attached to a 1 / 4 "water supply pipe. 3. firmly fix the set of an adapter attached to a connection with 0.75-11.5 NH (MAGUERA RASK) from back coffee machine. 4. Open up water supply

TANK DRAINAGE 1. Loosen the screws that hold up his front access panel. Pull back the panel. 2. Push the white clamp from a long hose that goes between an inlet and its entrance solenoid. 3. Unplug the hose and an entrance solenoid strap. 4. place the end of a drainage hose in an area with capacity for 13.25 l (3.5 gallons, simple models) or 22.7 L and at least 6,0 billion.Double model. 5. Drop the white clamp to drain water from your tank. 6. When the tank remains empty, put back a hose onto an esponoid and tighten its clamp. 7. Replace the front panel and press them.

41581.8000 120408

Page 8 of the Bunn Infusion Series ICBA user manual — G
Page 8 · click to enlarge
Page 8

OPERATIONS CHECKS

A

D B

F

A

Bunn Infusion Series ICBA — OPERATIONS CHECKS diagram (page 8)
Fig. 3

H G NOTE - For simple models, refer to the left-hand side of a double model.

G

A. INABLE BREW ON / OFF INTERRUPTOR (Inactivated and deactivated percolation) The "ENABLE BREW ON / OFF '(indicator lights) switch activates the percolation circuit and energizes a tank's fill cycle. When you press again (the indicator goes out), a tank's fill and pounding stop. When stopping a percolation cycle after it's been started, the water passage to pitcher does not stop until an empty funnel. The press of this switch while the pinterbox's program leads to an output and a return onto its main screen.

B. Programming (left) That hidden switch can be used to move back through the list of functions while in program mode.

C BREW (Filling) When the "ENABLE BREW ON / OFF 'switch is on N and its main screen's visible, a momentary press-free of this breaker starts an occlusion cycle from his select side.

D. Programming (right) The press and hold with this switch can be entered into the program menus. The switch will be pounding and logged with each function screen at step-by, stage.

E. RETIREMENT SELECTION SWITCHES When you press the half (medium) or full and complete portions switch, select how much product to prepare on your selected side. The press of a different switch after an intersecting cycle has been initiated does not change the percolation portion in place. The light indicates the portion selected to be pernamed. It's also used in programming to adjust values for both sizes of portions.

F. FUNCTION SCREEN That's the screen that shows different percolator functions and allows them to conduct their program.

G. FAIRY SENSIBLE COIL It's used to "get, and we have been using Smart Unit information from the face of a collection with an advertising card.

H. DIGITAL FUNCTION DISPLAY SWITCHES: The switch is used to select the options (NO / -) that appear on your screen during training. Brewer: The switch is used to select DONE options that appear on the screen while currently in program. Control: The switch is used to select options (YES / +) that appear on the screen while currently in program.

41581.8000 120408

Page 9 of the Bunn Infusion Series ICBA user manual — INITIAL PREPARATIONS
Page 9 · click to enlarge
Page 9

INITIAL PREPARATIONS

1. Enter an empty funnel onto the rails of a frying. 2. Put an empty pitcher under his funnel. 3. Connect the percolator to power supply. Be sure that the ON / OFF switch is on N (LED). 4. The water will pass to the tank and stop once it reaches its highest capacity. The screen will be displayed PLEASE WAIT... TANK FILLING till the tank's filled with water. 5. Wait about 20 minutes for the water from a tank to be heated at an appand temperature. The screen will display READY TO BREW... WA TER TEMP: (COFFEE-MAKING LIST.. TEMP. (G) 200 ° The following information shall be submitted to the Commission and its competent authorities: During this time some water will drip from the funnel and that's because of its expansion, but it should not be later. 6. Put a small container under the key and open up his lever. Drop it after I hear that the tank's been filled. 7. The values of water volumes and flows have been set at production. If you need to increase or reduce the volume, please see Section of this coffee production Volumeter Adjustment manual. 8. The coffee machine is currently ready to be used as per the production of a café.

The percolation water temperature is at a factory level determined to be 200 ° F (93.3). The high altitude will require a lower temperature to avoid boiling. To title the percolation water temperature, you should use this box as a guide. FingerworkWater boiling point N ° CProjected water temperature N ° C -1000213.8 101.0200 93.3 -500212.9 100.5200 93.3 0212.0 100.0200 93.3 500211.1 99.5200 93.3 1000210.2 99.0200 93.3 1500209.3 98.5200 93.3 2000208.4 98.0200 93.3 2500207.4 97.4200 93.3 3000206.5 96.9199 92.8 3500205.6 96.4198 92.2 4000204.7 95.9197 91.7 4500203.8 95.4196 91.1 5000202.9 94.9195 90.6 5500201.9 94.4195 90.6 6000201.0 93.9194 90.0 6500200.1 93.4193 89.4 7000 7500199.2 92.9 198.3 92.4192 88.9 191 88.3 8000197.4 91.9190 87.8 8500196.5 91.4189 87.2 9000195.5 90.8188 86.7 9500194.6 90.3187 86.1 10000193.7 89.8186 85.6

DISPLAY OF ASSIGNED RECIPES AND NUMBER 1. Be sure that the ON / OFF (Fold and turn off) switch is on OPF [LED turned out]. 2. Press and hold BREW A (Percolation A.). The screen will display the name of a recipe assigned to A percolation while INTERRUPTOR IS NOT INCIDIED. That's to say that percolation cannot be initiated while the ON / OFF switch is at an FOD. 3. Repeat for BREW B and FREWC. 4. (Double models only) Repeat steps 1 - 3 to the other side. 5. Be sure that ON / OFF switch's on FOD. To see the machine's identification number, press and hold your left hidden button till you have been shown on display: AND. Drop the hidden left button. 6. After 5 seconds of waiting, the screen will display: ICBXXXLINKX. That's the machine serial number.

Page 10 of the Bunn Infusion Series ICBA user manual — INITIAL PREPARATIONS
Page 10 · click to enlarge
Page 10

COFFEE PILLING WITHOUT A SMARTPHONE AND MG OR DBC MILL: 1. Start every percolation cycle with an empty pintering funnel. 2. Enter a BUNN filter into the funnel. 3. Put the coffee fresh into a filter and level up with its ground as it's soft. 4. Flow the funnel onto its rails till it's high. 5. Put an empty pitcher under his funnel. 6. The "ENABLE BREW ON / OFF switch from the select side should be on NO. Choose the desired range volume. 7. Press momentarily and drop the BREW (Filling) button. There may be some cases where the percolation cycle does not start with BREW: a. THE SWITCH'S NOT ON - The ON / OFF switch should be on N. b. HIGH PERCOLATION TEMPERATURE - Wait till hot or cancel the option BREW LOCKOUT (Filling) c. CHECK THE FUNNEL - Remove the funnel and remove your used coffee. d. FITTED - Select a different percolation button or serving size. 8. If none of the above messages appear on display, they will be read NOW BREWING (Percol and) while the remaining time of an intersecting cycle. 9. A rectipting of drip time will be available at once after the percolation DRIPPING (Goting) That shows the remaining time so that it doesn't get more coffee from his end of a funnel. 10. Carefully remove the percolation funnel and discard ground coffee with a filter only after you have been noticeably stopped dripping.

WITH A SMARTPHONE AND AN ANTI-DBC OR MG G9-2T MILL: 1. Choose the small portion size onto your mill. 2. Enter a BUNN filter into the funnel. 3. Fold the chosen quantity of fresh coffee at Smart Channel using G9-2T DBC or MHG with Intelligent Section and level ground Coffee by shaking it gently. 4. Flow the funnel onto his rails. The pinterer will read the name of coffee and its size through an integrated circuit situated in a frying handle. NOTE: The pilling machine will match the size of a percolation portion with that and its share. MULINO PERCOLADOR Small half portion Medium full Portion Great * Full porting INCORRECT GRIND... BATCH SIZE WRONG (Wrong ground... wrong portion size) and then PRESS BREW TO BREAK ANYWHERE (BREW press to paddle anything). 5. Put an empty pitcher under his funnel. 6. The "ENABLE BREW ON / OFF switch from the select side should be on NO. 7. Press momentarily and release the BREW button. There may be some cases where the percolation cycle does not start with BREW: a. THE SWITCH'S NOT ON - The "ENABLE BREW ON / OFF) 'switch should be on N. b. HIGH PERCOLATION TEMPERATURE - Wait till hot or cancel the option BREW LOCKOUT (Filling) c. CHECK THE FUNNEL - Remove the funnel and remove your used coffee. d. INCORRECT GROUND - It indicates that a large portion was milling using the mill. Check the size of your portion and weight for coffee ground. 8. If none of the above messages appear on display, they will be read NOW BREWING (Percol and) while the remaining time of an intersecting cycle. 9. A rectipting of drip time will be available at once after the percolation DRIPPING (Goting) That shows the remaining time so that it doesn't get more coffee from his end of a funnel. 10. Carefully remove the percolation funnel and discard ground coffee with a filter only after you have been noticeably stopped dripping.

Page 11 of the Bunn Infusion Series ICBA user manual — INITIAL PREPARATIONS
Page 11 · click to enlarge
Page 11

CLEANING 1. It's recommended to wear a rinsed wet cloth into an unabrasive soft liquid detergent for cleaning all surfaces of Bunn-O- Matic equipment. Do NOT FIT this with a water pressure device. 2. Check and clear every spray head. The holes in the spray head should be always open.

NOTA: The accumulations in the spray head and connection can restrict water flow with an impact on coffee's percolation. To achieve consistent good results, clear the spray head and connect weekly. When performing a visual examination, it may appear that for light through all the holes in his plate of tipboard's head spray but an thin film with waste can let out lights and prevent water flow.

3. Unplug the spray head from his peller. Untiring her by withdrawing the seal. 4. Use the sharp end of your cleaning tool to remove mineral deposits from head agents. 5. Insert the long end of a tool into an interface and turn it several times to remove mineral deposits from its connection. 6. Insert the short end of a tool into its derivation connections and turn it several times to remove mineral deposits from an intermittent. 7. Rearm and connect your spray head. Just tighten your head with his hand.

See Programming Manual for calibration routine to check that the spray head flow coincides with a scheduled passing. Retirement of the percolator may be necessary because and after accumulation with calcareous deposits. If the waste accumulated in a peller was cleaned and moved, it should be recalibrated to get its intended volumes.

Page 12 of the Bunn Infusion Series ICBA user manual — A LIGHT AND AN ELECTRONIC SYSTEM WITH A HIGH LEVEL OF POWER
Page 12 · click to enlarge
Page 12

COFFEE MAKER'S PLANNING The program of this coffee machine is divided into two levels. At level 1 there's a function. All other functions are accessed at level 2. The following function screens are in order of appearance. Each screen has instructions how to gain access and program with the different functions of a coffee machine.

IMPORTANT PROGRAMMING NOTES

- READ CAREFULLY. To leave the program mode at any time, press and drop ON / OFF (FACKING) button located on a front breaker panel. The screen will be back to the MAJOR PANTALLA. If during the coffee maker's configuration none of his five program switches are pressed for a minute, and while an atypical function screen will be set up with its display back to The PRINCIPAL PANTALLA. Remember to put a container and an ameler under the spray while using with its Filling Reg for CAUDAL ALIBRAR titration as well at coffee valves or after-production in SERY HERRAMIES / DIRECTOR PROBAR.

MAIN SCREEN

READY TO BREW WATER TEMP: 200 °

COFFEE READY FOR PRODUCTION

TEMP. DEL AGUA: 200°

P2426

That screen appears as soon and after the padded's ready to use. That screen shows the water temperature of a tank. When the water from a tank reaches its proper adjusted temperature, his screen will change with HEATING( HEATING) a READY TO BREW (CLEAR).

To get additional information, you can download the program manual at www.bunn.com

UNLOCK

MEMORY

Programming BOOK INTERRUPTOR (located on memory module card at units prior to N / S ICB001330 and main board with C's icb010330.lt) The switch can be used to prevent access at coffee machine's planning levels. Once all the right percolation settings have been programmed, an operator can place his switch in "ON 'position to stop someone from changing them. The "ON 'switch also allows you to access the program menus for viewing current parameters. Nevertheless, no change will be held up.

A LIGHT AND AN ELECTRONIC SYSTEM WITH A HIGH LEVEL OF POWER

AND

P3048

To get more advanced Programming information, please refer to the 41581.0001 programming manual at www.bunn.com

41581.8000 120408

Page 13 of the Bunn Infusion Series ICBA user manual — SERVICE TOOLS?
Page 13 · click to enlarge
Page 13

COFFEE MACHINE PLANNING (CONT.)

PROGRAMMING FUNCTIONS - FLOW DIAGRAM

BREW LOCKOUT?

PROGRAMMING FUNCTIONS - LEVEL 1

NO DONE YES

POUNDING BLOCK ISN'T READY IF

PROGRAMMING FUNCTIONS - LEVEL 2

Bunn Infusion Series ICBA — COFFEE MACHINE PLANNING (CONT.) diagram (page 13)
Fig. 4

(-) READY AND TIPSY WITH AN UNLISTED LIGHT IF YOU HAVE TO TURN ON A BAD ENERGY SAVING OR GET SOME MISSET.

To get more advanced Programming information, please refer to the 41581.0001 programming manual at www.bunn.com

SERVICE TOOLS?

FACTORY ADJUSTMENTS

NO SI

NO SI

41581.8000 120408

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the Bunn Infusion Series ICBA

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Bunn Infusion Series ICBA

Be the first to ask — other owners or our team will answer.

Original document

Bunn Infusion Series ICBA manual PDF

13 pages·1.9 MB·Espresso Maker·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…