EN
Bunn logo
Official user manual

Bunn CDBCP

36 pages·1.6 MB·Coffeemaker·PDF·ENDEFRITNLJA
Bunn CDBCP
Table of Contents 59 sections BUNN · CONTENTS · BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY · OPERATING CONTROLS · … ShowHide
Page 1 of the Bunn CDBCP user manual — BUNN
Page 1 · click to enlarge
Page 1

BUNN

®

Bunn CDBCP — BUNN diagram (page 1)
Fig. 1
Page 5 of the Bunn CDBCP user manual — OPERATING CONTROLS
Page 5 · click to enlarge
Page 5

OPERATING CONTROLS

Model CEZ ON/OFF SWITCH Placing the "ON/OFF" switch in the "ON" upper position supplies power to the brew station warmer, enables the brew circuit, and energizes the tank refill circuit. Placing the switch in the "OFF" lower position stops tank refilling and brewing and deenergizes the brew station warmer. Stopping a brew cycle after it has been started will not stop the flow of water into the decanter until the funnel is empty.

Bunn CDBCP — OPERATING CONTROLS diagram (page 5)
Fig. 2
Bunn CDBCP — OPERATING CONTROLS diagram (page 5)
Fig. 3
Page 6 of the Bunn CDBCP user manual — READY INDICATOR
Page 6 · click to enlarge
Page 6

OPERATING CONTROLS (cont.)

ADDITIONAL WARMER SWITCHES (CDBC only)

Pressing any additional warmer switch so that the indicator is glowing, supplies power to the associated warmer.

READY INDICATOR

This indicator glows when the preset temperature has been achieved. The word "NOT" above "READY" will glow in all other instances.

TEMPERATURE INDICATORS (Feature disabled from the factory – refer to page 8.)

The indicator glows to communicate the brew water temperature. Two indicators will glow when the temperature is between them.

INITIAL SET-UP 1. Insert an empty funnel into the funnel rails. 2. Place an empty decanter under the funnel. 3. Connect the brewer to the power source. 4. Model CDBC – Press the "ON/OFF" switch (indicator glowing). Model CEZ – Place the "ON/OFF" switch in the "ON" upper position. 5. Water will flow into the tank and stop when the tank is filled to its capacity. 6. Wait approximately twenty minutes for the water in the tank to heat to the proper temperature. 7. Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refilling. If brewer is not equipped with a faucet, place a empty decanter beneath the funnel and initiate a brew cycle. 8. Model CDBC – Place an empty decanter/server beneath the funnel and press the "ON/OFF" switch (indicator glowing) then momentarily press and release the "BREW" switch. Model CEZ – Place an empty decanter beneath the funnel and place the "ON/OFF" switch in the "ON" upper position then momentarily press and release the "BREW" switch. 9. Allow the cycle to finish and measure the amount of water in the decanter/server. It should be 64 ounces ± 2. Refer to the adjustments section of this manual should the volume need to be increased or decreased.

The brewer is now ready for use in accordance with the coffee brewing instructions below.

COFFEE BREWING 1. Insert a BUNN® filter into the funnel. 2. Pour fresh coffee grounds into the filter and level the bed of grounds by gently shaking. 3. Slide the funnel into the funnel rails. 4. Place an empty decanter/server beneath the funnel. 5. Model CDBC – Press the "ON/OFF" switch (indicator glowing) then momentarily press and release the "BREW" switch. Model CEZ – Place the "ON/OFF" switch in the "ON" upper position then momentarily press and release the "BREW" switch. 6. When brewing is completed, simply discard the grounds and filter.

29079 042803

Page 7 of the Bunn CDBCP user manual — READY INDICATOR
Page 7 · click to enlarge
Page 7

POUR-OVER FEATURE If the brewer is equipped with a pour-over feature, follow the instructions below. 1. Remove the thumbscrew and pour-in lid from the top cover of the brewer and set aside. 2. Insert a BUNN® filter into the funnel. 3. Pour fresh coffee grounds into the filter and level the bed of grounds by gently shaking. 4. Slide the funnel into the funnel rails. 5. Place an empty decanter beneath the funnel. 6. Measure 64 ounces of cold water in a container and slowly pour the water into the pour-in opening. 7. Press the ON/OFF button to activate the lower warmer (Indicator lamp on). NOTE: Do not press the Brew Button. It is not necessary when using the pour-over feature. 8. When brewing is completed, simply discard the grounds and filter.

CLEANING 1. The use of a damp cloth rinsed in any mild, non-abrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment. 2. Check and clean the sprayhead. The sprayhead holes must always remain open.

Page 8 of the Bunn CDBCP user manual — CEZ ADJUSTMENTS & OPTIONAL SETTINGS
Page 8 · click to enlarge
Page 8

CEZ ADJUSTMENTS & OPTIONAL SETTINGS

Bunn CDBCP — CEZ ADJUSTMENTS & OPTIONAL SETTINGS diagram (page 8)
Fig. 4
Page 9 of the Bunn CDBCP user manual — Adjusting Automatic Warmer Shut-Off
Page 9 · click to enlarge
Page 9

CDBC ADJUSTMENTS & OPTIONAL SETTINGS

Bunn CDBCP — CDBC ADJUSTMENTS & OPTIONAL SETTINGS diagram (page 9)
Fig. 5

Setting Brew Temperature

The brewer is factory set to brew at 200°F (93˚C). To change this setting, press and hold the "HIDDEN" switch beneath the "®". The word "TEMP" above the "ON/OFF" switch will glow to correspond with the temporary function change of this switch. Repeatedly press and release the "ON/OFF" switch until one of the bank of temperature indicators shows the approximate desired temperature. When two indicators are glowing, the temperature is approximately the number between them.

Displaying Brew Temperature

The brewer is factory set with the temperature display disabled. To change this setting, press and hold the "ON/ OFF" switch and the "HIDDEN" switch beneath the "®" for five seconds, the entire bank of temperature indicators will glow. Release both switches. Pressing and releasing the "ON/OFF" switch will toggle between turning the entire bank of temperature indicators on-or-off, signifying the "ON" or "OFF" condition of this display. Wait for a few seconds, the brewer will maintain this last setting.

Setting Brew Lockout

The brewer is factory set with the brew lockout disabled. Brew lockout prevents starting a brew cycle if the ready indicator is not glowing. When an attempt at brewing cannot be allowed, the word "NOT" and "LOCKOUT" flash for three seconds to indicate the reason the brew can't begin. To change the condition of the brew lockout, press and hold the "HIDDEN" switch beneath the "®" and momentarily press the "BREW" switch.

Adjusting Automatic Warmer Shut-Off

The brewer is factory set with this feature disabled. The automatic warmer shut-off deenergizes all warmers after a predetermined time period after the most recent brew cycle. To change the setting, press and hold the "BREW" switch and the "HIDDEN" switch beneath the "®" for five seconds, the entire bank of temperature indicators will flash on-and-off. Release both switches. Pressing and releasing the "BREW" switch will select the number of temperature indicators from none to five. When no indicators are glowing, this feature is disabled and all warmers will be controlled only by their respective switches. When one to five indicators are glowing, it indicates the approximate number of hours of delay before all warmers will be automatically deenergized after the most recent brew cycle.

CDBC & CEZ models are factory set to deliver 64 ounces ± 2 for each brew cycle.

29079 042803

Page 10 of the Bunn CDBCP user manual — ADJUSTMENTS & OPTIONAL SETTINGS (cont.)
Page 10 · click to enlarge
Page 10

ADJUSTMENTS & OPTIONAL SETTINGS (cont.)

BREW VOLUME SET-UP: Use the following steps when the setting is unknown or a different circuit board is being installed. 1. Place an empty funnel in the funnel rails and an empty decanter/server or graduated vessel beneath the funnel. 2. Place the "ON/OFF" switch in the "ON", upper position. 3. Press and hold the brew start button until you hear the brew solenoid click on-and-off three times (approximately 5 seconds). Release the button. 4. Allow the cycle to continue until the desired amount of water is dispensed and then turn "OFF" the brewer. The brewer is now set to dispense this amount of water for each subsequent brew cycle.

To increase the amount of water for each brew cycle place an empty funnel in the funnel rails and an empty decanter/server or graduated vessel beneath the funnel. Press the "ON/OFF" switch. Press and hold the "BREW" switch until you hear the solenoid click on-and-off three times (approximately 5 seconds), then release the "BREW" switch. Momentarily press and release the "BREW" switch once for each ounce (approximate) of water to be added to the prior setting and allow the brew cycle to finish.

To decrease the amount of water for each brew cycle place an empty funnel in the funnel rails and an empty decanter/server or graduated vessel beneath the funnel. Press the "ON/OFF" switch. Momentarily press and release the "BREW" switch once for each ounce (approximate) of water to be removed from the existing setting. Press and hold the "BREW" switch until you hear the solenoid click on-and-off three times (approximately 5 seconds), then release the "BREW" switch and allow the cycle to finish.

29079 020103

Page 11 of the Bunn CDBCP user manual — TROUBLESHOOTING
Page 11 · click to enlarge
Page 11

TROUBLESHOOTING

A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic Technical Service Department.

  • Inspection, testing, and repair of electrical equipment should be performed only by qualified service personnel.
  • All electronic components have 120 volt ac and low voltage dc potential on their terminals. Shorting of terminals or the application of external voltages may result in board failure.
  • Intermittent operation of electronic circuit boards is unlikely. Board failure will normally be permanent. If an intermittent condition is encountered, the cause will likely be a switch contact or a loose connection at a terminal or crimp.
  • Solenoid removal requires interrupting the water supply to the valve. Damage may result if solenoids are energized for more than ten minutes without a supply of water.
  • The use of two wrenches is recommended whenever plumbing fittings are tightened or loosened. This will help to avoid twists and kinks in the tubing.
  • Make certain that all plumbing connections are sealed and electrical connections tight and isolated.
  • This brewer is heated at all times. Keep away from combustibles.
  • Unplug the brewer when servicing, except when electrical tests are specified.
  • Follow recommended service procedures.
  • Replace all protective shields or safety notices.

Before troubleshooting this brewer, check for the following:

A. Control Boards (CDBC)

1. Make sure ribbon cable is properly attached to the control board (ALL PINS INSERTED INTO PLUG). 2. Make sure there is a nylon insulating washer under each screw head that holds the control board to the plastic front end cap. This is important for proper operation.

B. Control Boards (CEZ)

Locate J6 connector on control board. If jumper is across pins 1 & 2, board is set up to operate tea brewer or a brewer that DOES NOT use a water level probe. If jumper is across pins 2 & 3, board is set up to operate a coffee brewer or a brewer that uses a water level probe. Look at the bottom side of the control board. Pin 1 of connector J6 is marked by a square solder pad on the foil side of the board and pins 2,3 & 4 are marked by a round solder pad.

C. Control Boards (CDBC & CEZ)

Make sure before servicing brewer that voltage is present at control board.

On CDBC models, press any warmer switch or observe if any indicator lights are glowing on the control panel. If so, proceed with testing. If not, check for voltage across pins 1 & 2 of the ten pin J1 connector (black and white wires). If voltage is present, replace the control board. If voltage is not present, check wiring and voltage across terminal block (black and white). Correct the problem and retest before proceeding with testing.

On CEZ models, check for voltage across pins 1 & 7 of the eight pin J1 connector (black and white wires). If voltage is present, proceed with testing. If voltage is not present, check wiring and voltage across terminal block (black and white). Correct the problem and retest before proceeding with testing.

29079 042803

Page 12 of the Bunn CDBCP user manual — REFILL CIRCUIT
Page 12 · click to enlarge
Page 12

TROUBLESHOOTING (cont.)

REFILL CIRCUIT

PROBABLE CAUSE REMEDY PROBLEM

Will not fill or refill

1. Power off to brewer (all models)

Press warmer switches on control panel to determine if power is ON.

2. Water shut off (all models)

Make sure water is ON.

3. Display flashing (CDBC) or ready light flashing (CEZ)

Brewer has shut down due to malfunction (See Diagnostic Chart in manual, Page 19, or under top lid of brewer).

4. ON/OFF Switch (all models)

Make sure ON/OFF Switch is "ON" and indicator is lit.

5. Lime build up on Probe (all models)

Remove the Probe and check for lime deposit on tip. Clean and reinstall.

6. Refill Valve or Control Board (all models)

Disconnect the brewer from the power source and remove wires from refill valve coil. Check for continuity across the terminals of the solenoid coil. If continuity is not present, replace the refill valve (See page 30). If continuity is present, the coil may be stuck closed. Shut water off to brewer. Set the ON/OFF switch to the "OFF" position. Open the faucet and drain water down in the tank until flow stops or slows to a trickle. Attach a voltmeter to the terminals of the refill solenoid. Connect the brewer to the power source. Press the switch "ON". Within five seconds, voltage should be present at the solenoid terminals. If voltage is not present, refer to the wiring diagrams and check the wiring harness.

29079 042803

Page 13 of the Bunn CDBCP user manual — PROBABLE CAUSE REMEDY PROBLEM
Page 13 · click to enlarge
Page 13

TROUBLESHOOTING (cont.)

REFILL CIRCUIT (cont.)

PROBABLE CAUSE REMEDY PROBLEM

Fill or refill does not shut "OFF" (ON/OFF Switch "ON")

1. Lime build up on probe (all models)

Remove Probe and check for lime deposits on tip. Clean and reinstall.

2a. Water Level Probe Sensing System (CDBC)

A) Disconnect the brewer from the power source. Disconnect the J3 connector from the control board. Check for continuity from the nut on top of the level probe to pin 1 of the plug, continuity should be present. Pull the temperature probe up about an inch from the grommet. Check for continuity from the outside surface of the temperature probe and pin 4 of the plug, continuity should be present. Connect the J3 plug to the control board and proceed to step 3.

2b. Water Level Probe Sensing System (CEZ)

B) Disconnect the brewer from the power source. Disconnect the J5 connector from the control board. Check for continuity from the nut on top of the level probe to pin 5 of the plug, continuity should be present. Pull the temperature probe up about an inch from the grommet. Check for continuity from the outside surface of the temperature probe and pin 2 of the plug, continuity should be present. Connect the J5 plug to the control board and proceed to step 3.

Press ON/OFF switch to "ON" (In- dicator lamp should be lit). If wa- ter continuously flows out of air vent tube, disconnect the brewer from the power source. If water flow stops, replace the control board. If water flow does not stop, repair or replace the refill sole- noid. (See page 30)

3. Refill valve or control board (all models)

Fill or refill does not shut "OFF" (ON/OFF Switch "OFF")

If water continuously flows out of air vent tube, disconnect the brewer from the power source. If water flow does not stop, repair or replace the refill solenoid. If the valve closes when power is re- moved, replace the control board. (See pages 21 & 22)

1. Refill valve or control board (all models)

29079 042803

Page 14 of the Bunn CDBCP user manual — PROBLEM PROBABLE CAUSE REMEDY HEATING CIRCUIT
Page 14 · click to enlarge
Page 14

TROUBLESHOOTING (cont.)

PROBLEM PROBABLE CAUSE REMEDY HEATING CIRCUIT

Water does not heat to proper temperature

1. Display flashing (CDBC) or ready light flashing (CEZ)

Brewer has shut down due to malfunction (See Diagnostic Chart in manual, Page 19, or under top lid).

2. Water not touching temperature probe

Remove probe and grommet. Look into hole on tank lid. Water must be within one inch from top of tank.

3a. Dry Plug In Probe Sensing System (CDBC)

A) Disconnect the brewer from the power source. Disconnect the J3 connector from the control board. Check for continuity from the tank mounting screw where the green wire mounts, to pin 2 of the plug, continuity should be present. Pull the temperature probe up about an inch from the grommet. Check for continuity from the outside surface of the temperature probe and pin 4 of the plug, continuity should be present. Connect the J3 plug to the control board and pro- ceed to step 4a.

3b. Dry Plug In Probe Sensing System (CEZ)

B) Disconnect the brewer from the power source. Disconnect the J5 connector from the control board. Check for continuity from the tank mounting screw where the green wire mounts, to pin 5 of the plug, continuity should be present. Pull the temperature probe up about an inch from the grommet. Check for continuity from the outside surface of the temperature probe and pin 2 of the plug, continuity should be present. Connect the J5 plug to the control board and pro- ceed to step 4b.

29079 042803

Page 15 of the Bunn CDBCP user manual — PROBLEM PROBABLE CAUSE REMEDY
Page 15 · click to enlarge
Page 15

TROUBLESHOOTING (cont.)

HEATING CIRCUIT (cont.)

PROBLEM PROBABLE CAUSE REMEDY

Water does not heat to proper temperature (cont.)

4a. Temperature Probe (CDBC)

A) Remove the probe from the grommet and submerge in a water bath of approximately 70°F(21°C). Connect an ohmmeter to pins 3 and 4 of the J3 connector. At 60°F(16°C) the reading should be 15.3k ± 2k OHMS, at 70°F(21°C) the reading should be 11.8k ± 2k OHMS, and at 80°F(27°C) the read- ing should be 9.3k ± 2k OHMS. If the probe is within these param- eters, reconnect the J3 plug to the control board.

4b. Temperature Probe (CEZ)

B) Remove the probe from the grommet and submerge in a water bath of approximately 70°F(21°C). Connect an ohmmeter to pins 2 and 3 of the J5 connector. At 60°F(16°C) the reading should be 15.3k ± 2k OHMS, at 70°F(21°C) the reading should be 11.8k ± 2k OHMS, and at 80°F(27°C) the read- ing should be 9.3k ± 2k OHMS. If the probe is within these param- eters, reconnect the J5 plug to the control board.

5. Limit Thermostat (all models)

Disconnect the brewer from the power source. Check for continu- ity across the limit thermostat ter- minals. Continuity should be present. If not replace the limit thermostat.(See page 27)

6. Tank Heater (all models)

Disconnect the brewer from the power source. Check for continu- ity between the white terminal of the terminal block (or Red termi- nal on 208/240 volt models) and the black wire on the relay on the control board. There should be a low OHM reading. If no continuity is present, check for a wiring prob- lem, then replace the tank heater if no wiring problem is found. (See page 28)

Spitting or excessive steaming

1. Lime build up on temperature probe, tank or tank heater

Inspect probe and tank assembly for excessive lime deposits. Delime as required.

29079 042803

Page 16 of the Bunn CDBCP user manual — PROBLEM PROBABLE CAUSE REMEDY
Page 16 · click to enlarge
Page 16

TROUBLESHOOTING (cont.)

HEATING CIRCUIT (cont.)

PROBLEM PROBABLE CAUSE REMEDY

Spitting or excessive steaming (cont.)

2a. Temperature Probe (CDBC)

A) Remove the probe from the grommet and submerge in a water bath of approximately 70°F(21°C). Connect an ohmmeter to pins 3 and 4 of the J3 connector. At 60°F(16°C) the reading should be 15.3k ± 2k OHMS, at 70°F(21°Cº the reading should be 11.8k ± 2k OHMS, and at 80°F(27°C) the read- ing should be 9.3k ± 2k OHMS. If the probe is within these param- eters, reconnect the J3 plug to the control board.

2b. Temperature Probe (CEZ)

B) Remove the probe from the grommet and submerge in a water bath of approximately 70°F(21°C). Connect an ohmmeter to pins 2 and 3 of the J5 connector. At 60°F(16°C) the reading should be 15.3k ± 2k OHMS, at 70°F(21°C) the reading should be 11.8k ± 2k OHMS, and at 80°F(27°C) the read- ing should be 9.3k ± 2k OHMS. If the probe is within these param- eters, reconnect the J5 plug to the control board.

3. Control Board (all models)

Set the temperature to 200°F (93°C). Let tank temperature sta- bilize. If temperature in tank is above temperature setting by more than 7°F(-14°C), replace the con- trol board.(See pages 21 & 22)

Brewer is making unusual noises

1. Plumbing lines

Plumbing lines should not rest on the counter top.

2. Water supply

The brewer must be connected to a cold water supply.

3. Lime build up

Remove the tank lid and clean inside of tank with a deliming agent, if necessary.

29079 042803

Page 17 of the Bunn CDBCP user manual — BREWING CIRCUIT
Page 17 · click to enlarge
Page 17

TROUBLESHOOTING (cont.)

BREWING CIRCUIT

PROBLEM PROBABLE CAUSE REMEDY

Brew cycle will not start 1. Display flashing (CDBC) or ready light flashing (CEZ)

Brewer has shut down due to malfunction (See Diagnostic Chart in manual, Page 19, or under top lid of brewer).

2. No water

Water lines and valves to the brewer must be open.

3. No power or incorrect voltage to the brewer

Check for voltage across the black and white terminals at the termi- nal block.

4. ON/OFF switch not in the "ON" position

The indicator lamp must be lit

5. Low water temperature (Brew lockout is enabled)

Allow brewer to heat until ready lamp is lit, or disable the brew lockout feature. (See page 7 or 8)

6. Water not touching refill probe inside tank

Press ON/OFF switch (indicator must be lit). Brewer will refill until water touches probe inside tank. Water must be in contact with refill probe before brew cycle will start.

7. Switch panel (CDBC)

Disconnect the brewer from the power source. Disconnect the rib- bon connector from the control board. Check for continuity be- tween pins 1 & 2 (An arrow on the connector indicates pin 1). No continuity should be present. Press the BREW switch. Continuity should be present for as long as the switch is held "ON". If no con- tinuity is present, replace the switch membrane decal.(See page 23)

29079 042803

Page 18 of the Bunn CDBCP user manual — PROBLEM PROBABLE CAUSE REMEDY
Page 18 · click to enlarge
Page 18

TROUBLESHOOTING (cont.)

BREWING CIRCUIT (cont.)

PROBLEM PROBABLE CAUSE REMEDY

Brew cycle will not start (cont.)

8. Control board or dispense valve (all models)

If the start switch (CEZ) or switch panel (CDBC) is operating prop- erly, proceed as follows. Attach a voltmeter to the terminals of the dispense solenoid. Connect the brewer to the power source. Turn on the brewer and press the BREW switch. Voltage should be present at the solenoid terminals. If volt- age is not present, refer to the wiring diagrams and check the wiring harness. If voltage is present, check for continuity across the terminals of the sole- noid coil. If continuity is not present, replace the solenoid (See page 26). If continuity is present, the valve may be stuck closed.

Consistently low beverage level in the dispenser or beverage over- flows dispenser

1. Brew volume (all models)

Set up brewer according to in- structions in section Adjustments- Brew Volumes. (See pages 7 or 8) Using a stop watch or second hand, time the length of the brew cycle. Record this time inside the top lid. If service is ever needed again, use the time as reference to determine if time has changed.

2. Lime build up

Inspect the dispense valve and spray head for excessive lime de- posits. Delime as required.

3. Dispense Valve

Remove dispense valve and clear any obstructions. Rebuild or re- place valve if necessary. (See page 26)

29079 020103

Page 19 of the Bunn CDBCP user manual — PROBLEM PROBABLE CAUSE REMEDY
Page 19 · click to enlarge
Page 19

TROUBLESHOOTING (cont.)

BREWING CIRCUIT (cont.)

PROBLEM PROBABLE CAUSE REMEDY

Dripping from spray head

1. Lime build up

Inspect the tank assembly for ex- cessive lime deposits. Delime as required.

2. Dispense valve

Remove the dispense valve and clear any obstructions. Rebuild or replace the valve if necessary.(See page 26)

1. Sprayhead

A six-hole stainless steel spray- head must be used for proper extraction.

2. Water temperature

Place an empty brew funnel on an empty decanter beneath the sprayhead. Initiate brew cycle and check the water temperature im- mediately below the sprayhead with a thermometer. The reading must not be less than 195°F(91°C). Adjust the temperature setting to increase the water temperature. Refer to Initial Set-up instructions.

3. Filter type

BUNN® paper filters must be used for proper extraction.

4. Coffee grind

A fine drip or grind must be used for proper extraction.

5. Funnel loading

The BUNN® paper filter must be centered in the funnel and the bed of grounds leveled by shaking gently.

Weak beverage · 29079 030101

Page 20 of the Bunn CDBCP user manual — PROBLEM PROBABLE CAUSE REMEDY
Page 20 · click to enlarge
Page 20

TROUBLESHOOTING (cont.)

BREWING CIRCUIT (cont.)

PROBLEM PROBABLE CAUSE REMEDY

Dry coffee grounds remain in the funnel

1. Sprayhead

Make sure sprayhead is present and holes are clear and unob- structed. There should be six sepa- rate streams of water coming out of the sprayhead.

2. Funnel loading

The BUNN® paper filter must be centered in the funnel and the bed of grounds leveled by shaking gen- tly.

Low beverage serving tempera- ture

1. Warmer

Disconnect the brewer from the power source. Remove the warmer plate and turn upside down to ex- pose the warmer terminals. Re- move the two wires. Check for continuity across the two warmer terminals. If continuity is not present, replace the warmer ele- ment (See page 31). If continuity is present, reconnect the wires to the warmer element. Check for voltage at the warmer terminals. Turn the warmer switch "ON". The indicator light will come on. Volt- age should be present at the ter- minals. If not, disconnect power supply and check wiring and switch.

29079 041599

Page 21 of the Bunn CDBCP user manual — FLASHES CAUSE THINGS TO CHECK
Page 21 · click to enlarge
Page 21

DIAGNOSTICS

Intermittent flashing of the READY indicator (Model CEZ) or the bank of temperature indicators (Model CDBC) indicates that a fault exists. Count the number of flashes between pauses and use this chart as a guide to investigating the fault.

FLASHES CAUSE THINGS TO CHECK

1 Dry Plug - In Fault - Water Pressure (Is water shut "OFF") Sheath of temperature probe dry for 10 minutes after power-up Temperature probe wiring Fill valve wiring, function, & strainer Green wire between tank and circuit board

2 Low Tank Level Fault - Water pressure (Is water shut "OFF") Level probe dry for 7 minutes after fill valve is energized Shorting pin on J6 connector of control board not on correct set of pins (CEZ only) See page 7. Level probe wiring Temperature probe wiring Fill valve wiring, function, & strainer

3 Low Water Temperature Fault - Tank heater wiring & function Sensor in tank is calling for heat for 30 minutes or more Temperature probe wiring

4 Tank Sensor Disagreement - Temperature probe wiring Level probe detects water, but dry plug-in probe dry Level probe wiring Green wire between tank and circuit board

5 Temp Sensor Out-of-Range - High Sensor not connected to circuit board

6 Temp Sensor Out-of-Range - Low Sensor wires shorted together or to chassis

29079 042803

Page 22 of the Bunn CDBCP user manual — DIAGNOSTICS
Page 22 · click to enlarge
Page 22
Bunn CDBCP — DIAGNOSTICS diagram (page 22)
Fig. 6
Page 23 of the Bunn CDBCP user manual — DIAGNOSTICS
Page 23 · click to enlarge
Page 23

SERVICE (cont.)

CONTROL BOARD - Model CDBC

Bunn CDBCP — DIAGNOSTICS diagram (page 23)
Fig. 7

Location:

The Control Board is located inside the top cover behind the front end cap.

Test Procedures:

The test procedures for the control board will vary depending upon the problems experienced by the brewer. Refer to the Troubleshooting guide beginning on page 9. The troubleshooting guide is divided into three sections, Refill Circuit, Heating Circuit, and Brew- ing Circuit.

Page 24 of the Bunn CDBCP user manual — DIAGNOSTICS
Page 24 · click to enlarge
Page 24

SERVICE (cont.)

CONTROL BOARD - Model CEZ

Bunn CDBCP — DIAGNOSTICS diagram (page 24)
Fig. 8

Location:

The Control Board is located inside the trunk behind the front access panel.

Test Procedures:

The test procedures for the control board will vary depending upon the problems experienced by the brewer. Refer to the Troubleshooting guide beginning on page 9. The troubleshooting guide is divided into three sections, Refill Circuit, Heating Circuit, and Brew- ing Circuit.

Page 25 of the Bunn CDBCP user manual — DIAGNOSTICS
Page 25 · click to enlarge
Page 25

SERVICE (cont.)

Bunn CDBCP — DIAGNOSTICS diagram (page 25)
Fig. 9

Removal and Replacement: 1. Disconnect the 11-pin connector to the switch panel from the control board. 2. Remove the four #6 screws, nylon washers and the two #4-40 screws securing the control board to the end cap assembly and set aside. 3. Gently pry the switch panel from the end cap assembly. 4 Remove any adhesive that remains on the end cap. 5. Remove the adhesive backing from the new switch panel. Insert the ribbon connector through the slot in the end cap and apply the switch panel to the end cap. 6. Install the control board to the back side of the end cap using the four #6 screws, nylon washers and the two #4-40 screws to the end cap assembly. NOTE: The four nylon washers must be installed under the heads of the four #6 screws to prevent a possible shorting of the control board circuits. 7. Reconnect the 11-pin connector from the switch panel to the control board making sure every pin on the control board is inserted into the ribbon cable plug.

The Switch Panel is located in the front of the hood.

Test Procedures:

The test procedures for the switch panel and the control board will vary depending upon the problems experienced by the brewer. Refer to the Troubleshoot- ing guide beginning on page 9. The troubleshooting guide is divided into three sections, Refill Circuit, Heating Circuit, and Brewing Circuit.

29079 042803

Page 26 of the Bunn CDBCP user manual — DIAGNOSTICS
Page 26 · click to enlarge
Page 26

SERVICE (cont.)

ON/OFF SWITCHES - Model CEZ

Bunn CDBCP — DIAGNOSTICS diagram (page 26)
Fig. 10
6. Check for continuity across the center and lower terminal with the switch in the "ON" position. Continuity must not be present when the switch is in the "OFF" position.

If continuity is present as described, reconnect the black wire to the center terminal and the remaining wire to the lower terminal. If continuity is not present as described, replace the switch.

Removal and Replacement: 1. Remove the wires from the switch terminals. 2. Remove hose connected to faucet. Remove nut securing faucet to brewer and remove faucet as- sembly. 3. Remove four nuts securing front end cap to brewer and remove end cap. 4. Remove switch and replace with new switch. 5. Install front end cap and faucet assembly. 6. Refer to FIG. 6 when reconnecting the wires.

Location:

The ON/OFF switches are located on the front of the hood.

Bunn CDBCP — DIAGNOSTICS diagram (page 26)
Fig. 11

Test Procedure: 1. Disconnect the brewer from the power source. 2. Viewing the switch from the back remove the white wire from the upper terminal and the black wire from the center terminal. 3. With a voltmeter, check the voltage across the white wire and the black wire. Connect the brewer to the power source. The indication must be 120 volts ac for two wire 120 volt models and three wire 120/240 volt models. 4. Disconnect the brewer from the power source.

If voltage is present as described, reconnect the white wire and proceed to #5. If voltage is not present as described, refer to the Wiring Diagrams and check the brewer wiring har- ness.

5. With the black wire removed, remove the wire from the lower terminal.

29079 071599

Page 27 of the Bunn CDBCP user manual — DIAGNOSTICS
Page 27 · click to enlarge
Page 27
Bunn CDBCP — DIAGNOSTICS diagram (page 27)
Fig. 12
Page 28 of the Bunn CDBCP user manual — DISPENSE VALVE
Page 28 · click to enlarge
Page 28

SERVICE (cont.)

DISPENSE VALVE

Bunn CDBCP — DISPENSE VALVE diagram (page 28)
Fig. 13

Location:

The dispense valve is located inside the top cover behind the front end cap.

Test Procedures: 1. Disconnect the brewer from the power source. 2. Check the water level in the tank to confirm that it is within 1/2" from the top of the tank. 3. Connect the brewer to the power source. If the brewer has been set for brewer temperature lock- out, this feature must be disabled. See Page 8 for procedure. 4. Check the dispense valve for coil action. Place the ON/OFF switch in the "ON" position, press and release the BREW switch. Listen carefully in the vicinity of the dispense valve for a "clicking" sound as the coil magnet attracts and repels the plunger. 5. Disconnect the brewer from the power source.

Bunn CDBCP — DISPENSE VALVE diagram (page 28)
Fig. 14

If the sound is heard as described, there may be a blockage in the dispense valve or the water line to the sprayhead. Remove the dispense valve and inspect for wear, and remove waterborne particles. If the sound is not heard as described, proceed to #6.

Page 29 of the Bunn CDBCP user manual — DISPENSE VALVE
Page 29 · click to enlarge
Page 29
Page 29 of the Bunn CDBCP user manual — DISPENSE VALVE
Page 30 of the Bunn CDBCP user manual — TANK HEATER
Page 30 · click to enlarge
Page 30

SERVICE (cont.)

TANK HEATER

If continuity is present as described, reconnect the wires, the tank heater is operating properly. If continuity is not present as described, replace the tank heater.

Bunn CDBCP — TANK HEATER diagram (page 30)
Fig. 15

Removal and Replacement: 1. Remove the top cover or top warmer housing and front access panel as previously described. 2. Disconnect the vent hose from the top of the tank by pulling the elbow fitting from the grommet in the top of the tank lid. 3. Drain water from the tank. 4. Disconnect the water supply tube to the dispense valve from the side of the tank. 5. Disconnect the water supply tube to the solenoid valve from the bottom of the tank. 6. On brewers with faucet, disconnect the outlet water line to the faucet from the side of the tank. 7. Disconnect the temperature probe from the top of the tank by pulling the probe from the grommet in the top of the tank lid. 8. Disconnect the pink wire from the level probe. 9. Disconnect the green wire from the top of the tank. 10. Disconnect the limit thermostat from the side of the tank. 11. Disconnect the two white wires from the tank warmer blanket. 12. Disconnect the black wire and the white or red wire from the tank heater terminals. 13. Remove the four #8-32 nuts securing the tank to the mounting brackets and remove the tank as- sembly. 14. Remove the eight #8-32 nuts securing the tank lid to the tank. 15. Remove the two hex nuts securing the tank heater to the bottom of the tank. Remove tank heater with gaskets and discard. 16. Install new tank heater with gaskets to the bottom of the tank and secure with two hex nuts. 17. Install tank assembly onto mounting brackets and secure in place with four #8-32 nuts.

Location:

The tank heater is located inside the tank and secured to the tank bottom.

Test Procedures: 1. Disconnect the brewer from the power supply. 2. With a voltmeter, check the voltage across the white or red wire from the terminal block and the black wire from the control board. Connect the brewer to the power source. The indication must be 120 volts ac for two wire 120 volt models or 240 volts ac for three wire 120/240 volt models. 3. Disconnect the brewer from the power source.

If voltage is present as described, proceed to #4 If voltage is not present as described, refer to the Wiring Diagrams and check wiring harness.

4. Disconnect the black wire and the white wire or red wire from the tank heater terminals. 5. Check for continuity across the tank heater terminals.

29079 030101

Page 31 of the Bunn CDBCP user manual — FIG. 14 TANK HEATER WIRING
Page 31 · click to enlarge
Page 31

SERVICE (cont.)

TANK HEATER (Cont.)

18. Install tank lid and secure in place with eight #8-32 nuts. 19. Connect the two white wires of the tank warmer blanket. 20. Connect the limit thermostat to the front of the tank assembly. 21. Connect the green wire to the tank mounting bracket using #8-32 nut. 22. Connect the pink wire to the level probe. 23. Insert the temperature probe through the grom- met in the tank lid. 24. Install the elbow fitting of the vent hose into the grommet in the tank lid. 25. On brewers with faucet, connect the outlet water line of the faucet to the side of the tank and secure with clamp. 26. Connect the water supply tube from the solenoid to the bottom of the tank and secure with clamp. 27. Connect the water supply tube from the dispense valve to the side of the tank and secure with clamp. 28. Refer to FIG. 14 when reconnecting the tank heater wires. 29. Install access panels and covers and refer to Initial Set-up for refill and operation.

BLK to Control Board

WHI or RED to Terminal Block

FIG. 14 TANK HEATER WIRING

29079 041599

Page 32 of the Bunn CDBCP user manual — FIG. 16 REFILL VALVE WIRING
Page 32 · click to enlarge
Page 32

SERVICE (cont.)

REFILL VALVE

If continuity is not present as described, replace the refill valve.

6. Check the refill valve for coil action. Connect the brewer to the power source. With "ON/OFF" switch in the "ON' upper position press start switch and listen carefully in the vicinity of the refill valve for a" clicking" sound as the coil magnet attracts. 7. Disconnect the brewer from the power source.

If the sound is heard as described and water will not pass through the refill valve, there may be a blockage in the water line before the refill valve or, the solenoid valve may require inspection for wear, and removal of waterborne particles. If the sound is not heard as described, replace the refill valve.

Removal and Replacement: 1. Remove both wires from the refill valve. 2. Turn off the water supply to the brewer. 3. Disconnect the water lines to and from the refill valve. 4. Remove the two 1/4"-20 screws securing the refill valve mounting bracket to the component bracket. Remove bracket and valve as an assembly. 5. Using two 1/4"-20 screws install the new refill valve and bracket to the component bracket. 6. Securely fasten the water lines to and from the valve. 7. Refer to FIG. 16 when reconnecting the wires.

Location:

The refill valve is located inside the trunk on the lower center part of the component bracket.

Test Procedures: 1. Disconnect the brewer from the power source. 2. Disconnect the white and white/blue wires from the refill valve. Set the "ON/OFF" switch in the "ON" upper position. 3. With a voltmeter, check the voltage across the coil wires. Connect the brewer to the power source. The indication must be 120 volts ac for two wire 120 volt models and three wire 120/240 volt models. 4. Disconnect the brewer from the power source.

If voltage is present as described, proceed to #5. If voltage is not present as described, refer to Wiring Diagrams and check brewer wiring harness.

5. Check for continuity across the refill valve coil terminals.

If continuity is present as described, reconnect the white and white/blue wires from the circuit board.

FIG. 16 REFILL VALVE WIRING

Page 33 of the Bunn CDBCP user manual — WARMER ELEMENT(S)
Page 33 · click to enlarge
Page 33

SERVICE (cont.)

WARMER ELEMENT(S)

If voltage is present as described, proceed to #5. If voltage is not present as described, refer to Wiring Diagrams and check brewer wiring harness.

Bunn CDBCP — WARMER ELEMENT(S) diagram (page 33)
Fig. 16
5. Check the continuity across the two terminals on the warmer element.

If continuity is present as described, reconnect the two wires to the warmer element. If continuity is not present as described, replace the warmer element.

Removal and Replacement: 1. Remove the three #4-40 screws securing the warmer assembly to the brewer. 2. Lift the warmer assembly from the brewer. 3. Disconnect the two wires from the warmer ele- ment terminals. 4. Remove the two #8-32 nuts securing the warmer element to the warmer plate. 5. Securely install new warmer element. 6. Reconnect the two wires to warmer element termi- nals. 7. Securely install warmer assembly on the brewer. 8. Refer to the Wiring Diagrams when reconnecting the wires.

Location:

The warmer element(s) is located under the warmer plate.

Test Procedures: 1. Disconnect the brewer from the power source. 2. Use the white wire from the terminal block and the other bottom wire on the "ON/OFF" switch. 3. With a voltmeter, check voltage across the two wires with the "ON/OFF" switch in the "ON" posi- tion. Connect the brewer to the power source.The indication must be 120 volts ac for two wire 120 volt models and three wire 120/240 volt models. 4. Disconnect the brewer from the power source.

29079 041599

Page 34 of the Bunn CDBCP user manual — FRONT WARMER WHI
Page 34 · click to enlarge
Page 34

SCHEMATIC WIRING DIAGRAM CDBC - 15, 20 & 35

N L2

GRN

LIMIT THERMOSTAT

BLU-14

TANK HEATER

WHI-14 (MODELS 15 & 20)

RED-14 (MODEL 35)

"KEEP WARM" HEATER WHI

WHI

BREW STATION WARMER (CONTROLLED BY ON/OFF SW)

WHI/RED

WHI

REFILL

WHI

DISPENSE J1-1 J1-2

SOL

C O N T R O L

BLU-14

WHI

SOL

WHI

J1-1

BRN/BLK

P2 P1

BRN/BLK

FRONT WARMER

WHI

WHI

J1-5

WHI/RED

P1, P2, &

B O A R DRO

P3 ARE PINS OF A POLARIZED

VIO

VIO

REAR WARMER

J1-10

THREE-PIN CONNECTOR.

FRONT WARMER WHI

WHI

REAR WARMER

29077.0000C 04/03 ©1998 BUNN-O-MATIC CORPORATION

Page 35 of the Bunn CDBCP user manual — P1, P2, & P3 ARE PINS OF A
Page 35 · click to enlarge
Page 35

SCHEMATIC WIRING DIAGRAM CEZ

N L2

Bunn CDBCP — N L2 diagram (page 35)
Fig. 17

P1, P2, & P3 ARE PINS OF A

POLARIZED THREE-PIN

CONNECTOR.

Bunn CDBCP — P1, P2, & P3 ARE PINS OF A diagram (page 35)
Fig. 18

120V AC 2 WIRE 120/208V AC 3 WIRE 120/240V AC 3 WIRE SINGLE PHASE

29079 030101

Page 36 of the Bunn CDBCP user manual — N L2
Page 36 · click to enlarge
Page 36

SCHEMATIC WIRING DIAGRAM CDBCP/CDBCPF - 15, 20 & 35

W/Flashing Lamp (Freshness)

N L2

Bunn CDBCP — N L2 diagram (page 36)
Fig. 19

WARMER WIRING REFERENCE (ALL CONFIGURATIONS INCLUDE BREW STATION WARMER)

WITH TOP WARMERS WITH LEFT WARMERS WITH RIGHT WARMERS WITH LEFT & RIGHT WARMERS WITH LEFT & TOP WARMERS WITH RIGHT & TOP WARMERS

120V AC 2 WIRE 120/208V AC 3 WIRE 120/240V AC 3 WIRE SINGLE PHASE

Ask about the Bunn CDBCP

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Bunn CDBCP

Be the first to ask — other owners or our team will answer.

Original document

Bunn CDBCP manual PDF

36 pages·1.6 MB·Coffeemaker·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…