Fig. 3 — 541A180 Unit Dimensions

1 2 3 4 5 6 7 8 9 10 11 12
18 19 20 21 22 23 24 25
1 — Defrost Board/Time Guard II Control 11 — Power Terminal Block 20 — High-Pressure Switch 2 — Fuse 12 — Control Terminal Block 21 — Compressor 3 — Fan No. 1 13 — Compressor Lockout (CLO2 for Crankcase Heater)
22 — Capacity Control Solenoid 4 — Compressor Lockout (CLO) Device 23 — Filter Drier 5 — Outdoor-Fan Relay 14 — Control Relay (CR3) 24 — Muffler 6 — Outdoor-Fan Contactor 15 — Liquid Line Solenoid 25 — Oil Solenoid 7 — Compressor Contactor 16 — Control Relay (CR2) 26 — Reversing Valve 8 — Fan Motor Capacitors 17 — No Dump Relay (NDR) 27 — Accumulator 9 — Circuit Breaker 18 — Oil Pressure Switch 28 — Coil 10 — Fan No. 2 19 — Fusible Plug (hidden)
Fig. 4 — Component Locations — 541A180 Shown

Table 1 — Physical Data — 575B072, 575C090,120 and 541A180 Units
*Unit is factory supplied with holding charge only. †Typical operating charge with 25 ft of interconnecting pipe. **Storage capacity of condenser coil with 80% full of liquid at 95 F. ††Equipped with an electric solenoid unloader, capacity steps are 100% and 67%.

III. COMPLETE REFRIGERANT PIPING CONNECTIONS Refrigerant lines must be carefully designed and constructed to ensure equipment reliability and efficiency. Line length, pressure drop, compressor oil return, and vertical separation are several of the design criteria that must be evaluated. See Table 2.
unit to outdoor unit before opening the liquid and vapor lines at the outdoor unit. For specific filter driers see Table 4.
D. Liquid Line Piping Procedure Pipe the system liquid line as follows:
A. Check Vertical Separation
If there is any vertical separation between the indoor and out- door units, check to ensure that the separation is within allowable limits. Relocate equipment if necessary. See Table 3.
B. Refrigerant Line Sizing Consider the length of the piping required between the out- door and indoor units. The maximum allowable line length is 100 ft. See Table 3. Refrigerant suction piping should be insulated. IMPORTANT: A refrigerant receiver is not provided with the unit. Do not install a receiver. IMPORTANT: For 575C090,120 applications with liquid lift greater than 20 ft, use 5/8-in. liquid line. Maximum lift is 60 ft.
4. Remove runaround loop (581A180 only). 5. Connect system liquid line from liquid connection of outdoor unit (575B,C, 541A) to indoor unit (524A-H) liquid line connections. Select proper field-supplied bi-flow filter driers and install in the liquid line. See Fig. 5. Install a field-supplied liquid moisture indica- tor between the filter drier(s) and the liquid connec- tions on the indoor unit. Braze or silver alloy solder all connections. Pass nitrogen or other inert gas through piping while making connections to prevent formation of copper oxide. (Copper oxides are extremely active under high temperature and pres- sure. Failure to prevent collection of copper oxides may result in system component failures.)
Table 2 — Refrigerant Piping Sizes
E. Liquid Line Solenoid Valve
Addition of a liquid solenoid valve (LLSV) is required (except for 541A180 units that already have LLSV factory-installed). The LLSV must be a bi-flow type suited for use in heat pump systems. Refer to Table 4. Wire the solenoid valve in parallel with the compressor contactor coil. The LLSV must be installed at the outdoor unit with the flow arrow pointed toward the outdoor unit (in-flow direction for the Heating mode).
*If there is a vertical separation between indoor and outdoor units, see Table 3 — Maximum Vertical Separation. LEGEND L — Liquid Line V — Vapor Line NOTES:

Table 3 — Maximum Vertical Separation*
*Vertical distance between indoor and outdoor units.
C. Install Filter Drier(s) and Moisture Indicator(s)
Every unit should have a filter drier and liquid-moisture indicator (sight glass). In some applications, depending on space and convenience requirements, it may be desirable to install 2 filter driers and sight glasses. One filter drier and sight glass may be installed at A locations in Fig. 5. If desired, 2 filter driers and sight glasses may be installed at B locations in Fig. 5. Select the filter drier for maximum unit capacity and minimum pressure drop. Complete the refrigerant piping from indoor
TXV — Thermostatic Expansion Valve
Fig. 5 — Location of Sight Glass(es)
and Filter Driers

Table 4 — Refrigerant Specialties Part Numbers
*A filter drier is shipped loose with the 575B072 units. †Bushings required. **Factory Installed.
F. Provide Safety Relief A fusible plug is located on the compressor crankcase or in the liquid line. See Fig. 6. Do not cap this plug. If local code requires additional safety devices, install them as directed.

Head Pressure Control (541A180 only) Fan cycling for head pressure control is a standard offering but is functional on the cooling cycle only. Number 2 fan cycles as a function of liquid pressure. Fan cycling pressure switch cycles the fan off at 160 ± 10 psig as pressure decreases and cycles back on at 255 ± 10 psig. Switch is auto- matically bypassed in heating cycle. Table 5 shows minimum outdoor air temperature for full cooling capacity.
Fig. 6 — Location of Fusible Plug —
G. Vapor Line Piping Procedure Connect system vapor line to the vapor line stub on the out- door unit and the vapor stubs on the indoor unit. At the indoor unit, construct vapor piping branches as shown in Fig. 7 for good mixing of the refrigerant leaving the indoor coil during cooling. This will ensure proper TXV (thermo- static expansion valve) bulb sensing. Where vapor line is exposed to outdoor air, line must be insu- lated. See Table 6 for insulation requirements.

Table 5 — Minimum Outdoor Air
*Applies to Cooling mode of operation only. †Wind baffles (field-supplied and field-installed) are recommended for
all units with low ambient head pressure control. Refer to Low Ambient Control Installation Instructions (shipped with accessory) for details.
Table 6 — Insulation for Vapor Line Exposed
TXV — Thermostatic Expansion Valve
Fig. 7 — Vapor Line Branch Piping Details
*Recommended vapor line insulation for piping exposed to outdoor conditions to prevent loss of heating during heating cycle. When vapor line goes through interior spaces, insulation should be selected to pre- vent condensation on cooling cycle. Heating capacity should be reduced 1000 Btuh if over 35 ft of vapor line with 3/4 in. insulation is exposed to outdoor conditions. †Closed cell foam insulation with a thermal conductivity of: 0.28 Btu
541A180 Unit · Operating Temperature · to Outdoor Conditions

A. Power Supply
Electrical characteristics of available power supply must agree with nameplate rating. Supply voltage must be within tolerances shown in Table 7. Phase imbalance must not exceed 2%. Operation of unit on improper supply voltage or with excessive phase imbalance constitutes abuse and is not covered by Bryant warranty.
D. General Wiring Notes (See Fig. 8-13)
Per local code requirements, provide an adequate fused disconnect switch within sight of unit and out of reach of children. Provision the switch for locking open (off) to prevent power from being turned on while unit is being serviced. The disconnect switch, fuses, and field wiring must comply with local requirements. Refer to Table 7 for unit electrical data.
2. The power-circuit field supply disconnect should never be open except when unit is being serviced or is to be down for a prolonged period. When operation is resumed, crankcase heater should be energized for 24 hours before start-up. If system is to be shut down for a prolonged period, it is recommended that the suction and discharge valves be closed to prevent an excessive accumulation of refrigerant in the com- pressor oil. 3. Terminals for field power supply are suitable for cop- per, copper-clad aluminum, or aluminum conductors. 4. Bryant recommends an indoor airflow switch (field supplied) be installed and interlocked with the outdoor unit. This prevents the outdoor unit from operating if indoor airflow fails (broken fan belt, etc.). Operation of the compressor in vacuum can damage bearing surfaces. Install indoor airflow switch in a convenient location at the indoor supply air duct and wire per Fig. 14. 5. If the system is equipped with an accessory electric heater, refer to the 524A-H installation instructions and tables.
B. Power Wiring All power wiring must comply with applicable local require- ments. Run power wires from disconnect switch through unit power opening and connect to terminal block inside the unit control box. Unit must be grounded.
C. Unbalanced 3-Phase Supply Voltage Never operate a motor where a phase imbalance in supply voltage is greater than 2%. Use the following formula to determine the percentage of voltage imbalance:
% Voltage Imbalance:
= 100 x max voltage deviation from average voltage
Example: Supply voltage is 460-3-60.
AB = 452 v BC = 464 v AC = 455 v
E. Control Circuit Wiring
Control voltage is 24 v. See unit label diagram for field supplied wiring details. Route control wires through opening in unit to connection in unit control box. Control Transformer Wiring
Average Voltage = 452 + 464 + 455 3
On 208/230V units, check the transformer primary wiring connections. See Fig. 8 or refer to unit label diagram.
= 457 (AB) 457 – 452 = 5 v (BC) 464 – 457 = 7 v (AC) 457 – 455 = 2 v Maximum deviation is 7 v. Determine percent of voltage imbalance.
For 575B,C Unit — If unit will be operating at 208-3-60 power, remove black wire (BLK) from the transformer pri- mary connection labeled “230” and move it to the connection labeled “208”. See Fig. 8.
For 541A Unit — Transformers no. 1 and 2 are wired for a 230-v unit. If a 208/230-v unit is to be run with a 208-v power supply, the transformers must be rewired as follows:
% Voltage Imbalance= 100 x
= 1.53% This amount of phase imbalance is satisfactory as it is below the maximum allowable 2%.
WARNING: Unit cabinet must have an uninter- rupted, unbroken electrical ground to minimize the possibility of personal injury if an electrical fault should occur. This ground may consist of electrical wire connected to unit ground lug in control compartment, or conduit approved for electrical ground when installed in accordance with NEC (National Electrical Code), ANSI/NFPA (American National Standards Institute/National Fire Protection Association), and local electrical codes. Failure to follow this warning could result in the installer being liable for personal injury of others.
average voltage · = 1371 3

Duplex 575C120, 541A180 with 524A-H240 or 524A-H300 In order to properly connect two heat pump condensing units to a single 524A-H packaged air handler, it is necessary to add field-supplied Fan Coil Relay Board(s), P/N 33ZCRLYBRD. Relay board(s) no. 1 and no. 2 should be installed in the control box of condensing unit.
Fig. 8 — Wiring Diagram — 575C090,120 —
NOTE: For wire runs up to 50 ft, use no. 18 AWG insulated wire (35 C minimum). For 51 to 75 ft, use no. 16 AWG insulated wire (35 C minimum). For over 75 ft, use no. 14 AWG insulated wire (35 C minimum). All wire larger than no. 18 AWG cannot be directly connected to the thermostat and will require a junc- tion box and a splice at the thermostat.
Table 7 — Electrical Data
FLA — Full Load Amps LRA — Locked Rotor Amps MCA — Minimum Circuit Amps MOCP — Maximum Overcurrent Protection NEC — National Electrical Code RLA — Rated Load Amps
*Units are suitable for use on electrical systems where voltage supplied to the unit terminals is not below or above the listed limits.
Control Transformer

LEGEND DF — Defrost Relay LP/HP — Low or High-Pressure Switch (Optional) PS — Pressure Switch RV — Reversing Valve SEN — Outdoor Coil Temperature Sensor TSTAT — Thermostat Line Voltage Factory Low Voltage Factory Low Voltage Field
FAN RV COIL
BK
RV
BK
CC BL
BL
PS2
Y
LP/HP
COLOR CODE
PS1
Y
LP/HP
BK Black BL Blue O Orange R Red W White Y Yellow
BK
SEN
BK
O W R
Y
R-RV
NOTES:
W Y O BL
DEFROST HEAT
COMPRESSOR HEAT/COOL
COMMON
24 VAC R
Fig. 9 — Wiring Diagram — 575B072; 208/230-3-60 Units
THERMOSTAT
BOARD (TB)
R
Y
LEGEND IFC — Indoor Fan Contactor LLSV — Liquid Line Solenoid Valve TB — Terminal Block Field Wiring
E
W2
NOTES:
IFC LLSV
8 TO ELECTRIC HEATER ACCESSORY, IF EQUIPPED
Fig. 10 — Wiring Diagram — 575C090,120; 230-3-60 Units


LEGEND EQUIP — Equipment GND — Ground HC — Heater Contactor IFC — Indoor Fan Contactor IFM — Indoor Fan Motor NEC — National Electrical Code TB — Terminal Block
Fig. 11 — Wiring Diagram — 541A180 Unit With Standard Thermostat and Electric Heat

HC1
FIELD
POWER
DISCONNECT
HTR1
SUPPLY
HC1
EQUIP GND
CIRCUIT BREAKER (5 HP AND LARGER)
IFC
21 22 23 12 13
11 1 2 3
524A-H240 TERMINAL BLOCK
TB1
FIELD POWER WIRING
UNIT WIRING
R
Y1
524A-H HEAT ACCESSORY
Y2
HEAT PUMP “A”
W1
W1
W2
W2
TB2
G
WHT
C2 IFC C1
R
WHT
CR
RELAY BOARD (33ZCRLYBRD)
R
Y1
Y1
G
FAN
Y2
Y2
G2/(W)
(VALVE)
W1
W1
G3/(Y)
HI(COOL)
W2
MED(HEAT)
G
W2
COM
LO
CR
G
O
TSTAT
HEAT PUMP “B”
CR — Control Relay (Field-Supplied) EQUIP — Equipment GND — Ground HC — Heating Contactor HTR — Electric Heater IFC — Indoor-Fan Contactor IFM — Indoor-Fan Motor TB — Terminal Block TSTAT — Thermostat
R
Y1
Y2
W1
W2
G
Fig. 12 — Wiring Diagram — Duplex 575C120 With 524A-H240 and Electric Heat
3-Ph ONLY · Factory Wiring · Field Control Wiring

FIELD
HC1
DISCONNECT
POWER
HTR1
SUPPLY
HC1
EQUIP GND
CIRCUIT BREAKER (5 HP AND LARGER)
IFC
21 22 23 12 13
11 1 2 3
524A-H300 TERMINAL BLOCK
TB1
UNIT WIRING
FIELD POWER WIRING
R
Y1
524A-H HEAT ACCESSORY
Y2
HEAT PUMP A
541A180
W1
W1
W2
W2
TB2
G
WHT
C2 IFC C1
WHT
R
RELAY BOARD (33ZCRLYBRD)
B
RELAY BOARD (33ZCRLYBRD)
R
W1
Y1
G
FAN
G
FAN
Y2
A2
G2/(W)
(VALVE)
Y1
CR
G2/(W)
(VALVE)
W1
G3/(Y)
HI(COOL)
Y2
G3/(Y)
HI(COOL)
W2
MED(HEAT)
MED(HEAT)
G
COM
Q
COM
LO
LO
P
TSTAT*
HEAT PUMP B
575C120
CR — Control Relay (Field-Supplied) EQUIP — Equipment GND — Ground HC — Heating Contactor HTR — Electric Heater IFC — Indoor-Fan Contactor IFM — Indoor-Fan Motor TB — Terminal Block TSTAT — Thermostat
CR R
Y1
Y2
W1
CR
W2
G
*Do not configure TSTAT for heat pump. NOTE: Use copper conductors only.
Fig. 13 — Wiring Diagram — Duplex 575C120 and 541A180 With 524A-H300 and Electric Heat

AFS — Airflow Switch (Sail Switch) CR — Control Relay DB — Defrost Board
Factory Wiring Field Control Wiring
Fig. 14 — Typical Field Wiring for Airflow Switch —
3-Ph ONLY · Factory Wiring · Field Control Wiring


1. Check all air handler and other equipment auxiliary components. Consult manufacturer’s instructions re- garding any other equipment attached to unit. If unit has field-installed accessories, be sure all are properly installed and correctly wired. If used, airflow switch must be properly installed. See Fig. 14 for typical field wiring. 2. As shipped, compressor is held down by 4 bolts. After unit is installed, loosen each bolt and locknut until flat washer or snubber can be moved with finger pres- sure. Be sure compressor floats freely on the mount- ing springs (541A units only). See Fig. 15A and 15B for compressor mounting. 3. Check tightness of all electrical connections.
a. Set the space thermostat system switch to OFF, or
adjust the temperature so there is no demand for cooling. b. Close the field disconnect.
c. Leave the compressor circuit breaker off. The
crankcase heater is now energized.
a. Pressurize refrigerant piping; do not exceed
150 psi. b. Using soap bubbles and/or an electronic leak detector, test refrigerant piping, connections and joints, and the indoor coil. See Fig. 16.
c. Check for leaks. Evacuate and dehydrate entire refrigerant system.
7. 541A180 only — compressor oil level should be visible in sight glass. Adjust the oil level as required. No oil should be removed unless the crankcase heater has been energized for at least 24 hours. See Start-Up section, Preliminary Oil Charge. NOTE: The 575B, 575C units do not have a compres- sor oil level sight glass. These units are factory charged with the required amount of oil. If required, use the following oil for replacement: For 575B units use Zerol 150, part number P903-2001. For 575C units use RCD, part number P903-0101. 8. Backseat (open) compressor suction and discharge valves. Now close valves one turn to allow refrigerant pressure to reach test gages.

CAUTION: The 575C090 and 575C120 units contain a 9 lb charge of refrigerant. Add remainder of preliminary charge and allow pressure to equalize before starting compressor. Failure to do so WILL cause the compressor to overheat in a few minutes, possibly causing permanent compressor damage. The amount of refrigerant added must be at least 80% of the operating charge listed in the Physical Data table (Table 1).

Before starting the unit, charge liquid refrigerant into the high side of the system through the liquid service valve. Allow high and low side pressures to equalize before starting compressor. If pressures do not equalize readily, charge vapor on low side of system to assure charge in the evapora- tor. Refer to GTAC II, Module 5, Charging, Recovery, Recy- cling, and Reclamation for liquid charging procedures.
becomes excessive, and automatically resets when the internal temperature drops to a safe level. This overload usually resets within 60 minutes (or longer). If the internal overload is suspected of being open, disconnect the electrical power to the unit and check the circuit through the overload with an ohmmeter or continuity tester.
III. LIQUID LINE SOLENOID
To minimize refrigerant migration to the compressor during the heat pump OFF cycle, the 575B,C unit must have a bi-flow liquid line solenoid valve (field supplied). The valve opens when the compressor is energized, and closes when the compressor is deenergized. This reduces compressor flooded starts, thus significantly increasing compressor life.
Advanced Scroll Temperature Protection (ASTP) is a form of internal discharge temperature protection that unloads the scroll compressor when the internal temperature reaches approximately 300 F. At this temperature, an internal bi- metal disk valve opens and causes the scroll elements to sep- arate, which stops compression. Suction and discharge pres- sures balance while the motor continues to run. The longer the compressor runs unloaded, the longer it must cool before the bi-metal disk resets. See Fig. 17. To manually reset ASTP, the compressor should be stopped and allowed to cool. If the compressor is not stopped, the motor will run until the motor protector trips, which occurs up to 90 minutes later. Advanced Scroll Temperature Protec- tion will reset automatically before the motor protector resets, which may take up to 2 hours. A label located above the terminal box identifies Copeland Scroll compressor models (ZR94, 108 and 125) that contain this technology. See Fig. 18.
IV. ACCUMULATOR The unit accumulator controls the rate of liquid refrigerant to the compressor during heat pump operation. The 541A accumulator features a unique method for returning oil to the compressor. The oil return mechanism is external to the accumulator. The mixture of oil and refriger- ant is metered to the compressor by a brass orifice which is removable and cleanable. The oil return mechanism also contains a solenoid valve that opens when the compressor is ON and closes when the compressor is OFF. This keeps the liquid refrigerant stored in the accumulator from draining to the compressor during the heat pump OFF cycle, which further protects the compressor against flooded starts.
0 10 20 30 40 50 60 70 80 90 100 110 120
I. COMPRESSOR ROTATION (575B,C Units)
0 10 20 30 40 50 60 70 80 90
Compressor Unloaded Run Time (Minutes)
On 3-phase units with scroll compressors, it is important to be certain compressor is rotating in the proper direction. To determine whether or not compressor is rotating in the proper direction:
*Times are approximate. NOTE: Various factors, including high humidity, high ambient tempera- ture, and the presence of a sound blanket will increase cool-down times.
Fig. 17 — Recommended Minimum Cool-Down Time After

II. COMPRESSOR OVERLOAD This overload interrupts power to the compressor when either the current or internal motor winding temperature
Fig. 18 — Advanced Scroll Temperature Protection Label
Recommended Cooling Time · (Minutes) · Compressor is Stopped*

IV. COMPRESSOR LOCKOUT DEVICE The compressor lockout (CLO) device prevents the compres- sor from starting or running in a high pressure, loss-of- charge or freezestat open situation. Reset the CLO device by setting the thermostat to eliminate cooling demand and return it to the original set point. If the system shuts down again for the same fault, determine the possible cause before attempting to reset the CLO device.
Refer to Charging Charts Fig. 19A-19C and Table 8. Do not exceed maximum refrigerant charge. Vary refrigerant until the conditions of the chart are met. Note that charging charts are different from type normally used. Charts are based on charging the units to the correct subcooling for the various operating conditions. Accurate pressure gage and temperature sensing device are required. Connect the pressure gage to the service port on the liquid line service valve. Mount the temperature sensing device on the liquid line, close to the liquid line service valve and insulate it so that outdoor ambient temperature does not affect the reading. Indoor airflow must be within the normal operating range of the unit. Operate unit a minimum of 15 minutes. Ensure pressure and temperature readings have stabilized. Plot liquid pressure and temperature on chart and add or reduce charge to meet curve. Adjust charge to conform with charging chart, using the liquid pressure and temperature to read chart.
V. PRELIMINARY OIL CHARGE (541A) The compressor is factory charged with oil (see Table 1). When oil is checked at start-up, it may be necessary to add or remove oil to bring it to the proper level. Add oil only if necessary to bring oil into view in sight glass. Use only Bryant-approved compressor oil. One recommended oil level adjustment method is as follows:
A. Add Oil Close suction service valve and pump down crankcase to 2 psig. Wait a few minutes and repeat until pressure remains steady at 2 psig. Remove oil fill plug above the sight glass, add oil through plug hole, and replace plug. Run compressor for 20 minutes and check oil level.
If the sight glass is cloudy, check refrigerant charge again. Ensure all fans are operating. Also ensure maximum allow- able liquid lift has not been exceeded. If charged per chart and if the sight glass is still cloudy, check for a plugged filter drier or a partially closed solenoid valve. Replace or repair, as needed.
Petroleum Specialties, Inc Cryol 150A Texaco, Inc Capella WF-32 Witco Chemical Co Suniso 3GS Do not use oil that has been drained out, or oil that has been exposed to atmosphere.
VIII. CHECK HEATING CYCLE OPERATION Place thermostat selector switch at HEAT and reset the space set point above ambient temperature so that a call for heating is ensured. Compressor will start within 5 minutes. Observe system operation.
B. Remove Oil Pump down compressor to 2 psig. Loosen the 1/4-in. pipe plug at the compressor base and allow the oil to seep out past the threads of the plug. Retighten plug when level is correct.
IX. CHECK COMPRESSOR OIL LEVEL (541A) After adjusting the refrigerant charge, allow the system to run fully loaded for 20 minutes. Running oil level should be within view in the crankcase sight glass. Stop compressor at the field power supply disconnect and check the crankcase oil level. Add oil only if necessary to bring the oil into view in the sight glass. If oil is added, run the system for an addi- tional 10 minutes, then stop and check oil level. If the level remains low, check the piping system for proper design for oil return; also check the system for leaks.
VI. START UNIT The field disconnect is closed, the fan circuit breaker is closed, and the space thermostat is set above ambient so that there is no demand for cooling. Only the crankcase heater will be energized. Next, close the compressor circuit breaker and then reset space thermostat below ambient so that a call for cooling is ensured.
If the initial check shows too much oil (too high in the sight glass) remove oil to proper level. See Preliminary Oil Charge section for proper procedure for adding and removing oil. When the above checks are complete, repeat the procedure with the unit operating at minimum load conditions. Unload the compressor by disconnecting the field-control circuit lead
at TB2 .
Reconnect the field-control circuit lead when checks are complete.
After starting, there is a delay of at least 3 seconds before compressor starts.
Ensure all safety controls are operating, control panel covers are on, and the service panels are in place.
Table 8 — Maximum Refrigerant Charge CAUTION: Never charge liquid into the low- pressure side of system. Do not overcharge. During charging or removal of refrigerant, be sure indoor-fan system is operating.
(lb) 575B 072 27.0


I. 575B072 UNITS When power is supplied to unit, the transformer (TRAN) and crankcase heater (CCH) are energized.
A. Cooling
On a call for cooling, the thermostat completes the following circuits: R-G, R-Y, and R-O. If the compressor recycle delay of 3 minutes is complete, the compressor and outdoor fan start. The reversing valve is energized for cooling and the indoor- fan motor starts. When the thermostat is satisfied, the circuits are opened, and the compressor, outdoor-fan motor, and indoor-fan motor stop. The reversing valve is deenergized.
B. Heating
On a call for heating, the thermostat completes the following circuits: R-G and R-Y. If the compressor recycle delay of 3 minutes is complete, the compressor and outdoor fan start. The indoor-fan motor will also start.
If room temperature continues to fall, the thermostat completes circuit R-W. If the optional electric heat package is used, the heat relay is energized, and the electric heaters are energized.
Fig. 19A — 575B072 Charging Chart
When the thermostat is satisfied, the circuits are opened, and the compressor, outdoor-fan motor, heaters, and indoor- fan motor stop.
LIQUID TEMPERATURE AT LIQUID VALVE (F)
ADD CHARGE IF ABOVE CURVE
C. Defrost Defrost board (DB) is a time and temperature control, which includes a field-selectable time period between checks for frost (30, 50, and 90 minutes). Electronic timer and defrost cycle start only when contactor is energized and defrost ther- mostat (DFT) is closed (below 28 F).
Defrost mode is identical to Cooling mode, except outdoor-fan motor (OFM) stops and a bank of supplemental electric heat turns on to warm air supplying the conditioned space. Defrost mode is terminated when the DFT reaches 65 F.
D. Air Circulation When the fan switch is at FAN ON, the indoor-air fans oper- ate continuously to provide ventilation. The thermostat operates the other components as described above.
100 150 200 250 300 350 400
344 LIQUID PRESSURE AT LIQUID VALVE (Kilopascals)
689 1034 1379 1724 2069 2414
Fig. 19B — 575C090,120 Charging Chart
E. Emergency Heat Cycle
If the compressor is inoperative due to a tripped safety device, the second stage of the thermostat automatically energizes the indoor-air fan and the electric resistance heat- ers (if equipped).

II. 575C090,120 UNITS When power is supplied to unit, the transformer (TRAN) is energized. The crankcase heater is also energized.
A. Cooling
With the thermostat subbase in the cooling position, and when the space temperature comes within 2° F of the cooling set point, the thermostat makes circuit R-O. This energizes the reversing valve solenoid (RVS) and places the unit in standby condition for cooling. As the space temperature continues to rise, the second stage of the thermostat makes, closing circuit R-Y. When compres- sor time delay (5 ± 2 minutes) is completed, a circuit is made to contactor (C), starting the compressor (COMP) and outdoor-fan motor (OFM). Circuit R-G is made at the same time, energizing the indoor-fan contactor (IFC) and starting the indoor-fan motor (IFM) after one-second delay.
Fig. 19C — 541A180 Charging Chart

When the thermostat is satisfied, contacts open, deenergiz- ing C. The COMP, IFM, and OFM stop.
When the thermostat is satisfied, the contacts open, deener- gizing first the Heat Pump B and then Heat Pump A.
B. Heating On a call for heat, thermostat makes circuits R-Y and R-G. When compressor time delay (5 ± 2 minutes) is completed, a circuit is made to C, starting COMP and OFM. Circuit R-G also energizes IFC and starts IFM after a 1-second delay.
Heating When the thermostat calls for heating, the circuit from R to Y1 is completed. If the time delays and safeties are satisfied, the compressor contactor closes, starting the compressor and outdoor-fan motors of Heat Pump A and Heat Pump B. At the same time the circuit is completed from R to G, starting the indoor-fan motor. If the second stage of heating is required, the circuit from R to W2 will be completed and the electric resistance heaters will be energized. When the thermostat is satisfied, the contacts open, deener- gizing Heat Pump A and Heat Pump B.
A. Heating Place thermostat selector at HEAT and set temperature selector above room ambient.
B. Cooling
B. Duplex 575C120 and 541A180 Units With 524A-H300 (See Fig. 13) Cooling
Place thermostat selector at COOL and set temperature selector below room ambient.
When thermostat calls for unit operation (either heating or cooling), the indoor-fan motor starts immediately. The outdoor-fan motors and compressor start within 3 seconds to 5 minutes depending on when unit was last shut off by ther- mostat, because unit contains a compressor time delay cir- cuit. When first-stage cooling is required, thermostat (TC1) closes, causing the heat pump to start with an unloaded com- pressor. When TC2 closes, demanding additional cooling, the compressor loads to full load operation. During heating, compressor is always fully loaded. When TH1 demands first-stage heating, the heat pump starts within 3 seconds to 5 minutes depending on when unit was last shut off by thermostat, because unit contains a compres- sor time delay circuit. (The defrost board has speed termi- nals to shorten this cycle.) When TH2 of the thermostat closes, auxiliary heat supply (electric strip heat) is energized in 1 or 2 stages depending on number of stages available and whether outdoor thermostats are closed.
When the thermostat calls for cooling, the circuit from R to Y1 is completed. If the time delays and safeties are satisfied, the compressor contactor closes, starting the compressor and outdoor-fan motors of Heat Pump A (541A180). At the same time the circuit is completed from R to G, starting the indoor- fan motor. If the space temperature continues to rise, the circuit is completed from R to Y2 and the Cooling mode is initiated in Heat Pump B (575C120).
When the thermostat is satisfied, the contacts open, deener- gizing first the Heat Pump B and then Heat Pump A.
Heating When the thermostat calls for heating, the circuit from R to W1 is completed. If the time delays and safeties are satisfied, the compressor contactor closes, starting the compressor and outdoor-fan motors of Heat Pump A and Heat Pump B. At the same time the circuit is completed from R to G, starting the indoor-fan motor. If the second stage of heating is required, the circuit from R to W2 will be completed and the electric resistance heaters will be energized. When the thermostat is satisfied, the contacts open, deener- gizing Heat Pump A and Heat Pump B.
Defrost is achieved by reversal from heating to cooling cycle and deenergization of outdoor-fan motors, allowing hot refrigerant gas to defrost outdoor coil. Defrost is achieved with a timer set to initiate defrost every 30, 50, or 90 minutes (factory set at 30 minutes). Defrost is initiated when refrigerant temperature leaving the outdoor coil is measured below 27 F, (typically when the outdoor ambient temperature is below 45 F as sensed by the defrost thermostat [DFT]). Defrost is terminated when: The refrigerant temperature rises to 80 F at the DFT location on the liquid line; or the refrigerant pressure rises to 280 psig at the HPS2 location on the liquid line; or the defrost timer completes the 10-minute cycle.
C. Safeties The high-pressure switch, loss-of-charge switch, oil pressure safety switch, and compressor overtemperature safety are located in a CLO circuit that prevents heat pump operation if these safety devices are activated. A light at the thermo- stat energizes when CLO circuit is affected. The lockout sys- tem can be reset by adjusting the thermostat to open the contacts (down for Heating mode, up for Cooling mode), deenergizing the CLO circuitry. Compressor overcurrent pro- tection is achieved with a circuit breaker which requires manual resetting at the outdoor unit control box. The unit is equipped with an oil pressure safety switch that protects the compressor if oil pressure does not develop on start-up or is lost during operation. The oil pressure switch is of the manual reset type and therefore must be reset at the outdoor unit. DO NOT RESET MORE THAN ONCE.
A. Duplex 575C120 Units with 524A-H240 (See Fig. 12) Cooling
When the thermostat is set for cooling, and the space tem- perature comes within 2° F of the cooling set point, the ther- mostat completes the circuit from R to O and the reversing valves in both units are energized. If the space temperature continues to rise, the circuit from R to Y1 is completed. If the time delays and safeties are satisfied, the compressor contac- tor closes, starting the compressor and outdoor-fan motors of Heat Pump A. At the same time the circuit is completed from R to G, starting the indoor-fan motor. If the space tempera- ture continues to rise, the circuit is completed from R to Y2 and the Cooling mode is initiated in Heat Pump B in a similar manner.
If oil pressure switch trips, determine cause and correct. DO NOT JUMPER OIL PRESSURE SAFETY SWITCH.
To reset the oil pressure switch:

Unit is equipped with a no-dump reversing valve circuit. When unit is in Cooling mode, reversing valve remains in cooling position until a call for heating is requested by ther- mostat. When unit is in Heating mode, reversing valve remains in heating position until there is a call for cooling. The crankcase heater is in a lockout circuit. If crankcase heater is defective, compressor is locked off. Heat pump remains off until corrective action is taken. The lockout cir- cuit cannot be reactivated by adjusting the thermostat. To reset the crankcase heater lockout, disconnect and then reconnect power to unit.
D. Check Operation
Ensure operation of all safety controls. Replace all service panels. Be sure that control panel cover is closed tightly.
V. RESTART Manual reset of the 24-v control circuit is necessary if unit shutdown is caused by automatic reset devices (including IP [internal compressor overcurrent protection], HPS [high- pressure switch], and LCS [loss-of-charge switch]) or if shutdown is caused by manual reset devices (including OPS [oil pressure switch] and compressor circuit breaker protection). To restart the unit when IP, HPS, or LCS has tripped (after device has reset automatically), open and then close the thermostat contacts. Opening and then closing thermostat contacts interrupts and restores 24-v power to the compressor lockout (CLO), which resets the circuit.
II. 575C090,120 COOLING MODE OPERATION (See Fig. 20)
1. High pressure, high temperature refrigerant vapor from the compressor flows through the reversing valve and is directed to the vapor headers of both outdoor coils. 2. At the outdoor coil vapor header, the high pressure, high temperature refrigerant vapor flows up to check valve “A” that blocks the flow. All the refrigerant is then directed to flow into the coil circuits. 3. Subcooled refrigerant liquid leaves the coil circuits through the side outlet on the liquid headers. The liquid refrigerant from each coil flows through check valves “B” which are open, enters the liquid line and goes to the indoor coil.
It is necessary to manually reset the compressor circuit breaker and OPS at the unit if either of these safeties should shut down the unit. IMPORTANT: If OPS trips, it must be reset first before mak- ing and breaking the thermostat contacts to reset CLO. If this procedure is not followed, the CLO cannot reset.
III. 575C090,120 HEATING MODE OPERATION (See Fig. 21)
See Table 1 for compressor information. Follow safety codes and wear safety glasses and work gloves.
3. The liquid refrigerant is expanded as it passes through the fixed orifice metering devices into outdoor coil circuits. The refrigerant evaporates as it passes through the coil circuits resulting in low pressure vapor. 4. The low pressure vapor leaves the coil circuits and enters the vapor headers, check valves “A” are open, and returns to the compressor through the vapor line, reversing valve, and accumulator, reentering the compressor at the suction connection. CAUTION: Excessive movement of copper lines at compressor may cause higher levels of vibration when unit is restored to service.

IV. 541A180 COOLING MODE OPERATION (See Fig. 22)
The crankcase heater prevents refrigerant migration and compressor oil dilution during shutdown when compressor is not operating. Close both compressor service valves when crankcase heater is deenergized for more than 6 hours.
Each fan is supported by a formed-wire mount bolted to the fan deck and covered with a wire guard. On the 541A180, the exposed end of the motor shaft is covered with a rubber boot. In case a fan motor must be repaired or replaced, be sure the rubber boot is put back on when the fan is reinstalled and be sure the fan guard is in place before starting the unit.
V. 541A180 HEATING MODE OPERATION (See Fig. 23)
1. High pressure, high temperature refrigerant vapor from the compressor flows through the reversing valve and is directed through the system vapor line to the indoor coil. Refrigerant is condensed and subcooled in the indoor coil and returns to the outdoor unit through the system liquid line. 2. Check valve “B” blocks the flow of liquid and the refrigerant is then directed to flow through check valve “C” (which is open), through the filter drier, and into the liquid header assembly.
VIII. LUBRICATION Fan motors have permanently sealed bearings. No further lubrication is required.

Fig. 20 — 575C090,120 Cooling Mode (Size 090 Shown)


Fig. 21 — 575C090,120 Heating Mode (Size 090 Shown)


This section discusses the cleaning and the maintenance of standard coils and E-Coated coils. Routine cleaning of coil surfaces is essential to minimize contamination build-up and remove harmful residue. Inspect coils monthly and clean as required.
B. Cleaning and Maintaining E-Coated Coils
A. Cleaning Standard Coils Standard coils can be cleaned with a vacuum cleaner, washed out with low velocity water, blown out with com- pressed air, or brushed (do not use wire brush). Fan motors are dripproof but not waterproof. Do not use acid cleaners. Clean coil annually or as required by location or outdoor air conditions. Inspect coil monthly and clean as required. Fins are not continuous through coil sections. Dirt and debris may pass through first section and become trapped, restricting airflow. Use a flashlight to determine if dirt or debris has col- lected between coil sections. Clean coils as follows:
Routine cleaning of coil surfaces is essential to maintain proper operation of the unit. Elimination of contamination and removal of harmful residue will greatly increase the life of the coil and extend the life of the unit. The following maintenance and cleaning procedures are recommended as part of the routine maintenance activities to extend the life of the coil. Remove Surface Loaded Fibers
Debris such as dirt and fibers on the surface of the coil should be removed with a vacuum cleaner. If a vacuum cleaner is not available, a soft brush may be used. The clean- ing tool should be applied in the direction of the fins. Coil surfaces can be easily damaged (fin edges bent over) if the tool is applied across the fins.
1. Turn off unit power. 2. Remove screws holding rear corner posts and top cover in place. Pivot top cover up 12 to 18 in. and support with a board or other adequate rigid support. See Fig. 24. 3. Remove clips securing tube sheets together at the return bend end of the coil. Carefully spread the ends of the coil rows apart by moving the outer sections. See Fig. 25. 4. Using a water hose or other suitable equipment, flush down between the sections of coil to remove dirt and debris.
A periodic clean water rinse is very beneficial for coils that are applied in coastal or industrial environments. However, it is very important that the water rinse is made with very low velocity water stream to avoid damaging the fin edges. Monthly cleaning is recommended.


The following field supplied equipment is required for coil cleaning:
Environmentally Sound Coil Cleaner Application Instructions Perform the following procedure to clean the coil.
Fig. 24 — Pivot and Support Top Cover

Fig. 25 — Coil Cleaning (Typical)
Routine Cleaning of E-Coated Coil Surfaces
CAUTION: Do not use bleach, harsh chemicals, or acid cleaners on outdoor or indoor coils of any kind. These types of cleaners are difficult to rinse, and they promote rapid corrosion of the fin collar — copper tube connection. Only use the Environmentally Sound Coil Cleaner. Never use high pressure air or liquids to clean coils. High pressures damage coils and increase the airside pressure drop. To promote unit integrity, follow clean- ing and maintenance procedures in this document.
Monthly cleaning with Environmentally Sound Coil Cleaner is essential to extend the life of coils. It is recommended that all coils including standard aluminum, pre-coated, copper/copper, or E-coated coils be cleaned with the Environ- mentally Sound Coil Cleaner as described below. Coil clean- ing should be part of the regularly scheduled maintenance procedures of the unit to ensure long life of the coil. Failure to clean the coils may result in reduced durability in the environment. Environmentally Sound Coil Cleaner is non-bacterial, biodegradable and will not harm the coil or surrounding components such as electrical wiring, painted metal surfaces or insulation. Use of non-recommended coil cleaners is strongly discouraged since coil and unit durability could be affected.
A complete list of replacement parts is available from your Bryant dealer.


CCH — Crankcase Heater
N.C. — Normally Closed


TXV — Thermostatic Expansion Valve
CCH — Crankcase Heater
Copyright 2004 Bryant Heating & Cooling Systems Printed in U.S.A. CATALOG NO. 5357-506

I. PRELIMINARY INFORMATION
OUTDOOR UNIT: MODEL NO. _______________________________ SERIAL NO.: __________________________________
INDOOR UNIT: MODEL NO. _________________________________ SERIAL NO.: __________________________________
ADDITIONAL ACCESSORIES __________________________________________________________________________________
II. PRE-START-UP
OUTDOOR UNIT IS THERE ANY SHIPPING DAMAGE? (Y/N)
WILL THIS DAMAGE PREVENT UNIT START-UP? (Y/N) _____________
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT? (Y/N)
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY? (Y/N)
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY? (Y/N)
HAVE COMPRESSOR HOLDDOWN BOLTS BEEN LOOSENED (Washers are snug, but not tight)? (Y/N)
CONTROLS ARE THERMOSTAT AND INDOOR FAN CONTROL WIRING CONNECTIONS MADE AND CHECKED? (Y/N)
ARE ALL WIRING TERMINALS (including main power supply) TIGHT? (Y/N)
HAS CRANKCASE HEATER BEEN ENERGIZED FOR 24 HOURS? (Y/N)
INDOOR UNIT HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE? (Y/N)
HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT? (Y/N)
DO THE FAN BELTS HAVE PROPER TENSION? (Y/N)
PIPING HAVE LEAK CHECKS BEEN MADE AT COMPRESSOR, OUTDOOR UNIT, INDOOR UNIT, TXVs (Thermostatic Expansion Valves), SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS WITH A LEAK DETECTOR? (Y/N)
HAVE ALL COMPRESSOR SERVICE VALVES BEEN FULLY OPENED (BACKSEATED)? (Y/N)
IS THE OIL LEVEL IN COMPRESSOR CRANKCASE VISIBLE IN THE COMPRESSOR SIGHT GLASS? (Y/N)
CHECK VOLTAGE IMBALANCE LINE-TO-LINE VOLTS: AB V AC V BC V
(AB + AC + BC)/3 = AVERAGE VOLTAGE = V
VOLTAGE IMBALANCE = 100 X (MAX DEVIATION)/(AVERAGE VOLTAGE) = %
IF OVER 2% VOLTAGE IMBALANCE, DO NOT ATTEMPT TO START SYSTEM! CALL LOCAL POWER COMPANY FOR ASSISTANCE.

CHECK INDOOR FAN SPEED AND RECORD CHECK OUTDOOR FAN SPEED AND RECORD AFTER AT LEAST 10 MINUTES RUNNING TIME, RECORD THE FOLLOWING MEASUREMENTS:
COOLING HEATING OIL PRESSURE SUCTION PRESSURE SUCTION LINE TEMP DISCHARGE PRESSURE DISCHARGE LINE TEMP ENTERING OUTDOOR AIR LEAVING OUTDOOR AIR TEMP INDOOR ENTERING-AIR DB (dry bulb) TEMP INDOOR ENTERING-AIR WB (wet bulb) TEMP INDOOR LEAVING-AIR DB TEMP INDOOR LEAVING-AIR WB TEMP
COMPRESSOR AMPS (L1/L2/L3) /
CHECK THE COMPRESSOR OIL LEVEL SIGHT GLASSES; ARE THE SIGHT GLASSES SHOWING OIL LEVEL IN VIEW? (Y/N)
Copyright 2004 Bryant Heating & Cooling Systems Printed in U.S.A. 10-05A CL-2 CATALOG NO. 5357-506
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.