1 Introduction The fireplace may only be installed by a qualified installer/dealer. We strongly recommend that these installation instructions be read properly. This appliance complies with the guidelines for European Gas Appliances (GAD) and carries the CE marking. 2 Security notices. The apparatus must be installed and inspected annually in accordance with this installation requirement, as well as the applicable national and local requirements. Check that the data on the plate match the local gas type and pressure. The settings and the construction of the fireplace must not be changed! Do not place any extra imitation wood or glow material on the burner or in the combustion chamber. The device is for atmosphere and heating purposes. This means that all surfaces, including the glass, can become very hot (hotter than 100°C) except for this form the underside of the fireplace and control buttons. Do not place combustible materials within 0.5 m of the radiation part of the fireplace. The natural air circulation of the fireplace makes moisture and non-hardened volatile components from paint, building materials and floor coverings etc. sucked in. These constituents can be placed as soot on cold surfaces. Therefore, do not light the fireplace shortly after a renovation. The first time the fireplace lit a few hours at its highest stand, so that paint would have the chance to harden out. Ensure sufficient ventilation to remove any vapours released. We recommend that you be as little present in space as possible during this process. Please note:
2 children and pets are not present in the room. 3 Installation requirements
3.1 Fireplace
This device shall be built into an existing or newly built bosom. For flexible gas pipes, the control block is mounted on the right side of the fireplace for transport reasons. unscrew it and mount it at a distance of max. 30 cm behind the control hatch. The receiver in a transporter (see fig. 1.5 A) is attached to the side of the control block support, can now be moved on top of the line block. The transporter can be omitted.
3.2 Booze
The bosom must be made of non-combustible material. The space above the fireplace should always be ventilated by means of: the grids or a similar alternative with minimum free passage of 200cm2. Use special decorative plaster for finishing (min. 100°C resistant) or glass fibre wallpaper for discoloration and cracks etc. to be avoided. Minimum drying time 24 hours per mm finish.
3.3 Requirements for drainage channel and exits
For the supply and disposal you must always use the drainage materials prescribed by Faber International BV. Only with the use of these materials can Faber International BV guarantee a good working environment. The outer surface of the concentric drain material can be +/- 150°C. When through a flammable wall or ceiling, provide insulation and
1 all transport containers have been removed.

protection. And keep a sufficient distance. Make sure that the concentric drain material is held every 2 metres at large discharge lengths, so that the weight of the material does not rest on the fireplace. You should never start on the device with a short-term concentric drain material
4.1 Gas connection The gas connection must comply with local standards. We recommend a gas connection of Ø 15mm directly from the gas meter to the device, with in close proximity to the appliance a shut-off valve which is always accessible. Position the gas connection so that it is easily accessible, and for service the burner unit can be dismantled at any time.
3.4 Ends The combined supply and disposal can pass through both the façade and the roof. Check that the exit you want meets local requirements regarding discomfort and ventilation openings. For proper operation, the exit shall be at least 0,5m from: Angles of the building. Rooftops and balconies. Roof edges. (except the ridge edge)
4.2 Electrical connection If an adapter is used for the power supply, a wall socket 230VAC .50Hz must be mounted near the fireplace.
4.3 Preparation of the fireplace
Remove the fireplace from its packaging. Please note that the gas supply lines underneath the device are not damaged. Clear a place, if you will. safe storage of list and glass. Delete if necessary the list and glass, and take the packed parts from the fireplace. Prepare the gas connection on the gas control block.
3.5 Existing chimney You can also connect the fireplace to an existing chimney. The existing chimney then functions as an air supply and a flexible stainless steel pipe pulled through the chimney drains the exhaust gases.The flexible stainless-steel tube of Ø 100mm must have a CE mark up to 6000 The chimney shall then meet the following conditions:
4.4 Installation of the fireplace Takes into account the Installation requirements (see Chapter 3)
4.4.1 Floor standing Set the device in place and adjust height with the struts if necessary. Adjust height and adjust the fireplace. (see Fig. 1.3)
The passage of the chimney canal must be at least 150 x 150mm. No more than one appliance must be connected to a chimney The chimney shall be in good condition:
Large height adjustment:
o with the extendable leg, or with long legs supplied. Precisely:
o No leakage and o Good cleaning For more information about the connections to existing chimney channels, see manual .
o with the swivel-adjustable legs.
4 Preparation and installation instruction

Always use a bosom iron when the boss is bricked. This must not be placed directly on the fireplace.
4.4.2 hanging on the wall The device can be attached to the wall by hanging. supplied hanging bracket and keilbolten (see fig. 1.2). These fixing materials are intended exclusively for mounting on brick or concrete walls. For walls of other materials, for example hollow building blocks, consult the specialist dealership.
4.8 Frameless without optional decoration plate
Build the bosom against the built-in frame (see Figure 1.1 B). Keeps a minimum clearance of 3mm between bosom and device related to the setting of the fireplace. The depth of the day does not affect the removal of glass
4.5 Mounting of flue gas drainage materials
In the case of a passage through the wall or ceiling, the hole shall be at least 5 mm larger than the diameter of the drain material. Horizontal sections should be installed on a bulkhead towards the fireplace (3 degrees). Build the system from the fireplace. If this is not possible, a sliding intersection can be used. The 1⁄2 meter short pipe is used to fit the drainage system. Always make sure the inner pipe is 2 cm longer than the outer pipe. The facade and roof throughput are also shortable. These parts need to be secured with a parking lot. A recessed flue gas drain can not isolate but ventilate. (approx. 100cm2)
4.9 Frameless with optional decoration plate
Build the bosom around against the built-in frame (see Figure 1.1-B), except for the lower part. Keep a minimum clearance of 3mm between bosom and device related to the setting of the fireplace. The height of the lower part shall be equal to the bottom of the recesses. (See Fig. 1.4) Place the decoration plate on the built-in frame. 5 Take Glass
5.1 Glass removal front
Remove the cover strips A on the side. (see Fig. 2.1) Remove cover strip B at the bottom. (see Fig. 2.2 ) Place the suction cups on the glass. Remove the seal cord from the sponge. (see Fig. 2.3) Slide the glass upwards so that the bottom is released from the sponge. Now gradually remove the glass and down. (see Fig. 2.4)
4.6 Build a bosom. Before the bosom is placed we recommend to perform a gas fire test as described in Chapter 7 .
4.7 Booze
Make the bosom of non-combustible sheet material in combination with metal profiles or brick/cell concrete blocks. Please take into account grids and control hatch (see Fig. 1.1 and 1.2). Place a screen plate (see Figure 1.1 A) of non-combustible material above the grids.
5.2 Glass removal side There is no need to take the glass off at the side for placing the wood set or for performing maintenance.
First remove the foreglass. Get the bottom plate out of the combustion chamber. (see Fig. 2.5) Place the suction cups on the glass.

Remove the seal cord from the sponge. (see Fig. 2.6) Slide the glass upwards, so that the bottom is released from the sponge and now gradually pull in and down the glass. (see Fig. 2.7 and 2.8) Repositioning the glass goes in reverse order. Remove all the Fingerprints on the glass, which will burn if the fireplace is used. 6 Installation of decoration material It is not permitted to add other or more materials in the combustion chamber. Always keep the flame free of decoration material! Do not throw all decoration material on the burner at once; it may become blocked by the dust parts.
7.1 Control of ignition flame, head burner. Light the fireplace as described in the user manual. Check that the watch flame is well above the head burner and is not covered by chips, a log or pebbles. Check the ignition of the head burner for full and small position. (the ignition must be smooth and quiet).
7.2 Gas leak control. Check with a gas leak seeker or spray all connections and connections for any gas leakages.
7.3 Checking of burner pressure and prepressure Check that the burner pressure and prepressure correspond to the data on the plate Pre-pressure measurement:
6.1 Wood set
Turn off the device valve. Rotate the measuring nipple B (see Fig. 1.6) open some blows and connect a measuring hose to the gas control block. Take this measurement at full fireplace and when the fireplace is on a watchflame. If the pressure is too high, you cannot connect it. Measure burner pressure:
Place part of the chips on the burner and bottom. Places the logs as prescribed. (See Fig. 5.1 or included wood set card). Divide the rest of the chips on the burner and bottom. Avoid a thick layer on the burner; this will affect the fire image. Start the fireplace as described in the user manual. Assess if the flame distribution is correct. If necessary, move the chips until a good flame distribution is achieved. Place the glass plate and check the fire image.
Check the burner pressure only at proper prepressure. Rotate the measuring nipple A (see Fig. 1.6) open some blows and connect a measuring hose to the gas control block. The pressure shall be the value indicated on the plate. By way of derogation, contact the manufacturer. *Close all pressure gauges and check for gas leakage.
6.2 Gravels
Place the pebbles on the burner and bottom. 5.2 or included wood set card). Avoid a double layer; this will affect the fire image. Place the glass plate and check the fire image. 7 Installation control.

O The exhaust.
7.4 Flame Image Control Let the fireplace burn for at least 20 minutes and then check the flame image on: 1. Flame distribution 2. Color of flames If one or both points are not acceptable check then: The wood setup and/or the
9.2 Replace:
o At LPG flat burner, the fireplaces. o If necessary, the chips/embers.
9.3 Cleaning the glass Most of the attack can be removed with a dry cloth. With ceramic hotplates cleanser you can get the glass clean. Please note: avoid fingerprints on the glass. These are no longer removable after burning in! Now perform the check as described in Chapter 7 . .
amount of chips or pebbles on the burner. The compounds of the pipe material
for leakage. (in case of blue flames). Whether the right thruster is mounted. The end of the line.
o Wall throughput on the right side above and correct position o Roof throughput is in a proper position Whether maximum lengths of flue gas discharge have not been exceeded. 8 Customer instruction Advise that the appliance must be checked annually by an approved installer to ensure safe use and long life Give advice and instructions on glass maintenance and cleaning. Emphasize the risk of burning in fingerprints. Inform the customer about how the device works and the remote control, including replacing batteries and adjusting the receiver. Handed to the customer: Installation instructions User's manual Wood set Instructions card Suction cups 9 Annual maintenance
10 Conversion to other gas types (e.g. propane) This can only be done by placing a suitable burner unit. Please contact your supplier. Always indicate the type and serial number of the device when ordering. 11 Drain calculation The possibilities of drain lengths and the possible thruster are laid down in a driving table (see Chapter 12). This table is based on vertical and horizontal length.
For the determination of vertical length, all lengths of drain pipes shall be added in the vertical direction.
- The roof passage always counts for 1 meter For the determination of horizontal length, all lengths of drain tubes in the horizontal direction must be added:
- every 90° bend in the horizontal section is 2 meters. - every 45° bend in the horizontal section counts for 1 metre. - Turns from vertical to horizontal or vice versa do not count for the calculation. - The facade throughput always counts for 1 meter.
9.1 Control and cleaning:
Check and clean if necessary after check:
o The flame of the fire o The burner (In LPG flat burner replace the burning furnace) oh The combustion chamber o The glass o The logs on if. Fracture.

If dragged below 45°, the actual vertical and horizontal lengths shall be calculated.
11.1 Points of interest:
The maximum chimney length is 12 meters. Never start with a 90° or 45° bend from the device. It must always be started 1 metre vertically, if horizontal cross-section exceeds 1 meter. A short pipe must never be started from the device.

11.2 Example calculations Example 1 Count the horizontal lengths Tube lengths C+E = 1 + 1 2 m Bend D = 1 x 2 m 2 m Total 4 m Count vertical lengths Tube length A 1 m Roof throughput G 1 m Total 2 m Example 2 Count horizontal lengths Tube lengths J + L = 0,5 + 0.5 1 m Bends K+ M = 2 + 2 m 4 m Wall exhaust 1 m Total horizontal length 6 m Count vertical lengths Tube length H 1 m Total 1m


12 The table shows the correct vertical and horizontal length. In the case of a .x.x and if values are not included in the table, the combination is not permitted.
The value found indicates the width of the drive to be placed ("0" means no thrust). A 30mm thruster is mounted as standard.



C11 C11C11 C31 C11
Set to gas type G25 G30 G31 G20 G30G31
Load Hi kW 10.2 9.2 7.8 10.2 9.2 9.2
Code Injector No. 36 No. 23 No. 23 No. 36 No. 23 No. 23
Diameter aan/afvoer mm 100-150
Batteries transmitter V 9. 9 9














www.faber.nl - [email protected]
Saturn 8 EN - 8448 CC Heerenveen
PO Box 219 EN 8440 AE Heerenveen
F. +31(0)513 656501
Pages referenced in this manual — manufacturer, support and downloads.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.