J30-06935 INSTALLATION INSTRUCTIONS AND PARTS LIST TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS
Model No. Serial No.
FOR YOUR SAFETY The use and storage of gasoline or other fl ammable vapors and liquids in open containers in the vicinity of this appliance is hazardous.

FOR YOUR SAFETY If you smell gas: 1. Open windows. 2. Don't touch electrical switches. 3. Extinguish any open fl ame. 4. Immediately contact your gas supplier.
Improper installation, adjustment, alteration, service, or maintenance can cause property damage, injury, or death. Read the installation, operating, and maintenance instruction thoroughly before installing or servicing this equipment.
Install, operate, and maintain unit in accordance with the manufacturer's instructions to avoid exposure to fuel substances, or substances from incomplete combustion, which can cause death or serious illness. The state of California has determined that these substances may cause cancer, birth defects, or other reproductive harm.
INSTALLER'S RESPONSIBILITY Installer Please Note: This equipment has been test fired and inspected. It has been shipped free from defects from our factory. However, shipment and installation problems such as loose wires, leaks, or loose fasteners may occur. It is the installer's responsibility to inspect and correct any problem that may be found.
RECEIVING INSTRUCTIONS Inspect shipment immediately when received to determine if any damage has occurred to the unit during shipment. After the unit has been uncrated, check for any visible damage to the unit. If any damage is found, the consignee should sign the bill of lading indicating such damage and immediately file claim for damage with the transportation company.
HVAC PRODUCTS 260 NORTH ELM ST., WESTFIELD, MA 01085 TEL: (413) 564-5540 FAX: (413) 562-5311
03/07 Please utilize this toll free number to contact your local representative 800-490-2290.


Failure to comply with the general safety information may result in extensive property damage, severe personal injury, or death.
Do not attempt to convert the heater for use with a fuel other than the one intended. Such conversion is dangerous, as it will create the risks previously listed.
This product must be installed by a licensed plumber or gas fi tter when installed within the Commonwealth of Massachusetts.
Make certain that the power source conforms to the electrical requirements of the heater.
Do not depend upon a thermostat or other switch as sole means of disconnecting power when installing or servicing heater. Always disconnect power at main circuit breaker as described above. Failure to do so could result in fatal electric shock.
Installation must be made in accordance with local codes, or in absence of local codes, with the latest edition of the ANSI Standard Z223.1 (N.F.P.A. No. 54) National Fuel Gas Code. All of the ANSI and NFPA Standards referred to in these installation instructions are those that were applicable at the time the design of this appliance was certified. The ANSI Standards are available from CSA Information Services, 1-800- 463-6727. The NFPA Standards are available from the National Fire Protection Association, Batterymarch Park, Quincy, MA 02269. These unit heaters are designed for use in airplane hangars when installed in accordance with ANSI/NFPA No. 409, and in public garages when installed in accordance with NFPA No. 88A and NFPA No.88B.
Special attention must be given to any grounding information pertaining to this heater. To prevent the risk of electrocution, the heater must be securely and adequately grounded. This should be accomplished by connecting a ground conductor between the service panel and the heater. To ensure a proper ground, the grounding means must be tested by a qualifi ed electrician.
Do not insert fi ngers or foreign objects into heater or its air moving device. Do not block or tamper with the heater in any manner while in operation, or just after it has been turned off, as some parts may be hot enough to cause injury.
If installed in Canada, the installation must conform with local building codes, or in the absence of local building codes, with CGA-B149.1 “Installation Codes for Natural Gas Burning Appliances and Equipment” or CGA-B149.2 “Installation Codes for Propane Gas Burning Appliances and Equipment.” These unit heaters have been designed and certifi ed to comply with CGA 2.6. Also see sections on installation in AIRCRAFT HANGARS and PUBLIC GARAGES.
This heater is intended for general heating applications ONLY. It must NOT be used in potentially dangerous locations such as fl ammable, explosive, chemical-laden, or wet atmospheres.
Do not attach ductwork to this product or use it as a makeup air heater. Such usage voids the warranty and will create unsafe operation.
Do not alter the unit heater in any way or damage to the unit and/or severe personal injury or death may occur!
In cases in which property damage may result from malfunction of the heater, a back-up system or temperature sensitive alarm should be used.
Disconnect all power and gas supplies before installing or servicing the heater. If the power disconnect is out of sight, lock it in the open position and tag it to prevent unexpected application of power. Failure to do so could result in fatal electric shock, or severe personal injury.
The open end of piping systems being purged shall not discharge into areas where there are sources of ignition or into confined spaces UNLESS precautions are taken as follows: (1) by ventilation of the space, (2) control of the purging rate, (3) elimination of all hazardous conditions. All precautions must be taken to perform this operation in a safe manner!
Ensure that all power sources conform to the requirements of the unit heater, or damage to the unit will result!
Unless otherwise specifi ed, the following conversions may be used for calculating SI unit measurements: 1 foot = 0.305 m 1 inch = 25.4 mm 1 gallon = 3.785 L 1 pound = 0.453 kg 1 psig = 6.894 kPa 1 cubic foot = 0.028m3
Follow installation instructions CAREFULLY to avoid creating unsafe conditions. All wiring should be done and checked by a qualifi ed electrician, using copper wire only. All gas connections should be made and leak-tested by a suitably qualifi ed individual, per instructions in this manual. Also follow procedures listed on “Gas Equipment Start-Up Sheet” located in this manual.
1000 BTU per hour = 0.293 kW 1 inch water column = 0.249 kPa 1 litre/second = CFM x 0.472 1 meter/second = FPM ÷ 196.8
Use only the fuel for which the heater is designed (see rating plate). Using LP gas in a heater that requires natural gas, or vice versa, will create risk of gas leaks, carbon monoxide poisoning, and explosion.

Unit Size 100 125 150 175 200 250 300 350 400 PERFORMANCE DATA† Input - BTU/Hr. 100,000 125,000 150,000 175,000 200,000 250,000 300,000 350,000 400,000 (kW) (29.3) (36.6) (43.9) (51.2) (58.6) (73.2) (87.8) (102.5) (117.1) Output - BTU/Hr. 81,000 101,250 121,500 141,750 162,000 202,500 243,000 283,500 324,000 (kW) (23.7) (29.6) (35.6) (41.5) (47.5) (59.3) (71.2) (83.0) (95.0) Thermal Effi ciency (%) 81 Free Air Delivery - CFM 1,600 2,200 2,400 2,850 3,200 3,450 5,000 5,600 5,800 (cu. m/s) (0.756) (1.039) (1.133) (1.346) (1.511) (1.629) (2.361) (2.644) (2.738) Air Temperature Rise - Deg. F 47 42 47 46 47 54 45 47 51 (Deg. C) (26) (23) (26) (26) (26) (30) (24) (26) (28) Full Load Amps at 120V 5.3 5.8 5.8 8.0 8.0 8.0 11.3 13.5 13.5 MOTOR DATA: Motor HP (Qty.) 1/10 1/4 1/4 1/3 1/3 1/3 (2) 1/4 (2) 1/3 (2) 1/3 Motor kW (0.080) (0.19) (0.19) (0.25) (0.25) (0.25) (0.19) (0.25) (0.25) Motor Type SP PSC R.P.M. 1,050 1,140 Amps @ 115V 4.2 4.7 4.7 5.8 5.8 5.8 9.4 11.6 11.6 DIMENSIONAL DATA - inches (mm) “A” Overall Height to Top of Flue 33-3/4 34 34 34 (857) (864) (864) (864) “B” Jacket Width of Unit 20-3/4 20-3/4 20-3/4 32-3/4 32-3/4 32-3/4 50-3/4 50-3/4 50-3/4 (527) (527) (527) (831) (831) (831) (1289) (1289) (1289) “C” Width to CL Flue 13-3/8 13-3/8 13-3/8 19-3/8 19-3/8 19-3/8 28-3/8 28-3/8 28-3/8 (340) (340) (340) (492) (492) (492) (721) (721) (721) “D” Depth to Rear of Housing 11 12-1/4 12-1/4 12-1/4 (279) (311) (311) (311) “E” Hanging Distance Width 18-5/8 18-5/8 18-5/8 30-5/8 30-5/8 30-5/8 48-5/8 48-5/8 48-5/8 (473) (473) (473) (778) (778) (778) (1235) (1235) (1235) “F” Discharge Opening Width 18-3/4 18-3/4 18-3/4 30-3/4 30-3/4 30-3/4 48-3/4 48-3/4 48-3/4 (476) (476) (476) (781) (781) (781) (1238) (1238) (1238) “G” Depth to CL Flue 4-3/4 5-1/8 5-1/8 5-1/8 (121) (130) (130) (130) “H” Discharge Opening Height 24-1/2 (622) “L” Overall Unit Width 25-1/4 25-1/4 25-1/4 37-1/4 37-1/4 37-1/4 55-1/4 55-1/4 55-1/4 (641) (641) (641) (946) (946) (946) (1403) (1403) (1403) *Flue Size Diameter - in. 5 6 6 6 (Dia.-mm) (127) (152) (152) (152) Fan Diameter - in. (Qty.) 16 16 16 18 18 18 (2) 16 (2) 18 (2) 18 Gas Inlet-Natural Gas (in.) 1/2 3/4 Gas Inlet- LP Gas (in.) 1/2 OR 3/4 1/2 OR 3/4 1/2 OR 3/4 1/2 OR 3/4 Approximate Unit Weight - lbs. 133 145 155 191 201 211 307 321 335 (kg) (60) (66) (70) (87) (91) (96) (139) (145) (152) Approximate Ship Weight - lbs. 173 185 195 241 251 261 367 381 395 (kg) (78) (84) (88) (109) (114) (118) (166) (173) (179)
* For all installations, the fl ue collar is included with the unit and should be fi eld installed per the instructions included with the unit.
† Ratings shown are for unit installations at elevations between 0 and 2,000 ft (0 to 610m). For unit installations in U.S.A. above 2,000 ft. (610m), the unit input must be derated 4% for each 1,000 ft. (305m) above sea level; refer to
local codes, or in absence of local codes, refer to the latest edition of the National Fuel Gas Code, ANSI Standard Z223.1 (N.F.P.A. No. 54).
For installations in Canada, any reference to deration at altitudes in excess of 2,000 ft. (610m) are to be ignored. At altitudes of 2,000 ft. to 4,500 ft. (610 to 1372m), the unit must be derated to 90% of the normal altitude rating, and be so marked in accordance with the ETL certifi cation.

DIMENSIONS .XXX STANDARD UNITS DIMENSIONS IN PARENTHESIS (XXX) MILLIMETERS Figure 2 - Dimensional Drawing – Tubular Propeller Unit Heater

Do not install unit heaters in corrosive or fl ammable atmospheres! Premature failure of, or severe damage to the unit will result!
In Canada, installation must be in accordance to the latest edition of CGA B149 “Installation Codes for Gas Burning Appliances and Equipment.”
AIR DISTRIBUTION: Direct air towards areas of maximum heat loss. When multiple heaters are involved, circulation of air around the perimeter is recommended where heated air fl ows along exposed walls. Satisfactory results can also be obtained where multiple heaters are located toward the center of the area with heated air directed toward the outside walls. Be careful to avoid all obstacles and obstructions which could impede the warm air distribution patterns.
Avoid locations where extreme drafts can affect burner operation. Unit heaters must not be installed in locations where air for combustion would contain chlorinated, halo- genated or acidic vapors. If located in such an environment, premature failure of the unit will occur!
Since the unit is equipped with an automatic gas ignition system, the unit heater must be installed such that the gas ignition control system is not directly exposed to water spray, rain or dripping water.
Unit heaters should not be installed to maintain low temperatures and/or freeze protection of buildings. A minimum of 50°F (10°C) thermostat setting must be maintained. If unit heaters are operated to maintain lower than 50°F (10°C), hot flue gases are cooled inside the heat exchanger to a point where water vapor (a fl ue gas by-product) condenses onto the heat exchanger walls. The result is a mildly corrosive acid that prematurely corrodes the aluminized heat exchanger and can actually drip water down from the unit heater onto fl oor surface. Additional unit heaters should be installed if a minimum 50°F (10°C) thermostat setting cannot be maintained.
MOUNTING HEIGHT: Unit Heaters equipped with standard fan guards must be installed at a minimum of 8 feet (2.4m) above the fl oor, measured to the bottom of the unit. At heights above 8 feet (2.4m), less effi cient air distribution will result. If a unit is to be mounted below 8 feet (2.4m) from the fl oor, an OSHA approved fan guard is required on the unit.
AIR FOR COMBUSTION: The unit heater shall be installed in a location in which the facilities for ventilation permit satisfactory combustion of gas, proper venting, and the maintenance of ambient air at safe limits under normal conditions of use. The unit heater shall be located in such a manner as not to interfere with proper circulation of air within the confi ned space. When buildings are so tight that normal infi ltration does not meet air requirements, outside air shall be introduced per Sections 1.3.4.2 and 1.3.4.3 of ANSI Z223.1 for combustion requirements. A permanent opening or openings having a total free area of not less than one square inch per 5,000 BTU/Hr (1.5 kW) of total input rating of all appliances within the space shall be provided.
AIRCRAFT HANGARS: Unit Heaters must be installed in aircraft hangars as follows: In aircraft hangars, unit heaters must be at least 10 feet (3.0m) above the upper surface of wings or engine enclosures of the highest aircraft to be stored in the hangar, and 8 feet (2.4m) above the fl oor in shops, offi ces and other sections of the hangar where aircraft are not stored or housed. Refer to current ANSI/NFPA No. 409, Aircraft Hangars. In Canada, installation is suitable in aircraft hangars when acceptable to the enforcing authorities.
PUBLIC GARAGES: In repair garages, unit heaters must be located at least 8 feet (2.4m) above the fl oor. Refer to the latest edition of NFPA 88B, Repair Garages.
In parking structures, unit heaters must be installed so that the burner fl ames are located a minimum of 18 in. (457mm) above the fl oor or protected by a partition not less than 18 in. (457mm) high. However, any unit heater mounted in a parking structure less than 8 ft. (2.4m) above the fl oor must be equipped with an OSHA approved fan guard. Refer to the latest edition of NFPA 88A, Parking structures.

CLEARANCES: Each Gas Unit Heater shall be located with respect to building construction and other equipment so as to permit access to the Unit Heater. Clearance between vertical walls and the vertical sides of the Unit Heater shall be no less than 6 inches (152mm). However, to ensure access to the control box, a minimum of 18" (457mm) is required for the control box side. A minimum clearance of 6 inches (152mm) must be maintained between the top of the Unit Heater and the ceiling. The bottom of the Unit Heater must be no less than 12 inches (305mm) from any combustible. The distance between the flue collector and any combustible must be no less than 6 inches (152mm). Also see AIR FOR COMBUSTION and VENTING sections.

Make certain that the lifting methods used to lift the heater and the method of suspension used in the fi eld installation of the heater are capable of uniformly supporting the weight of the heater at all times. Failure to heed this warning may result in property damage or personal injury!

Make sure that the structure to which the unit heater is to be mounted is capable of safely supporting its weight. Under no circumstances must the gas lines, the venting system or the electrical conduit be used to support the heater; or should any other objects (i.e. ladder, person) lean against the heater gas lines, venting system or the electrical conduit for support. Failure to heed these warnings may result in property damage, personal injury, or death.
*All hanging hardware and wood is not included with the unit (To be fi eld supplied).
Unit Heaters must be hung level from side to side and from front to back, see Figure 3A, 3B and 3C. Failure to do so will result in poor performance and/or premature failure of the unit.
Ensure that all hardware used in the suspension of each unit heater is more than adequate for the job. Failure to do so may result in extensive property damage, severe personal injury, or death!
Refer to Figures 3A, 3B and 3C for suspension of units.

To avoid damage or possible personal injury, do not connect gas piping to this unit until a supply line pressure/leak test has been completed. Connecting the unit before completing the pressure/leak test may damage the unit gas valve and result in a fi re hazard.
Do not rely on a shut-off valve to isolate the unit while conducting gas pressure/leak tests. These valves may not be completely shut off, exposing the gas valve to excessive pressure and damage.
PIPE SIZING To provide adequate gas pressure to the gas unit heater, size the gas piping as follows:
2. Refer to Table 3. Match “Length of Pipe in Feet” with appropriate “Gas Input - Cu. Ft./Hr.” fi gure. This fi gure can then be matched to the pipe size at the top of the column. Example: It is determined that a 67 foot (20.4m) run of gas pipe is required to connect a 200 MBTU gas unit heater to a 1,000 BTU/cu ft. (0.29kW) natural gas supply. 200,000 BTU/Hr = 200 Cu. ft./hr. 1,000 BTU/cu. ft. Using Table 3, a 1 inch pipe is needed.
NOTICE: HEATER INSTALLATION FOR USE WITH PROPANE (BOTTLED) GAS MUST BE MADE BY A QUALIFIED L.P. GAS DEALER OR INSTALLER. HE/SHE WILL INSURE THAT PROPER JOINT COMPOUNDS ARE USED FOR MAKING PIPE CONNECTIONS; THAT AIR IS PURGED FROM LINES; THAT A THOROUGH TEST IS MADE FOR LEAKS BEFORE OPERATING THE HEATER; AND THAT IT IS PROPERLY CONNECTED TO THE PROPANE GAS SUPPLY SYSTEM.
Before any connection is made to the existing line supplying other gas appliances, contact the local gas company to make sure that the existing line is of adequate size to handle the combined load.
Maximum Capacity of Pipe in Cubic Feet of Gas per Hour (Cubic Meters per Hour) for Gas Pressures of 0.5 psig (3.5 kPa) or Less, and a Pressure Drop of 0.5 Inch Water Column (124.4 Pa) (Based on a 0.60 Specifi c Gravity Gas) Nominal Iron Internal Length of Pipe, Feet (meters)
Pipe Size Dia. 10 20 30 40 50 60 70 80 90 100 125 150 175 200 in. in. (3.0) (6.1) (9.1) (12.2) (15.2) (18.3) (21.3) (24.4) (27.4) (30.5) (38.1) (45.7) (53.3) (61.0) 1/2 0.622 175 120 97 82 73 66 61 57 53 50 44 40 37 35 (4.96) (3.40) (2.75) (2.32) (2.07) (1.87) (1.73) (1.61) (1.50) (1.42) (1.25) (1.13) (1.05) (0.99) 3/4 0.824 360 250 200 170 151 138 125 118 110 103 93 84 77 72 (10.2) (7.08) (5.66) (4.81) (4.28) (3.91) (3.54) (3.34) (3.11) (2.92) (2.63) (2.38) (2.18) (2.04) 1 1.049 680 465 375 320 285 260 240 220 205 195 175 160 145 135 (19.3) (13.2) (10.6) (9.06) (8.07) (7.36) (6.80) (6.23) (5.80) (5.52) (4.96) (4.53) (4.11) (3.82) 1 1/4 1.380 1400 950 770 660 580 530 490 460 430 400 360 325 300 280 (39.6) (26.9) (21.8) (18.7) (16.4) (15.0) (13.9) (13.0) (12.2) (11.3) (10.2) (9.20) (8.50) (7.93) 1 1/2 1.610 2100 1460 1180 990 900 810 750 690 650 620 550 500 460 430 (59.5) (41.3) (33.4) (28.0) (25.5) (22.9) (21.2) (19.5) (18.4) (17.6) (15.6) (14.2) (13.0) (12.2) 2 2.067 3950 2750 2200 1900 1680 1520 1400 1300 1220 1150 1020 950 850 800 (112) (77.9) (62.3) (53.8) (47.6) (43.0) (39.6) (36.8) (34.5) (32.6) (28.9) (26.9) (24.1) (22.7) 2 1/2 2.469 6300 4350 3520 3000 2650 2400 2250 2050 1950 1850 1650 1500 1370 1280 (178) (123) (99.7) (85.0) (75.0) (68.0) (63.7) (58.0) (55.2) (52.4) (46.7) (42.5) (38.8) (36.2) 3 3.068 11000 7700 6250 5300 4750 4300 3900 3700 3450 3250 2950 2650 2450 2280 (311) (218) (177) (150) (135) (122) (110) (105) (97.7) (92.0) (83.5) (75.0) (69.4) (64.6) 4 4.026 23000 15800 12800 10900 9700 8800 8100 7500 7200 6700 6000 5500 5000 4600 (651) (447) (362) (309) (275) (249) (229) (212) (204) (190) (170) (156) (142) (130)

1. Install the gas piping in accordance with applicable local codes. 2. Check gas supply pressure. Each unit heater must be connected to a manifold pressure and a gas supply capable of supplying its full rated capacity as specified in Table 4. A field LP tank regulator must be used to limit the supply pressure to a maximum of 14 in. W.C. (3.5 kPa). All piping should be sized in accordance with the latest edition of ANSI Standard Z223.1, National Fuel Gas Code; in Canada, according to CGA B149. See Tables 1 & 3 for correct gas piping size. If gas pressure is excessive on natural gas applications, install a pressure regulating valve in the line upstream from the main shutoff valve. 3. Adequately support the piping to prevent strain on the gas manifold and controls. 4. To prevent the mixing of moisture with gas, run the take-off piping from the top, or side, of the main. 5. Standard Unit Heaters, optional two-stage units are supplied with a combination valve which includes: a. Manual "A" valve b. Manual "B" valve c. Solenoid valve d. Pressure regulator Pipe directly into the combination valve (see Figure 4). 6. Gas valve has a pressure test post requiring a 3/32" hex head wrench to read gas supply and manifold pressures. Open 1/4 turn counterclockwise to read, turn clockwise to close and reseat. A 5/16" ID hose fi ts the pressure post. 7. Provide a drip leg in the gas piping near the gas unit heater. A ground joint union and a manual gas shutoff valve should be installed ahead of the unit heater controls to permit servicing. The manual shutoff valve must be located external to the jacket (See Figure 4). 8. Make certain that all connections have been adequately doped and tightened.
Never use an open fl ame to detect gas leaks. Explosive conditions may exist which may result in personal injury or death!
The appliance and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system in excess of 1/2 psig (3.5 kPa).
The appliance must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.5 kPa).
SINGLE STAGE GAS PIPING REQUIREMENTS*
GasType Natural Gas Propane (LP) Gas
Manifold 3.5 in. W.C. 10.0 in. W.C. Pressure (0.9 kPa) (2.5 kPa)
14.0 in. W.C. Max. 14.0 in. W.C. Max. Supply Inlet (3.5 kPa) (3.5 kPa) Pressure 5.0 in. W.C. Min. 11.0 in W.C. Min. (1.2 kPa) (2.7 kPa)
Do not over tighten the inlet gas piping into the valve. This may cause stresses that will crack the valve!
*For single stage application only at normal altitudes.
Check all pipe joints for leakage using a soap solution or other approved method. Never use an open flame or severe personal injury or death may occur!

HAZARDOUS VOLTAGE! DISCONNECT ALL ELECTRIC POWER INCLUDING REMOTE DISCONNECTS BEFORE SERVICING. Failure to disconnect power before servicing can cause severe personal injury or death.
Standard units are shipped for use on 115 volt, 60 hertz, single phase electric power. The motor name-plate and electrical rating of the transformer should be checked before energizing the unit heater electrical system. All external wiring must conform to the latest edition of ANSI/NFPA No. 70, United States National Electrical Code, and applicable local codes; in Canada, to the Canadian Electrical Code, Part 1, CSA Standard C22.1.
W R
R G W1 W2
G
D6922B
Do not use any tools (i.e. screwdriver, pliers, etc.) across terminals to check for power. Use a voltmeter.
THERMOSTAT HEAT ANTICIPATOR ADJUSTMENTS: The initial heat anticipator setpoint should equal the thermostat's current amperage draw when the unit is firing. This setpoint should be measured for the best results. Use the recommended ranges for a guide. If further information is needed, consult your thermostat manufacturer's instructions.
It is recommended that the electrical power supply to each unit heater be provided by a separate, fused, and permanently live electrical circuit. A disconnect switch of suitable electrical rating should be located as close to the gas valve and controls as possible. Each unit heater must be electrically grounded in accordance with the latest edition of the United States National Electrical Code, ANSI/NFPA No. 70, or CSA Standard C22.1. Refer to Figures 5a, 5b, 5c, 5d and 5e.
Mount the thermostat approximately 5 feet (1.5m) above the floor, in an area where it will be exposed to a free circulation of average temperature air. Always refer to the thermostat instructions, as well as our unit wiring diagram, and wire accordingly. Avoid mounting the thermostat in the following locations: 1. Cold Areas - Outside walls or areas where drafts may affect the operation of the control. 2. Hot Areas - Areas where the sun's rays, radiation, or warm air currents may affect the operation of the control. 3. Dead Areas - Areas where the air cannot circulate freely, such as behind doors or in corners.
Should any high limit wires have to be replaced, they must be replaced with wiring material having a temperature rating of 200° C minimum.
Honeywell T834H-1009 · or T834H-1017 · Thermostat

Figure 5d - Tubular Units Equipped with Natural Gas and Propane (LP) Gas




ANSI now organizes vented appliances into four categories.
Category I Includes non-condensing appliances with negative vent pressure, like the traditional atmospheric unit heater.
Category IV Covers condensing appliances with positive vent pressure.
Category II Groups condensing appliances with negative vent pressure.
Category III Appliances are non-condensing and operate with a positive vent pressure.
All unit heaters must be vented! All Venting installations shall be in accordance with the latest edition of Part 7, Venting of Equipment of the National Fuel Gas Code, ANSI Z223.1, or applicable provisions of local building codes. Refer to page 15 for Canadian installations. Refer to Figures 6, 7, 8A, 8B, 9A and 9B.
CARBON MONOXIDE! Your venting system must not be blocked by any snow, snow drifts, or any foreign matter. Inspect your venting system to ensure adequate ventilation exists at all times! Failure to heed these warnings could result in Carbon Monoxide Poisoning (symptoms include grogginess, lethargy, inappropriate tiredness, or fl u-like symptoms).
Observe the following precautions when venting the unit: 1. Use flue pipe of the same size as the flue connections on the gas unit heater (See Table #1). All heaters should be vented with UL Listed Type B vent, a factory built chimney, or a lined brick and mortar chimney that has been constructed in accordance with the National Building Code.

(CATEGORY III)
Horizontal venting arrangements are designed to be used with single wall vent pipe. Horizontal venting arrangements must terminate external to the building using either single wall or double wall (Type B) vent. If single wall vent pipe is used, it must be constructed of 26 gauge galvanized steel or a material of equivalent durability and corrosion resistance for the vent system. For installations in Canada, use corrosion resistant and gas-tight, listed vent pipe conforming with local building codes, or in the absence of local building codes, with current CAN/CGA-B149.1, Installation Codes for Natural Gas Burning Appliances and Equipment or CAN/CGA- B149.2, Installation Codes for Propane Gas Burning Appliances and Equipment. See Figures 7, 8A and 9A for special installation requirements regarding these venting conditions.
The vent terminal must be at least 12 inches (305mm) from the exterior of the wall that it passes through to prevent degradation of the building material by flue gases.
The vent terminal must be at least 3 feet (1m) above grade, or in snow areas, at least 3 feet above the snow line to prevent blockage by snow.
Through the wall vent for these appliances shall NOT terminate over public walkways, or over an area where the condensate or vapor could create a nuisance or hazard or could be detrimental to the operation of regulators, relief valves, or other equipment.
The vent pipe equivalent length must not exceed 50 feet (15.2m). Equivalent length is the total length of straight sections PLUS 15 feet (4.6m) for each 90 elbow and 8 feet (2.44m) for each 45 elbow.
Do not use Type B (double wall) vent internally within the building on horizontally vented power vented units!
Maintain 6 inches (152mm) between the vent pipe and combustible materials.
If double wall venting is used, components which are UL Listed and approved for Category III positive pressure venting systems MUST be used.
The vent terminal must be installed with a minimum horizontal clearance of 4 feet (1.2m) from electric meters, gas meters, regulators, and relief equipment.
A Breidert Type L, Fields Starkap, or equivalent vent cap must be supplied by the customer for each power vented unit. The vent pipe diameter MUST be as specified in Table 1 (“D” Dia. Flue Opening). All unit sizes are factory equipped with the required fl ue size collar; attach in place (if not mounted to outlet); refer to included vent collar instruction sheet for additional requirements.
Seal all vent pipe joints and seams to prevent leakage. Use General Electric RTV-108, Dow-Corning RTV-732 silicone sealant or equivalent; or 3M #425 aluminum foil tape (or equivalent). The vent air system must be installed to prevent collection of condensate. Pitch horizontal pipes downward 1/4 inch per foot (21mm per meter) toward the outlet for condensate drainage.
Vent Systems - Termination Clearance Requirements
Horizontal portions of the venting systems shall be supported at maximum intervals of 4 feet (1.2m) to prevent sagging (in Canada, support at 3 feet (1m) maximum intervals).
Door, window or any gravity air inlet 4 feet horizontally
Forced air inlet within 10 ft. 3 feet above
Insulate single wall vent pipe exposed to cold air or running through unheated areas.
Adjoining building or parapet 6 feet
Adjacent public walkways 7 feet above grade
Each unit must have an individual vent pipe and vent terminal! Each unit MUST NOT be connected to other vent systems or to a chimney.
The venting system for these appliances shall terminate at least 4 feet (1.2m) below, 4 feet (1.2m) horizontal from, or 1 foot (0.3m) above any door, window, or gravity vent air inlet into the building.

Figure 7 - Horizontally Vented Tubular Unit Heater – Category III
ADDITIONAL REQUIREMENT FOR CANADIAN INSTALLATIONS
REFER TO SPECIFICATION TABLE AND INSTALLATION MANUAL FOR PROPER USAGE. * The following instructions apply to Canadian installations in addition to installation and operating instructions. 1. Installation must conform with local building codes, or in the absence of local codes, with current CGA B149.1, Installation Codes for Natural Gas Burning Appliances and Equipment, or CGA B149.2, Installation Codes for Propane Gas Burning Appliances and Equipment. 2. Any reference to U. S. standards or codes in these instructions are to be ignored, and the applicable Canadian standards or codes applied



EXPLANATION OF CONTROLS (See Figure 10): 1. The unit heater is equipped with a power vent system that consists of a power venter motor and blower, pressure switch, and sealed fl ue collector in place of the conventional draft diverter. 2. The power venter motor is energized by the room thermostat through the integrated control board when a demand for heat is sensed. The pressure switch measures the flow through the vent system and energizes the direct spark ignition system beginning the pre-purge timing when the fl ow is correct.
START-UP (Also refer to lighting instruction plate equipped on the unit) 1. Open the manual gas valve in the gas supply line to the unit heater. Loosen the union in the gas line to purge it of air. Tighten the union and check for leaks.
The pressure switch MUST NOT be bypassed. The unit MUST NOT be fi red unless the power venter is operating. An unsafe condition could result.
Never use an open flame to detect gas leaks. Explosive conditions may exist which could result in personal injury or death.
3. The direct ignition system consists of an ignition control module and a gas valve. When the pre- purge period ends, the spark ignition system is energized, and the gas valve opens to supply gas to the burners. When the thermostat is satisfi ed, the vent system is de-energized and the valve closes to stop the fl ow of gas to the unit. 4. The limit switch interrupts the fl ow of electric current to the control board, interrupting the fl ow of gas to the gas valve if the unit heater becomes overheated. 5. Once the thermostat is satisfi ed, or the limit switch interrupts the fl ow of electric current to the control board, the unit will begin a post-purge period. When the post-purge period ends, the power venter motor is de-energized. 6. The fan operation is delayed 30 seconds once the thermostat is closed, and continues operation for 30 seconds after the thermostat opens.
2. Open the manual valve on the unit heater. 3. Turn ON the electrical power. 4. The unit should be under the control of the thermostat. Turn the thermostat to the highest point and determine that the power venter motor starts and the burners ignite. Turn the thermostat to the lowest point and determine that the power venter motor shuts off and the burners are extinguished. 5. Turn the thermostat to the desired position. 6. See Gas Input Rate and Adjustments sections.
SHUT DOWN 1. Turn the valve selector lever to the “OFF” position. 2. Turn off the electricity. 3. To relight, follow “start-up” instructions.
See Figures 10-17 for parts/identifi cation.


Primary air adjustment is made at the factory. No fi eld adjustments are necessary.
Check the gas input rate as follows (Refer to General Safety Information section for metric conversions).
2. PROPANE GAS: An exact manifold pressure of 10.0 inches W.C. (2.5 kPa) must be maintained for proper operation of the unit heater. If the unit is equipped with a pressure regulator on the combination gas valve, follow steps "a" through "d" above. If the unit is not so equipped, the propane gas supply system pressure must be regulated to attain this manifold operating pressure. 3. The adjusted manifold pressure should not vary more than 10% from pressure specifi ed in Table 5.
Never overfi re the unit heater, as this may cause unsatisfactory operation, or shorten the life of the heater.
PROPANE TYPE OF GAS NATURAL
* INPUT
HEATING VALUE 1075 BTU/Ft3
(40.1 MJ/m3)
(93.1 MJ/m3)
NO. OF BURNER ORIFICES
MANIFOLD PRESSURE
3600 (Sec. per Hr.) X BTU/Cu. Ft. = Input Rate Time (Sec.)
3.5" W.C. (0.87kPA)
10" W.C. (2.49 kPA)
93 42 116 42 140 42 163 42 186 42 233 42 280 42 326 42 372 42
40 53 50 53 60 53 70 53 80 53 100 53 120 53 140 53 160 53
For example: Assume the BTU content of one cubic foot of gas is 1000, and that it takes 18 seconds to burn one cubic foot of gas. 3600 x 1000 = 200,000 18
FT 3 /HR ORIFICE DRILL
FT 3 /HR ORIFICE DRILL
FT 3 /HR ORIFICE DRILL
FT 3 /HR ORIFICE DRILL
FT 3 /HR ORIFICE DRILL
Adjust the gas pressure as follows:
*This schedule is for units at operating at normal altitudes of 2000 ft. (610m) or less.
When installed in Canada, any references to deration at altitudes in excess of 2000 ft. (610m) are to be ignored. At altitudes of 2000 to 4500 ft. (610 to 1372m), the unit heaters must be orifi ced to 90% of the normal altitude rating, and be so marked in accordance with ETL certifi cation.
located on the combination gas valve. c. With a small screwdriver, rotate the adjustment
screw counterclockwise to decrease pressure, or clockwise to increase pressure. d. Replace regulator adjustment screw cap.
2500 BTU/Ft3

TUBULAR UNIT HEATER HIGH ALTITUDE DERATION This Tubular Unit Heater has been manufactured utilizing standard burner orifi ces and a normal manifold pressure setting as per the specifi cations shown on your unit rating plate.
Manifold Pressure (In. W.C.)
Manifold Pressure (In. W.C.)
Value BTU/Cu. ft. Altitude
Value BTU/Cu. ft.
All unit deration must be done through fi eld adjustments by a qualifi ed technician. Once the proper adjustments are made in the fi eld, attach label #J17-06459 to the unit, and record adjusted manifold pressure, altitude of the unit installation and the technician’s name and date on the label using a permanent marker.
Refer to Installation Instruction section on Adjustments- Gas Input Rate for adjusting the manifold pressure.
*Notes: 1. Consult local utility for actual heating value. 2. Tables based on heating value of 1,050 BTU/Cu. ft. at sea level.

SYMPTOMS POSSIBLE CAUSE(S) CORRECTIVE ACTION
A. Flame pops back.
B. Noisy Flame.
C. Yellow tip fl ame (some yellow
D. Floating fl ame.
E. Gas odor.
F. Delayed ignition.
G. Failure to ignite.
1. Open all manual valves “check for leaks”. 2. Turn on power supply, check fuses and replace if bad. 3. Turn up thermostat, Check for 24v on terminals R and W1 on terminal strip. 4. Check switch for continuity if open with no heat present, replace. 5. Check switch operation to ensure switch closes after draftor purge period. If it does not make/check tubing connections/ blockage. 6. Check all wiring per diagram. 7. Check all ground wires and connections. 8. Check both, for wiring according to diagram; check for 24V at gas valve terminals during
trial for ignition period if present and valve does not open. Replace valve.
H. Condensation.

SYMPTOMS POSSIBLE CAUSE(S) CORRECTIVE ACTION
I. Burners will not shut off.
J. Rapid burner cycling.
K. Noisy power ventor.
L. Fan will not run.
M. Fan motor turns on and off
while burner is operating.
N. Fan will not stop.
in a fl ash code mode, replace board.
O. Not enough heat.
P. Too much heat.

SYMPTOMS POSSIBLE CAUSE(S) CORRECTIVE ACTION
Q. Cold air is delivered during
heater operation.
R. High limit tripping.
open when unit is running or is the switch open during start-up. 4. Check for 24v on line side of the high limit. Constant voltage should be recorded if not control board is suspect. Check fl ash code.
S. Power ventor will not run.
check amp draw of motor. Replace if needed. 3. Check for continuous 115v on terminal
“CBM Blower” and neutral during call for heat. If not present and all checks are normal, replace.
T. Power ventor turns on and off
during operation.
U. Power ventor will not stop.

Table 6 - Tubular Propeller Troubleshooting with LED Indicator Assistance No Cycling or appliance power or thermostat call for heat since appliance failure has occured.
Slow Flash Fast Flash
Control OK, no call for heat.
Control OK, call for heat present.
Internal control fault, or no power.
Line voltage power can cause product damage, severe injury or death. Only a trained experienced service technician should perform this trouble- shooting.
Control internal failure or bad ground.
In lockout from failed ignitions or fl ame losses.
Pressure Switch open with inducer on or closed with inducer off.
Limit or rollout switch is open.
Flame sensed while gas valve is off.
*NOTICE: Air flow proving switch and power ventor hose barbs must be free of any dust or debris at all times. Periodically check these openings and/or if any problems occur.
On-board microprocessors disagree.

PERIODIC SERVICE 2. Turn off the manual gas valve and electrical power to the unit heater. 3. To clean or replace the burners, remove burner cover. Remove top strip from above burners. Lift burners up and pull away from manifold to remove. 4. With the burners removed, wire brush the inside surfaces of the heat exchanger. 5. Remove any dirt, dust, or other foreign matter from the burners using a wire brush and/or compressed air. 6. Reassemble the unit heater by replacing all parts in reverse order. 7. Check the burner adjustment. 8. Check all gas control valves and pipe connections for leaks. 9. Check the operation of the automatic gas valve by lowering the setting of the thermostat, stopping the operation of the gas duct furnace. The gas valve should close tightly, completely extinguishing the fl ame on the burners. 10. Inspect and service motor/fan assembly. To maintain efficient air flow, inspect and clean the fan blades and guard to prevent buildup of foreign matter. 11. Check lubrication instructions on motor. If oiling is required, add 3 or 4 drops of electric motor oil as follows: a. Light Duty - After 3 years or 25,000 hours of
All Maintenance/Service information should be recorded accordingly on the Inspection Sheet provided in this manual.
Open all disconnect switches and disconnect all electrical and gas supplies and secure in that position before servicing unit. Failure to do so may result in personal injury or death from electrical shock.
Gas tightness of the safety shut- off valves must be checked on at least an annual basis.
To check gas tightness of the safety shut-off valves, turn off the manual valve upstream of the appliance combination control. Remove the 1/8 inch pipe plug on the inlet side of the combination control and connect a manometer to that tapping. Turn the manual valve on to apply pressure to the combination control. Note the pressure reading on the manometer, then turn the valve off. A loss of pressure indicates a leak. If a leak is detected, use a soap solution to check all threaded connections. If no leak is found, combination control is faulty and must be replaced before putting appliance back in service.
hours of operation. c. Heavy Duty - Annually after 1 year or at least
1500 hours of operation.
Under no circumstances should combustible material be located within the clearances specified in this manual. Failure to provide proper clearance could result in personal injury or equipment damage from fi re.

1. The "Manufacturer" warrants to the original owner at original installation site that the above model Gas-Fired Heater ("the Product") will be free from defects in material or workmanship for (1) year from the date of shipment from the factory, or one and one-half (1-1/2) years from the date of manufacture, whichever occurs fi rst. The Manufacturer further warrants that the complete heat exchanger, and burners be free from defects in material or workmanship for a period of ten (10) years from the date of manufacture. If upon examination by the Manufacturer the Product is shown to have a defect in material or workmanship during the warranty period, the manufacturer will repair or replace, at its option, that part of the Product which is shown to be defective.
not been installed, maintained, or operated in accordance with furnished written instructions, or has been altered or modifi ed in any way by any unauthorized person. b. to any expenses, including labor or material, incurred during removal or reinstallation of the Product c. to any damage due to corrosion by chemicals, including halogenated hydrocarbons, precipitated in the air d. to any workmanship of the installer of the Product
with prior written approval of the Manufacturer. All returns must be freight prepaid. c. determination in the reasonable opinion of the Manufacturer that there exists a defect in material or
5. THIS LIMITED WARRANTY IS IN LIEU OF ALL WARRANTIES, EITHER EXPRESS OR IMPLIED, AND ALL SUCH OTHER WARRANTIES, INCLUDING WITHOUT LIMITATION IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, ARE HEREBY DISCLAIMED AND EXCLUDED FROM THIS LIMITED WARRANTY. IN NO EVENT SHALL THE MANUFACTURER BE LIABLE IN ANY WAY FOR ANY CONSEQUENTIAL, SPECIAL, OR INCIDENTAL DAMAGES OF ANY NATURE WHATSOEVER, OR FOR ANY AMOUNTS IN EXCESS OF THE SELLING PRICE OF THE PRODUCT OR ANY PARTS THEREOF FOUND TO BE DEFECTIVE. THIS LIMITED WARRANTY GIVES THE ORIGINAL OWNER OF THE PRODUCT SPECIFIC LEGAL RIGHTS. YOU MAY ALSO HAVE OTHER RIGHTS WHICH MAY VARY BY JURISDICTION.
In the interest of product improvement, we reserve the right to make changes without notice.


Figure 13 - Heat Exchanger Assembly Figure 14 - Electrical Control Panel


Motor


Figure 16 - Power Venter Assembly (300/400 Unit Sizes Shown)
Figure 17 - Turbulator/High Limit Location


START-UP
PRE-INSPECTION INFORMATION
With power and gas off. Type of Equip: Unit Heater
Serial Number _________________________ Model Number __________________________
Name Plate Voltage: _____________ Name Plate Amperage: _____________
Type of Gas: Natural LP Tank Capacity lbs. Rating: BTU @ °F kg kw @ °C ❐ Are all panels, doors, vent caps in place? ❐ Has the unit suffered any external damage? Damage ❐ Does the gas piping and electric wiring appear to be installed in a professional manner? ❐ Has the gas and electric been inspected by the local authority having jurisdiction? ❐ Is the gas supply properly sized for the equipment? ❐ Were the installation instructions followed when the equipment was installed? ❐ Have all fi eld installed controls been installed? ❐ Do you understand all the controls on this equipment? If not, contact your wholesaler or rep. (DO NOT START this equipment unless you fully understand the controls.)
GENERAL With power and gas off. ❐ Make certain all packing has been removed. ❐ Tighten all electrical terminals and connections. ❐ Check damper linkages for tightness. ❐ Check all fans & blowers for free movement. ❐ Check all controls for proper settings.
GAS HEATING With power and gas on. ❐ Inlet gas pressure in. W.C. or kPa ❐ Burner ignition. ❐ Manifold gas pressure in. W.C. or kPa ❐ Cycle on HIGH LIMIT. ❐ Cycle fi restat and/or freezestat. ❐ Check electronic modulation. Set at: ❐ Cycle and check all other controls not listed. ❐ Check operation of remote panel. ❐ Entering air temp °F or °C ❐ Discharge air temp. (high fi re) °F. or °C ❐ External static pressure in. W.C. ❐ Cycle by thermostat or operating control.
Pages referenced in this manual — manufacturer, support and downloads.
Common problems, likely causes, and what to do.
| Problem | Possible cause | Remedy | |
|---|---|---|---|
| A. Flame pops back. | 1. Burner orifi ce too small. | 1. Check with local gas supplier for proper orifi ce size and replace. Refer to “Operation”. | p.20 |
| B. Noisy Flame. | 1. Irregular orifi ce causing whistle or resonance. 2. Excessive gas input. | 1. Replace orifi ce. 2. Test and reset manifold pressure. | p.20 |
| C. Yellow tip fl ame (some yellow tipping on LP gas is permissible). | 1. Clogged main burners. 2. Misaligned orifi ces. 3. Insuffi cient combustion air. 4. Possibly over fi red. | 1. Clean main burner ports. 2. Replace manifold assembly. 3. Insuffi cient combustion air. 4. Check gas input and manifold pressures. | p.20 |
| D. Floating fl ame. | 1. Blocked venting. 2. Insuffi cient combustion air. 3. Blocked heat exchanger. 4. Air leak into combustion chamber or draft hood. | 1. Clean Flue. Refer to “Installation”. 2. Clean combustion air inlet openings. 3. Clean heat exchanger. Refer to “Installation”. 4. Determine cause and repair accordingly. | p.20 |
| E. Gas odor. | 1. Shut off gas supply immediately! 2. Leaking gas test port on valve. 3. Blocked heat exchanger. 4. Blocked draft hood. 5. Negative pressure in the building. | 1. Inspect all gas piping and repair. 2. Check to ensure gas test ports are seated. 3. Clean heat exchanger/fl ue. 4. Clean fl ue collector. 5. See “Installation”. | p.20 |
| F. Delayed ignition. | 1. Improper ground. 2. Bad or broken spark cable. 3. Faulty control. 4. Pressure regulator set too low. 5. Main burner orifi ces dirty. 6. Improper venting. | 1. Check grounding wires and spark bracket connections. 2. Inspect spark cable connections and cuts. 3. Check to ensure spark is energized after pre purge period. 4. Test and reset manifold pressure refer to “Operations”. 5. Clean or replace orifi ces. 6. Refer to “Installation”. | p.20 |
| G. Failure to ignite. | 1. Gas supply is off. 2. No power supply to unit. 3. Thermostat not calling. 4. Defective high limit. 5. Defective drafter prove switch. 6. Loose wiring. 7. Improper ground. 8. Improper thermostat or transformer wiring. | 1. Open all manual valves “check for leaks”. 2. Turn on power supply, check fuses and replace if bad. 3. Turn up thermostat, Check for 24v on terminals R and W1 on terminal strip. 4. Check switch for continuity if open with no heat present, replace. 5. Check switch operation to ensure switch closes after draftor purge period. If it does not make/check tubing connections/ blockage. 6. Check all wiring per diagram. 7. Check all ground wires and connections. 8. Check both, for wiring according to diagram; check for 24V at gas valve terminals during trial for ignition period if present and valve does not open. Replace valve. | p.20 |
| H. Condensation. | 1. Improper venting. 2. Unit under fi red. 3. Building too cold. | 1. Refer to “Installation, Venting”. 2. Check gas supply pressures to unit. Refer to “Installation”. 3. Refer to “Installation”. | p.20 |
| I. Burners will not shut off. | 1. Thermostat located incorrectly. 2. Improper thermostat wiring. 3. Shorted circuit. 4. Defective sticking gas valve. 5. Excessive gas supply pressure. | 1. Relocate thermostat away from outside wall or drafts. 2. Check thermostat circuit for open and close on terminal strip on heater “R” and “W”. 3. Check thermostat circuit for shorts “staples piercing wires”. 4. Check for 24v on gas valve terminals when thermostat is not calling. 5. Refer to “Installation”. | p.21 |
| J. Rapid burner cycling. | 1. Loose electrical connections at thermostat or gas valve. 2. Excessive thermostat heat anticipator setting. 3. Unit cycling on high limit. 4. Poor thermostat location. | 1. Tighten all electrical connections. 2. Adjust heat anticipator setting for longer cycles. Refer to “Electrical Connections”. 3. Check for proper air supply across heat exchanger and proper gas supply. 4. Relocate thermostat . | p.21 |
| K. Noisy power ventor. | 1. Power ventor wheel loose. 2. Power ventor wheel is dirty. 3. Power ventor wheel is rubbing on the housing. | 1. Replace or tighten. 2. Clean power ventor wheel. 3. Realign power ventor wheel. | p.21 |
| L. Fan will not run. | 1. Loose electrical connections. 2. Defective motor or overload. 3. Defective control board. | 1. Check and tighten wires on fan circuit. 2. Test for 115v on terminal ACB Heat and “L2” if voltage is present replace motor. 3. Test for 115v on terminal ACB Heat and “L2” on the control board, if voltage is not present 45 seconds after trial for ignition replace board. | p.21 |
| M. Fan motor turns on and off while burner is operating. | 1. Motor overload protection is tripping. 2. Loose wiring or connection. 3. Control board is defective. | 1. Check motor amps against motor name plate, check voltage, replace if found defective. 2. Check for 115v between motor leads. 3. Check terminal ACB Heat for voltage if voltage not constant, replace board. | p.21 |
| N. Fan will not stop. | 1. Control Board is in fl ame failure mode. 2. Fan improperly wired. 3. Defective board. | 1. Turn 115v power off to the unit, wait 10 seconds and reapply voltage to the unit. 2. Check wiring of fan circuit to wiring diagram. 3. If unit is not calling for heat and board is not in a fl ash code mode, replace board. | p.21 |
| O. Not enough heat. | 1. Incorrect gas input. 2. Heater undersized. 3. Thermostat malfunction. 4. Heater cycling on limit. 5. Incorrect orifi ce sizes. | 1. Refer to “Operation”. 2. Is the heater output sized correctly for heat loss of the space. Has the space been enlarged. 3. Check thermostat circuit, 24v on terminals “R” and “W” on terminal strip. 4. Check air movement across heat exchanger. Check voltage and amps at the fan motor. Check gas input to ensure unit is not over fi red. Check heat exchanger to ensure unit is not dirty. 5. Check orifi ce size, replace if undersized. | p.21 |
| P. Too much heat. | 1. Unit is over fi red. 2. Thermostat malfunction. 3. Heater runs continuously. | 1. Refer to “Operation”. Check orifi ce size. If too big replace. 2. Check thermostat for operation, to ensure circuit open and closes. 3. Check wiring per diagram; check operation at the gas valve, look for a short in thermostat circuit. | p.21 |
| Q. Cold air is delivered during heater operation. | 1. Incorrect manifold pressure or input. 2. Air throughput too high. | 1. Refer to “Operation”. 2. Refer to “Operation”. | p.22 |
| R. High limit tripping. | 1. Unit is over fi red. 2. Air fl ow is low. 3. Defective switch. 4. Defective control board. | 1. Burner orifi ces may be too large, verify and replace. 2. Check for proper voltage, ensure fan blade is correct. 3. Check operation of switch, did the switch open when unit is running or is the switch open during start-up. 4. Check for 24v on line side of the high limit. Constant voltage should be recorded if not control board is suspect. Check fl ash code. | p.22 |
| S. Power ventor will not run. | 1. Loose wiring or connections. 2. Motor overload is tripped or bad motor. 3. Bad control board. | 1. Check all wring in the power vent circuit to ensure good connection, including “Neutral”. 2. Check for 115v between motor leads and check amp draw of motor. Replace if needed. 3. Check for continuous 115v on terminal “CBM Blower” and neutral during call for heat. If not present and all checks are normal, replace. | p.22 |
| T. Power ventor turns on and off during operation. | 1. Power ventor improperly wired. 2. Motor overload cycling or defective motor. 3. Defective control board. | 1. Check power ventor circuit per wiring diagram. 2. Check motor voltage and amp draw to motor name plate, replace if motor found defective. 3. Check for continuous 115v on terminal “CMB Blower” during call for heat, replace board if found defective. | p.22 |
| U. Power ventor will not stop. | 1. Power ventor improperly wired. 2. Main burner did not light on call for heat. 3. Defective control board. | 1. Check power ventor circuit per wiring diagram. 2. Heater is in lockout mode check fl ash code table for problem. 3. No fl ash codes present along with no call for heat, replace control board. | p.22 |
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.