XC14−018 BASE SECTION
ELONGATED LEGS


Nominal Cooling Capacity 018 = 1.5 tons 024 = 2 tons 030 = 2.5 tons 036 = 3 tons 041 = 3.5 tons 042 = 3.5 tons 047 = 4 tons 048 = 4 tons 060 = 5 tons
506636−01


SUCTION LINE SERVICE VALVE FIELD CONNECTION FOR SUCTION LINE

To prevent stripping of the various caps used, the appropriately sized wrench should be used and fitted snugly over the cap before tightening.
USING MANIFOLD GAUGE SET When checking the system charge, only use a manifold gauge set that features low loss anti−blow back fittings.
Manifold gauge set used with HFC−410A refrigerant systems must be capable of handling the higher system operating pressures. The gauges should be rated for use with pressures of 0 − 800 psig on the high side and a low side of 30" vacuum to 250 psig with dampened speed to 500 psi. Gauge hoses must be rated for use at up to 800 psig of pressure with a 4000 psig burst rating.
These instructions are intended as a general guide and do not supersede local codes in any way. Consult authorities who have jurisdiction before installation. TORQUE REQUIREMENTS When servicing or repairing heating, ventilating, and air conditioning components, ensure the fasteners are appropriately tightened. Table 1 lists torque values for fasteners.
OPERATING SERVICE VALVES The liquid and vapor line service valves are used for removing refrigerant, flushing, leak testing, evacuating, checking charge and charging. Each valve is equipped with a service port which has a factory−installed valve stem. Figure 2 provides information on how to access and operating both angle and ball service valves.
Only use Allen wrenches of sufficient hardness (50Rc − Rockwell Harness Scale minimum). Fully insert the wrench into the valve stem recess. Service valve stems are factory−torqued (from 9 ft−lbs for small valves, to 25 ft−lbs for large valves) to prevent refrigerant loss during shipping and handling. Using an Allen wrench rated at less than 50Rc risks rounding or breaking off the wrench, or stripping the valve stem recess. See the Lennox Service and Application Notes #C−08−1 for further details and information.
506636−01

SERVICE PORT CORE
(VALVE STEM SHOWN CLOSED) INSERT HEX WRENCH HERE
TO INDOOR
(VALVE STEM SHOWN OPEN) INSERT HEX WRENCH HERE
UNIT
SERVICE PORT
STEM CAP
CORE
TO OUTDOOR UNIT
ANGLE−TYPE SERVICE VALVE
ANGLE−TYPE SERVICE VALVE
(FRONT−SEATED CLOSED)
(BACK−SEATED OPENED)
WHEN SERVICE VALVE IS CLOSED, THE SERVICE PORT IS OPEN TO THE LINE SET AND INDOOR UNIT. When service valve is OPEN, the service port is open to linE set, indoor and outdoor unit.
Operating Ball Type Service Valve:
A service port cap protects the service port core from contamination and serves as the primary leak seal.
With torque wrench: Finger tighten and torque cap per table 1. Without torque wrench: Finger tighten and use an appropriately sized wrench to turn an additional 1/6 turn clockwise.
12 3 4 5 6 7 8 9 10 1112
TO OPEN ROTATE STEM COUNTERCLOCKWISE 90°.
VALVE STEM
TO CLOSE ROTATE STEM CLOCKWISE 90°.
Stem cap protects the valve stem from damage and serves as the primary seal. Replace the stem cap and tighten as follows:
1/12 TURN
SERVICE PORT
With Torque Wrench: Finger tighten and then torque cap per table 1. Without Torque Wrench: Finger tight- en and use an appropriately sized wrench to turn an additional 1/12 turn clockwise.
12 3 4 5 6 7 8 9 10 11 12
SERVICE PORT
CAP
STEM CAP
TO OUTDOOR
UNIT

Disconnect all power to the existing outdoor unit at the disconnect switch or main fuse box/breaker panel.
Connect a gauge set, clean recovery cylinder and a recovery machine to the service ports of the existing unit. Use the instructions provided with the recovery machine to make the connections.
MAIN FUSE BOX/BREAKER
MANIFOLD GAUGES
PANEL
RECOVERY MACHINE
DISCONNECT
HIGH LOW
SWITCH
OUTDOOR UNIT
CLEAN RECOVERY CYLINDER
Remove existing HCFC−22 refrigerant using one of the following procedures: RECOVERING REFRIGERANT
METHOD 1: Us this method if the existing outdoor unit is not equipped with shut−off valves, or if the unit is not operational and you plan to use the existing HCFC−22 to flush the system. Remove all HCFC−22 refrigerant from the existing system. Check gauges after shutdown to confirm that the entire system is completely void of refrigerant. METHOD 2: Use this method if the existing outdoor unit is equipped with manual shut−off valves, and you plan to use new HCFC−22 refrigerant to flush the system. The following devices could prevent full system charge recovery into the outdoor unit: Outdoor unit’s high or low−pressure switches (if applicable) when tripped can cycle the compressor OFF. Compressor can stop pumping due to tripped internal pressure relief valve. Compressor has internal vacuum protection that is designed to unload the scrolls (compressor stops pumping) when the pressure ratio meets a certain value or when the suction pressure is as high as 20 psig. (Compressor suction pressures should never be allowed to go into a vacuum. Prolonged operation at low suction pressures will result in overheating of the scrolls and permanent damage to the scroll tips, drive bearings and internal seals.) Once the compressor can not pump down to a lower pressure due to one of the above system conditions, shut off the vapor valve. Turn OFF the main power to unit and use a recovery machine to recover any refrigerant left in the indoor coil and line set.
Perform the following task: A Start the existing HCFC−22 system in the cooling mode and close the liquid line valve. B Use the compressor to pump as much of the existing HCFC−22 refrigerant into the outdoor unit until the outdoor system is full. Turn the outdoor unit main power OFF and use a recovery machine to remove the remaining refrigerant from the system.
C When the low side system pressures reach 0 psig, close the vapor line valve. D Check gauges after shutdown to confirm that the valves are not allowing refrigerant to flow back into the low side of the system.
506636−01


ABOVE UNIT NOTES: Clearance to one of the other three sides must be 36 inches (914mm). Clearance to one of the remaining two sides may be 12 inches (305mm) and the final side may be 6 inches (152mm).
PLACING UNIT ON SLAB When installing unit at grade level, the top of the slab should be high enough above grade so that water from higher ground will not collect around the unit. The slab should have a slope tolerance as described in figure 5, detail B. NOTE If necessary for stability, anchor unit to slab as described in figure 5, detail D.
CAUTION
In order to avoid injury, take proper precaution when lifting heavy objects.
See Unit Dimensions on page 3 for sizing mounting slab, platforms or supports. Refer to figure 4 for mandatory installation clearance requirements.
ELEVATING THE UNIT Units are outfitted with elongated support feet as illustrated in figure 5, detail C.
If additional elevation is necessary, raise the unit by extending the height of the unit support feet. This may be achieved by using a 2 inch (50.8mm) Schedule 40 female threaded adapter. The specified coupling will fit snuggly into the recessed portion of the feet. Use additional 2 inch (50.8mm) Schedule 40 male threaded adaptors which can be threaded into the female threaded adaptors to make additional adjustments to the level of the unit. NOTE Keep the height of extenders short enough to ensure a sturdy installation. If it is necessary to extend further, consider a different type of field−fabricated framework that is sturdy enough for greater heights.
Some localities are adopting sound ordinances based on the unit’s sound level registered from the adjacent property, not from the installation property. Install the unit as far as possible from the property line.
When possible, do not install the unit directly outside a window. Glass has a very high level of sound transmission. For proper placement of unit in relation to a window see the provided illustration in figure 5, detail A.

Install unit away from windows.
Install unit level or, if on a slope, maintain slope tolerance of two (2) degrees (or two inches per five feet [50 mm per 1.5 m]) away from building structure.
MOUNTING SLAB
TWO 90° ELBOWS INSTALLED IN LINE SET WILL
GROUND LEVEL
REDUCE LINE SET VIBRATION.
DETAIL D
Slab Side Mounting
SHEET METAL SCREWS
COIL
STABILIZING BRACKET (18 GAUGE
METAL 2" WIDTH; HEIGHT AS
BASE PAN
REQUIRED)
#10 1−1/4" LONG HEX HD SCREW
AND FLAT WASHER
CORNER POST
Concrete slab use two plastic anchors (hole drill 1/4") Wood or plastic slab no plastic anchor (hole drill 1/8")
DETAIL E
Deck Top Mounting
Stabilizing bracket (18 gauge metal 2" (50.8mm) width; height as required); bend to form right angle as exampled below.
MINIMUM ONE
PER SIDE
2" (50.8MM) SCH 40 FEMALE THREADED
ADAPTER
2" (50.8MM) SCH 40 MALE THREADED
ADAPTER
SAME FASTENERS AS SLAB SIDE MOUNTING.
STABILITY
Use additional 2" SCH 40 male threaded adapters which can be threaded into the female threaded adapters to make additional adjustments to the level of the unit.
One bracket per side (minimum). For extra stability, two brackets per side, two inches (51mm) from each corner.
using Feet Extenders · 506636−01

Removing and Installing Panels
Install the unit a minimum of 6 inches (152 mm) above the roof surface to avoid ice build−up around the unit. Locate the unit above a load bearing wall or area of the roof that can adequately support the unit. Consult local codes for rooftop applications.
Do not allow panels to hang on unit by top tab. Tab is for alignment and not designed to support weight of panel.
To prevent personal injury, or damage to panels, unit or structure, be sure to observe the following: While installing or servicing this unit, carefully stow all removed panels out of the way, so that the panels will not cause injury to personnel, nor cause damage to objects or structures nearby, nor will the panels be subjected to damage (e.g., being bent or scratched). While handling or stowing the panels, consider any weather conditions, especially windy conditions, that may cause panels to be blown around and battered.
Roof Damage! This system contains both refrigerant and oil. Some rubber roofing material may absorb oil and cause the rubber to swell when it comes into contact with oil. The rubber will then bubble and could cause leaks. Protect the roof surface to avoid exposure to refrigerant and oil during service and installation. Failure to follow this notice could result in damage to roof surface.
PANEL SHOWN SLIGHTLY ROTATED TO ALLOW TOP TAB TO EXIT (OR ENTER) TOP SLOT FOR REMOVING (OR INSTALLING) PANEL.
HOLES LIP
LOUVERED PANEL INSTALLATION
Position the panel almost parallel with the unit as illustrated in detail D with the screw side as close to the unit as possible. Then, in a continuous motion:
DETAIL B
Detail C
MAINTAIN MINIMUM PANEL ANGLE (AS CLOSE TO PARALLEL WITH THE UNIT AS POSSIBLE) WHILE INSTALLING PANEL.
THEN DOWN TO REMOVE
PANEL
HOLD DOOR FIRMLY TO THE HINGED
ANGLE MAY BE TOO EXTREME
SIDE TO MAINTAIN FULLY−ENGAGED TABS
PREFERRED ANGLE FOR INSTALLATION
Figure 6. Removing and Installing Panels

Field refrigerant piping consists of liquid and vapor lines from the outdoor unit to the indoor unit coil (braze connections). Use Lennox L15 (sweat, non−flare) series line set, or field−fabricated refrigerant line sizes as listed in table 2.
This section provides information on installation or replacement of existing line set. If new or replacement line set is not being installed then proceed to Brazing Connections on page 12.
Lennox highly recommends changing line set when converting the existing system from HCFC−22 to HFC−410A. If that is not possible and the line set is the proper size as reference in table 2, use the procedure outlined under Flushing the System on page 13.
To obtain the correct information from Lennox, be sure to communicate the following information: Model (XC14) and size of unit (e.g. −036).
Line set diameters for the unit being installed as listed in table 2 and total length of installation.
If refrigerant lines are routed through a wall, then seal and isolate the opening so vibration is not transmitted to the building. Pay close attention to line set isolation during installation of any HVAC system. When properly isolated from building structures (walls, ceilings. floors), the refrigerant lines will not create unnecessary vibration and subsequent sounds. See figure 7 for recommended installation practices. Also, consider the following when placing and installing a high−efficiency outdoor unit.
Number of elbows vertical rise or drop in the piping.
The compressor is charged with sufficient Polyol ester oil for line set lengths up to 50 feet. Recommend adding oil to system based on the amount of refrigerant charge in the system. No need to add oil in system with 20 pounds of refrigerant or less. For systems over 20 pounds − add one ounce of every five pounds of refrigerant. Recommended topping−off POE oils are Mobil EAL ARCTIC 22 CC or ICI EMKARATE RL32CF.
Liquid lines that meter the refrigerant, such as RFC1 liquid lines, must not be used in this application. Existing line set of proper size as listed in table 2 may be reused. If system was previously charged with HCFC−22 refrigerant, then existing line set must be flushed (see Flushing Line Set and Indoor Coil on page 15).
Mineral oils are not compatible with HFC−410A. If oil must be added, it must be a Polyol Ester oil.
506636−01

Line Set Isolation The following illustrations are examples of proper refrigerant line set isolation:
REFRIGERANT LINE SET TRANSITION
FROM VERTICAL TO HORIZONTAL
AUTOMOTIVE MUFFLER-TYPE HANGER
MUFFLER-TYPE HANGER
OUTSIDE WALL LIQUID LINE VAPOR LINE
WALL STUD
WIRE TIE
INSIDE WALL
STRAP
STRAP LIQUID LINE TO VAPOR LINE
WOOD BLOCK BETWEEN STUDS
NON−CORROSIVE METAL SLEEVE
WIRE TIE
LIQUID LINE
NON−CORROSIVE
METAL SLEEVE
WOOD BLOCK
VAPOR LINE − WRAPPED IN ARMAFLEX
WIRE TIE
STRAP
REFRIGERANT LINE SET INSTALLING
HORIZONTAL RUNS
SLEEVE
To hang line set from joist or rafter, use either metal strapping material or anchored heavy nylon wire ties.
VAPOR LINE WRAPPED
WITH ARMAFLEX
8 FEET (2.43 METERS)
OUTSIDE
STRAPPING MATERIAL (AROUND
WALL
LIQUID LINE
VAPOR LINE ONLY)
FLOOR JOIST OR
ROOF RAFTER
TAPE OR WIRE TIE
8 FEET (2.43 METERS)
PVC PIPE
CAULK
NON−CORROSIVE METAL SLEEVE
FIBERGLASS
INSULATION
TAPE OR WIRE TIE
STRAP THE VAPOR LINE TO THE JOIST OR RAFTER AT 8 FEET (2.43 METERS) INTERVALS THEN STRAP THE LIQUID LINE TO THE VAPOR LINE.
ROOF RAFTER
Figure 7. Line Set Installation

Brazing Connections Use the procedures outline in figures 8 and 9 for brazing line set connections to service valves.
Connect gauge set low pressure side to vapor line service valve and repeat procedure starting at paragraph 4 for brazing the liquid line to service port valve.
Polyol Ester (POE) oils used with HFC−410A refrigerant absorb moisture very quickly. It is very important that the refrigerant system be kept closed as much as possible. DO NOT remove line set caps or service valve stub caps until you are ready to make connections.
Allow braze joint to cool before removing the wet rag from the service valve. Temperatures above 250ºF can damage valve seals.
Use silver alloy brazing rods with 5% minimum silver alloy for copper−to−copper brazing. Use 45% minimum alloy for copper−to−brass and copper−to−steel brazing.
Fire, Explosion and Personal Safety Hazard. Failure to follow this warning could result in damage, personal injury or death. Never use oxygen to pressurize or purge refrigeration lines. Oxygen, when exposed to a spark or open flame, can cause fire and/or an ex- plosion, that could result in property damage, personal injury or death.
When using a high pressure gas such as dry nitrogen to pressurize a refrigeration or air conditioning system, use a regulator that can control the pressure down to 1 or 2 psig (6.9 to 13.8 kPa).
Brazing alloys and flux contain materials which are hazardous to your health. Avoid breathing vapors or fumes from brazing operations. Perform operations only in well−ventilated areas. Wear gloves and protective goggles or face shield to protect against burns. Wash hands with soap and water after handling brazing alloys and flux.
506636−01

Remove service cap and core from both the suction / vapor and liquid line service ports. 1 2
CUT AND DEBUR CAP AND CORE REMOVAL Cut ends of the refrigerant lines square (free from nicks or dents) and debur the ends. The pipe must remain round. Do not crimp end of the line.
SERVICE PORT
SERVICE
CAP
PORT CORE
LINE SET SIZE MATCHES SERVICE VALVE CONNECTION
SERVICE
SERVICE VALVE CONNECTION
PORT CORE
SERVICE PORT CAP
COPPER TUBE
STUB
LIQUID LINE SERVICE
SUCTION / VAPOR LINE
REDUCER
VALVE
SERVICE VALVE
LINE SET SIZE IS SMALLER
DO NOT CRIMP SERVICE VALVE
THAN CONNECTION
CONNECTOR WHEN PIPE IS SMALLER THAN CONNECTION
REFRIGERANT LINE
ATTACH THE MANIFOLD GAUGE SET FOR BRAZING LIQUID AND SUCTION / VAPOR LINE SERVICE VALVES
Flow regulated nitrogen (at 1 to 2 psig) through the low−side refrigeration gauge set into the liquid line service port valve, and out of the suction / vapor line service port valve.
A Connect gauge set low pressure side to liquid line service valve (service port).
HIGH LOW
NITROGEN AT 1 TO 2 PSIG.
B Connect gauge set center port to bottle of nitrogen with regulator.
C Remove core from valve in suction / vapor line service port to allow nitrogen to escape.
B
SUCTION / VAPOR SERVICE PORT MUST BE OPEN TO ALLOW EXIT POINT FOR NITROGEN
SERVICE
VALVE
VAPOR LINE
INDOOR
OUTDOOR
UNIT
UNIT
NITROGEN
LIQUID LINE
LIQUID LINE SERVICE
A
WHEN BRAZING LINE SET TO SERVICE VALVES, POINT FLAME
AWAY FROM SERVICE VALVE.

To help protect service valve seals during brazing, wrap water saturated cloths around service valve bodies and copper tube stubs. Use additional water saturated cloths underneath the valve body to protect the base paint. 4
Flow regulated nitrogen (at 1 to 2 psig) through the refrigeration gauge set into the valve stem port connection on the liquid service valve and out of the suction / vapor valve stem port. See steps 3A, 3B and 3C on manifold gauge set connections 5
BRAZE LINE SET
Wrap both service valves with water saturated cloths as illustrated here and as mentioned in step 4, before brazing to line set. Water saturated cloths must remain water saturated throughout the brazing and cool−down process.
WHEN BRAZING LINE SET TO SERVICE VALVES, POINT FLAME
AWAY FROM SERVICE VALVE.
LIQUID LINE
WARNING
SUCTION / VAPOR LINE
WHEN BRAZING LINE SET TO SERVICE VALVES, POINT FLAME
AWAY FROM SERVICE VALVE.
WATER SATURATED CLOTH
PREPARATION FOR NEXT STEP 7
After all connections have been brazed, disconnect manifold gauge set from service ports. Apply additional water saturated cloths to both services valves to cool piping. Once piping is cool, remove all water saturated cloths. Refer to the unit installation instructions for the next step in preparing the unit.
506636−01

1B
1A
TYPICAL EXISTING FIXED ORIFICE REMOVAL PROCEDURE (UNCASED COIL SHOWN)
TYPICAL EXISTING EXPANSION VALVE REMOVAL PROCEDURE (UNCASED COIL SHOWN)
TWO PIECE PATCH PLATE
LIQUID LINE
EXPANSION
DISTRIBUTOR TUBES
(UNCASED COIL ONLY)
ORIFICE HOUSING
VALVE
LIQUID LINE ORIFICE HOUSING
DISTRIBUTOR
TUBES
TEFLON ®
TEFLON ® RING
RING
FIXED ORIFICE
BRASS NUT
TEFLON ® RING
SENSING
LINE
DISTRIBUTOR
ASSEMBLY
DISTRIBUTOR
EQUALIZER LINE
REMOVE AND DISCARD
ASSEMBLY
WHITE TEFLON ® SEAL
(IF PRESENT)
LIQUID LINE ASSEMBLY
(INCLUDES STRAINER)
LIQUID LINE ASSEMBLY WITH
BRASS NUT
A On fully cased coils, remove the coil access and plumbing panels. B Remove any shipping clamps holding the liquid line and distributor as- sembly. C Using two wrenches, disconnect liquid line from liquid line orifice hous- ing. Take care not to twist or damage distributor tubes during this pro- cess. D Remove and discard fixed orifice, valve stem assembly if present and Teflon® washer as illustrated above. E Use a field−provided fitting to temporary reconnect the liquid line to the indoor unit’s liquid line orifice housing.
LINE FITTING
VAPOR
LINE
LIQUID
SENSING BULB
LINE
A On fully cased coils, remove the coil access and plumbing panels. B Remove any shipping clamps holding the liquid line and distributor assembly. C Disconnect the equalizer line from the expansion valve equalizer line fitting on the vapor line. D Remove the vapor line sensing bulb. E Disconnect the liquid line from the expansion valve at the liquid line assembly. F Disconnect the expansion valve from the liquid line orifice housing. Take care not to twist or damage distributor tubes during this process. G Remove and discard expansion valve and the two Teflon® rings. H Use a field−provided fitting to temporary reconnect the liquid line to the indoor unit’s liquid line orifice housing. LOW HIGH
GAUGE MANIFOLD INVERTED HCFC−22 CYLINDER CONTAINS CLEAN HCFC−22 TO BE USED FOR FLUSHING.
NEW OUTDOOR
UNIT
FLUSHING LINE SET
CLOSED OPENED
EXISTING
The line set and indoor unit coil must be flushed with at least the same amount of clean refrigerant that previously charged the system. Check the charge in the flushing cylinder before proceeding.
UNIT
B
LIQUID LINE SERVICE
VALVE
A Set the recovery machine for liquid recovery and start the recovery machine. Open the gauge set valves to allow the recovery machine to pull a vacuum on the existing system line set and indoor unit coil. B Invert the cylinder of clean HCFC−22 and open its valve to allow liquid refrigerant to flow into the system through the vapor line valve. Allow the refrigerant to pass from the cylinder and through the line set and the indoor unit coil before it enters the recovery machine. C After all of the liquid refrigerant has been recovered, switch the recovery machine to vapor recovery so that all of the HCFC−22 vapor is recovered. Allow the recovery machine to pull down to 0 the system. D Close the valve on the inverted HCFC−22 drum and the gauge set valves. Pump the remaining refrigerant out of the recovery machine and turn the machine off.
CYLINDER
TANK RETURN
B
C D
VAPOR LIQUID
INLET
DISCHARGE
RECOVERY MACHINE
A Inverted HCFC−22 cylinder with clean refrigerant to the vapor service valve. B HCFC−22 gauge set (low side) to the liquid line valve. C HCFC−22 gauge set center port to inlet on the recovery machine with an empty recovery tank to the gauge set. D Connect recovery tank to recovery machines per machine instructions.

Installing Indoor Metering Device This outdoor unit is designed for use in systems that use either fixed orifice or expansion valve metering devices at the indoor coil.
See the Lennox XC14 Engineering Handbook for approved expansion valve kit match−ups. The expansion valve unit can be installed internal or external to the indoor coil. In applications where an uncased coil is being installed in a field−provided plenum, install the expansion valve in a manner that will provide access for field servicing of the expansion valve. Refer to below illustration for reference during installation of expansion valve unit.
If using a fixed orifice metering device, use the the one provided with the outdoor unit. The metering device is located in the installation instruction bag. For installing the orifice, reverse the procedure outlined in figure 10, 1A.
A Remove the field−provided fitting that temporary reconnected the liquid line to the indoor unit’s distributor assembly. B Install one of the provided Teflon® rings around the stubbed end of the expansion valve and lightly lubricate the connector threads and expose surface of the Teflon® ring with refrigerant oil. C Attach the stubbed end of the expansion valve to the liquid line orifice housing. Finger tighten and use an appropriately sized wrench to turn an additional 1/2 turn clockwise as illustrated in the figure above, or 20 ft−lb. D Place the remaining Teflon® washer around the other end of the expansion valve. Lightly lubricate connector threads and expose surface of the Teflon® ring with refrigerant oil. E Attach the liquid line assembly to the expansion valve. Finger tighten and use an appropriately sized wrench to turn an additional 1/2 turn clockwise as illustrated in the figure above or 20 ft−lb.
(Uncased Coil Shown)
1 2 3 4 5 6 7 8 9 10 11 12
STUB
LIQUID LINE
ORIFICE HOUSING DISTRIBUTOR
END
EXPANSION
VALVE
TUBES
TEFLON ®
RING
TEFLON ®
SENSING
RING
LINE
DISTRIBUTOR
EQUALIZER LINE
ASSEMBLY
LIQUID LINE ASSEMBLY WITH
SENSING BULB INSTALLATION
BRASS NUT
A Attach the vapor line sensing bulb in the proper orientation as illustrated to the right using the clamp and screws provided.
VAPOR
FITTING (SEE EQUALIZER LINE INSTALLATION FOR FURTHER DETAILS)
LINE
1 2 3 4 5 6 7 8 9 10 11 12
B Connect the equalizer line from the expansion valve to the equalizer vapor port on the vapor line. Finger tighten the flare nut plus 1/8 turn (7 ft−lbs) as illustrated below.
Sensing bulb insulation is required if mounted external to the coil casing. sensing bulb installation for bulb positioning.
ON LINES SMALLER THAN 7/8", MOUNT SENSING BULB AT EITHER THE 3 OR 9 O’CLOCK POSITION.
VAPOR LINE
A Remove and discard either the flare seal cap or flare nut with copper flare seal bonnet from the equalizer line port on the vapor line as illustrated in the figure to the right. B Remove and discard either the flare seal cap or flare nut with copper flare seal bonnet from the equalizer line port on the vapor line as illustrated in the figure to the right.
BULB
FLARE SEAL CAP
FLARE NUT
VAPOR LINE
ON 7/8" AND LARGER LINES, MOUNT SENSING BULB AT EITHER THE 4 OR 8 O’CLOCK POSITION. NEVER MOUNT ON BOTTOM OF LINE.
COPPER FLARE SEAL BONNET
MALE BRASS EQUALIZER LINE FITTING
BULB BULB
VAPOR LINE
1/2 Turn · 1/8 Turn · 506636−01

The Environmental Protection Agency (EPA) prohibits the intentional venting of HFC refrigerants during maintenance, service, repair and disposal of appliance. Approved methods of recovery, recycling or reclaiming must be followed.
When using a high pressure gas such as dry nitrogen to pressurize a refrigeration or air conditioning system, use a regulator that can control the pressure down to 1 or 2 psig (6.9 to 13.8 kPa).
If this unit is being matched with an approved line set or indoor unit coil which was previously charged with mineral oil, or if it is being matched with a coil which was manufactured before January of 1999, the coil and line set must be flushed prior to installation. Take care to empty all existing traps. Polyol ester (POE) oils are used in Lennox units charged with HFC−410A refrigerant. Residual mineral oil can act as an insulator, preventing proper heat transfer. It can also clog the expansion device, and reduce the system performance and capacity. Failure to properly flush the system per the instructions below will void the warranty.
Leak detector must be capable of sensing HFC refrigerant.
Refrigerant can be harmful if it is inhaled. Refrigerant must be used and recovered responsibly. Failure to follow this warning may result in personal injury or death.
A Connect an HFC−410A manifold gauge set high pressure hose to the vapor valve service port.
OUTDOOR UNIT
NITROGEN
HFC−410A
TEST FOR LEAKS
After the line set has been connected to the indoor and outdoor units, check the line set connections and indoor unit for leaks. Use the following procedure to test for leaks:
A With both manifold valves closed, connect the cylinder of HFC−410A refrigerant to the center port of the manifold gauge set. Open the valve on the HFC−410A cylinder (vapor only).
B Open the high pressure side of the manifold to allow HFC−410A into the line set and indoor unit. Weigh in a trace amount of HFC−410A. [A trace amount is a maximum of two ounces (57 g) refrigerant or three pounds (31 kPa) pressure]. Close the valve on the HFC−410A cylinder and the valve on the high pressure side of the manifold gauge set. Disconnect the HFC−410A cylinder.
C Connect a cylinder of dry nitrogen with a pressure regulating valve to the center port of the manifold gauge set.
D Adjust dry nitrogen pressure to 150 psig (1034 kPa). Open the valve on the high side of the manifold gauge set in order to pressurize the line set and the indoor unit.
E After a few minutes, open one of the service valve ports and verify that the refrigerant added to the system earlier is measurable with a leak detector.
F After leak testing disconnect gauges from service ports.

HIGH LOW
A Connect low side of manifold gauge set with 1/4 SAE in−line tee to vapor line service valve B Connect high side of manifold gauge set to liquid line service valve C Connect micron gauge available connector on the 1/4 SAE in−line tee. D Connect the vacuum pump (with vacuum gauge) to the center port of the manifold gauge set. The center port line will be used later for both the HFC−410A and nitrogen containers.
MANIFOLD GAUGE SET
UNIT
A34000 1/4 SAE TEE WITH SWIVEL COUPLER
A
MICRON
GAUGE
TO VAPOR SERVICE VALVE
NITROGEN
HFC−410A
B
VACUUM PUMP
TO LIQUID LINE SERVICE VALVE
D 2
EVACUATE THE SYSTEM
RECOMMEND MINIMUM 3/8" HOSE
A Open both manifold valves and start the vacuum pump. B Evacuate the line set and indoor unit to an absolute pressure of 23,000 microns (29.01 inches of mercury). NOTE During the early stages of evacuation, it is desirable to close the manifold gauge valve at least once. A rapid rise in pressure indicates a relatively large leak. If this occurs, repeat the leak testing procedure.
C When the absolute pressure reaches 23,000 microns (29.01 inches of mercury), perform the following: Close manifold gauge valves Close valve on vacuum pump Turn off vacuum pump Disconnect manifold gauge center port hose from vacuum pump Attach manifold center port hose to a dry nitrogen cylinder with pressure regulator set to 150 psig (1034 kPa) and purge the hose. Open manifold gauge valves to break the vacuum in the line set and indoor unit. Close manifold gauge valves. D Shut off the dry nitrogen cylinder and remove the manifold gauge hose from the cylinder. Open the manifold gauge valves to release the dry nitrogen from the line set and indoor unit. E Reconnect the manifold gauge to the vacuum pump, turn the pump on, and continue to evacuate the line set and indoor unit until the absolute pressure does not rise above 500 microns (29.9 inches of mercury) within a 20−minute period after shutting off the vacuum pump and closing the manifold gauge valves. F When the absolute pressure requirement above has been met, disconnect the manifold hose from the vacuum pump and connect it to an upright cylinder of HFC−410A refrigerant. Open the manifold gauge valve 1 to 2 psig in order to release the vacuum in the line set and indoor unit. G Perform the following:
Close manifold gauge valves. Shut off HFC−410A cylinder. Reinstall service valve cores by removing manifold hose from service valve. Quickly install cores with core tool while maintaining a positive system pressure. Replace stem caps and secure finger tight, then tighten an additional one−sixth (1/6) of a turn as illustrated.
3 4 5 6 7 8 9 10 11 12
506636−01


temperatures and pressures present during operation of an air conditioning system. Non−condensables and water suction combine with refrigerant to produce substances that corrode copper piping and compressor parts.
Use a thermocouple or thermistor electronic vacuum gauge that is calibrated in microns. Use an instrument capable of accurately measuring down to 50 microns.
In the U.S.A., wiring must conform with current local codes and the current National Electric Code (NEC). In Canada, wiring must conform with current local codes and the current Canadian Electrical Code (CEC). Refer to the furnace or air handler installation instructions for additional wiring application diagrams and refer to unit nameplate for minimum circuit ampacity and maximum overcurrent protection size. 24VAC TRANSFORMER Use the transformer provided with the furnace or air handler for low-voltage control power (24VAC − 40 VA minimum)

Evacuating the system of non−condensables is critical for proper operation of the unit. Non−condensables are defined as any gas that will not condense under
SIZE CIRCUIT AND INSTALL DISCONNECT SWITCH 1
Install room thermostat (ordered separately) on an inside wall approximately in the center of the conditioned area and 5 feet (1.5m) from the floor. It should not be installed on an outside wall or where it can be affected by sunlight or drafts.
Refer to the unit nameplate for minimum circuit ampacity, and maximum fuse or circuit breaker (HACR per NEC). Install power wiring and properly sized disconnect switch.
THERMOSTAT
PANEL
DISCONNECT
SWITCH
5 FEET (1.5M)
HIGH VOLTAGE FIELD WIRING
FACTORY WIRING
LOW VOLTAGE (24V) FIELD WIRING
WIRE RUN LENGTH AWG# INSULATION TYPE
WIRE NUTS
LESS THAN 100’ (30 METERS) 18 TEMPERATURE RATING
MORE THAN 100’ (30 METERS) 16 35ºC MINIMUM.
A Run 24VAC control wires through cutout with grommet. B Run 24VAC control wires through wire tie. C Make 24VAC control wire connections using field provided wire nuts. D Tighten wire tie to security 24V control wiring.
BLACK
GROMMET
D
24V CONTROL WIRES
B
TIGHTEN WIRE TIE



506636−01




506636−01

If the outdoor unit is void of refrigerant, clean the system using the procedure described below.
System Refrigerant
If unit is equipped with a crankcase heater, it should be energized 24 hours before unit start−up to prevent compressor damage as a result of slugging.
LOW HIGH
B SUCTION LINE
SERVICE PORT CONNECTION
OUTDOOR UNIT
REFRIGERANT TANK
CHARGE IN LIQUID PHASE
A
VAPOR LINE SERVICE VALVE
DIGITAL SCALE
C D
TEMPERATURE
TEMPERATURE SENSOR
SENSOR
LIQUID LINE SERVICE VALVE
TO LIQUID LINE SERVICE
(LIQUID LINE)
VALVE
AClose manifold gauge set valves and connect the center hose to a cylinder of HFC−410A. Set for liquid phase charging.
BConnect the manifold gauge set’s low pressure side to the suction line service port.
CConnect the manifold gauge set’s high pressure side to the liquid line service port.
DPosition temperature sensor on liquid line near liquid line service port.

START: Determine how refrigerant is metered
WHEN TO CHARGE? Warm weather best Can charge in colder weather CHARGE METHOD? Determine by: Metering device type Outdoor ambient temperature REQUIREMENTS: Sufficient heat load in structure Indoor temperature between 70-80ºF (21−26ºC) Manifold gauge set connected to unit Thermometers: − to measure outdoor ambient temperature − to measure liquid line temperature − to measure suction line temperature
metering
device?
TXV FIXED ORIFICE
64ºF (17.7ºC) and
65ºF (18.3ºC) and
40ºF (4.4ºC) and
39ºF (3.8ºC) and
WEIGH-IN
SUBCOOLING WEIGH-IN SUPERHEAT

CHECKING AIR FLOW AT INDOOR COIL Check airflow using the Delta−T (DT) process using the illustration in figure 20.
DT 80 24 24 24 23 23 22 22 22 20 19 18 17 16 15 78 23 23 23 22 22 21 21 20 19 18 17 16 15 14 76 22 22 22 21 21 20 19 19 18 17 16 15 14 13 74 21 21 21 20 19 19 18 17 16 16 15 14 13 12
Temp. of air entering indoor coil ºF
72 20 20 19 18 17 17 16 15 15 14 13 12 11 10
70 19 19 18 18 17 17 16 15 15 14 13 12 11 10 57 58 59 60 61 62 63 64 65 66 67 68 69 70
A 72º
C 53º
19º
Cº TDrop – DT = ºF ACTION
air flow air flow
53º 19 – 15 = 4 Increase the airflow 58º 14 – 15 = −1 (within +3º range) no change
62º 10 – 15 = −5 Decrease the airflow
All temperatures are expressed in ºF
WET BULB
Changing air flow affects all temperatures; recheck tempera- tures to confirm that the temperature drop and DT are within +3º.
Figure 20. Checking Indoor Airflow over Evaporator Coil using Delta−T Chart WEIGH IN
64ºF (17.7ºC) and Below
If the system is void of refrigerant, first, locate and repair any leaks and then weigh in the refrigerant charge into the unit. To calculate the total refrigerant charge:
Adjust amount. for variation
in line set length listed on line set length table below.

Refrigerant Charge per Line Set Length
Ounces per 5 feet (g per 1.5 m) adjust from 15 feet (4.6 m) line set*
Liquid Line Set Diameter
3/8" (9.5 mm) 3 ounce per 5’ (85 g per 1.5 m)
*If line length is greater than 15 ft. (4.6 m), add this amount. If line length is less than 15 ft. (4.6 m), subtract this amount.

USE WEIGH-IN METHOD Weigh-in or remove refrigerant based upon line length
DO NOT CHARGE UNIT
ABOVE or
(Results of charging at low
BELOW
temperatures not reliable)
64ºF and BELOW
APPROACH TXV
If refrigerant is added or removed, retest to confirm that unit is properly charged.
APPº (Approach) Values(F:+/−1.0° [C: +/−0.6°])
ºF (ºC)* −018 −024 −030 −036 −041 −042 −047 −048 −060 65 (18) 4 (2.2) 2 (1.1) 2 (1.1) 2 (1.1) 3 (1.7) 6 (3.3) 9 (5.0) 7 (3.9) 8 (4.4) 75 (24) 5 (2.8) 4 (2.2) 4 (2.2) 5 (2.8) 3 (1.7) 6 (3.3) 9 (5.0) 8 (4.4) 9 (5.0) 85 (29) 6 (3.3) 4 (2.2 6 (3.3) 8 (4.4) 4 (2.2) 8 (4.4) 8 (4.4) 8 (4.4) 9 (5.0) 95 (35) 5 (2,8) 4 (2.2) 5 (2.8) 7 (3.9) 4 (2.2) 8 (4.4) 8 (4.4) 8 (4.4) 9 (5.0) 105 (41) 3 (1.7) 4 (2.2 5 (2.8) 6 (3.3) 4 (2.2) 8 (4.4) 8 (4.4) 8 (4.4) 9 (5.0) 115 (45) 3 (1.7) 3 (1.7) 4 (2.2) 6 (3.3) 5 (2.8) 8 (4.4) 8 (4.4) 9 (5.0) 9 (5.0) *Temperature of air entering outdoor coil
If value is greater than shown (high approach), add refrigerant; if less than shown (liquid temperature too close to ambient temperature, low approach), remove refrigerant.
1. Connect gauge set as illustrated in figure 18. 2. Confirm proper airflow across coil using figure 20. 3. Compare unit pressures with table 4, Normal Operating Pressures. 4. Set thermostat to call for heat (must have a cooling load between 70-80ºF (21−26ºC) 5. Measure outdoor ambient temperature 6. When heat demand is satisfied, set thermostat to call for cooling 7. Allow temperatures and pressures to stabilize. NOTE − If necessary, block outdoor coil to maintain 325 − 375 psig. 8. Record liquid line temperature: LIQº =
START: Measure outdoor ambient temperature
USE WEIGH-IN METHOD Weigh-in or remove refrigerant based upon line length
DO NOT CHARGE UNIT
ABOVE or
(Results of charging at low
BELOW
temperatures not reliable)
64ºF and BELOW
SUBCOOLING TXV
BLOCK OUTDOOR COIL: [sometimes necessary with lower temperatures] Use cardboard or plastic sheet to restrict the airflow through the outdoor coil to achieve pressures from 325−375 psig (2240−2585 kPa). Higher pressures are needed to check charge. Block equal sections of air intake panels and move coverings sideways until the liquid pressure is in the above noted ranges.
If refrigerant is added or removed, verify charge using the Approach Method.
If value is MORE than shown, remove refrigerant.
SCº (Subcooling) Values (F:+/−1.0° [C: +/−0.6°])
ºF (ºC)* −018 −024 −030 −036 −041 −042 −047 −048 −060 65 (18) 10 (5.6) 10 (5.6) 11 (6.1) 13 (7.2) 9 (5.0) 10 (5.6) 6 (3.3) 8 (4.4) 8 (4.4) 75 (24) 6 (3.3) 7 (3.9) 8 (4.4) 9 (5.0) 7 (3.9) 7 (3.9) 6 (3.3) 8 (4.4) 7 (3.9) 85 (29) 6 (3.3) 8 (4.4) 6 (3.3) 7 (3.9) 7 (3.9) 8 (4.4) 6 (3.3) 8 (4.4) 8 (4.4) 95 (35) 6 (3.3) 9 (5.0) 6 (3.3) 8 (4.4) 7 (3.9) 8 (4.4) 6 (3.3) 8 (4.4) 7 (3.9) 105 (41) 10 (5.6) 9 (5.0) 7 (3.9) 9 (5.0) 7 (3.9) 8 (4.4) 6 (3.3) 8 (4.4) 6 (3.3) 115 (45) 10 (5.6) 10 (5.6) 8 (4.4) 10 (5.6) 6 (3.3) 7 (3.9) 5 (2.8) 7 (3.9) 6 (3.3) *Temperature of air entering outdoor coil
If value is LESS than shown, add refrigerant.
Figure 23. Using HFC−410A Subcooling (TXV) Charge Method
MORE or · 506636−01

1. Confirm proper airflow across coil using figure 20. 2. Compare unit pressures with table 4, Normal Operating Pressures. 3. Use SUPERHEAT to correctly charge unit or to verify the charge is correct. 4. Set thermostat to call for heat (must have a cooling load between 70-80ºF (21−26ºC) 5. Connect gauge set. 6. When heat demand is satisfied, set thermostat to call for cooling. 7. Allow temperatures and pressures to stabilize. 8. Measure the suction line pressure and use the use value to determine saturation temperature (table 3): SATº =
USE WEIGH-IN METHOD Weigh-in or remove refrigerant based upon line length
ABOVE or
BELOW 39ºF and BELOW
SHº (Superheat) Values (+/−5ºF) Wet Bulb (air entering indoor coil) ºF* 50 52 54 56 58 60 62 64 66 68 70 72 74 76 40 15 18 20 23 26 29 32 34 38 41 43 46 48 51 45 13 16 18 21 24 27 30 33 36 39 41 44 46 49 50 11 14 16 19 22 25 28 31 34 37 39 42 44 47 55 9 12 14 17 20 23 27 30 33 36 38 40 42 44 60 7 10 12 15 18 21 24 27 30 33 35 38 40 43 65 - 6 10 13 16 19 21 24 27 30 33 36 38 41 70 - - 7 10 13 16 19 21 24 27 30 33 36 39 75 - - - 6 9 12 15 18 21 24 28 31 34 37 80 - 5 8 12 15 18 21 25 28 31 35 85 - 8 11 15 19 22 26 30 33 90 - 5 9 13 16 20 24 27 31 95 - 6 10 14 18 22 25 29 100 - 8 12 16 21 24 28 105 - 5 9 13 17 22 26 110 - 6 11 15 20 25 115 - 8 14 18 24 * Dry−bulb temperature (ºF) of entering outdoor ambient air.
If refrigerant is REMOVED, retest to confirm that unit is properly charged.
If refrigerant is ADDED, retest to confirm that unit is properly charged.
If value is LESS than shown, then REMOVE refrigerant.
If value is MORE than shown, then ADD refrigerant.
Figure 24. Using HFC−410A Superheat (Fixed Orifice) Charge Method
Table 3. HFC−410A Temperature (°F) − Pressure (Psig) °F Psig °F Psig °F Psig °F Psig °F Psig °F Psig °F Psig °F Psig
32 100.8 48 137.1 63 178.5 79 231.6 94 290.8 110 365.0 125 445.9 141 545.6 33 102.9 49 139.6 64 181.6 80 235.3 95 295.1 111 370.0 126 451.8 142 552.3 34 105.0 50 142.2 65 184.3 81 239.0 96 299.4 112 375.1 127 457.6 143 559.1 35 107.1 51 144.8 66 187.7 82 242.7 97 303.8 113 380.2 128 463.5 144 565.9 36 109.2 52 147.4 67 190.9 83 246.5 98 308.2 114 385.4 129 469.5 145 572.8 37 111.4 53 150.1 68 194.1 84 250.3 99 312.7 115 390.7 130 475.6 146 579.8 38 113.6 54 152.8 69 197.3 85 254.1 100 317.2 116 396.0 131 481.6 147 586.8 39 115.8 55 155.5 70 200.6 86 258.0 101 321.8 117 401.3 132 487.8 148 593.8 40 118.0 56 158.2 71 203.9 87 262.0 102 326.4 118 406.7 133 494.0 149 601.0 41 120.3 57 161.0 72 207.2 88 266.0 103 331.0 119 412.2 134 500.2 150 608.1 42 122.6 58 163.9 73 210.6 89 270.0 104 335.7 120 417.7 135 506.5 151 615.4 43 125.0 59 166.7 74 214.0 90 274.1 105 340.5 121 423.2 136 512.9 152 622.7 44 127.3 60 169.6 75 217.4 91 278.2 106 345.3 122 428.8 137 519.3 153 630.1 45 129.7 61 172.6 76 220.9 92 282.3 107 350.1 123 434.5 138 525.8 154 637.5
46 132.2 62 175.4 77 224.4 93 286.5 108 355.0 124 440.2 139 532.4 155 645.0
47 134.6 78 228.0 109 360.0 140 539.0
MORE or



When liquid line temperature drops below 50°F the thermostat closes energizing HR1. The thermostat will open, de−energizing HR1 once liquid line temperature reaches 70°F .
Liquid Line Filter Drier A filter drier is factory-installed as illustrated in Unit Dimensions on page 2, with each XC14 unit to ensure a clean, moisture−free system. A replacement filter drier is available from Lennox. Refer to Lennox Repair Part Program.
Some scroll compressor have internal vacuum protector that will unload scrolls when suction pressure goes below 20 psig. A hissing sound will be heard when the compressor is running unloaded. Protector will reset when low pressure in system is raised above 40 psig. DO NOT REPLACE COMPRESSOR.
HOMEOWNER Cleaning of the outdoor unit’s coil should be performed by a trained service technician. Contact your dealer and set up a schedule (preferably twice a year, but at least once a year) to inspect and service your outdoor unit. The following maintenance may be performed by the homeowner.
Maintenance DEALER Maintenance and service must be performed by a qualified installer or service agency. At the beginning of each cooling season, the system should be checked as follows:
Outdoor Unit 1. Clean and inspect the outdoor coil. The coil may be flushed with a water hose. Ensure the power is turned off before you clean the coil.
Sprinklers and soaker hoses should not be installed where they could cause prolonged exposure to the outdoor unit by treated water. Prolonged exposure of the unit to treated water (i.e., sprinkler systems, soakers, waste water, etc.) will corrode the surface of steel and aluminum parts and diminish performance and longevity of the unit.
Outdoor Coil The outdoor unit must be properly maintained to ensure its proper operation. Please contact your dealer to schedule proper inspection and maintenance for your equipment. Make sure no obstructions restrict airflow to the outdoor unit. Grass clippings, leaves, or shrubs crowding the unit can cause the unit to work harder and use more energy. Keep shrubbery trimmed away from the unit and periodically check for debris which collects around the unit. Cleaning of the outdoor unit’s coil should be performed by a trained service technician. Contact your dealer and set up a schedule (preferably twice a year, but at least once a year) to inspect and service your outdoor unit.
Outdoor Coil It may be necessary to flush the outdoor coil more frequently if it is exposed to substances which are corrosive or which block airflow across the coil (e.g., pet urine, cottonwood seeds, fertilizers, fluids that may contain high levels of corrosive chemicals such as salts)
Outdoor Coil The outdoor coil may be flushed with a water hose. Outdoor Coil (Sea Coast) Moist air in ocean locations can carry salt, which is corrosive to most metal. Units that are located near the ocean require frequent inspections and maintenance. These inspections will determine the necessary need to wash the unit including the outdoor coil. Consult your installing contractor for proper intervals/procedures for your geographic area or service contract.
Routine Maintenance In order to ensure peak performance, your system must be properly maintained. Clogged filters and blocked airflow prevent your unit from operating at its most efficient level.

at the indoor unit (installed internal or external to the cabinet) or behind a return air grille in the wall or ceiling. Check the filter monthly and clean or replace it as needed. 2. Disposable Filter Disposable filters should be replaced with a filter of the same type and size.
Thermostat Operation See the thermostat homeowner manual for instructions on how to operate your thermostat.
Preservice Check If your system fails to operate, check the following before calling for service: Verify room thermostat settings are correct. Verify that all electrical disconnect switches are ON. Check for any blown fuses or tripped circuit breakers. Verify unit access panels are in place. Verify air filter is clean. If service is needed, locate and write down the unit model number and have it handy before calling.
Accessories For update−to−date information, see any of the following publications: Lennox XC14 Engineering Handbook Lennox Product Catalog Lennox Price Book
Job Location City State
Installer City State
Unit Model No. Serial No. Service Technician
Nameplate Voltage
Rated Load Ampacity Compressor Outdoor Fan
Maximum Fuse or Circuit Breaker
Electrical Connections Tight? Indoor Filter clean? Supply Voltage (Unit Off)
Indoor Blower RPM S.P. Drop Over Indoor (Dry) Outdoor Coil Entering Air Temp.
Refrigerant Lines: Leak Checked? Properly Insulated? Outdoor Fan Checked?
Service Valves: Fully Opened? Caps Tight? Thermostat
Voltage With Compressor Operating Calibrated? Properly Set? Level?
506636−01