
GE Zenith Controls
ZT X Series Automatic Transfer Switches 40-400 Amps

Operation and Maintenance Manual


Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
The safe operation of your switch is GE Zenith’s focus. The proper storage, installation, operation and mainte- nance will help increase the life of the switch.
Due to hazardous voltage and current, GE Zenith rec-
ommends that a GE Zenith Certified technician or a
qualified electrician must perform the installation and maintenance of the switch.
Equipment Inspection and Storage Once you have received the transfer switch, inspect it for any damage. This includes damage to the enclo- sure, power panel, control panel and wiring harness. If any damage is found or suspected, file a claim as soon as possible with the carrier and notify the nearest GE Zenith representative.
Each GE Zenith transfer switch is factory wired and tested. A complete information package is furnished with each switch which includes:
a. Sequence of operation. b. Description and operation of all accessories supplied. c. Power panel connection diagram and schematic. d. Description and identification of all customer field connections.
Before installation, it is necessary to store the transfer switch in a clean dry place, protected from dirt and water. Provide ample air circulation and heat, if necessary, to prevent condensation.
Installation of GE Zenith transfer switches includes:
a. Mounting the transfer switch cabinet. b. Connection of all Normal, Emergency, and Load cables or bus bars. c. Connection of external control circuits as required. Mounting Enough room should be allowed to open the cabinet doors fully for inspection and servicing of the switch per NEC and local codes.
Operating Storage Temperature Temperature (Ambient): Humidity
-30°C to +75°C (-22°F to +167°F)
-20°C to +65°C (-4°F to +149°F)
5% to 95% (non-con- densing)
CAUTION
Before drilling conduit entry holes or any accessory mounting holes, cover and protect
the switch and control panel to prevent dirt
and metal fragments from entering the mechanical and electrical components.
Do not use a blower since debris may
become lodged in the electrical and mechanical components and cause damage.
Failure to do so may result in damage and malfunction of the switch.


Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
Power Connections GE Zenith transfer switches are supplied with UL listed solderless screw type terminals as standard for the Normal, Emergency and Load power connections. Table 1 lists the number and sizes of cable lugs supplied as standard for each switch amp rating.
Connect the Normal, Emergency, and Load conductors to the clearly marked terminals on the transfer switch. Remove surface oxides from cables by cleaning with a wire brush. Verify that all connections are correct before tightening the lugs. All cable lug connections must be tightened to the proper torque values as shown in Table 2.


T = Load N = Utility E = Generator

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
Manual operation is possible for maintenance purposes only. Manual operation of the switch can be checked before it is operated electrically.
With all power off, insert a Phillips screwdriver or equivalent size tool into the manual operator socket and operate the transfer switch between the Utility and Generator positions. The transfer switch should operate smoothly without binding. Return the switch to the Utility position, remove the screwdriver.
The engine-start terminals are clearly identified by a label on the microcontroller backplate. In the case of manual transfer switches, or in other applications not requiring the microprocessor, clearly marked terminal blocks are provided in the upper left corner of the control panel for the engine start control wires.
Terminals for field connections to the A3 Emergency auxiliary contacts and the A4 Normal auxiliary contacts are also provided. These terminals are clearly marked and appear on the side of the power panel. On 400 amp metal frame units these terminals appear on the bracket above the operator handle.
GE Zenith Controls
RATING : VOLTS -
HZ -
AMPS -
PHASE -
SYSTEM VOLTS:
MODEL NUMBER:

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
installed and/or replaced as recommended, an exerciser set from the front panel will lose its settings during power outages and the exerciser will not work. Note: Battery life if reduced if neither source is avail- able. Typical battery life when both sources are unavailable is 21 days.
This applies only to the switches with the RM4-CAT exerciser option:
Only after ATS installation, connect a commercial-grade alkaline 9V battery to the MX60 controller via the har- ness connected to the controller. The battery should be placed in the holder installed just above the controller. The battery is used to maintain the exerciser function in the event of power outage. The battery should be replaced at least once a year. If the battery is not
Should the battery connection become disconnected in shipping, take the controller cover off and plug the harness into the receptacle in the top right corner of the MX controller as shown in figure 2 and 5. Reinstall the cover and connect the battery.


Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
Simulate a utility outage by opening the S1 Utility side breaker. The delay to engine start timer (P) begins its timing cycle. After the P timer has completed its timing cycle, the engine start contacts close to start the generator.
Functional Test Functional testing of the automatic transfer switch (ATS) is described in this section. Before proceeding, read and understand all instructions and review the operation of all accessories provided.
When generator voltage and frequency reach the preset restore points (see Table 4) the S2 Available LED illumi- nates. Simultaneously, the delay to generator timer (W) begins its timing cycle. When the W time delay is com- pleted the ATS will transfer to Generator, the S1 position LED goes off, and the S2 position LED illuminates.
To begin the test, close the Utility source circuit breaker. Referring to Figure 7, the controller will illuminate the Utility Available LED when proper voltage is sensed. If the ATS mechanism is set on S1, the S1 position LED will also light.. Verify the phase to phase voltages at the Utility line terminals.
Reclose the Utility breaker to retransfer to utility. The delay to utility timer (T) begins its timing cycle (Table 3). When the T timer has completed its timing cycle, the ATS will transfer. The optional S2 position LEDs go off, and the S1 position LED illuminates. The delay engine stop timer (U) begins its timing cycle. The generator runs unloaded for the duration of the U timing cycle. When the timer completes its timing cycle, the generator will stop. The S2 Available LED goes off.
Next, close the Generator source breaker and start the engine generator. The S2 (Generator) Available LED will illuminate when proper voltage and frequency levels are sensed. After both sources have been verified, shut down the engine generator, and put the generator’s start control in the automatic position. Complete the visual inspection of the transfer switch, and replace the cabinet cover (or close the cabinet door).
Action P Timer W Timer T Timer U Timer P - 5 sec. W - 20 sec. T - 5 min. U - 5 min.
S1 Fail or Time Delay Time Delay Time Delay Time Delay Test or S2 Start S2 Stable S1 Stable S2 Stop Exerciser
Transfer to S2 Retransfer to S1 Engine Cool-Down
S1 returns or Test/Exerciser Ends
S1 Fail Voltage 80% Nominal Line Voltage S2 Fail Voltage 80% Nominal Line Voltage S1 Restore 90% Nominal Line Voltage S2 Restore Voltage 90% Nominal Line Voltage S1 Fail Frequency 80% S2 Fail Frequency 90% S1 Restore Frequency 90% S2 Restore Frequency 95% Timers
P Timer W Timer T Timer U Timer P - 5 sec. W - 20 sec. T - 5 min. U - 5 min.
Utility Generator

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
System Voltage Settings ZTX controller boards are preconfigured to the system voltages specified at the time of order. Exact system volt- ages are normally set at the factory, however, depend- ing on the actual application and system nominal volt- age, ZTX control boards are capable of being adjusted slightly, to meet different source characteristics for voltage as well as frequency. (See Table 5)
Voltage / Frequency Selection Jumper Settings
JP1
JP2
JP2
B A
B A
Figure 6 (on right) shows the variations each of the 3 basic types of controllers can be adjusted to within its nominal voltage range. Position Jumpers JP1 and JP2, as needed for voltage. Position JP3 for frequency. As with any other Jumper setting, always remove power completely from the controller before making changes.
JP1
JP2
JP2
B A
B A
JP3
JP3
B A
B A


Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
S1 (Utility) Available Green LED. When on, indicates source is acceptable.
S1 (Utility) Position Green LED. When on, indicates ATS is connected to Utility
S2 (Generator) Available Red LED. When on, indicates source is acceptable.
S2 (Generator) Position Red LED. When on, indicates ATS is connected to Generator.
Timing/In-phase Amber LED. When blinking, indicates the ATS is timing a Delay When on steady, indicates the ATS is waiting for both sources to synchronize with each other.

TEST - Pressed and held for 1 second Simulates a power outage, starts the Generator and transfers the ATS to S2.
BYPASS TIMER - Pressed while E is blinking bypasses any remaining countdown Timer
CANCEL - Depending on the current state of ATS operation, ends specific functions or indications

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
TIMER BYPASS
The TEST KEY initiates a transfer sequence to S2 and holds the ATS in that mode until either the CANCEL key is pressed or, a situation arises to cause the ATS to go back to S1(ie, S2 actually fails).
This key is used to bypass (truncate), any of the running timers shown in Table 3. Whenever the Timing/ Inphase LED is blinking, pressing the TIMER BYPASS will end that particular delay and cause the ATS con- troller to immediately jump to the next sequence step.
In order to perform a TEST, the ATS must be on S1 and S1 must qualify as a "good source" by being above the FAIL thresholds for both Voltage and Frequency (see Table 2).
Once the TEST KEY is pressed for at least 1 Sec, the ATS will begin the Timer Sequence (see figure 5), attempt to start S2 generator source, and if S2 qualifies as a "good source", transfer the load to S2. (There is no P-Time in a test)
The CANCEL key performs 3 different cancel actions depending on the ATS current state of operation:
the CANCEL key will cancel the test.
The TEST key is typically used to perform a system operational or maintenance test or, to purposely cause and hold the Load off of S1. If during the TEST, S2 fails and S1 is available, the TEST will be cancelled and the Load will be immediately retransferred to S1.
ing and holding the CANCEL key for 10 Sec. will cancel (and remove), the set exercise
Whenever it is required to have a regular test performed automatically on a repeating basis, the Automatic Exerciser function can be setup using this key.
Depending on the jumper settings shown in Figure 8, the ATS can be programmed to perform a repeating 7, 14, 21 or 28 day exercise at a particular time of day.
To initiate an Automatic Exercise, the EXER SET key is pressed and held for at least 1 Sec. at the desired exercise time. The ATS will begin the Timer Sequence, attempt to start S2 generator source and if S2 qualifies as a good source, transfer the Load to S2 for the dura- tion of the Generator Run-Time. After the Generator Run-time has expired, the timing sequence will restart and the Load will be transferred back to S1, after T- time, ending by running the U-time and finally ending the call for S2.

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
Automatic Generator Exerciser The ZTX automatic generator Exerciser can perform a pre-scheduled repeating test of the generator and/or the ATS mechanism depending on which jumpers are selected on the controller board. Additionally, the ATS can be preset to perform the exercise every 7, 14, 21 or 28 days. Regardless of which interval is selected, all exercisers have a preset run-duration of 10 minutes.
the ATS is waiting for the next impending exercise, the ATS will not show a blinking indication but instead will show the S2 Available LED as solidly on to indicate the true condition of S2. Any Exercise event can be prema- turely canceled by pressing the CANCEL key.
Selection of the exerciser interval is through three jumpers located on the controller board as shown in Figure 6. The Exerciser comes from the factory preset at 28 days and is not active. To change the exerciser interval, remove power from the controller completely, and move the jumpers at positions jp4 and jp5 to match the selected repeat-cycle from the configurations shown in Figure 7.
A set Exerciser can be completely cleared out of memory by pressing and holding the CANCEL key for at least 10 Seconds causing the blink indication to stop.
If S2 fails to meet the criteria for a good source, during an Exercise attempt, the Controller will continue to hold the P-contacts closed for the duration of the Runtime timer then wait for the next scheduled exercise. If S2 fails during an Exercise, the Controller will abort that exercise and wait till then next scheduled exercise.
The Exerciser function can be programmed to perform either a Load-transfer or a non-Load transfer. Selecting either is done by changing the Jumper JP6 as shown in Figure 8. To change between a Load-transfer or no-Load transfer, remove power from the controller completely and move the jumper at position JP6.
Automatic Exerciser Jumper Settings
In order to set an automatic Exerciser, choose the exer- ciser interval and whether a Load-transfer or no-Load transfer is desired as stated above. An exercise can only be set if S1 is available and the ATS (and Load), is on S1 source.
JP4
JP5
JP5
B A
B A
To establish an Exerciser
JP4
JP4
At the exact time desired, press and hold the EXER SET key for at least 1 second. The ATS will immediately start an initial exercise by attempting to start the generator, running through the Timers (figure 3) and will either only start the generator, or, will start the generator and transfer the Load from S1 to S2, for the time duration of the exerciser interval, 10 minutes. Once the Exercise is completed, the ATS will continue the timing sequence and retransfer the Load back to S1, cool down the gen- erator and terminate until the next scheduled interval time. Any time an Exerciser has been established and is scheduled, the S2 Available and S2 position LEDs quick- ly blink approximately every 4 seconds as a reminder. However, if S2 source becomes available during the time
JP5
B A
B A
JP6
B A

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
In-Phase Monitor ZTX ATS senses when the sources are as far out as 2 Hz or as close as .01Hz in frequency differential of each other and transfers the load to and from either source in-phase. If turned on, R50 In-Phase monitor tracks the frequency of both the Utility and Generator sources allowing a smooth, synchronous transfer of the load, which is especially beneficial where conveyors, pumps and other motor loads are involved. ZTX indicates it is waiting for the sources to synchronize by holding the Timer/In-Phase LED on. When both sources have syn- chronized, the ATS will transfer the Load (within 20° of each other, if sources are within 2Hz differential), and the Timer/In-Phase LED will turn off. If the sources fail to synchronize, after 1 minute, the controller will blink the Timer/In-Phase LED once, alerting the operator that the In-Phase monitor function can be bypassed by pressing the CANCEL key, causing an immediate trans- fer (see Cancel Key function). If the CANCEL key is not pressed, the ZTX will continue to wait for an in- Phase condition to occur.
In the case of both sources coming from the same source, or, one configured as WYE and the other as DELTA, the frequency difference is fixed at the same frequency or fixed but 30 degrees out of phase. In those cases, In-Phase Monitor can be turned off.
In-Phase Monitor is turned on as default from the factory. To turn In-Phase Monitor OFF or ON, take the following steps:
Turn In-Phase Monitor OFF:
Turn In-Phase Monitor ON:
In a typical ATS application, one source is on the utility and one source is a backup system such as a gas or diesel generator. Because sources have a slight frequency difference, sources come in and out of phase. If ZTX In-Phase Monitor is on, The ZTX ATS Controller monitors both sources and transfers the Load at the ideal time to minimize back-EMF conditions.


Partial Coverage System
Total Coverage System



N1 N2
SN SCOM
SE
CCE
E2
E1
OPTIONAL 3
E 3 N 2
E 2 N3 2
Figure 12 Figure 13



Standard Transition - 225 to 400 Amps


Cable Connection Lug S-2701 N 1,2,3 N E 1,2,3 N T 1,2,3 N Wire Size #4-600 MCM #4-600 MCM

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
Service must be performed by qualified personnel.
S1 or S2 Available LED not lit Sources either fully or partially unacceptable Check for under voltage S1 or S2 breakers open Check for missing phase (s) Check for under frequency
ATS will not retransfer Load T - Timer has not expired back to Utility Automatic Exerciser is in process S1 Utility fully or partially unacceptable
ATS does not transfer Load to S2 S2 Generator fully or partially unacceptable Set motor-saver to dropout below (generator) Motor loads on system creating enough back- ATS Fail setpoint EMF to keep missing phase from falling below Fail setpoint.
S2 Generator will not start X1 or X2 not connected Check Generator Start wiring
S2 Generator will not shut down U - Timer not expired Wait for U timer to expire Automatic Exerciser in process
All LEDs off Keypad connector unplugged at Controller Both source breakers open
ATS will not transfer in-phase In-Phase monitor not on Turn on In-Phase monitor Frequency difference between S1 and Adjust Generator governor to hold S2 greater than 2Hz. freqency closer to Utility
ATS will not retain a Battery dead or missing Replace battery with a fresh industrial Set Automatic Exerciser grade Alkaline battery
Timer/In-Phase LED constantly on Both sources locked in frequency or one Turn In-Phase monitor off source greater than 20° out of phase
S1 and S2 LEDs Blinking Phase Rotation Mis-match between sources Rewire sources to be same rotation
S1 Position LED Blinking SN limit switch bad or intermittent Check connection or SN limit switch
S2 Position LED Blinking SE Limit switch bad or intermittent Check connection or SE limit switch
Both S1 and S2 Positioin Solenoid bad or disconnected Requires CANCEL key to clear - LEDs Blinking ATS contactor in mid-position check Solenoid Requires CANCEL key to clear - Check both limit switches

A Product of GE Consumer & Industrial General Electric Company 830 West 40 thStreet, Chicago, IL 60609 USA 773 299-6600, Fax: 773 247-7805 www.geelectrical.com
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.