Table of Contents 62 sections GE Zenith Controls · ZT X Series Automatic Transfer Switches 40-400 Amps · 72 R -1000 9/05 · Operation and Maintenance Manual · … ShowHide
Page 1 of the GE ZTX user manual — 72 R -1000 9/05
Page 1 · click to enlarge
Page 1

e

GE Zenith Controls

ZT X Series Automatic Transfer Switches 40-400 Amps

GE ZTX — e diagram (page 1)
Fig. 1 · e

72 R -1000 9/05

Operation and Maintenance Manual

Page 3 of the GE ZTX user manual — WARNING
Page 3 · click to enlarge
Page 3

Installation

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

The safe operation of your switch is GE Zenith’s focus. The proper storage, installation, operation and mainte- nance will help increase the life of the switch.

2. Verify that all cabled connections are correct. 3. Check engine start connections and verify the correct connection of all control wires. 4. Check the lug torque values of the power connections.

CAUTION

Due to hazardous voltage and current, GE Zenith rec-

ommends that a GE Zenith Certified technician or a

qualified electrician must perform the installation and maintenance of the switch.

5. Make sure that all covers and barriers are installed and properly fastened.

Equipment Inspection and Storage Once you have received the transfer switch, inspect it for any damage. This includes damage to the enclo- sure, power panel, control panel and wiring harness. If any damage is found or suspected, file a claim as soon as possible with the carrier and notify the nearest GE Zenith representative.

Each GE Zenith transfer switch is factory wired and tested. A complete information package is furnished with each switch which includes:

a. Sequence of operation. b. Description and operation of all accessories supplied. c. Power panel connection diagram and schematic. d. Description and identification of all customer field connections.

Before installation, it is necessary to store the transfer switch in a clean dry place, protected from dirt and water. Provide ample air circulation and heat, if necessary, to prevent condensation.

Installation of GE Zenith transfer switches includes:

a. Mounting the transfer switch cabinet. b. Connection of all Normal, Emergency, and Load cables or bus bars. c. Connection of external control circuits as required. Mounting Enough room should be allowed to open the cabinet doors fully for inspection and servicing of the switch per NEC and local codes.

Operating Storage Temperature Temperature (Ambient): Humidity

-30°C to +75°C (-22°F to +167°F)

-20°C to +65°C (-4°F to +149°F)

5% to 95% (non-con- densing)

Final Equipment Inspection Prior to energizing the transfer switch:

CAUTION

1. Remove any debris incurred, with a vacuum, due to shipment or installation.

Before drilling conduit entry holes or any accessory mounting holes, cover and protect

the switch and control panel to prevent dirt

WARNING

and metal fragments from entering the mechanical and electrical components.

Do not use a blower since debris may

become lodged in the electrical and mechanical components and cause damage.

Failure to do so may result in damage and malfunction of the switch.

Page 4 of the GE ZTX user manual — Installation
Page 4 · click to enlarge
Page 4
GE ZTX — Installation diagram (page 4)
Fig. 2 · Installation

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Power Connections GE Zenith transfer switches are supplied with UL listed solderless screw type terminals as standard for the Normal, Emergency and Load power connections. Table 1 lists the number and sizes of cable lugs supplied as standard for each switch amp rating.

Connect the Normal, Emergency, and Load conductors to the clearly marked terminals on the transfer switch. Remove surface oxides from cables by cleaning with a wire brush. Verify that all connections are correct before tightening the lugs. All cable lug connections must be tightened to the proper torque values as shown in Table 2.

GE ZTX — Installation diagram (page 4)
Fig. 3 · Installation
Screw Type Terminals for External Power Connections Switch Size (Amps)Utility, Generator and Load Terminals Fully Rated Neutral Bar (When Required) Cable Per Pole Range of Wire Sizes No. of CablesRange of Wire Sizes 401 #8 to 3/0 AWG 3#8 to 1/0 AWG 801 #8 to 3/0 AWG 3#8 to 1/0 AWG 1001 #8 to 3/0 AWG 3#8 to 1/0 AWG 1501 #8 to 3/0 AWG 3#8 AWG to 300 MCM 200, 225, 250*1 #6 AWG to 250 MCM 3#6 AWG to 300 MCM 300, 4001 #4 AWG to 600 MCM 3#4 AWG to 300 MCM
GE ZTX — Installation diagram (page 4)
Fig. 4 · Installation

T = Load N = Utility E = Generator

Page 5 of the GE ZTX user manual — SERIAL NUMBER:
Page 5 · click to enlarge
Page 5

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Control Connections Connecting Engine Start may cause Generator to start. Before connecting, turn Generator OFF. With the Generator breaker open and the Generator control switch off, install the Generator start connections. JPBattery Connection Figure 2

Manual operation is possible for maintenance purposes only. Manual operation of the switch can be checked before it is operated electrically.

With all power off, insert a Phillips screwdriver or equivalent size tool into the manual operator socket and operate the transfer switch between the Utility and Generator positions. The transfer switch should operate smoothly without binding. Return the switch to the Utility position, remove the screwdriver.

The engine-start terminals are clearly identified by a label on the microcontroller backplate. In the case of manual transfer switches, or in other applications not requiring the microprocessor, clearly marked terminal blocks are provided in the upper left corner of the control panel for the engine start control wires.

Tightening Torque for Lugs Socket Size Across FlatsTorque Lb. - In.Lb. - Ft. 1/8454 5/321008 3/1612010 7/3215012 1/420017 5/1627523 3/837531 1/250042 9/1660050

Terminals for field connections to the A3 Emergency auxiliary contacts and the A4 Normal auxiliary contacts are also provided. These terminals are clearly marked and appear on the side of the power panel. On 400 amp metal frame units these terminals appear on the bracket above the operator handle.

g

GE Zenith Controls

SERIAL NUMBER:

RATING : VOLTS -

HZ -

AMPS -

PHASE -

SYSTEM VOLTS:

MODEL NUMBER:

Page 6 of the GE ZTX user manual — ATTENTION!
Page 6 · click to enlarge
Page 6

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

ATTENTION!

installed and/or replaced as recommended, an exerciser set from the front panel will lose its settings during power outages and the exerciser will not work. Note: Battery life if reduced if neither source is avail- able. Typical battery life when both sources are unavailable is 21 days.

This applies only to the switches with the RM4-CAT exerciser option:

Only after ATS installation, connect a commercial-grade alkaline 9V battery to the MX60 controller via the har- ness connected to the controller. The battery should be placed in the holder installed just above the controller. The battery is used to maintain the exerciser function in the event of power outage. The battery should be replaced at least once a year. If the battery is not

Should the battery connection become disconnected in shipping, take the controller cover off and plug the harness into the receptacle in the top right corner of the MX controller as shown in figure 2 and 5. Reinstall the cover and connect the battery.

GE ZTX — ATTENTION! diagram (page 6)
Fig. 5
Show 4 more labels / short text on this page
Battery and Holder · Battery Harness · MX60 Controller · (Under Cover)
Page 7 of the GE ZTX user manual — Preset Settings
Page 7 · click to enlarge
Page 7

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Simulate a utility outage by opening the S1 Utility side breaker. The delay to engine start timer (P) begins its timing cycle. After the P timer has completed its timing cycle, the engine start contacts close to start the generator.

Functional Test Functional testing of the automatic transfer switch (ATS) is described in this section. Before proceeding, read and understand all instructions and review the operation of all accessories provided.

When generator voltage and frequency reach the preset restore points (see Table 4) the S2 Available LED illumi- nates. Simultaneously, the delay to generator timer (W) begins its timing cycle. When the W time delay is com- pleted the ATS will transfer to Generator, the S1 position LED goes off, and the S2 position LED illuminates.

To begin the test, close the Utility source circuit breaker. Referring to Figure 7, the controller will illuminate the Utility Available LED when proper voltage is sensed. If the ATS mechanism is set on S1, the S1 position LED will also light.. Verify the phase to phase voltages at the Utility line terminals.

Reclose the Utility breaker to retransfer to utility. The delay to utility timer (T) begins its timing cycle (Table 3). When the T timer has completed its timing cycle, the ATS will transfer. The optional S2 position LEDs go off, and the S1 position LED illuminates. The delay engine stop timer (U) begins its timing cycle. The generator runs unloaded for the duration of the U timing cycle. When the timer completes its timing cycle, the generator will stop. The S2 Available LED goes off.

Next, close the Generator source breaker and start the engine generator. The S2 (Generator) Available LED will illuminate when proper voltage and frequency levels are sensed. After both sources have been verified, shut down the engine generator, and put the generator’s start control in the automatic position. Complete the visual inspection of the transfer switch, and replace the cabinet cover (or close the cabinet door).

ATS Timing Cycle

Action P Timer W Timer T Timer U Timer P - 5 sec. W - 20 sec. T - 5 min. U - 5 min.

S1 Fail or Time Delay Time Delay Time Delay Time Delay Test or S2 Start S2 Stable S1 Stable S2 Stop Exerciser

Transfer to S2 Retransfer to S1 Engine Cool-Down

S1 returns or Test/Exerciser Ends

Preset Settings

S1 Fail Voltage 80% Nominal Line Voltage S2 Fail Voltage 80% Nominal Line Voltage S1 Restore 90% Nominal Line Voltage S2 Restore Voltage 90% Nominal Line Voltage S1 Fail Frequency 80% S2 Fail Frequency 90% S1 Restore Frequency 90% S2 Restore Frequency 95% Timers

P Timer W Timer T Timer U Timer P - 5 sec. W - 20 sec. T - 5 min. U - 5 min.

Utility Generator

Page 8 of the GE ZTX user manual — JP1
Page 8 · click to enlarge
Page 8

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

System Voltage Settings ZTX controller boards are preconfigured to the system voltages specified at the time of order. Exact system volt- ages are normally set at the factory, however, depend- ing on the actual application and system nominal volt- age, ZTX control boards are capable of being adjusted slightly, to meet different source characteristics for voltage as well as frequency. (See Table 5)

Voltage / Frequency Selection Jumper Settings

JP1

JP1

JP2

JP2

B A

B A

Figure 6 (on right) shows the variations each of the 3 basic types of controllers can be adjusted to within its nominal voltage range. Position Jumpers JP1 and JP2, as needed for voltage. Position JP3 for frequency. As with any other Jumper setting, always remove power completely from the controller before making changes.

JP1

JP1

JP2

JP2

B A

B A

JP3

JP3

B A

B A

Type 1 Type 2 Type 3 Type 4 Frequency 120V208 - 240VAC380 - 416VAC440 - 480VAC JP1 JP2JP1 JP2JP1 JP2JP1 JP2JP3 B B208 A B380 B B440 B A50 Hz A - -220 B A416 A B480 A A60 Hz B - -240 A A- - -- - -- - Table 5
Show 6 more labels / short text on this page
240/480 · 120/380 · 208/416 · 220/440 · 50Hz · 60Hz
Page 9 of the GE ZTX user manual — E
Page 9 · click to enlarge
Page 9

Control Interface

GE ZTX — Control Interface diagram (page 9)
Fig. 6 · Control Interface

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Indicator LED s

A

S1 (Utility) Available Green LED. When on, indicates source is acceptable.

B

S1 (Utility) Position Green LED. When on, indicates ATS is connected to Utility

S2 (Generator) Available Red LED. When on, indicates source is acceptable.

D

S2 (Generator) Position Red LED. When on, indicates ATS is connected to Generator.

E

Timing/In-phase Amber LED. When blinking, indicates the ATS is timing a Delay When on steady, indicates the ATS is waiting for both sources to synchronize with each other.

GE ZTX — E diagram (page 9)
Fig. 7

TEST - Pressed and held for 1 second Simulates a power outage, starts the Generator and transfers the ATS to S2.

BYPASS TIMER - Pressed while E is blinking bypasses any remaining countdown Timer

CANCEL - Depending on the current state of ATS operation, ends specific functions or indications

Page 10 of the GE ZTX user manual — EXER SET
Page 10 · click to enlarge
Page 10

Control Interface (cont’d)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Using the Keypad Controls

TEST KEY

TIMER BYPASS

The TEST KEY initiates a transfer sequence to S2 and holds the ATS in that mode until either the CANCEL key is pressed or, a situation arises to cause the ATS to go back to S1(ie, S2 actually fails).

This key is used to bypass (truncate), any of the running timers shown in Table 3. Whenever the Timing/ Inphase LED is blinking, pressing the TIMER BYPASS will end that particular delay and cause the ATS con- troller to immediately jump to the next sequence step.

In order to perform a TEST, the ATS must be on S1 and S1 must qualify as a "good source" by being above the FAIL thresholds for both Voltage and Frequency (see Table 2).

CANCEL

Once the TEST KEY is pressed for at least 1 Sec, the ATS will begin the Timer Sequence (see figure 5), attempt to start S2 generator source, and if S2 qualifies as a "good source", transfer the load to S2. (There is no P-Time in a test)

The CANCEL key performs 3 different cancel actions depending on the ATS current state of operation:

1. If the ATS is currently performing a TEST,

the CANCEL key will cancel the test.

The TEST key is typically used to perform a system operational or maintenance test or, to purposely cause and hold the Load off of S1. If during the TEST, S2 fails and S1 is available, the TEST will be cancelled and the Load will be immediately retransferred to S1.

2. If an Automatic Exerciser has been set, press-

ing and holding the CANCEL key for 10 Sec. will cancel (and remove), the set exercise

3. If after in-phase monitor has passed 1 minute, waiting for sources to synchronize, will cause transfer immediatly (which may result in an out-of-phase transfer).

EXER SET

Whenever it is required to have a regular test performed automatically on a repeating basis, the Automatic Exerciser function can be setup using this key.

Depending on the jumper settings shown in Figure 8, the ATS can be programmed to perform a repeating 7, 14, 21 or 28 day exercise at a particular time of day.

To initiate an Automatic Exercise, the EXER SET key is pressed and held for at least 1 Sec. at the desired exercise time. The ATS will begin the Timer Sequence, attempt to start S2 generator source and if S2 qualifies as a good source, transfer the Load to S2 for the dura- tion of the Generator Run-Time. After the Generator Run-time has expired, the timing sequence will restart and the Load will be transferred back to S1, after T- time, ending by running the U-time and finally ending the call for S2.

Page 11 of the GE ZTX user manual — JP5
Page 11 · click to enlarge
Page 11

Control Interface (cont’d)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Automatic Generator Exerciser The ZTX automatic generator Exerciser can perform a pre-scheduled repeating test of the generator and/or the ATS mechanism depending on which jumpers are selected on the controller board. Additionally, the ATS can be preset to perform the exercise every 7, 14, 21 or 28 days. Regardless of which interval is selected, all exercisers have a preset run-duration of 10 minutes.

the ATS is waiting for the next impending exercise, the ATS will not show a blinking indication but instead will show the S2 Available LED as solidly on to indicate the true condition of S2. Any Exercise event can be prema- turely canceled by pressing the CANCEL key.

Selection of the exerciser interval is through three jumpers located on the controller board as shown in Figure 6. The Exerciser comes from the factory preset at 28 days and is not active. To change the exerciser interval, remove power from the controller completely, and move the jumpers at positions jp4 and jp5 to match the selected repeat-cycle from the configurations shown in Figure 7.

To completely clear an already-set Exerciser

A set Exerciser can be completely cleared out of memory by pressing and holding the CANCEL key for at least 10 Seconds causing the blink indication to stop.

If S2 fails to meet the criteria for a good source, during an Exercise attempt, the Controller will continue to hold the P-contacts closed for the duration of the Runtime timer then wait for the next scheduled exercise. If S2 fails during an Exercise, the Controller will abort that exercise and wait till then next scheduled exercise.

Selecting Exerciser with or without Load Transfer

The Exerciser function can be programmed to perform either a Load-transfer or a non-Load transfer. Selecting either is done by changing the Jumper JP6 as shown in Figure 8. To change between a Load-transfer or no-Load transfer, remove power from the controller completely and move the jumper at position JP6.

Setting and Canceling an Exerciser

Automatic Exerciser Jumper Settings

In order to set an automatic Exerciser, choose the exer- ciser interval and whether a Load-transfer or no-Load transfer is desired as stated above. An exercise can only be set if S1 is available and the ATS (and Load), is on S1 source.

JP4

JP4

JP5

JP5

B A

B A

To establish an Exerciser

JP4

JP4

At the exact time desired, press and hold the EXER SET key for at least 1 second. The ATS will immediately start an initial exercise by attempting to start the generator, running through the Timers (figure 3) and will either only start the generator, or, will start the generator and transfer the Load from S1 to S2, for the time duration of the exerciser interval, 10 minutes. Once the Exercise is completed, the ATS will continue the timing sequence and retransfer the Load back to S1, cool down the gen- erator and terminate until the next scheduled interval time. Any time an Exerciser has been established and is scheduled, the S2 Available and S2 position LEDs quick- ly blink approximately every 4 seconds as a reminder. However, if S2 source becomes available during the time

JP5

JP5

B A

B A

JP6

B A

Show 6 more labels / short text on this page
7 Day · 14 Day · 21 Day · 28 Day · No Load · JP6 Load
Page 12 of the GE ZTX user manual — Timer / In-phase LED
Page 12 · click to enlarge
Page 12

Control Interface (cont’d)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

In-Phase Monitor ZTX ATS senses when the sources are as far out as 2 Hz or as close as .01Hz in frequency differential of each other and transfers the load to and from either source in-phase. If turned on, R50 In-Phase monitor tracks the frequency of both the Utility and Generator sources allowing a smooth, synchronous transfer of the load, which is especially beneficial where conveyors, pumps and other motor loads are involved. ZTX indicates it is waiting for the sources to synchronize by holding the Timer/In-Phase LED on. When both sources have syn- chronized, the ATS will transfer the Load (within 20° of each other, if sources are within 2Hz differential), and the Timer/In-Phase LED will turn off. If the sources fail to synchronize, after 1 minute, the controller will blink the Timer/In-Phase LED once, alerting the operator that the In-Phase monitor function can be bypassed by pressing the CANCEL key, causing an immediate trans- fer (see Cancel Key function). If the CANCEL key is not pressed, the ZTX will continue to wait for an in- Phase condition to occur.

In the case of both sources coming from the same source, or, one configured as WYE and the other as DELTA, the frequency difference is fixed at the same frequency or fixed but 30 degrees out of phase. In those cases, In-Phase Monitor can be turned off.

In-Phase Monitor is turned on as default from the factory. To turn In-Phase Monitor OFF or ON, take the following steps:

Turn In-Phase Monitor OFF:

1. Remove all power, (both S1 and S2) from the controller. Wait at least 20 seconds.
2. From the keypad, hold both the BYPASS and CANCEL keys down while energizing either source. If In-Phase Monitor was on, the Timer / In-phase LED will flash once for 1 second, then go out. The In-Phase Monitor is now off.

Turn In-Phase Monitor ON:

In a typical ATS application, one source is on the utility and one source is a backup system such as a gas or diesel generator. Because sources have a slight frequency difference, sources come in and out of phase. If ZTX In-Phase Monitor is on, The ZTX ATS Controller monitors both sources and transfers the Load at the ideal time to minimize back-EMF conditions.

1. Remove all power, (both S1 and S2) from the controller. Wait at least 20 seconds.
2. From the keypad, hold both the BYPASS and CANCEL keys down while energizing either source. If In-Phase Monitor was off, the Timer/In-Phase LED will light and remain lit until the keys are released. The In-Phase Monitor is now on.

Timer / In-phase LED

GE ZTX — Timer / In-phase LED diagram (page 12)
Fig. 8 · Timer / In-phase LED
Page 13 of the GE ZTX user manual — Example Systems
Page 13 · click to enlarge
Page 13

Example Systems

Partial Coverage System

Total Coverage System

Show 16 more labels / short text on this page
Loads · Transfer Switch · Utility Source · Generator Source · Circuit Breaker · Utility Panel · Loads · Distribution Panel · Transfer Switch · Utility Source · Generator Source · Circuit Breaker · Circuit Breaker · Main Breaker · Panel · All Loads
Page 14 of the GE ZTX user manual — CCN
Page 14 · click to enlarge
Page 14

Typical Diagrams

GE ZTX — Typical Diagrams diagram (page 14)
Fig. 9 · Typical Diagrams
GE ZTX — Typical Diagrams diagram (page 14)
Fig. 10 · Typical Diagrams

CCN

N1 N2

SN SCOM

SE

CCE

E2

E1

OPTIONAL 3

E 3 N 2

E 2 N3 2

Figure 12 Figure 13

Page 15 of the GE ZTX user manual — Replacement Parts
Page 15 · click to enlarge
Page 15

Replacement Parts

GE ZTX — Replacement Parts diagram (page 15)
Fig. 11 · Replacement Parts
Page 16 of the GE ZTX user manual — Replacement Parts (cont’d)
Page 16 · click to enlarge
Page 16

Replacement Parts (cont’d)

Standard Transition - 225 to 400 Amps

GE ZTX — Replacement Parts (cont’d) diagram (page 16)
Fig. 12 · Replacement Parts (cont’d)
GE ZTX — Replacement Parts (cont’d) diagram (page 16)
Fig. 13 · Replacement Parts (cont’d)

Cable Connection Lug S-2701 N 1,2,3 N E 1,2,3 N T 1,2,3 N Wire Size #4-600 MCM #4-600 MCM

Page 17 of the GE ZTX user manual — Symptom Possible Cause Corrective Action
Page 17 · click to enlarge
Page 17

Troubleshooting

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Service must be performed by qualified personnel.

Symptom Possible Cause Corrective Action

S1 or S2 Available LED not lit Sources either fully or partially unacceptable Check for under voltage S1 or S2 breakers open Check for missing phase (s) Check for under frequency

ATS will not retransfer Load T - Timer has not expired back to Utility Automatic Exerciser is in process S1 Utility fully or partially unacceptable

ATS does not transfer Load to S2 S2 Generator fully or partially unacceptable Set motor-saver to dropout below (generator) Motor loads on system creating enough back- ATS Fail setpoint EMF to keep missing phase from falling below Fail setpoint.

S2 Generator will not start X1 or X2 not connected Check Generator Start wiring

S2 Generator will not shut down U - Timer not expired Wait for U timer to expire Automatic Exerciser in process

All LEDs off Keypad connector unplugged at Controller Both source breakers open

ATS will not transfer in-phase In-Phase monitor not on Turn on In-Phase monitor Frequency difference between S1 and Adjust Generator governor to hold S2 greater than 2Hz. freqency closer to Utility

ATS will not retain a Battery dead or missing Replace battery with a fresh industrial Set Automatic Exerciser grade Alkaline battery

Timer/In-Phase LED constantly on Both sources locked in frequency or one Turn In-Phase monitor off source greater than 20° out of phase

S1 and S2 LEDs Blinking Phase Rotation Mis-match between sources Rewire sources to be same rotation

S1 Position LED Blinking SN limit switch bad or intermittent Check connection or SN limit switch

S2 Position LED Blinking SE Limit switch bad or intermittent Check connection or SE limit switch

Both S1 and S2 Positioin Solenoid bad or disconnected Requires CANCEL key to clear - LEDs Blinking ATS contactor in mid-position check Solenoid Requires CANCEL key to clear - Check both limit switches

Page 18 of the GE ZTX user manual — g GE Zenith Controls
Page 18 · click to enlarge
Page 18

g GE Zenith Controls

A Product of GE Consumer & Industrial General Electric Company 830 West 40 thStreet, Chicago, IL 60609 USA 773 299-6600, Fax: 773 247-7805 www.geelectrical.com

Ask about the GE ZTX

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the GE ZTX

Be the first to ask — other owners or our team will answer.

Original document

GE ZTX manual PDF

18 pages·1004 KB·Portable Generator·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…