BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT — Save these instructions for local inspector’s use. IMPORTANT — Observe all governing codes and ordinances.
CONTENTS Design Information Models Available 2 Product Dimensions and Clearances 3 Tools and Parts Required 3 Parts Supplied 3 Electrical Tools and Parts Required 3 Advance Planning 3
Installation Preparation Electrical Requirements 4 Install Junction Box 4 Preparing the Opening (Installation without
an accessory storage drawer) 5-6 Preparing the Opening (Installation with
an accessory storage drawer) 7-8
Installation Instructions Step 1, Remove Packaging and Parts 9 Step 2, Route Conduit 10 Step 3, Install Bottom Trim 11 Step 4, Install Mounting Screws 11 Step 5, Finalize Installation 11
IMPORTANT — Use this oven only for its intended purpose. Never use the oven for warming or heating a room. Prolonged use of the oven without proper ventilation can be hazardous. CAUTION: For personal safety, remove house fuse or oven circuit breaker before beginning installation to avoid severe or fatal shock injury. CAUTION: For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of the 80-pound oven and 30-pound drawer, plus additional oven loads of up to 50 pounds or a total weight of up to 160 pounds. CAUTION: For personal safety, this product cannot be installed in cabinet arrangements such as an island, a peninsula or below a countertop.
Monogram Pro Range Models: ZSC2202NSS–Stainless Steel NOTE: This unit cannot be installed with an accessory storage drawer.

PRODUCT DIMENSIONS AND CLEARANCES NOTE: Appearance will vary by model.

TOOLS AND PARTS REQUIRED (NOT SUPPLIED) #2 Phillips screwdriver Hand held drill High speed drill bit, 3/32″ diameter 3/8″ slot head screwdriver Level Saw 2x4 or 2x2 lumber for installing runners
or 3/8″ plywood for floor (if required) Wood screws or other hardware for installing
runner or shelf to support oven (if required) Safety glasses or goggles
PARTS SUPPLIED 6 brass screws (3 required, 3 extra) 5 color matched screws (4 required, 1 extra) Bottom trim
ELECTRICAL TOOLS AND PARTS REQUIRED (NOT SUPPLIED) Junction box Electrical cable (3-conductor or 4-conductor wire
as required by local codes) UL-listed conduit connectors Wire cutters and wire strippers

INSTALL JUNCTION BOX
Single Speedcook Installation Product rating is 120/208 or 120/240 volt, 60 Hz, 30 amps. This product must be connected to a supply circuit of the proper voltage and frequency and protected by a time delay fuse or circuit breaker. Power should be supplied from a separate, dedicated 30-ampere branch circuit. Wire size must conform to the requirements of the National Electrical Code or the prevailing local code.
The conduit is located at the top right on the back of the oven.
Locate and install the junction box within reach of the oven conduit.
Combined Speedcook and Wall Oven Installation When installed in combination with a GE/Monogram single wall oven, use separate electrical junction boxes. Refer to single oven installation instructions for electrical requirements of that product. These connections must be made by a qualified electrician. All electrical connections must meet National Electrical Code or prevailing local codes.
Combined Speedcook and Warming Drawer Installation When installing the Speedcook oven over a GE or Monogram electric warming drawer, a separate 120V, 60Hz, properly grounded receptacle must be installed. See instructions packed with the warming drawer.
Cutout Height

PREPARE THE OPENING (CONT.)
The Advantium 240V can be installed in combination with other GE/Monogram appliances. Always follow each product’s Installation Instructions to complete the installation.
Construct Solid Bottom Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides
Single Advantium 240V Installation: Order a 30” wide single oven cabinet or cut the opening in a wall to the dimensions shown.
Per warming drawer requirement
Construct Base Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides
Construct a solid oven floor of 3/8” min. thick plywood supported by 2 x 4 or 2 x 2 runners on all sides. • The support must be level and rigidly mounted, flush with the bottom edge of the cutout.

PREPARE THE OPENING (CONT.) Installation over a GE/Monogram Oven and Warming Drawer:
Construct Solid Bottom Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides
Construct Solid Bottom Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides

PREPARE THE OPENING (CONT.)
The Advantium 240V can be installed in combination with other GE/Monogram appliances. Always follow each product’s Installation Instructions to complete the installation.
Single Advantium 240V Installation (cont.) When installed over a single oven or a warming drawer, allow at least 2” between the two openings. This separation will provide clearance for bottom overlap of the Advantium 240V and the other appliance overlaps.
Single Advantium 240V Installation: Order a 30” wide single oven cabinet or cut the opening in a wall to the dimensions shown.
Construct a solid oven floor of 3/8” min. thick plywood supported by 2 x 4 or 2 x 2 runners on all sides. • The support must be level and rigidly mounted, flush with the bottom edge of the cutout.
Construct Solid Bottom Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides
Construct Base Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides
Per warming drawer requirement
* For existing cutouts, a maximum width of 28-1/2” is acceptable. If the opening is slightly wider, secure a furring strip on each side of the cutout for securing the oven. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details.

PREPARE THE OPENING (CONT.) Installation over a GE/Monogram Oven and Warming Drawer:
Construct Solid Bottom Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides
Construct Solid Bottom Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides
45-1/4” Min. Per warming drawer requirement
* For existing cutouts, a maximum width of 28-1/2” is acceptable. If the opening is slightly wider, secure a furring strip on each side of the cutout for securing the oven. • If you are replacing a GE/Monogram electric double oven with the combined installation of an Advantium 240V and a single oven, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2” minimum shown.
* For existing cutouts, a maximum width of 28-1/2” is acceptable. If the opening is slightly wider, secure a furring strip on each side of the cutout for securing the oven. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details.


5 Color Matched Screws (4 required, 1 extra) Cooking Guide

(Oven shown without accessory storage drawer.)

INSTALL BOTTOM TRIM


Advantium ® 240V Built-In Accessory Storage Drawer JX2200, JX2201, ZX2201
BEFORE YOU BEGIN
5” · Allow 15” clearance · when fully open

REMOVE PACKAGING AND PARTS
Remove the front two bottom screws on each side of the oven and the top center screw on each side of the storage drawer.
A
Place storage drawer on a surface with the front of drawer hanging over the edge of the surface. Not placing the front edge of drawer over the edge of the surface may result in damage to the drawer since the front edge of drawer hangs below the bottom of drawer.
Place the side supports into the tabs on the drawer and secure using the screws supplied and the screws removed in Step C.
Place the oven on top of the storage drawer. Make sure that the back and sides of the oven align with the back and sides of drawer.
The oven and storage drawer assembly is now ready to be installed. Return to the Advantium 240V Built-In SpeedCook Oven Installation Instructions to complete the installation.
Side Supports (2) · Assembly Instructions · Screws (2 Sets)





GE Consumer & Industrial Appliances General Electric Company Louisville, KY 40225 ge.com
Printed in Korea
Pages referenced in this manual — manufacturer, support and downloads.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.