Table of Contents 80 sections GE Zenith Controls · ZBTS/ZBTSD Series Bypass Isolation Transfer Switches 100-4000 Amps · Operation and Maintenance Manual · 71R-4000B 1/06 · … ShowHide
GE Zenith Controlsp.1ZBTS/ZBTSD Series Bypass Isolation Transfer Switches 100-4000 Ampsp.1Operation and Maintenance Manualp.171R-4000B 1/06p.1Authorized Servicep.2For GE parts and service, call: 773 299-6600p.2Table of Contentsp.2Introductionp.2NOTE S:p.2Safetyp.3DANGERp.3HAZARDOUS VOLTAGE (Can Cause Severe Injury or Death)p.3CAUTIONp.3Equipment Inspection and Storagep.3Final Equipment Inspection Prior to energizing the transfer switch:p.3WARNINGp.3Installationp.4SPREADER BARp.4LIFTING EYESp.4D CABINETp.4Installation (cont’d)p.5SERIAL NUMBER:p.5RATING : VOLTS -p.5HZ -p.5AMPS -p.5PHASE -p.5SYSTEM VOLTS:p.5MODEL NUMBER:p.5CAUTIONSp.5S 1 O Kp.6Control Connectionsp.7Entelli-Switch 250 Controllerp.8Entelli-Switch 250 Controller Consists of two major assemblies:p.8CPSp.8Entelli-Switch 250 Controller (cont’d)p.9S1 OKp.9* E *p.901: 50 FRI 31 MAY 2003p.9Entelli-Switch 250p.9User Setting for Voltage & Frequencyp.10Standard 3-Phase Sensing on 3 and 4 Pole Unitsp.10Source 1p.10Source 2p.10Accessory Group Packagesp.11* Delayed Transition Units Only. ** Optional for 40-400 Ampp.11Accessory Definitionsp.12Accessory Definitions (cont’d)p.13How to Set the System Clockp.15CDT One Event Timer Exerciserp.16How to CONFIGURE (CFG) and Set (SET) the Timer Exerciserp.16CDP Clock Exerciserp.17SET EXERCISER 00:00p.17NL #1p.17BACK ^ v SAVEp.17Entelli-Switch 250 User Setup - CFG Menup.18Turn options ON or OFF via keypad through the CFG menup.18Entelli-Switch 250 User Setup - SET Menup.19Entelli-Switch 250 User Setup - System Infop.20Testingp.21NOTICEp.21ATS Testingp.21Delayed Transitionp.21Standard Transitionp.21Sequence of Operationp.22Timer Designations as they appear in the SET menup.22Sequence of Operation (cont’d)p.23Bypass-Isolation Operationp.23100-400 AMP 1) Automatic a) Manually operated Bypass Switch contactsp.24600-1200 AMP 1) Automatic a) Manually operated Bypass Switch contactsp.251600-4000 AMP 1) Automatic a) Manually operated Bypass Switch contactsp.26Controls Power Supply (CPS)p.27Controls Power Supply (CPS) (cont’d)p.28Standard Transition CPS Schematicp.28XN1 -p.28SOURCE 1 CONTROL TRANSFORMERp.28XN2 -p.28SOURCE 1 3 PHASE SENSINGp.28TRANSFORMERp.28XN1 XN2p.28XE1p.28
Page 1 of the GE ZBTSD user manual — 71R-4000B 1/06
Page 1 · click to enlarge
Page 1

GE Zenith Controls

ZBTS/ZBTSD Series Bypass Isolation Transfer Switches 100-4000 Amps

GE ZBTSD — GE Zenith Controls diagram (page 1)
Fig. 1 · GE Zenith Controls
GE ZBTSD — GE Zenith Controls diagram (page 1)
Fig. 2 · GE Zenith Controls

Operation and Maintenance Manual

71R-4000B 1/06

Page 2 of the GE ZBTSD user manual — Table of Contents
Page 2 · Contents
Contents

Contents

GE Zenith Controlsp.1ZBTS/ZBTSD Series Bypass Isolation Transfer Switches 100-4000 Ampsp.1Operation and Maintenance Manualp.171R-4000B 1/06p.1Authorized Servicep.2For GE parts and service, call: 773 299-6600p.2Table of Contentsp.2Introductionp.2NOTE S:p.2Safetyp.3DANGERp.3HAZARDOUS VOLTAGE (Can Cause Severe Injury or Death)p.3CAUTIONp.3Equipment Inspection and Storagep.3Final Equipment Inspection Prior to energizing the transfer switch:p.3WARNINGp.3Installationp.4SPREADER BARp.4LIFTING EYESp.4D CABINETp.4Installation (cont’d)p.5SERIAL NUMBER:p.5RATING : VOLTS -p.5HZ -p.5AMPS -p.5PHASE -p.5SYSTEM VOLTS:p.5MODEL NUMBER:p.5CAUTIONSp.5S 1 O Kp.6Control Connectionsp.7Entelli-Switch 250 Controllerp.8Entelli-Switch 250 Controller Consists of two major assemblies:p.8CPSp.8Entelli-Switch 250 Controller (cont’d)p.9S1 OKp.9* E *p.901: 50 FRI 31 MAY 2003p.9Entelli-Switch 250p.9User Setting for Voltage & Frequencyp.10Standard 3-Phase Sensing on 3 and 4 Pole Unitsp.10Source 1p.10Source 2p.10Accessory Group Packagesp.11* Delayed Transition Units Only. ** Optional for 40-400 Ampp.11Accessory Definitionsp.12Accessory Definitions (cont’d)p.13How to Set the System Clockp.15CDT One Event Timer Exerciserp.16How to CONFIGURE (CFG) and Set (SET) the Timer Exerciserp.16CDP Clock Exerciserp.17SET EXERCISER 00:00p.17NL #1p.17BACK ^ v SAVEp.17Entelli-Switch 250 User Setup - CFG Menup.18Turn options ON or OFF via keypad through the CFG menup.18Entelli-Switch 250 User Setup - SET Menup.19Entelli-Switch 250 User Setup - System Infop.20Testingp.21NOTICEp.21ATS Testingp.21Delayed Transitionp.21Standard Transitionp.21Sequence of Operationp.22Timer Designations as they appear in the SET menup.22Sequence of Operation (cont’d)p.23Bypass-Isolation Operationp.23100-400 AMP 1) Automatic a) Manually operated Bypass Switch contactsp.24600-1200 AMP 1) Automatic a) Manually operated Bypass Switch contactsp.251600-4000 AMP 1) Automatic a) Manually operated Bypass Switch contactsp.26Controls Power Supply (CPS)p.27Controls Power Supply (CPS) (cont’d)p.28Standard Transition CPS Schematicp.28XN1 -p.28SOURCE 1 CONTROL TRANSFORMERp.28XN2 -p.28SOURCE 1 3 PHASE SENSINGp.28TRANSFORMERp.28XN1 XN2p.28XE1p.28
Page 3 of the GE ZBTSD user manual — WARNING
Page 3 · click to enlarge
Page 3

Safety

DANGER

HAZARDOUS VOLTAGE (Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

The safe operation of your switch is GE Zenith’s focus. The proper storage, installation, operation and mainte- nance will help increase the life of the switch.

2. Verify that all cabled connections are correct and that phase rotation of both sources match. 3. Check engine start connections. 4. Verify the correct connection of all control wires. 5. Check settings of all timers and adjust as necessary. 6. Adjust any optional accessories as required. 7. Check the lug torque values of the power connections.

CAUTION

Due to hazardous voltage and current, GE Zenith rec-

ommends that a GE Zenith Certified technician or a

qualified electrician must perform the installation and maintenance of the switch.

Equipment Inspection and Storage

8. Make sure that all covers and barriers are installed and properly fastened.

Once you have received the transfer switch, inspect it for any damage. This includes damage to the enclosure, power panel, control panel and wiring harness. If any damage is found or suspected, file a claim as soon as possible with the carrier and notify the nearest GE Zenith representative.

Each GE Zenith transfer switch is factory wired and tested. A complete information package is furnished with each switch which includes:

Before installation, if it is necessary, store the transfer switch in a clean dry place, protected from dirt and water. Provide ample air circulation and heat, if neces- sary, to prevent condensation.

a. Sequence of operation. b. Description and operation of all accessories supplied. c. Power panel connection diagram and schematic. d. Description and identification of all customer field connections.

Operating Storage Temperature Temperature (Ambient): Humidity

Installation of GE Zenith transfer switches includes:

-30°C to +75°C (-22°F to +167°F)

40-400 AMP (molded shell) -20°C to +65°C (-4°F to +149°F)

5% to 95% (non-con- densing)

a. Mounting the transfer switch cabinet. b. Connection of Source 1, Source 2, and Load cables or bus bars. c. Connection of external control circuits as required. Mounting Adequate lifting means must be used to mount the transfer switch into place. The recommended method for moving the transfer switch using the lifting eyes, where supplied, and a spreader bar is illustrated in Figure 1. Enough room should be allowed to open the cabinet doors fully for inspection and servicing of the switch per NEC and local codes.

40-4000 AMP (all other frame and panel types) -20°C to +60°C (-4°F to +140°F)

Final Equipment Inspection Prior to energizing the transfer switch:

CAUTION

1. Remove any debris incurred, with a vacuum, due to shipment or installation.

Before drilling conduit entry holes or any accessory mounting holes, cover and protect

the switch and control panel to prevent dirt

WARNING

and metal fragments from entering the mechanical and electrical components.

Do not use a blower since debris may

become lodged in the electrical and mechanical components and cause damage.

Failure to do so may result in damage and malfunction of the switch.

GE Zenith Controls 1 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 4 of the GE ZBTSD user manual — D CABINET
Page 4 · click to enlarge
Page 4

Installation

DANGER

HAZARDOUS VOLTAGE (Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

GE ZBTSD — HAZARDOUS VOLTAGE (Can Cause Severe Injury or Death) diagram (page 4)
Fig. 3 · HAZARDOUS VOLTAGE (Can Cause Severe Injury or Death)

Power Connections GE Zenith transfer switches are supplied with UL listed solderless screw type terminals as standard for the Source 1, Source 2 and Load power connections. Table 1 lists the number and sizes of cable lugs supplied as standard for each switch amp rating.

SPREADER BAR

H

Connect the Source 1, Source 2, and Load conductors to the clearly marked terminals on the transfer switch. Remove surface oxides from cables by cleaning with a wire brush. Verify that all connections are correct before tightening the lugs. All cable lug connections must be tightened to the proper torque values as shown in Table 2.

LIFTING EYES

D CABINET

Power Connections: Screw Type Terminals for External Power Connections Switch Size (Amps)Source 1, Source 2 & Load TerminalsNeutral Bar (When Required) Cable Per PoleRange of Wire SizesNo. of CablesRange of Wire Sizes 401#8 AWG to 1/03#8 AWG to 1/0 801#8 AWG to 1/03#8 AWG to 1/0 1001#8 AWG to 1/03#8 AWG to 1/0 1501#8 AWG to 3/03#8 AWG to 300 MCM 200, 225, 25001#6 AWG to 250 MCM3#6 AWG to 300 MCM 260, 300, 4001#4 AWG to 600 MCM3#4 AWG to 300 MCM 6002#2 AWG to 600 MCM8#2 AWG to 600 MCM 800, 1000, 12004#2 AWG to 600 MCM12#2 AWG to 600 MCM 1600, 2000 2600, 3000, 4000Line, Load and Neutral terminals are located in the rear of switch and arranged for bus bar locations Table 1
Tightening Torque for Lugs Socket Size Across FlatsTorque Lb. - In.Lb. - Ft. 1/8454 5/321008 3/1612010 7/3215012 1/420017 5/1627523 3/837531 1/250042 9/1660050

Engine Start Control Connections Engine-start control wires connect to control terminals beside the Entelli-Switch 250. Engine start terminals are indicated by a schematic symbol (the symbol indicates the contact state for a de-energized normal source). Figure 2 shows the engine-start contacts.

Make all other necessary control connections to the control panel terminal blocks per the schematics supplied with the ATS.

2 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

45° · Table 2

Page 5 of the GE ZBTSD user manual — SERIAL NUMBER:
Page 5 · click to enlarge
Page 5

Installation (cont’d)

DANGER

HAZARDOUS VOLTAGE (Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

IInitial Energization Before proceeding, refer to the information package supplied with the ATS and read and understand the information on all accessories provided.

E

P Relay (Engine Start)

Contact rating is 10 Ampere at 120VAC or 28VDC Gold plated

1. Unlock the enclosure. 2. Open the enclosure. 3. Verify the correct system voltage.

Engine Start Control Connections The engine-start terminals are clearly identified by a label on the microcontroller backplate. In the case of manual transfer switches, or in other applications not requiring the microprocessor, clearly marked terminal blocks are provided in the upper left corner of the con- trol panel for the engine start control wires.

the transfer switch lists the voltage. See Figure 4.

4. Close Source 1 circuit. breaker.

Available LED if proper voltage is sensed.

5. Verify the phase to phase voltages at Source 1 line terminals. 6. Close Source 2 circuit breaker. 7. Start the generator’s engine.

Figure 2 shows location of engine start connections for Bypass Isolation Transfer Switch. Figure 6 (pg.5) shows location of engine start connections for Automatic Transfer Switch.

Available LED when preset voltage and frequency levels are reached.

8. Verify the phase to phase voltages at Source 1 line terminals. 9. Verify that the phase rotation of Source 1 is the same as the phase rotation of Source 2. 10. Shut down the generator’s engine. 11. Place the starting control in the Automatic position. 12. Complete the visual inspection of the transfer switch. 13. Close the enclosure. 14. Lock the enclosure.14. Lock the enclosure.

Terminals for field connections to the A3 Source 2 auxiliary contacts and the A4 Source 1 auxiliary contacts are also provided. These terminals are clearly marked and appear on the side of the power panel. On 400 amp metal frame units these terminals appear on the bracket above the operator handle.

GE ZBTSD — E diagram (page 5)
Fig. 4

GE Zenith Controls

SERIAL NUMBER:

RATING : VOLTS -

HZ -

AMPS -

PHASE -

SYSTEM VOLTS:

MODEL NUMBER:

CAUTIONS

Certain accessories, per specific schematics, can inhibit automatic transfer.

Engine Gen-Set could start when engine control wires are attached.

GE Zenith Controls 3 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Figure 3 (Typical)

Page 6 of the GE ZBTSD user manual — WARNING
Page 6 · click to enlarge
Page 6

Installation (cont’d)

Initial Energization (cont’d) After all options and accessories are checked and verified, follow these steps to set up the ATS. Refer to Entelli-Switch 250 display Figure 5. The annunciation LEDs illuminate to indicate (1) source availability, (2) ATS position, and (3) Entelli-Switch 250 control function (timing).

1. Unlock the enclosure. 2. Open the enclosure. 3. Place the Disconnect Switch in the Inhibit.
4. Close the external (up-stream) Source 1 circuit breaker.
GE ZBTSD — Installation (cont’d) diagram (page 6)
Fig. 5 · Installation (cont’d)

If Source 1 Available LED does not illuminate, verify that Source 1 Voltage is above the preset restore value.

The Gen-Set will start and run while Source 2 stop Delay Timer is timing.

S 1 O K

5. Close the External (up-stream) Source 2 line circuit breaker. 6. Start the engine generator in MANUAL mode.

2 1 : 5 6 M O N 2 3 A P R 2 0 0 2 M O R E T E S T

7. Verify the phase to phase voltages at Source 2 line terminals. 8. Verify that the phase rotation of Source 2 is the same as the phase rotation of Source 1. 9. Shut down the generator's engine. (Place in Automatic Mode.)

Figure 5 – LCD and keypad

10. Place the disconnect switch to AUTO. 11. Complete the visual inspection of the transfer switch. 12. Close the enclosure. 13. Lock the enclosure.

WARNING

When performing a hi-pot or dielectric test on the power section, DISCONNECT the control panel plugs from the microprocessor to avoid potential damage.

4 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 7 of the GE ZBTSD user manual — Control Connections
Page 7 · click to enlarge
Page 7

Installation (cont’d)

DANGER

HAZARDOUS VOLTAGE (Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Control Connections

Clock Program Backup Battery

GE ZBTSD — Control Connections diagram (page 7)
Fig. 6 · Control Connections

Remove protective strip to enable clock functions

Connectors to I/O Modules

A complete information package is furnished with each transfer switch including a complete connection diagram and schematic which details all necessary control circuit field connections.

The terminals are clearly identified by a label on the microcontroller backplate. In the case of manual trans- fer switches, or in other applications not requiring the microprocessor, clearly marked terminal blocks are provided in the upper left corner of the control panel for the engine start control wires.

The engine start control wires connect to the engine start relay terminals located to the left of the microprocessor. Figure 6 shows the location of these terminals.

GE Zenith Controls 5 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Show 6 more labels / short text on this page
Engine Start Connections · Network Connector · Input/Output · To CPS Box · To Power · Panel
Page 8 of the GE ZBTSD user manual — S 1 O K
Page 8 · click to enlarge
Page 8

Entelli-Switch 250 Controller

Entelli-Switch 250 Controller Consists of two major assemblies:

Engine Start Relay P

I. The Microprocessor contains the following:

GE ZBTSD — Entelli-Switch 250 Controller diagram (page 8)
Fig. 7 · Entelli-Switch 250 Controller

A. Entelli-Switch 250 Board - Customer Input and Output (I/O) for system interface. Located on the left hand side of the back of the unit (see figure 7)

1. I/O accessories that can be found here are: a. Engine start relay P output b. Pre-Signal to transfer T3, W3 and UMD output (optional) c. Transfer Inhibit Q3 and Q7 input (optional) d. Remote test Q2 input (optional) e. Network interface ZNET input/output (optional)

and Access Code Label

B. LCD and Keypad located on the exterior of the door (see figure 8)

1. User accessibility to the following: a. LED indication of source availability b. LED indication of transfer switch position c. LCD screen indicates: (1) timer count down (numeric) (2) event reporting (text) d. Keypad provides user interface to: [in conjunction with LCD screen] (1) Setting sensors and timers (2) Configuring logic accessories

CPS

II. The Controls Power Supply (CPS)

Contains transformers which drop line voltage to control level for controller input and SCR inputs (see figure 7).

GE ZBTSD — CPS diagram (page 8)
Fig. 8

S 1 O K

2 1 : 5 6 M O N 2 3 A P R 2 0 0 2 M O R E T E S T

6 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Show 4 more labels / short text on this page
I/O Interface · Entelli-Switch 250 · Board · Battery Strip
Page 9 of the GE ZBTSD user manual — Entelli-Switch 250
Page 9 · click to enlarge
Page 9

Entelli-Switch 250 Controller (cont’d)

LCD & Keypad These options are accessible through the LCD and keypad (see figure below). To become familiar with the options loaded into a particular unit, scrolling through the SET and CFG menu will show the descriptions of the options (see pages 16-17). These menus are the very same menus that are used to access the setting and/or configuration of these options. The SET (setting) menu is primarily used to show or change, time and voltage settings. The CFG menu is primarily used to turn an option on or off. When scrolling through these menus,

no changes can be made without entry of the access code. The factory set six-digit access code is located on a white label on the back of the unit (see figure 11 pgs. 16-18).

The Entelli-Switch 250 has many logic options. Each controller is downloaded with options at the time of manufacture. The collection of options that any one controller has is specified at the time of order placement. The following pages include all the options that can reside in the controller. Not all units include all options.

Source 2 Position LED (Red) indicates Power Panel (ATS) is closed to Source 2 position

Source 1 LED (Green) indicates Source 1 is acceptable for use

Source 1 Position LED (Green) indicates Power Panel (ATS) is closed to Source 1 position

Source 2 (Red) indicates Source 2 is acceptable for use

GE ZBTSD — Entelli-Switch 250 Controller (cont’d) diagram (page 9)
Fig. 9 · Entelli-Switch 250 Controller (cont’d)

S1 OK

* E *

Current Time, Day and Date of Display

01: 50 FRI 31 MAY 2003

SET Menu MORE CFG TEST SET

Menus (MORE, CFG, TEST) Keypad

#4 or the word on the LCD above the key. The word above the key changes depending on which screen is being displayed.

Entelli-Switch 250

#1 or the word on the LCD above the key. The word above the key changes depending on which screen is being displayed.

#2 or the word on the LCD above the key. The word above the key changes depending on which screen is being displayed.

#3 or the word on the LCD above the key. The word above the key changes depending on which screen is being displayed.

GE Zenith Controls 7 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

LCD Screen · Exercise Event "Impending"

Page 10 of the GE ZBTSD user manual — Source 2
Page 10 · click to enlarge
Page 10

User Setting for Voltage & Frequency

Standard 3-Phase Sensing on 3 and 4 Pole Units

Source 1

Under Voltage "Fail" Factory Default: 80% This adjustment determines the low voltage threshold. Adjust via the SET menu. Range is 75% to 98% in 1% increments (see page 17). "Fail" must be a minimum of 2 % below "Restore" setting. Once voltage falls below threshold, T timer will be bypassed to expedite the transfer to Source 1.

Under Voltage "Restore" Factory Default: 90% This adjustment determines the minimum acceptable voltage required to transfer to Source 1. Adjust via the SET menu. Range is 85% to 100% in 1% increments (see page 17). Once satisfied, the T timer will begin timing to transfer to Source 1.

Under Voltage "Fail" Factory Default: 80% This adjustment determines the low voltage threshold. Adjust via the SET menu. Range is 75% to 98% in 1% increments (see page 17). "Fail" must be a minimum of 2 % below "Restore" setting. Once voltage falls below threshold, P timer begins timing to signal Source 2 Generator to start.

Over Voltage "Fail" Factory Default: 110% This adjustment determines the maximum acceptable Over Voltage. Adjust via the SET menu. Range is 105% to 110% in 1% increments (see page 17). Once exceed- ed, the T timer will be bypassed to expedite the transfer to Source 1.

Over Voltage "Restore" Factory Default: 105% This adjustment determines the minimum acceptable Over Voltage threshold at which the transfer switch is allowed to transfer to Source 2. Adjust via the SET menu. Range is 103% to 105% in 1% increments (see page 17). “Restore” must be a minimum of 2% below “Fail” setting.

Under Frequency "Restore" Factory Default: 95% This adjustment determines the minimum acceptable frequency required to transfer to Source 1. Adjust via the SET menu. Range is 90% to 100% in 1% increments (see page 17). Once satisfied, the T timer will begin timing to transfer to Source 1.

Under Frequency "Fail" Factory Default: 90%, (5 seconds minimum). This adjustment determines the low frequency threshold. Adjust via the SET menu. Range is 88% to 98% in 1% increments (see page 17). "Fail" must be a minimum of 2 % below "Restore" setting. Once satisfied, the T timer will begin timing to transfer to Source 1.

Under Frequency "Restore" Factory Default: 95% This adjustment determines the minimum acceptable frequency required to transfer to Source 2. Adjust via the SET menu. Range is 90% to 100% in 1% increments (see page 17). Once satisfied, the W timer will begin timing to transfer to Source 2.

Over Frequency "Restore" Factory Default: 102% This adjustment determines the minimum acceptable Over Frequency threshold at which the transfer switch is allowed to re-transfer to Source 1. Adjust via the SET menu. Range is 102% to 104% in 1% increments (see page 17). “Restore” must be a minimum of 1% below “Fail” setting.

Under Frequency "Fail" Factory Default: 90%, (5 seconds minimum). This adjustment determines the low frequency threshold. Adjust via the SET menu. Range is 88% to 98% in 1% increments (see page 17). "Fail" must be a minimum of 2 % below "Restore" setting. Once satisfied, the W timer will begin timing to transfer to Source 2.

Over Frequency "Fail" Factory Default: 105% This adjustment determines the maximum acceptable Over Frequency. Adjust via the SET menu. Range is 103% to 105% in 1% increments (see page 17).Once exceeded, the P timer begins timing to signal the generator to start.

Over Frequency "Fail" Factory Default: 105% This adjustment determines the maximum acceptable Over Frequency. Adjust via the SET menu. Range is 103% to 105% in 1% increments (see page 17). Once exceeded, the T timer will be bypassed to expedite the transfer to Source 1.

Source 2

Under Voltage "Restore" Factory Default: 90% This adjustment determines the minimum acceptable voltage required to transfer to Source 2. Adjust via the SET menu. Range is 85% to 100% in 1% increments (see page 17). Once satisfied, the W timer will begin timing to transfer to Source 2.

Over Frequency "Restore" Factory Default: 102% This adjustment determines the minimum acceptable Over Frequency threshold at which the transfer switch is allowed to re-transfer to Source 2. Adjust via the SET menu. Range is 102% to 104% in 1% increments (see page 17). “Restore” must be a minimum of 1% below “Fail” setting.

8 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 11 of the GE ZBTSD user manual — * Delayed Transition Units Only. ** Optional for 40-400 Amp
Page 11 · click to enlarge
Page 11

Accessory Group Packages

GE ZBTSD — Accessory Group Packages diagram (page 11)
Fig. 10 · Accessory Group Packages

Standard Accessory included in the group package. Optional Accessory not included but can be added to group package. Optional Accessory. Can not be used with accessory having the same symbol. N/A Denotes an Accessory with 2 circuits as a standard. Denotes an Accessory with 3 circuits as a standard.

* Delayed Transition Units Only. ** Optional for 40-400 Amp

GE Zenith Controls 9 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Table 3

Page 12 of the GE ZBTSD user manual — Accessory Definitions
Page 12 · click to enlarge
Page 12

Accessory Definitions

6P Test Switch, Momentary 6A Test Switch, Maintained Auto/Momentary Test 6AP Test Switch, Maintained/Momentary utilizing keypad 6B Test Switch, Maintained - Auto / Momentary - Test, Key Operated 6C Test Switch, Maintained - Auto / Maintained - Test, Key Operated A1 Auxiliary Contact, operates on Source 1 line failure. A1E Auxiliary Contact, operates on Source 2 line failure. A3 Auxiliary Contact: Closed in emergency (Source 2) Additional Available (10 max.) and need to be specified. A4 Auxiliary Contact: Closed in normal (Source 1) Additional Available (10 max.) and need to be specified. A62 Sequential Universal Motor Load Disconnect Circuit. Normally closed auxiliary contacts for motor loads. Open 0-60 seconds prior to transfer, after transfer, or both in either direction then re-close in timed sequence after transfer. AB3 Auxiliary Contact: Closed in bypass emergency (Source 2) (S.P.D.T.) (Standard up to 400 Amp) Additional Available (10 max.) and need to be specified. AB4 Auxiliary Contact: Closed in bypass normal (Source 1) (S.P.D.T.) (Standard up to 400 Amp) Additional Available (10 max.) and need to be specified. B9 Battery charger connections. Calibrate While monitoring the actual Phase to Phase voltage lev- els and Frequency with a calibrated test equipment, the Phase to Phase voltage sensing and Frequency can be adjusted accordingly. Calibration capabilities are available for Frequency and AB, BC, CA Phase to Phase voltage for both Sources. Adjust via SET menu (see page 18) CDP Clock Exerciser Load/ No Load: Allows the Generator to start and run unloaded or to simulate a power failure, start Generator and run under load. Can be configured by end user for 1, 7, 14, 28, 365 day cycle. (See page 16)

CDT Load or NO-Load. One event exerciser with adjustable Engine exercise timer. Exercise duration can be set between 5 and 60 minutes in 1 minute increments. Can be configured to run every 1, 7, 14, or 28 days. Factory Default is 20minutes. When exerciser is impending, (*E*) appears in the upper right hand corner of LCD screen. See page 15 for instructions. Configured via CFG (see page 17). Set via SET menu (see page 18). CTAP Alarm Panel on transfer to Source 2 with Silence button. DS Disconnect Switch, Auto/Inhibit. Inhibits transfer in either direction when in inhibit. Allows automatic operation when in Auto. (40-400 Amps optional, 600-4000 Amps standard) DT (Delayed Transition Only) Time Delay from Neutral Switch position to Source 1 position. Adjustable 0-10 minutes in 1 second incre- ments. Standard setting is 5 seconds. Adjust via SET menu (see page 18) DW (Delayed Transition Only) Time Delay from Neutral Switch position to Source 2 position. Adjustable 0-10 minutes in 1 second incre- ments. Standard setting is 5 seconds.Adjust via SET menu (see page 18) E Engine Start Contact EL/P

Event Log: Sequentially Numbered Log of 16 events that track date, time, reason and action taken System Data: Total Life Transfers (N2P)

Days Powered Up Total Transfers to S2 Total S1 Failures Time S1 available in Hrs Time S2 available in Hrs. (N1P) F Fan contact, operates when generator is running. HT Heater and Thermostat K Frequency Meter, Door mount. K/P Frequency Indication for S1 and S2 L LNP Center-off position LCD-Indicator Indicating LED lights:

L1 Indicates Switch in Source 2 position. L2 Indicates Switch in Source 1 position. L3 Indicates Source 1 available. L4 Indicates Source 2 available.

10 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 13 of the GE ZBTSD user manual — Accessory Definitions (cont’d)
Page 13 · click to enlarge
Page 13

Accessory Definitions (cont’d)

M1 Single Phase Amp Meter M2 Three Phase Amp Meter M80 3000 Digital Power Monitor M82 5200 Digital Power Meter M83A EPM 5300 Digital Power Meter with Modbus Port M83B EPM 5350 Digital Power Meter with Ethernet Port M84 7430 Digital Power Meter , Wye or Delta M85A EPM 9450 Digital Power Meter, Ethernet M85B EPM 9450 Digital Power Meter with Internal 56K Mod. M86A EPM 9650 Digital Power Meter, Wye or Delta, RS232 or RS485 M86B EPM 9650 Digital Power Meter, Wye or Delta, RS232 or RS485 N1 Running Time Meter, Door mount N2 Operation Counter, Door Mount P1 Time Delay Source 2 Start. Adjustable 0-10 seconds. Standard setting is 3 seconds. Adjust via SET menu (see page 18) P2 Time Delay S2 Start. Adjustable 1/6 to 300 seconds. Q2 Remote Peak Shave or Area Protection Circuit. Energize Q2 to simulate Source 1 Line failure causing the Generator to start and transfer the load to Source 2. Should Emergency fail during this operation, Transfer Switch will retransfer back to Source 1. Q3 Remote inhibit transfer to Source 2 circuit. Energize Q3 input to allow transfer to Source 2. To enable Q3 option, engage Q3 jumper.

Q7 Inhibit transfer to Source 1 circuit. Energize Q7 input to prevent transfer to Source 1. R1-1/R1-3 Source 1 Over Voltage sensing for single and three phase systems. Source 1 Over Voltage "Fail" Factory Default: 110% This adjustment determines the maximum acceptable over voltage. Adjust via the SET menu. Range is 105% to 110% in 1% increments (see page 18). Once exceeded, the P timer begins timing to signal the Generator to start.

Source 1 Over Voltage "Restore" Factory Default: 105% This adjustment determines the minimum acceptable over Voltage threshold at which the Transfer Switch is allowed to automatically transfer to Source 1. Adjust via SET menu. Range is 103% to 108% in 1% increments. "Restore" must be a minimum of 2% below "Fail" setting (see page 18). R15/R15D Load Shed Should Source 2 become overloaded, a signal can be given to switch to the dead or Mid position. R16 Phase Rotation Sensing Can be turned on or off via CFG menu (see page 17). Factory Default is on. This feature prevents Line Source to Line Source trans- fers from occurring between dissimilar phase sequences. This condition is primarily caused by an installation error. Connections from Source 1 and Source 2 need be verified, compared, and corrected to remedy the inconsistent phase rotation between the sources. WARNING: Turning off this feature can cause severe damage to loads. R26 Interruptable Power Rate Provisions. Allow transfer out of Source 1 position to Source 2 or dead Source 2. Alarm and Pre-Signal circuit included.

GE Zenith Controls 11 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 14 of the GE ZBTSD user manual — Accessory Definitions (cont’d)
Page 14 · click to enlarge
Page 14

Accessory Definitions (cont’d)

R50 In Phase Monitor this feature restricts Live to Live Source Transfers to occur unless both Sources are within 7 electrical degrees or less of each other. (live Source to live Source transfers usually occur during transfer back to Source 1 or during Testing). R50 does not change the operation of the Automatic Transfer Switch in a power failure mode. After all timer functions have elapsed, the CHECKING FOR SOURCE SYNCHRO- NISM will be displayed as well as the direction of transfer (S1-S2 for example denotes transfer from Source 1 to Source2). When synchronism is accomplished, transfer will take place. Notes: - If S2 Frequency is less than S1 Frequency,

S12P Auto / Manual Selector In "Auto" position, the Automatic Transfer Switch functions automatically as specified with the Switch drawings. In "Manual" the Automatic Transfer Switch will transfer to either direction upon depression of Source 1 or Source 2 transfer buttons. Should Source 1 fail, the Generator (Source 2), will automatically start. Once transferred in Manual, the Switch maintains position selected even if selected power fails. S13P Transfer Commit. Configured via CFG menu. (see page 17) When this Feature is set to OFF: The transfer Switch is not committed to transfer unless the outage duration is longer than the timers that precede the transfer to Source 2 position. This assumes that the outage will be an isolated event. When this Feature is set to ON: The transfer Switch is committed to transfer to Source 2 position once the W timer has begun timing, even if Source 1 power returns before the transfer to Source 2. This is to ensure that the transfer takes place, because one outage may be followed by another. S14 Test / Auto / Source 1 Selector, Door mount SW1 Auto/Off/Start Engine control selector, Door mount (Keyed or non-keyed operation available) SW2 Auto / Off Engine control selector, Door mount (Keyed or non-keyed operation available) SW3 Source Priority Selector Switch, Door mount Allows selection of Source 1 or Source 2 to be the Prime Source. Transfer Switch will transfer to selected Prime Source if that Source is available. (Keyed or non-keyed operation available) T Time Delay (S1) Source 1 Stable Timer. To delay trans- fer to Source 1 (immediate retransfer on Source 2 fail- ure). Adjustable 0-60 minutes in 1 second increments. Standard setting is 30 minutes. Adjust via SET menu (see page 18) T3/W3 Elevator Pre-Signal Auxiliary Contacts: Open 0-60 seconds prior to transfer to either direction, re-closes after transfer. U (S2) Source 2 Stop Delay Timer. Allows Engine to run unloaded after switch retransfer to Source 1. Adjustable 0-60 minutes in 1 second increments. Standard setting is 5 minutes. Adjust via SET menu (see page 18)

display will show a series of (-…..) symbols. - If S2 Frequency is greater than S1 Frequency,

display will show a series of (+++++…..) symbols. - Each (-) or (+) symbol represents 10 electrical

degrees out of phase. A maximum of 18 symbols (180 electrical degrees) can be monitored. - The number of (-) or (+) symbols decrease

as the two sources approach synchronism and increase as the two sources drift out of synchronism. - If S1 and S2 Frequencies are identical, the

display will show a series of alternating

- symbols (++++…) which also indicate the approximate out of phase degrees

In the event that the Sources do not come within 7 electrical degrees of each other within 60 seconds, the unit will display the message: SYNCH CHECKING and will allow the user to BYPASS. If the BYPASS button is pressed, the unit will display the message: WARNING MAY CAUSE DAMAGE TO THE LOAD. Pressing XFR will actually bypass the R50. Since R50 is a passive device, the length of time it takes to reach Synchronism is de- pendent on the frequency difference between the two Sources. Source 1 is usually a Utility and the frequency is not within the control of the consumer. Source 2 needs to be adjusted to create an adequate difference in order for the transfer to happen a timely fashion. Note: For optimum performance, Source 2 Generator should be adjusted a Maximum of 2 Hertz above or below the Utility frequency, minimum of 0.1 Hertz. (58 to 59.9) or (60.1 to 62) Hertz. Adjustment of Generator to 60Hertz could cause lengthy transfer delay.

R50 Feature can be turned ON or OFF via CFG Menu (see page 17). Factory Default if OFF. S5P Auto / Semi Manual selector In "Auto" position, retransfer to Source 1 is automatic after the T timer has timed out. The T time delay is bypassed if Source 2 fails. In "Manual", retransfer to Source 1 is upon depression of BYPASS DELAY button YEN or if Source 2 fails.

12 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 15 of the GE ZBTSD user manual — How to Set the System Clock
Page 15 · click to enlarge
Page 15

Accessory Definitions (cont’d)

UMD Universal Motor Load Disconnect Circuit: Auxiliary Contact opens 0-60 seconds prior to transfer in either direction, re-closes after transfer. Can be configured by end user for Pre-transfer, Post-transfer, or both. VI Voltage Imbalance (Three Phase) For a three phase source, this feature monitors phase voltage ratios based on a selected range within a selected time window. Should any phase fall below the selected lower window limit or exceed the selected higher window limit within the selected time frame, the controller initiates transfer to the other source.

W Time Delay (S2) Source 2 Stable Timer. To delay trans- fer to Source 2. Adjustable 0-5 minutes in 1 second increments. Standard setting is 1 second. Adjust via SET menu (see page 18) YEN Bypass Timers Key utilizing Keypad. When applicable, the system prompts the user to press a button to bypass (T) or (W) Timers should the user so desires. ZNET Network Communications Interface Card

Range: 5% to 20% of Nominal voltage, 10 to 30 seconds window, user adjustable. Resolution: 1% Increments Minimum Differential: 2% between “Fail” and “Restore” settings. Factory default: 10% “Fail”, 8% “Restore”, 30 Seconds. See CFG Menu page 17 to configure ON or OFF. See SET Menu page 18 to set Percentage and time windows

How to Set the System Clock

How to Set the System Clock

Set System Clock, time and date · If the clock is not set, the display will show SET SYSTEM CLOCK on the second line of the S1 OK screen. · The S1 OK screen will show time (hours and minutes) on the second line if the system clock has been set. (Date on third line)

11. Use the up and down key up to change the month. 12. Press SAVE (This will enter this value and complete the clock setting). 13. Use the up and down keys to change the date. 14. Press SAVE (this will enter this value and move cursor to year). 15. Use the up and down keys to change year. 16. Press SAVE (this will enter this value and compete the clock setting). 17. To edit settings, press SEL and repeat steps 6-16. 18. If the setting is satisfactory, press MORE (unit then returns to the SET menu then press BACK, then ESC.)

Setting the System Clock (Start from S1 OK screen) 1. Remove battery protective white plastic strip near P relay. * 2. Press MORE then press SET. 3. Press MORE and scroll to SET SYSTEM CLOCK using the MORE key. 4. Press SEL. 5. ENTER ACCESS CODE located on the white label on the back of the controller. 6. Press SEL. 7. Use the up and down keys to change the hour value. 8. Press SAVE (this will enter this value and move cursor to minutes). 9. Use the up and down keys to change the minutes. 10. Press SAVE (this will enter this value and move cursor to month).

* Replacement battery part #K-4100 Battery will last 5 years and provides power to retain clock function only (Controller functions without battery).

GE Zenith Controls 13 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 16 of the GE ZBTSD user manual — How to CONFIGURE (CFG) and Set (SET) the Timer Exerciser
Page 16 · click to enlarge
Page 16

CDT One Event Timer Exerciser

Load / No-Load One event Exerciser with adjustable Timer. Exercise duration can be set between 5 and 60 minutes in 1 minute increments. Can be configured to run every 1,7,14, or 28 days. Factory default is 20 minutes.

  • If the CDT Exerciser is Factory configured for a Load Exerciser, the Controller will immediately start a load exercise. The controller will start the generator, transfer the load to Source 2 and remain in Source 2 for the duration set for EXER S2 RUN TIME in the SET menu. The controller will retransfer the load back to Source 1 after the S1 stable timer has timed out and run the generator unloaded for the duration of the S2 stop delay timer (Engine Cool Down Timer).
  • If the CDT Exerciser is Factory configured for a No-Load Exerciser, the Controller will immediately start a No-load exercise. The controller will start the generator and run it unloaded for the duration of the S2 stop delay timer (Engine Cool Down Timer).

How to CONFIGURE (CFG) and Set (SET) the Timer Exerciser

1. Beginning from the S1 OK screen, press MORE then CFG. 2. Press MORE to scroll to CONFIG TIMER EXERCISER screen. 3. The third line of the CONFG TIMER EXERCISER will show either DAILY, WEEKLY, 14 DAY, 28 DAY, or OFF. 4. If the third line of the CONFG TIMER EXERCISER shows DAILY, WEEKLY, 14 DAY, or 28 DAY as desired, then proceed to step 10. 5. If the third line of the CONFG TIMER EXERCISER shows OFF or if another timer selection is desired, continue. 6. Press SEL. 7. Enter ACCESS code located on white label on the back of the controller. 8. Press UP or DOWN to select DAILY, WEEKLY, 14 DAY, or 28 DAY as desired. 9. Press SAVE. 10. Press MORE to scroll to CONFG TIMER EXERCISER (XFR) or (NO XFR). 11. Press Up or Down to select XFR (Load Transfer) or NO XFR (No Load Transfer). 12. Press SAVE. 13. Press MORE repeatedly to BACK then S1 OK screen.

Exercise will be repeated at the same time as initiated on every 1, 7, 14, or 28 days according to the selection made in the Configure CFG menu.

How to Bypass (Cancel) an exercise during an exercise cycle 1) Press BPASS 2) Allow the controller to complete the Engine cool down cycle If the CDT Exerciser is Factory configured for a No-Load Exerciser Or allow the controller to complete retransfer to Source 1 If the CDT Exerciser is Factory configured for a Load Exerciser

How to Bypass the next exercise event and Keep the rest of scheduled events unchanged 1) Press Test 2) Press MORE 3) Press BYPASS EXER To re-institute the next exercise event back, press CANCL BPASS

Set (SET) the Exerciser: 14. Beginning from the S1 OK screen, press MORE then SET. 15. Press MORE repeatedly until EXER S2 RUN TIME screen. 16. Press SEL 17. Enter ACCESS code located on white label on the back of the controller. 18. Press SEL 19. Cursor is indicated as a line under character to be changed. Change values with up and down keys. 20. Press SAVE when complete. 21. Press MORE repeatedly until SET USER SETUP then press BACK then ESC to the S1 OK screen.

How to initiate a new exercise start time 1) Press TEST 2) Press MORE 3) Press EXER CANCL 4) Press START TIMER TEST

How to check the next exercise event 1) From S1 OK screen, press MORE three times. 2) The unit will display the PLANT EXERCISER NEXT event in DAYS, HOURS, and MINUTES 3) Press ESC to S1 OK Screen.

How to Initiate CDT Exerciser and to start an exercise cycle every 1, 7, 14, or 28 days From S1 screen 1) Press TEST 2) Press MORE 3) Press START TEST TIMER (to initiate Test).

14 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 17 of the GE ZBTSD user manual — BACK ^ v SAVE
Page 17 · click to enlarge
Page 17

CDP Clock Exerciser

  • Load / No-Load Clock Exerciser Allows the Generator to start and run unloaded or to simulate a power failure, start Generator and run under load. Can be configured by the end user for 1, 7, 14, 28, or 365 day cycles.
  • A total of 7 independent No Load exercise periods (up to 10 hours each) can be programmed for each of the daily, weekly, 14-day, and 28-day exercisers.
  • A total of 24 independent No Load exercise periods (up to 10 hours) can be programmed for the 365-day Exerciser.
6. Cursor is indicated as a line under character to be changed. Change values with up and down keys. Press SAVE after each entry to save value and to move to the next value to be changed. 7. Press BACK when complete. 8. Press MORE repeatedly until SET USER SETUP . Press BACK then ESC to the S1 OK screen.

How to Bypass (Cancel) an exercise during an exercise cycle 1) Press BPASS 2) Allow the controller to complete the Engine cool down cycle. If the CD Exerciser is configured or Set for a No-Load Exercise. Or allow the controller to complete retransfer to Source 1. If the CD Exerciser is configured for a Load Exerciser

How to Configure (CFG) the Exerciser 1. Beginning from the S1 OK screen, press MORE then CFG. 2. Press MORE to scroll to CONFIG CLOCK EXERCISER screen. 3. The third line of the CONFG CLOCK EXERCISER will show either DAILY, WEEKLY, 14 DAY, 28 DAY, 365 DAY or OFF. 4. If the third line of the CONFG CLOCK EXERCISER shows DAILY, WEEKLY, 14 DAY, 28 DAY, or 365 DAY as desired, press MORE repeatedly to BACK. Press ESC then proceed to the SET menu to set the EXERCISER. 5. If the third line of the CONFG CLOCK EXERCISER shows OFF, continue. 6. Press SEL. 7. Enter ACCESS code located on white label on the back of the controller. 8. Press UP or DOWN to select DAILY, WEEKLY, 14 DAY, 28 DAY, or 365 DAY as desired. 9. Press SAVE. 10. Press MORE repeatedly to BACK then ESC to S1 OK screen.

How to Bypass the next exercise event and Keep the rest of scheduled events unchanged 1) Press TEST 2) Press MORE 3) Press BYPASS EXER To re-institute the next exercise event back, press CANCL BPASS

How to check the next exercise event 1) From S1 OK screen, press MORE three times. 2) The unit will display the PLANT EXERCISER NEXT event in DAYS, HOURS, and MINUTES 3) Press ESC to S1 OK Screen.

  • Notes:
  • In the S1 OK screen, an ( *E* ) appears in the upper right hand corner of LCD screen when exercise is impending.
  • For Load Exerciser, actual exercise period (ATS in S2 position)= CDT (Exerciser) timing period +T (S1 Stable Timer) timing period.
  • A value greater than zero must be entered in the Exerciser duration field to be accepted as a valid exercise period.
  • The Exercise cycle will be repeated on a regular basis as programmed and initiated in the SET menu depending on what Exerciser was configured (selected) in the CFG menu.

How to set (SET) the DAILY Exerciser 1. Beginning from the S1 OK screen, press MORE then SET. 2. Press MORE repeatedly until SET EXERCISER screen. 3. Press SEL. 4. Enter ACCESS code located on white label on the back of the controller. 5. Press SEL

Indicates # of Exercise Periods

GE ZBTSD — CDP Clock Exerciser diagram (page 17)
Fig. 11 · CDP Clock Exerciser

Load No-Load (CDP) Exercise Indicator

Indicates type of Exerciser DAILY, WEEKLY, 14-DAY, 28-DAY or 365-DAY

SET EXERCISER 00:00

NL #1

Exercise duration for this event in hours and minutes up to 10 hours per event

BACK ^ v SAVE

Indicates Exerciser start: Time for DAILY Exerciser Time & Day for WEEKLY Exerciser Time, Date & Month for 14-DAY, 28-DAY and 365-DAY Exerciser (24 Hour System) To previous field or to exit screen.

Up and Down Use to change values.

To save value and to move cursor to next field to be changed.

GE Zenith Controls 15 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Cursor

Page 18 of the GE ZBTSD user manual — Turn options ON or OFF via keypad through the CFG menu
Page 18 · click to enlarge
Page 18

Entelli-Switch 250 User Setup - CFG Menu

GE ZBTSD — Entelli-Switch 250 User Setup - CFG Menu diagram (page 18)
Fig. 12 · Entelli-Switch 250 User Setup - CFG Menu

Turn options ON or OFF via keypad through the CFG menu

Enter six digit access code (The factory assigned six-digit access code

2 Controller Outputs have Limited Source Capacity. Use only GE Zenith-specified Output Modules.

Input and output availability subject to factory configuration. *

Contact Rating10A @ 250 VAC or 30 VDC

Lithium Battery Exerciser Battery Replacement-K-4100 (BR2032) Service Life-10 Years † During normal operation

16 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 19 of the GE ZBTSD user manual — Entelli-Switch 250 User Setup - SET Menu
Page 19 · click to enlarge
Page 19

Entelli-Switch 250 User Setup - SET Menu

GE ZBTSD — Entelli-Switch 250 User Setup - SET Menu diagram (page 19)
Fig. 13 · Entelli-Switch 250 User Setup - SET Menu

Enter six digit access code (The factory assigned six-digit access code is located on the back of the controller)

2 Controller Outputs have Limited Source Capacity. Use only GE Zenith-specified Output Modules.

Input and output availability subject to factory configuration. *

Contact Rating10A @ 250 VAC or 30 VDC

Lithium Battery Exerciser Battery Replacement-K-4100 (BR2032) Service Life-10 Years † During normal operation

GE Zenith Controls 17 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 20 of the GE ZBTSD user manual — Entelli-Switch 250 User Setup - System Info
Page 20 · click to enlarge
Page 20

Entelli-Switch 250 User Setup - System Info

GE ZBTSD — Entelli-Switch 250 User Setup - System Info diagram (page 20)
Fig. 14 · Entelli-Switch 250 User Setup - System Info
GE ZBTSD — Entelli-Switch 250 User Setup - System Info diagram (page 20)
Fig. 15 · Entelli-Switch 250 User Setup - System Info

Enter six digit access code (The factory assigned six-digit access code is located on the back of the controller)

2 Controller Outputs have Limited Source Capacity. Use only GE Zenith-specified Output Modules.

Input and output availability subject to factory configuration. *

Contact Rating10A @ 250 VAC or 30 VDC

Lithium Battery Exerciser Battery Replacement-K-4100 (BR2032) Service Life-10 Years † During normal operation

18 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 21 of the GE ZBTSD user manual — Standard Transition
Page 21 · click to enlarge
Page 21

Testing

NOTICE

A periodic test of the transfer switch under load conditions is recommended to insure proper operation.

(See National Electric Code articles 700 and 701)

ATS Testing

GE ZBTSD — ATS Testing diagram (page 21)
Fig. 16 · ATS Testing

Start generator and verify proper voltage, frequency and phase sequence (match to Source 1). Shut down gen set and place in Auto. Complete the visual inspection of the transfer switch, and close the cabinet door.

S Y S T E M T E S T

FA S T X F R N O M O R E T E S T L O A D X F R

Initiate the test by pressing the TEST button on the LCD keypad. The controller will then prompt for your access code. After entering the code, three test options will appear— XFR LOAD, FAST TEST and NO XFR (See Figure 12).

Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbutton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.

  • XFR LOAD test starts the generator and using the current timer settings, transfers the load to Source 2.
  • FAST TEST test presets timer values to a maximum 30 seconds during the test. After completion of the test, all timers are reset to their original values. (T3, W3, DT and DW remain)
  • NO XFR test starts the generator but does not transfer the load to the Source 2.

Delayed Transition

Source 1 Power Failure: When the test is initiated, the controller initiates the Time Delay Source 2 Start (Engine Start Timer "P") cycle. A manual CANCEL button is provided to cancel the test if desired Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" values, the time delay to open Source 1 timer (W) begins its timing cycle to ensure voltage and frequency sta- bilization before re-transfer. A manual pushbutton BYPASS is provided to bypass the "W" time delay if desired. After the (W) time delay, the MX controller initiates a transfer signal through the SCR-NO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 2 timer (DW) begins its timing cycle. After the (DW) time delay, the MX controller initiates a transfer signal through the SCR-E to operate the main transfer operator. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.

Press and hold the desired test option button until the switch transfers to Source 2 (load test) or until the generator has been run for the desired amount of time (no load test). Releasing the test button before W timer timeout will abort the test (Exception: when the transfer commit option, is configured “ON”).

To test lamps, press TEST then scroll through MORE, then press LAMP TEST. To cancel LAMP TEST press MORE.

Standard Transition

When the test is initiated, the controller initiates the Time Delay Source 2 Start Timer (Engine Start Timer "P") cycle. A manual CANCEL button is provided to cancel the test if desired. Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" Values, the time delay to Source 2 Timer (W) begins its timing cycle to ensure voltage and frequency stabilization before transfer. A manual pushbutton BYPASS is provided to bypass the "W" time delay if desired. After the (W) time delay, the MX con- troller initiates a transfer signal through the SCR-E to operate the main transfer operator. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.

Restoration of Source 1 Power: Deactivating the test switch initiates re-transfer to Source 1sequence. The delay to open Source 2 Timer (T) begins its timing cycle to ensure voltage and frequency stabilization before retransfer. A manual pushbutton BYPASS is provided to bypass the "T" time delay if desired. After the (T) time delay, the MX controller initiates a transfer signal through the SCR-EO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 1 timer (DT) begins its timing cycle. After the (DT) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.

Restoration of Source 1 Power: Deactivating the test switch initiates re-transfer to Source 1 sequence. The delay to Source 1 Timer (T) begins its timing cycle to ensure voltage and frequency stabilization before retransfer. A manual pushbutton BYPASS is provided to bypass the "T" time delay if desired. After the (T) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.

Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbutton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.

GE Zenith Controls 19 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 22 of the GE ZBTSD user manual — Timer Designations as they appear in the SET menu
Page 22 · click to enlarge
Page 22

Sequence of Operation

Standard Transition

Delayed Transition

Source 1 Power Failure: When Source 1 voltage or frequency has fallen below the preset "Fail" values, the controller initiates the Time Delay Source 2 Start Timer (Engine Start Timer "P") cycle. Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" Values, the time delay to Source 2 Timer (W) begins its timing cycle to ensure voltage and frequency stabilization before transfer. A manual pushbutton BYPASS is provid- ed to bypass the "W" time delay if desired. After the (W) time delay, the MX controller initiates a transfer signal through the SCR-E to operate the main transfer opera- tor. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.

Source 1 Power Failure: When Source 1 voltage or frequency has fallen below the preset "Fail" values, the controller initiates the Time Delay Source 2 Start (Engine Start Timer "P") cycle. Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" values, the time delay to open Source 1 timer (W) begins its timing cycle to ensure voltage and frequency stabilization before re-transfer. A manual pushbutton BYPASS is provided to bypass the "W" time delay if desired. After the (W) time delay, the MX controller initiates a transfer signal through the SCR-NO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 2 timer (DW) begins its timing cycle. After the (DW) time delay, the MX controller initiates a transfer signal through the SCR-E to operate the main transfer operator. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.

Restoration of Source 1 Power: When Source 1 power reach the preset "Restore" values, the controller initiates re-transfer to Source 1sequence.The delay to Source 1 Timer (T) begins its timing cycle to ensure voltage and frequency stabiliza- tion before retransfer. A manual pushbutton BYPASS is provided to bypass the "T" time delay if desired. After the (T) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.

Restoration of Source 1 Power: When Source 1 power reach the preset "Restore" values, the controller initiates re-transfer to Source 1 sequence. The delay to open Source 2 Timer (T) begins its timing cycle to ensure voltage and frequency stabilization before retransfer. A manual pushbutton BYPASS is pro- vided to bypass the "T" time delay if desired. After the (T) time delay, the MX controller initiates a transfer sig- nal through the SCR-EO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 1 timer (DT) begins its timing cycle. After the (DT) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.

Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbut- ton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.

Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbut- ton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.

Timer Designations as they appear in the SET menu

ATS Type P W DW T DT U

Standard Time Delay Time Delay Time Delay S2 Stop Transition S2 Start S2 Stable S1 Stable Delay

Delayed Time Delay Time Delay ATS Open Time Delay ATS Open S2 Stop Transition S2 Start S2 Stable Time to S2 S1 Stable Time to S1 Delay

Source 1 Transfer to Source 2 Source 1 Transfer to Source 1 Engine Fails Returns Cooldown

20 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Table 4

Page 23 of the GE ZBTSD user manual — Sequence of Operation (cont’d)
Page 23 · click to enlarge
Page 23

Sequence of Operation (cont’d)

Bypass-Isolation Operation

GE ZBTSD — Sequence of Operation (cont’d) diagram (page 23)
Fig. 17 · Sequence of Operation (cont’d)

An automatic transfer switch equipped with a bypass-isola- tion switch provides the ability to withdraw the ATS for test- ing and/or maintenance purposes without interrupting the served load.

Operation of the unit is quick and convenient requiring only one operator and less than one minute to complete. Instructions are mounted on the front of each isolation switch door along with a mimic panel providing indication of power source availability and ATS/bypass switch positions.

The bypass switch is normally open on both sources with the ATS feeding the system load. During operation, the bypass is closed paralleling the ATS contacts which then allows withdrawal of the ATS to the “TEST” or “ISOLATE” positions. Mechanical and electrical interlocks are included to prevent cross-servicing or bypassing to a dead source.

In the “TEST” position, the ATS is disconnected from the load (now fed through the bypass) but control power is present to allow complete operational testing through the control panel of the transfer switch

In the “ISOLATE” position, the ATS is completely withdrawn and may be removed from the enclosure for maintenance if desired.

After the isolation operation, if the bypass is closed on Source 1 and if this source fails, an auxiliary contact on the bypass control will automatically start the engine-generator set. When the second source is available, the manual handle of the bypass may be operated to transfer the load to the available source. Interlocks prevent both this transfer, if the ATS is in the circuit and connected to the opposite source or reconnection of the ATS unless the positions match.

GE ZBTSD — Sequence of Operation (cont’d) diagram (page 23)
Fig. 18 · Sequence of Operation (cont’d)

While the bypass switch is out of the AUTO

position/mode, the ATS is INHIBITED from automatic operation. Make certain the ATS is left

GE Zenith Controls 21 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 24 of the GE ZBTSD user manual — Sequence of Operation (cont’d)
Page 24 · click to enlarge
Page 24

Sequence of Operation (cont’d)

100-400 AMP 1) Automatic a) Manually operated Bypass Switch contacts

GE ZBTSD — Sequence of Operation (cont’d) diagram (page 24)
Fig. 19 · Sequence of Operation (cont’d)

(BN/BE) are open and ATS is supplying load. b) Disconnect Switch (DS) is in Auto. 2) To Bypass ATS a) Open bottom cabinet door and turn DS to Inhibit. b) Position manual bypass handle (MBH) to same

power source as ATS. 3) To Test ATS a) Bypass per above instructions. b) Move ATS location handle (ALH) to Test location. c) Turn DS to Auto. d) Test Switch (TS) on bottom cabinet door

will allow electrical operation of ATS. 4) To Isolate ATS a) Bypass per above instructions. b) Move ALH to Isolate location. 5) To Remove ATS a) Bypass and isolate per above instructions. b) Move ALH to Release location. c) Disconnect multipin plugs. d) Lift ATS out of drawer. 6) To Reconnect ATS a) Place ATS into drawer slots (front rollers first). b) Turn DS to Inhibit. c) Manually position ATS into same source

as Bypass Switch. d) Reconnect multipin plugs and external

connections to ATS. e) Push ATS inward to engage carriage. f) Move ALH to Test location (as indicated by light). g) Turn DS to Auto and use TS to electrically

operate ATS. h) Turn DS to Inhibit. i) Move ALH to Auto location. j) Turn DS to Auto and open Bypass with MBH. k) ATS is now fully automatic.

Notes: 1. DS in Inhibit will prevent ATS electrical operation. 2. Do not use excessive force on mechanical handles. 3. Figures depict Bypass Source 1. Sequence is the same for Bypass Source 2. 4. When ATS is in Test or Isolate, Bypass Switch is manual transfer switch to either available source (indicated on light panel). 5. To operate Bypass Switch when ATS is in Test or Isolate, position MBH to available power source.

Legend: 1. BP - Bypass switch (indicated by contacts BN/BE) is a three position switch. 2. ATS - Automatic Transfer Switch.

22 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 25 of the GE ZBTSD user manual — Sequence of Operation (cont’d)
Page 25 · click to enlarge
Page 25

Sequence of Operation (cont’d)

600-1200 AMP 1) Automatic a) Manually operated Bypass Switch contacts

(BN/BE) are open and ATS is supplying load. b) Disconnect Switch (DS) is in Auto. 2) To Bypass ATS a) Open bottom cabinet door and turn DS to Inhibit. b) Turn Bypass Selector Switch (BSS) to same power

source as ATS c) Position manual bypass handle (MBH) upward. 3) To Test ATS a) Bypass per above instructions. b) Rotate crank mechanism counter-clockwise until

ATS test light is illuminated. c) Turn DS to Auto. d) Test Switch (TS) on bottom cabinet door will allow

electrical operation of ATS. 4) To Isolate ATS a) Bypass per above instructions. b) Rotate cank mechanism counter-clockwise

until ATS Isolated light is illuminated. 5) To Remove ATS a) Bypass and isolate per above instructions. b) Disconnect multipin plugs and external

connections to ATS. c) Rotate four power panel latches to vertical

position, slide ATS forward and lock mechanism in place. d) ATS can now be removed from cabinet. 6) To Reconnect ATS a) Place ATS in slide mechanism. b) Unlock slide mechanism. Slide ATS over power

panel latches and rotate latches to horizontal position. c) Turn DS to Inhibit. d) Manually position ATS into same source

as Bypass Switch. e) Reconnect multipin plugs and external

connections to ATS. f) Rotate crank mechanism clockwise until

ATS Test light is illuminated. g) Turn DS to Auto and use TS to electrically

operate ATS. h) Turn DS to Inhibit. i) Move ALH to Auto location. j) Turn DS to Auto and open Bypass with MBH. k) ATS is now fully automatic.

Notes: 1. DS in Inhibit will prevent ATS electrical operation. 2. Do not use excessive force on mechanical handles. 3. Figures depict Bypass Source 1. Sequence is the same for Bypass Source 2. 4. When ATS is in Test or Isolate, Bypass Switch is manual transfer switch to either available source (indicated on light panel). 5. To operate Bypass Switch when ATS is in Test or Isolate: a) Move MBH downward (to open Bypass Contacts BN/BE). b) Turn BSS to opposite power source. c) Move MBH upward to close into selected power source.

Legend: 1. BP - Bypass switch (indicated by contacts BN/BE) is a three position switch. 2. ATS - Automatic Transfer Switch.

GE Zenith Controls 23 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 26 of the GE ZBTSD user manual — Sequence of Operation (cont’d)
Page 26 · click to enlarge
Page 26

Sequence of Operation (cont’d)

1600-4000 AMP 1) Automatic a) Manually operated Bypass Switch contacts

(BN/BE) are open and ATS is supplying load. b) Disconnect Switch (DS) is in Auto. 2) To Bypass ATS a) Open bottom cabinet door and turn DS to Inhibit. b) Turn Bypass Selector Switch (BSS) to same power

source as ATS c) Position manual bypass handle (MBH) upward. 3) To Test ATS a) Bypass per above instructions. b) Rotate crank mechanism counter-clockwise until

ATS test light is illuminated. c) Turn DS to Auto. d) Test Switch (TS) on bottom cabinet door will allow

electrical operation of ATS. 4) To Isolate ATS a) Bypass per above instructions. b) Rotate crank mechanism counter-clockwise

until ATS Isolated light is illuminated. 5) To Remove ATS a) Bypass and isolate per above instructions. b) Disconnect multipin plugs and external

connections to ATS. c) Slide four corner latches of ATS to innermost

position. d) ATS can now be removed from cabinet. 6) To Reconnect ATS a) Roll cart back into cabinet. b) Slide four corner latches of ATS to outermost

position. c) Turn DS to Inhibit. d) Manually position ATS into same source

as Bypass Switch. e) Reconnect multipin plugs and external

connections to ATS. f) Rotate crank mechanism clockwise until

ATS Test light is illuminated. g) Turn DS to Auto and use TS to electrically

operate ATS. h) Turn DS to Inhibit. i) Rotate crank mechanism clockwise until ATS

location pointer is aligned with Auto mark on location indicator. (ATS must be in same source as Bypass.) j) Turn DS to Auto and open Bypass with MBH. k) ATS is now fully automatic.

Notes: 1. DS in Inhibit will prevent ATS electrical operation. 2. DO NOT use excessive force on mechanical handles. 3. Figures depict Bypass Source 1. Sequence is the same for Bypass Source 2. 4. When ATS is in Test or Isolate, Bypass Switch is a manual transfer switch to either available source (indicated on light panel). 5. To operate Bypass Switch when ATS is in Test or Isolate: a) Move MBH downward (to open Bypass Contacts BN/BE) b) Turn BSS to opposite power source. c) Move MBH upward to close into selected power source.

Legend: 1. BP - Bypass switch (indicated by contacts BN/BE) is a three position switch. 2. ATS - Automatic Transfer Switch.

24 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 27 of the GE ZBTSD user manual — Controls Power Supply (CPS)
Page 27 · click to enlarge
Page 27

Controls Power Supply (CPS)

GE ZBTSD — Controls Power Supply (CPS) diagram (page 27)
Fig. 20 · Controls Power Supply (CPS)

voltage. This is accomplished by the Controls Power Supply (CPS). This method of switching operator voltage and applying power and sensing voltage to the printed circuit board isolates the MX250 from the line voltage, further protecting the controller from harmful line transients.

Each Entelli-Switch 250 microprocessor based ATS controller requires Controls Power Supply (CPS) to apply line voltage to the ATS operator via SCRs. Also required is power for the Entelli-Switch 250 printed circuit board and an application of sensing voltage proportional to line

GE ZBTSD — Controls Power Supply (CPS) diagram (page 27)
Fig. 21 · Controls Power Supply (CPS)
GE ZBTSD — Controls Power Supply (CPS) diagram (page 27)
Fig. 22 · Controls Power Supply (CPS)

Primary CPS CPS Voltage Assembly Board at 50/60 Hz Part No. No.

120V 50P-1224 50P-1200 208-220V 50P-1225 50P-1201 230-240V 50P-1226 50P-1202 277V 50P-1227 50P-1203 380-400V 50P-1228 50P-1204 416-440V 50P-1229 50P-1205 460-480V 50P-1230 50P-1206 575-600V 50P-1231 50P-1207

GE Zenith Controls 25 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 28 of the GE ZBTSD user manual — XN1 -
Page 28 · click to enlarge
Page 28

Controls Power Supply (CPS) (cont’d)

Standard Transition CPS Schematic

XN1 -

SOURCE 1 CONTROL TRANSFORMER

XN2 -

SOURCE 1 3 PHASE SENSING

TRANSFORMER

XN1 XN2

XE1

XE2

XE1 -

SOURCE 2 CONTROL TRANSFORMER

XE2 - SOURCE 2 3 PHASE SENSING TRANSFORMER

24V 10V 11V 10V

24V 10V 11V

900 SOURCE 2 24V OUTPUT

SOURCE 1 24V OUTPUT

3 PHASE SOURCE 2

JC

(BLANK)

JC

(BLANK)

C.V. SCR-E

GND

C.V. SCR-N

GROUND

JC

C.V. SCR-E CONTROL VOLTAGE (SOURCE 2)

C.V. SCR-N CONTROL VOLTAGE (SOURCE 1)

JC

COMMON

SINGLE PHASE SOURCE 2 SENSING

3-PHASE SOURCE 1 SENSING

SOURCE 1 CONTROL POWER

SOURCE 2 CONTROL POWER

J5

Delayed Transition CPS Schematic

XN1 -

SOURCE 1 CONTROL TRANSFORMER

XN2 -

SOURCE 1 3 PHASE SENSING

TRANSFORMER

XN1 XN2

XE1

XE2

XE1 -

SOURCE 2 CONTROL TRANSFORMER

XE2 -

SOURCE 2 3 PHASE SENSING

24V 10V 11V 10V 24V 10V 11V 10V

TRANSFORMER

900 SOURCE 2 24V OUTPUT

SOURCE 1 24V OUTPUT

3-PHASE SOURCE 2 SENSING

JC

C.V. SCR-EO CONTROL VOLTAGE (OPEN SOURCE 2)

JC

JC

JC

C.V. SCR-NO CONTROL VOLTAGE (OPEN SOURCE 1)

C.V. GND

SCR-EO

SCR-N

C.V. SCR-E

GROUND

SCR-NO

C.V. SCR-E CONTROL VOLTAGE (SOURCE 2)

JC

JC 801

JC

C.V. SCR-N CONTROL VOLTAGE (SOURCE 1)

JC

COMMON

SINGLE PHASE SOURCE 2 SENSING

3-PHASE SOURCE 1 SENSING

SOURCE 1 CONTROL POWER

SOURCE 2 CONTROL POWER

J5

26 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Show 6 more labels / short text on this page
20 21 22 · (18) · (1) · 20 21 22 · (18) · (1)
Page 29 of the GE ZBTSD user manual — Symptom Annunciation Possible Cause(s) Corrective Action
Page 29 · click to enlarge
Page 29

Troubleshooting and Diagnostics

DANGER

HAZARDOUS VOLTAGES CAN CAUSE SEVERE INJURY OR DEATH. These charts may indicate problems that require authorized GE Zenith service personnel. Hazardous voltages may exist on termination plugs other than those that go into the Entelli-Switch 250.

General Troubleshooting The following troubleshooting guide is used to recognize, and determine basic faults. When using this guide, it will ask several questions about the condition of the switch. This guide will then list an order of the possible faults. You will then look at the first suspected fault to determine if it is the problem. If it is not a fault, you go to the

second suspected fault. If you go through all of the suspected faults, or the chart instructs you to, call a GE Zenith Representative for further assistance.

Symptom Annunciation Possible Cause(s) Corrective Action

Engine does not START SOURCE 2 AVAILABLE LED off

Engine start wires not terminated properly

Check engine start connections

Generator is in OFF position Investigate why Engine Control Switch was turned off

Engine does not stop LCD Display - “TD Engine Cool Down”

U timing cycle not complete

Check U timer setting

SOURCE 1 POSITION, and SOURCE 1 and SOURCE 2 AVAILABLE LEDs on, but U timer has timed out

Engine start wires not terminated correctly

Check Engine Start Connections

Place generator in AUTO

ATS will not transfer to SOURCE 2

SOURCE 2 AVAILABLE LED off

SOURCE 2 voltage or frequency not within acceptable parameters

CheckEngine Start Connections, Generator Breaker, Generator Output, and Engine Control Switch

Power supply connector unplugged

LCD Display - “S1 TD XFR S1>S2 Time Remaining ”

W timing cycle not complete Check WTimer setting

ATS will not transfer to SOURCE 1

LCD Display - “ATS Open Time Remaining ”

DW timing cycle not complete Check DWTimer setting

SOURCE 1 AVAILABLE LED off

SOURCE 1 voltage or frequency not within acceptable parameters

Check utility and utility breakers

Power supply connector unplugged

LCD Display - “Diagnostic Code 001”

Limit switch or RT box connector unplugged

LCD Display - “S1 OK Time Remaining

T timing cycle not complete

Check TTimer setting

LCD Display - “ATS Open Time Remaining ”

TD timing cycle not complete Check DTTimer setting

GE Zenith Controls 27 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Show 8 more labels / short text on this page
Generator in MANUAL · None · Plug in connector · None · Plug in connector · Call Technical Services · Bypass” · Table 5
Page 30 of the GE ZBTSD user manual — WARNING
Page 30 · click to enlarge
Page 30

Maintenance and Testing

CDT battery replacement - lithium batteries may last up to 10 years, however it is recommended that battery replacement be included in a 3-5 year service cycle. The battery maintains the exerceser memory only and does not otherwise affect the operation.

CAUTION

Due to hazardous voltage and current, GE Zenith recommends that a GE Zenith Certified technician

or a qualified electrician must perform the installation and maintenance of the switch.

WARNING

Testing A manual operator handle is provided with the transfer switch for maintenance purposes only. Manual operation of the switch must be checked before it is operated electrically. Both power sources must be disconnected before manual operation of the switch. Insert the handle and operate the transfer switch between the Source 1 and Source 2 positions. The transfer switch should operate smoothly without binding. Return the switch to Source 1 position, remove the handle, and return it to the holder provided.

Both power sources must be disconnected

before manual operation of the switch.

A preventive maintenance program will insure high reliability and long life for the transfer switch. The preventive maintenance program for the transfer switch should include the following items:

Inspection and Cleaning The switch should be inspected for any accumulation of dust, dirt, or moisture, and should be cleaned by vacuuming or wiping with a dry cloth or soft brush. do not use a blower since debris may become lodged in the electrical and mechanical components and cause damage.

After completing the inspection, cleaning and servicing of the transfer switch, reinstall the switch cover, and close and lock the cabinet door. Reclose the circuit breakers feeding the utility and generator sources to the switch.

Remove the transfer switch barriers and check the condition of the contacts. Any surface deposits must be removed with a clean cloth (do not use emery cloth or a file). If the contacts are pitted or worn excessively, they should be replaced. A general inspection of mechanical integrity should be made to include loose, broken or badly worn parts.

Initiate the electrical transfer test by activating the TS test switch. P timer will time out and the micro- controller will send an engine start signal. When the W time has elapsed, the switch will complete its transfer by closing into Source 2.

Deactivating the test switch will start retransfer to Source 1. The switch will complete its retransfer to Source 1 after the time delay of the T timer. The U engine overrun timer allows the engine generator to run unloaded for a preset cool down period.

Servicing All worn or inoperative parts must be replaced using GE Zenith recommended replacement parts. Please refer to the Replacement Parts manual for specific part information and ordering procedures. Please contact the GE Zenith Technical Services Department for the Replacement Parts manual.

The operating mechanism of the transfer switch is lubricated with Lubriplate 105. The lubricant applied at the factory provides adequate lubrication for the lifetime of the switch. Should debris contaminate the mechanism, clean and apply additional Lubriplate.

WARNING

When performing a hi-pot or dielectric test

on the power section, DISCONNECT the control panel plugs from the microprocessor

GE Zenith can provide complete preventative main- tenance services. Please contact the GE Zenith Technical Services Department for additional information.

to avoid potential damage.

28 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Page 31 of the GE ZBTSD user manual — Controls Power Supply (CPS) (cont’d)
Page 31 · click to enlarge
Page 31

GE Zenith Controls 29 I ZBTSH/ZBTSDH Operation and Maintenance Manual (71R-4000A)

Page 32 of the GE ZBTSD user manual — GE Zenith Controls
Page 32 · click to enlarge
Page 32

GE Zenith Controls

A Product of GE Consumer & Industrial General Electric Company 830 West 40 thStreet, Chicago, IL 60609 USA 773 299-6600, Fax: 630 652-4501 www.geelectrical.com

Ask about the GE ZBTSD

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the GE ZBTSD

Be the first to ask — other owners or our team will answer.

Original document

GE ZBTSD manual PDF

32 pages·1.1 MB·Switch·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…