ZBTS/ZBTSD Series Bypass Isolation Transfer Switches 100-4000 Amps




DANGER
Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
The safe operation of your switch is GE Zenith’s focus. The proper storage, installation, operation and mainte- nance will help increase the life of the switch.
Due to hazardous voltage and current, GE Zenith rec-
ommends that a GE Zenith Certified technician or a
qualified electrician must perform the installation and maintenance of the switch.
Once you have received the transfer switch, inspect it for any damage. This includes damage to the enclosure, power panel, control panel and wiring harness. If any damage is found or suspected, file a claim as soon as possible with the carrier and notify the nearest GE Zenith representative.
Each GE Zenith transfer switch is factory wired and tested. A complete information package is furnished with each switch which includes:
Before installation, if it is necessary, store the transfer switch in a clean dry place, protected from dirt and water. Provide ample air circulation and heat, if neces- sary, to prevent condensation.
a. Sequence of operation. b. Description and operation of all accessories supplied. c. Power panel connection diagram and schematic. d. Description and identification of all customer field connections.
Operating Storage Temperature Temperature (Ambient): Humidity
Installation of GE Zenith transfer switches includes:
-30°C to +75°C (-22°F to +167°F)
40-400 AMP (molded shell) -20°C to +65°C (-4°F to +149°F)
5% to 95% (non-con- densing)
a. Mounting the transfer switch cabinet. b. Connection of Source 1, Source 2, and Load cables or bus bars. c. Connection of external control circuits as required. Mounting Adequate lifting means must be used to mount the transfer switch into place. The recommended method for moving the transfer switch using the lifting eyes, where supplied, and a spreader bar is illustrated in Figure 1. Enough room should be allowed to open the cabinet doors fully for inspection and servicing of the switch per NEC and local codes.
40-4000 AMP (all other frame and panel types) -20°C to +60°C (-4°F to +140°F)
CAUTION
Before drilling conduit entry holes or any accessory mounting holes, cover and protect
the switch and control panel to prevent dirt
and metal fragments from entering the mechanical and electrical components.
Do not use a blower since debris may
become lodged in the electrical and mechanical components and cause damage.
Failure to do so may result in damage and malfunction of the switch.
GE Zenith Controls 1 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

DANGER
Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Power Connections GE Zenith transfer switches are supplied with UL listed solderless screw type terminals as standard for the Source 1, Source 2 and Load power connections. Table 1 lists the number and sizes of cable lugs supplied as standard for each switch amp rating.
H
Connect the Source 1, Source 2, and Load conductors to the clearly marked terminals on the transfer switch. Remove surface oxides from cables by cleaning with a wire brush. Verify that all connections are correct before tightening the lugs. All cable lug connections must be tightened to the proper torque values as shown in Table 2.
Engine Start Control Connections Engine-start control wires connect to control terminals beside the Entelli-Switch 250. Engine start terminals are indicated by a schematic symbol (the symbol indicates the contact state for a de-energized normal source). Figure 2 shows the engine-start contacts.
Make all other necessary control connections to the control panel terminal blocks per the schematics supplied with the ATS.
2 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)
45° · Table 2

DANGER
Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
IInitial Energization Before proceeding, refer to the information package supplied with the ATS and read and understand the information on all accessories provided.
P Relay (Engine Start)
Contact rating is 10 Ampere at 120VAC or 28VDC Gold plated
Engine Start Control Connections The engine-start terminals are clearly identified by a label on the microcontroller backplate. In the case of manual transfer switches, or in other applications not requiring the microprocessor, clearly marked terminal blocks are provided in the upper left corner of the con- trol panel for the engine start control wires.
the transfer switch lists the voltage. See Figure 4.
Available LED if proper voltage is sensed.
Figure 2 shows location of engine start connections for Bypass Isolation Transfer Switch. Figure 6 (pg.5) shows location of engine start connections for Automatic Transfer Switch.
Available LED when preset voltage and frequency levels are reached.
Terminals for field connections to the A3 Source 2 auxiliary contacts and the A4 Source 1 auxiliary contacts are also provided. These terminals are clearly marked and appear on the side of the power panel. On 400 amp metal frame units these terminals appear on the bracket above the operator handle.

RATING : VOLTS -
HZ -
AMPS -
PHASE -
SYSTEM VOLTS:
MODEL NUMBER:
CAUTIONS
Certain accessories, per specific schematics, can inhibit automatic transfer.
Engine Gen-Set could start when engine control wires are attached.
GE Zenith Controls 3 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)
Figure 3 (Typical)

Initial Energization (cont’d) After all options and accessories are checked and verified, follow these steps to set up the ATS. Refer to Entelli-Switch 250 display Figure 5. The annunciation LEDs illuminate to indicate (1) source availability, (2) ATS position, and (3) Entelli-Switch 250 control function (timing).

If Source 1 Available LED does not illuminate, verify that Source 1 Voltage is above the preset restore value.
The Gen-Set will start and run while Source 2 stop Delay Timer is timing.
2 1 : 5 6 M O N 2 3 A P R 2 0 0 2 M O R E T E S T
Figure 5 – LCD and keypad
When performing a hi-pot or dielectric test on the power section, DISCONNECT the control panel plugs from the microprocessor to avoid potential damage.
4 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

DANGER
Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
Clock Program Backup Battery

Remove protective strip to enable clock functions
Connectors to I/O Modules
A complete information package is furnished with each transfer switch including a complete connection diagram and schematic which details all necessary control circuit field connections.
The terminals are clearly identified by a label on the microcontroller backplate. In the case of manual trans- fer switches, or in other applications not requiring the microprocessor, clearly marked terminal blocks are provided in the upper left corner of the control panel for the engine start control wires.
The engine start control wires connect to the engine start relay terminals located to the left of the microprocessor. Figure 6 shows the location of these terminals.
GE Zenith Controls 5 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Entelli-Switch 250 Controller Consists of two major assemblies:
Engine Start Relay P
I. The Microprocessor contains the following:

A. Entelli-Switch 250 Board - Customer Input and Output (I/O) for system interface. Located on the left hand side of the back of the unit (see figure 7)
and Access Code Label
B. LCD and Keypad located on the exterior of the door (see figure 8)
II. The Controls Power Supply (CPS)
Contains transformers which drop line voltage to control level for controller input and SCR inputs (see figure 7).

2 1 : 5 6 M O N 2 3 A P R 2 0 0 2 M O R E T E S T
6 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

LCD & Keypad These options are accessible through the LCD and keypad (see figure below). To become familiar with the options loaded into a particular unit, scrolling through the SET and CFG menu will show the descriptions of the options (see pages 16-17). These menus are the very same menus that are used to access the setting and/or configuration of these options. The SET (setting) menu is primarily used to show or change, time and voltage settings. The CFG menu is primarily used to turn an option on or off. When scrolling through these menus,
no changes can be made without entry of the access code. The factory set six-digit access code is located on a white label on the back of the unit (see figure 11 pgs. 16-18).
The Entelli-Switch 250 has many logic options. Each controller is downloaded with options at the time of manufacture. The collection of options that any one controller has is specified at the time of order placement. The following pages include all the options that can reside in the controller. Not all units include all options.
Source 2 Position LED (Red) indicates Power Panel (ATS) is closed to Source 2 position
Source 1 LED (Green) indicates Source 1 is acceptable for use
Source 1 Position LED (Green) indicates Power Panel (ATS) is closed to Source 1 position
Source 2 (Red) indicates Source 2 is acceptable for use

* E *
Current Time, Day and Date of Display
SET Menu MORE CFG TEST SET
Menus (MORE, CFG, TEST) Keypad
#4 or the word on the LCD above the key. The word above the key changes depending on which screen is being displayed.
#1 or the word on the LCD above the key. The word above the key changes depending on which screen is being displayed.
#2 or the word on the LCD above the key. The word above the key changes depending on which screen is being displayed.
#3 or the word on the LCD above the key. The word above the key changes depending on which screen is being displayed.
GE Zenith Controls 7 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)
LCD Screen · Exercise Event "Impending"

Source 1
Under Voltage "Fail" Factory Default: 80% This adjustment determines the low voltage threshold. Adjust via the SET menu. Range is 75% to 98% in 1% increments (see page 17). "Fail" must be a minimum of 2 % below "Restore" setting. Once voltage falls below threshold, T timer will be bypassed to expedite the transfer to Source 1.
Under Voltage "Restore" Factory Default: 90% This adjustment determines the minimum acceptable voltage required to transfer to Source 1. Adjust via the SET menu. Range is 85% to 100% in 1% increments (see page 17). Once satisfied, the T timer will begin timing to transfer to Source 1.
Under Voltage "Fail" Factory Default: 80% This adjustment determines the low voltage threshold. Adjust via the SET menu. Range is 75% to 98% in 1% increments (see page 17). "Fail" must be a minimum of 2 % below "Restore" setting. Once voltage falls below threshold, P timer begins timing to signal Source 2 Generator to start.
Over Voltage "Fail" Factory Default: 110% This adjustment determines the maximum acceptable Over Voltage. Adjust via the SET menu. Range is 105% to 110% in 1% increments (see page 17). Once exceed- ed, the T timer will be bypassed to expedite the transfer to Source 1.
Over Voltage "Restore" Factory Default: 105% This adjustment determines the minimum acceptable Over Voltage threshold at which the transfer switch is allowed to transfer to Source 2. Adjust via the SET menu. Range is 103% to 105% in 1% increments (see page 17). “Restore” must be a minimum of 2% below “Fail” setting.
Under Frequency "Restore" Factory Default: 95% This adjustment determines the minimum acceptable frequency required to transfer to Source 1. Adjust via the SET menu. Range is 90% to 100% in 1% increments (see page 17). Once satisfied, the T timer will begin timing to transfer to Source 1.
Under Frequency "Fail" Factory Default: 90%, (5 seconds minimum). This adjustment determines the low frequency threshold. Adjust via the SET menu. Range is 88% to 98% in 1% increments (see page 17). "Fail" must be a minimum of 2 % below "Restore" setting. Once satisfied, the T timer will begin timing to transfer to Source 1.
Under Frequency "Restore" Factory Default: 95% This adjustment determines the minimum acceptable frequency required to transfer to Source 2. Adjust via the SET menu. Range is 90% to 100% in 1% increments (see page 17). Once satisfied, the W timer will begin timing to transfer to Source 2.
Over Frequency "Restore" Factory Default: 102% This adjustment determines the minimum acceptable Over Frequency threshold at which the transfer switch is allowed to re-transfer to Source 1. Adjust via the SET menu. Range is 102% to 104% in 1% increments (see page 17). “Restore” must be a minimum of 1% below “Fail” setting.
Under Frequency "Fail" Factory Default: 90%, (5 seconds minimum). This adjustment determines the low frequency threshold. Adjust via the SET menu. Range is 88% to 98% in 1% increments (see page 17). "Fail" must be a minimum of 2 % below "Restore" setting. Once satisfied, the W timer will begin timing to transfer to Source 2.
Over Frequency "Fail" Factory Default: 105% This adjustment determines the maximum acceptable Over Frequency. Adjust via the SET menu. Range is 103% to 105% in 1% increments (see page 17).Once exceeded, the P timer begins timing to signal the generator to start.
Over Frequency "Fail" Factory Default: 105% This adjustment determines the maximum acceptable Over Frequency. Adjust via the SET menu. Range is 103% to 105% in 1% increments (see page 17). Once exceeded, the T timer will be bypassed to expedite the transfer to Source 1.
Under Voltage "Restore" Factory Default: 90% This adjustment determines the minimum acceptable voltage required to transfer to Source 2. Adjust via the SET menu. Range is 85% to 100% in 1% increments (see page 17). Once satisfied, the W timer will begin timing to transfer to Source 2.
Over Frequency "Restore" Factory Default: 102% This adjustment determines the minimum acceptable Over Frequency threshold at which the transfer switch is allowed to re-transfer to Source 2. Adjust via the SET menu. Range is 102% to 104% in 1% increments (see page 17). “Restore” must be a minimum of 1% below “Fail” setting.
8 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)


Standard Accessory included in the group package. Optional Accessory not included but can be added to group package. Optional Accessory. Can not be used with accessory having the same symbol. N/A Denotes an Accessory with 2 circuits as a standard. Denotes an Accessory with 3 circuits as a standard.
GE Zenith Controls 9 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)
Table 3

6P Test Switch, Momentary 6A Test Switch, Maintained Auto/Momentary Test 6AP Test Switch, Maintained/Momentary utilizing keypad 6B Test Switch, Maintained - Auto / Momentary - Test, Key Operated 6C Test Switch, Maintained - Auto / Maintained - Test, Key Operated A1 Auxiliary Contact, operates on Source 1 line failure. A1E Auxiliary Contact, operates on Source 2 line failure. A3 Auxiliary Contact: Closed in emergency (Source 2) Additional Available (10 max.) and need to be specified. A4 Auxiliary Contact: Closed in normal (Source 1) Additional Available (10 max.) and need to be specified. A62 Sequential Universal Motor Load Disconnect Circuit. Normally closed auxiliary contacts for motor loads. Open 0-60 seconds prior to transfer, after transfer, or both in either direction then re-close in timed sequence after transfer. AB3 Auxiliary Contact: Closed in bypass emergency (Source 2) (S.P.D.T.) (Standard up to 400 Amp) Additional Available (10 max.) and need to be specified. AB4 Auxiliary Contact: Closed in bypass normal (Source 1) (S.P.D.T.) (Standard up to 400 Amp) Additional Available (10 max.) and need to be specified. B9 Battery charger connections. Calibrate While monitoring the actual Phase to Phase voltage lev- els and Frequency with a calibrated test equipment, the Phase to Phase voltage sensing and Frequency can be adjusted accordingly. Calibration capabilities are available for Frequency and AB, BC, CA Phase to Phase voltage for both Sources. Adjust via SET menu (see page 18) CDP Clock Exerciser Load/ No Load: Allows the Generator to start and run unloaded or to simulate a power failure, start Generator and run under load. Can be configured by end user for 1, 7, 14, 28, 365 day cycle. (See page 16)
CDT Load or NO-Load. One event exerciser with adjustable Engine exercise timer. Exercise duration can be set between 5 and 60 minutes in 1 minute increments. Can be configured to run every 1, 7, 14, or 28 days. Factory Default is 20minutes. When exerciser is impending, (*E*) appears in the upper right hand corner of LCD screen. See page 15 for instructions. Configured via CFG (see page 17). Set via SET menu (see page 18). CTAP Alarm Panel on transfer to Source 2 with Silence button. DS Disconnect Switch, Auto/Inhibit. Inhibits transfer in either direction when in inhibit. Allows automatic operation when in Auto. (40-400 Amps optional, 600-4000 Amps standard) DT (Delayed Transition Only) Time Delay from Neutral Switch position to Source 1 position. Adjustable 0-10 minutes in 1 second incre- ments. Standard setting is 5 seconds. Adjust via SET menu (see page 18) DW (Delayed Transition Only) Time Delay from Neutral Switch position to Source 2 position. Adjustable 0-10 minutes in 1 second incre- ments. Standard setting is 5 seconds.Adjust via SET menu (see page 18) E Engine Start Contact EL/P
Event Log: Sequentially Numbered Log of 16 events that track date, time, reason and action taken System Data: Total Life Transfers (N2P)
Days Powered Up Total Transfers to S2 Total S1 Failures Time S1 available in Hrs Time S2 available in Hrs. (N1P) F Fan contact, operates when generator is running. HT Heater and Thermostat K Frequency Meter, Door mount. K/P Frequency Indication for S1 and S2 L LNP Center-off position LCD-Indicator Indicating LED lights:
L1 Indicates Switch in Source 2 position. L2 Indicates Switch in Source 1 position. L3 Indicates Source 1 available. L4 Indicates Source 2 available.
10 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

M1 Single Phase Amp Meter M2 Three Phase Amp Meter M80 3000 Digital Power Monitor M82 5200 Digital Power Meter M83A EPM 5300 Digital Power Meter with Modbus Port M83B EPM 5350 Digital Power Meter with Ethernet Port M84 7430 Digital Power Meter , Wye or Delta M85A EPM 9450 Digital Power Meter, Ethernet M85B EPM 9450 Digital Power Meter with Internal 56K Mod. M86A EPM 9650 Digital Power Meter, Wye or Delta, RS232 or RS485 M86B EPM 9650 Digital Power Meter, Wye or Delta, RS232 or RS485 N1 Running Time Meter, Door mount N2 Operation Counter, Door Mount P1 Time Delay Source 2 Start. Adjustable 0-10 seconds. Standard setting is 3 seconds. Adjust via SET menu (see page 18) P2 Time Delay S2 Start. Adjustable 1/6 to 300 seconds. Q2 Remote Peak Shave or Area Protection Circuit. Energize Q2 to simulate Source 1 Line failure causing the Generator to start and transfer the load to Source 2. Should Emergency fail during this operation, Transfer Switch will retransfer back to Source 1. Q3 Remote inhibit transfer to Source 2 circuit. Energize Q3 input to allow transfer to Source 2. To enable Q3 option, engage Q3 jumper.
Q7 Inhibit transfer to Source 1 circuit. Energize Q7 input to prevent transfer to Source 1. R1-1/R1-3 Source 1 Over Voltage sensing for single and three phase systems. Source 1 Over Voltage "Fail" Factory Default: 110% This adjustment determines the maximum acceptable over voltage. Adjust via the SET menu. Range is 105% to 110% in 1% increments (see page 18). Once exceeded, the P timer begins timing to signal the Generator to start.
Source 1 Over Voltage "Restore" Factory Default: 105% This adjustment determines the minimum acceptable over Voltage threshold at which the Transfer Switch is allowed to automatically transfer to Source 1. Adjust via SET menu. Range is 103% to 108% in 1% increments. "Restore" must be a minimum of 2% below "Fail" setting (see page 18). R15/R15D Load Shed Should Source 2 become overloaded, a signal can be given to switch to the dead or Mid position. R16 Phase Rotation Sensing Can be turned on or off via CFG menu (see page 17). Factory Default is on. This feature prevents Line Source to Line Source trans- fers from occurring between dissimilar phase sequences. This condition is primarily caused by an installation error. Connections from Source 1 and Source 2 need be verified, compared, and corrected to remedy the inconsistent phase rotation between the sources. WARNING: Turning off this feature can cause severe damage to loads. R26 Interruptable Power Rate Provisions. Allow transfer out of Source 1 position to Source 2 or dead Source 2. Alarm and Pre-Signal circuit included.
GE Zenith Controls 11 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

R50 In Phase Monitor this feature restricts Live to Live Source Transfers to occur unless both Sources are within 7 electrical degrees or less of each other. (live Source to live Source transfers usually occur during transfer back to Source 1 or during Testing). R50 does not change the operation of the Automatic Transfer Switch in a power failure mode. After all timer functions have elapsed, the CHECKING FOR SOURCE SYNCHRO- NISM will be displayed as well as the direction of transfer (S1-S2 for example denotes transfer from Source 1 to Source2). When synchronism is accomplished, transfer will take place. Notes: - If S2 Frequency is less than S1 Frequency,
S12P Auto / Manual Selector In "Auto" position, the Automatic Transfer Switch functions automatically as specified with the Switch drawings. In "Manual" the Automatic Transfer Switch will transfer to either direction upon depression of Source 1 or Source 2 transfer buttons. Should Source 1 fail, the Generator (Source 2), will automatically start. Once transferred in Manual, the Switch maintains position selected even if selected power fails. S13P Transfer Commit. Configured via CFG menu. (see page 17) When this Feature is set to OFF: The transfer Switch is not committed to transfer unless the outage duration is longer than the timers that precede the transfer to Source 2 position. This assumes that the outage will be an isolated event. When this Feature is set to ON: The transfer Switch is committed to transfer to Source 2 position once the W timer has begun timing, even if Source 1 power returns before the transfer to Source 2. This is to ensure that the transfer takes place, because one outage may be followed by another. S14 Test / Auto / Source 1 Selector, Door mount SW1 Auto/Off/Start Engine control selector, Door mount (Keyed or non-keyed operation available) SW2 Auto / Off Engine control selector, Door mount (Keyed or non-keyed operation available) SW3 Source Priority Selector Switch, Door mount Allows selection of Source 1 or Source 2 to be the Prime Source. Transfer Switch will transfer to selected Prime Source if that Source is available. (Keyed or non-keyed operation available) T Time Delay (S1) Source 1 Stable Timer. To delay trans- fer to Source 1 (immediate retransfer on Source 2 fail- ure). Adjustable 0-60 minutes in 1 second increments. Standard setting is 30 minutes. Adjust via SET menu (see page 18) T3/W3 Elevator Pre-Signal Auxiliary Contacts: Open 0-60 seconds prior to transfer to either direction, re-closes after transfer. U (S2) Source 2 Stop Delay Timer. Allows Engine to run unloaded after switch retransfer to Source 1. Adjustable 0-60 minutes in 1 second increments. Standard setting is 5 minutes. Adjust via SET menu (see page 18)
display will show a series of (-…..) symbols. - If S2 Frequency is greater than S1 Frequency,
display will show a series of (+++++…..) symbols. - Each (-) or (+) symbol represents 10 electrical
degrees out of phase. A maximum of 18 symbols (180 electrical degrees) can be monitored. - The number of (-) or (+) symbols decrease
as the two sources approach synchronism and increase as the two sources drift out of synchronism. - If S1 and S2 Frequencies are identical, the
display will show a series of alternating
- symbols (++++…) which also indicate the approximate out of phase degrees
In the event that the Sources do not come within 7 electrical degrees of each other within 60 seconds, the unit will display the message: SYNCH CHECKING and will allow the user to BYPASS. If the BYPASS button is pressed, the unit will display the message: WARNING MAY CAUSE DAMAGE TO THE LOAD. Pressing XFR will actually bypass the R50. Since R50 is a passive device, the length of time it takes to reach Synchronism is de- pendent on the frequency difference between the two Sources. Source 1 is usually a Utility and the frequency is not within the control of the consumer. Source 2 needs to be adjusted to create an adequate difference in order for the transfer to happen a timely fashion. Note: For optimum performance, Source 2 Generator should be adjusted a Maximum of 2 Hertz above or below the Utility frequency, minimum of 0.1 Hertz. (58 to 59.9) or (60.1 to 62) Hertz. Adjustment of Generator to 60Hertz could cause lengthy transfer delay.
R50 Feature can be turned ON or OFF via CFG Menu (see page 17). Factory Default if OFF. S5P Auto / Semi Manual selector In "Auto" position, retransfer to Source 1 is automatic after the T timer has timed out. The T time delay is bypassed if Source 2 fails. In "Manual", retransfer to Source 1 is upon depression of BYPASS DELAY button YEN or if Source 2 fails.
12 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

UMD Universal Motor Load Disconnect Circuit: Auxiliary Contact opens 0-60 seconds prior to transfer in either direction, re-closes after transfer. Can be configured by end user for Pre-transfer, Post-transfer, or both. VI Voltage Imbalance (Three Phase) For a three phase source, this feature monitors phase voltage ratios based on a selected range within a selected time window. Should any phase fall below the selected lower window limit or exceed the selected higher window limit within the selected time frame, the controller initiates transfer to the other source.
W Time Delay (S2) Source 2 Stable Timer. To delay trans- fer to Source 2. Adjustable 0-5 minutes in 1 second increments. Standard setting is 1 second. Adjust via SET menu (see page 18) YEN Bypass Timers Key utilizing Keypad. When applicable, the system prompts the user to press a button to bypass (T) or (W) Timers should the user so desires. ZNET Network Communications Interface Card
Range: 5% to 20% of Nominal voltage, 10 to 30 seconds window, user adjustable. Resolution: 1% Increments Minimum Differential: 2% between “Fail” and “Restore” settings. Factory default: 10% “Fail”, 8% “Restore”, 30 Seconds. See CFG Menu page 17 to configure ON or OFF. See SET Menu page 18 to set Percentage and time windows
Set System Clock, time and date · If the clock is not set, the display will show SET SYSTEM CLOCK on the second line of the S1 OK screen. · The S1 OK screen will show time (hours and minutes) on the second line if the system clock has been set. (Date on third line)
11. Use the up and down key up to change the month. 12. Press SAVE (This will enter this value and complete the clock setting). 13. Use the up and down keys to change the date. 14. Press SAVE (this will enter this value and move cursor to year). 15. Use the up and down keys to change year. 16. Press SAVE (this will enter this value and compete the clock setting). 17. To edit settings, press SEL and repeat steps 6-16. 18. If the setting is satisfactory, press MORE (unit then returns to the SET menu then press BACK, then ESC.)
Setting the System Clock (Start from S1 OK screen) 1. Remove battery protective white plastic strip near P relay. * 2. Press MORE then press SET. 3. Press MORE and scroll to SET SYSTEM CLOCK using the MORE key. 4. Press SEL. 5. ENTER ACCESS CODE located on the white label on the back of the controller. 6. Press SEL. 7. Use the up and down keys to change the hour value. 8. Press SAVE (this will enter this value and move cursor to minutes). 9. Use the up and down keys to change the minutes. 10. Press SAVE (this will enter this value and move cursor to month).
* Replacement battery part #K-4100 Battery will last 5 years and provides power to retain clock function only (Controller functions without battery).
GE Zenith Controls 13 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Load / No-Load One event Exerciser with adjustable Timer. Exercise duration can be set between 5 and 60 minutes in 1 minute increments. Can be configured to run every 1,7,14, or 28 days. Factory default is 20 minutes.
1. Beginning from the S1 OK screen, press MORE then CFG. 2. Press MORE to scroll to CONFIG TIMER EXERCISER screen. 3. The third line of the CONFG TIMER EXERCISER will show either DAILY, WEEKLY, 14 DAY, 28 DAY, or OFF. 4. If the third line of the CONFG TIMER EXERCISER shows DAILY, WEEKLY, 14 DAY, or 28 DAY as desired, then proceed to step 10. 5. If the third line of the CONFG TIMER EXERCISER shows OFF or if another timer selection is desired, continue. 6. Press SEL. 7. Enter ACCESS code located on white label on the back of the controller. 8. Press UP or DOWN to select DAILY, WEEKLY, 14 DAY, or 28 DAY as desired. 9. Press SAVE. 10. Press MORE to scroll to CONFG TIMER EXERCISER (XFR) or (NO XFR). 11. Press Up or Down to select XFR (Load Transfer) or NO XFR (No Load Transfer). 12. Press SAVE. 13. Press MORE repeatedly to BACK then S1 OK screen.
Exercise will be repeated at the same time as initiated on every 1, 7, 14, or 28 days according to the selection made in the Configure CFG menu.
How to Bypass (Cancel) an exercise during an exercise cycle 1) Press BPASS 2) Allow the controller to complete the Engine cool down cycle If the CDT Exerciser is Factory configured for a No-Load Exerciser Or allow the controller to complete retransfer to Source 1 If the CDT Exerciser is Factory configured for a Load Exerciser
How to Bypass the next exercise event and Keep the rest of scheduled events unchanged 1) Press Test 2) Press MORE 3) Press BYPASS EXER To re-institute the next exercise event back, press CANCL BPASS
Set (SET) the Exerciser: 14. Beginning from the S1 OK screen, press MORE then SET. 15. Press MORE repeatedly until EXER S2 RUN TIME screen. 16. Press SEL 17. Enter ACCESS code located on white label on the back of the controller. 18. Press SEL 19. Cursor is indicated as a line under character to be changed. Change values with up and down keys. 20. Press SAVE when complete. 21. Press MORE repeatedly until SET USER SETUP then press BACK then ESC to the S1 OK screen.
How to initiate a new exercise start time 1) Press TEST 2) Press MORE 3) Press EXER CANCL 4) Press START TIMER TEST
How to check the next exercise event 1) From S1 OK screen, press MORE three times. 2) The unit will display the PLANT EXERCISER NEXT event in DAYS, HOURS, and MINUTES 3) Press ESC to S1 OK Screen.
How to Initiate CDT Exerciser and to start an exercise cycle every 1, 7, 14, or 28 days From S1 screen 1) Press TEST 2) Press MORE 3) Press START TEST TIMER (to initiate Test).
14 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

How to Bypass (Cancel) an exercise during an exercise cycle 1) Press BPASS 2) Allow the controller to complete the Engine cool down cycle. If the CD Exerciser is configured or Set for a No-Load Exercise. Or allow the controller to complete retransfer to Source 1. If the CD Exerciser is configured for a Load Exerciser
How to Configure (CFG) the Exerciser 1. Beginning from the S1 OK screen, press MORE then CFG. 2. Press MORE to scroll to CONFIG CLOCK EXERCISER screen. 3. The third line of the CONFG CLOCK EXERCISER will show either DAILY, WEEKLY, 14 DAY, 28 DAY, 365 DAY or OFF. 4. If the third line of the CONFG CLOCK EXERCISER shows DAILY, WEEKLY, 14 DAY, 28 DAY, or 365 DAY as desired, press MORE repeatedly to BACK. Press ESC then proceed to the SET menu to set the EXERCISER. 5. If the third line of the CONFG CLOCK EXERCISER shows OFF, continue. 6. Press SEL. 7. Enter ACCESS code located on white label on the back of the controller. 8. Press UP or DOWN to select DAILY, WEEKLY, 14 DAY, 28 DAY, or 365 DAY as desired. 9. Press SAVE. 10. Press MORE repeatedly to BACK then ESC to S1 OK screen.
How to Bypass the next exercise event and Keep the rest of scheduled events unchanged 1) Press TEST 2) Press MORE 3) Press BYPASS EXER To re-institute the next exercise event back, press CANCL BPASS
How to check the next exercise event 1) From S1 OK screen, press MORE three times. 2) The unit will display the PLANT EXERCISER NEXT event in DAYS, HOURS, and MINUTES 3) Press ESC to S1 OK Screen.
How to set (SET) the DAILY Exerciser 1. Beginning from the S1 OK screen, press MORE then SET. 2. Press MORE repeatedly until SET EXERCISER screen. 3. Press SEL. 4. Enter ACCESS code located on white label on the back of the controller. 5. Press SEL
Indicates # of Exercise Periods

Load No-Load (CDP) Exercise Indicator
Indicates type of Exerciser DAILY, WEEKLY, 14-DAY, 28-DAY or 365-DAY
NL #1
Exercise duration for this event in hours and minutes up to 10 hours per event
Indicates Exerciser start: Time for DAILY Exerciser Time & Day for WEEKLY Exerciser Time, Date & Month for 14-DAY, 28-DAY and 365-DAY Exerciser (24 Hour System) To previous field or to exit screen.
Up and Down Use to change values.
To save value and to move cursor to next field to be changed.
GE Zenith Controls 15 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)
Cursor


Enter six digit access code (The factory assigned six-digit access code
2 Controller Outputs have Limited Source Capacity. Use only GE Zenith-specified Output Modules.
Input and output availability subject to factory configuration. *
Lithium Battery Exerciser Battery Replacement-K-4100 (BR2032) Service Life-10 Years † During normal operation
16 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)


Enter six digit access code (The factory assigned six-digit access code is located on the back of the controller)
2 Controller Outputs have Limited Source Capacity. Use only GE Zenith-specified Output Modules.
Input and output availability subject to factory configuration. *
Lithium Battery Exerciser Battery Replacement-K-4100 (BR2032) Service Life-10 Years † During normal operation
GE Zenith Controls 17 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)



Enter six digit access code (The factory assigned six-digit access code is located on the back of the controller)
2 Controller Outputs have Limited Source Capacity. Use only GE Zenith-specified Output Modules.
Input and output availability subject to factory configuration. *
Lithium Battery Exerciser Battery Replacement-K-4100 (BR2032) Service Life-10 Years † During normal operation
18 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

NOTICE
A periodic test of the transfer switch under load conditions is recommended to insure proper operation.
(See National Electric Code articles 700 and 701)

Start generator and verify proper voltage, frequency and phase sequence (match to Source 1). Shut down gen set and place in Auto. Complete the visual inspection of the transfer switch, and close the cabinet door.
S Y S T E M T E S T
FA S T X F R N O M O R E T E S T L O A D X F R
Initiate the test by pressing the TEST button on the LCD keypad. The controller will then prompt for your access code. After entering the code, three test options will appear— XFR LOAD, FAST TEST and NO XFR (See Figure 12).
Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbutton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.
Source 1 Power Failure: When the test is initiated, the controller initiates the Time Delay Source 2 Start (Engine Start Timer "P") cycle. A manual CANCEL button is provided to cancel the test if desired Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" values, the time delay to open Source 1 timer (W) begins its timing cycle to ensure voltage and frequency sta- bilization before re-transfer. A manual pushbutton BYPASS is provided to bypass the "W" time delay if desired. After the (W) time delay, the MX controller initiates a transfer signal through the SCR-NO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 2 timer (DW) begins its timing cycle. After the (DW) time delay, the MX controller initiates a transfer signal through the SCR-E to operate the main transfer operator. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.
Press and hold the desired test option button until the switch transfers to Source 2 (load test) or until the generator has been run for the desired amount of time (no load test). Releasing the test button before W timer timeout will abort the test (Exception: when the transfer commit option, is configured “ON”).
To test lamps, press TEST then scroll through MORE, then press LAMP TEST. To cancel LAMP TEST press MORE.
When the test is initiated, the controller initiates the Time Delay Source 2 Start Timer (Engine Start Timer "P") cycle. A manual CANCEL button is provided to cancel the test if desired. Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" Values, the time delay to Source 2 Timer (W) begins its timing cycle to ensure voltage and frequency stabilization before transfer. A manual pushbutton BYPASS is provided to bypass the "W" time delay if desired. After the (W) time delay, the MX con- troller initiates a transfer signal through the SCR-E to operate the main transfer operator. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.
Restoration of Source 1 Power: Deactivating the test switch initiates re-transfer to Source 1sequence. The delay to open Source 2 Timer (T) begins its timing cycle to ensure voltage and frequency stabilization before retransfer. A manual pushbutton BYPASS is provided to bypass the "T" time delay if desired. After the (T) time delay, the MX controller initiates a transfer signal through the SCR-EO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 1 timer (DT) begins its timing cycle. After the (DT) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.
Restoration of Source 1 Power: Deactivating the test switch initiates re-transfer to Source 1 sequence. The delay to Source 1 Timer (T) begins its timing cycle to ensure voltage and frequency stabilization before retransfer. A manual pushbutton BYPASS is provided to bypass the "T" time delay if desired. After the (T) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.
Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbutton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.
GE Zenith Controls 19 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Standard Transition
Delayed Transition
Source 1 Power Failure: When Source 1 voltage or frequency has fallen below the preset "Fail" values, the controller initiates the Time Delay Source 2 Start Timer (Engine Start Timer "P") cycle. Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" Values, the time delay to Source 2 Timer (W) begins its timing cycle to ensure voltage and frequency stabilization before transfer. A manual pushbutton BYPASS is provid- ed to bypass the "W" time delay if desired. After the (W) time delay, the MX controller initiates a transfer signal through the SCR-E to operate the main transfer opera- tor. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.
Source 1 Power Failure: When Source 1 voltage or frequency has fallen below the preset "Fail" values, the controller initiates the Time Delay Source 2 Start (Engine Start Timer "P") cycle. Upon completion of the (P) time delay, an Engine start Signal is sent to Source 2. When Source 2 voltage and frequency reach the preset "Restore" values, the time delay to open Source 1 timer (W) begins its timing cycle to ensure voltage and frequency stabilization before re-transfer. A manual pushbutton BYPASS is provided to bypass the "W" time delay if desired. After the (W) time delay, the MX controller initiates a transfer signal through the SCR-NO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 2 timer (DW) begins its timing cycle. After the (DW) time delay, the MX controller initiates a transfer signal through the SCR-E to operate the main transfer operator. The load is now transferred to Source 2 line. The transfer switch is mechanically locked. SN limit switch awaits the next operation to Source 1.
Restoration of Source 1 Power: When Source 1 power reach the preset "Restore" values, the controller initiates re-transfer to Source 1sequence.The delay to Source 1 Timer (T) begins its timing cycle to ensure voltage and frequency stabiliza- tion before retransfer. A manual pushbutton BYPASS is provided to bypass the "T" time delay if desired. After the (T) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.
Restoration of Source 1 Power: When Source 1 power reach the preset "Restore" values, the controller initiates re-transfer to Source 1 sequence. The delay to open Source 2 Timer (T) begins its timing cycle to ensure voltage and frequency stabilization before retransfer. A manual pushbutton BYPASS is pro- vided to bypass the "T" time delay if desired. After the (T) time delay, the MX controller initiates a transfer sig- nal through the SCR-EO to operate the main transfer operator. The load is now transferred to the Open position. The time delay to Source 1 timer (DT) begins its timing cycle. After the (DT) time delay, the MX controller initiates a transfer signal through the SCR-N to operate the main transfer operator. The load is now transferred to Source 1 line. The transfer switch is mechanically locked. SE limit switch awaits the next operation to Source 2.
Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbut- ton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.
Immediately after re-transfer, the S2 Stop Delay Timer (Delay to Engine Stop "U") begins its cycle to allow Source 2 Engine to run unloaded. A manual pushbut- ton BYPASS is provided to bypass the "U" time delay if desired. Upon completion of the (U) timing cycle, the controller sends an Engine stop signal.
ATS Type P W DW T DT U
Standard Time Delay Time Delay Time Delay S2 Stop Transition S2 Start S2 Stable S1 Stable Delay
Delayed Time Delay Time Delay ATS Open Time Delay ATS Open S2 Stop Transition S2 Start S2 Stable Time to S2 S1 Stable Time to S1 Delay
Source 1 Transfer to Source 2 Source 1 Transfer to Source 1 Engine Fails Returns Cooldown
20 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)
Table 4

Bypass-Isolation Operation

An automatic transfer switch equipped with a bypass-isola- tion switch provides the ability to withdraw the ATS for test- ing and/or maintenance purposes without interrupting the served load.
Operation of the unit is quick and convenient requiring only one operator and less than one minute to complete. Instructions are mounted on the front of each isolation switch door along with a mimic panel providing indication of power source availability and ATS/bypass switch positions.
The bypass switch is normally open on both sources with the ATS feeding the system load. During operation, the bypass is closed paralleling the ATS contacts which then allows withdrawal of the ATS to the “TEST” or “ISOLATE” positions. Mechanical and electrical interlocks are included to prevent cross-servicing or bypassing to a dead source.
In the “TEST” position, the ATS is disconnected from the load (now fed through the bypass) but control power is present to allow complete operational testing through the control panel of the transfer switch
In the “ISOLATE” position, the ATS is completely withdrawn and may be removed from the enclosure for maintenance if desired.
After the isolation operation, if the bypass is closed on Source 1 and if this source fails, an auxiliary contact on the bypass control will automatically start the engine-generator set. When the second source is available, the manual handle of the bypass may be operated to transfer the load to the available source. Interlocks prevent both this transfer, if the ATS is in the circuit and connected to the opposite source or reconnection of the ATS unless the positions match.

While the bypass switch is out of the AUTO
position/mode, the ATS is INHIBITED from automatic operation. Make certain the ATS is left
GE Zenith Controls 21 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

100-400 AMP 1) Automatic a) Manually operated Bypass Switch contacts

(BN/BE) are open and ATS is supplying load. b) Disconnect Switch (DS) is in Auto. 2) To Bypass ATS a) Open bottom cabinet door and turn DS to Inhibit. b) Position manual bypass handle (MBH) to same
power source as ATS. 3) To Test ATS a) Bypass per above instructions. b) Move ATS location handle (ALH) to Test location. c) Turn DS to Auto. d) Test Switch (TS) on bottom cabinet door
will allow electrical operation of ATS. 4) To Isolate ATS a) Bypass per above instructions. b) Move ALH to Isolate location. 5) To Remove ATS a) Bypass and isolate per above instructions. b) Move ALH to Release location. c) Disconnect multipin plugs. d) Lift ATS out of drawer. 6) To Reconnect ATS a) Place ATS into drawer slots (front rollers first). b) Turn DS to Inhibit. c) Manually position ATS into same source
as Bypass Switch. d) Reconnect multipin plugs and external
connections to ATS. e) Push ATS inward to engage carriage. f) Move ALH to Test location (as indicated by light). g) Turn DS to Auto and use TS to electrically
operate ATS. h) Turn DS to Inhibit. i) Move ALH to Auto location. j) Turn DS to Auto and open Bypass with MBH. k) ATS is now fully automatic.
Notes: 1. DS in Inhibit will prevent ATS electrical operation. 2. Do not use excessive force on mechanical handles. 3. Figures depict Bypass Source 1. Sequence is the same for Bypass Source 2. 4. When ATS is in Test or Isolate, Bypass Switch is manual transfer switch to either available source (indicated on light panel). 5. To operate Bypass Switch when ATS is in Test or Isolate, position MBH to available power source.
Legend: 1. BP - Bypass switch (indicated by contacts BN/BE) is a three position switch. 2. ATS - Automatic Transfer Switch.
22 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

600-1200 AMP 1) Automatic a) Manually operated Bypass Switch contacts
(BN/BE) are open and ATS is supplying load. b) Disconnect Switch (DS) is in Auto. 2) To Bypass ATS a) Open bottom cabinet door and turn DS to Inhibit. b) Turn Bypass Selector Switch (BSS) to same power
source as ATS c) Position manual bypass handle (MBH) upward. 3) To Test ATS a) Bypass per above instructions. b) Rotate crank mechanism counter-clockwise until
ATS test light is illuminated. c) Turn DS to Auto. d) Test Switch (TS) on bottom cabinet door will allow
electrical operation of ATS. 4) To Isolate ATS a) Bypass per above instructions. b) Rotate cank mechanism counter-clockwise
until ATS Isolated light is illuminated. 5) To Remove ATS a) Bypass and isolate per above instructions. b) Disconnect multipin plugs and external
connections to ATS. c) Rotate four power panel latches to vertical
position, slide ATS forward and lock mechanism in place. d) ATS can now be removed from cabinet. 6) To Reconnect ATS a) Place ATS in slide mechanism. b) Unlock slide mechanism. Slide ATS over power
panel latches and rotate latches to horizontal position. c) Turn DS to Inhibit. d) Manually position ATS into same source
as Bypass Switch. e) Reconnect multipin plugs and external
connections to ATS. f) Rotate crank mechanism clockwise until
ATS Test light is illuminated. g) Turn DS to Auto and use TS to electrically
operate ATS. h) Turn DS to Inhibit. i) Move ALH to Auto location. j) Turn DS to Auto and open Bypass with MBH. k) ATS is now fully automatic.
Notes: 1. DS in Inhibit will prevent ATS electrical operation. 2. Do not use excessive force on mechanical handles. 3. Figures depict Bypass Source 1. Sequence is the same for Bypass Source 2. 4. When ATS is in Test or Isolate, Bypass Switch is manual transfer switch to either available source (indicated on light panel). 5. To operate Bypass Switch when ATS is in Test or Isolate: a) Move MBH downward (to open Bypass Contacts BN/BE). b) Turn BSS to opposite power source. c) Move MBH upward to close into selected power source.
Legend: 1. BP - Bypass switch (indicated by contacts BN/BE) is a three position switch. 2. ATS - Automatic Transfer Switch.
GE Zenith Controls 23 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

1600-4000 AMP 1) Automatic a) Manually operated Bypass Switch contacts
(BN/BE) are open and ATS is supplying load. b) Disconnect Switch (DS) is in Auto. 2) To Bypass ATS a) Open bottom cabinet door and turn DS to Inhibit. b) Turn Bypass Selector Switch (BSS) to same power
source as ATS c) Position manual bypass handle (MBH) upward. 3) To Test ATS a) Bypass per above instructions. b) Rotate crank mechanism counter-clockwise until
ATS test light is illuminated. c) Turn DS to Auto. d) Test Switch (TS) on bottom cabinet door will allow
electrical operation of ATS. 4) To Isolate ATS a) Bypass per above instructions. b) Rotate crank mechanism counter-clockwise
until ATS Isolated light is illuminated. 5) To Remove ATS a) Bypass and isolate per above instructions. b) Disconnect multipin plugs and external
connections to ATS. c) Slide four corner latches of ATS to innermost
position. d) ATS can now be removed from cabinet. 6) To Reconnect ATS a) Roll cart back into cabinet. b) Slide four corner latches of ATS to outermost
position. c) Turn DS to Inhibit. d) Manually position ATS into same source
as Bypass Switch. e) Reconnect multipin plugs and external
connections to ATS. f) Rotate crank mechanism clockwise until
ATS Test light is illuminated. g) Turn DS to Auto and use TS to electrically
operate ATS. h) Turn DS to Inhibit. i) Rotate crank mechanism clockwise until ATS
location pointer is aligned with Auto mark on location indicator. (ATS must be in same source as Bypass.) j) Turn DS to Auto and open Bypass with MBH. k) ATS is now fully automatic.
Notes: 1. DS in Inhibit will prevent ATS electrical operation. 2. DO NOT use excessive force on mechanical handles. 3. Figures depict Bypass Source 1. Sequence is the same for Bypass Source 2. 4. When ATS is in Test or Isolate, Bypass Switch is a manual transfer switch to either available source (indicated on light panel). 5. To operate Bypass Switch when ATS is in Test or Isolate: a) Move MBH downward (to open Bypass Contacts BN/BE) b) Turn BSS to opposite power source. c) Move MBH upward to close into selected power source.
Legend: 1. BP - Bypass switch (indicated by contacts BN/BE) is a three position switch. 2. ATS - Automatic Transfer Switch.
24 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)


voltage. This is accomplished by the Controls Power Supply (CPS). This method of switching operator voltage and applying power and sensing voltage to the printed circuit board isolates the MX250 from the line voltage, further protecting the controller from harmful line transients.
Each Entelli-Switch 250 microprocessor based ATS controller requires Controls Power Supply (CPS) to apply line voltage to the ATS operator via SCRs. Also required is power for the Entelli-Switch 250 printed circuit board and an application of sensing voltage proportional to line


Primary CPS CPS Voltage Assembly Board at 50/60 Hz Part No. No.
120V 50P-1224 50P-1200 208-220V 50P-1225 50P-1201 230-240V 50P-1226 50P-1202 277V 50P-1227 50P-1203 380-400V 50P-1228 50P-1204 416-440V 50P-1229 50P-1205 460-480V 50P-1230 50P-1206 575-600V 50P-1231 50P-1207
GE Zenith Controls 25 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Standard Transition CPS Schematic
SOURCE 1 CONTROL TRANSFORMER
XN2 -
SOURCE 1 3 PHASE SENSING
TRANSFORMER
XN1 XN2
XE1
XE2
XE1 -
SOURCE 2 CONTROL TRANSFORMER
XE2 - SOURCE 2 3 PHASE SENSING TRANSFORMER
24V 10V 11V 10V
24V 10V 11V
900 SOURCE 2 24V OUTPUT
SOURCE 1 24V OUTPUT
3 PHASE SOURCE 2
JC
(BLANK)
JC
(BLANK)
C.V. SCR-E
GND
C.V. SCR-N
GROUND
JC
C.V. SCR-E CONTROL VOLTAGE (SOURCE 2)
C.V. SCR-N CONTROL VOLTAGE (SOURCE 1)
JC
COMMON
SINGLE PHASE SOURCE 2 SENSING
3-PHASE SOURCE 1 SENSING
SOURCE 1 CONTROL POWER
SOURCE 2 CONTROL POWER
J5
Delayed Transition CPS Schematic
XN1 -
SOURCE 1 CONTROL TRANSFORMER
XN2 -
SOURCE 1 3 PHASE SENSING
TRANSFORMER
XN1 XN2
XE1
XE2
XE1 -
SOURCE 2 CONTROL TRANSFORMER
XE2 -
SOURCE 2 3 PHASE SENSING
24V 10V 11V 10V 24V 10V 11V 10V
TRANSFORMER
900 SOURCE 2 24V OUTPUT
SOURCE 1 24V OUTPUT
3-PHASE SOURCE 2 SENSING
JC
C.V. SCR-EO CONTROL VOLTAGE (OPEN SOURCE 2)
JC
JC
JC
C.V. SCR-NO CONTROL VOLTAGE (OPEN SOURCE 1)
C.V. GND
SCR-EO
SCR-N
C.V. SCR-E
GROUND
SCR-NO
C.V. SCR-E CONTROL VOLTAGE (SOURCE 2)
JC
JC 801
JC
C.V. SCR-N CONTROL VOLTAGE (SOURCE 1)
JC
COMMON
SINGLE PHASE SOURCE 2 SENSING
3-PHASE SOURCE 1 SENSING
SOURCE 1 CONTROL POWER
SOURCE 2 CONTROL POWER
J5
26 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

DANGER
HAZARDOUS VOLTAGES CAN CAUSE SEVERE INJURY OR DEATH. These charts may indicate problems that require authorized GE Zenith service personnel. Hazardous voltages may exist on termination plugs other than those that go into the Entelli-Switch 250.
General Troubleshooting The following troubleshooting guide is used to recognize, and determine basic faults. When using this guide, it will ask several questions about the condition of the switch. This guide will then list an order of the possible faults. You will then look at the first suspected fault to determine if it is the problem. If it is not a fault, you go to the
second suspected fault. If you go through all of the suspected faults, or the chart instructs you to, call a GE Zenith Representative for further assistance.
Engine does not START SOURCE 2 AVAILABLE LED off
Engine start wires not terminated properly
Check engine start connections
Generator is in OFF position Investigate why Engine Control Switch was turned off
Engine does not stop LCD Display - “TD Engine Cool Down”
U timing cycle not complete
Check U timer setting
SOURCE 1 POSITION, and SOURCE 1 and SOURCE 2 AVAILABLE LEDs on, but U timer has timed out
Engine start wires not terminated correctly
Check Engine Start Connections
Place generator in AUTO
ATS will not transfer to SOURCE 2
SOURCE 2 AVAILABLE LED off
SOURCE 2 voltage or frequency not within acceptable parameters
Power supply connector unplugged
LCD Display - “S1 TD XFR S1>S2 Time Remaining ”
W timing cycle not complete Check WTimer setting
ATS will not transfer to SOURCE 1
LCD Display - “ATS Open Time Remaining ”
DW timing cycle not complete Check DWTimer setting
SOURCE 1 AVAILABLE LED off
SOURCE 1 voltage or frequency not within acceptable parameters
Check utility and utility breakers
Power supply connector unplugged
LCD Display - “Diagnostic Code 001”
Limit switch or RT box connector unplugged
LCD Display - “S1 OK Time Remaining
T timing cycle not complete
Check TTimer setting
LCD Display - “ATS Open Time Remaining ”
TD timing cycle not complete Check DTTimer setting
GE Zenith Controls 27 I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

CDT battery replacement - lithium batteries may last up to 10 years, however it is recommended that battery replacement be included in a 3-5 year service cycle. The battery maintains the exerceser memory only and does not otherwise affect the operation.
Due to hazardous voltage and current, GE Zenith recommends that a GE Zenith Certified technician
or a qualified electrician must perform the installation and maintenance of the switch.
Testing A manual operator handle is provided with the transfer switch for maintenance purposes only. Manual operation of the switch must be checked before it is operated electrically. Both power sources must be disconnected before manual operation of the switch. Insert the handle and operate the transfer switch between the Source 1 and Source 2 positions. The transfer switch should operate smoothly without binding. Return the switch to Source 1 position, remove the handle, and return it to the holder provided.
Both power sources must be disconnected
before manual operation of the switch.
A preventive maintenance program will insure high reliability and long life for the transfer switch. The preventive maintenance program for the transfer switch should include the following items:
Inspection and Cleaning The switch should be inspected for any accumulation of dust, dirt, or moisture, and should be cleaned by vacuuming or wiping with a dry cloth or soft brush. do not use a blower since debris may become lodged in the electrical and mechanical components and cause damage.
After completing the inspection, cleaning and servicing of the transfer switch, reinstall the switch cover, and close and lock the cabinet door. Reclose the circuit breakers feeding the utility and generator sources to the switch.
Remove the transfer switch barriers and check the condition of the contacts. Any surface deposits must be removed with a clean cloth (do not use emery cloth or a file). If the contacts are pitted or worn excessively, they should be replaced. A general inspection of mechanical integrity should be made to include loose, broken or badly worn parts.
Initiate the electrical transfer test by activating the TS test switch. P timer will time out and the micro- controller will send an engine start signal. When the W time has elapsed, the switch will complete its transfer by closing into Source 2.
Deactivating the test switch will start retransfer to Source 1. The switch will complete its retransfer to Source 1 after the time delay of the T timer. The U engine overrun timer allows the engine generator to run unloaded for a preset cool down period.
Servicing All worn or inoperative parts must be replaced using GE Zenith recommended replacement parts. Please refer to the Replacement Parts manual for specific part information and ordering procedures. Please contact the GE Zenith Technical Services Department for the Replacement Parts manual.
The operating mechanism of the transfer switch is lubricated with Lubriplate 105. The lubricant applied at the factory provides adequate lubrication for the lifetime of the switch. Should debris contaminate the mechanism, clean and apply additional Lubriplate.
When performing a hi-pot or dielectric test
on the power section, DISCONNECT the control panel plugs from the microprocessor
GE Zenith can provide complete preventative main- tenance services. Please contact the GE Zenith Technical Services Department for additional information.
to avoid potential damage.
28 GE Zenith Controls I ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

GE Zenith Controls 29 I ZBTSH/ZBTSDH Operation and Maintenance Manual (71R-4000A)

A Product of GE Consumer & Industrial General Electric Company 830 West 40 thStreet, Chicago, IL 60609 USA 773 299-6600, Fax: 630 652-4501 www.geelectrical.com
Owners and our team usually reply within a day — and your question helps the next person too.