OWNER’S OPERATION AND INSTALLATION MANUAL
PFS ®
US C
ICC-ES #ESR-2542
MODELS (V)S42 SERIES
SAVE THIS BOOK This book is valuable. In addition to instructing you on how to install and maintain your appliance, it also contains information that will enable you to obtain re placement parts or accessory items when needed. Keep it with your other important papers.
This fireplace is approved for use as a wood burning fireplace or for use with a vented gas log approved to ANS Z21.60, Z21.84 standards or for use with a vent-free gas log heater approved to ANS Z21.11.2 standard. A FMI PRODUCTS, LLC hood must be installed when using a vent-free log heater (see , page 16).
This wood burning fireplace complies with UL127- CAN/ULC-S610-M87 standard as a FACTORY BUILT APPLIANCE.
FOR CANADA: The authority having jurisdiction (such as the municipal building department, fire department, etc.) should be contacted before installation to deter mine the need to obtain a permit.
INSTALLER: Leave this manual with the appliance. CONSUMER: Retain this manual for future reference.
For more information, visit www.fmiproducts.com

TABLE OF CONTENTS Safety 2 Specifications 3 Fireplace Installation 4 Venting Installation 6 Optional Gas Line Installation 11
Operation and Maintenance Guidelines 12 Parts 14 Technical Service 17 Accessories 17
ponents, doors, air inlet system and damper control. b. Use of any component part not manu
factured or approved by FMI PROD UCTS, LLC in combination with a FMI PRODUCTS, LLC fireplace system. Proper installation is the most important step in ensuring safe and continuous operation of the fireplace. Consult the local building codes as to the particular requirements concerned with the installation of all factory built fireplaces.
This fireplace is not intended to be used as a substitute for a fur nace to heat an entire home. Use for supplemental heat only.



SELECTING LOCATION To determine the safest and most efficient location for the fireplace, you must take into consideration the following guidelines: 1. The location must allow for proper clear ances (see Figures 1 and 2). 2. Consider a location where the fireplace will not be affected by drafts, air condition ing ducts, windows or doors. 3. A location that avoids the cutting of joists or roof rafters will make installation easier. 4. An outside air kit is available with this fireplace (see Optional Outside Air Kit on page 6).
FRAMING 1. Frame opening for the fireplace using dimensions shown in Figures 1 and 2. 2. If fireplace is to be installed directly on carpeting, tile (other than ceramic) or any combustible material other than wood flooring, the fireplace must be installed upon a metal or wood panel extending the full width and depth of the fireplace. 3. Set fireplace directly in front of this open ing and slide the unit back until nailing flanges touch the side framing. 4. Check the level of the fireplace and shim with sheet metal if necessary. 5. Before securing fireplace to prepared framing, the ember protector (provided) must be placed between the hearth ex tension (not supplied) and under bottom front edge of fireplace to protect against glowing embers falling through. If fireplace is to be installed on a raised platform, a Z- type ember protector (not supplied) must be fabricated to fit your required platform height. The ember protector should ex tend under fireplace a minimum of 1 1/2". The ember protector should be made of galvanized sheet metal (28 gauge mini mum) to prevent corrosion. 6. Using screws or nails, secure fireplace to framing through flanges located on the sides of fireplace.
MINIMUM CLEARANCE TO COMBUSTIBLES Back and sides of fireplace 3/4" minimum* Floor** 0" minimum Perpendicular wall to opening 12" minimum Top spacers 0" minimum Mantel clearances see Mantels, page 5 Chimney outer pipe surface 1" minimum * Not required at nailing flanges ** See step 2 of Framing
Minimum/Maximum Chimney Height for Residential Installation The minimum height of the chimney, mea sured from the base of the fireplace to the flue gas outlet of the termination, is 14.5 feet for straight flue or a flue with one elbow set. The maximum distance between elbows is 6 feet. For systems with two elbow sets, the minimum height is 22 feet. The maximum height of any system is 50 feet. This measurement includes the fireplace, chimney sections and the height of the termination assembly at the level of the flue gas outlet (see Figure 18, page 11).
43.375"
23.50"
48.25" Figure 1 - Framing Dimensions
Minimum/Maximum Chimney Height for Outdoor Installation The minimum height of the chimney, mea sured from the base of the fireplace to the flue gas outlet of the termination, is 8 feet (minimum of 4 feet of chimney pipe sections required for outdoor installation).
19.466"
MAINTAIN 3/4" CLEARANCE AT SIDES AND BACK OF FIREPLACE
59.264"
27.527"
3/4" CLEARANCE NOT REQUIRED AT NAILING FLANGES
83.830"
Figure 2 - Corner Installation

DRAIN PAN (DP42) For outdoor installations, the fireplace enclo sure must allow for adequate drainage and fresh air ventilation. It is recommended that a sealed, corrosion resistant catch pan with provision for drainage be installed under the fireplace within the fireplace enclosure (see Accessories, page 16).
MANTELS A mantel may be installed if desired (see Figure 4). Woodwork such as wood trims, mantels or any other combustible material projecting from front face must not be placed within 12" of the fireplace opening. Combus tible materials above 12" and projecting more than 1 1/2" from the fireplace must not be placed less than 15" from top opening of the fireplace (NFPA STD 211, Sec. 7-3.3.3). Mantels or any other combustible material also may come up to the side edge of the black metal face of the fireplace just as long as the projection from the front face fall within the limit shown in Figure 4.
HEARTH EXTENSION A hearth extension projecting a minimum of 20" in front of and a minimum of 12" beyond each side of the fireplace opening is required to protect combustible floor construction in front of the fireplace. Fabricate a hearth extension using a material which meets the following specifications: a layer of noncom bustible, inorganic material having a thermal conductivity of K=0.84 BTU IN/FT, HR. F (or less) at 1" thick. For example, if the material selected has a K factor of 0.25, such as glass fiber, the following formula would apply: 0.25 x 1.0" = 0.30" thickness required 0.84 Thermal conductivity "K" of materials can be obtained from the manufacturer or supplier of the noncombustible material. If the hearth ex tension is to be covered, use noncombustible material such as tile, slate, brick, concrete, metal, glass, marble, stone, etc. Provide a means to prevent the hearth extension from shifting and seal gap between the fireplace frame and hearth extension with a noncom bustible material (see Figure 3).


Figure 3 - Hearth Extension
Figure 4 - Mantel Clearances to
Combustible Material

OPTIONAL OUTSIDE AIR KIT (MODEL AK4/AK4F) The installation of an outside air kit should be performed during the rough framing of the fireplace due to the nature of it's location. Outside combustion air is accessed through a vented crawl space (AK4F) or through a sidewall (AK4).
Secure to Collars with Metal Tape, Screws or Straps (Min. of 1/4" x 20" in size)
Air Inlet Location Must Allow For Bushes or Snow
* The lineal gain for the terminations is mea sured to the flue gas outlet height.
Vented Crawl Space (Check Local Codes Before Installing in a Vented Crawl Space)
Vent Hood Required for Wall Installation
12 3/8" Galvanized Outer Pipe
Hemmed End 8" Stainless Inner Pipe
Figure 5 - Outside Air Kit
CHIMNEY PIPE The FMI PRODUCTS, LLC chimney system consists of 12", 18", 24", 36" and 48" snap- lock, double-wall pipe segments, planned for maximum adaptability to individual site requirements. Actual lengths gained after fit ting overlaps must be taken into consideration (lineal gain) and are given in the lineal gain chart (see Figure 6). Lineal gain is the actual measurable length of a part after two or more parts are connected. For Canada, use chimney parts designated "HT".
Figure 6 - Lineal Gain
ASSEMBLY AND INSTALLATION OF DOUBLE WALL CHIMNEY SYSTEM Each double wall chimney section consists of a galvanized outer pipe, a stainless steel inner flue pipe and a wire spacer. Pipe sections must be assembled independently as the chimney is installed. When connecting chimney directly to fireplace, the inner flue pipe section must be installed first with lanced side up. The outer pipe section can then be installed over the flue pipe section with hemmed end up. Press down on each pipe section until lances securely engage hem on fireplace starter. The wire will assure the proper spacing between inner and outer pipe sections.

Air Inlet Eyebrow

Continue to assemble chimney sections as outlined, making sure that both the inner and outer pipe sections are locked together. When installing double wall snap-lock chimney together, it is important to assure the joint be tween the chimney sections is locked. Check by pulling chimney upward after locking. The chimney will not come apart if properly locked. It is not necessary to add screws to keep chimney together (exception - see Figure 9, page 8).
USING ELBOW OFFSETS (30E-8DM) 1. To achieve desired offset, you may install combinations of 12", 18", 24", 36" and 48" length of double wall pipe (see offset chart and Figure 7). 2. Chimney weight above offset rests on return elbow. Straps must be securely nailed to rafters or joists (see Figure 8, details A and B on page 8). 3. Maximum length of pipe between supports (return elbow or 12S-8DM) is 6' of angle run. Maximum of two 6' angle run sections per chimney system (see Figure 7). 4. All pipe connections between the offset and return must be secured with two screws on the outer pipe only (see Figure 9, page 8). Do not penetrate the inner stainless.

Figure 7 - Typical Offset Terminations
Return Elbow

2" Min.
Screws or Staples (Min. of 8)
Detail B Angle Firestop
Figure 10 - Firestop Spacer with Living
Screws or Staples (Min. of 8)
Detail A Return Elbow
Existing Ceiling Frame Figure 8 - Ceiling Support Pipe
Figure 11 - Firestop Spacer with Attic
PENETRATING ROOF To maintain a 1" clearance to the pipe on a roof with a pitch, a rectangular opening must be cut. 1. Determine the center point through which the pipe will penetrate the roof. 2. Determine the center point of the roof. Pitch is the distance the roof drops over a given span, usually 12". A 6/12 pitch means that the roof drops 6" for each 12" one measure horizontally down from the roof rafters. 3. Use the roof opening chart (Figure 12, page 9) to determine the correct opening length and flashing required. 4. Remove the shingles around the opening measured. Cut out this section. 5. Add the next sections of the pipe until the end penetrates the roof line. Check to see that the proper clearances are maintained. Extend chimney by adding sections of double wall pipe until pipe is minimum of 30" above the highest point of the roof cut out. Termination and chimney must extend a minimum of 36" above the highest point where it passes through the roof.
Figure 9 - Elbow Offset
FIRESTOP SPACERS (FS-8DM) Firestop spacers are required at each point where the chimney penetrates a floor space. Their purpose is to establish and maintain the required clearance between the chimney and the combustible materials. When the pipe passes through a framed opening into a living space above, the firestop must be placed onto the ceiling from below as shown in Figure 10. They also provide complete separation from one floor space to another or attic space as required by most codes. When the double wall pipe passes through a framed opening into an attic space, the firestop must be placed into an attic floor as shown in Figure 11.

Storm Collar Installation (SC1 or SC2) Place storm collar over pipe and slide down until it is snug against the open edge of the flashing (see Figure 14). Use SC1 for all round terminations and SC2 for all terminations with slip sections. Apply waterproof caulk around the perimeter of the collar to provide a proper seal.

14 3/8" (36.5 cm) 30" (76.2 cm) 1" (2.5 cm)

Terminations/Spark Arrestor The fireplace system must be terminated with the listed round top or chase terminations. In any case, refer to the installation instructions supplied with the termination. The termination approved for this fireplace are the RT-8DM and RTL-8DM that can be used for flashing or chase and ET-8DM, ETO-8DM, ETL-8DM and ETLO- 8DM for chase style termination only. Figure 15 shows an RTL-8DM round top termination.
Figure 12 - Roof Opening Measurements
FLASHING INSTALLATION (V6F-8DM OR V12F-8DM) Determine the flashing to be used with the roof opening chart. Slide flashing over pipe until base is flat against roof. Replace as many shingles as needed to cover exposed area and flashing base. Secure in position by nail ing through shingles (see Figure 13). DO NOT NAIL THROUGH FLASHING CONE.

Installing Flashing on a Metal Roof When installing the flashing on a metal roof, it is required that putty tape be used between the flashing and the roof. The flashing must be secured to the roof using #8 x 3/4" screws and then sealed with roof coating to prevent leakage through the screw holes. A roof coating must also be applied around the perimeter of the flashing to provide a proper seal.
Attach Bracket Tabs to Outer Pipe (3 Places) Secure with Screws


Figure 13 - Flashing Installation
Minimum Measurements · Waterproof Caulk · Chimney Pipe

Terminations with 16" slip pipe sections are available. The RTT-8DM and RTTL-8DM are approved for flashing installations. When needed, these adjustable terminations may be used in combination with the pipe assembly to achieve the correct chimney height. Note: In the rare instance there is a problem with the side driven rain or wind or the chim ney is not drafting properly, an ADS-8DM (Anti-Draft Shield) can be used with round terminations.
10 FOOT RULE All flue gas outlet chimney terminations must extend a minimum of 3 feet in height above the highest point where it passes through the roof and must be at least 2 feet above the high est point of the roof that is within a horizontal distance of 10 feet (see Figure 17).

CHASE INSTALLATIONS Instructions for chase installations are included with the chase style termination chosen. In a multiple chase installation, be sure to provide adequate distance between terminations to prevent smoke spillage from one termination to another. We suggest that terminations be separated at least 24", center to center and stacked at a vertical height dif ference of 18" (see Figure 16). Note: If a decorative shroud is to be installed, contact the manufacturer for specifications.
Figure 17 - 10 Foot Rule
FINISHING FIREPLACE Combustible materials, such as wallboard, gypsum board, sheet rock, drywall, plywood, etc. may make direct contact with sides and top around the fireplace face. It is important that combustible materials do not overlap the face itself. Brick, glass, tile or other noncombustible materials may overlap the front face provided they do not obstruct essential openings like louvered slots or any other opening. When overlapping with a noncombustible facing material, use only noncombustible mortar or adhesive.

Figure 16 - Multiple Chase Installation

EFFECTIVE HEIGHT OF TERMINATION CAP
MIN. HEIGHT OF 22 FT. (WITH 2 ELBOW SETS) MAX. HEIGHT OF 50 FT.
EFFECTIVE HEIGHT OF TERMINATION CAP
EFFECTIVE HEIGHT OF TERMINATION CAP
14.5 FT. MINIMUM
14.5 FT.
UP TO 6FT. MAX. HEIGHT
UP TO 6FT. MAX.
30E-8DM
Figure 18 - Typical Residential Installations
Gas line hook up should be done by your supplier or a qualified service person. Note: Before you proceed, make sure your gas supply is turned off. Use only a 1/2" black iron pipe and appropri ate fittings. 1. Remove knockout indentation on refrac tory or firebrick wall located above the refractory hearth floor. The knockout indentation must be firmly tapped with any solid object such as a 1/2" dowel until it is released. Remove fragmented portions of refractory (see Figure 19). 2. Remove gas line cover plate located on either side of fireplace and pull out insu lation from gas line conduit sleeve. Save insulation for reuse. Replace screws. 3. Run a 1/2" black iron gas line into the fireplace through the rear at gas line conduit sleeve (if using a raised platform, add height). Provide sufficient gas line into fireplace chamber for fitting connection
(see Figure 20, page 12). Note: Secure incoming gas line to wood framing to provide rigidity for threaded end. 4. Repack insulation around gas line and into sleeve opening. Seal any gaps between gas line and refractory knockout hole with refractory cement or commercial furnace cement, Install the gas appliance or cap- off gas line if desired.
Side Firebrick Finished Side
Figure 19 - Gas Line Knockout

CAUTION: All gas piping and connections must be tested for leaks after the installation is completed. After ensuring that the gas valve is on, apply soap and water solution to all connections and joints. Bubbles forming show a leak. Correct all leaks at once. DO NOT USE AN OPEN FLAME FOR LEAK TESTING AND DO NOT OPER ATE ANY APPLIANCE IF A LEAK IS DETECTED. LEAK TESTING SHOULD BE DONE BY A QUALI FIED SERVICE PERSON.
If you install a decorative gas appliance (vented gas log), the decorative gas appliance must comply with the Standard for Decorative Gas Appliance for Installation in Solid Fuel Burning Fireplaces, ANS Z21.60 or Z21.84 and shall also be installed in accordance with the National Fuel Gas Code, ANSI 7223NFPA 54 latest edition.
Side Firebrick Finished Side
Incoming 1/2" Black Iron Pipe
Seal Opening with Refractory Cement
Provide Enough Threaded End for Fitting Connection Figure 20 - Gas Line Installation
Outside of Fireplace · Gas Line Conduit · Repack Insulation

GLASS DOORS Glass doors are optional with the fireplace. When the fireplace is in operation, doors must be fully opened or fully closed position only or a fire hazard may be created (see Figure 21). A fireplace equipped with glass doors oper ates mush differently than a fireplace with an open front. A fireplace with glass doors has a limited amount of air for combustion. Exces sive heat within the fireplace can result if too large a fire is built or if the combustion air gate is not completely open. The following tips should be followed to as sure that both the fireplace and the glass door retain their beauty and function properly. Both the flue damper and the glass doors must be fully opened before starting the fire. This will provide sufficient combustion air and maintain safe temperatures in the firebox. IMPORTANT: The glass must be allowed to warm slowly and evenly. The tempered glass will withstand a gradual temperature rise to 550° F, which is more than a normal fire will generate. Such materials as pitch/wax laden logs, very dry mill end lumber and large amounts of paper or cardboard boxes can create an excessively hot fire and should not be burned in this fireplace. Always keep the fire well back from the doors and never allow flames to contact the glass.
Figure 21 - Glass Doors
Cleaning the Glass Clean the glass with any commercial glass cleaner or soap and water. Do not use any abrasive material to clean the glass. Do not clean the glass with any cool water is the glass is still hot from the fire and smoke. A gas line or gas log lighter may be installed for the purpose of installing a vented or vent- free decorative gas appliance incorporating an automatic shutoff device and complying with the Standard for Decorative Gas Appliances for Installation in Vented Fireplaces, ANSI Z21.60 or American Gas Association draft requirements for Gas Fired Log Lighters for Wood Burning Fireplaces, Draft NO. 4 dated August, 1993. If you wish to install an unvented (vent-free) gas log set, only unvented gas log sets which have been found to comply with the standard for unvented room heaters, ANSI Z21.11.2 are to be installed in this fireplace.

OUTSIDE AIR AND DAMPER HANDLE OPERATION The damper handle, which opens and closes the damper blade, is located in the upper front face of the fireplace. Pushing the handle into the left of the keyway slot will free the damper blade to automatically open. Pushing the handle in to the right will lock the damper blade closed (see Figure 22). The outside air kit handle is located at the left hand side of the fireplace (see Figure 22). Pulling the handle out will free the outside air door to open. Pushing the handle in will lock the door closed.
Outside Air Kit Handle
Figure 22 - Damper and Air Kit Handle
LOCATING ACCESS COVER PLATE Sheet metal cover plates located underneath front hearth refractory may have shifted or moved out of place while fireplace was in transit. These cover plates must be kept in the proper location prior to using the fireplace (See Figure 23).
For further operating guidelines, instruc tions and warranty information, please re fer to your homeowner's guide or contact your authorized dealer.
Figure 23 - Locating Access Cover Plate

WOOD BURNING FIREPLACE MODELS S42, S42H, S42R, S42RH, VS42, VS42H, VS42R AND VS42RH
S42RH
VS42H
VS42R
VS42RH
S42R
VS42
S42

WOOD BURNING FIREPLACE MODELS S42, S42H, S42R, S42RH, VS42, VS42H, VS42R AND VS42RH


WOOD BURNING FIREPLACE MODELS S42, S42H, S42R, S42RH, VS42, VS42H, VS42R AND VS42RH This list contains replaceable parts used in your fireplace.
KEY NO. PART NO. DESCRIPTION QTY. 1 107797-01 Insulation Pan 1 2 ** Fireplace Top 1 3 107800-01 Fireplace Surround 1 4 106642-01 Air Rod Retainer 1 5 106643-01 Damper Rod Retainer 1 6 ** Firebox Bottom 1 7 ** Firebox Surround 1 8 ** Air Separator 1 9 See Page 15 Left Refractory 1 10 See Page 15 Right Refractory 1 11 See Page 15 Rear Refractory 1 12 See Page 15 Bottom Rear Refractory 1 13 See Page 15 Bottom Front Refractory 1 14 106683-01 Firebox Support Leg 4 15 ** Damper Can Collar 1 16 107839-01 Screen Rod 2 17 ** Firebox Top Assembly 1 18 106703-01 Air Kit Door Assembly 1 19 ** Face Weldment 1 20 110892-02 Air Deflector 1 21 111327-02 Fireplace Top Insulation 1 22 ** Access Panel 1 23 107854-01 Right Refractory Bracket 1 24 107854-02 Left Refractory Bracket 1 25 111100-01 Grate 1 26 11418 Push-On Nut 2 27 110891-01 Stainless Screen 2 28 ** Collar Insulation 1 29 20023 Chimney Starter Collar 1 30 20027 Refractory Retainer 2 31 106539-02 Grate Retainer 2 32 111073-01 Door Stop 1 33 111204-01 Pivot Clip 2 34 20090 Spring Clip 2 35 20280 Top Spacer 4 36 21171 Conduit Plate Cover 4 37 21379 Gas Conduit 2 38 21380 Gas Conduit 2 PARTS AVAILABLE NOT SHOWN 106625-01 Home Owner’s Guide 1 20093 Ember Protector 2 ** Not a field replaceable part

DOUBLE WALL PIPE 12-8DM 12-8HT 18-8DM 18-8-HT 24-8DM 24-8HT 36-8DM 36-8HT 48-8DM 48-8HT
BI-FOLD GLASS DOOR BDO42 - Black BDO42B - Brushed Brass BDO42P - Platinum
ROOF FLASHING 0 TO 6/12 PITCH - V6F-8DM 6/12 TO 12/12 PITCH - V12F-8DM
ANTI-DRAFT SHIELD (Round Top Termination Only) ADS-8DM
FIRESTOP SPACER FS-8DM
HOOD STAINLESS STEEL - HS42 Required when installing a vent-free gas log in this fireplace.

MESH ROUND TOP TERMINATIONS RT-8DM
MESH ROUND TOP TERMINATIONS WITH SLIP SECTION RTT-8DM
OUTSIDE AIR KIT FOR FLOOR INSTALLATION - AK4F
ROUND TOP TERMINATIONS WITH LOUVERS RTL-8DM
ROUND TOP TERMINATIONS WITH LOUVERS WITH SLIP SECTION RTTL-8DM
SQUARE CHASE-TOP TERMINATION ET-8DM, ETO-8DM
ECONO-TOP TERMINATION WITH SLIP SECTION ETL-8DM, ETLO-8DM
STORM COLLAR SC1-1 For RT-8DM and RTL-8DM SC2-1 For RTT-8DM and RTTL-8DM

2701 S. Harbor Blvd. Santa Ana, CA 92704
111099-01 Rev. L 03/11
1-866-328-4537 www.fmiproducts.com
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.