Operator’s
Manual
E–design 150–400A, F–design 600–800A, G–design 1000–4000A, F–design 3000–4000A,
INSTALLATION 1-1 Mounting and Line Connections 1-1 Auxiliary Circuits and Harness 1-2 Engine Starting Contacts 1-2 Functional Test 1-2, 1-3, 1-4, 1-5
of possible personal injury.
TESTING & SERVICE 2-1 Transfer Test 2-1 Preventive Maintenance 2-1 Disconnecting the Controller 2-1 Manual Load Transfer 2-2 Trouble-Shooting 2-2
of possible equipment damage.
Refer to Group 5 Controller User’s Guide 381333–126 for ATS status display messages, time delays, pickup & dropout settings, and adjustments.
INDEX back cover
An experienced licensed electrician must install the ADTS.
Refer to the outline and wiring drawings provided with your 7000 Series ADTS for all installation and connection details and accessories.


G design 4000 A
G design 2000 A
381333–129 C 50 Hanover Road, Florham Park, New Jersey 07932–1591 USA For sales or service call 1 800 800–2726 (ASCO) www.ascopower.com
ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3
section-page

Catalog Number Identification Typical 7000 Series catalog no. for G–design switched neutral, 3 pole, 2000 A, 480 V, ADTS in Type 1 enclosure:
J 400
C – type 1
F – type 3R
G – type 4
L – type 12
M 460
E 230
N 480
M –type 3R secure
Q 575 P 550
N –type 4 secure P –type 4X secure Q –type 12 secure
R 600
blank – open type

field connections terminal block TB
G–design 2000 ampere size in typical enclosure with location of customer connections

Nameplate The Transfer Switch nameplate includes data for each specific 7000 Series ADTS. Use the switch only within the limits shown on this nameplate. A typical Catalog Number is shown on the previous page with its elements explained.
Each automatic delayed–transition transfer switch contains a rating label to define the loads and fault circuit withstand / closing ratings. Refer to the label on the transfer switch for specific values.
Do not exceed the values on the rating label. Exceeding the rating can cause personal injury or serious equipment damage.

field connections terminal block TB
G–design 4000 ampere size in typical enclosure with location of customer connections
Transfer · Switch · Group 5 Controller

ASCO Series 7000 Automatic Delayed–Transition Transfer Switches are factory wired and tested. Field installation simply requires mounting and connection of service cables, and auxiliary control circuits (if required).
De–energize the conductors before making any line or auxiliary circuitry connections. Be sure that Normal and Emergency line connections are in proper phase rotation. Place engine gen- erator starting control in the OFF position. Make sure engine generator is not in operation.
For large switches, open the front door and remove the four lag screws (2 in front, 2 in rear) securing enclosure to the wood skid.
Supporting Foundation
Do not connect the power conductors to the transfer switch until they are tested. Installing power cables in conduit, cable troughs and ceiling-suspended hangers often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor’s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation.
The supporting foundation for the enclosure must level and straight. Refer to the applicable enclosure outline drawing included with the ADTS for all mounting details including door opening space.
If bottom cable entry is used, the foundation must be prepared so that the conduit stubs are located correctly. Refer to the enclosure outline drawing for specified area and location. Provide cable bending space and clearance to live metal parts. When a concrete floor is poured, use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment.
After the power cables have been tested, connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with the switch. Make sure the lugs provided are suitable for use with the cables being installed. Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the switch. Be careful when stripping insulation from the cables; avoid nicking or ringing the conductor. Remove surface oxides from cables by cleaning with a wire brush. When aluminum cable is used, apply joint compound to conductors. Tighten cable lugs to the torque specified on rating label.
Refer to the outline and mounting diagram provided with the ADTS; it shows all mounting details and instructions.
Protect the switch from construction grit and metal chips to prevent malfunction or shortened life of the automatic switch switch.
Mount the ADTS vertically to a rigid supporting structure. Level all mounting points by using flat washers behind the holes to avoid distortion of the switch.
Do not run cables in front of or behind the switch. Cables can be bundled on the right side of the switch. Maintain proper electrical clearance between the live metal parts and grounded metal: ½ inch minimum for 150-400 amps, 1 inch minimum over 400 amps.
The controller is mounted on the cabinet door. An add-on DIN rail is provided for some optional accesso- ries and is mounted below controller on the door.
It is not necessary to remove the barriers from the transfer switches to install the cables. If you do remove them,however, be sure to reinstall the barriers carefully.
For 1000 & 1200 amp. sizes, an auxiliary cable box is required for all (normal, emergency, & load)bottom or top entry. Order ASCO part no. 609027 if required.
For large switches use grade 5 hardware to connect bus to appropriate terminal plates. Wipe off the bus surfaces before they are joined. If the bus is very dirty, gently clean the surfaces with a non---flammable solvent. Avoid touching the cleaned surfaces.
On 1000 & 1200 amp. be sure to install auxiliary cable box if both service and load cables are en- tering through the top or bottom of enclosure.
A Wiring Diagram is furnished with the ASCO Series 7000 ADTS (separate from this manual). Refer to this drawing. All wiring must be made in accordance with the National Electrical Code and local codes.
Do not breathe cleaning solvent vapors.

Tighten bolted joints to the torque specified in Table A.
Engine Starting Contacts The engine control contact connections (if used) are located on the transfer switch. Connect signal wires to appropriate terminals as specified in Table B and shown in Figure 1---1.
The reliablility of the connection depends
on how clean and how tight the joint is.
Table B. Engine start connections
Table A. Tightening torque values for bolted joints

A grounding wire must be connected to the controller’s lower left mounting stud. Because the controller is mounted on the enclosure door, a conductive strap must be used between the enclosure and the door. This connection provides proper grounding which does not rely upon the door hinges.
The transfer switch is connected to the left side of the control panel by a plug-in harness (two plugs).
Connect auxiliary circuit wires to appropriate terminals on the transfer switch. Note the control features that are furnished on this switch. Make the necessary auxiliary connections by referring to the Wiring Diagram.
Figure 1-1. Customer terminal block
on the top right side of enclosure.
The Functional Test consists of three checks:
Read all instructions on the Wiring Diagram and labels affixed to the ADTS. Note the control features that are provided and review their operation before proceeding.
V 1 — Manual Operation Test, page 1–3
V 2 — Voltage Checks, page 1–4
Continue to 1 – Manual Operation Test on next page.
V 3 — Electrical Operation, page 1–5
Do these checks in the order presented
to avoid damaging the ATS.




Figure 1-2. Figure 1-3. Figure 1-4 150 – 400 A (3 pole) 600 & 800 A (& 4 pole 400 A) 3000 & 4000 A E–design switches F–design switches F–design transfer switches
1000 through 4000 A G–design See Figure 1-5. Install the hub (with pin) onto the shaft and insert the manual firmly into the side hole in the hub. Push in or pull out hub to engage opposite source contacts.
A detachable manual operator handle is provided on the Transfer Switches for maintenance purposes only. Manual operation of both CN and CE transfer switches must be checked before they are operated electrically.
3000 and 4000 A F–design See Figure 1-4. Insert the manual handle into the hole in the weight.
Do not manually operate the transfer switch
until both power sources are disconnected:
open both circuit breakers.
150 through 400 A E–design See Figure 1-2. Insert the manual handle into the hole in the shaft, left side of the operator.
600 and 800 A F–design See Figure 1-3. Attach the manual handle onto the pivot shaft extension, left side of the operator.
Verify that the maintenance handle has been removed and stored properly before proceeding!
Now continue to 2 – Voltage Checks on next page.
Turn counterclockwise to OPEN contacts.
into hole (spring fully compressed)

Grasp handle firmly with both hands
Turn clockwise to CLOSE contacts.
Slide the hub onto the shaft and insert the pin.
counterclockwise DOWN OPENS the contacts Pull out shaft to open Emergency source contacts (upper) Push in shaft to open Normal source contacts (lower)
clockwise DOWN OPENS the contacts Pull out shaft to close Emergency source contacts (upper) Push in shaft to close Normal source contacts (lower)
contact position indicators (left side)
Figure 1-5. 1000 – 4000 ampere G–design transfer switches.



RED
RED GREEN
AMBER
Figure 1-6. Standard controls and indicators.

First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.
Before energizing the switch check to be sure that both normal and emergency contacts are not left in the closed position.

Verify that the feeders have been connected to the proper lugs.
Use extreme caution when using a meter to measure voltages. Do not touch power terminals; shock, burns, or death could result !
Perform steps 1 through 6 at the right. Observe the status lights. See Figure 1–6.
Q Black square means light is on.
S White square means light is off.
* If necessary, adjust voltage regulator on the generator according to the manufacturer’s recommendations. The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer Switch nameplate.

Now continue to 3 – Electrical Operation on next page.
observe these lights

RED
RED GREEN
AMBER
Figure 1-7. Standard controls and indicators.

This procedure will check the electrical operation of the Automatic Delayed–Transition Transfer Switch. See Figure 1---7.

Close the enclosure door first !

Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure.
Perform steps 1 through 5 at the right. Observe the status lights.
Q Black square means light is on.

S White square means light is off.

This completes the Functional Test of the ADTS.
observe these lights · operate this switch

DISCONNECTING THE CONTROLLER
Operate the 7000 Series ADTS at least once a month by following the five–step Electrical Operation Transfer Test procedure on page 1–5.
The harness disconnect plugs are furnished for repair purposes only and should not have to be unplugged. If the control panel must be isolated, follow these steps:
PREVENTIVE MAINTENANCE Reasonable care in preventive maintenance will insure high reliability and long life for the 7000 Series ADTS. An annual preventive maintenance program is recom- mended.
Do not unplug the controller until steps 1a or 1b is completed.
ASCO Services, Inc. (ASI) is ASCO Power Technologies’ national service organization. ASI can be contacted at 1-800-800-2726 for information on preventive maintenance agreements.
place standby engine starting control in the off position. Then open the emergency source circuit breaker.
Checklist for Yearly Inspection
b. If the transfer switch is in the Emergency
position, open the normal source circuit breaker. Place the engine starting control in the test or run position.
Hazardous voltage capable of causing shock, burns, or death is used in this switch. Deenergize both Normal – Emergency power sources before performing inspections!
j Clean the ADTS enclosure. Brush and vacuum
away any excessive dust accumulation. Remove any moisture with a clean cloth. j Check the transfer switch contacts. Remove
Do not unplug the controller until steps 1a or 1b is completed.
transfer switch barriers and check the condition of the contacts. Replace contacts when pitted or worn excessively. Reinstall the barriers carefully. j Maintain transfer switch lubrication. If switch is
subjected to severe dust or abnormal operating conditions, renew factory lubrication on all move- ments and linkages. Relubricate solenoid operator if TS coil is replaced. Don’t use oil; order lubrica- tion kit 75-100. j Check all cable connections & retighten them.
be sure that the standby engine starting control is still in the off position. The emergency source circuit breaker still should be open. b. If the transfer switch is in the Emergency
position, normal source circuit breaker still should be open.
Replacement parts are available in kit form. When ordering parts provide the Serial No., Bill of Material No. (BOM), and Catalog No. from the transfer switch nameplate. Contact your local ASCO Power Technolo- gies Sales Office or ASI:
place the standby engine starting control in the automatic position. Then close the emergency source circuit breaker. b. If the transfer switch is in the Emergency
call 1 – 800 – 800 – ASCO ( 2726 )
position, close the normal source circuit breaker.
Disconnecting the Plugs · Reconnecting the Plugs

This procedure will manually transfer the load if the control panel is disconnected.
Do not manually operate the transfer switch until both power sources are disconnected (all conductors deenergized).
Verify that the maintenance handle has been removed before proceeding!
Hazardous voltage capable of causing shock, burns, or death is used in this switch. Do not touch the power or load terminals of the transfer switch!
Table 2-1. Trouble-Shooting Checks.
* These are factory settings. Refer to Controller User’s Guide. If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies sales office or ASI at 1–800–800–2726. Furnish the Serial No. and Catalog No. from the transfer switch nameplate.
(continued)



A
O operation
auxiliary cable box, 1–1
electrical, 1–5 manual, 1–3
illustration of, 1–3 warning, 1–3 sequence of, 2–1 optional accessories
see Controller User’s Guide
engine start contacts, 1–2 rating, cover
lugs, 1–2 preparation, 1–2
rating label, cover replacement parts, 2–1
Load Disconnect Active light, 1–5
see Controller User’s Guide
disconnecting, 2–1 see Controller User’s Guide
T test, functional, 1–2, 1–3, 1–4, 1–5 time delays, 2–1
E
see Controller User’s Guide Transfer Control selector switch
manual load transfer, 3–2
Retransfer Delay Bypass, 1–5 Transfer Test, 1–5 Transfer Switch Connected to
Emergency Source Accepted light, 1–5
Emergency light, 1–5 Transfer Switch Connected to Normal
light, 1–4, 1–5 transfer test, 1–5 transfer to emergency, 1–5 transfer to normal, 1–5, 2–1 trouble–shooting, 2–2
functional test, 1–2, 1–3, 1–4, 1–5
N
V voltage checks, 1–4 voltage, pickup and dropout settings
customercare@asco.com 800–800–ASCO
Normal Source Accepted light, 1–5
see Controller User’s Guide
Printed in U.S.A. E ASCO Power Technologies, L.P. 2009
Pages referenced in this manual — manufacturer, support and downloads.