
Operator’s
Manual
Refer to the outline and wiring drawings provided with your 7000 Series ATS for all installation and connection details and accessories.
Refer to Group 5 Controller User’s Guide 381333–126 for ATS status display messages, time delays, pickup & dropout settings, and adjustments.
Each Automatic Transfer Switch contains a rating label to define the loads and fault circuit withstand/closing ratings. Refer to the label on the Transfer Switch for specific values.

Do not exceed the values on the rating label. Exceeding the rating can cause personal injury or serious equipment damage.
Nameplate The Transfer Switch nameplate includes data for each specific 7000 Series ATS. Use the switch only within the limits shown on this nameplate. A typical Catalog Number is shown on the next page with its elements explained.
An experienced licensed electrician must install the ATS.
INSTALLATION 1-1 Mounting and Line Connections 1-1 Auxiliary Circuits and Harness 1-2 Engine Starting Contacts 1-2 Functional Test 1-2, 1-3, 1-4
TESTING & SERVICE 2-1 Transfer Test 2-1 Preventive Maintenance 2-1 Disconnecting the Controller 2-1 Manual Load Transfer 2-2 Trouble-Shooting 2-2
INDEX back cover
30---230 amp. size
381333–229 D 50 Hanover Road, Florham Park, New Jersey 07932–1591 USA For sales or service call 1 800 800–2726 (ASCO) www.ascopower.com
ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3 telephone 519 758–8450, fax 519 758–0876, for service call 1 888 234–2726 (ASCO) www.asco.ca
section-page

Typical 7000 Series 7ATS catalog no. for overlapping neutral, 3 pole, 150 amp, 480 V, in Type 1 enclosure:
D design prefix letter
** 200 and 230 amp. limited to 480 volts

transfer control & lights
cable spacers (see INSTALLATION)
150 amp. size in typical enclosure with location of customer connections

The ASCO 7000 Series Automatic Transfer Switch (ATS) is factory wired and tested. Field installation requires mounting, connecting service cables, and connecting engine start and auxiliary control circuits (if required).
often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor’s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation.
The supporting foundation for the enclosure must be level and straight. Refer to the applicable enclosure outline drawing included with the switch for all mounting details including door opening space.
After the power cables have been tested, connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with the switch. Make sure the lugs provided are suitable for use with the cables being installed. Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the switch. Be careful when stripping insulation from the cables; avoid nicking or ringing the conductor. Remove surface oxides from cables by cleaning with a wire brush. When aluminum cable is used, apply joint compound to conductors. Tighten cable lugs to the torque specified on rating label.
If bottom cable entry is used, the foundation must be prepared so that the conduit stubs are located correctly. Refer to the enclosure outline drawing for specified area and location. Provide cable bending space and ½ inch minimum clearance to live metal parts. When a concrete floor is poured, use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment.
Refer to the Outline and Mounting Diagram provided with the ATS; it shows all mounting details and instructions.
Three cable spacers are included with 150, 200, & 230 A transfer switches. When installing power cables, run the cables through the cable spacers as shown in Figure 1-1. Position the cable spacers within 1½ inches from the lugs.
Protect the switch from construction grit and metal chips to prevent malfunction or shortened life of the automatic switch switch.
Mount the ASCO ATS vertically to a rigid supporting structure. Level all mounting points by using flat washers behind the holes to avoid distortion of the switch.
The cable spacers must be located as shown for 150, 200, and 230 ampere transfer switches.

The controller is mounted on the cabinet door. An add-on DIN rail is provided for some optional accesso- ries and is mounted below the controller on the door.
1 ½ inch approximate
A Wiring Diagram is furnished with the ASCO 7000 Series ATS (separate from this manual). Refer to this drawing. All wiring must be made in accordance with the National Electrical Code and local codes.
De–energize the conductors before making any line or auxiliary circuitry connections. Be sure that Normal and Emergency line connections are in proper phase rotation. Place engine gen- erator starting control in the OFF position. Make sure engine generator is not in operation.
Figure 1-1. Cable spacer for 150, 200, and 230 amp.
transfer switches.
A grounding wire must be connected to the controller’s lower left mounting stud. Because the controller is mounted on the enclosure door, a conductive strap must be used between the enclosure and the door. This connection provides proper grounding which does not rely upon the door hinges.
Do not connect the power conductors to the transfer switch until they are tested. Installing power cables in conduit, cable troughs and ceiling-suspended hangers
cable spacers · cable spacer



The transfer switch is connected to the left side of the controller by a plug-in harness (two plugs).
TOP STUD
Engine Starting Contacts The engine control contact connections (if used) are located on the transfer switch. Connect signal wires to appropriate terminals as specified in Table A and shown in Figure 1-2.
TS
TB 14
STUD
NR
BOTTOM
STUD
TB 15 TB 16
NR
Figure 1-2. Engine starting contact label and location on left side of transfer switch.
Table A. Engine Start Connections
Connect auxiliary circuit wires to appropriate terminals on the transfer switch. Note the control features that are furnished on this switch. Make the necessary auxiliary connections by referring to the Wiring Diagram.
The Functional Test consists of three checks:
direction of the weight. Turn it up or down as shown to manually operate the transfer switch. It should operate smoothly without any binding. If it does not, check for shipping damage or construction debris.
S 1 — Manual Operation Test, on this page
S 2 — Voltage Checks, page 1–3
S 3 — Electrical Operation, page 1–4
reversed this operation is also reversed.
Now continue to 2 – Voltage Checks on next page.
Do these checks in the order presented to avoid damaging the ATS.
Position of the transfer switch is indicated here
Read all instructions on the Wiring Diagram and labels affixed to the automatic transfer switch. Note the control features that are provided and review their operation before proceeding.
weight marked N (normal) and E (emergency)

A maintenance handle is provided on the Transfer Switch for maintenance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically).
Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.
With ALL POWER OFF grasp maintenance handle and turn it quickly with your thumb and fingers.
Figure 1–3. Maintenance handle and positions.
maintenance handle · weight · floating weight



RED
RED GREEN
Figure 1-4. Standard controls and indicators.

First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.
Verify that the feeders have been connected to the proper lugs.

Use extreme caution when using a meter to measure voltages. Do not touch power terminals; shock, burns, or death could result !
Perform steps 1 through 6 at the right. Observe the status lights. See Figure 1–4.
Q Black square means light is on.
S White square means light is off.
* If necessary, adjust voltage regulator on the generator according to the manufacturer’s recommendations. The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer Switch nameplate.

Refer to Section 3 of Group 5 Controller User’s Guide 381333–126 for how to display the Status of the ATS and the Voltage and Frequency of each source.
Now continue to 3 – Electrical Operation on next page.
observe these lights

RED
RED GREEN
Figure 1-5. Standard controls and indicators.

This procedure will check the electrical operation of the Automatic Transfer Switch. See Figure 1–5.

Be sure to close the enclosure door before proceeding to prevent personal injury in case of electrical system fault.

Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure.
Perform steps 1 through 5 at the right. Observe the status lights.
Q Black square means light is on.

S White square means light is off.

This completes the Functional Test of the ATS.
operate this switch · observe these lights

DISCONNECTING THE CONTROLLER
Operate the 7000 Series ATS at least once a month by following the five–step Electrical Operation Transfer Test procedure on page 1–4.
The harness disconnect plugs are furnished for repair purposes only and should not have to be unplugged. If the controller must be isolated, follow these steps:
PREVENTIVE MAINTENANCE Reasonable care in preventive maintenance will insure high reliability and long life for the 7000 Series ATS. An annual preventive maintenance program is recom- mended.
Do not unplug the controller until step 1a or 1b is completed.
ASCO Services, Inc. (ASI) is ASCO Power Technologies’s national service organization. ASI can be contacted at 1-800-800-2726 for infor- mation on preventive maintenance agreements. In Canada call 1–888–234–ASCO (2726).
a. If the transfer switch is in the Normal position,
first place standby engine starting control in the off position. Second, then open the emergency source circuit breaker. Third, open the normal source circuit breaker.
Checklist for Yearly Inspection
b. If the transfer switch is in the Emergency
position, first open the normal source circuit breaker. Second, place the engine starting control in the test or run position. Third, open the emergency source circuit breaker.
Hazardous voltage capable of causing shock, burns, or death is used in this switch. Deenergize both Normal – Emergency power sources before performing inspections!
S Clean the ATS enclosure.
Brush and vacuum away any excessive dust accumulation. Remove any moisture with a clean cloth.
Do not unplug the controller until step 1a or 1b is completed.
S Check the transfer switch contacts.
Remove the transfer switch barriers and check con- tact condition. Replace the contacts if they become pitted or worn excessively. Reinstall the barriers carefully.
a. If the transfer switch is in the Normal position,
first be sure that both normal and emergency source circuit breakers are open. Second, be sure that the standby engine starting control is still in the off position.
S Maintain transfer switch lubrication.
The transfer switch has been properly lubricated, and under normal operating conditions no further lubricating is required. Renew factory lubrication if the switch is subjected to severe dust or abnormal operating conditions. Relubricate the operator if TS coil is replaced. Order lubrication 625550–001 (Castrol EndurexR 4000 lubricant).
b. If the transfer switch is in the Emergency posi-
tion, first be sure that both normal and emer- gency source circuit breakers are open.
S Check all cable connections & retighten them.
a. If the transfer switch is in the Normal position,
first close the normal source circuit breaker. Second, close the emergency source circuit breaker. Third, place the standby engine starting control in the automatic position.
Replacement parts are available in kit form. When ordering parts provide the Serial No., Bill of Material No. (BOM), and Catalog No. from the transfer switch nameplate. Contact your local ASCO Power Technolo- gies sales office or ASI. In the United States call 1–800–800–ASCO (2726), or in Canada call 1–888–234–ASCO (2726).
b. If the transfer switch is in the Emergency
position, first close the emergency source circuit breaker. Second close the normal source circuit breaker.
Disconnecting the Plugs · Reconnecting the Plugs

This procedure will manually transfer the load if the controller is disconnected.
Do not manually operate the transfer switch until both power sources are disconnected (all conductors deenergized).
Hazardous voltage capable of causing shock, burns, or death is used in this switch. Do not touch the power or load terminals of the transfer switch!
Table 2-1. Trouble-Shooting Checks.
* These are factory settings. Refer to the Group 5 Controller User’s Guide.
If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies sales office or ASI. In the United States, call 1–800–800–2726. In Canada, call 1–888–234–2726. Furnish the Serial No., Bill of Material (BOM) No., & Catalog No. from transfer switch nameplate.

A
R
engine start contacts, 1–2 rating, cover
lugs, 1–1 preparation, 1–1 spacers, 1–1
see Controller User’s Guide
catalog number, inside cover
manual load transfer, 2–2
test, functional, 1–2, 1–3, 1–4
illustration of, 1–2 warning, 1–2
see Controller User’s Guide
disconnecting, 2–1 see Controller User’s Guide grounding, 1–1
Transfer Control selector switch
Retransfer Delay Bypass, 1–4 Transfer Test, 1–4
Transfer Switch Connected to
Normal Source Accepted light, 1–3,
Emergency light, 1–3, 1–4
Transfer Switch Connected to
Normal light, 1–3, 1–4
Emergency Source Accepted light,
electrical, 1–4 manual, 1–2
transfer to emergency, 1–4
transfer to normal, 1–4
illustration of, 1–2 warning, 1–2 sequence of
functional test, 1–2, 1–3, 1–4
see Controller User’s Guide
see Controller User’s Guide
voltage, pickup and dropout settings
see Controller User’s Guide
customercare@asco.com 800–800–ASCO
phase rotation check, 1–3
Printed in U.S.A. Copyright ASCO Power Technologies, L.P. 2007
Pages referenced in this manual — manufacturer, support and downloads.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.