7000 Series ATS Automatic Transfer Switches D design, 30 through 230 A

Operator’s

Manual

Refer to the outline and wiring drawings provided with your 7000 Series ATS for all installation and connection details and accessories.

Refer to Group 5 Controller User’s Guide 381333–126 for ATS status display messages, time delays, pickup & dropout settings, and adjustments.

Rating Label

Each Automatic Transfer Switch contains a rating label to define the loads and fault circuit withstand/closing ratings. Refer to the label on the Transfer Switch for specific values.

Emerson 7000 — Rating Label diagram (page 1)
Fig. 1 · Rating Label

Do not exceed the values on the rating label. Exceeding the rating can cause personal injury or serious equipment damage.

Nameplate The Transfer Switch nameplate includes data for each specific 7000 Series ATS. Use the switch only within the limits shown on this nameplate. A typical Catalog Number is shown on the next page with its elements explained.

An experienced licensed electrician must install the ATS.

TABLE OF CONTENTS

INSTALLATION 1-1 Mounting and Line Connections 1-1 Auxiliary Circuits and Harness 1-2 Engine Starting Contacts 1-2 Functional Test 1-2, 1-3, 1-4

TESTING & SERVICE 2-1 Transfer Test 2-1 Preventive Maintenance 2-1 Disconnecting the Controller 2-1 Manual Load Transfer 2-2 Trouble-Shooting 2-2

INDEX back cover

30---230 amp. size

381333–229 D 50 Hanover Road, Florham Park, New Jersey 07932–1591 USA For sales or service call 1 800 800–2726 (ASCO) www.ascopower.com

ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3 telephone 519 758–8450, fax 519 758–0876, for service call 1 888 234–2726 (ASCO) www.asco.ca

section-page

Page 2 of the Emerson 7000 user manual — 7ATS C 3 150 N 5 C
Page 2 · click to enlarge
Page 2

Catalog Number Identification

Typical 7000 Series 7ATS catalog no. for overlapping neutral, 3 pole, 150 amp, 480 V, in Type 1 enclosure:

D design prefix letter

7ATS C 3 150 N 5 C

Voltage Controller Enclosure A 115 J 400 5 – standard C – type 1 B 120 K 415 5X – if F – type 3R C L accessories G – type 4 208 440 ordered L D M – type 12 220 460 M E N –type 3R secure 230 480 N F P –type 4 secure 240 550 P G Q –type 4X secure 277 575 Q –type 12 secure H R 380 600 blank – open type VoltageEnclosure A 115 B 120 C 208 D 220 E 230 F 240 G 277 H 380J 400 K 415 L 440 M 460 N 480 P 550 Q 575 R 600C – type 1 F – type 3R G – type 4 L – type 12 M –type 3R secure N –type 4 secure P –type 4X secure Q –type 12 secure blank – open type
3. three Ø 2 – single Ø

** 200 and 230 amp. limited to 480 volts

Emerson 7000 — 7ATS C 3 150 N 5 C diagram (page 2)
Fig. 2

transfer control & lights

cable spacers (see INSTALLATION)

150 amp. size in typical enclosure with location of customer connections

Show 21 more labels / short text on this page
Phase Poles Neutral · A – solid · 30 70 100 · C – overlapping · blank – none · 200 ** · 230 ** · terminals for switch · Transfer Switch · position contacts · load power connections · emergency power connections · maintenance · handle (see WARNING · under Manual · Operation) · Controller · terminals for · engine start · contacts · normal power connections
Page 3 of the Emerson 7000 user manual — Testing Power Conductors
Page 3 · click to enlarge
Page 3

SECTION 1 INSTALLATION

The ASCO 7000 Series Automatic Transfer Switch (ATS) is factory wired and tested. Field installation requires mounting, connecting service cables, and connecting engine start and auxiliary control circuits (if required).

often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor’s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation.

Supporting Foundation

The supporting foundation for the enclosure must be level and straight. Refer to the applicable enclosure outline drawing included with the switch for all mounting details including door opening space.

Connecting Power Conductors

After the power cables have been tested, connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with the switch. Make sure the lugs provided are suitable for use with the cables being installed. Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the switch. Be careful when stripping insulation from the cables; avoid nicking or ringing the conductor. Remove surface oxides from cables by cleaning with a wire brush. When aluminum cable is used, apply joint compound to conductors. Tighten cable lugs to the torque specified on rating label.

If bottom cable entry is used, the foundation must be prepared so that the conduit stubs are located correctly. Refer to the enclosure outline drawing for specified area and location. Provide cable bending space and ½ inch minimum clearance to live metal parts. When a concrete floor is poured, use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment.

Mounting

Refer to the Outline and Mounting Diagram provided with the ATS; it shows all mounting details and instructions.

Three cable spacers are included with 150, 200, & 230 A transfer switches. When installing power cables, run the cables through the cable spacers as shown in Figure 1-1. Position the cable spacers within 1½ inches from the lugs.

Protect the switch from construction grit and metal chips to prevent malfunction or shortened life of the automatic switch switch.

Mount the ASCO ATS vertically to a rigid supporting structure. Level all mounting points by using flat washers behind the holes to avoid distortion of the switch.

The cable spacers must be located as shown for 150, 200, and 230 ampere transfer switches.

Emerson 7000 — Mounting diagram (page 3)
Fig. 3 · Mounting

The controller is mounted on the cabinet door. An add-on DIN rail is provided for some optional accesso- ries and is mounted below the controller on the door.

Line Connections

1 ½ inch approximate

A Wiring Diagram is furnished with the ASCO 7000 Series ATS (separate from this manual). Refer to this drawing. All wiring must be made in accordance with the National Electrical Code and local codes.

De–energize the conductors before making any line or auxiliary circuitry connections. Be sure that Normal and Emergency line connections are in proper phase rotation. Place engine gen- erator starting control in the OFF position. Make sure engine generator is not in operation.

Figure 1-1. Cable spacer for 150, 200, and 230 amp.

transfer switches.

Controller Ground

A grounding wire must be connected to the controller’s lower left mounting stud. Because the controller is mounted on the enclosure door, a conductive strap must be used between the enclosure and the door. This connection provides proper grounding which does not rely upon the door hinges.

Testing Power Conductors

Do not connect the power conductors to the transfer switch until they are tested. Installing power cables in conduit, cable troughs and ceiling-suspended hangers

cable spacers · cable spacer

Page 4 of the Emerson 7000 user manual — 1 – Manual Operation Test
Page 4 · click to enlarge
Page 4

INSTALLATION (continued)

Emerson 7000 — INSTALLATION (continued) diagram (page 4)
Fig. 4 · INSTALLATION (continued)

Harnesses

Emerson 7000 — Harnesses diagram (page 4)
Fig. 5 · Harnesses

ENGINE STARTING CONTACTS

The transfer switch is connected to the left side of the controller by a plug-in harness (two plugs).

( SHOWN DE–ENERGIZED )

TOP STUD

Engine Starting Contacts The engine control contact connections (if used) are located on the transfer switch. Connect signal wires to appropriate terminals as specified in Table A and shown in Figure 1-2.

MIDDLE

TS

TB 14

STUD

NR

BOTTOM

STUD

TB 15 TB 16

NR

Figure 1-2. Engine starting contact label and location on left side of transfer switch.

Table A. Engine Start Connections

Auxiliary Circuits

When normal source failsTerminals on transfer switch contact closesTB14 and TB15 contact opensTB14 and TB16

Connect auxiliary circuit wires to appropriate terminals on the transfer switch. Note the control features that are furnished on this switch. Make the necessary auxiliary connections by referring to the Wiring Diagram.

Functional Test

The Functional Test consists of three checks:

direction of the weight. Turn it up or down as shown to manually operate the transfer switch. It should operate smoothly without any binding. If it does not, check for shipping damage or construction debris.

S 1 — Manual Operation Test, on this page

S 2 — Voltage Checks, page 1–3

3. Return the transfer switch to the Normal position.

S 3 — Electrical Operation, page 1–4

reversed this operation is also reversed.

Now continue to 2 – Voltage Checks on next page.

Do these checks in the order presented to avoid damaging the ATS.

Position of the transfer switch is indicated here

Read all instructions on the Wiring Diagram and labels affixed to the automatic transfer switch. Note the control features that are provided and review their operation before proceeding.

weight marked N (normal) and E (emergency)

Emerson 7000 — Functional Test diagram (page 4)
Fig. 6 · Functional Test

1 – Manual Operation Test

A maintenance handle is provided on the Transfer Switch for maintenance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically).

Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.

1. After deenergizing both power sources, open the enclosure door. Locate and the maintenance handle on the left side of the transfer switch. See Figure 1–3.

With ALL POWER OFF grasp maintenance handle and turn it quickly with your thumb and fingers.

2. Grasp the attached maintenance handle and turn it with thumb and fingers as shown to manually operate it. The maintenance handle turns the opposite

Figure 1–3. Maintenance handle and positions.

maintenance handle · weight · floating weight

Page 5 of the Emerson 7000 user manual — Note
Page 5 · click to enlarge
Page 5

INSTALLATION (continued)

Emerson 7000 — INSTALLATION (continued) diagram (page 5)
Fig. 7 · INSTALLATION (continued)
Emerson 7000 — INSTALLATION (continued) diagram (page 5)
Fig. 8 · INSTALLATION (continued)

GREEN

RED

RED GREEN

Figure 1-4. Standard controls and indicators.

1Close the normal source circuit breaker. The Transfer Switch Connected To Normal and the Normal Source Accepted lights should come on. 2Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch normal source terminals. 3Close the emergency source circuit breaker. (Start generator, if necessary.) The Transfer Switch Connected To Normal & Emergency Source Accepted lights should come on. 4Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch emergency source terminals.* 5Use a phase rotation meter to check phase rotation of emergency source; it must be the same as the normal source.A B C 6Shut down the engine–generator, if applicable. The Emergency Source Accepted light should go off. Then put the starting control selector switch (on the generator set) in the automatic position. Close enclosure door.
Emerson 7000 — GREEN diagram (page 5)
Fig. 9

2 – Voltage Checks

First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.

Verify that the feeders have been connected to the proper lugs.

Emerson 7000 — 2 – Voltage Checks diagram (page 5)
Fig. 10 · 2 – Voltage Checks

Use extreme caution when using a meter to measure voltages. Do not touch power terminals; shock, burns, or death could result !

Perform steps 1 through 6 at the right. Observe the status lights. See Figure 1–4.

Q Black square means light is on.

S White square means light is off.

* If necessary, adjust voltage regulator on the generator according to the manufacturer’s recommendations. The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer Switch nameplate.

Note

Emerson 7000 — Note diagram (page 5)
Fig. 11 · Note

Refer to Section 3 of Group 5 Controller User’s Guide 381333–126 for how to display the Status of the ATS and the Voltage and Frequency of each source.

Now continue to 3 – Electrical Operation on next page.

observe these lights

Page 6 of the Emerson 7000 user manual — Transfer Test
Page 6 · click to enlarge
Page 6

INSTALLATION (continued)

GREEN

RED

RED GREEN

Figure 1-5. Standard controls and indicators.

1The Transfer Switch Connected To Normal and Normal Source Accepted lights should be on. 2Turn and hold Transfer Control switch clockwise to Transfer Test until the engine starts and runs (within 15 sec.). Emergency Source Accepted light should come on. 3Transfer switch will operate to the Emergency position after Feature 2B time delay. The Transfer Switch Connected To Emergency light should come on and Load Connected to Normal light goes off. 4Transfer switch will operate back to Normal position after Feature 3A time delay. For immediate retransfer turn Transfer Control counterclockwise to Retransfer Delay Bypass. The Transfer Switch Connected To Normal light should come on; Transfer Switch Connected to Emergency light should go off. 5The engine–generator will stop after the Feature 2E time delay (unloaded running engine cooldown). The Emergency Source Accepted light should go off.
Emerson 7000 — GREEN diagram (page 6)
Fig. 12

3 – Electrical Operation

This procedure will check the electrical operation of the Automatic Transfer Switch. See Figure 1–5.

Emerson 7000 — 3 – Electrical Operation diagram (page 6)
Fig. 13 · 3 – Electrical Operation

Be sure to close the enclosure door before proceeding to prevent personal injury in case of electrical system fault.

Transfer Test

Emerson 7000 — Transfer Test diagram (page 6)
Fig. 14 · Transfer Test

Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure.

Perform steps 1 through 5 at the right. Observe the status lights.

Q Black square means light is on.

Emerson 7000 — Transfer Test diagram (page 6)
Fig. 15 · Transfer Test

S White square means light is off.

Emerson 7000 — Transfer Test diagram (page 6)
Fig. 16 · Transfer Test

This completes the Functional Test of the ATS.

operate this switch · observe these lights

Page 7 of the Emerson 7000 user manual — REPLACEMENT PARTS
Page 7 · click to enlarge
Page 7

SECTION 2 TESTING & SERVICE

TRANSFER TEST

DISCONNECTING THE CONTROLLER

Operate the 7000 Series ATS at least once a month by following the five–step Electrical Operation Transfer Test procedure on page 1–4.

The harness disconnect plugs are furnished for repair purposes only and should not have to be unplugged. If the controller must be isolated, follow these steps:

PREVENTIVE MAINTENANCE Reasonable care in preventive maintenance will insure high reliability and long life for the 7000 Series ATS. An annual preventive maintenance program is recom- mended.

Do not unplug the controller until step 1a or 1b is completed.

1. Observe the position of the transfer switch.

ASCO Services, Inc. (ASI) is ASCO Power Technologies’s national service organization. ASI can be contacted at 1-800-800-2726 for infor- mation on preventive maintenance agreements. In Canada call 1–888–234–ASCO (2726).

a. If the transfer switch is in the Normal position,

first place standby engine starting control in the off position. Second, then open the emergency source circuit breaker. Third, open the normal source circuit breaker.

Checklist for Yearly Inspection

b. If the transfer switch is in the Emergency

position, first open the normal source circuit breaker. Second, place the engine starting control in the test or run position. Third, open the emergency source circuit breaker.

Hazardous voltage capable of causing shock, burns, or death is used in this switch. Deenergize both Normal – Emergency power sources before performing inspections!

2. Separate the two quick disconnect plugs by squeezing the latches. Do not pull on the harness wires.

S Clean the ATS enclosure.

Brush and vacuum away any excessive dust accumulation. Remove any moisture with a clean cloth.

Do not unplug the controller until step 1a or 1b is completed.

S Check the transfer switch contacts.

Remove the transfer switch barriers and check con- tact condition. Replace the contacts if they become pitted or worn excessively. Reinstall the barriers carefully.

1. Observe the position of the transfer switch.

a. If the transfer switch is in the Normal position,

first be sure that both normal and emergency source circuit breakers are open. Second, be sure that the standby engine starting control is still in the off position.

S Maintain transfer switch lubrication.

The transfer switch has been properly lubricated, and under normal operating conditions no further lubricating is required. Renew factory lubrication if the switch is subjected to severe dust or abnormal operating conditions. Relubricate the operator if TS coil is replaced. Order lubrication 625550–001 (Castrol EndurexR 4000 lubricant).

b. If the transfer switch is in the Emergency posi-

tion, first be sure that both normal and emer- gency source circuit breakers are open.

2. The two harness plugs and sockets are keyed. Carefully align the plugs with the sockets and press straight in until both latches click. Close the door!

S Check all cable connections & retighten them.

3. Restore the two sources in sequence as follows:

a. If the transfer switch is in the Normal position,

REPLACEMENT PARTS

first close the normal source circuit breaker. Second, close the emergency source circuit breaker. Third, place the standby engine starting control in the automatic position.

Replacement parts are available in kit form. When ordering parts provide the Serial No., Bill of Material No. (BOM), and Catalog No. from the transfer switch nameplate. Contact your local ASCO Power Technolo- gies sales office or ASI. In the United States call 1–800–800–ASCO (2726), or in Canada call 1–888–234–ASCO (2726).

b. If the transfer switch is in the Emergency

position, first close the emergency source circuit breaker. Second close the normal source circuit breaker.

Disconnecting the Plugs · Reconnecting the Plugs

Page 8 of the Emerson 7000 user manual — TROUBLE-SHOOTING
Page 8 · click to enlarge
Page 8

TESTING & SERVICE (continued)

MANUAL LOAD TRANSFER

1. Deenergize both the normal and emergency source conductors (remove fuses or open circuit breakers).

This procedure will manually transfer the load if the controller is disconnected.

2. Use the maintenance handle to manually operate the transfer switch to the opposite source. See Manual Operation on page 1–2.

Do not manually operate the transfer switch until both power sources are disconnected (all conductors deenergized).

3. If the transfer switch is in the Emergency position manually start the engine generator and then install emergency source fuse or close the circuit breaker.

TROUBLE-SHOOTING

Hazardous voltage capable of causing shock, burns, or death is used in this switch. Do not touch the power or load terminals of the transfer switch!

Table 2-1. Trouble-Shooting Checks.

CHECK IN NUMERICAL SEQUENCE PROBLEM1 OPERATION2 GEN-SET3 VOLTAGE Engine–generator set does not start when the Transfer Control switch is turned and held in Transfer Test position or when the normal source fails.Hold Transfer Test switch 15 seconds or the outage must be long enough to allow for Feature 1C time delay plus engine cranking and starting time.Starting control must be in the automatic position. Batteries must be charged and connected. Check wiring to engine starting contacts on customer terminal block TB. Verify that the small plug J3 is connected to receptacle P3.– Transfer switch does not transfer the load to the emergency source after the engine–generator set starts.Wait for Feature 2B time delay to time out (if used).Generator output circuit breaker must be closed. Generator frequency must be at least 95% of nominal (57 Hz for a 60 Hz system.) *Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals EA and EC (or EL1 and EL2 for 2 pole switches). * Transfer switch does not transfer the load to normal source when normal returns or when the Transfer Control switch is released.Wait for Feature 3A time delay to time out (if used).–Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals NB and NC, NC and NA, and NA and NB (or NL1 and NL2 for 2 pole switches). Engine–generator-set does not stop after load retransfer to the normal source.Wait for Feature 2E time delay to time out (if used).Starting control must be in the automatic position.–

* These are factory settings. Refer to the Group 5 Controller User’s Guide.

If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies sales office or ASI. In the United States, call 1–800–800–2726. In Canada, call 1–888–234–2726. Furnish the Serial No., Bill of Material (BOM) No., & Catalog No. from transfer switch nameplate.

Page 9 of the Emerson 7000 user manual — HELP
Page 9 · click to enlarge
Page 9

INDEX

A

R

engine start contacts, 1–2 rating, cover

S

lugs, 1–1 preparation, 1–1 spacers, 1–1

M

see Controller User’s Guide

catalog number, inside cover

manual load transfer, 2–2

T

test, functional, 1–2, 1–3, 1–4

illustration of, 1–2 warning, 1–2

see Controller User’s Guide

disconnecting, 2–1 see Controller User’s Guide grounding, 1–1

N

Transfer Control selector switch

Retransfer Delay Bypass, 1–4 Transfer Test, 1–4

Transfer Switch Connected to

E

Normal Source Accepted light, 1–3,

Emergency light, 1–3, 1–4

1–4 O

Transfer Switch Connected to

Normal light, 1–3, 1–4

Emergency Source Accepted light,

electrical, 1–4 manual, 1–2

transfer to emergency, 1–4

F

transfer to normal, 1–4

illustration of, 1–2 warning, 1–2 sequence of

functional test, 1–2, 1–3, 1–4

see Controller User’s Guide

H

see Controller User’s Guide

voltage, pickup and dropout settings

P

see Controller User’s Guide

HELP

customercare@asco.com 800–800–ASCO

phase rotation check, 1–3

Printed in U.S.A. Copyright ASCO Power Technologies, L.P. 2007

Show 32 more labels / short text on this page
auxiliary circuits, 1–2 · labels, · rating label, cover · replacement parts, 2–1 · lights, 1–3, 1–4 · cable · lubrication, 2–1 · service, 2–2 · settings · illustration of, 1–1 · maintenance, preventive, 2–1 · cleaning, 2–1 · manual operation, 1–2 · connections · line, 1–1 · time delays, 2–2 · controller, 1–1, 1–2 · nameplate, cover · electrical operation, 1–4 · transfer test, 1–4 · 1–3, 1–4 · operation · frequency, generator, 2–2 · trouble–shooting, 2–2 · optional accessories · voltage checks, 1–3 · harness, 1–2 · disconnect plugs, 2–1 · parts, 2–1 · problem, 2–2 · inspection, 2–1 · installation, 1–1
Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the Emerson 7000

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson 7000

Be the first to ask — other owners or our team will answer.

Original document

Emerson 7000 manual PDF

9 pages·1 MB·Switch·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…