EN
Emerson logo
Official user manual

Emerson 400A

20 pages·440 KB·Switch·PDF·ENDEFRITNLJA
Emerson 400A
Table of Contents 8 sections 067k0 · 067kp · 067k1 · 228h2 · … ShowHide
Page 1 of the Emerson 400A user manual — TABLE OF CONTENTS
Page 1 · click to enlarge
Page 1

Operator’s

Series 300 Automatic Transfer Switches

Manual

E–design, 260 and 400 A

Refer to the outline and wiring drawings provided with your ASCO Series 300 ATS for all installation details.

Rating Label

Each automatic transfer switch contains a rating label to define the loads and fault circuit withstand / closing ratings. Refer to the label on the transfer switch for specific values.

Do not exceed the values on the rating label. Exceeding the rating can cause personal injury or serious equipment damage.

An experienced licensed electrician must install the Automatic Transfer Switch (ATS).

Emerson 400A — Rating Label diagram (page 1)
Fig. 1 · Rating Label

TABLE OF CONTENTS

INSTALLATION 1-1 Mounting and Line Connections 1-1 Engine Starting Contacts 1-2 Input / Output Label 1-2 Functional Test 1-3, 1-4, 1-5

SEQUENCE OF OPERATION 2-1

TESTING & SERVICE 3-1 Preventive Maintenance 3-1 Transfer Test 3-1 Disconnecting the Controller 3-1 Manual Load Transfer 3-2 Trouble-Shooting 3-2

ADJUSTMENTS 4-1 Time Delay and Sensor Adjustments 4-1 How to Change a Setting 4-2

CONTROL FEATURES 5-1 Engine Exercisers 5-1, 5-2, 5-3 Motor Load Transfer 5-4 Load Disconnect & Remote Control 5-4

INDEX back of manual

381333–067 K 50 Hanover Road, Florham Park, New Jersey 07932–1591 USA For sales or service call 1 800 800–2726 (ASCO) www.ascopower.com

ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3

section-page

Page 2 of the Emerson 400A user manual — 067k0
Page 2 · click to enlarge
Page 2
Page 2 of the Emerson 400A user manual — 067k0
Page 3 of the Emerson 400A user manual — E 300 C 3 400 N 1 C
Page 3 · click to enlarge
Page 3

Nameplate and Catalog Number Identification

The Transfer Switch nameplate includes data for each specific ASCO Series 300 ATS. Use the ATS only within the limits shown on this nameplate. A typical Catalog Number is shown below with its elements explained.

The example is for a Series 300 ATS with switched neutral, 3 pole, 400 ampere, 480 V, in a Type 1 enclosure:

E 300 C 3 400 N 1 C

witch er Neutral Phase Poles Amperes C – overlapping 2 – single Ø 260 3 – three Ø 400 blank – solid NeutralAmperes C – overlapping blank – solid260 400
Voltage Controller Enclosure A 115 J 400 1 – standard C – type 1 B 120 K 415 1X – if F – type 3R C 208 L 440 accessories G – type 4 D 220 M 460 ordered L – type 12 E 230 N 480 blank – open type F 240 Q 575 H R 380 600 Voltage A 115 B 120 C 208 D 220 E 230 F 240 H 380J 400 K 415 L 440 M 460 N 480 Q 575 R 600
Emerson 400A — E 300 C 3 400 N 1 C diagram (page 3)
Fig. 2

emergency power connections membrane

terminals for switch position

400 ampere size in typical enclosure with location of customer connections

Show 10 more labels / short text on this page
load power connections · controls · terminals for · engine start · contacts · Transfer · Switch · Controller · contacts · normal power connections
Page 4 of the Emerson 400A user manual — 067kp
Page 4 · click to enlarge
Page 4
Page 4 of the Emerson 400A user manual — 067kp
Page 5 of the Emerson 400A user manual — Line Connections
Page 5 · click to enlarge
Page 5

SECTION 1 INSTALLATION

Series 300 Automatic Transfer Switches are factory wired and tested. Installation requires skid removal then secur- ing the enclosure to the supporting foundation.

Be sure that the insulator piece is behind 260 and 400 ampere transfer switches.

Emerson 400A — SECTION 1 INSTALLATION diagram (page 5)
Fig. 3

Supporting Foundation

The supporting foundation for the enclosure must be level and straight. Refer to the applicable enclosure outline drawing included with the Series 300 for all mounting details including door opening space.

If bottom cable entry is used, the foundation must be prepared so that the conduit stubs are located correctly. Refer to the enclosure outline drawing for specified area and location. Provide cable bending space and clearance to live metal parts. When a concrete floor is poured, use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment.

Figure 1-1. Insulator backing piece for 260 and 400

Mounting

ampere transfer switches.

Refer to the applicable enclosure outline drawing furnished with this switch and mount the Series 300 according to details and instructions shown on diagram.

The controller is mounted on the cabinet door. An add-on DIN rail is provided for some optional accesso- ries and is mounted below the controller on the door.

NOTICE

Testing Power Conductors

Protect the automatic transfer switch from construction grit and metal chips to prevent malfunction or shortened life of the ATS.

Do not connect the power conductors to the ASCO Series 300 transfer switch until they are tested. Installing power cables in conduit, cable troughs and ceiling-suspended hangers often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor’s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation.

Mount the ATS vertically to a rigid supporting structure. Level all mounting points by using flat washers behind the holes to avoid distortion of the switch.

Transfer switches rated 260 and 400 amperes are mounted on an insulator backing piece (installed behind the transfer switch). If the transfer switch is removed from the cabinet and then reinstalled, this insulator piece must be placed behind the transfer switch. See Figure 1–1.

Connecting Power Conductors

After the power cables have been tested, connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with this Series 300. Make sure the lugs provided are suitable for use with the cables being installed. Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the Series 300 ATS. Be careful when stripping insulation from the cables; avoid nicking or ringing the conductor. Remove surface oxides from cables by cleaning with a wire brush. When aluminum cable is used, apply joint compound to conductors. Tighten cable lugs to the torque specified on rating label.

Line Connections

Refer to the Wiring Diagram provided with your Series 300 ATS. All wiring must be made in accordance with the National Electrical Code and local codes.

De–energize the conductors before making any line or auxiliary circuitry connections. Be sure that Normal and Emergency line connections are in proper phase rotation. Place engine generator starting control in the OFF position. Make sure engine generator is not in operation.

Do not run cables behind the switch. Cables can be bundled on the right side of the switch. Maintain proper electrical clearance between the live metal parts and grounded metal: ½ inch minimum.

It is not necessary to remove the barriers from the transfer switches to install cables.

insulator backing piece

Page 6 of the Emerson 400A user manual — Auxiliary Circuits
Page 6 · click to enlarge
Page 6

INSTALLATION (continued)

Engine Starting Contacts

Controller Ground

The engine control contact connections are located on the transfer switch. Connect signal wires to appropriate term– inals as specified in Table A, shown in Figure 1–2.

A grounding wire must be connected to the controller’s lower left mounting stud. Because the controller is mounted on the enclosure door, a conductive strap must be used between the enclosure and the door. This connection provides proper grounding which does not rely upon the door hinges.

Table A. Engine start connections.

When normal source failsTerminals on transfer switch contact closesTB14 and TB15 contact opensTB14 and TB16

Harnesses

The transfer switch is connected to the left side of the controller by a plug–in harness (two plugs).

Emerson 400A — Harnesses diagram (page 6)
Fig. 4 · Harnesses

Auxiliary Circuits

Connect auxiliary circuit wires to appropriate terminals on transfer switch. Note the control features that are furnished on this switch. Make the necessary auxiliary connections by referring to Section 5, Control Features.

Emerson 400A — Auxiliary Circuits diagram (page 6)
Fig. 5 · Auxiliary Circuits

Figure 1-2. Engine starting contact label and location

for 260 and 400 ampere transfer switches.

Connections to Controller for other Control Features (located on bottom of Controller):

Feature Connections (see Wiring Diagram

Remote Control Features Connections

(refer to the Wiring Diagram & page 5–5 for DIP switch settings) Each control contact must be suitable

& refer to page 5–5 for DIP switch settings)

(refer to page 5–2)

for a 5 V DC low energy circuit.

Emerson 400A — Auxiliary Circuits diagram (page 6)
Fig. 6 · Auxiliary Circuits

Figure 1-3. Input / output label on the Controller showing possible connections to the lower terminal block.

Show 7 more labels / short text on this page
Transfer Switch · Load Disconnect · Programmable Engine Exerciser · connection, · if provided · for factory · use only
Page 7 of the Emerson 400A user manual — NOTICE
Page 7 · click to enlarge
Page 7

INSTALLATION (continued)

Functional Test

The Functional Test consists of three checks: manual operation, voltage checks, and electrical operation.

Emerson 400A — INSTALLATION (continued) diagram (page 7)
Fig. 7 · INSTALLATION (continued)

NOTICE

Do these checks in the order presented to avoid damaging the automatic transfer switch.

Read all instructions on the Wiring Diagram and labels affixed to the automatic transfer switch. Note the control features that are provided and review their operation before proceeding.

1 – Manual Operation Test

A detachable manual operator handle is provided on the Transfer Switch for maintenance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically).

Figure 1-4. Removable maintenance handle on

260 and 400 ampere transfer switches.

Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.

1. Insert the maintenance handle into the hole in the shaft, left side of the operator.
2. Move the maintenance handle as shown to manually operate the transfer switch. The switch should operate smoothly without any binding. If it does not, check for shipping damage or construction debris.
3. Return the transfer switch to the N (normal) position.
4. Remove the maintenance handle and store it on the transfer switch in the place provided.

NOTICE

Verify that the maintenance handle has been removed before proceeding!

Now continue to 2 – Voltage Checks on next page.

Show 4 more labels / short text on this page
maintenance · handle · hole · shaft
Page 8 of the Emerson 400A user manual — 2 – Voltage Checks
Page 8 · click to enlarge
Page 8

INSTALLATION (continued)

Emerson 400A — INSTALLATION (continued) diagram (page 8)
Fig. 8 · INSTALLATION (continued)

Figure 1–5. Standard controls and indicators.

2 – Voltage Checks

1Close the normal source circuit breaker. The Normal Transfer Switch Position and the Normal Source Accepted lights should come on.Source Accepted Normal Emergency 2Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch normal source terminals. 3Close the emergency source circuit breaker. (Start generator, if necessary.) The Emergency Source Accepted light should come on.Source Accepted Normal Emergency 4Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch emergency source terminals.* 5Use a phase rotation meter to check phase rotation of emergency source; it must be the same as the normal source.A B C 6Shut down the engine–generator, if applicable. The Emergency Source Accepted light should go off. Then put the starting control selector switch (on the generator set) in the automatic position. Close enclosure door.Source Accepted Normal Emergency

First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.

Use extreme caution when using a meter to measure voltages in the following steps. Do not touch power terminals; shock, burns, or death could result !

Perform steps 1 through 6 at the right. Observe the status lights. See Figure 1–5.

O Black circle means light is on.

P White circle means light is off.

* If necessary, adjust voltage regulator on the generator according to the manufacturer’s recommendations. The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer Switch nameplate.

Also see page 4–1 for the HI–LOW voltage adjust setting in the controller. The LOW setting shifts all voltage settings down 4.2%; for example, 240 V to 230 V.

Now continue to 3 – Electrical Operation on next page.

observe these lights

Page 9 of the Emerson 400A user manual — Transfer Test
Page 9 · click to enlarge
Page 9

INSTALLATION (continued)

Figure 1–6. Standard controls and indicators.

3 – Electrical Operation

1The normal source must be available and the generator must be ready to start. Check that the Normal Source Accepted light is on.Source Accepted Normal Emergency 2Press and hold the Transfer Test button until the engine starts and runs. This should happen within 15 sec.Transfer Test 3The Emergency Source Accepted light should come on.Source Accepted Normal Emergency 4The transfer switch should transfer to the Emergency position. The Emergency Transfer Switch Position light should come on and the Normal light should go off.Transfer Switch Position Normal Emergency 5If the transfer to emergency delay is used the transfer should occurs after a time delay (up to 5 minutes). For immediate transfer press the Bypass Time Delay button.Bypass Time Delay 6The transfer switch should transfer back to the Normal position. The Normal Transfer Switch Position light should come on and the Emergency light should go off.Transfer Switch Position Normal Emergency 7If the retransfer to normal delay is used the retransfer should occur after a time delay (up to 30 minutes). For immediate retransfer press the Bypass Time Delay button.Bypass Time Delay 8The unloaded running delay keeps the generator running for 5 minutes (cool–down period). Then the generator should stop and the Emergency Source Accepted light should go off.Source Accepted Normal Emergency

This procedure will check the electrical operation of the Automatic Transfer Switch.

Close the transfer switch enclosure door and tighten the screws before you test electrical operation.

Transfer Test

Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure.

Perform steps 1 through 8 at the right. Observe the status lights. See Figure 1–6.

O Black circle means light is on.

P White circle means light is off.

This completes the Functional Test of the ASCO Series 300 Automatic Transfer Switch. Leave the engine–generator starting control in the automatic position.

observe these lights · press this button

Page 10 of the Emerson 400A user manual — Retransfer to Normal
Page 10 · click to enlarge
Page 10

SECTION 2 SEQUENCE OF OPERATION

Lights show position of transfer switch. Lights show the sources accepted.

Transfer To Emergency

Light for built–in engine exercise timer:

The sequence for load transfer to emergency source begins automatical- ly when normal source voltage falls below the preset dropout point or when Transfer Test button is pressed. An under voltage condition on any phase of the normal source is de- tected by the sensor.

³ blinks rapidly when

button is held 5 sec. while being set

³ blinks slowly when

button is released (set) and during 20 min. exercise period.

³ stays on after engine

When the normal source voltage fails or the Transfer Test button is pressed, the SE relay de-energizes and relay NR begins its timing cycle (1 or 3 seconds, momentary normal source outage delay). The NR relay is provided with a time delay on dropout to override momentary outages and prevent nuisance starting of the engine-driven generator. If the normal source voltage returns above the sensor dropout setting before the time delay expires, the NR relay timing cycle is reset to zero and relay SE energizes.

Hold 15 sec. to start the engine generator and to transfer the load to emergency.

Press to cancel the active exercise period (stops engine now or after cooldown) See page 5–1.

Hold 5 sec. to set 20 min. engine exercise period immediately (engine starts) and weekly thereafter.

Figure 2–1. Membrane controls and indicator lights.

Retransfer to Normal

The sequence for load retransfer to the normal source automatically begins when the voltage sensor detects restoration of the normal source. The voltage level must rise above the preset pickup point on all phases before the sensor will accept the normal source.

If the normal source voltage does not return above the sensor dropout setting before the time delay expires, the NR relay de-energizes and signals the engine-driven gen- erator to start. At the same time, a voltage and frequen- cy sensor begins monitoring the emergency source. The sensor will accept the emergency source only when both voltage and frequency reach preset pickup points. Usual- ly about ten seconds elapse from dropout of the NR relay to acceptance by the sensor. This time span occurs be- cause the engine-driven generator must crank, start, and run up to nominal pickup points. For this reason, if the Transfer Test button is pressed it must be held for 15 sec- onds. If the emergency source is available immediately, the sensor may accept it as soon as NR relay drops out.

When the normal source is accepted by the sensor, relay SE begins its timing cycle (adjustable 1 sec. to 30 min., retransfer to normal delay). For immediate retransfer press Bypass Time Delay button. SE relay is provided with a time delay on pickup to prevent immediate load retransfer to the normal source. The delay insures that the normal source has stabilized before reconnection of vital loads. If the normal source voltage falls below the present dropout point before the time delay expires, the timing cycle is reset to zero. If the emergency source fails for more than 4 seconds during the timing cycle, ER relay drops out and the load is immediately retransferred to the normal source, if that source is acceptable.

When the emergency source is accepted by the sensor, relay ER begins its timing cycle (transfer to emergency delay). ER relay is provided with an adjustable (0 to 5 minutes) time delay on pickup to delay transfer of the load to the emergency source. For immediate transfer press Bypass Time Delay button.

SE relay energizes and ER relay is dropped out. The TS coil is energized, the transfer switch operates, and all switch contacts (mains, controls, auxiliaries) reverse position. The transfer switch is now supplying the load from the normal source again.

Upon retransfer to the normal source, NR relay begins its timing cycle (unloaded running delay, engine cooldown). NR relay is provided with a 5 min. time delay on pickup to keep the engine running for a cool-down period.

ER relay energizes, the TS coil is energized, the transfer switch operates, and all switch contacts (mains, controls, auxiliaries) reverse position. The transfer switch is now supplying the load from the emergency source.

NR relay energizes after the time delay and signals the engine-driven generator to shut down. All circuits are reset for any future normal source failure.

The transfer switch will remain in the Emergency position until the normal source is restored. If the Transfer Test button is used, the transfer switch will remain on emergency until the retransfer to normal delay times out.

Activationof standardcontrol featuresshown inSection 5will alter the sequence of operation and introduce additional time delays during transfer operations.

Show 6 more labels / short text on this page
stops (exerciser is · enabled for weekly · operation) · See page 5–1 · for complete · instructions
Page 11 of the Emerson 400A user manual — Checklist for Yearly Inspection
Page 11 · click to enlarge
Page 11

SECTION 3 TESTING & SERVICE

PREVENTIVE MAINTENANCE

S Check all cable connections & retighten them.

Torque to values shown on transfer switch label.

For high reliability and long life for the ATS:

Replacement parts. When ordering parts provide the Serial and Catalog Nos. from the transfer switch nameplate. Contact ASI. In the US call 1–800–800–ASCO (2726)).

Operate the switch at least once a month. Perform this 4–step Electrical Operation Test (test with load transfer).

DISCONNECTING THE CONTROLLER

The harness disconnect plugs are furnished for repair purposes only and should not have to be unplugged. If the controller must be isolated, follow these steps carefully.

Disconnecting the Plugs

1. Observe the position of the transfer switch. a. If the transfer switch is in the Normal position,

place standby engine starting control in the off position. Then open the emergency source circuit breaker.

Transfer Switch Test

1.Press and hold the door-mounted Transfer Test button until the engine starts and runs. This should happen within 15 seconds. 2.The transfer switch will operate to the Emergency position. If the Transfer To Emergency Delay is used, the transfer will occur after a time delay (up to 5 minutes). For immediate transfer press Bypass Time Delay button. 3.The Transfer Switch will operate back to the Normal position after the Retransfer To Normal Delay (up to 30 minutes). For immediate retransfer press Bypass Time Delay button. 4.Unloaded Running (Engine Cooldown) Delay allows engine to run unloaded for 5 minutes.

b. If the transfer switch is in the Emergency position,

open the normal source circuit breaker. Place the engine starting control in the test or run position.

2. Separate the quick disconnect plugs by squeezing the latches. Do not pull on the harness wires.
3. Label, remove, and tape the signal wires connected to the engine start terminals on the transfer switch: TB1 and TB3, or TB1 and TB2.

Reconnecting the Plugs

1. Observe the position of the transfer switch. a. If the transfer switch is in the Normal position, be

Checklist for Yearly Inspection

sure that the standby engine starting control is still in the off position. The emergency source circuit breaker still should be open.

b. If the transfer switch is in the Emergency position,

Hazardous voltage capable of causing shock, burns, or death is used in this switch. Deenergize both Normal & Emergency power sources before performing inspections!

normal source circuit breaker still should be open. 2. Reconnect the signal wires connected to the appropriate engine start terminals on the transfer switch. See Section 1, Engine Starting Contacts.

3. The harness plugs and sockets are keyed. Carefully align the plugs with the sockets and press straight in until both latches click.

S Clean the enclosure. De–energize all sources,

then brush and vacuum away any excessive dust accumulation. Remove moisture with a clean cloth.

4. Restore the opposite source as follows: a. If the transfer switch is in the Normal position,

S Check the transfer switch contacts. De-energize

all sources, then remove the transfer switch barriers and check contact condition. Replace the contacts if they become pitted or worn excessively. Reinstall the barriers carefully.

place the standby engine starting control in the automatic position. Then close the emergency source circuit breaker.

b. If the transfer switch is in the Emergency position,

S Maintain transfer switch lubrication. Under

close the normal source circuit breaker. The load will be automatically retransferred to the normal source after the Retransfer to Normal Delay. For immediate retransfer, press Bypass Time Delay button. Place the engine starting control in the automatic position.

normal operating conditions no further lubricating is required. Renew factory lubrication if the switch is subjected to severe dust or abnormal operating conditions or if TS coil is replaced. Order lubricant 625550–001 (Castrol EndurexR 4000 lubricant).

Page 12 of the Emerson 400A user manual — TROUBLE-SHOOTING
Page 12 · click to enlarge
Page 12

TESTING & SERVICE (continued)

MANUAL LOAD TRANSFER This procedure will manually transfer the load if the controller is disconnected.

1. Open normal and emergency source circuit breakers.
2. Use the maintenance handle to manually operate transfer switch to the opposite source. See page 1–3, Manual Operation Test .

Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.

3. If the transfer switch is in the Emergency position manually start the engine generator and then close the emergency source circuit breaker.

TROUBLE-SHOOTING

Proceed with care! The automatic transfer switch is energized.

Table 3-1. Trouble-Shooting Checks.

CHECK IN NUMERICAL SEQUENCE PROBLEM1 OPERATION2 GEN-SET3 VOLTAGE Gen-Set does not start when the Transfer Test button is pressed and held for 15 seconds or when the normal source fails.Hold the Transfer Test button 15 sec. or the outage must be long enough to allow for the 1 or 3 sec. Momentary Normal Source Outage Delay plus engine cranking and starting time.Starting control must be in automatic position. Batteries must be charged and connected. Check wiring to engine starting contacts.— Transfer switch does not transfer the load to emergency source after the gen-set starts.Wait for Transfer to Emergency Delay (0 to 5 min.) to time out. For immediate transfer, press the Bypass Time Delay button. If Motor Load Transfer is active, wait for inphase condition (see below).Generator output circuit breaker must be closed. Generator frequency must be at least 57 Hz.Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals EA and EC (or EL1 and EL2 for 2 pole switches). * * These are factory settings. Transfer switch does not transfer the load to normal source when normal returns or when Transfer Test button is released.Wait for Retransfer to Normal Delay (1 sec. to 30 min.) to time out. For immediate re– transfer, press Bypass Time Delay button. If Motor Load Transfer is active, wait for inphase condition (see below).—Voltmeter should read at least 90% of nominal phase to phase voltage between transfer switch terminals NB and NC, NC and NA, and NA and NB (or NL1 and NL2 for 2 pole switches). Gen-Set does not stop after load retransfer to the normal source.Wait for the 5 minute Unloaded Running Delay to time out.Starting control must be in automatic position.—

Trouble-Shooting the Motor Load Transfer Feature (refer to page 5–4)

3. Press and hold Transfer Test button. The load should transfer to emergency source when meter needle is near 0 volts. If transfer does not occur, Motor Load Transfer feature is not operating. 4. Release the Transfer Test button. The load should retransfer back to the normal source after the Retransfer to Normal Delay, if used. The retransfer should occur when the needle is near 0 volts. If retransfer does not occur after the time delay, the Motor Load Transfer feature is not operating. 5. For immediate retransfer, press the Bypass Time Delay button. Then disconnect the voltmeter.

Use extreme caution when using a meter to measure voltages in the following steps. Do not touch power terminals; shock, burns, or death could result !

1. Connect a voltmeter (set for twice system phase–to–phase voltage) between Transfer Switch terminals NA and EA. 2. Manually start generator. Voltmeter needle should sweep back and forth at a regular rate between 0 and about twice system voltage.

If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies sales office, representative, or ASI. In the United States, call 1–800–800–2726. Furnish the Serial No., Bill of Material (BOM) No., and Catalog No. from transfer switch nameplate.

Page 13 of the Emerson 400A user manual — HI HI
Page 13 · click to enlarge
Page 13

SECTION 4 ADJUSTMENTS

Time Delay Adjustment Standard time delays are set to customer specifications (if none specified, standard factory settings are used).

To change a setting, follow procedure on page 4-2. Use Table 4-1 as a guide to time delay values and their cor- responding adjustment DIP switch or potentiometer.

Table 4-1. Time Delay Settings

Emerson 400A — SECTION 4 ADJUSTMENTS diagram (page 13)
Fig. 9

Override Momentary TD ES 3 seconds 1 second Actuator 1 on

Override Momentary Normal Source Outages TD ES 3 seconds 3 seconds Actuator 1 off

Transfer to Emergency TIMER 0 minutes 0 to 5 P2 Transfer to Emergency TIMER

Override Momentary Emergency S. Outages — 4 seconds non-adjustable — — —

Retransfer to Normal TIMER 30 minutes 1 second to P1 Retransfer to Normal TIMER

Unloaded Running (Engine Cooldown) — 5 minutes non-adjustable — — —

Sensor Adjustments Voltage and frequency sensor pickup and dropout points are set to customer specifications (if none specified, standard factory settings are used). To change a setting, follow procedure on page 4–2. Use Tables 4-2 and 4–3 for settings and corresponding DIP switch actuators.

NOTICE

Any change in these settings may affect the normal operation of the automatic transfer switch. This change could allow the load circuits to remain connected to a low voltage source.

Table 4-2. Voltage and Frequency Settings. ( Shaded DIP switches are standard factory settings).

DESCRIPTION LABELS SETTING % of nominal S1 DIP DESCRIPTION LABELS SETTING FACT. SET ADJ RANGE

S1 DIP SWITCH

PU / N Pickup 90 % 95 % * Actuator 3 off

PU / N Pickup 90 % 90 % Actuator 3 on

90 % * Actuator 1 off Actuator 2 off

DO / N Dropout 85 % 85 % Actuator 1 on Actuator 2 off

DO / N Dropout 85 % 80 % Actuator 1 off Actuator 2 on

70 % Actuator 1 on Actuator 2 on

Emergency Source – – Pickup 90 % non-adjustable Emergency Source

Voltage – – Dropout 75 % non-adjustable – –

– – Pickup 95 % non-adjustable

Emergency Source – – Dropout 85 % non-adjustable – – Emergency Source

Frequency 60 / 50 60 / 50 Hz 60 Hz 60 Hz Actuator 4 off

eque cy 60 / 50 Hz 60 / 50 Hz 60 Hz 50 Hz Actuator 4 on

Voltage Phases 3 1 3 / 1 3 3 phase Actuator 6 off

Voltage Phases 3, 1 3 / 1 3 1 phase Actuator 6 on

* If dropout voltage is set to 90%, the pickup voltage must be set to 95%.

Table 4-3. Transformer Voltage Adjust.

(Low setting shifts all voltage settings down 4.2%; for example, 240 V to 230 V, or 480 V to 460 V)

DESCRIPTION LABELS FACTORY SETTING ADJUSTMENT S3 DIP SWITCH

LOW Actuator 2 off

Voltage Adjust (4 2%) LOW / HI

Voltage Adjust (4.2%) LOW /

HI HI

HI Actuator 2 on

Normal Source Voltage

Page 14 of the Emerson 400A user manual — SW1 SW2 SW3
Page 14 · click to enlarge
Page 14

ADJUSTMENTS (continued)

NOTICE

Emerson 400A — NOTICE diagram (page 14)
Fig. 10
Emerson 400A — NOTICE diagram (page 14)
Fig. 11

Do not make any setting changes while the controller is energized.

How to Change a Setting

1. Prevent the transfer switch from operating by disconnecting one source first, then the other, as follows:

hook on left side

a. If the transfer switch is in the Normal position, open the emergency source circuit breaker. Turn the engine starting control to off. Then open the normal source circuit breaker.

Figure 4-1. Controller cover latch.

b. If the transfer switch is in the Emergency position, open the normal source circuit breaker. Turn engine starting control to test or run. Then open the emergency source circuit breaker.

Emerson 400A — How to Change a Setting diagram (page 14)
Fig. 12 · How to Change a Setting
2. Disconnect both harness plugs from controller by squeezing the latches. Do not pull on the wires.
3. Remove cover from the controller by releasing latch on right side with your thumb. See Figure 4-1.

J5

4. Locate the appropriate adjustment potentiometer or DIP switch for the setting that you want to change. Refer to Table 4-1 and Table 4–2 on page 4-1 and Figure 4-2, Figure 4–3, Figure 4–4 on page 4–2.

P1

retransfer to normal time delay

P2

S3 DIP

5. Use a small screwdriver to turn the potentiometer clockwise to increase the time delay or counterclockwise to decrease it. See Figure 4-3.

S1 DIP

S2 DIP

6. Use a ball-point pen (or similar pointed tool) to slide the switch actuators left or right so they match the illustration next to the setting (left = off, right = on). Recheck the setting. See Figure 4-4.

Figure 4-2. Location of potentiometers.

Emerson 400A — S1 DIP diagram (page 14)
Fig. 13
7. Install the cover on the controller by hooking it on the left side and latching the right side.

P1 or P2 potentiometer

8. Reconnect both harness plugs to the controller by aligning and pressing straight in until latches click.

Figure 4-3. Changing time delay potentiometers.

Close the transfer switch enclosure door.

9. Close the enclosure door, then restore both sources:
Emerson 400A — S1 DIP diagram (page 14)
Fig. 14

a. If the transfer switch is in the Normal position first close the normal source circuit breaker, then close the emergency source circuit breaker.

SW1 SW2 SW3

b. If the transfer switch is in the Emergency position, close the normal source circuit breaker. The load will be automatically retransferred to the normal source. Then close the emergency source circuit breaker.

(8 on each DIP switch)

10. Turn the engine starting control to automatic .

Figure 4-4. Setting DIP switch actuators.

Show 18 more labels / short text on this page
thumb latch cover · 9 volt alkaline · battery · battery on/off jumper · harness · plugs · transfer to emergency · switch · time delay · switch · switch · clockwise to · increase · counterclockwise · to decrease · DIP switches · actuator · on off
Page 15 of the Emerson 400A user manual — How to Set Built–In Timer
Page 15 · click to enlarge
Page 15

SECTION 5 CONTROL FEATURES – ENGINE EXERCISERS

These timers periodically exercise the emergency engine-generator plant. They can be set to exercise with or without load transfer, or they can be completely disabled. The engine-generator should be exercised under load once a week for a minimum time period of 20 minutes, or follow the recommendations of the engine-generator set manufacturer. Refer to page 4–2 for location of DIP switches, battery (provided), and jumper block in the controller.

BUILT–IN ENGINE EXERCISER The engine exerciser included in ASCO Series 300 Automatic Transfer Switches provides a once a week 20–minute exercise period. It occurs immediately when the Set Engine Exerciser push button is pressed (and held for at least 5 seconds), and then at the same time weekly thereafter. A 9 volt alkaline battery (Duracell MN1604, Everready 522, or Panasonic 6AM6) is furnished and installed in the controller to maintain the setting. The battery jumper block must be shifted to the ON position. See Figure 4–2 on page 4–2.

DIP Switch Settings

Emerson 400A — DIP Switch Settings diagram (page 15)
Fig. 15 · DIP Switch Settings

Fill in day and time set. Week Day Time

Emerson 400A — DIP Switch Settings diagram (page 15)
Fig. 16 · DIP Switch Settings

Press to cancel an active exercise period (stops generator). Press and hold for 5 sec. or until status light blinks rapidly to set exercise period immediately and every week hereafter (generator starts).

If Exercise with Load is set, retransfers load to Normal, then stops generator after min. cooldown.

If Exerciser with Load is set, transfers load to Emergency.

Figure 5-1. Operator panel pushbuttons and light.

Select below either Exercise without Load or Exercise with Load according to the setting of DIP switch S1, actuator 8. The load transfers from the Normal source to Emergency source (generator) and back again if Exercise with Load is selected.

Exercise without Load, DIP Switch S1, Actuator 8 off

How to Set Built–In Timer

Push Button Status Light

OPOPOP set exercise period Exercise the generator now and every week at this time hereafter.

Exerciser hold 5 sec.

2 release blinks slowly

OPPOPP exercise period now active Generator starts and runs.

Time Delay O stays on cancel active exercise period Generator stops.

4 — O stays on generator off Exerciser enabled; repeats every 7 days.

Exercise with Load, DIP Switch S1, Actuator 8 on

How to Set Built–In Timer

Push Button Status Light

OPOPOP set exercise period Exercise the generator now and every week at this time hereafter.

Exerciser hold 5 sec.

2 release blinks slowly

OPPOPP exercise period now active Generator starts and runs; the load transfers to Emergency.

The load retransfers to Normal; then generator runs for 5 minute cooldown ( light blinks slowly during cooldown ). 4 — O stays on generator off Exerciser enabled; repeats every 7 days.

OPPOPP cancel active exercise period

Show 13 more labels / short text on this page
status light · Step · Function Explanation · 1 Set Engine · blinks rapidly · 3 press Bypass · Step · Function Explanation · 1 Set Engine · blinks rapidly · 3 press Bypass · blinks slowly · Time Delay
Page 16 of the Emerson 400A user manual — DIP Switch Settings in the Controller
Page 16 · click to enlarge
Page 16

CONTROL FEATURES (continued)

Optional Accessory 11BG – SOURCE AVAILABILITY SIGNAL

& PROGRAMMABLE ENGINE EXERCISER MODULE

Emerson 400A — Optional Accessory 11BG – SOURCE AVAILABILITY SIGNAL diagram (page 16)
Fig. 17 · Optional Accessory 11BG – SOURCE AVAILABILITY SIGNAL

connections for source availability signal contacts

Figure 5–2. Accessory 11BG module (mounted behind operator interface and connected to the controller)

includes source availability signal contacts and a programmable engine exerciser.

Source Availability Signal Contacts

Emerson 400A — Source Availability Signal Contacts diagram (page 16)
Fig. 18 · Source Availability Signal Contacts

The module provides one Form C contact each for the normal and emergency sources signal the acceptability of the source as sensed by the controller. The signal contacts operate in conjunction with the Source Accepted lights on the operator interface. Field wiring terminals are provided as shown in Figure 5–3 and the wiring diagram.

SOURCE AVAILABILITY SIGNALS

2 AMPS @ 30 VDC, resistive 0.5 AMP @ 125 VAC, resistive contacts shown de–energized

Contact ratings:

2 amps @ 30 Vdc, 0.5 amp. @ 125 Vac resistive

Figure 5–3. Source availability signal contacts.

Programmable Engine Exerciser

The module includes a programmable engine exerciser that provides for weekly or biweekly operation. This optional exercise timer may have to be turned on (enabled) by setting the S1 DIP switch actuator 7 to off, and S2 DIP switch actuator 5 to off. A backup battery in the controller (see page 4–2 and page 5–3) must be turned on to maintain the settings and to allow programming with the normal and emergency power turned off (page 5–1).

DIP Switch Settings in the Controller

FUNCTION S1 DIP SWITCH

S2 DIP SWITCH Opt. Timer

Opt. Timer

The programmable engine exerciser incorporates a 7 day or 14 day time base. Proper controller settings must be made to determine whether or not the test will be done with or without load transfer (S1 DIP switch actuator 8). See next page for instructions on setting the timer.

Shaded DIP switches are standard factory settings.

Show 22 more labels / short text on this page
2–line display · 3 buttons · (see page 4–2) · Actuator · Actuator · Enabled · 7 off · 5 off · Actuator · Actuator · Disabled · 7 off · 5 on · Exercise · Actuator · without · 8 off · Load · Exercise · Actuator · with Load · 8 on
Page 17 of the Emerson 400A user manual — Start Time Display
Page 17 · click to enlarge
Page 17

CONTROL FEATURES (continued)

How to Set Optional Programmable Engine Exerciser (part of Acc. 11BG module)

Hazardous voltage capable of causing shock, burns, or death is used in this transfer switch. Deenergize both Normal and Emergency power sources before programming the exerciser.

Run Time Display

The Run Time Display shows the run time for the engine exerciser. The default setting from the factory is 30 min.

Emerson 400A — Run Time Display diagram (page 17)
Fig. 19 · Run Time Display

Time Display

Navigating the Menu

The Time Display shows the present system time. The format is “hours:minutes:seconds”.

Use the UP and DOWN arrow keys to move through the displays.

Changing the Parameters

Use the UP and DOWN arrow keys to move though the displays to the parameter to be changed. Push the ENTER key to start the editing process. The first parameter will flash. Use the UP and DOWN arrow keys to adjust the parameter to the desired value and press the ENTER key to save the value. The next parameter will now flash. Repeat the process until each parameter is properly configured.

Date Display

The Date Display shows the present system date. The format is “day of week (week) month/day of month/year”.

Daylight Savings Time Adjust Display

This display shows whether the automatic daylight saving time adjustment is active. The factory default is “NO”. If enabled, the unit will automatically adjust for daylight saving time at 2 AM on Sunday as follows:

Engine Exerciser Display

The Engine Exerciser Display shows the status of the engine exerciser. When the unit is shipped from the factory the programmable engine exerciser is “Disabled” and must be set to “Enabled” by the customer. When the engine exerciser is running, this display will count down the remaining time until the end of the exercise period.

Part No. 629857–001* 629857–002* Start first Sunday in April 2nd Sunday in March Stop last Sunday in Oct first Sunday in Nov

* Part no. on back of circuit board. New DST starts in 2007.

Fast / Slow Adjust Display

This display shows the automatic fast/slow adjustment value. The factory default is 0. This feature can be used to trim a clock that runs fast or slow. For example, if your clock runs 10 seconds slow per week, change the fast/slow adjust value to “+10” and the unit will automatically add 10 seconds to the clock every week.

Start Time Display

The Start Time Display shows the engine exerciser start time. There are four parameters that determine the start time:

weekly (”Every”) or bi–weekly (”Alt”) operation

day of week (”Sun” through “Sat”)

start hour (0 through 23) start minutes (0 through 59) For example, if the user wants the exerciser to run every other Saturday at 3 PM, the proper configuration would be: “Alt Sat @ 15:00”

Date exerciser was set Fill in your settings for future reference Weekly or Bi–weekly Day of Week Start Time Run Time

Every = weekly Alt = bi–weekly Sun through Sat 0 – 23 hour 0 – 59 minute

0. 23 hour 0 – 59 minute 30 min. is default setting
Show 8 more labels / short text on this page
Fast/Slow Adjust · Daylight Saving · Time Adjust · Date · Time · Run TIme · Start TIme · Engine Exerciser
Page 18 of the Emerson 400A user manual — Bypass Transfer Time Delay (CP12–13)
Page 18 · click to enlarge
Page 18

CONTROL FEATURES (continued)

INPHASE MONITOR FOR MOTOR LOAD TRANSFER

LOAD DISCONNECT FEATURE

Connect external circuits to the terminals indicated on the Wiring Diagram provided with the ATS.

Inphase monitoring logic controls transfer and retransfer of motor loads, so that inrush currents do not exceed normal starting currents. It avoids nuisance tripping of circuit breakers and mechanical damage to motor couplings.

The double throw (Form C) contact is rated for 28 VDC or 120 VAC (5 amperes resistive). The contact operates prior to a selectable 0, 3, 10, or 20 second delay before transfer of the Automatic Transfer Switch. The contact resets either immediately following transfer or after the same delay as set for pre–signal before transfer.

The Motor Load Transfer feature is built into the controller. DIP switch S1 (actuator 5) activates this feature: right = ON, left = OFF.

Emerson 400A — INPHASE MONITOR FOR MOTOR LOAD TRANSFER diagram (page 18)
Fig. 20

Time delay between the load disconnect control signal and initiation of transfer is set on the controller with DIP switch S2 (actuators 6, 7, 8) as shown below:

Delay Before Transfer

Emerson 400A — Delay Before Transfer diagram (page 18)
Fig. 21 · Delay Before Transfer
Emerson 400A — Delay Before Transfer diagram (page 18)
Fig. 22 · Delay Before Transfer

If the Motor Load Transfer feature is enabled, it will be activated following the Load Disconnect Feature Delay Before Transfer delay.

Delay After Transfer*

LD TDAT S2 DIP SWITCH

enable Actuator 6 on

disable Actuator 6 off

*Enabling the Delay After Transfer will cause the control signal to reset after the same delay as set for the Delay Before Transfer.

REMOTE CONTROL FEATURES

These remote control features require a customer–supplied normally closed contact suitable for a 5 V dc low energy circuit. Refer to the Wiring Diagram provided with the ATS. Activate appropriate DIP switch S2 actuators below.

Remote Test (terminals CP6–7)

Remote Transfer to Emergency (CP8–9)

RTSW S2 DIP SWITCH

RT /E S2 DIP SWITCH

disable Actuator 3 on

disable Actuator 2 on

enable Actuator 3 off

enable Actuator 2 off

Bypass Transfer Time Delay (CP12–13)

Inhibit Transfer to Emergency (CP10–11)

TD E/N BYP. S2 DIP SWITCH

N/E INHIB. S2 DIP SWITCH

disable Actuator 1 on

disable Actuator 4 on

enable Actuator 1 off

enable Actuator 4 off

Page 19 of the Emerson 400A user manual — 44G K613127–003
Page 19 · click to enlarge
Page 19

CONTROL FEATURES (continued)

OPTIONAL STRIP HEATER (Accessory 44)

Accessory 44 Strip Heater is designed to keep ambient temperatures within the Automatic Transfer Switch enclosure at acceptable levels. This accessory consists of a mounting bracket with strip heater, thermostat, and terminal block. A transformer with fuses is included when the power for the assembly is derived from voltages above 120 V ac. The 120 V ac customer powered assembly does not include a transformer. This optional accessory is available factory installed or in kit form.

Emerson 400A — CONTROL FEATURES (continued) diagram (page 19)
Fig. 23 · CONTROL FEATURES (continued)

Turn the thermostat’s dial to required setting as shown.

turn clockwise to raise temperature

Figure 5–4. Thermostat.

AVAILABLE KITS

Controls

Strip Heater – Accessory 44

11BG K629830

120 volt customer supplied voltage

& Source Availability Contacts

44A K613127–001

Serial Communication Module 72A K601110

208. 480 volt ATS derived voltage

44G K613127–002

380 volt ATS derived voltage

44G K613127

550. 600 volt ATS derived voltage

44G K613127–003

Show 11 more labels / short text on this page
thermostat · dial · turn counterclockwise · to lower temperature · Description Accessory Kit · Description Accessory Kit · Programmable Engine Exerciser · (without transformer) · (with transformer) · (with transformer) · (with transformer)
Page 20 of the Emerson 400A user manual — F
Page 20 · click to enlarge
Page 20

INDEX

A

G

P

H

programmable engine exerciser, 5–2,

B

R

HELP

bypass time delay, 1–5, 2–1, 3–1

800–800–2726 (ASCO) customercare@asco.com

remote control features, 5–4

bypass transfer time delay, 5–4 inhibit transfer to emergency, 5–4 remote test, 5–4 remote transfer to emergency, 5–4

S

service, call 800–800–2726 (ASCO)

engine control contact, 1–2 line, 1–1

set engine exerciser, 5–1, 5–2, 5–3

engine starting contacts, 1–2 inputs / outputs, 1–2 rating, cover

changing, 4–1 factory, 4–1 frequency, 4–1 phase, 4–1 time delay, 4–1 voltage, 4–1

auxiliary, 1–2 engine control, 1–2 main, 1–3, 3–1 source availability signal, 5–2

load disconnect feature, 5–4

load disconnect, 5–4 motor load transfer, 5–4 plant exerciser, 5–1, 5–2, 5–3

M

source accepted lights, 1–4, 1–5

T

codes, cover cover removal, 4–2 disconnecting, 3–1 time delay potentiometers, 4–2

manual load transfer, 3–2

test, functional, 1–3, 1–4, 1–5

illustration of, warning, 1–3

adjustment, 4–1 gen–set cooldown, 4–1 how to change, 4–2 override momentary outages, 4–1 settings, 4–1 transfer to emergency, 4–1 transfer to normal, 4–1

motor load transfer feature, 5–4

D

N

DIP Switches, 4–1, 4–2, 5–1, 5–2, 5–4

E

O

timer (plant exerciser), how to set,

electrical, 1–5 manual, 1–3

transfer switch position lights, 1–4,

engine exerciser, 5–1, 5–2, 5–3

engine starting contacts, 1–2

illustration of, 1–3 warning, 1–3 sequence of, 2–1

transfer test, 1–5, 3–1

F

features, see control features

& source availability signal contacts, 5–2, 5–3 serial communication module, 5–5 strip heater, 5–5

frequency, pickup and dropout

voltage, pickup and dropout settings,

functional test, 1–3, 1–4, 1–5

Printed in U.S.A. Copyright --- ASCO Power Technologies, L.P. 2011

Show 40 more labels / short text on this page
accessories, 5–2, 5–5 · ground, controller, 1–1 · parts, 3–1 · problem, 3–2 · auxiliary circuits, 1–2 · handle, maintenance, 1–3 · harness, 1–2 · battery, 4–2, 5–1 · disconnect plugs, 3–1 · buttons, push, 3–1 · rating label, cover · cable · lugs, preparation, 1–1 · inphase monitor, 5–4 · replacement parts, 3–1 · catalog number, cover · inspection, 3–1 · cleaning, 3–1 · installation, 1–1 · connections · labels, · settings · contacts · lights, 1–4, 5–1 · control features, 5–1 · lubrication, 3–1 · maintenance, preventive, 3–1 · controller, 4–1, 4–2 · terminal block, 1–2 · manual operation, 1–3 · time delay · nameplate, cover · 5–1, 5–2, 5–3 · electrical operation, 1–5 · operation · trouble–shooting, 3–2 · optional accessories · programmable engine exerciser · voltage, phase, 4–1 · settings, 4–1
Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the Emerson 400A

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson 400A

Be the first to ask — other owners or our team will answer.

Original document

Emerson 400A manual PDF

20 pages·440 KB·Switch·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…