EN
Bunn logo
Official user manual

Bunn T3A

30 pages·1.6 MB·Ice Tea Maker·PDF·ENDEFRITNLJA
Bunn T3A
Table of Contents 24 sections BUNN · T3,T3A · T6,T6A · OPERATING & SERVICE MANUAL · … ShowHide
Page 1 of the Bunn T3A user manual — BUNN-O-MATIC CORPORATION
Page 1 · click to enlarge
Page 1

BUNN

®

T3,T3A

T6,T6A

Bunn T3A — BUNN diagram (page 1)
Fig. 1
Bunn T3A — BUNN diagram (page 1)
Fig. 2

OPERATING & SERVICE MANUAL

BUNN-O-MATIC CORPORATION

POST OFFICE BOX 3227 SPRINGFIELD, ILLINOIS 62708-3227 TELEPHONE: (217) 529-6601 FAX: (217) 529-6644

10145.0000G 7/00 © 1984 Bunn-O-Matic Corporation

Page 3 of the Bunn T3A user manual — USER NOTICES
Page 3 · click to enlarge
Page 3

USER NOTICES

Carefully read and follow all notices on the equipment and in this manual. They were written for your protec- tion. All notices on the equipment should be kept in good condition. Replace any unreadable or damaged labels.

Bunn T3A — USER NOTICES diagram (page 3)
Fig. 3

#00831.0000

Bunn T3A — USER NOTICES diagram (page 3)
Fig. 4

#00656.0000

Bunn T3A — USER NOTICES diagram (page 3)
Fig. 5

#03408.0000

Bunn T3A — USER NOTICES diagram (page 3)
Fig. 6

#03409.0000

10145 021599

Page 4 of the Bunn T3A user manual — PLUMBING REQUIREMENTS
Page 4 · click to enlarge
Page 4

ELECTRICAL REQUIREMENTS CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.

120V model brewers require 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. "A" model brewers require 2-wire, grounded service rated 240 volts ac, 10 amp, single phase, 50 Hz. "B" model brewers require 2-wire, grounded service rated 100 volts ac, 15 amp, single phase, 60 Hz. Proceed as follows:

CAUTION – Improper electrical installation will damage electronic components. 1. An electrician must provide electrical service as specified. 2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source. 3. Remove top cover from the brewer. 4. Rotate the control thermostat knob fully counterclockwise to the "OFF" position and replace the top cover. 5. Connect the brewer to the power source. 6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been hooked up, the brewer is ready for Initial Set-Up.

PLUMBING REQUIREMENTS

These brewers must be connected to a cold water system with operating pressure between 20 (138) and 90 psi (620 kPa) from a 1⁄2" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi(345 kPa). The water inlet fitting is 1⁄4" flare.

NOTE - Bunn-O-Matic recommends 1⁄4" copper tubing for installations of less than 25 feet and 3⁄8" for more than 25 feet from the 1⁄2" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

Bunn T3A — PLUMBING REQUIREMENTS diagram (page 4)
Fig. 7

This equipment must be installed to comply with the Basic Plumbing Code of the

Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).

1. Remove the shipping cap from the bulkhead fitting on the bottom of the brewer. 2. Attach the flare fitting from the short piece of tubing on the strainer/flow control (supplied) to the water inlet fitting at the rear of the brewer. 3. Flush the water line and securely attach it to the flare fitting on the strainer/flow control. 4. Turn on the water supply.

Electrical Hook-Up · 10145 072600

Page 5 of the Bunn T3A user manual — PLUMBING REQUIREMENTS
Page 5 · click to enlarge
Page 5

INITIAL SET-UP (FILL & HEAT) CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the instructions.

1. Complete the electrical and plumbing instructions prior to starting this procedure. 2. Remove the top panel and check that the thermostat dial is rotated fully counterclockwise to the “OFF” position. 3. Set the delay dial at eight minutes. Replace top panel. Plug in brewer. 4. Remove the filter screen and metal ferrule from the funnel to speed this procedure. Insert the funnel into the funnel rail and push it until it stops. Rotate the funnel handle to the left or right (T6) to align the funnel discharge over the hole in the reservoir cover. (Model T3 funnel does not rotate.) 5. Turn the ON/OFF switch (T3) to “ON” or SELECTOR switch (T6) to the “LEFT” or “RIGHT” and momentarily depress the start switch. Water will immediately start flowing into the water tank and will automatically shut off at the end of three minutes. Depress the start switch again. During the second period the tank will fill to its capacity and the excess will flow from the sprayhead and out of the funnel. 6. Wait until the flow stops then turn the ON/OFF or SELECTOR switch to the “OFF” position. 7. Rotate the thermostat fully clockwise, (“ON”) and wait for the water tank to stabilize at its proper tempera- ture. During this period some water will come out of the funnel due to expansion, this will not occur thereaf- ter. 8. Turn the ON/OFF switch (T3) to “ON” or SELECTOR switch (T6) to the “LEFT” or “RIGHT” and depress the start switch to cycle the control thermostat. 9. Wait until the flow stops then turn the ON/OFF or SELECTOR switch to the “OFF” position. 10. The brewer is now ready for initial timer adjustment.

INITIAL TIMER ADJUSTMENT 1. Complete the initial fill and heat instructions prior to starting this procedure. 2. With the filter screen and metal ferrule removed from the funnel, water will flow quickly from the funnel and speed this procedure. Insert the funnel into the funnel rails and push it until it stops. Rotate the funnel handle to the left or right (T6) to align the funnel discharge over the hole in the reservoir cover. (Model T3 funnel does not rotate.) 3. Check the delay dial is at eight minutes and the dilution dial is at three minutes and forty-five seconds. 4. Empty the tea reservoir of any water that may have accumulated. 5. Turn the ON/OFF switch to “ON” (T3), or the SELECTOR switch to “LEFT” or “RIGHT”, (T6), and momentarily depress the start switch. After a few seconds water should flow from the funnel into the reservoir. Allow this to continue until it stops and immediately turn the ON/OFF or SELECTOR switch to “OFF”. 6. Measure the water collected in the reservoir. It should equal seventy-six ounces. If it is less or more than this amount, adjust the brew timer accordingly (See Adjusting Brew Volumes) and repeat Steps 5 and 6 until you get the proper amount. 7. Rotate the delay dial fully counterclockwise to speed this next procedure. Drain the reservoir. 8. Momentarily depress the start switch and allow both the concentrate and dilution cycles to occur. When all water stops flowing, the level in the reservoir should be in the middle of the two lower stud heads that hold the dilution water nozzle in place. If it is not correct, rotate the dilution dial up or down accordingly and repeat this step until the proper level is achieved. 9. Return the delay dial to eight minutes.

10145 072600

Page 6 of the Bunn T3A user manual — OPERATING CONTROLS A. ON/OFF SWITCH (T3 ONLY)
Page 6 · click to enlarge
Page 6

INITIAL TIMER ADJUSTMENT (cont.)

10. Install the ferrule and screen in the funnel. Load the funnel with a BUNN® paper filter and approximately four ounces of loose tea leaves. Depress the start button to brew tea and observe the funnel drip out and the dilution streams near the end of the cycle. The dilution stream should stop approximately thirty seconds after the drip out has stopped. 11. If this does not happen, load the funnel with a fresh filter and tea, rotate the delay dial up or down accordingly and repeat Step 10 until proper timing is achieved. 12. Replace the top panel. The brewer is now ready for normal operation.

ADJUSTING BREW VOLUMES CAUTION - Disconnect the power source from the brewer prior to the removal of any panel for the replacement or adjustment of any component. NOTE: Prior to setting or modifying batch sizes, check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in place. 1. Modifying batch sizes. To modify a batch volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board. To increase a batch size. Press and hold the START or BREW switch until three clicks are heard. Release the switch (Failure to release the switch within two seconds after the third click causes the volume setting to be aborted and previous volume setting will remain in memory) and press it again one or more times. Each time the switch is pressed, two seconds are added to the brew time period. Allow the brew cycle to finish in order to verify that the desired volume has been achieved. To decrease a batch size. Press and release the START or BREW switch once for every two-second interval to be removed from the total brew time period; then immediately press and hold down the START or BREW switch until three clicks are heard. Release the switch. (Failure to release the switch within two seconds after the third click causes the volume setting to be aborted and previous volume setting will remain in memory). Allow the brew cycle to finish in order to verify that the desired volume has been achieved. 2. Setting batch sizes. To set a batch volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board. Press and hold the START or BREW switch until three distinct clicks are heard, and then release the switch. (Failure to release the switch within two seconds after the third click causes the volume setting to be aborted and previous volume setting will remain in memory). View the level of the liquid being dispensed. When the desired level is reached, turn the ON/OFF switch to “OFF” (lower). The brewer remem- bers this volume and will continue to brew batches of this size until the volume setting procedure is repeated. NOTE: When brewing coffee, batch volumes will decrease due to absorption by the coffee grounds. 3. Setting programming disable feature. If it becomes necessary to prevent anyone from changing brew times once programmed, you can set the SET/LOCK switch to the “LOCK” position. This will prevent any program- ming to be done until switch is once again placed in the “SET” position.

OPERATING CONTROLS A. ON/OFF SWITCH (T3 ONLY)

ON - Placing the switch in the"ON" (left) position allows the start switch to activate a timed brew cycle for three gallons of tea.

OFF - Placing the switch in the "OFF" (right) position stops the brew cycle. Stopping a brew cycle after it has been started will not stop the flow of water into the funnel until the tank syphons down to its proper level. The switch should always be placed in this position after a brew cycle and whenever the brewer is unattended.

10145 072600

Page 7 of the Bunn T3A user manual — CLEANING CAUTION - CLEAN AND SANITIZE YOUR ICED TEA BREWER DAILY
Page 7 · click to enlarge
Page 7

OPERATING CONTROLS (cont.)

B. SELECTOR SWITCH (T6 ONLY) Placing the selector switch in the "ON" (left or right) position allows the start switch to activate a timed brew cycle for three gallons of tea. It also selects into which reservoir dilution water will be introduced. This switch should always be in the "OFF" (center) position after a brew cycle or when the brewer is unattended.

C. START SWITCH Starts a brew cycle when the ON/OFF or SELECTOR switch is in the "ON" position.

CLEANING CAUTION - CLEAN AND SANITIZE YOUR ICED TEA BREWER DAILY

1. Remove and thoroughly clean the entire brew funnel. The funnel tip and screen must be free from any tea particles or residue. Reassemble the funnel. 2. Place the ON/OFF or SELECTOR switch in the "OFF” position. Remove and thoroughly rinse the sprayhead. The holes must be open and clear of any mineral deposits. Wipe the sprayhead panel clean with a damp cloth. 3. Insert the deliming spring into the sprayhead fitting until no more than two inches is visible and move it in and out 5 or 6 times. Insert the spring into the airvent hole in the sprayhead panel and move it in and out 5 or 6 times. Reattach the sprayhead. 4. Twist the faucet shank nut in a clockwise direction and remove the faucet from the brewer. 5. Thoroughly clean the entire inside surface of the reservoir, the surfaces behind the reservoir rim, and the faucet with a brush using a mild detergent and water solution. Rinse the reservoir and shank in warm water, 6. Disassemble the faucet. The faucet cleaning procedure requires a three compartment sink. Thoroughly wash all faucet parts in a mild detergent and water solution in the first sink. Rinse the parts in hot water in the second sink. Sanitize the parts for one minute in 75o warm chlorine solution (at least 50 ppm) in the third sink. Reassemble the faucet and attach it to the brewer. 7. Sanitize all exposed surfaces of the reservoir with a 75o warm chlorine solution (at least 100 ppm). Empty the reservoir, insert the brew funnel and thoroughly rinse everything by running two complete brew cycles, empty the reservoir after each brew cycle. 8. Wash the entire outside surface of the brewer with a clean damp cloth.

TEA BREWING 1. Begin each brew cycle with a clean empty brew funnel and reservoir(s). 2. Insert a BUNN® filter into the funnel. 3. Pour the packet of loose fresh tea leaves into the filter. Approximately four ounces is recommended. 4. Level the bed of tea leaves by gently shaking. 5. Slide the funnel into the funnel rails until it stops. On T6 brewers, fully rotate the funnel handle to the left or right to align the funnel discharge over the selected reservoir. 6. Place the ON/OFF or SELECTOR switch in the “ON” position. 7. Momentarily press the start switch.

10145 072600

Page 8 of the Bunn T3A user manual — WARNING –
Page 8 · click to enlarge
Page 8

TROUBLESHOOTING

A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic Technical Service Department.

  • Inspection, testing, and repair of electrical equipment should be performed only by qualified service personnel.
  • All electronic components have 120 volt ac and low voltage dc potential on their terminals. Shorting of terminals or the application of external voltages may result in board failure.
  • Intermittent operation of electronic circuit boards is unlikely. Board failure will normally be permanent. If an intermittent condition is encountered, the cause will likely be a switch contact or a loose connection at a terminal or crimp.
  • Solenoid removal requires interrupting the water supply to the valve. Damage may result if solenoids are energized for more than ten minutes without a supply of water.
  • The use of two wrenches is recommended whenever plumbing fittings are tightened or loosened. This will help to avoid twists and kinks in the tubing.
  • Make certain that all plumbing connections are sealed and electrical connections tight and isolated.
  • This brewer is heated at all times. Keep away from combustibles.

WARNING –

  • Exercise extreme caution when servicing electrical equipment.
  • Unplug the brewer when servicing, except when electrical tests are specified.
  • Follow recommended service procedures
  • Replace all protective shields or safety notices

Brew cycle will not start

1. No water

Water lines and valves to the brewer must be open.

2. No power or incorrect voltage to the brewer

Check circuit breakers or fuses.

3.External Strainer/ Flow Control (.750 GPM)

(A) Direction of flow arrow must be pointing towards the brewer.

(B) Remove the strainer/flow con- trol and check for obstructions. Clear or replace.

4. (A) ON/OFF Switch (T3)

Refer to Service - ON/OFF Switch for testing. See page 24

(B) Selector Switch (T6)

Refer to Service - Selector Switch for testing. See page 24

Show 4 more labels / short text on this page
Problem · Probable Cause · Remedy · 10145 072600
Page 9 of the Bunn T3A user manual — PROBLEM PROBABLE CAUSE REMEDY
Page 9 · click to enlarge
Page 9

TROUBLESHOOTING (cont.)

PROBLEM PROBABLE CAUSE REMEDY

Brew cycle will not start (cont.)

5. Start Switch

Refer to Service - Start Switch for testing procedures. See page 26

6. Brew Timer

Refer to Service - Brew Timer for testing procedures. See page 17 or 18

7. Brew Solenoid Valve

Refer to Service - Brew Solenoid Valve for testing procedures. See page 15

8. Internal Flow control (.195 GPM)

(A) Direction of flow arrow must be pointing towards brewer.

(B) Remove the flow control and check for obstructions. Clear or re- place.

Water is not hot

1. Limit Thermostat CAUTION - Do not eliminate or bypass limit thermostat or thermal cut-off. Use only BOM replacement part #29329.1000

Refer to Service - Limit Thermostat for testing procedures. See page 23

2. Control Thermostat

Refer to Service - Control Thermo- stat for testing procedures. See page 20

3. Tank Heater

Refer to Service - Tank Heater for testing procedures. See page 27

Dilution cycle will not start

1. (A) ON/OFF Switch (T3)

Refer to Service - ON/OFF Switch for testing procedures. See page 24

(B) Selector Switch (T6)

Refer to Service - Selector Switch for testing procedures. See page 24

2. Start Switch

Refer to Service - Start Switch for testing procedures. See page 26

3. Dilution Timer

Refer to Service - Dilution Timer for testing procedures. See page 22

10145 072600

Page 10 of the Bunn T3A user manual — PROBLEM PROBABLE CAUSE REMEDY
Page 10 · click to enlarge
Page 10

TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY

Dilution cycle will not start (cont.)

4. Dilution Solenoid Valve

Refer to Service - Dilution Solenoid Valve for testing procedures. See page 21

Inconsistent beverage level in dis- penser

1. Internal Flow Control (.195 GPM)

(A) Direction of flow arrow must be pointing towards the brewer.

(B) Remove the flow control and check for obstruction. Clear or re- place.

2. Syphon System

The brewer must be level or slightly lower in front to syphon properly.

3. Lime Build-up CAUTION - Tank and tank components should be delimed regularly depending on local water conditions. Excessive mineral build-up on stainless steel surfaces can initiate corrosive reactions resulting in serious leaks.

Inspect the tank assembly for ex- cessive lime deposits. Delime as required.

4. Water Pressure

The water pressure to the brewer must be at least 20 psi (138 kPa).

Consistently high or low beverage level in the dispenser

1. Brew Timer/Dilution Timer

With the ON/OFF switch "ON" adjust the brew timer to achieve the rec- ommended 76 oz of concentrate then the dilution timer to achieve a total of 396 oz for each three-gal- lon brew cycle.

2. External Strainer/Flow Control (.750GPM)

(A) Direction of flow arrow must be pointing towards brewer.

(B) Remove the strainer/flow con- trol and check for obstructions. Clear or replace.

10145 072600

Page 11 of the Bunn T3A user manual — REMEDY PROBABLE CAUSE PROBLEM
Page 11 · click to enlarge
Page 11

TROUBLESHOOTING (cont.)

REMEDY PROBABLE CAUSE PROBLEM

Spitting or excessive steaming

1. Lime Build-up CAUTION - Tank and tank components should be delimed regularly depending on local water conditions. Excessive mineral build-up on stainless steel surfaces can initiate corrosive reactions resulting in serious leaks.

Inspect tank assembly for excessive lime deposits. Delime as required.

2. Control Thermostat

Refer to Service - Control Thermo- stat for testing procedures. See page 20

Drip-out time too long

1. Funnel Tip

The brew funnel should be cleaned thoroughly before each brew cycle to lessen the chance of tea leaf par- ticles clogging the drip-out tip.

1. Syphon System

The brewer must be level or slightly lower in front to syphon properly.

2. Lime Build-up CAUTION - Tank and tank components should be delimed regularly depending on local water conditions. Excessive mineral build-up on stainless steel surfaces can initiate corrosive reactions resulting in serious leaks.

Inspect the tank assembly for ex- cessive lime deposits. Delime as required.

3. Brew Solenoid Valve

Refer to Service - Brew Solenoid Valve for testing procedures. See page 15

Water flows into tank continuously (ON/OFF or Slector Switch "ON")

1. Brew Timer

Refer to Service - Brew Timer for testing procedures. See page 17 or 18

Water flows into tank continuously (ON/OFF or Selector Switch "OFF")

1. Brew Solenoid Valve

Refer to Service - Brew Solenoid Valve for testing procedures. See page 15

Dripping from sprayhead · 10145 072600

Page 12 of the Bunn T3A user manual — REMEDY PROBABLE CAUSE PROBLEM
Page 12 · click to enlarge
Page 12

TROUBLESHOOTING (cont.)

REMEDY PROBABLE CAUSE PROBLEM

1.Dispenser

The dispenser must be completely empty before starting a brew cycle.

2. Brew Timer

Refer to Service - Brew Timer for testing procedures. See page 17 or 18

3. Brew Solenoid Valve

Remove the Brew Solenoid Valve and clean any obstruction. Rebuild or replace the valve if necessary. See page 15

4. Dilution Timer

Refer to Service - Dilution Timer for testing procedures. See page 22

5. Dilution Solenoid Valve

Refer to Service - Dilution Solenoid Valve for testing procedures. See page 21

1. Filter Type

BUNN® paper filters must be used for proper extraction.

2. Tea

A sufficient quantity of fresh, loose tea leaves should be used for proper extraction.

3. Sprayhead

A six-hole stainless steel spray- head must be used for proper ex- traction.

4. Funnel Loading

The BUNN® paper filter must be centered in the funnel and the bed of tea leaves leveled by gentle shak- ing.

5. Water Temperature

Place an empty funnel into the fun- nel rails on the brewer. Initiate a brew cycle and check the water temperature immediately below the sprayhead with a thermometer. The reading should not be less than 200°F(93°C). Adjust the control thermostat to increase the water temperature. Replace if necessary.

Beverage overflows dispenser · Weak beverage · 10145 072600

Page 13 of the Bunn T3A user manual — PROBLEM PROBABLE CAUSE REMEDY
Page 13 · click to enlarge
Page 13

TROUBLESHOOTING (cont.)

PROBLEM PROBABLE CAUSE REMEDY

Dry tea leaves remain in the funnel

1. Funnel Loading

The BUNN® paper filter must be centered in the funnel and the bed of grounds leveled by gently shak- ing.

Brewer is making unusal noises

1. Solenoid(s)

The nut on the solenoid(s) must be tight or it will vibrate during opera- tion.

2. Plumbing Lines

Plumbing lines should not be rest- ing on the counter top.

3. Water Supply

(A) The brewer must be connected to a cold water line.

(B) Water pressure to the brewer must not exceed 90 psi(620 kPa). Install a regulator if necessary to lower the working pressure to ap- proximately 50 psi (345 kPa).

4. Tank Heater

Remove and clean lime off the tank heater. See page 27

10145 072600

Page 14 of the Bunn T3A user manual — COMPONENT ACCESS
Page 14 · click to enlarge
Page 14

SERVICE

Bunn T3A — SERVICE diagram (page 14)
Fig. 8

This section provides procedures for testing and replacing various major components used in this brewer should service become necessary. Refer to Troubleshooting for assistance in determining the cause of any problem.

COMPONENT ACCESS

All components are accessible by the removal of the top cover and rear inspection panel.

The top cover is attached with four #6-32 screws. Removal of the top cover will allow access to ON/OFF or SELECTOR switch, start switch, brew timer, dilu- tion timer, control thermostat, limit thermostat and tank heater,

The rear inspection panel is attached with six #8- 32 screws. Removal of the rear panel will allow access to the brew solenoid valve, dilution solenoid valve(s) and .195 GPM flow control and check valve.

Brew Solenoid Valve 15 Brew Timer (Early Models) 17 Digital Brew Timer (Late Models) 18 Control Thermostat 20 Dilution Solenoid Valve 21 Dilution Timer 22 Limit Thermostat 23 ON/OFF Switch & Selector Switch 24 Start Switch 26 Tank Heater 27 Wiring Diagrams 28 thru 30

Contents · 10145 072600

Page 15 of the Bunn T3A user manual — SERVICE
Page 15 · click to enlarge
Page 15
Bunn T3A — SERVICE diagram (page 15)
Fig. 9

If continuity is present as described, reconnect the white/violet from the switch and white/green wire from the brew timer. If continuity is not present as described, replace the solenoid valve.

6. Check the solenoid valve for coil action. Connect the brewer to the power source. With ON/OFF or SELECTOR switch in the "ON" (T3 left, T6 left or right) position press start switch and listen carefully in the vicinity of the solenoid valve for a "clicking" sound as the coil magnet attracts. 7. Disconnect the brewer from the power source.

If the sound is heard as described and water will not pass through the solenoid valve, there may be a block- age in the water line before the solenoid valve or, the solenoid valve may require inspection for wear, and removal of waterborne particles. If the sound is not heard as described, replace the solenoid valve.

Viewing the brewer from the rear the brew sole- noid valve is mounted on the left side of the mounting bracket.

Removal and Replacement: 1. Remove all wires from solenoid valves. 2. Turn off the water supply to the brewer. 3. Disconnect the water lines to and from the sole- noid valves. 4. Remove the two #8-32 keps nuts holding the mounting bracket to the brewer base. 5. Lift out the bracket. 6. Remove the two #10-32 slotted-head screws hold- ing the solenoid valve to the mounting bracket. 7. Securely install the new solenoid valve to the mounting bracket. 8. Attach the mounting bracket to the brewer base. 9. Securely fasten the water lines to and from the solenoid valves. 10. Refer to the Fig. 3 when reconnecting the wires.

Test Procedures: 1. Disconnect the brewer from the power source. 2. Disconnect the white/violet and white/green wires from the solenoid valve. With the ON/OFF or SE- LECTOR switch in the "ON" (T3 left, T6 Left or right) position and press the start switch. 3. With a voltmeter, check the voltage across the white/violet and white/green wires. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models. 4. Disconnect the brewer from the power source,

If voltage is present as described, proceed to #5. If voltage is not present as described, refer to Wiring Diagrams and check brewer wiring harness.

5. Check for continuity across the solenoid valve coil terminals.

10145 072600

Page 16 of the Bunn T3A user manual — SERVICE
Page 16 · click to enlarge
Page 16

BREW SOLENOID VALVE (cont.)

Bunn T3A — SERVICE diagram (page 16)
Fig. 10

WHI/GRN to BREW Timer TL4 WHI/VIO to Dilution Solenoid

WHI/VIO to Brew Solenoid WHI/VIO to Brew Timer TL1

WHI/GRN to Brew Timer TL4 WHI/VIO to Brew Timer TL1

10145 072600

Page 17 of the Bunn T3A user manual — BREW TIMER
Page 17 · click to enlarge
Page 17

Wiring Diagrams and check the wiring harness.

BREW TIMER

5. Check the voltage across terminals TL1 and TL4 with a voltmeter when the ON/OFF or SELECTOR switch is in the “ON” (T3 left, T6 left or right) po- sition and the start switch is momentarily placed in the lower position. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models for approximately twenty seconds and then return to its previous indication. b) 240 volts ac for two wire 240 volt models for approximately twenty seconds and then return to is previous indication. c) 100 volts ac for two wire 100 volt models for approximately twenty seconds and then return to its previous indication. 6. Disconnect the brewer from the power source.

Bunn T3A — BREW TIMER diagram (page 17)
Fig. 11

If voltage is present as described, the timer is operat- ing properly. Adjust the timer dial as required. If voltage is not present as described, replace the timer.

The brew timer is located in the hood. It consists of the left dial plate and circuit board.

Removal and Replacement: 1. Remove all wires from the timer. 2. Remove the circuit board and dial plate from the brackets. 3. Install the new timer circuit board as described in the Late Model Timer Section. 4. Refer to Fig. 7 when reconnecting the wires. 5. Install the Timer Setting Decal, provided with the timer replacement kit, to the rear of the schematic, on the top cover. 5. Adjust the timer as required. Refer to Late Model Timer Section.

Test Procedure: 1. Disconnect the brewer from the power source. 2. Remove the wires from terminals TL3, TL4, & TL5 of the timer and rotate the dial fully counterclock- wise. 2. With a voltmeter, check the voltage across termi- nals TL1 and TL2 when the ON/OFF or SELECTOR switch is in the “ON” (T3 left, T6 left or right) po- sition. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models. 3. Disconnect the brewer from the power source.

Bunn T3A — BREW TIMER diagram (page 17)
Fig. 12

WHI to Power Cord (100V & 120V) or RED to Power Connector (240V) WHI to Dilution Timer (100V & 120V) or RED to Dilution Timer (240V)

If voltage is present as described, proceed to #4. If voltage is not present as described, refer to the Wir- ing Diagrams and check the wiring harness.

4. Check for continuity across the white/orange and white/yellow wires when the start switch is held in the lower position.

If continuity is present as described, refer to Fig. 5 and reconnect the wires to terminals TL3, TL4, & TL5 of the timer board and proceed to #5. If continuity is not present as described, refer to the

10145 072600

Page 18 of the Bunn T3A user manual — BREW TIMER
Page 18 · click to enlarge
Page 18

SERVICE (cont.) DIGITAL BREW TIMER (Late Models)

If voltage is not present as described, refer to the Wiring Diagrams and check the brewer wiring har- ness.

Bunn T3A — BREW TIMER diagram (page 18)
Fig. 13
6. With a voltmeter, check the voltage across terminals TL1 and TL4 when the "ON/OFF" switch is in the "ON" position. Connect the brewer to the power source. The indication must be 0 volts.

If voltage is as described, proceed to #7. If voltage is not as described, disconnect the brewer from the power source and replace the timer.

7. With a voltmeter, check the voltage across terminals TL1 and TL4 when the "ON/OFF" switch is in the "ON" position. Connect the brewer to the power source and press the "START" switch. The indication must be as follows: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac on two wire 240 volt models. c) 100 volts ac for two wire 100 volt models.

If voltage is present as described, the brew timer is operating properly. Reset the timer as required, to obtain the desired brew volume. If voltage is not present as described, disconnect the brewer from the power source and replace the timer.

The timer is located inside the hood, attached to the left side.

Test Procedure. NOTE: Do not remove or install wires while timer board is installed. Pressure applied to one side may cause damage to the board. 1. Disconnect the brewer from the power source and remove the front access panel. 2. Remove the two #8-32 screws securing circuit board to the mounting bracket. 3. Remove circuit board and spacers (as required). 4. With a voltmeter, check the voltage across termi- nals TL1 and TL2 when the "ON/OFF" switch is in the "ON" position. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models. 5. Disconnect the brewer from the power source.

Removal and Replacement: 1. Remove the two #8-32 screws securing circuit board to the mounting bracket. 2. Remove circuit board and spacers (as required). 3. Remove all wires from the timer. 4. Attach all wires to the replacement timer board prior to installation to the component mounting bracket. Refer to FIG. 7 when reconnecting the wires. 5. Install new circuit board with spacers (as re- quired) to the component mounting bracket. 6. Adjust the timer as described below.

Timer Setting: NOTE: Prior to setting or modifying volumes, check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in place. NOTE: All volume settings must be done with the sprayhead installed.

If voltage is present as described, proceed to #6.

10145 072600

Page 19 of the Bunn T3A user manual — BREW TIMER
Page 19 · click to enlarge
Page 19

DIGITAL BREW TIMER (Late Models)(cont.)

1. Modifying brew volumes. To modify a brew volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board.
3. Setting programming disable feature. If it becomes necessary to prevent anyone from changing brew time once programmed, you can set the SET/ LOCK switch to the “LOCK” position. This will prevent any further programming until switch is once again put into the “SET” position.

To increase a brew volume, place the ON/OFF switch in the “ON” position, press and hold the START switch until three clicks are heard. Release the switch and press it again one or more times. (Failure to re- lease the switch within two seconds after the third click causes the volume setting to be aborted and pre- vious volume setting will remain in memory.) Each time the switch is pressed, two seconds are added to the brew time period. Allow the brew cycle to finish in order to verify that the desired volume has been achieved.

Bunn T3A — BREW TIMER diagram (page 19)
Fig. 14

To decrease a brew volume, place the ON/OFF switch in the “ON” position, press and release the START switch once for every two-second interval to be removed from the total brew time period; then im- mediately press and hold down the START switch until three clicks are heard. Release the switch. (Failure to release the switch within two seconds after the third click causes the volume setting to be aborted and pre- vious volume setting will remain in memory). Allow the brew cycle to finish in order to verify that the de- sired volume has been achieved.

2. Setting brew volumes. To set a brew volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board. Place the ON/OFF switch in the “ON” position, press and hold the START switch until three distinct clicks are heard and then release the switch. (Failure to release the switch within two seconds after the third click causes the volume set- ting to be aborted and previous volume setting will remain in memory.) View the level of the liquid being dispensed. When the desired level is reached, turn the ON/OFF switch to “OFF”. NOTE: Several ounces of water will continue to sy- phon from the tank after turning the switch “OFF”. The brewer remembers this volume and will continue to brew batches of this size until the volume setting procedure is repeated.

TL1 - WHI/VIO to Dilution Timer and WHI/VIO to ON/OFF Switch TL2 - WHI to Power Cord (100V & 120V) or RED to Power Connector (240V) and WHI to Dilution Timer (100V & 120V) or RED to Dilution Timer (240V) TL3 - WHI/ORN to Start Switch TL4 - WHI/GRN to Brew Solenoid TL5 - WHI/YEL to Start Switch

J2-2 - PNK to Selector Switch (Half Batch Option only) J2-3 - GRY to Selector Switch (Half Batch Option only)

10145 072600

Page 20 of the Bunn T3A user manual — CONTROL THERMOSTAT
Page 20 · click to enlarge
Page 20

240 volt two wire models when the control ther- mostat is turned fully clockwise. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models. 8. Disconnect the brewer from the power source.

CONTROL THERMOSTAT

Bunn T3A — CONTROL THERMOSTAT diagram (page 20)
Fig. 15

If voltage is present as described, reinstall the capil- lary tube into the tank to the line 4.5" above the bulb, the control thermostat is operating properly. If voltage is not present as described, replace the ther- mostat.

Removal and Replacement: 1. Remove both wires from the control thermostat terminals. 2. Remove the thermostat capillary bulb by firmly pulling up on the capillary tube at the tank lid. This will disengage the grommet from the tank lid. 3. Remove the #8-32 screw holding the control ther- mostat to its bracket. 4. Slide the grommet to the line 4.5" above the bulb on the new capillary tube. 5. Insert the capillary bulb through the hole in the tank lid and press the grommet firmly and evenly so that the groove in the grommet fits into the tank lid. 6. Carefully bend the capillary tube so that the tube and bulb inside the tank are in a vertical position.

The control thermostat is located inside hood on the right side just behind the dilution timer.

Test Procedures: 1. Disconnect the brewer from the power source. 2. Locate the blue/black wire on the control thermo- stat. 3. With a voltmeter, check the voltage across the blue/ black wire on the control thermostat and the white wire on the tank heater for 100 volt and 120 volt two wire models or red wire on the tank heater for 240 volt two wire models. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models. 4. Disconnect the brewer from the power source.

7. Fasten the new control thermostat to its bracket. 8. Refer to Fig. 9 when reconnecting the wires. 9. Adjust the control thermostat as required.

If voltage is present as described, proceed to #5. If voltage is not present as described, refer to the Wiring Diagrams and check the brewer wiring har- ness.

Bunn T3A — CONTROL THERMOSTAT diagram (page 20)
Fig. 16
5. Locate the black wire on the control thermostat. 6. Gently remove the capillary bulb and grommet from the tank. 7. With a voltmeter, check the voltage across the black wire of the control thermostat and the white wire on the tank heater for 100 volt and 120 volt two wire models or red wire on the tank heater for

10145 072600

Page 21 of the Bunn T3A user manual — CONTROL THERMOSTAT
Page 21 · click to enlarge
Page 21
Bunn T3A — CONTROL THERMOSTAT diagram (page 21)
Fig. 17

main for the approximate setting on the dilution dial, then return to its previous indication.

If voltage is present as described, proceed to #4. If voltage is not present as described, refer to the Wir- ing Diagrams and check the wiring harness.

4. Remove both wires from the coil and check for continuity across the coil terminals.

If continuity is present as described, reconnect the white/blue and white/violet wires and proceed to #5. If continuity is not present as described, replace the solenoid valve.

5. Check the solenoid valve for coil action. Connect the brewer to the power source, place the ON/OFF or SELECTOR switch in the “ON” (T3 left, T6 left or right) position and momentarily place the start switch in the lower position and release. Listen carefully after the approximate setting on the de- lay dial in the vicinity of the solenoid valve for a “clicking” sound as the coil magnet attracts and after the approximate setting on the dilution dial, repels the plunger. 6. Disconnect the brewer from the power source.

Viewing the brewer from the rear the dilution so- lenoid for the T3 is mounted on the center of the sole- noid mounting bracket, the T6 solenoids are mounted in the center and the right side of the mounting bracket.

Test Procedure: 1. Disconnect the brewer from the power source. 2. T3 - With a voltmeter, check the voltage across the white/blue and white/violet wires on the dilu- tion solenoid terminals when the ON/OFF switch is in the “ON” (left) position and the start switch is momentarily placed in the lower position. Con- nect the brewer to the power source. After the approximate setting on the delay dial, the indica- tion must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models, re- main for the approximate setting on the dilution dial, and then return to its previous indication. T6 - With a voltmeter, check the voltage across the white/blue and yellow wires on the dilution so- lenoid terminals for the right reservoir and the white/blue and the brown/black for the left reser- voir when the SELECTOR switch is in the “ON” (left for the left reservoir or right for the right res- ervoir) position and the start switch is momen- tarily placed in the lower position. Connect the brewer to the power source. After the approxi- mate setting on the delay dial, the indication must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models, re-

If the sound is heard as described and water will not pass through the solenoid valve, there may be a block- age in the water line before or after the solenoid valve or, the solenoid valve may require inspection for wear, and removal of waterborne particles. If the sound is not heard as described, replace the solenoid valve.

Removal and Replacement: 1. Remove all wires from the solenoid valves. 2. Turn off the water supply to the brewer. 3. Disconnect the water lines to and from the sole- noid valves. 4. Remove the two #8-32 keps nuts holding the mounting bracket to the trunk base. 5. Lift out the bracket. 6. Remove the two #10-32 slotted-head screws hold- ing the solenoid valve to the mounting bracket. 7. Securely install the new solenoid valve to the mounting bracket. 8. Attach the mounting bracket to the trunk base. 9. Securely fasten the water lines to and from the solenoid valves. 10. Refer to Fig. 3 when reconnecting the wires.

10145 072600

Page 22 of the Bunn T3A user manual — CONTROL THERMOSTAT
Page 22 · click to enlarge
Page 22

SERVICE (cont.) DILUTION TIMER

If continuity is present as described, reconnect the wires to terminals TL3, TL4, & TL5 of the timer board and proceed to #5. If continuity is not present as described, refer to the Wiring Diagrams and check the wiring harness.

Bunn T3A — CONTROL THERMOSTAT diagram (page 22)
Fig. 18

5. With a voltmeter, check the voltage across termi- nals TL1 and TL4 when the ON/OFF or selector switch is in the "ON" (T3 left, T6 left or right) po- sition and the start switch is momentarily placed in the lower position. Connect the brewer to the power source. After a delay of approximately three minutes, the indication must be: a) 120 volts ac for two wire 120 volt models for approximately one minute and then return to its previous indication. b) 240 volts ac for two wire 240 volt models for approximately one minute and then return to its previous indication. c) 100 volts ac for two wire 100 volt models for approximately one minute and then return to its previous indication. 6. Disconnect the brewer from the power source.

The dilution timer is located inside the hood on the right side. It consists of the dial plate with two dials and circuit board.

If voltage is present as described, the timer is operat- ing properly. Adjust the timer dials as required. If voltage is not present as described, replace the timer.

Test Procedure: 1. Disconnect the brewer from the power source and remove the wires from terminals TL3, TL4, & TL5 of the timer and rotate both dials fully counter- clockwise. 2. With a voltmeter, check the voltage across termi- nals TL1 and TL2 when the ON/OFF switch is in the "ON" position. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models. 3. Disconnect the brewer from the power source.

Removal and Replacement: 1. Remove all wires from the timer. 2. Remove the circuit board and dial plate from the brackets. 4. Install the new dial plate and circuit board to the brackets. 5. Refer to Fig. 12 when reconnecting the wires. 6. Adjust the timer dials as required.

Bunn T3A — CONTROL THERMOSTAT diagram (page 22)
Fig. 19

WHI to Brew Timer (100V & 120V Models) RED to Brew Timer (240V Models)

If voltage is present as described, proceed to #4. If voltage is not present as described, refer to the Wir- ing Diagrams and check the wiring harness.

PNK to Selector Switch (Half Batch Option Only) GRY to Selector Switch (Half Batch Option Only)

GRY to Selector Switch (Half Batch Option Only) PNK to Selector Switch (Half Batch Option Only)

4. Check for continuity across the green and red/ black wires when the start switch is held in the lower position.

10145 072600

Page 23 of the Bunn T3A user manual — LIMIT THERMOSTAT
Page 23 · click to enlarge
Page 23

LIMIT THERMOSTAT

4. Remove the blue/black wire from the limit ther- mostat. 5. With a voltmeter, check the voltage across the ex- posed terminal of the limit thermostat and the white wire or red wire on the tank heater. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models. 6. Disconnect the brewer from the power source.

Bunn T3A — LIMIT THERMOSTAT diagram (page 23)
Fig. 20

If voltage is present as described, reconnect the blue wire to the limit thermostat. The limit thermostat is operating properly. If voltage is not present as described, replace the limit thermostat.

Removal and Replacement 1. Remove both wires from the limit thermostat ter- minals. 2. Carefully slide the limit thermostat out from un- der the retaining clip. 3. Carefully slide the new limit thermostat into the retaining clip. 4. Refer to Fig. 14 when reconnecting the wires.

The limit thermostat is located inside the hood on the tank lid.

Test Procedure: 1. Disconnect the brewer from the power source and remove the black wire from the limit thermostat. 2. With a voltmeter, check the voltage across the black wire removed from the limit thermostat and the white wire or red wire on the tank heater ter- minal. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models. b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models. 3. Disconnect the brewer to from the power source.

Bunn T3A — LIMIT THERMOSTAT diagram (page 23)
Fig. 21

If voltage is present as described, reconnect the black wire and proceed to #4. If voltage is not present as described, refer to the Wir- ing Diagrams and check the wiring harness.

10145 072600

Page 24 of the Bunn T3A user manual — LIMIT THERMOSTAT
Page 24 · click to enlarge
Page 24

ON/OFF SWITCH (T3 W/OUT HALF BATCH) or SE- LECTOR SWITCH (T3 W/HALF BATCH and T6 BREW- ERS)

6. Check for continuity across the center and end terminals of the top row when the switch is in the “ON” (left) position.
Bunn T3A — LIMIT THERMOSTAT diagram (page 24)
Fig. 22

If continuity is present as described, replace the wires, the switch is operating properly. If continuity is not present as described, replace the switch.

T3 Brewers W/Half Batch Option 1. Disconnect the brewer from the power source. 2. Remove the black wire from the top center switch terminal. 3. With a voltmeter, check the voltage across the black wire removed from the selector switch and the white wire or red wire on the tank heater. 4. Connect the brewer to the power source.The indi- cation must be: a) 120 volts ac for two wire 120 volt models. a) 240 volts ac for two wire 240 volt models. b) 100 volts ac for two wire 100 volt models. 5. Disconnect the brewer from the power source.

If voltage is present as described, proceed to #6. If voltage is not present as described, refer to the Wir- ing Diagrams and check the wiring harness.

The ON/OFF or SELECTOR switch is located in the left front of the hood.

6. Check for continuity across the center and left or right terminals of the top row when the switch is "FULL" or "HALF" (left or right) position.

Test Procedure: T3 Brewers W/Out Half Batch Option 1. Disconnect the brewer from the power source. 2. Remove the black and white/violet wires from the switch terminals. 3. With a voltmeter, check the voltage across the black wire removed from the ON/OFF switch and the white wire remaining on the switch terminal. 4. Connect the brewer to the power source.The indi- cation must be 120 volts ac for two wire 120 volt models. 5. Disconnect the brewer from the power source.

If continuity is present as described, replace the wires, the switch is operating properly. If continuity is not present as described, replace the switch.

7. On T3 brewers disconnect the pink and gray wires from the left and center terminals. 8. Check for continuity across the left and center terminals in rows two, three and four with the switch in the half batch position.

If voltage is present as described, proceed to #6. If voltage is not present as described, refer to the Wir- ing Diagrams and check the wiring harness.

If continuity is present as described, replace the wires the switch is operating properly. If continuity is not present as described, replace the switch.

10145 072600

Page 25 of the Bunn T3A user manual — LIMIT THERMOSTAT
Page 25 · click to enlarge
Page 25

ON/OFF SWITCH (T3 W/OUT HALF BATCH) or SE- LECTOR SWITCH (T3 W/HALF BATCH and T6 BREWERS)(cont.)

Removal and Replacement: 1. Remove the wires from the switch terminals. 2. Compress the clips inside the hood and gently push the switch through the opening. 3. Push the new switch into the opening and spread the clips to hold the switch captive in the hood. 4. Refer to FIG. 16 when reconnecting the wires.

T6 Brewers 1. Disconnect the brewer from the power source. 2. Remove the black wire from the top center switch terminal. 3. With a voltmeter, check the voltage across the black wire removed from the selector switch and the white wire or red wire on the tank heater. 4. Connect the brewer to the power source.The indi- cation must be: a) 120 volts ac for two wire 120 volt models. a) 240 volts ac for two wire 240 volt models. b) 100 volts ac for two wire 100 volt models. 5. Disconnect the brewer from the power source.

Bunn T3A — LIMIT THERMOSTAT diagram (page 25)
Fig. 23

BLK to Power Cord (100V & 120V Models) BLK to Power Connector (240V Models)

If voltage is present as described, proceed to #6. If voltage is not present as described, refer to the Wir- ing Diagrams and check the wiring harness.

WHI to Dilution Timer TL2 (100V & 120V Models) RED to Diltuion Timer (240V Models)

6. Check for continuity across the center and left or right terminals of the top row when the switch is "ON" (left or right) position.

BLK to Power Cord (100V & 120V Models) BLK to Power Connector (240V Models)

If continuity is present as described, replace the wires, the switch is operating properly. If continuity is not present as described, replace the switch.

WHI/VIO to Dilution Timer TL1 WHI/VIO to Brew Timer TL1

GRY to Dilution Timer (Delay) GRY to Dilution Timer (Dilution)

PNK to Dilution Timer (Delay) PNK to Dilution Timer (Dilution)

7. Check for continuity across the left and center terminals in rows two, three and four with the switch in the "ON" (left or right) position.

If continuity is present as described, replace the wires. The switch is operating properly. If continuity is not present as described, replace the switch.

BLK to Power Connector (120V Models) BLK to Power Connector (240V Models) WHI/VIO to Brew Timer TL1

10145 072600

Page 26 of the Bunn T3A user manual — LIMIT THERMOSTAT
Page 26 · click to enlarge
Page 26

SERVICE (cont.) START SWITCH

If continuity is present as described, reconnect the wires, the switch is operating properly. If continuity is not present as described, replace the switch.

Bunn T3A — LIMIT THERMOSTAT diagram (page 26)
Fig. 24

Removal and Replacement: 1. Remove the wires from the switch terminals. 2. Compress the clips inside the hood and gently push the switch through the opening. 3. Push the new switch into the opening and spread the clips to hold the switch captive in the hood. 4. Refer to Fig. 18 when reconnecting the wires.

Bunn T3A — LIMIT THERMOSTAT diagram (page 26)
Fig. 25

WHI/ORN to Brew Timer TL3 RED/BLK to Dilution Timer TL3

The start switch is located in the right front of the hood.

Test Procedure: 1. Disconnect the brewer from the power source. 2. Remove the wires from all four terminals. 3. Check for continuity across the two terminals on the right side of the switch when it is held in the lower position. Continuity must not be present across these terminals in the upper position.

If continuity is present as described, proceed to #4. If continuity is not present as described, replace the switch.

4. Check for continuity across the two terminals on the left side of the switch when it is held in the lower position. Continuity must not be present across these terminals in the upper position.

10145 072600

Page 27 of the Bunn T3A user manual — TANK HEATER
Page 27 · click to enlarge
Page 27

Removal and Replacement: 1. Disconnect the black wire and the white or red wire from the tank heater terminals. 2. Remove sprayhead and the hex nut securing the sprayhead tube to the hood. Set aside for reas- sembly. 3. Disconnect vent tube. 4. Remove the six #10 thread cutting screws secur- ing the tank lid to the tank. 5. Remove the tank lid with limit thermostat, spray- head tube, tank heater and vent tube. 6. Remove the two hex nuts securing the tank heater to the tank lid. Remove tank heater with gaskets and discard. 7. Install new tank heater with gaskets on the tank lid and secure with two hex nuts. 8. Install tank lid with limit thermostat, sprayhead tube, tank heater and vent tube using six #10 thread cutting screws. 9. Secure sprayhead tube to hood using a hex nut. 10. Install sprayhead. 11. Connect vent tube to fitting. 12. Reconnect the wires to the limit thermostat, tank heater. See limit thermostat section in this manual when reconnecting wires. 13. Refer to Fig. 20 when reconnecting the tank heater wires.

TANK HEATER

Bunn T3A — TANK HEATER diagram (page 27)
Fig. 26

The tank heater is located inside the tank and se- cured to the tank lid.

Test Procedures: 1. Disconnect the brewer from the power supply. 2. With a voltmeter, check the voltage across the black and white wires on 100 volt and 120 volt models or the black and red wires for 240 volt models. Connect the brewer to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models . b) 240 volts ac for two wire 240 volt models. c) 100 volts ac for two wire 100 volt models. 3. Disconnect the brewer from the power source.

Bunn T3A — TANK HEATER diagram (page 27)
Fig. 27

BLK to Control Thermostat WHI to Power Cord (100v & 120V Models) RED to Power Connector (240V Models)

If voltage is present as described, proceed to #4 If voltage is not present as described, refer to the Wiring Diagrams and check wiring harness.

4. Disconnect the black wire and the white wire or red wire from the tank heater terminals. 5. Check for continuity across the tank heater terminals.

If continuity is present as described, reconnect the wires, the tank heater is operating properly. If continuity is not present as described, replace the tank heater. NOTE- If the tank heater remains unable to heat, re-

move and inspect heater for cracks in the sheath.

10145 072600

Page 28 of the Bunn T3A user manual — TANK HEATER
Page 28 · click to enlarge
Page 28
Bunn T3A — TANK HEATER diagram (page 28)
Fig. 28

10145 072600

Page 29 of the Bunn T3A user manual — TANK HEATER
Page 29 · click to enlarge
Page 29
Bunn T3A — TANK HEATER diagram (page 29)
Fig. 29

10145 072600

Page 30 of the Bunn T3A user manual — TANK HEATER
Page 30 · click to enlarge
Page 30
Bunn T3A — TANK HEATER diagram (page 30)
Fig. 30
Bunn T3A — TANK HEATER diagram (page 30)
Fig. 31

10145 072600

Ask about the Bunn T3A

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Bunn T3A

Be the first to ask — other owners or our team will answer.

Original document

Bunn T3A manual PDF

30 pages·1.6 MB·Ice Tea Maker·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…