EN
Bunn logo
Official user manual

Bunn AF PR-2

18 pages·1 MB·Beverage Dispenser·PDF·ENDEFRITNLJA
Bunn AF PR-2
Table of Contents 56 sections BUNN · AF PR-2 AF PR-3 · OPERATING & SERVICE MANUAL · BUNN-O-MATIC CORPORATION · … ShowHide
Page 1 of the Bunn AF PR-2 user manual — 28791.0001B 1/00 ©1998 Bunn-O-Matic Corporation
Page 1 · click to enlarge
Page 1

BUNN

®

AF PR-2 AF PR-3

Bunn AF PR-2 — BUNN diagram (page 1)
Fig. 1

OPERATING & SERVICE MANUAL

BUNN-O-MATIC CORPORATION

POST OFFICE BOX 3227 SPRINGFIELD, ILLINOIS 62708-3227 PHONE: (217) 529-6601 FAX: (217) 529-6644

28791.0001B 1/00 ©1998 Bunn-O-Matic Corporation

Page 2 of the Bunn AF PR-2 user manual — 00656.0000
Page 2 · click to enlarge
Page 2

INTRODUCTION This equipment supplies a premixed liquid product to the hoppers on the CDS-2 or 3 dispensers. It is for indoor use only on a sturdy counter or shelf.

WARRANTY

Bunn-O-Matic Corp. (“Bunn”) warrants the equipment manufactured by it to be commercially free from defects in material and workmanship existing at the time of manufacture and appearing within one year from the date of installation. In addition:

1.) Bunn warrants electronic circuit and/or control boards to be commercially free from defects in material and workmanship for two years from the date of installation.

2.) Bunn warrants the compressor on refrigeration equipment to be commercially free from defects in material and workmanship for two years from the date of installation.

3.) Bunn warrants that the grinding burrs on coffee grinding equipment will grind coffee to meet original factory screen sieve analysis for three years from date of installation or for 30,000 pounds of coffee, whichever comes first.

This warranty does not apply to any equipment, component or part that was not manufactured by Bunn or that, in Bunn’s judgement, has been affected by misuse, neglect, alteration, improper installation or operation, improper maintenance or repair, damage or casualty.

THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY, WRITTEN OR ORAL, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. The agents, dealers or employees of Bunn are not authorized to make modifications to this warranty or to make additional warranties that are binding on Bunn. Accordingly, statements by such individuals, whether oral or written, do not constitute warranties and should not be relied upon.

The Buyer shall give Bunn prompt notice of any claim to be made under this warranty by telephone at (217) 529-6601 or by writing to Post Office Box 3227, Springfield, Illinois, 62708-3227. If requested by Bunn, the Buyer shall ship the defective equipment prepaid to an authorized Bunn service location. If Bunn determines, in its sole discretion, that the equipment does not conform to the warranty, Bunn shall repair the equipment with no charge for parts during the warranty period and no charge for labor by a Bunn Authorized Service Representative during the warranty period. If Bunn determines that repair is not feasible, Bunn shall, at its sole option, replace the equipment or refund the purchase price for the equipment.

THE BUYER’S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS EQUIPMENT, WHETHER DERIVED FROM WARRANTY OR OTHERWISE, SHALL BE LIMITED, AS SPECIFIED HEREIN, TO REPAIR OR, AT BUNN’S SOLE OPTION, REPLACEMENT OR REFUND.

In no event shall Bunn be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.

USER NOTICES Carefully read and follow all notices on the equipment and in this manual. They were written for your protection. All notices are to be kept in good condition. Replace any unreadable or damaged labels.

Bunn AF PR-2 — WARRANTY diagram (page 2)
Fig. 2
Bunn AF PR-2 — WARRANTY diagram (page 2)
Fig. 3

00656.0000

00986.0002

28791.1 011500

Page 3 of the Bunn AF PR-2 user manual — ELECTRICAL HOOK-UP
Page 3 · click to enlarge
Page 3

INITIAL SET-UP NOTE: This refill unit should not be used to initially fill the hopper. Running the motor for extended periods will

trip the thermal switch. The thermal switch will reset, but requires up to 30 minutes of cooling time. NOTE: Hoses, clamps and product container connectors are not supplied. Fittings and labels are supplied. Make

hose assemblies as required.

1. Assemble hoppers with probe housing assemblies to CDS-2, CDS-3 or modify existing hoppers using template provided. 2. Make sure probe housing assembly is pushed down into slots on back of hoppers. 3. Install cable assembly to the lower right front of the auto refill box and the probe housing assemblies on the hoppers. The connectors on the cable pushes in and cap rotates 1/4 turn to lock into position. 4. Run output tubes from auto refill box to the quick disconnects in the hoppers. NOTE: Make sure numbers on the labels match up. Cable#1 with Hose#1, Cable#2 with Hose#2...ect. 5. Connect one end of input hoses to the auto refill box and the other end to the product container. Product container connectors (BIB) are not supplied. Install your own interface. NOTE: Make sure all connections are made before connecting the auto refill box to the power source. 6. Each product container has an ON/OFF refill switch located on the front of the auto refill box. A second switch for each hopper is at the probe housing assembly. These are 3 position switches, high level, low level and a center “OFF” position. 7. Place the main ON/OFF switch and ON/OFF refill switches in the “OFF” position. 8. Make sure all hoses are connected. Connect the dispenser to the power source and place the main ON/OFF switch in the “ON” position. 9. Place one of the ON/OFF refill switches in the “ON” position, after a four second delay product will begin to flow through the hoses into the hopper. Be sure the switch selected is filling the correct hopper, if not, check the labels. See NOTE in step #4. 10. To test refill circuit short out probes on one of the hoppers with a screwdriver, that hopper should shut off, remove the screwdriver and the hopper will start to fill again after a four second delay. If hopper does not start to fill, check labels, refer to NOTE in step #4.

ELECTRICAL REQUIREMENTS

The 200 volt or 240 volt versions require 2 wire, grounded service rated 200 volts ac or 240 volts ac, single phase, 50 Hz. (Refer to the dispenser’s data plate for exact voltage requirement.)

ELECTRICAL HOOK-UP

28791.1 011500

Page 4 of the Bunn AF PR-2 user manual — TROUBLESHOOTING
Page 4 · click to enlarge
Page 4

CLEANING

RECOMMENDED WEEKLY CLEANING: This should be done in conjunction with the recommended weekly cleaning of your CDS-2 or CDS-3 machine. The CDS Hoppers must be empty before starting.

1. Prepare a 1 gallon cleaning solution consisting of 1 gallon of hot water and a sanitizing cleaner which contains 3-5% chlorine based sanitizer. Mix per manufacturers instructions 2. Remove connectors from each concentrate container and place them directly into the cleaning solution. 3. Energize each refill station and allow the cleaning solution to pump through the system into the hoppers. The cleaning procedure should remove the color stains from the tubing. If not, prepare another gallon of cleaning solution and repeat. 4. After the cleaning solution has been pumped into the hoppers, rinse the cleaning solution container with hot water. 5. Fill the cleaning solution container with hot water. Energize each refill station and rinse thoroughly. The amount of clean hot rinse water should equal the amount of cleaning solution pumped through the system. 6. Empty the hoppers of your CDS machine and follow the recommended cleaning instructions. NOTE: The hoses should be checked monthly for deterioration, cracks and possible discoloration from some concentrates. Replace the tubing when necessary.

TROUBLESHOOTING

A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic Technical Service Department.

  • Inspection, testing, and repair of electrical equipment should be performed only by qualified service personnel.
  • All electronic components have 120 volt ac and low voltage dc potential on their terminals. Shorting of terminals or the application of external voltages may result in board failure.
  • Intermittent operation of electronic circuit boards is unlikely. Board failure will normally be permanent. If an intermittent condition is encountered, the cause will likely be a switch contact or a loose connection at a terminal or crimp.
  • Solenoid removal requires interrupting the water supply to the valve. Damage may result if solenoids are energized for more than ten minutes without a supply of water.
  • The use of two wrenches is recommended whenever plumbing fittings are tightened or loosened. This will help to avoid twists and kinks in the tubing.
  • Make certain that all plumbing connections are sealed and electrical connections tight and isolated.
  • Keep away from combustibles.
  • Unplug the dispenser when servicing, except when electrical tests are specified.
  • Follow recommended service procedures
  • Replace all protective shields or safety notices

28791.1 011500

Page 5 of the Bunn AF PR-2 user manual — OPERATING CONTROLS
Page 5 · click to enlarge
Page 5

OPERATING CONTROLS

Bunn AF PR-2 — OPERATING CONTROLS diagram (page 5)
Fig. 4

A. MAIN POWER ON/OFF The main power ON/OFF switch is located on the right of the front panel just above the power cord.

B. REFILL CIRCUIT ON/OFF The refill circuit ON/OFF switches are located on the right of the front panel just above the main power switch. These allow each circuit to operate independently of the other.

Page 6 of the Bunn AF PR-2 user manual — Motor thermal cutout (motor stops running)
Page 6 · click to enlarge
Page 6

TROUBLESHOOTING (cont.)

PROBLEM

PROBABLE CAUSE REMEDY

Product will not dispense

1. Empty product container

Replace or refill

2. No power or incorrect voltage to the dispenser

(A1) Check the outlet for 120 volts on two wire 120 volt dispenser.

(A2) Check the outlet for 200 volts or 240 volts ac for two wire 200 volt or 240 volt dispensers.

(B) Check circuit breakers or fuses.

3. Signal cable unplugged

Signal cable must be plugged in.

4. Hopper is full

Product must not be touching probes to fill.

5. Fuse and fuse holder

Refer to Service - Fuse and Fuse Holder for test procedures. See page 8

6. Main ON/OFF switch

Refer to Service - Main ON/OFF Switch for testing procedure. See page 9

7. Probe box LOW/OFF/HIGH switches

Refer to Service - Probe System. See page 10

8. Circuit board

Refer to Service - Circuit Board for testing procedures. See page 7

9. Vacuum switches

Refer to Service - Vacuum Switches for testing procedures. See page 14

10. Vacuum/Supply pump

Refer to Service - Vacuum/ Supply Pump for testing procedures. See page 12

1. Motor over heats

The thermal switch will reset, but requires up to 30 minutes of cooling time. See NOTE below.

Motor thermal cutout (motor stops running)

trip the thermal switch. The thermal switch will reset, but requires up to 30 minutes of cooling time.

28791.1 011500

Page 8 of the Bunn AF PR-2 user manual — FIG. 2 CIRCUIT BOARD
Page 8 · click to enlarge
Page 8

CIRCUIT BOARD

Removal and Replacement: 1. Disconnect the ten pin plug from the main wiring harness to the circuit board. 2. Remove the six #4-40 screws and spacers secur- ing the circuit board to the solenoid mounting bracket. Remove circuit board and discard. 3. Install new circuit board using #4-40 screws and spacers to secure the circuit board to the vacuum switch mounting bracket. The spacers must be between the solenoid mounting bracket and the circuit board. 4. Refer to Fig. 3 for circuit board ten pin connector.

O

N

OFF OFF

O

N

OFF OFF

O

N

OFF OFF

OFF OFF

O

N

Bunn AF PR-2 — O diagram (page 8)
Fig. 5

FIG. 2 CIRCUIT BOARD

SERVICE Location:The circuit board is located inside the autofillbox, mounted on the right side of the vacuum switch mounting. Test Procedure: 1. Disconnect the dispenser from the power source. 2. Disconnect the ten pin plug on the main wiringharness from the connector on the circuit board.3. Check the voltage across the black wire(#3) andthe white wire (#6) with a voltmeter. Connect the dispenser to the power source. The indication must be: a) 120 volts ac for two wire 120 volt models. b) 200 to 240 volts ac for two wire 200 or 240 volt models.If voltage is present as described, replace the circuitboard. If voltage is not present as described, refer to the wiring diagrams and check the main wiring har- ness.

Page 9 of the Bunn AF PR-2 user manual — SERVICE
Page 9 · click to enlarge
Page 9

SERVICE

FUSE AND FUSE HOLDER

Bunn AF PR-2 — SERVICE diagram (page 9)
Fig. 6

Removal and Replacement: Fuse: 1. Remove the cap from the fuse holder. 2. Remove fuse from the fuse holder, inspect, if blown discard. 3. Install new 10 amp fuse in the fuse holder. 4. Reinstall fuse holder cap.

Fuse Holder: 1. Disconnect the wires from the rear of the fuse holder. 2. Remove the nut securing the fuse holder to the front of the main mounting panel. 3. Push the fuse holder through the hole in the panel. 4. Install new fuse holder and fuse through the hole in the panel. 5. Secure the fuse holder to the panel. 6. Refer to Fig 5 and reconnect the wires.

The fuse holder is located on the lower right front of the autofill box just to the left of the power cord.

Test Procedure: 1. Disconnect the dispenser from the power source. 2. Remove cap and fuse from fuse holder. 3. Remove fuse from the cap. 4. Check for continuity through the fuse.

Bunn AF PR-2 — SERVICE diagram (page 9)
Fig. 7

If continuity is present as described, reinstall the fuse, the fuse is operating properly. If continuity is not present as described, replace the fuse.

28791.1 011500

Page 10 of the Bunn AF PR-2 user manual — Location:
Page 10 · click to enlarge
Page 10

SERVICE (cont.)

MAIN ON/OFF SWITCH

If voltage is present as described, proceed to #5. If voltage is not present as described, refer to the wiring diagrams and check the dispenser wiring har- ness.

Bunn AF PR-2 — SERVICE (cont.) diagram (page 10)
Fig. 8 · SERVICE (cont.)
5. Check for continuity across the switch terminals with the switch in the “ON” position. Continuity must not be present when the switch is in the “OFF” position.

If continuity is present as described, reconnect the wires to the switch terminals. If continuity is not present as described, replace the switch.

Removal and Replacement:: 1. Remove the wires from the switch terminals. 2. Compress the clips inside the autofill box and gently push the switch through the opening 3. Push the new switch into the opening and spread the clips to hold switch in the autofill box. 4. Refer to Fig 7 when reconnecting the wires.

Location:

The main ON/OFF switch is located on the lower right front of the autofill box just above the power cord.

Test Procedure: 1. Disconnect the dispenser from the power source. 2. Disconnect the black wire from the fuse holder to the main ON/OFF switch. Disconnect the white wire from pump #1. 3. Check for voltage across the black wires removed from the switch and the white wire removed from pump #1. Connect the dispenser to the power source. The indication must be: a) 120 volts ac for 2 wire 120 volt models. b) 200 to 240 volts ac for two wire 200 or 240 volt models. 4. Disconnect the dispenser from the power source.

Bunn AF PR-2 — Location: diagram (page 10)
Fig. 9 · Location:

28791.1 011500

Page 11 of the Bunn AF PR-2 user manual — PROBE SYSTEM
Page 11 · click to enlarge
Page 11

PROBE SYSTEM

Probe Boxes: 1. Disconnect the signal cable from the probe boxes. 2. Remove probe box from CDS hopper. 3. Place the switch on the probe box in the “HIGH” position. 4. Check the resistance across the box cable pins, see Fig. 8B.

Bunn AF PR-2 — PROBE SYSTEM diagram (page 11)
Fig. 10
FIG. 8 PROBESWITCHES FIG. 8 PROBESWITCHES
Page 12 of the Bunn AF PR-2 user manual — PROBE SYSTEM
Page 12 · click to enlarge
Page 12
Bunn AF PR-2 — PROBE SYSTEM diagram (page 12)
Fig. 11
Page 13 of the Bunn AF PR-2 user manual — VACUUM/SUPPLY PUMP ASSEMBLY
Page 13 · click to enlarge
Page 13

SERVICE (cont.)

a) 120 volts ac for two wire 120 volt models. b) 200 to 240 volts ac for two wire 200 or 240 volt models. If voltage is present as described, replace the pump. If voltage is not present as described, refer to the wiring diagrams and check the main wiring harness.

VACUUM/SUPPLY PUMP ASSEMBLY

Bunn AF PR-2 — VACUUM/SUPPLY PUMP ASSEMBLY diagram (page 13)
Fig. 12

J4-1 2 3 4 5 6 7 8 9 J4-10

C I R C U I T B O A R D

Pump Removal and Replacement: 1. Disconnect the wires from the pump leads. 2. Disconnect the input and output tubes. 3. Remove the four thumb screws securing the pump head to the pump body, discard pump head with tubes. 4. Remove the two #8-32 keps nuts securing the pump to the main mounting panel. 5. Remove the two #6-32 screws securing the pump body to the mounting bracket. 6. Remove pump body and discard. 7. Install new pump assembly on the pump mount- ing bracket and secure with two #6-32 screws. 8. Remove the four thumb screws securing the new pump head with hoses to the new pump body. 9. Using two #6-32 screws mount the pump body on the pump mounting bracket. 10. Using two #8-32 keps nuts mount the pump body and bracket to main panel. 11. Install new pump head with hoses to the rear of the pump body and secure with four thumb screws. 12. Connect the input and output tubes using new hose clamps. 13. Refer to Fig 17 and reconnect the wires.

The vacuum/supply pumps are located inside the autofill box.

Test Procedure: 1. Disconnect the dispenser from the power source. 2. Disconnect the white wire from the pump lead and the yellow, orange or red wire from the other lead. 3. Check the voltage across the white wire and yel- low, orange or red wire with a voltmeter. Connect the dispenser to the power source. Push the pump (flavor) switch for the pump to be tested. The indication must be :

Page 14 of the Bunn AF PR-2 user manual — ROLLERS
Page 14 · click to enlarge
Page 14

SERVICE (cont.)

VACUUM/SUPPLY PUMP TUBE INSTALLATION 1. Separate the pump head from the pump body. Hold pump head as shown in Fig. 18, with roller in the 2, 6 10 o’clock positions. 2. Wrap tubing around rollers and hold as shown in Fig. 18. 3. Insert the slot of the tubing key (supplied), as shown in Fig. 18 on the rotor so the bottom edge of the key is pressing the tubing into the pump head cavity. 4. Push down and turn the key counterclockwise to guide the tubing deep into the pump head cavity as shown in Fig. 19. 5. Hold the tubing and rotor in the pump head and remove key carefully. 6. Place pump body on the rotor shaft. 7. Squeeze the pump body and pump head together simultaneously until pump body and pump head are touching on all sides. Be careful not to pinch the tubing between the pump body and the pump head. FIG. 18 TUBING START POSITION

ROLLERS

PUMP HEAD

TUBING KEY

ENTRY PORT EXIT PORT

ROTOR

ROTOR SHAFT

FIG. 19 TUBING LOADED

28791.1 011500

Page 15 of the Bunn AF PR-2 user manual — ROLLERS
Page 15 · click to enlarge
Page 15
Bunn AF PR-2 — ROLLERS diagram (page 15)
Fig. 13

C I R C U I T B O A R D

J4-1 2 3 4 5 6 7 8 9 J4-10

Page 16 of the Bunn AF PR-2 user manual — ROLLERS
Page 16 · click to enlarge
Page 16
Bunn AF PR-2 — ROLLERS diagram (page 16)
Fig. 14

28791.1 011500

Page 17 of the Bunn AF PR-2 user manual — PROBE CONTROL
Page 17 · click to enlarge
Page 17

SCHEMATIC WIRING DIAGRAM

AFPR-3

N

GRN

Bunn AF PR-2 — N diagram (page 17)
Fig. 15

PROBE CONTROL

PROBE CONTROL

PROBE CONTROL

28791.1 011500

Page 18 of the Bunn AF PR-2 user manual — SCHEMATIC WIRING DIAGRAM
Page 18 · click to enlarge
Page 18
Page 18 of the Bunn AF PR-2 user manual — SCHEMATIC WIRING DIAGRAM

Ask about the Bunn AF PR-2

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Bunn AF PR-2

Be the first to ask — other owners or our team will answer.

Original document

Bunn AF PR-2 manual PDF

18 pages·1 MB·Beverage Dispenser·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…