


SAFETY CONSIDERATIONS Improper installation, adjustment, alteration, service, maintenance, or use can cause explosion, fire, electrical shock, or other conditions which may cause death, personal injury, or property damage. Consult a qualified installer, service agency, or your distributor or branch for information or assistance. The qualified installer or agency must use factory-authorized kits or accessories when modifying this product. Refer to the individual instructions packaged with the kits or accessories when installing. Follow all safety codes. Wear safety glasses, protective clothing, and work gloves. Use quenching cloth for brazing operations. Have fire extinguisher available. Read these instructions thor- oughly and follow all warnings or cautions included in literature and attached to the unit. Consult local building codes and National Electrical Code (NEC) for special requirements. Recognize safety information. This is the safety-alert symbol
. When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury. Understand the signal words DANGER, WARNING, and CAU- TION. These words are used with the safety-alert symbol. DAN- GER identifies the most serious hazards which will result in severe personal injury or death. WARNING signifies hazards which could result in personal injury or death. CAUTION is used to identify unsafe practices which would result in minor personal injury or product and property damage. NOTE is used to highlight suggestions which will result in enhanced installation, reliability, or operation.
Fig. 1—Models 661C

INSTALLATION RECOMMENDATIONS NOTE: In some cases noise in the living area has been traced to gas pulsations from improper installation of equipment.
Fig. 2—Models 661G and 661S

Avoid contact between tubing and structure NOTE:


JOIST
INSULATION
VAPOR TUBE
DIMENSIONS (IN.)
MINIMUM MOUNTING PAD
TIEDOWN KNOCKOUT LOCATIONS
UNIT SIZE
DIMENSIONS
A B C
LIQUID TUBE
SUSPENSION
018—030 22-1/2 X 22-1/2 3-11/16 18-1/8 14-3/8 042—060 30 X 30 6-1/2 23-1/2 20
Fig. 4—Mounting Unit to Pad
Fig. 3—Connecting Tube Installation
When outdoor unit is connected to factory-approved indoor unit, outdoor unit contains system refrigerant charge for operation with indoor unit of the same size when connected by 15 ft of field-supplied or factory accessory tubing. For proper unit opera- tion, check refrigerant charge using charging information located on control box cover. IMPORTANT: Maximum liquid-line size is 3/8-in. O.D. for all residential applications including long line. IMPORTANT: Always install a liquid-line filter drier. Refer to Product Data Sheet for appropriate part number. Obtain filter drier from service parts or your distributor or branch.
When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. Allow 30-in. clearance to service end of unit and 48 in. above unit. For proper airflow, a 6-in. clearance on 1 side of unit and 12 in. on all remaining sides must be maintained. Maintain a distance of 24 in. between units. Position so water, snow, or ice from roof or eaves cannot fall directly on unit.
On rooftop applications, locate unit at least 6 in. above roof surface.
IV. OPERATING AMBIENTS The minimum outdoor operating ambient in cooling mode is 55°F, and the maximum outdoor operating ambient in cooling mode is 125°F. The maximum outdoor operating ambient in heating mode is 66°F.
A. Unpack Unit Move to final location. Remove carton taking care not to damage unit. B. Inspect Equipment
File claim with shipping company prior to installation if shipment is damaged or incomplete. Locate unit rating plate on unit service panel. It contains information needed to properly install unit. Check rating plate to be sure unit matches job specifications. II. INSTALL ON A SOLID, LEVEL MOUNTING PAD If conditions or local codes require the unit be attached to pad, tie down bolts should be used and fastened through knockouts provided in unit base pan. Refer to unit mounting pattern in Fig. 4 to determine base pan size and knockout hole location. On rooftop applications, mount on level platform or frame 6 in. above roof surface. Place unit above a load-bearing wall and isolate unit and tubing set from structure. Arrange supporting members to adequately support unit and minimize transmission of vibration to building. Consult local codes governing rooftop applications. Roof mounted units exposed to winds above 5 mph may require wind baffles to achieve adequate defrost. Consult Low-Ambient Guideline for wind baffle construction.
In areas where prolonged freezing temperatures are encountered, elevate unit per local climate and code requirements to provide clearance above estimated snowfall level and ensure adequate drainage of unit.
VI. CHECK INDOOR AND OUTDOOR CHECK-FLO- RATER® PISTON Check indoor coil piston to see if it matches the required piston shown on outdoor unit rating plate. If it does not match, replace indoor coil piston with piston shipped with outdoor unit. The piston shipped with outdoor unit is correct for any approved indoor coil combination.

TABLE 1—REFRIGERANT CONNECTIONS AND RECOMMENDED LIQUID AND VAPOR TUBE DIAMETERS (IN.)
LIQUID VAPOR VAPOR (LONG LINE) Connection Diameter Tube Diameter Connection Diameter Tube Diameter Connection Diameter Tube Diameter 018, 024 3/8 3/8 5/8 5/8 5/8 3/4 060, 036 3/8 3/8 3/4 3/4 3/4 7/8 042, 048 3/8 3/8 7/8 7/8 7/8 1-1/8 060 3/8 3/8 7/8 1-1/8 7/8 1-1/8
Check outdoor unit piston. Remove retainer on liquid service valve and check piston size with matching number listed on outdoor unit rating plate.
Outdoor units may be connected to indoor section using accessory tubing package or field-supplied refrigerant grade tubing of correct size and condition. For tubing requirements beyond 50 ft in length or 20 ft vertical differential, substantial capacity and performance losses can occur. Following the recommendations in the Residen- tial Split System Long-Line Application Guideline will reduce these losses. Refer to Table 1 for field tubing equivalent line length.
Check defrost thermostat to ensure it is properly located and securely attached. There is a liquid header with a brass distributor and feeder tube going into outdoor coil. At the end of 1 of the feeder tubes, there is a 3/8-in. O.D. stub tube approximately 2 in. long. (See Fig. 5.) The defrost thermostat should be located on stub tube. Note that there is only 1 stub tube used with liquid header, and on most units it is the bottom circuit.
If refrigerant tubes or indoor coil are exposed to atmosphere, they must be evacuated to 500 microns to eliminate contamination and moisture in the system.
A. Outdoor Unit Connected to Factory-Approved In- door Unit
Outdoor unit contains correct system refrigerant charge for opera- tion with indoor unit of same size when connected by 15 ft of field-supplied or factory-accessory tubing. Check refrigerant charge for maximum efficiency.
B. Refrigerant Tubing
Connect tubing to fittings on outdoor unit vapor and liquid service valves. (See Table 1.) Use refrigerant grade tubing. Refer to appropriate section below for type of service valves installed on unit.
C. Sweat Connection
Fig. 5—Defrost Thermostat Location
Remove plastic retainer holding outdoor piston in liquid service valve and connect sweat/flare adapter provided to valve. (See Fig. 6.) Connect refrigerant tubing to fittings on outdoor unit vapor and liquid service valves. Service valves are closed from factory and ready for brazing. After wrapping service valve with a wet cloth, tubing set can be brazed to service valve using either silver bearing or non-silver bearing brazing material. Consult local code require- ments. Refrigerant tubing and indoor coil are now ready for leak testing. This check should include all field and factory joints.
D. Final Tubing Check IMPORTANT: Check to be certain factory tubing on both indoor and outdoor unit has not shifted during shipment. Ensure tubes are not rubbing against each other or any sheet metal. Pay close attention to feeder tubes, making sure wire ties on feeder tubes are secure and tight.

PISTON
PISTON RETAINER
B. Connect Ground and Power Wires
Connect ground wire to ground connection in control box for safety. Connect power wiring to contactor as shown in Fig. 7.
C. Connect Control Wiring
Route 24v control wires through control wiring grommet and connect leads to control wiring. (See Fig. 8 and 9.)
Fig. 6—Liquid Service Valve with Sweat Adapter Tube
Use No. 18 AWG color-coded, insulated (35°C minimum) wire. If thermostat is located more than 100 ft from unit, as measured along the control voltage wires, use No. 16 AWG color-coded wire to avoid excessive voltage drop.
CONTACTOR
All wiring must be NEC Class 1 and must be separated from incoming power leads.
Use furnace transformer, fan coil transformer, or accessory trans- former for control power, 24v/40va minimum.
WIRING
FIELD GROUND
WIRING
GROUND LUG
D. Final Wiring Check
Fig. 7—Line Power Connections
IX. MAKE ELECTRICAL CONNECTIONS
When equipped with a crankcase heater, furnish power to heater a minimum of 24 hr before starting unit. To furnish power to heater only, set thermostat to OFF and close electrical disconnect to outdoor unit. A crankcase heater is required if refrigerant tubing is longer than 50 ft.
Be sure field wiring complies with local and national fire, safety, and electrical codes, and voltage to system is within limits shown on unit rating plate. Contact local power company for correction of improper voltage. See unit rating plate for recommended circuit protection device.
When equipped with a crankcase heater, furnish power to heater a minimum of 24 hr before starting unit. To furnish power to heater only, set thermostat to OFF and close electrical disconnect to outdoor unit. A crankcase heater is required if refrigerant tubing is longer than 50 ft.
Refer to the individual instructions packaged with kits or acces- sories when installing.
A. Route Ground and Power Wires
Remove access panel to gain access to unit wiring. Extend wires from disconnect through power wiring hole provided and into unit control box.

BRYANT PROGRAMMABLE
FA, FB, FC,
ONE OUTDOOR THERMOSTAT FA, FB, FC, FD, FF, FH
FD, FF, FH
HEAT PUMP
THERMOSTAT
HEAT PUMP
MODEL HP
FAN COIL
FAN COIL
MODEL HP


when installing outdoor thermostat.
energized when requesting supplemental heat.
BRYANT PROGRAMMABLE
THERMOSTAT
FK4C FAN COIL
HEAT PUMP
MODEL HP
FA, FB, FC,
TWO OUTDOOR THERMOSTATS
THERMOSTAT
FD, FF, FH
HEAT PUMP
MODEL HP
FAN COIL


when installing outdoor thermostats.
energized when requesting supplemental heat.
Fig. 8—Typical 24v Circuit Connections using Bryant Model HP Thermostat with Fan Coils and No Outdoor Thermostat, 1
Outdoor Thermostat, or 2 Outdoor Thermostats

FA, FB, FC,
ONE OUTDOOR THERMOSTAT
OTHER HP THERMOSTAT
FD, FF, FH
HEAT PUMP
OTHER HP THERMOSTAT
FD, FF, FH
HEAT PUMP
FAN COIL
FAN COIL


when installing outdoor thermostat.
energized when requesting supplemental heat.
TWO OUTDOOR THERMOSTATS
OTHER HP THERMOSTAT
FD, FF, FH
HEAT PUMP
FAN COIL
OTHER HP THERMOSTAT
FK4C FAN COIL
HEAT PUMP


when installing outdoor thermostats.
energized when requesting supplemental heat.
Fig. 9—Typical 24v Circuit Connections using Other HP Thermostats with Fan Coils and No Outdoor T

are equipped with a phase monitor to detect if the incoming power is correctly phased for compressor operation. (See Fig. 10 and Table 3.) If the phasing is correct, circuit R-Y energizes contactor, starting outdoor fan motor and compressor circuit. R-G energizes indoor unit blower relay, starting indoor blower motor on high speed. NOTE: If the phasing is incorrect, the contactor will not be energized. To correct the phasing, interchange any two of the three power connections on the field side. When thermostat is satisfied, its contacts open, de-energizing the contactor and blower relay. Compressor and motors should stop. NOTE: If indoor unit is equipped with a time-delay relay circuit, the blower runs an additional 90 sec to increase system efficiency.
24-V FIELD WIRING
FIELD SPLICE CONNECTION
ODT
OUTDOOR THERMOSTAT
EHR
EMERGENCY HEAT RELAY
SUPPLEMENTAL HEAT RELAY SHR
HEATING On a call for heating, thermostat makes circuits R-Y and R-G. If phasing is correct, circuit R-Y energizes contactor, starting out- door fan motor and compressor. Circuit R-G energizes indoor blower relay, starting blower motor on high speed. Should temperature continue to fall, R-W2 is made through second-stage room thermostat bulb. Circuit R-W2 energizes a sequencer, bringing on first bank of supplemental electric heat and providing electrical potential to second heater sequencer (if used). If outdoor temperature falls below setting of outdoor thermostat (field-installed option), contacts close to complete circuit and bring on second bank of supplemental electric heat. When thermostat is satisfied, its contacts open, de-energizing contactor and sequencer. All heaters and motors should stop.
Fig. 10—Phase Monitor Control
DEFROST The defrost control is a time/temperature control which includes a field-selectable (quick-connects located at board edge) time period between defrost cycles (30, 50, or 90 minutes), factory set at 90 minutes. The electronic timer and defrost cycle start only when contactor energized and defrost thermostat is closed. Defrost mode is identical to cooling mode except that outdoor fan motor stops and second-stage heat is turned on to continue warming conditioned space. To initiate defrost, the defrost thermostat must be closed. This can be accomplished as follows:
A. Sequence of Operation l .
With power supplied to indoor and outdoor units, transformer is energized.
On a call for cooling, thermostat makes circuits R-O, R-Y, and R-G. Circuit R-O energizes reversing valve, switching it to cooling position. On three phase models with scroll compressors, the units

3. Restart unit in heating mode, allowing frost to accumulate on outdoor coil. 4. After a few minutes in heating mode, liquid line tempera- ture should drop below closing point of defrost thermostat (approximately 30°F). 5. Short between speed-up terminals with a flat-bladed screw- driver. (See Fig. 11.) This reduces the timing sequence to 1/256th of original time. (See Table 2.) 6. When you hear reversing valve change position, remove screwdriver immediately; otherwise, control will terminate normal 10-minute defrost cycle in approximately 2 sec. NOTE: Length of defrost cycle is dependent on the length of time it takes to remove screwdriver from test pins after reversing valve has shifted.
TIMING SEQUENCE
SPEED-UP (NOMINAL) 30-minute cycle 27 33 7 sec 50-minute cycle 45 55 12 sec 90-minute cycle 81 99 21 sec 10-minute cycle 9 11 2 sec 5 minutes 4.5 5.5 1 sec
MAXIMUM (MINUTES)
A. Heating Check Chart Procedure To check system operation during heating cycle, refer to the Heating Check Chart on outdoor unit. This chart indicates whether a correct relationship exists between system operating pressure and air temperature entering indoor and outdoor units. If pressure and temperature do not match on chart, system refrigerant charge may not be correct. Do not use chart to adjust refrigerant charge.
OF1
To calculate additional charge required for a 25-ft line set:
25 ft - 15 ft = 10 ft X 0.6 oz/ft =6 oz of additional charge
O R T2 Y TI DFT C TEST 30 50 90
R
Y
CES0110063,
CARE AND MAINTENANCE
Fig. 11—Defrost Control
XIV. CHECK CHARGE Factory charge is shown on unit rating plate. To check charge in cooling mode, refer to Cooling Only Procedure on unit wiring and charging label. To check charge in heating mode, refer to Heating Check Chart Procedure.
For continuing high performance and to minimize possible equip- ment failure, periodic maintenance must be performed on this equipment.
Frequency of maintenance may vary depending upon geographic areas, such as coastal applications.
© 2002 Bryant Heating & Cooling Systems 7310 W. Morris St. Indianapolis, IN 46231 —8— Printed in U.S.A. 661c187 Catalog No. 5366-119
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.