EN
Viessmann logo
Official user manual

Viessmann Solar Divicon (DN25B)

26 pages·557 KB·Household Appliance·PDF·ENDEFRITNLJA
Viessmann Solar Divicon (DN25B)
Table of Contents 31 sections Installation, Start-up and Service Instructions · Solar-Divicon, DN25B · 1 For your safety · 1.1 About this manual · … ShowHide
Page 1 of the Viessmann Solar Divicon (DN25B) user manual — Solar-Divicon, DN25B
Page 1 · click to enlarge
Page 1
Viessmann Solar Divicon (DN25B) — Installation, Start-up and Service Instructions diagram (page 1)
Fig. 1 · Installation, Start-up and Service Instructions

Installation, Start-up and Service Instructions

For use by the heating contractor

Solar-Divicon, DN25B

Viessmann Solar Divicon (DN25B) — Solar-Divicon, DN25B diagram (page 1)
Fig. 2 · Solar-Divicon, DN25B

Please file in Service Binder

997692210VIEUS0x-mub-en – V01 05/2014 1

Page 2 of the Viessmann Solar Divicon (DN25B) user manual — Installation, Start-up and Service Instructions
Page 2 · click to enlarge
Page 2
Page 2 of the Viessmann Solar Divicon (DN25B) user manual — Installation, Start-up and Service Instructions
Page 3 of the Viessmann Solar Divicon (DN25B) user manual — 1.3 Qualification of the installer
Page 3 · click to enlarge
Page 3

1 For your safety

Carefully read this manual before installation and commissioning. Non-observance of the instructions in this manual may lead to serious material damage and serious injuries that may result in death.

Indicates that there is risk of death, serious injuries or considerable material damage if suitable safety precautions are not taken.

Indicates that there is a risk of light injuries if suitable safety precautions are not taken.

Keep this manual in close proximity of the system for later use.

Indicates that there is a risk of material damage if suitable safety precautions are not taken.

1.1 About this manual

1.2 Designated use

This manual describes the function, installation, commissioning and operation of the solar stations Solar-Divicon DN25B. The chapters called [specialist] are only addressed to installation contractors.

The solar station is a pre-assembled fitting assembly checked for tightness and used for recirculating the solar fluid in a closed loop solar circuit. The solar station must only be used in solar thermal systems as pumping station in the solar circuit, taking into consideration the technical limit values indicated in this manual. The station may only be assembled indoors. The station must be assembled and operated as described in this manual!

For other components of the solar installation, such as collectors, storage tanks, expansion tanks, and controllers, please refer to the instructions of the corresponding product.

Unintended use of the solar station will invalidate any liability claims.

Only use accessories from Viessmann.

The wrapping materials are made of recyclable materials that can be recycled by standard recycling operations.

1.3 Qualification of the installer

Installation and commissioning of this equipment should be done by qualified installers [specialist] in accordance with local, state, provincial, and federal codes which may be applicable.

The following must also be observed during installation and commissioning:

Relevant regional and national regulations (for

example Occupational Safety and Health Act)

Relevant accident prevention regulations (for

example of the Employer's Liability Insurance Association)

Instructions and safety instructions mentioned in

this manual

Page 4 of the Viessmann Solar Divicon (DN25B) user manual — 1.4 Hand-over of the system [specialist]
Page 4 · click to enlarge
Page 4

1.4 Hand-over of the system [specialist]

After installation and commissioning, the installer is responsible for familiarizing the end user with the functions of the system and the basic safety measures.

After commissioning, fill in the log on the last page of

this manual. Hand the manual over to the end user and instruct

them to to keep the manual in close proximity to the system. Instruct the end user to have the solar station

serviced and repaired by a specialist only. The controller settings must not be changed by the customer. Explain to the end user the function of the system and

of the safety devices. Point out to the end user that the shell must remain mounted during operation and that the ball valves in the temperature gauges and flowmeter must always be open. 1.5 General safety instructions

Before installing and commissioning the product, you must read and observe the following safety instructions:

Personal injury and material damage caused by excess pressure! Closing both ball valves will disconnect the safety assembly from the heat exchanger. Heating the storage tank can result in the formation of high pressures, which may lead to material damage and personal injury! In operation, the ball valves with

collector temperatures are below 150 °F (70 °C). Connect a discharge line to the

safety assembly. Observe the instructions regarding the pressure relief valve. The pressures calculated by the

temperature gauges and the ball valve at the flowmeter must always be open. Close the ball valves only when

installation planner for the expansion tank and the operating pressure of the installation must be set prior to filling system

service is required.

Material damage due to mineral oils! Mineral oil products permanently damage the EDPM sealing elements, resulting in a loss of their sealing characteristics. We cannot be held liable for damage caused by seals thus damaged, nor will we offer a replacement under warranty. It is imperative to prevent the EPDM sealing

Risk of burns! The valves, fittings and the pump may heat up to more than 212 °F (100 °C) during operation.

The shell must remain closed during

operation.

elements from making contact with substances containing mineral oils. Use silicone- or polyalkylene-based lubricants free of

mineral oil, such as Unisilikon L250L and Syntheso Glep 1 from the company Klüber or a silicone spray

Page 5 of the Viessmann Solar Divicon (DN25B) user manual — 1.6 General instructions regarding solar fluid
Page 5 · click to enlarge
Page 5

1.6 General instructions regarding solar fluid

Only use solar fluid specified in the Vitosol Collector Installation Manuals and the Vitosol Operating and Service Instructions.

Also refer to these manuals to determine the following:

Solar fluid fill pressure Fluid volume required to fill system pH testing Maintenance requirements.

Propylene glycol: Hazardous in case of ingestion!

Propylene glycol is hazardous in case of ingestion. It is irritant in case of eye or skin contact.

Wear chemical resistant protective gloves and safety

glasses with side-shields when handling propylene glycol mixtures.

Observe the instructions of the antifreeze

manufacturer.

It often happens that solar thermal systems cannot be completely drained after flushing. Thus, there is a risk of frost damage when flushing with water. Therefore, the solar thermal system should only be flushed and filled with the solar fluid used later on.

All components in the solar station are resistant to a percentage of propylene glycol of up to 50%.

Page 6 of the Viessmann Solar Divicon (DN25B) user manual — 2 Description of the product
Page 6 · click to enlarge
Page 6

2 Description of the product

Viessmann Solar Divicon (DN25B) — 2 Description of the product diagram (page 6)
Fig. 3 · 2 Description of the product

The solar station is mounted on a wall support and held by clip springs. The station contains important valves, fittings and safety equipment for operating a solar thermal system:

1.1 Return to the collector field

1.2 Ball valve with temperature gauge in the return equipped with replaceable spindle (blue)

1.3 Pressure relief valve, 87 psi (6 bar)

1.4 Fill valve

1.5 Connection for the expansion tank

1.6 Pressure gauge 87 psi (6 bar)

3.1 Ball valve in flowmeter

3.2 Drain valve

3.3 Flowmeter

Viessmann Solar Divicon (DN25B) — 2 Description of the product diagram (page 6)
Fig. 4 · 2 Description of the product

3.4 Return from the storage tank

4.1 Supply to the storage tank

4.2 Airstop equipped with manual bleeder

5.2 Ball valve with temperature gauge in the supply equipped with replaceable spindle (red)

5.1 Supply from the collector field

2 Solar pump · Assembly example

Page 7 of the Viessmann Solar Divicon (DN25B) user manual — Solar-Divicon DN25B Installation Steps:
Page 7 · click to enlarge
Page 7

3 Assembly and installation [specialist]

The solar station may only be installed indoors with a power supply of 120 V / 60 Hz. The installation site must be dry, stable and frost-free.

Material damage due to high temperatures!

Since the solar fluid may be very hot near the collector, the fitting assembly must be installed at a sufficient distance from the collector field.

It may be necessary to install an upstream tank, in order to protect the expansion tank

Viessmann Solar Divicon (DN25B) — 3 Assembly and installation [specialist] diagram (page 7)
Fig. 5 · 3 Assembly and installation [specialist]

Solar-Divicon DN25B Installation Steps:

1. Remove the station from the packaging.
2. Pull off the front shell.
3. Hold the solar station to the mounting location and
Viessmann Solar Divicon (DN25B) — Solar-Divicon DN25B Installation Steps: diagram (page 7)
Fig. 6 · Solar-Divicon DN25B Installation Steps:

level the unit. Mark the mounting hole locations

(next to the temperature gauges) onto the mounting

surface.

4. Drill the holes into the mounting surface, and fasten

the solar station to the wall by means of the

enclosed screws and, if required, the enclosed wall

anchors.

Page 8 of the Viessmann Solar Divicon (DN25B) user manual — 3 Assembly and installation [specialist]
Page 8 · click to enlarge
Page 8
Viessmann Solar Divicon (DN25B) — 3 Assembly and installation [specialist] diagram (page 8)
Fig. 7 · 3 Assembly and installation [specialist]
5. Connect the solar station to the system by means of copper or stainless steel pipes ⑤ Supply from collector field ① Return to the collector field ④ Supply to the storage tank ③ Return from the storage tank

All pipe connections are designed as cutting-ring compression fitting 1" copper pipe. Pipe size can be reduced to ¾” copper if required.

Viessmann Solar Divicon (DN25B) — 3 Assembly and installation [specialist] diagram (page 8)
Fig. 8 · 3 Assembly and installation [specialist]

Assembly of the cutting-ring compression fitting:

Push the union nut ② and the cutting ring ③ onto the 1” copper

pipe ①. The pipe must protrude at least ⅛" (3 mm) from the cutting ring in order to ensure the force transmission and the sealing.

Insert the support sleeve ④ into the copper pipe.

Insert the copper pipe with the plugged-on individual parts (②, ③

and ④) all the way into the housing of the cutting-ring fitting ⑤.

First tighten the union nut ② manually.

Tighten the union nut ② by rotating it by one full turn.

Secure the housing of the cutting-ring fitting ⑤ against distortion in order to avoid damaging the sealing ring.

6. Connect a discharge line to the connection (1.3) at the pressure relief valve. Conduct the discharge line into a heat-resistant container. Secure the discharge line such that in the event of escaping vapor people in the vicinity are not put at risk.
Viessmann Solar Divicon (DN25B) — 3 Assembly and installation [specialist] diagram (page 8)
Fig. 9 · 3 Assembly and installation [specialist]
7. Connect the connecting line for the expansion tank below the pressure gauge (1.5).
8. Adapt the initial pressure of the expansion tank to the system and connect the expansion tank. Observe the manufacturer's separate instructions of the expansion tank! Also observe the layout of the installation planner.
9. Check all pipe connections and retighten if necessary.
Page 9 of the Viessmann Solar Divicon (DN25B) user manual — 3 Assembly and installation [specialist]
Page 9 · click to enlarge
Page 9

Risk of electric shock!

Prior to commencing electrical work, disconnect the main power supply!

Only after completing all installation work, flushing and filling should the mains plug be plugged

into an outlet! This avoids an unintentional start of the pump motor.

10. Connect the 120V power supply from the solar controller to the solar station pump. The controller must be provided on site. Observe the separate instructions of the controller!

Wiring can run in the slots in the back foam insulation panel of the solar station.

Observe all local electrical code requirements.

120V power supply connection

The assembly of the solar station is now complete, and you can commission the station.

Electric cable slots

Page 10 of the Viessmann Solar Divicon (DN25B) user manual — 4 Commissioning [specialist]
Page 10 · click to enlarge
Page 10

4 Commissioning [specialist]

Before commissioning the solar station, you must read and observe the following safety instructions:

Risk of burns and scalding!

Propylene glycol: hazardous in case of ingestion!

The valves and fittings may heat up to more than 212 °F (100 °C). During flushing, filling and venting, the solar fluid can escape as vapor and result in scalding.

Propylene glycol is hazardous in case of ingestion. It is irritant in case of eye or skin contact.

Wear chemical resistant protective gloves and safety

glasses with side-shields when handling propylene glycol mixtures.

Flush and fill the system only if the

Observe the instructions of the antifreeze

collector temperatures are below 150 °F (70 °C).

manufacturer.

It often happens that solar thermal systems cannot be completely drained after flushing. Thus, there is a risk of frost damage when flushing with water.

When commissioning the system, first fill the storage

circuit and then the solar circuit. This guarantees that any absorbed heat can also be dissipated.

Therefore, the solar thermal system should only be

flushed and filled with the solar fluid used later on.

Use a water and propylene glycol mixture with max.

50% of propylene glycol as solar fluid, in order to avoid damaging the seals.

Risk of frost!

Page 11 of the Viessmann Solar Divicon (DN25B) user manual — 14 mm
Page 11 · click to enlarge
Page 11

4.1 Flushing and filling the solar circuit [specialist]

The fill and drain connections required for flushing and filling have been integrated into the solar station.

In order to flush any dirt particles that may still be present out of the system, use only flush and fill stations equipped with suitable micro filters.

Ball valve with integrated check valve

(Normal direction of flow in the picture: downstream)

Viessmann Solar Divicon (DN25B) — 4.1 Flushing and filling the solar circuit [specialist] diagram (page 11)
Fig. 10 · 4.1 Flushing and filling the solar circuit [speciali…
Viessmann Solar Divicon (DN25B) — 4.1 Flushing and filling the solar circuit [specialist] diagram (page 11)
Fig. 11 · 4.1 Flushing and filling the solar circuit [speciali…
Viessmann Solar Divicon (DN25B) — 4.1 Flushing and filling the solar circuit [specialist] diagram (page 11)
Fig. 12 · 4.1 Flushing and filling the solar circuit [speciali…

14 mm

Check valve in operation, through-flow in flow direction only (normal operating position).

Check valve not in operation, through-flow in both directions (use this positioning to help purge air during intial commissioning).

Ball valve closed, no through-flow (service postion).

0° 45° 90°

Page 12 of the Viessmann Solar Divicon (DN25B) user manual — 4.1 Flushing and filling the solar circuit [specialist]
Page 12 · click to enlarge
Page 12
Viessmann Solar Divicon (DN25B) — 4.1 Flushing and filling the solar circuit [specialist] diagram (page 12)
Fig. 13 · 4.1 Flushing and filling the solar circuit [speciali…

The airstop with manual bleeder is used to bleed the solar thermal system. To ensure a perfect ventilation of the solar circuit, the flow velocity must be at least 0.3 m/s in the supply.

Pipe diameterFlow rateFlow rate at 0.3 m/sat 0.3 m/s [USgpm][l/min] ¾"1.495.6 1"2.38.8

The air liberated from the solar fluid is collected in the upper area of the airstop and can be discharged via the vent plug [4.2].

Venting the solar thermal system after commissioning

Immediately after installation, vent the solar thermal system daily and then weekly or monthly, depending on the vented air quantity. This ensures optimum operation of the solar thermal system. Check the system pressure after venting and increase it to the prescribed operating pressure, if necessary.

Airstop

Page 13 of the Viessmann Solar Divicon (DN25B) user manual — 4.3 Flushing and filling [specialist]
Page 13 · click to enlarge
Page 13
Viessmann Solar Divicon (DN25B) — 4.2 Preparation for flushing [specialist] diagram (page 13)
Fig. 14 · 4.2 Preparation for flushing [specialist]

4.2 Preparation for flushing [specialist]

The solar circuit is flushed in the direction of flow.

1. Disconnect the expansion tank from the solar thermal system! Please observe the manufacturer's instructions.
2. Open the check valves in the supply and return by turning the ball valves (1.2 and 5.2) to position 45° (see page 11).
3. Close the ball valve (3.1) in the flowmeter.
4. Connect the flush and fill station to the solar station: - Pressure hose to the fill connection (1.4) - Flushing hose to the drain connection (3.2).
Viessmann Solar Divicon (DN25B) — 4.2 Preparation for flushing [specialist] diagram (page 13)
Fig. 15 · 4.2 Preparation for flushing [specialist]

4.3 Flushing and filling [specialist]

1. Open the fill and drain valves (1.4 and 3.2).
2. Put the flush and fill station into operation and keep flushing until clear medium escapes.
3. Vent the solar thermal system several times at the vent plug of the airstop (4.2) during flushing until the solar fluid escapes without forming bubbles (see page 12).
Viessmann Solar Divicon (DN25B) — 4.3 Flushing and filling [specialist] diagram (page 13)
Fig. 16 · 4.3 Flushing and filling [specialist]

Compact mobile charging cart for flushing,

filling and purging the solar circuit

Page 14 of the Viessmann Solar Divicon (DN25B) user manual — 4.2 Preparation for flushing [specialist]
Page 14 · click to enlarge
Page 14
Viessmann Solar Divicon (DN25B) — 4.2 Preparation for flushing [specialist] diagram (page 14)
Fig. 17 · 4.2 Preparation for flushing [specialist]
4. Close the drain valve (3.2) with the filling pump running and increase the system pressure, depending on the design of the system, to max. 5 bar. Refer to “Vitosol Operating and Service Instructions” for instructions on calculating the correct fill pressure. The pressure can be read on the pressure gauge. Close the fill valve (1.4) and switch off the pump of the flush and fill station.
Viessmann Solar Divicon (DN25B) — 4.2 Preparation for flushing [specialist] diagram (page 14)
Fig. 18 · 4.2 Preparation for flushing [specialist]
5. Check at the pressure gauge if the system pressure is dropping and eliminate any leaks, if present.
6. Reduce the pressure on the drain valve (3.2) to the system-specific pressure.

Check the pressure on the pressure relief valve

7. Connect the expansion tank to the solar circuit and set the operating pressure of the solar thermal system by means of the flush and fill station (for the required expansion tank pressure settings, refer to “Vitosol Operating and Service Instructions” ).
8. Close the fill and drain valves (1.4 and 3.2).
9. Open the ball valve (3.1) in the flowmeter.
10. Set the check valves in the ball valves (1.2 and 5.2) to operating position (see page 11).

(87 psi/6 bar)!

Page 15 of the Viessmann Solar Divicon (DN25B) user manual — 4.4 Setting the solar loop flowrate [specialist]
Page 15 · click to enlarge
Page 15

Risk of electric shock!

Check if the sensors and the pump are properly connected to the controller and if the controller

housing is closed. Only then should the mains plug of the controller be plugged into an outlet.

11. Connect the controller (to be provided on site) to the power supply and set the solar circuit pump in the manual mode to ON as described in the controller manual. Run the solar circuit pump at maximum rotation speed for at least 15 minutes. In the meantime, vent the solar thermal system several times at the vent plug of the airstop until the solar fluid escapes without forming bubbles (see page 12). If necessary, increase the system pressure to the operating pressure again.

Viessmann Solar Divicon (DN25B) — 4.4 Setting the solar loop flowrate [specialist] diagram (page 15)
Fig. 19 · 4.4 Setting the solar loop flowrate [specialist]
12. Remove the hoses of the flush and fill station and screw the the closure caps on the fill and drain valves. Note: The closure caps are only for protection against soiling. They have not been constructed for high system pressures, their tightness being guaranteed by the closed ball valves.
Viessmann Solar Divicon (DN25B) — 4.4 Setting the solar loop flowrate [specialist] diagram (page 15)
Fig. 20 · 4.4 Setting the solar loop flowrate [specialist]

4.4 Setting the solar loop flowrate [specialist]

Viessmann Solar Divicon (DN25B) — 4.4 Setting the solar loop flowrate [specialist] diagram (page 15)
Fig. 21 · 4.4 Setting the solar loop flowrate [specialist]
Scale1-10 USgpm (The unit is specified on the scale)

Reading edge = Upper edge of the floating body

Exampleapprox. 2 USgpm

Refer to “Vitosol Operating and Service Instructions”) for the correct adjustment of the flow rate.

1. Set the desired max. flow rate via the rotation speed of the solar pump. The controller will set the speed accordingly. In exceptional cases, the flow rate can also be reduced via the ball valve (3.1).
2. Mount the front shell on the solar station.
3. Set the controller to automatic mode (see controller manual).

Correct · Incorrect

Page 16 of the Viessmann Solar Divicon (DN25B) user manual — 6 Maintenance and decommissioning [specialist]
Page 16 · click to enlarge
Page 16

5 Cleaning

The valves, fittings and the pump may heat up to more than 212 °F (100 °C) during operation.

The shell must remain closed

when cleaning.

Clean the solar station only from the outside with a damp cloth. Never use scouring or sand-containing cleaning agents.

6 Maintenance and decommissioning [specialist]

Before maintaining and decommissioning the product, you must read and observe the following safety instructions:

Risk of electric shock!

Risk of burns and scalding!

Disconnect all electrical devices in

The valves and fittings may heat up

the heating circuit from the power supply before carrying out maintenance work or decommissioning!

to more than 212 °F (100 °C). During maintenance or decommissioning, the solar fluid may escape as vapor and result in scalding!

Secure the electrical devices

Flush and fill the system only if the

against being switched on again.

collector temperatures are below 122 °F (50 °C).

Wait until the solar fluid has cooled

down to 122 °F (50 °C).

Risk of burns!

Page 17 of the Viessmann Solar Divicon (DN25B) user manual — 6.2 Complete draining of the solar installation [specialist]
Page 17 · click to enlarge
Page 17

6.1 Partial draining of the solar installation [specialist]

Partial draining allows components in the station below the ball valves (5.2 and 1.2), for example the pump, to be replaced, without having to drain the collector array and piping.

Viessmann Solar Divicon (DN25B) — 6.1 Partial draining of the solar installation [specialist] diagram (page 17)
Fig. 22 · 6.1 Partial draining of the solar installation [spec…
1. Disconnect the controller from the power supply and

secure it against being switched on again.

2. Close the ball valves in the supply and return ball

valve [5.2|1.2] by rotating them to the 90° position

(90°, see page 11).

3. Connect a heat-resistant hose to the drain valve [3.2].

Make sure that the solar fluid is collected in a heat-

resistant container.

4. Open the drain valve [3.2].
5. Carefully open the vent plug at the airstop [4.2] and

close it again (see 12).

The escaping solar fluid can be very hot.

Position and secure the heat-resistant collecting container such that persons nearby and the

environment are not put at risk when the solar thermal system is drained.

6.2 Complete draining of the solar installation [specialist]

Complete draining enables replacement of the solar fluid, dismounting of the solar station and replacement of seals above the ball valves (5.2 and 1.2).

1. Perform partial draining as described above.
2. Open the check valves in the supply and return ball valves (5.2 and 1.2) by rotating them to the 45° position (see page 11).
3. To accelerate draining of the solar circuit, you can open the bleeding device, if present, at the highest point of the solar thermal system.
4. Dispose of the solar fluid observing the local regulations.
Page 18 of the Viessmann Solar Divicon (DN25B) user manual — 6.4 Replacing the gaskets in the solar station [specialist]
Page 18 · click to enlarge
Page 18

6.3 Replacing the pump [specialist]

Viessmann Solar Divicon (DN25B) — 6.3 Replacing the pump [specialist] diagram (page 18)
Fig. 23 · 6.3 Replacing the pump [specialist]
1. Perform partial draining as described in section 6.1 Partial draining of the solar installation [specialist].
2. Disconnect the pipe joint between the solar station and the storage supply.
3. Dismount the flowmeter (3.3).
4. Dismount the pump.
5. Install the new pump. Do not forget to insert new gaskets.
6. Mount the flowmeter (3.3).
7. Connect the solar station and the system again by means of pipes.
8. Check all screw connections and retighten them, if necessary.
9. Open the ball valves (5.2 and 1.2).
10. If the system pressure no longer corresponds to the operating pressure, repeat commissioning as described from page 10 onward.

6.4 Replacing the gaskets in the solar station [specialist]

1. Gaskets below the ball valves: Perform partial draining as described in section 6.1 Partial draining of the solar installation [specialist]. Gaskets above the ball valves: Drain the solar thermal system completely as described in section 6.2 Complete draining of the solar installation [specialist] .
2. Dismount individual components of the station and insert new gaskets.
3. Re-assemble the station.
4. Connect the station and the system by means of pipes.
5. Check all screw connections and retighten them, if necessary.
6. Open the ball valves (5.2 and 1.2).
7. If the system pressure no longer corresponds to the operating pressure, repeat commissioning as described from page 10 onward.
Page 19 of the Viessmann Solar Divicon (DN25B) user manual — 6.5 Dismounting [specialist]
Page 19 · click to enlarge
Page 19

6.5 Dismounting [specialist]

Viessmann Solar Divicon (DN25B) — 6.5 Dismounting [specialist] diagram (page 19)
Fig. 24 · 6.5 Dismounting [specialist]
1. Drain the solar thermal system completely as described in section 6.2 Complete draining of the solar installation [specialist] .
Viessmann Solar Divicon (DN25B) — 6.5 Dismounting [specialist] diagram (page 19)
Fig. 25 · 6.5 Dismounting [specialist]
2. Disconnect the pipe joints with the solar thermal system.
Viessmann Solar Divicon (DN25B) — 6.5 Dismounting [specialist] diagram (page 19)
Fig. 26 · 6.5 Dismounting [specialist]
3. To remove the solar station from the support, pull out the clip springs sideways using a screwdriver.
Viessmann Solar Divicon (DN25B) — 6.5 Dismounting [specialist] diagram (page 19)
Fig. 27 · 6.5 Dismounting [specialist]
Viessmann Solar Divicon (DN25B) — 6.5 Dismounting [specialist] diagram (page 19)
Fig. 28 · 6.5 Dismounting [specialist]
4. Pull out the station towards the front.
Page 20 of the Viessmann Solar Divicon (DN25B) user manual — 7 Application range of the check valves [specialist]
Page 20 · click to enlarge
Page 20

7 Application range of the check valves [specialist]

Within their application range, the two check valves in the solar station prevent unwanted gravity circulation. The efficiency of the check valves depends on:

the installation height the temperature difference between the storage tank and the collector the type of heat transfer medium

In the diagram below you can see whether the check valves integrated in the stations are sufficient . If the check valves are not sufficient, you need to install additional components to prevent gravity circulation. You can mount components such as syphons ("heat traps"), 2-way valves (zone valves) or additional check valves.

Example:

You would like to install a Solar-Divicon solar station. The station comprises two check valves, 2 x 7.9 inch head = 15.8 inch head (2 x 200 mm wc = 400 mm wc).

You use a mixture of water and 40% of propylene glycol as a solar fluid. The installation height between the collector and the storage tank is ~33 ft (10 m).

Viessmann Solar Divicon (DN25B) — 7 Application range of the check valves [specialist] diagram (page 20)
Fig. 29 · 7 Application range of the check valves [specialist]

Installation height in ft

Temperature difference storage tank/collector in °R Result:

The check valves prevent gravity circulation up to a temperature difference of about 112 °R (~62 K). If the temperature difference between the collector and the tank is larger, the difference in density of the solar fluid will be so large, that the check valves are pushed open.

The density of the solar fluid decreases with rising temperature. In high installations with large temperature differences, the difference in density will cause gravity circulation. This circulation can cool down the storage tank

*Solar fluid = mixture of water and 40% glycol

Page 21 of the Viessmann Solar Divicon (DN25B) user manual — 8 Spare parts [specialist]
Page 21 · click to enlarge
Page 21

8 Spare parts [specialist]

Page 22 of the Viessmann Solar Divicon (DN25B) user manual — 9 Technical data and pressure drop characteristic
Page 22 · click to enlarge
Page 22

9 Technical data and pressure drop characteristic

DimensionsTotal height 19.6" (498 mm)

Total width 12.1" (307 mm)

Depth 6.3" (160 mm)

Center distance supply/return 3.94" (100 mm)

Pipe connections 1" cutting-ring compression fitting

Connection for the expansion tank ¾" female thread, NPT

Outlet of pressure relief valve ¾" female thread

Operating dataMax. admissible pressure 87 psi (6 bar)

Max. operating temperature 248 °F (120 °C)

Short-term load 320 °F (160 °C) < 15 minutes

Max. propylene glycol content 50 %

EquipmentPressure relief valve 87 psi (6 bar)

Pressure gauge 0-87 psi (0–6 bar)

Check valves 2 x 7.9 inch head (2 x 200 mm wc), can be opened Flowmeter 1 - 10 USgpm (4-38 lpm)

Solar loop pump Wilo Star 30U-25

MaterialValves and fittings Brass

Insulation EPP, = 0.043 W/(m K)

Viessmann Solar Divicon (DN25B) — 9 Technical data and pressure drop characteristic diagram (page 22)
Fig. 30 · 9 Technical data and pressure drop characteristic
Viessmann Solar Divicon (DN25B) — 9 Technical data and pressure drop characteristic diagram (page 22)
Fig. 31 · 9 Technical data and pressure drop characteristic
Viessmann Solar Divicon (DN25B) — 9 Technical data and pressure drop characteristic diagram (page 22)
Fig. 32 · 9 Technical data and pressure drop characteristic

Gaskets EPDM · Check valves Brass

Page 23 of the Viessmann Solar Divicon (DN25B) user manual — 9.1 Pressure drop characteristic
Page 23 · click to enlarge
Page 23

9.1 Pressure drop characteristic

Viessmann Solar Divicon (DN25B) — 9.1 Pressure drop characteristic diagram (page 23)
Fig. 33 · 9.1 Pressure drop characteristic

Pressure loss - ft of head

Flow rate - USgpm

Solar-Divicon DN25B

Page 24 of the Viessmann Solar Divicon (DN25B) user manual — 10 Commissioning log
Page 24 · click to enlarge
Page 24

10 Commissioning log

Collectors (number / type)

Collector surface area ft²

System height ft. (Height difference between

station and collector field)

Pipeline ⌀ = in l = ft

Ventilation (collector field) ⃞ Manual bleeder ⃞ Automatic bleeder

⃞ No ⃞ Vented

Airstop (station) ⃞ Vented

Solar fluid (type) % of glycol

Antifreeze (checked up to)°F Serial numbers

Controller Pump stage (I, II, III)

Software version Expansion tank (type)

Viessmann Solar Divicon (DN25B) — 10 Commissioning log diagram (page 24)
Fig. 34 · 10 Commissioning log

Pressure relief valve ⃞ Checked

Check valves ⃞ Checked

Installation company Date, Signature

Show 9 more labels / short text on this page
System operator · Installation site · Flow rate UGgpm · Station · Pump (type) · System pressure psig · Initial pressure psig · Flow-rate- · reducing position
Page 25 of the Viessmann Solar Divicon (DN25B) user manual — Solar Station Solar-Divicon DN25B
Page 25 · click to enlarge
Page 25

Submittal Data Information

Viessmann Solar Divicon (DN25B) — Submittal Data Information diagram (page 25)
Fig. 35 · Submittal Data Information

Solar Station Solar-Divicon DN25B

Version01 Effective: May 1st, 2014 Supersedes:

Job: Engineer: Contractor: Rep:

ITEM NO. MODEL NO.

Features:

Viessmann Solar Divicon (DN25B) — Solar Station Solar-Divicon DN25B diagram (page 25)
Fig. 36 · Solar Station Solar-Divicon DN25B

All medium-carrying parts are made of

For use in closed loop design only. The

solar station is used on the primary loop of

1" cutting-ring compression fittings

solar thermal systems to control the

Fully pre-assembled on steel wall

temperature in the hot water storage tank.

support, quick and easy to mount on

This station contains the functional and

the wall due to stable snap-lock

safety devices for optimum circuit control.

technology Two ball valves with brass check

The components enable:

valves (7.9 inch head / 200 mm wc)

Medium circulation with solar pump

and spindle exchangeable under

Viessmann Solar Divicon (DN25B) — Solar Station Solar-Divicon DN25B diagram (page 25)
Fig. 37 · Solar Station Solar-Divicon DN25B

Safety against pressure increase

Exact flow rate control

Flushing, filling and draining the circuit

integrated into the ball valve with

Measuring the supply and return

Flowmeter 1-10 USgpm or 5-40 l/min

Deaerating the solar loop

Shutting off the circuits

Safety assembly with pressure relief

Thermal insulation of the components

valve 87 psi / 6 bars, pressure gauge

and connection for expansion tank

Airstop with manual bleeding for

venting the solar circuit, flush and fill

Total height 19.6" / 498 mm

Total width 12.1" / 307 mm Depth 6.3" / 160 mm

Viessmann Solar Divicon (DN25B) — Solar Station Solar-Divicon DN25B diagram (page 25)
Fig. 38 · Solar Station Solar-Divicon DN25B

Center distance, supply/return 3.94" /100 mm

Pipe connections 1" compression fitting

Max. admissible pressure87 psi / 6 bar

Max. operating temperature 248 °F / 120 °C

Max. propylene glycol content 50%

Valves and fittings Brass

Insulation EPP, = 0.043 W/(m K) Flow rate [US gpm]

Viessmann products specified in Imperial or metric units are approximate and are provided for reference only. For precise measurements, please contact Viessmann Technical

Service.

Viessmann reserves the right to change or modify product design, construction, specifications, or materials without prior notice and without incurring any obligation to make such

changes and modifications on Viessmann products previously or subsequently sold .

Show 16 more labels / short text on this page
7552 453 · brass · pressure · All-metal temperature gauges · immersion sleeve · temperatures · with ball valve · Preventing gravity circulation · valves · Dimen- sions · Pressure [head ft] · Operating data · Solar-Divicon DN25B · Gaskets EPDM · Materials · Check valves Brass
Page 26 of the Viessmann Solar Divicon (DN25B) user manual — Submittal Data Information
Page 26 · click to enlarge
Page 26

Viessmann Manufacturing Company Inc. 750 McMurray Road Waterloo, Ontario, N2V 2G5, Canada TechInfo Line: 1-888-484-8643 1-800-387-7373, Fax (519) 885-0887 www.viessmann.ca [email protected]

Viessmann Manufacturing Company (U.S) Inc. 45 Access Road Warwick, Rhode Island, 02886, USA TechInfo Line: 1-888-484-8643 1-800-288-0667, Fax (401) 732-0590 www.viessmann-us.com info@viessmann-us.com

5516 057 - 01 05/2014

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the Viessmann Solar Divicon (DN25B)

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Viessmann Solar Divicon (DN25B)

Be the first to ask — other owners or our team will answer.

Original document

Viessmann Solar Divicon (DN25B) manual PDF

26 pages·557 KB·Household Appliance·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…