EN
MrCool logo
Official user manual

MrCool Modular Blower (MMBV*E)

15 pages·1.4 MB·HVAC Equipment·PDF·ENDEFRITNLJA
MrCool Modular Blower (MMBV*E)
Table of Contents 37 sections Installation Manual · Signature Series · MMBV*E Modular Blower · Version Date: 04-21-21 · … ShowHide
Page 1 of the MrCool Modular Blower (MMBV*E) user manual — Version Date: 04-21-21
Page 1 · click to enlarge
Page 1

Please read this manual carefully before installation and keep it for future reference.

Installation Manual

Signature Series

MMBV*E Modular Blower

Due to updates and constantly improving performance, the information and instructions within this

manual are subject to change without notice. Please visit www.mrcool.com/documentation to

ensure you have the latest version of this manual.

Version Date: 04-21-21

Page 3 of the MrCool Modular Blower (MMBV*E) user manual — Installation
Page 3 · click to enlarge
Page 3

These electric furnaces are completely factory assembled and all components are performance tested. Each unit consists of a blower assembly, optional refrigerant coil,

Installation

This modular blower is designed for ease of installation

applications. The units are shipped from the factory completely assembled. Accessories may also be ordered

Knockouts are provided for electrical power wiring entrance.

installations only.

When used on cooling applications, excessive sweating may occur when unit is installed in a very humid space.

Read the entire instruction manual before starting the installation. Several of the installation steps can be done prior to setting the unit in place and doing this can save time and simplify installation. Do not remove the cabinet knockouts until it has been determined which knockouts will need to be removed for the installation. Determining which knockouts to remove will depend on the application and in some cases preference.

If installed in an unconditioned space, sealant should be applied around the power wires, control wires, refrigerant tubing, and condensate lines where they enter the cabinet. Power wires should be sealed on the inside where they exit the conduit opening. Sealant is required to prevent air leakage into and condensate from forming inside the unit, control box, and on electrical controls.

The unit must be installed in such a way as to allow free access to the coil compartment and blower/control compartment.

These instructions are intended to be a general guideline and do not supersede any local or national codes. Installation must conform with the local building codes and with the latest editions of the National Electric Code or Canadian Electric Code.

The unit must be installed in a level position to ensure proper condensate drainage. Make sure unit is level in both directions within 1/8”.

Improper installations not following these instructions can result in unsatisfactory operation and/or dangerous conditions and may void the unit warranty.

Units with circuit breakers installed in the vertical position must have breaker switch position “ON” in the up position and switch position “OFF” in the down position. This

General Information The modular blower furnace may be used with optional matching furnace coil cabinets in upflow, counterflow, or horizontal applications (see Figure 3 for acceptable system configurations). Tie-plates and the necessary hardware are packaged with the blower sections to connect the furnace and coil section cabinets together.

Electric Codes requirements.

The modular blower may be converted for vertical downflow applications. The circuit breaker(s) must be rotated 180°.

units with circuit breakers installed in the vertical position must have circuit breakers installed so that the breaker switch “ON” position and marking is up, and “OFF” position and marking is down.

be removed from inside any threaded drain pan hole to which a drain line is to be connected. Use care when removing the web so as to not damage the coil.

All electric furnaces installed with a mating coil section must follow the instructions listed below for proper condensate drainage. It is recommended that the auxiliary drain be connected to a drain line for all units. If the auxiliary drain is not connected, it must be plugged with provided cap. For

To avoid property damage caused by condensate drain

separate drain line to the outside under any indoor electric

building codes apply, install per those codes.

and routed to a drain.

Select the best position which suits the installation site conditions. Take into consideration required clearances, space, routing requirements for refrigerant line, condensate

Horizontal Installations Horizontal installations can be left or right hand. Adequate support must be provided to insure cabinet integrity.

Ensure that there is adequate room to remove service and access panels if installing in the horizontal position.

horizontal coil installations.

Page 4 of the MrCool Modular Blower (MMBV*E) user manual — Installation
Page 4 · click to enlarge
Page 4

Maintain all required clearances to combustible surfaces as stated on the unit rating plate.

opening provided around the blower outlet and should be installed as recommended in ASHRAE or ACCA Manual D.

Supply and return ductwork must be adequately sized to meet the system’s air requirements and static pressure capabilities. Ductwork should be insulated with a minimum of 1” thick insulation with a vapor barrier in conditioned areas or 2” minimum in unconditioned areas. Connect

The plenum forms an extension of the blower housing and minimizes air expansion losses from the blower.

If an elbow is included in the plenum close to the unit, it must not be smaller than the dimensions of the supply duct

Sheet metal ductwork run in unconditioned spaces must be insulated and covered with a vapor barrier. Fibrous ductwork may be used if constructed and installed in accordance with SMACNA Construction Standard on Fibrous Glass Ducts. Check local codes for requirements on ductwork and insulation.

Non-Ducted Return Closet Installation The cabinet can be installed in a closet with a false bottom to form a return air plenum or be installed with a return air plenum under the unit. Louvers or return air grilles are

without a ducted return to single story buildings.

Duct system must be designed within the range of external static pressure the unit is designed to operate against. It

  • Install louvers in a closet. Use the free area of louver or grille to determine the size opening required to provide the free area for metal louvers or grilles.
  • If the free area is not known, assume a 25% free area for wood or a 75% free area for metal louvers or grilles.

accessories, etc. are accounted for in total resistance.

  • If the return air plenum is used, the return air grille should be immediately in front of the opening in the

the unit around the blower outlet.

When not installed in front of the opening, there must be adequate clearance around the unit to allow for the free

Nominal Tons Air Conditioning & Nominal Air FlowSquare Inch Surface Area & Nominal SizeMinimum Return Air Free Area Disposable FiltersWashable Filters Up through 2 ton 800 - 900 CFM432 sq. in . 20 in x 25 in260 sq. in . 15 in x 20 in260 sq. in. 2-1/2 ton 900 - 1000 CFM480 sq. in . 20 in x 30 in288 sq. in . 14 in x 25 in288 sq. in. 3 ton s 1300 - 1500 CFM576 sq. in . 14 in x 25 in (2)346 sq. in . 16 in x 25 in346 sq. in. 3-1/2 tons 1300 - 1500 CFM672 sq. in . 16 in x 25 in (2)404 sq. in . 20 in x 25 in404 sq. in. 4 ton s 1500 - 1700 CFM768 sq. in . 20 in x 25 in (2)461 sq. in . 20 in x 25 in461 sq. in. 5 ton s 1900 - 2100 CFM960 sq. in . 20 in x 30 in (2)576 sq. in . 24 in x 25 in576 sq. in.

Table 1. Recommended Remote Filter Sizes

Page 5 of the MrCool Modular Blower (MMBV*E) user manual — CAUTION
Page 5 · click to enlarge
Page 5
  • Auxiliary drain (if used) should be run to a place where it would be noticeable if it becomes operational. Occupant should be warned that a problem exists if water should begin running from the auxiliary drain line.

Condensate Drain Connection

Do not operate unit without a drain trap. The condensate drain is on the negative pressure side of the blower; therefore, air being pulled through the condensate line will prevent positive drainage without a proper trap.

  • Test condensate drain pan and drain line after installation is complete. Pour several quarts of water

to make sure drain pan is draining completely, no leaks

from inside any threaded drain pan hole to which a drain line is to be connected. Use care when removing the web so as to not damage the coil.

from the termination of the primary drain line.

with the bottom of the inside of pan. Auxiliary connection is raised above the bottom of the inside of the pan. Plastic web covering 3/4” auxiliary connection must be broken out if used. Do not get primary and auxiliary connections interchanged.

connections on the drain pan.

Positive Liquid Seal Required

The unit is provided with 3/4” FPT condensate drain connections.

Figure 1. Typical Condensate Drain Connection

  • Connect the drain lines to the appropriate drain pan
  • Secondary drain connections should be connected to a separate drainage system.

CAUTION

  • Install a trap in the drain line below the bottom of the drain pan and pitch the drain lines down from the coil at least 1/4” per foot of run. Horizontal runs over 15’ long must also have an anti-siphon air vent (stand pipe), installed ahead of the horizontal run. An extremely long horizontal run may require an oversized drain line to eliminate air trapping.

the outside of the building, is required in all installations

locations, local codes may require an auxiliary drain pan for any horizontal installation.

  • Route to the outside or to an appropriate drain. Check local codes before connecting drain line to an existing drainage system.
  • Insulate drain lines where sweating could cause water damage.
  • The removal of cabinet knockouts required for drain connections can be made much easier with the indoor coil assembly removed from the cabinet.
  • Install drain lines so they do not block service access

coil, or blower removal and service access.

  • Make sure unit is level or pitched slightly toward primary drain connection so that drain pan will empty completely without water standing in pan.
  • Install a 2” trap in the primary drain line as close to the unit as practical. Make sure that the top of the trap is below connection to the drain pan to allow complete drainage of pan.
Show 4 more labels / short text on this page
Unit Drain Connection · 1 in Minimum · 3 in Minimum · 12 in Maximum
Page 6 of the MrCool Modular Blower (MMBV*E) user manual — NOTE
Page 6 · click to enlarge
Page 6

Electrical Wiring

IMPORTANT

The variable speed motor in the modular blower

WARNING

influx of current when power is applied. Power is to remain applied to the motor except during servicing. Remove AC power before plugging or unplugging the input power to the motor. Do not install blower relays that interrupt line voltage to the motor.

Turn off electric power at the fuse box or service panel before making any electrical connections and ensure a proper ground connection is made before connecting line voltage. Failure to do so can result in property damage, personal injury, or death.

Variable Speed Features The modular blower is equipped with a variable speed

Electrical Code recommendations, local codes, and applicable requirements of UL; or in accordance with the Canadian Electrical Code, local codes, and CSA Standards. Power wiring, disconnecting means, and over- current protection are to be supplied by the installer. See he unit rating plate for unit maximum over-current protection, minimum circuit ampacity, and operating voltage. The power supply must be sized and protected according to

of external static pressures. The variable speed blower offers the following comfort features:

Soft Start When called into operation, the variable speed motor will slowly ramp up to normal operating speed. This eliminates the noise and discomfort that results caused by the initial blast of air encountered with standard electric furnaces. It can take up to 7.5 minutes to reach normal operating speed.

require grounding of each circuit to lug(s) provided in unit.

NOTE

Continuous Blower Operation The comfort level of the living space can be enhanced when using this feature by allowing continuous circulation of air in between calls for cooling or heating. The circulation

Use copper conductors only.

The unit must be grounded with separate ground connector(s). See the electrical connection diagrams

minimum).

High voltage pigtail wiring connections are included in the unit. For systems requiring additional electric heat, this plug-in harness will be discarded and the high voltage

For situations where humidity control is a problem, the variable speed motor can be enabled to operate at a 10%

kit. Low voltage control wiring are pigtail leads located outside the cabinet and are color coded to match the connection called out on the wiring schematic.

by connecting to a standard humidity control that is normally closed and opens on humidity rise.

These units are designed for operation with a 208-240 volt single phase, 60 cycle, AC power supply. The units are internally factory wired for 240 volt installation. If 208 volt installation is desired, it will be necessary to change the black transformer lead in the blower cabinet control box to the 208V terminal on the transformer.

Page 7 of the MrCool Modular Blower (MMBV*E) user manual — DEHUMIDIFY
Page 7 · click to enlarge
Page 7

This model is designed for use with heat pumps as well as air conditioning systems. The motor control board needs to sense a signal on the “O” thermostat wire in order to use cooling delay timing. For a straight air conditioning system, connect the “O” wire to the 24 volt “R” wire.

Setup

coil should be between 350 – 450 CFM per ton of cooling

outdoor unit. If the electric furnace is to be used with smaller tonnage outdoor equipment, the variable speed

also features LED indicators that display operating mode,

changing the motor control board (refer to Table 2. Variable Speed Motor Application).

signals for emergency heat (EM), aux. heat (W1), reversing valve (O), compressor stage 1 (Y1), compressor stage 2 (Y2), and blower (G) are all indicated by lit LED’s on this board. If a humidistat is used, the dehumidify LED will light when the humidistat opens and the motor runs at reduced

IMPORTANT

The cooling blower speed must be set to provide a

for each 100 CFM. For example: if the operating CFM is

outdoor cooling capacity.

Variable Speed Motor Locate the motor control board in the blower control box. Set the HEAT and COOL CFM taps by moving the board jumpers to the A, B, C, or D positions (see Figure 2) based on the information found in Table 2. Variable Speed Motor Application. The ADJUST tap on the control board can be used to raise or lower the table CFMs. The (+) tap will raise the table CFM by 10%, and the (–) tap will lower the table CFM by 12%.

Special note for units equipped with a humidistat: If using a humidistat, the dehumidify resistor located on the bottom right of the control board must be removed (see Figure 2).

The HUM terminal on the board must be connected to the Normally Closed contact of the humidistat so that the board senses an open circuit on high humidity.

Application Table The versatility of the variable speed motor enables the performance of the modular blower to be tailored to the different modes of operation encountered in heating and cooling. All modular blowers are capable of operation

COOL HEAT ADJUST

a modular the control board taps and the thermostat (see Table 2. Variable Speed Motor Application). Before beginning the setup, become familiar with the information found in this table.

NORM

A B C D

A B C D

(+) (–) TEST

D1

The data in the application table is categorized by unit size and mode of operation. Use the information provided to determine the CFM taps needed for cooling and heating.

DEHUMIDIFY

CUT TO ENABLE

Figure 2. Motor Board Taps and Dehumidify Resistor

Page 8 of the MrCool Modular Blower (MMBV*E) user manual — Setup
Page 8 · click to enlarge
Page 8
Control Board Taps ModelModeThermostatCoolHeat HUM EM W1Y2 O Y1/ GABCDABCD CFMCFM MMBV08BECont. BlowerX500400350350 Cooling**X X1000800700600 HeatingX1000800700600 Aux. HeatXX************1000800700600 Emer. HeatX X************1000800700600 MMBV12BECont. BlowerX600500400350 Cooling**X X12001000800600 HeatingX12001000800600 Aux. HeatXX************12001100*1100*1100* Emer. HeatX X************12001100*1100*1100* MMBV16CECont. BlowerX800700600500 Cooling**X X1600140012001000 HeatingX1600140012001000 Aux. HeatXX************160014001200*1100* Emer. HeatX X************160014001200*1100* MMBV20DECont. BlowerX900800700600 Cooling**X X1800160014001200 HeatingX1800160014001200 Aux. HeatXX************1800160014001200* Emer. HeatX X************1800160014001200* * This CFM is not approved for use with highest kW heater size. . At the end of a call for cooling there is a blower delay of 1 minute.
MrCool Modular Blower (MMBV*E) — Setup diagram (page 8)
Fig. 1 · Setup

Table 2. Variable Speed Motor Application

MrCool Modular Blower (MMBV*E) — Setup diagram (page 8)
Fig. 2 · Setup
Page 9 of the MrCool Modular Blower (MMBV*E) user manual — Sequence of Operation
Page 9 · click to enlarge
Page 9

Heating (heat pump) When the thermostat calls for heat, the circuits between R and Y and R and G are completed. Circuit R-Y energizes the contactor starting the outdoor fan motor and the compressor. Circuit R and G energizes the blower relay starting the indoor blower motor.

Sequence of Operation

Cooling (cooling only or heat pump)

For single stage cooling, Y1 and Y2 need to be jumpered.

If the room temperature should continue to fall, the circuit between R and W1 is completed by the second stage heat room thermostat. Circuit R-W1 energizes a heat sequencer. The completed circuit will energize supplemental electric heat. Units with a second heater

When the thermostat calls for cooling, the circuit between R and G is completed, and the blower relay is energized. The Normally Open contacts close, causing the indoor blower motor to operate. The circuit between R and Y is also completed; this circuit closes the contactor in the outdoor unit starting the compressor and outdoor fan motor. Circuit R and O energizes the reversing valve switching it to the cooling position. (The reversing valve remains energized as long as selector switch is in the COOL position.)

W1 on the thermostat or connected to a second heating stage W2 on the thermostat sub-base.

Emergency Heat (heating heat pump) If selector switch on thermostat is set to the emergency heat position, the heat pump will be locked out of the heating circuit, and all heating will be electric heat. A jumper should be placed between W2 and E on the thermostat sub-base so that the electric heat control will transfer to the

On a call for 1st stage cooling, the thermostat closes R to Y. In 1st stage cooling, the blower runs at 70% of the

the thermostat closes R to Y2. In 2nd stage cooling, the

blower to cycle on and off with the electric heat when the fan switch is in the AUTO position.

Heating (electric heat only) When the thermostat calls for heat, the circuit between R and W is completed, and the heater sequencer is energized. A time delay follows before the heating elements and the indoor blower motor come on. Units with a second heat

W on the thermostat sub-base or connected to a second stage on the sub-base.

Single Stage Cooling · Two Stage Cooling

Page 10 of the MrCool Modular Blower (MMBV*E) user manual — System Check
Page 10 · click to enlarge
Page 10

System Check

coil should be between 350 – 450 CFM per ton of cooling

Pre-start Check • Is unit properly located, level, secure, and serviceable?

outdoor unit. If the electric furnace is to be used with smaller tonnage outdoor equipment, the variable speed

  • Has an auxiliary pan been provided under the unit

changing the motor control board (refer to Table 2. Variable Speed Motor Application).

  • Have all webs been carefully removed from the drain connections that are being used?

Electric Heater To check the electric heater operation:

  • Has the condensate line been properly sized, run, trapped, pitched, and tested?
  • Is the ductwork correctly sized, run, taped, and insulated?
1. Set thermostat to call for auxiliary heat (approximately 5° F above ambient temperature). The indoor blower and auxiliary heat should come on together. Allow a minimum of 3 minutes for all sequencers to cycle on.
  • Have all cabinet openings and wiring been sealed?
2. Set the thermostat so it does not call for heat. Allow up to 5 minutes for all sequencers to cycle off.
  • Has the indoor/outdoor unit application been reviewed for proper motor dip switch settings?
  • Is the wiring tight, correct, and to the wiring diagram?
  • Is the unit properly grounded and protected (fused)?
  • Is the thermostat correctly wired, level, and in a good location?
  • Is the unit circuit breaker(s) rotated properly – ON up/ OFF down?
  • Are all access panels in place and secure?

Refer to outdoor unit installation instructions for system start-up instructions and refrigerant charging instructions.

ceiling?

Page 11 of the MrCool Modular Blower (MMBV*E) user manual — Other Equipment Installed:
Page 11 · click to enlarge
Page 11

Replacement Parts

Maintenance

Use only original equipment service parts when repairing these products. These parts include but are not limited to: circuit breakers, heater controls, heater limit controls, heater elements, motor, blower relay, control transformer, blower wheel, indoor coil, and sheet metal parts.

Air Filters

IMPORTANT

to protect the coil, blower, and internal parts from excessive dirt and dust.

When ordering replacement parts, it is necessary to order by part number and include with the order the complete model number and serial number (see unit data plate). Refer to the parts list for unit component part numbers.

of inadequate heating or cooling performance. Replace

soaking in mild detergent and rinsing with cold water.

properly sized for it.

Owner Record

Furnace Model # Serial # Installation Date:

Installed By:

Dealer:

Address:

Telephone # License #

Contact Person:

Other Equipment Installed:

Equipment Type:

Model # Serial # Installation Date:

Equipment Type:

Model # Serial # Installation Date:

Equipment Type:

Model # Serial # Installation Date:

Page 12 of the MrCool Modular Blower (MMBV*E) user manual — Counterflow
Page 12 · click to enlarge
Page 12

Counterflow

Upflow

Left to Right

Airflow

Right to Left

Airflow

Horizontal

Figure 3.

Page 13 of the MrCool Modular Blower (MMBV*E) user manual — Counterflow
Page 13 · click to enlarge
Page 13
MrCool Modular Blower (MMBV*E) — Counterflow diagram (page 13)
Fig. 3 · Counterflow

Figure 4. Wiring Diagram for Variable Speed Blower

MrCool Modular Blower (MMBV*E) — Counterflow diagram (page 13)
Fig. 4 · Counterflow
Page 14 of the MrCool Modular Blower (MMBV*E) user manual — Counterflow
Page 14 · click to enlarge
Page 14
MrCool Modular Blower (MMBV*E) — Counterflow diagram (page 14)
Fig. 5 · Counterflow

2-Stage System only; for single-stage systems, jumper Y1 to Y2

Connect O to R for proper cooling blower delay

2-Stage System only; for single-stage systems, jumper Y1 to Y2

Connect common wired to thermostat only if required. See thermostat instructions.

Page 15 of the MrCool Modular Blower (MMBV*E) user manual — Signature Series
Page 15 · click to enlarge
Page 15

Please read this manual carefully before installation and keep it for future reference.

Signature Series

Consult with the sales agency or manufacturer for details.

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the MrCool Modular Blower (MMBV*E)

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the MrCool Modular Blower (MMBV*E)

Be the first to ask — other owners or our team will answer.

Original document

MrCool Modular Blower (MMBV*E) manual PDF

15 pages·1.4 MB·HVAC Equipment·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…