EN
D-Link logo
Official user manual

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC)

24 pages·563 KB·Networking Equipment·PDF·ENDEFRITNLJA
D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC)
Table of Contents 1 sections DGS-3000-28SC ShowHide
Page 1 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — Quick Installation Guide Краткое руководство по установке
Page 1 · click to enlarge
Page 1

DGS-3000-28SC

20-port 100/1000Base-X SFP, 4-port 100/1000Base-T/SFP combo and 4-port 10GBase-X SFP+ Stackable Managed L2 Switch / Управляемый L2 стекируемый коммутатор с 20 портами 100/1000Base-X SFP, 4 комбо-портами 100/1000Base-T/SFP и 4 портами 10GBase-X SFP+

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 1)
Fig. 1

Quick Installation Guide Краткое руководство по установке

Page 2 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — DGS-3000-28SC
Page 2 · click to enlarge
Page 2
Introduction This Quick Installation Guide gives instructions for setting up the D-Link DGS-3000-28SC switch. The model you have purchased may appear slightly different from those shown in the illustrations. Package Contents Open the shipping carton of the Switch and carefully unpack its contents. Please consult the packing list located to make sure all items are present and undamaged. • One DGS-3000-28SC Switch • AC power cord(s) • One DC power source connector • One RJ-45 to RS-232 console cable • One set of Power Cord Retainer • 2 Mounting Brackets • Mounting kit • Four rubber feet with adhesive backing • One Quick Installation Guide • Warranty Certificate If any of the above items are damaged or missing, please contact your local reseller for replacement. Hardware Overview LED Indicators LEDColourStatusDescription PowerGreenSolid GreenPower on. Light OffPower off. ConsoleGreenBlinking GreenDuring the Power-On Self Test (POST). Light OffThe Power-On Self Test (POST) is finished. Solid GreenA user is logged in through the console port. RPSGreenSolid GreenRPS is connected. Light OffRPS is not connected / RPS switch is turned off. Fan ErrRedBlinking RedAny of the fans has failed. Light OffAll fans are working normally. Link/Act LEDsThe Switch has LED indicators for Link and Activity. Stacking ID1-6For standalone Switches, this will display number “1”. For stacked Switches, this indicates the position in the stacking box ID, which can be assigned manually by the user or automatically by the system. HIndicates this switch is the master switch in the stack. hIndicates this switch is the backup master switch in the stack. GIndicates the Safeguard engine entered the exhausted mode. 2
D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 2)
Fig. 2
Page 3 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — DGS-3000-28SC
Page 3 · click to enlarge
Page 3

Installation Guidelines Installing the Switch without a Rack When installing the switch on a desktop or shelf, the rubber feet included with the device must be attached on the bottom at each corner of the device’s base. Allow enough ventilation space between the device and the objects around it.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 3)
Fig. 3

Installing the Switch in a Standard 19'' Rack The Switch can be mounted in a standard 19"(1U) rack using the provided mounting brackets. Fasten the mounting brackets to the sides of the Switch using the screws provided.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 3)
Fig. 4

Fasten the mounting brackets in any available open space in the rack using the screws provided.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 3)
Fig. 5
Page 4 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — Installing the Power Cord Clip
Page 4 · click to enlarge
Page 4

Installing Transceivers into the Transceiver Ports

The Switch is equipped with Small Form-factor Pluggable (SFP) and Small Form-factor Pluggable plus (SFP+) ports, which supply connecting SFP, WDM SFP and SFP+ transceivers.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — Installing Transceivers into the Transceiver Ports diagram (page 4)
Fig. 6 · Installing Transceivers into the Transceiver Ports

Connecting to Power Power On (AC Power) Plug one end of the AC power cord into the power socket of the Switch and the other end into the local power source outlet.

Power Failure (AC Power) For AC power supply units, as a precaution, in the event of a power failure, unplug the Switch. When power has resumed, plug the Switch back in.

Installing the Power Cord Clip

А) With the rough side facing down, insert the Tie Wrap into the hole below the power socket.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — Installing the Power Cord Clip diagram (page 4)
Fig. 7 · Installing the Power Cord Clip
Page 5 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — DGS-3000-28SC
Page 5 · click to enlarge
Page 5

B) Plug the AC power cord into the power socket of the Switch.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 5)
Fig. 8

C) Slide the Retainer through the Tie Wrap until the end of the cord.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 5)
Fig. 9

D) Circle the tie of the Retainer around the power cord and into the locker of the Retainer.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 5)
Fig. 10
Page 6 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — DGS-3000-28SC
Page 6 · click to enlarge
Page 6

E) Fasten the tie of the Retainer until the power cord is secured.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 6)
Fig. 11
  • Connecting a DC Power Supply The Switch provides a DC power source connector to connect to any DC power source. The DC power source that will be activated when the AC power is not working .The DC power source must meet the following requirements:
  • The DC power source's output voltage must be between 11.4V and 12.6V.
  • The DC power source's output current rate must be higher or equal to 2.5A.
  • Voltage protection must be apllied when the voltage is higher or equal to 15V.
  • Current protection must be apllied when the current is higher or equal to 6A.
D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 6)
Fig. 12

1. Make sure that the ON/OFF toggle switch on the rear panel of the Switch is turned off. 2. Connect one end of the DC power cords supplied to a DC power source. Make sure that connection polarity (positive and negative) is correct at both sides before using this feature to avoid any damaged. Connect the other end of the DC power cords to the DC power source connector. 3. Connect the DC power source connector to the switch. 4. Turn the ON/OFF toggle switch on.

Page 7 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — Installing the RPS into a Rack-mount Chassis
Page 7 · click to enlarge
Page 7

Connecting the RPS to the RPS Port The DPS-200A, DPS-500A, and DPS-500DC/В Redundant Power Supply (RPS) can be connected to the RPS port of the Switch using the DC power supply cord, called the DPS-CB150-2PS/В. It is important to notice that the RPS can supply power to one or two DGS-3000-28SC Switches at the same time.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 7)
Fig. 13

1. Disconnect the Switch from the main AC power source. 2. Insert the 14-pin end of the DC power supply cord into the RPS and the 2-pin end into the receptacle of the RPS port on the Switch. 3. Using a standard AC power cord, connect the RPS to the main AC power source. A green LED on the front panel of RPS will illuminate to indicate a successful connection. 4. Make sure that the ON/OFF toggle switch on the rear panel of the Switch is turned on. 5. Re-connect the Switch to the AC power source and power on the RPS. No configuration is needed in the Switch software for this installation.

Installing the RPS into a Rack-mount Chassis

The RPS can be installed into an RPS rack-mount chassis unit, called the DPS-800. The DPS-800 is a standard-size rack-mount (1 standard unit in height) designed to hold up to two RPS’s. 1. Install the DPS-200A/DPS-500A/DPS-500DC/В in the DPS-800 as shown below.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — Installing the RPS into a Rack-mount Chassis diagram (page 7)
Fig. 14 · Installing the RPS into a Rack-mount Chassis
Page 8 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — Switch Connections
Page 8 · click to enlarge
Page 8
2. Install the DPS-800 in an Equipment Rack as shown below.
D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 8)
Fig. 15

Switch Connections

Switch to End Node

End nodes include PCs outfitted with a 10, 100 or 1000 Mbps RJ-45 Ethernet Network Interface Card (NIC) and routers. An end node connects to the Switch via a twisted-pair UTP/STP cable. Connect the end node to any of the 1000Base-T ports of the Switch. The Link/Act LEDs for each Ethernet port will light green or amber when the link is valid.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — Switch Connections diagram (page 8)
Fig. 16 · Switch Connections
  • Switch to Another Switch The Switch can be used to connect to any other switch or hub in the network. This network topology is used when the Switch does not have enough ports to cater for all the end nodes in the network. There is a great deal of flexibility on how connections are made using the appropriate cabling.
  • Connect a 10Base-T switch port to the Switch via a twisted-pair Category 3, 4 or 5 UTP/STP cable.
  • Connect a 100Base-TX switch port to the Switch via a twisted-pair Category 5 UTP/STP cable.
Page 9 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — SNMP-based Management
Page 9 · click to enlarge
Page 9
  • Connect 1000Base-T switch port to the Switch via a twisted pair Category 5e UTP/STP cable.
  • Connect switch supporting a fiber-optic uplink to the Switch’s SFP/SFP+ ports via fiber-optic cabling.
D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 9)
Fig. 17

Connecting to Network Backbone or Server

The combo SFP ports and the 1000Base-T ports are ideal for uplinking to a network backbone, server or server farm. The copper ports operate at a speed of 10, 100 or 1000Mbps. Connections to the Gigabit Ethernet ports are made using a fiber-optic cable or Category 5e copper cable, depending on the type of port. A valid connection is indicated when the Link LED is lit.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — Connecting to Network Backbone or Server diagram (page 9)
Fig. 18 · Connecting to Network Backbone or Server

Management Options Web-based Management Interface

After successfully installing the Switch, the user can configure the Switch, monitor the LED panel, and display statistics graphically using one of the Web browser given below:

  • Microsoft® Internet Explorer (version 5.5 and later)
  • Netscape (version 8 and later)
  • Mozilla Firefox (version 2.0 and later)
  • Safari (version 4.0 and later)
  • Google Chrome (version 6.0 and later).

SNMP-based Management

The Switch can be managed with an SNMP-compatible console program. The Switch supports SNMP version 1.0, version 2.0 and version 3.0.

Page 10 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — Logging onto the Web Manager
Page 10 · click to enlarge
Page 10

Command Line Interface

The user can also connect a computer or terminal to the serial console port to access the Switch. The command line interface provides complete access to all Switch management features.

Connecting the Console Port

  • To use the console port, the following equipment is needed:
  • A terminal or a computer with both an RS-232 serial port and the ability to emulate a terminal (it is possible to use Hyperterminal, Putty, Minicom etc);
  • A console cable with a male DB-9 connector on one end and an RJ-45 connection on the other. This cable should be included with the Switch. To connect a terminal to the console port: 1. Connect the male DB-9 connector on the console cable to the RS-232 serial port on the computer. 2. Insert the RJ-45 connector into the RJ-45 console port on the front of the Switch. Set the terminal emulation software as follows:
  • Serial port: COM port 1 or COM port 2
  • Baud rate: 115200
  • Data bits: 8
  • Parity: none
  • Stop bits: 1
  • Flow control: none
  • Under Properties, select VT100 for Emulation mode.
  • Select Terminal keys for Function, Arrow and Ctrl keys. Make sure to use Terminal keys (not Windows keys) are selected. 3. After you have correctly set up the terminal, plug the power cord into the power receptacle on the back of the Switch. The boot sequence appears in the terminal. After the boot sequence completes, the console login screen will be displayed.

First Time Connecting to the Switch

Upon initial connection to the Switch, the login screen appears (see example below).

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — First Time Connecting to the Switch diagram (page 10)
Fig. 19 · First Time Connecting to the Switch

There is no initial username or password. Press Enter in both the Username and Password fields. Then access will be given to enter commands after the command prompt DGS-3000-28SC: admin#.

Logging onto the Web Manager

To begin managing the Switch, simply run the browser installed on your computer and point it to the IP address you have defined for the device. The URL in the address bar should read something like: http://123.123.123.123 where the numbers 123 represent the IP address of the Switch.

Page 11 of the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) user manual — Additional Information
Page 11 · click to enlarge
Page 11

This opens the management module's user authentication window, as seen below.

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) — DGS-3000-28SC diagram (page 11)
Fig. 20

As there is no default User name or Password, click OK to proceed. This will open the Web-based user interface.

Additional Information

For more detailed information on how to set up and configure the switch, please visit the website http://www.dlink.com/

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC)

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC)

Be the first to ask — other owners or our team will answer.

Original document

D-Link Layer 2 Gigabit Stackable Managed Switch (DGS-3000-28SC) manual PDF

24 pages·563 KB·Networking Equipment·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…