

ML-WT1

For the correct installation and use of this equipment, please read carefully the
requirements and strictly follow the instructions.
serviceman if the equipment is out of order.
design without guidance from a specialized serviceman.
maintenance.
above.
turbine (the exposed copper parts should be screwed together).
Follow grounding according to national standards, or according to the local
environment and soil condition.
5.When assembling the Wind turbine, all parts should be fastened only with the
fasteners specified.
6.The battery must be connected before the wind turbine is connected to the
controller.
Basic requirements: · Assembly Requirements:


1.Body frame
7.Fairing
2.Hoop seat
8.Bolt for hoop
3.Axis
9.Elastic washer
4.Hub
10.Bolt for blades
5.Blade
6.Anti-slack nut

pulled out from the bottom of the tower.
included in the package)
tighten up by holding the wrench with your left hand and rotating the hub clockwise
with your right hand.
tower to the controller.
and that the cables are connected. Use a telescope for extra visibility if required.
2.Timely inspection should be made after a heavy storm. If there is any damage, put
down the tower for maintenance. If mounted on a streetlight, an electrician should
safely climb the pole to check if the generator is not shortcircuited and is operating
properly.
3.Maintenance-free batteries should be kept clean.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.