1 Read directly please
This apparatus has been released for the intended purpose only by the manufacturer. Any other or far-reaching use shall be considered as improper. For this purpose, compliance with the relevant product documentation shall be included. It is not allowed to change the device or rebuild it.
This heat pump is intended for domestic use under Article 1 (2) (k) of the EC Directive. The pump is therefore also intended for use by laymen to heat shops, offices and other similar working environments as well as heating agricultural holdings, hotels, boarding houses or the like or for heating other residential facilities.
The heat pump complies with all relevant DIN/VDE requirements and EC guidelines. You can find these in the CE declaration in the Annex.
The electrical connection of the heat pump shall be performed according to valid VDE, EN and IEC standards and in accordance with the General Regulation for Electrical Installations (A.R.E.I.). Furthermore, the connection conditions of energy companies must be respected.
The heat pump shall be integrated into the heating system in accordance with the relevant requirements.
Persons, especially children, who are unable to use the device safely due to their physical, sensory or mental skills or because of lack of knowledge or experience, shall not be allowed to use it without supervision or instructions from a responsible person.
Always keep an eye on children to make sure they don't play with the device.

1.4 Energy-saving use of the heat pump
3.1 General
By using this heat pump you contribute to the stool of our environment. For efficient operation, careful dimensioning of the heating system and its heat source is very important. Particular attention should be paid to the lowest possible water flow temperature. Therefore, all connected energy consumers should be suitable for low running temperatures. A 1 K higher heating temperature increases energy consumption by approx. 2.5 %. Low temperature heating with pre-flow temperatures between 30 °C and 50 °C is suitable for energy saving.
The base unit consists of a compact heat pump for installation inside with integrated hot water boiler.
All components necessary for the operation of the heat pump are installed on the switch box with heat pump manager. A sensor for the outside temperature with mounting material as well as a filter are included in the heat pump. The power supply for the power and steering voltage shall be installed on site.
The heat source system with the glycol water distributor shall be installed on site.
During the use of the heat pump, the hot water temperature shall not exceed 45 °C. This allows you to save significantly on energy consumption.

2.1 Scope
The highly efficient compact soil/water heat pump with integrated hot water boiler is only intended for heating heating water and water for industrial purposes. The pump can be used in existing or newly installed heating systems. The heat carrier in the thermal source installation is glycol water. The heat source may be used as earth dons, collectors or similar installations.
The soil stores the heat of the sun, wind and rain. This geothermal heat is in the earth collector, the Earth dones and so on. absorbed by the glycol water at a low temperature. A circulating pump then transports the "heated" glycol water to the vaporizer of the heat pump. This heat is transferred to the coolant in the cooling cycle. The glycol water cools off again, so that it can absorb heat energy back into the glycol water circuit.
The coolant is sucked in by the electrically driven compressor, compressed and pumped to a higher temperature level. The electrical energy supplied in this process is not lost, but is largely transferred to the coolant.
Then the coolant enters the condenser and here again transfers its heat energy to the heating water. Depending on the working point, heating water can be heated to 62 °C.

3.3 Heat pump module
The cooling cycle is "remetically closed" and contains the fluorideed coolant R410A specified in the Kyoto Protocol with a GWP value of 1975. It is CFC free, does not break down ozone and is not flammable.
The hydraulic module for glycol water/water contains the components of the heating and glycol water circuit necessary to connect the heat pump.
The heat pump module switch box shall contain all components necessary for the operation of the cooling cycle.


4.1 Glycol water distributor
The glycol water distributor unites the collector or probe loops into one main line, which is connected to the heat pump. The integrated ball valves can be used to seal separate glycol water circuits for venting or emptying them.
The collector or probe tubes shall be connected from below with an arc to the distributor in order to allow for linear

to compensate for expansion in summer or winter (stress tearing).
The Smart RTC is a space temperature control with display, which displays the actual room temperature and allows you to set your desired room temperature. The Smart RTC is available as a build-in variant (RT Econ A) or as an installation variant (rt Econ U). Temperature sensors for both variants are already integrated to record room temperature.
If a glycol water pressure medium is prescribed, it can be incorporated into the main heat source (accessory pack of glycol water) as follows.

The additional assembly instructions of the Smart RTC shall be observed for installation and operation.

5 Transport
For more comfort, a remote control unit is available as special accessories. Control and menu navigation are identical to that of the heat pump manager. Connection with a 6-vein telephone cord (special accessories) with western contacts.
A lift truck is suitable for transport over a solid surface. If the heat pump is transported on an uneven surface or over stairs, it can be carried with straps. These can be placed directly under the pallet.

The heat pump manager can be connected to the network of a building management system with appropriate expansion. For the precise connection and configuration of the interface, the additional mounting instructions for the extension shall be observed.
The following connections are possible for the heat pump manager:
Modbus · Ethernet

To get to the inside of the device, it is possible to remove all front plates.



If the heat pump module is removed, it can be transported in a simple manner while transporting the heat pumps module separately.


After transport, the transmission device on the heat pump module shall be removed from both sides.



7 Assembly
6.1 General instructions
7.1 General
The compact bottom/water heat pump shall be placed in a frost-free and dry space on an even, smooth and horizontal surface. The frame must be close to the ground in order to ensure adequate sound insulation. The substrate shall be capable of carrying the weight of the heat pump and the amount of hot water. If feet are used, the heat pump shall be levelled. In this case, the declared sound level may be up to 3 dB(A) and additional noise insulating measures become necessary.
The heat pump can be connected to the following connections:
The heat pump shall be designed so that repair and maintenance work on the appliance can be carried out without any problems. This is guaranteed if a distance of approx. 1 m is held. If the heat pump is only accessible from the front (e.g. If installed in niches, etc.), the heat pump module can be removed by the service department (see Chapter 5).
Before connecting the heat pump to the hot water side, the heating system should be flushed down in order to allow possible dirt, residual insulation etc. to be removed. If the condenser is blocked by residual and contamination, this may lead to a failure of the heat pump.

After installation of the heating side, the heating system must be filled, ventilated and suppressed.
When filling the installation, care shall be taken:
untreated filling and supplemental water must have drinking water quality (colourless, clear, without deposits)
the filling and supplemental water must have been pre-filtered (porespan max. 5 μm)
Limestone formation in hot water heating systems cannot be completely prevented, but is negligible for installations with pre-run temperatures below 60 °C.
The mounting space shall not be subject to seasonal frost or temperatures higher than 35 oC.
For heat pumps for medium and high temperature, temperatures above 60 °C can also be reached.
Thanks to the effective sound insulation, the heat pump works very quietly. Audio transmission to the foundation or base the heating system is highly prevented by internal decoupling measures.
Therefore, the following guide values for filling and supplementing water according to VDI 2035 sheet 1 shall be used:
Total hardness in °dH
in moles/m3 or
tot 200 2,0 11,2 200 tot 600 1,5 8,4 > 600 < 0,02 < 0,11
The minimum heat pump heating water flow rate shall be guaranteed in each operating condition of the heating installation.
This can be done by a constantly open heating circuit, e.g. be reached in a reference space controlled by a room temperature regulator (available as special accessories).
(see connection schedule Fig. 5.1 on p.o.b. XVIII)

7.4.1 General
When the heat pump manager and heating circulation pumps are ready to operate, the frost protection of the heat exchanger manager works. The installation shall be emptied if the heat pump is shut down or if power failure occurs. In the case of heat pump systems where power failure cannot be recognised (holiday home), an appropriate frost protection shall be provided for the heating circuit.
Installation and commissioning shall be carried out by a certified specialist company. The operation and density of the entire system must be checked, including parts installed in the factory. The stainless steel storage vessel is suitable for normal drinking water according to EN 1,4162. Maximum chloride content in drinking water must be maintained.
The volume of the heating water shall be checked by the designer of the installation. An expansion vessel must be installed on site in the return line (according to DIN 4751 part 1). Tables in manufacturers' catalogues simplify the dimensioning of water to the installation.
The connection shall be made according to DIN 1988 and DIN 4753 Part 1. The country-specific rules should be respected.
The following materials can be found in the existing hot water circuit:
The connection shall be performed as follows:
Connect the glycol water line to the front run and return of the heat pump.
The hydraulic connection diagram must be observed.
Depending on the material used in the hot water environment (on site installation) corrosion can be caused by intolerable materials. This should be observed in particular when using raw materials containing zinc and aluminium. If there is a risk of contamination in the water when used, it may be necessary to provide for filter.
The supplied filter shall be mounted on site in the glycol water input of the heat pump.
The glycol water shall be prepared before filling the installation. The concentration of glycol water shall be at least 25%. This ensures frost clearance up to -14 °C.
Only monoethylene glycol or propylene glycol-based antifreeze agents may be used.
The working overprints shown on the type-plate shall not be exceeded. A pressure release device may need to be mounted.
The heat source system shall be ventilated and checked for density.
Before putting in service, check that the water supply is open and the storage vessel is full.
The hot water boiler shall be provided with a certified spring-loaded membrane safety valve on site. No locking device shall be fitted between the storage vessel and the safety valve. The failure-free operation of the valve shall be checked regularly. Annual maintenance of the installation by a specialist company is advisable.

7.5.2 Assembly of the external temperature sensor
The following temperature sensors are already built in or. shall be fitted in addition.
The temperature sensor must be installed in such a way that all weather conditions are recorded and the measurement value is not falsified.
Return temperature heating circuit (R2) built-in
on the outer wall of a heated living area, and
Primary circuit return temperature (R24) built-in
attach to the north/north-west side if possible
Pre-flow temperature heating circuit (R9) built in
Primary circuit pre-flow temperature (R6) built in
not in a "shut-down place' (e.g. in a wall niche or under
not near windows, doors, vents,
Fixing external or heat pumps
do not expose to direct sunlight in any season

Feeding mode: Length max. 40 m; vein diameter min. 0.75 mm2; cable outside diameter 4-8 mm.
NTC-2 in k 14,6 11,4 8,9 7,1 5,6 4,5 3,7
NTC-10 in k 67,7 53,4 42,3 33,9 27,3 22,1 18,0 15 20 25 30 35 40 45 50 55 60
2,9 2,4 2,0 1,7 1,4 1,1 1,0 0,8 0,7 0,6
14,9 12,1 10,0 8,4 7,0 5,9 5,0 4,2 3,6 3,1
The temperature sensors to be connected to the heat pump manager shall correspond to those in Fig. 7.1 on pag. 11 sensor characteristics shown. The only exception concerns the external temperature sensor that is in the liver size of the heat pump (see Fig. 7.2 on page 11)
All electrical connection work may be carried out only by an electrician or a person trained for the activity in question, taking into account:

land specific installation requirements (e.g. VDE 0100),
technical connection conditions of the energy undertaking; and
the network operator (e.g. TAB) and
The Commission is also aware of the difficulties encountered in implementing this directive.
To ensure the frost protection function of the heat pump, the heat exchanger manager shall not be switched off and flow through the heat pumps must take place.
The switch contacts of the output relays are unobstructed. Therefore, a voltage is measurable (depending on the internal resistance of a measuring instrument) even in non-closed contacts; however it is much lower than the power supply.
%XLWHQWHPSHUDWXXU>&@
The control clamps N1-J1 to N1- J11; N1-j19; N1-J20; N1/ J23; N2-J24 and the terminal strip X3 are equipped with an extra low voltage. If a wiring error is placed on these clamps, this destroys the heat pump manager.

1) The 5-arterial electric cable for the power part of the heat pump is fed from the flow meter of the pump through the energy-business blocking (if required) into the heat pumps. Connection of the power cable to the heat pump switch box via the clamps X1: L1/L2/L3/N/PE. The heat pump voltage supply shall be provided with an alpage cut-off of at least 3 mm contact opening distance (e.g. an energy-operated lock or power switch) and an alpogen power switch with one off for all external cables (switching off current and characteristic according to device information).

The heat pump is operated via the heat pump manager.
2) The 3-arterial supply line for the heat pump manager (heat controller N1) is fed into the heat pumps. Connection of the steering line to the heat pump control cabinet via the clamps X2: L/N/PE. The heat pump's power consumption can be found in the product information or on the label plate. The cable (L/N/PE~230 V, 50 Hz) for the WPM shall be under permanent voltage and must therefore be connected before energy operation. are connected to the household current, otherwise important security functions will be out of operation during energy-locking.
The setting of the overflow valve shall be aligned with the heating system. A wrong setting can lead to different types of malfunctions and increased electrical energy needs. To properly set the overflow valve, we recommend to act as follows:
Close all heating circuits which may be closed even when the installation is working depending on its use, so that water throughput in this mode is as unfavourable as possible. These are usually the heating circuits in the rooms on the south and west side. At least one heating circuit shall be kept open (e.g. bathroom).
The overflow valve shall be opened so far that the current heat source temperature results in the maximum temperature difference between heating pre- and return specified in the table below. The temperature difference shall be measured as close to the heat pump as possible. In the case of mono-energy installations, the heating element shall be deactivated during commissioning.
max. temperature difference between heating front and -
temperature
-5 °C 0 °C 10 K
1 °C 5 °C 11 K
8 Entry into service
6 °C 9 °C 12 K
10 °C 14 °C 13 K
15 °C 20 °C 14 K
8.1 General
21 °C 25 °C 15 K
For commissioning according to the requirements, it must be carried out by a factory-competent service. Under certain conditions, the guarantee is extended (cf. Guarantee fee).
Before commissioning, the following points shall be checked:
All connections of the heat pump must be mounted
be as described in Chapter 7.
The heat source system and the heating circuit shall be:
are filled and checked.
Filter and ventilator should be located in the glycol water inlet of the
heat pump is built in.
In the glycol water and heating circuit, all
slides which could impede the correct flow of flows are open.
The heat pump manager shall, according to the corresponding
instructions for use of the hydraulics present.

9.3 Cleaning on the side of the heat source
9.1 Maintenance
In order to avoid operational failures caused by the accumulation of dirt in heat exchangers, it is necessary to ensure that no dirt can enter the heating system and heater. If such malfunctions occur, the installation shall be cleaned as described below.
One day after commissioning, the filter sieve shall be cleaned. Further checks should be determined according to the degree of pollution. If there is no more contamination visible, the filter sieve can be dismantled to reduce pressure loss.
Especially when using steel components, oxygen in the heating water cycle can cause oxidation products (rust). The rust enters the heating system via valves, circulation pumps or plastic pipes. Therefore, a diffusion-proof installation should be considered - particularly in the case of underfloor heating pipes.
This heat pump is a quality product that must work without interference. If a malfunction occurs, it is displayed on the heat pump manager display. To this end, see the page Failure and Disturbance in the instructions for use of the heat pump manager.
If you cannot fix the malfunction yourself, please inform the competent service.
Also residues of lubricating and sealing agents can pollute the hot water.
If the pollution is such that it impedes the performance of the condenser in the heat pump, an installer shall clean the installation.
Based on the current state of knowledge, we recommend cleaning with 5% phosphoric acid or, if more frequent cleansing is required, by 5% formic acid.
In both cases, the cleaning solution should be at room temperature. It is advisable to rinse the heat exchanger against normal flow direction.
To prevent acidic cleaning from entering the heating system cycle, we recommend that the washing machine be connected directly to the pre-flow and return of the condenser. Afterwards, rinse thoroughly with appropriate neutralising agents to prevent damage caused by any residual cleaning agent.
Before disassembling the heat pump, the machine shall be voltage-free with all valves closed. The heat pump shall be disassembled by specialist personnel. Environmentally relevant requirements waste recovery, recycling and disposal of components and components according to the usual standards must be respected. This is particularly true for the competent removal of coolant and cooling oil.
Acids should be used with caution and appropriate requirements observed.
In case of doubt, the manufacturer of the cleansing agent shall be consulted!

2 Construction
Heat source Glycolwater Gly Col Water GlycoIwater
2.1 Implementation Compact Compact
2.2 Controller WPM EconPlus
2.3 Heat volume counter Integrated integrated
2.4 Place of establishment Inside
2.5 Power levels 1 1 1
3.1 Heating water flow °C 20 tot 62 ± 2 20 tot 62 ± 2 20 tot 62 ± 2
3.2 Glycol water (heat source) °C -5 to 25 -5 until 25 - 5 to 25
3.3 Antifreeze Monoethylene
3.4 Minimum concentration of glycol water (-13 °C freezing temperature) 25% 25% 25%
4.1 Heating water flow at internal pressure differential
after 14511 m3/h / Pa
Minimum m3/h / Pa
4.2 Glycol water flow rate at internal pressure differential (heat source) m3/h / Pa 1,45 / 17200 1,9 / 11200 2,6 /17500
4.3 Sound power according to EN 12102 dB(A) 46 46 47
4.4 Sound pressure at 1 m distance1 dB(A) 34 34 35
4.5 Free compression heating pump Pa 52000 44000 22000
4.6 Free compression glycol water pump Pa 45000 48000 31000
5.1 Device dimensions2 h x w x d mm 2000 590 x 730 2000 590 x 730 2000 590 x 730
5.2 Weight of transport unit/units incl. packaging/filled kg 210 / 382 217 / 390 230 / 404
5.3 Heating inch power connections G 11⁄4" outside G 1⁄4" out of G 1 1/2⁄4 "
5.4 Heat source inch adjustment connections G 11⁄4" outside G 1⁄4" out of G 1 1/2⁄4 "
5.5 Cooling agent; total filling weight type / kg R410A / 2,5 R410A / 2,9 R410A / 3,3
5.6 Lubricant; total capacity type / liter Polyol ester (POE) / 0,7 Polyolester (POA) / 1,2 Polyol esters (POe) / 1.2
5.7 Volume of heating water in unit liter 2,8 2,8 3,4
5.8 Volume of heat carrier in unit liter 3,0 3,6 4,5
6.1 Power supply / fuse (common power supply WP and 2nd WB) 3~/N/PE 400 V (50 HZ) /C16A
3~/N/PE 400 V (50 HZ) /C16A
3~/N/PE 400 V (50 HZ) /C20A
6.3 Steering voltage / fuse 1~/N/PE 230 V (50 HZ) /C13A
1~/N/PE 230 V (50 HZ) /C13A
1~/N/PE 230 V (50 HZ) /C13A
6.4 Degree of protection according to EN 60 529 IP 21 IP 21 IP 21
6.5 Current current m. softstarter A 28 (without soft starter) 17 20
6.6 Nominal consumption B0 / W35 / max. recording3 kW 1,30 / 2,6 1,67 / 3,2 2,22 / 4,3
6.7 Nominal current B0 / W35 / cos A/ -- 2,35 / 0,8 3,01 / 0,8 4,01 / 0,8
6.8 Power intake compressor protection (per compressor) W -- -- --
6.9 Power consumption heating circulation pump W max. 70 max. 70 max. 70
6.10 Power intake glycol water pump W max. 70 max. 70 max. 70
6.11 Electric radiator (2nd heat source) kW 2.4 or 64 2.4 respectively 64 2.4 respectively 64

8 Other implementation features
8.1 Water in apparatus protected against frost 5 Yes yes yes yes
8.2 max. working pressure (heat source/cooling plate) bar 3,0 3,0 3,0
EN 1.4162 EN 1.4162 EN 1.4162
9.1 Net content of litres 170 170 170
9.2 Surface heat exchanger m2 2,2 2,2 2,2
9.3 Heat loss at 50 °C boiler temperature 20 °C room temperature kW/h24h 0,86 0,86 0,86
9.4 Slide volume (without reheating)6 litres 207 207 207
at B-5 / W45 kW / --- 5,0 / 3,1 6,5 / 3,1 9,1 / 3,2
at B0 / W55 kW / --- 5,5 / 2,8 7,2 / 2,8 10,0 / 2,8
at B0 / W45 kW / --- 5,8 / 3,6 7,5 / 3,6 10,4 / 3,6
at B0 / W35 kW / --- 6,1 / 4,6 8,1 / 4,7 10,9 / 4,8
see CE declaration of conformity · see CE statement of conformity


2 Diagrams A-III
2.1 Characteristics SIW 6TU A-III 2.2 Characteristics SIw 8TU A -IV 2.3 Characteristics SI W 11TU A/V 2.4 Border diagram A-VI
3.1 Steering A-VII 3.2 Sturdy A-VIII 3.3 Power A-IX 3.4 Connection diagram A-X 3.5 Connectivity scheme A- XI 3.6 Legend A-III II
4.1 Steering A-XIV 4.2 Power A- XV 4.3 Connection diagram A-xvi 4.4 Legend A- xVII
5.1 Connection scheme for a heating circuit with underfloor heating and room temperature control via Smart RTC, hot water preparation A-XVIII 5.2 Connecting schedule for a heat ring with series switched buffer tank and warm water preparationA-XIX 5.3 Legend A-XX
www.dimplex.de 452236.66.01 · FD 9206 A-I



A1 Bridge Energy Business Blocking: must be placed if no energy business lock is available (contact open = power operation block) A2 Bridge Blocking - must be removed when the input is used (opening = WP blocked). A7.1/2 Bridge E10.1: by removing a bridge, the power decreases with 2 kW A11 Bridge solar energy: when using a solar module, the bridge must be removed and the contact points connected to the solar module. A - R2 Bridge return sensor: - shall be moved when a differential pressure-free distributor and a fuse-warming circuit reverse valve is used. New contact points: X3/1 and X3/2
B2* Pressostat low pressure primary circuit B3* Thermostat hot water B4 Thermostate pool water B5* Thermostate E10
E9* Immersion resistance hot water E10* 2. Heat source 2,4 or 6 kW
F2 Power supply fuse for plug-in plugs J12; J13 and J21 5x20 / 4.0 AT F3 Power supply circuit fuse J15 to J18 and J22, 5x 20 / 4,0 AT F10.1* Flow switch primary circuit F10.2* Flow switches secondary circuit F15 Engine protection M11 F17 Safety temperature limiter E10.1
F26 Engine protection M16 H5* Light distance indication malfunction
J1 Voltage supply N1 J2 - 3 Analog inputs J4 Analog outputs J5 Digital inputs J6 Analog exits J7 - 8 Digital inputs j9 free J10 Control panel J11 free J12 - J18 230 V AC - Outputs for control of system components J19 Digital inputsJ20 Analog inputs; analogue inputs; digital inputs J21 - J22 Digital outputsJ23 Bus connection to modules J24 Voltage device for components
K1 Contactor M1 K20* Contactor E10.1 K21* Contactors E9 K22* Energy control lock-in K23* Auxiliary relay for locking input K31.1* Requesting circulation hot water M1 Compressor M11 Primary circulating pump M13* Heating circulation pump M15* Heatation circulation pump 2nd circuit M16 Additional circulation pump m21* Mixer main or 3rd ring M22* Mixers 2nd heat circuit [M19]* Swimming pool water circulation pump [M24]* Circulation pump warm water
N1 Control unit field card Interface to N23 N14 Control panel N17* pCOe module N20* Heat volume counter N23* Electronic expansion valve control E*V connection (1=green, 2=yellow, 3=brown, 4=white) N24* Smart - RTC
R1* External sensor R2 Return sensor heating circuit R2.1* Return sensor heat circuit in differential pressureless distributor R3 Hot water sensor R5* Footer for 2nd ring R6 Front sensor primary cycle R7 Coder resistance

R9 Front sensor heating circuit R13 Footer renewable, space sensor, feel 3rd heat circuit R24 Returns sensor primary circuit
T1 Safety Transformer 230/24 V AC
X1 Clamping strip power supply E10 X1.1 Plug power voltage X2 Clamps strip voltage = 230 V AC circuit breaker X3 Clips strip extra low voltage < 25 V AC Switch box X5.1 Bus divider clamp among others. for N24 X7 Clamping strip power adjustment E10.1 X12 Plug steering voltage 230 V X13 Plugging extra low voltage

4.1 Sturdyness






F24 High pressure pressostat F5 Low pressure pressostaat F7 Hot gas thermostat F12 Malfunction notification contact
M1 Compressor M7 Actuator for expansion valve
N1* Heat pump manager N7 Softstart control N23* Control electronic expansion valve E*V connection (1=green, 2=yellow, 3=brown, 4=white) R25 Pressure sensor cooling cycle - low pressure po R26 Pressure sensor cool circuit - high pressure PC R27 Suction gas sensor
T1 Safety Transformer 230/24 V AC
W1* Heat pump connection line - manager 230 V W2* PHP interconnection line - Manager
X1.1 Power supply voltage plug X2 Clamping strip voltage = 230 V AC X3 Clip-band extra low voltage < 25 V AC x12 Plug 230 V steering voltage X13 Plugger extra low steering voltage * Components must be connected / made available on site In the factory wired Can be connected by customer if desired
K1 Contactor M1

5.1 Connection scheme for a heating circuit with underfloor heating and room temperature control via Smart RTC, hot water preparation




N1 Heat pump manager
R1 External temperature sensor
A-XX 452236.66.01 · FD 9206 www.dimplex.de

EC - Declaration of conformity EC Declaration of Conformity Déclaration de conformité CE
I, the undersigned Glen Dimplex Deutschland GmbH The signed Geschäftsbereich Dimplex Löjentreprise soussignée, Am Goldenen Feld 18 D - 95326 Kulmbach
confirms that the apparatus/devices listed below comply with the applicable EC directives listed below. This declaration shall cease to be valid at the time of any change in the device or devices.
hereby certificates that the following device(s) complies/comply with the applicable EU directives. This certification losses its validity if the device(s) is/are modified.
certified par la présente que le(s) appareil(s), décrit(s). ci-dessous sont conformes aux directives CE afférentes. Toute modification effectuée sur löjna(les) appareil(s) entraîne lövnaance de la validité de cette déclaration.
EC Directives Low voltage Directive 2006/96/EC EMC Directive 2004/108/EC Pressure equipment Directive 97/23/EC
EC Directives Low voltage directive 2006/95/EC EMC directive 2004/108/EC Pressure equipment directive 97/23/EC
Directives CEE Direct Basse Tension 2006/95/CE Directive CEM 2004/108/CE Directive Équipement Sous Pressure 97/23/CE
Applied standards Applied standard Norms appliquées
EN 60335-1+A11+A1+A12+Corr.+A2 EN 60335-1/A13 EN 60335-2-40+A11+A12+A1+Corr.+A2 EN 55014-1 EN 55014-2+A1 EN 61000-3-2 EN 61000-3-3+A1+A2 EN 378-1, EN 378-2+A1, EN 378-3, EN 378-4 EN 14511-1, EN 14511-2, EN 14511-3+AC, EN 14511-4 DIN 8901 BGR 500 (D), SVTI (CH)
Conformity assessment procedure according to the Pressure Equipment Directive:
Conformity assessment procedure according to pressure equipment directive: Module A
Procédure d'Ompément de la conformité selon la directive Équipements Sous Pressure: Module A
The EC declaration of conformity has been issued.
EC declaration of conformity issued on.
La déclaration de conformité CE a été délivrée le.
Module A

Glen Dimplex Deutschland GmbH Geschäftsbereich Dimfix Am Goldenen Feld 18 D-95326 Kulmbach
Errors and changes reserved.
+49 (0) 9221 709 565
Pages referenced in this manual — manufacturer, support and downloads.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.