Installation, use and maintenance rules

ACV N2 — Installation, use and maintenance rules diagram (page 1)
Fig. 1 · Installation, use and maintenance rules

N1 / N2 / N3

ACV N2 — N1 / N2 / N3 diagram (page 1)
Fig. 2
Page 3 of the ACV N2 user manual — WARNINGS
Page 3 · click to enlarge
Page 3

Introduction

USERS OF THIS MANUAL

Standards in force

This manual is intended for: - the engineer responsible for regulations - the installer - the user - the maintenance technician

The products in this manual are provided with a European certificate (European Directive 92/42/EEC . They also have the Belgian .OPTIMAZ-label (Stook oil burner).

SYMBOLS

The following symbols are used in this manual:

WARNINGS

This manual is an integral part of the equipment to which it refers and must be handed over to the user.

The installation and maintenance of the product shall be entrusted to approved technicians in accordance with applicable requirements.

The manufacturer may never be held liable for any damage resulting from errors in the installation or use of equipment or accessories that have not been approved by the manufacturer.

- Electrocution hazard.

Failure to comply with instructions regarding the

The operation and adjustment of this product may result in serious personal injury or environmental contamination.

This device is not equipped for use by

persons (included children) with limited physical or mental potential. Or persons who have not acquired the necessary knowledge except if they are accompanied by a person who is his own with the installation and responsible for their safety, health and well-being.

Page 4 of the ACV N2 user manual — Locking of the ACV burner
Page 4 · click to enlarge
Page 4

User Manual

Use of the boiler

Operation of the circulating pump: The circulation pump is controlled by the minimal thermostat, mounted at the back of the boiler. It is set to 45 °C by default, so that the circulating pump is switched on later during start of the burner in order to avoid any risk of rust formation in the combustion chamber.

To ensure the proper functioning of your installation

must be maintained by a qualified technician before the heating season each year. Start of the burner: In normal conditions, the burner automatically starts when the temperature of the boiler drops below its set value.

Manometer pressure heating system Your installation must be equipped with a safety valve, adjusted to 3 bar.

Make sure that the installation is always under water pressure. Cold and after ventilation of the installation, the pressure gauge shall always be between 0.5 and 1.5 bar depending on the height of the building.

Before each intervention to the boiler,

The boiler's power supply shall be interrupted by the external cabinet switch. The main switch of the control board shall also be placed in the .offfffff/s position.

  • Water refill: (Fig. 8, page 8)
  • Open the valve (1 ).
  • Tap after filling tightly.
  • De-ventoring the installation to allow accurate reading of pressure in the heating circuit.

Layout of the control board (fig. 1)

User does not have access to the internal

Safety valves (fig. 8, page 8 - No 3 If water is running out of one of the safety valves, you must stop the boiler and contact your installer

components of the control board.

1. Main switch to start the boiler and shut it down.

A monthly check is recommended: The lever of the draining device lights up for a few seconds to verify the proper operation of the safety valve.

2. Summer winter switch (to turn on and off the heating circulation pump).
3. Locking Signpost (lights when the water temperature of the heating circuit is too high).

If you find an irregularity during this short test,

Please contact your installer

4. Thermo-manometer (includes the temperature of the boiler and pressure in the primary circuit).

The water that runs out of the safety valve can be very hot

and cause severe burns.

5. Safety thermostat with manual re-initiation (if the temperature of the boiler is too high, then this safety device is activated).
6. Control thermostat (for the temperature of the boiler between 60 °C (min. Position) and 90 °C (max. position).

Locking of the ACV burner

If the burner does not work:

Diagram . .
Diagram . .
1. The burner's squeaky light is on.
2. Press the resetting button of the burner (fig. 2) on the burner.
3. If the burner still does not work, reactivate the safety thermostat on the control board (fig. 3.
4. If you have persistent problems, please contact your installer.
ACV N2 — Locking of the ACV burner diagram (page 4)
Fig. 4 · Locking of the ACV burner
ACV N2 — Locking of the ACV burner diagram (page 4)
Fig. 5 · Locking of the ACV burner

Fig. 2 Fig. 3

Page 5 of the ACV N2 user manual — CONSTRUCTION CHARACTERISTICS
Page 5 · click to enlarge
Page 5

Description of the appliance

General description

Covering The boiler is coated with a steel coat which was first degreased and phosphatized and subsequently at 220°C covered with a special lacquer. Presentation of the boiler (fig. 4) and (Fig. 5)

  • The model N is a solo CV boiler (heating).
  • The boiler control board N 1 - 2 - 3 includes a main switch, a summer-winter switch, an emergency warning lamp, a thermomanometer, a thermostat control and a safety thermostat with manual re-enabled operation.
1. Control board 2. Bend (6 pieces) 3. Thermal insulation 4. Heating Body 5. Fireplace door with insulation brick 6. Fuel oil burner (not included) 7. Departure heating 8. Connection point electric power supply of the boiler 9. Recycle heating 10. Shower connection 11. Minimum thermostat 45°C (T.O.D.) 12. Tap tap
  • The boiler N can be connected directly to the fireplace with a B23 type spectacle (fig. 7, page 7) .
  • Model N 1: useful power between 20 and 25 kW.
  • Model N 2: useful power between 28 and 36 kW.
  • Model N 3: useful power between 36.5 and 51 kW.

WORKING PRINCIPLE

Simple and safe control One button is sufficient to regulate the temperature of the heating water. This arrangement is done with the control thermostat, whose sensor is placed in the outgoing stream of the boiler.

ACV N2 — WORKING PRINCIPLE diagram (page 5)
Fig. 6
  • A safety thermostat with manual re-initiation locks the burner when the temperature of the primary liquid reaches 103°C.
  • A standard at 45°C adjusted minimum thermostat mounted on the back of the boiler ensures that the circulation pump of the kettle is switched on later. This prevents any risk of rust formation in the combustion chamber.

Preparation of hot drinking water The boiler .N• The product can be combined with the smart boiler (100 L) or any other ACV boiler.

CONSTRUCTION CHARACTERISTICS

External boiler body The external boiler body contains the primary liquid and is made of thick STW 22 steel.

Smoke channel The boiler's smoke canal is accessible from the front and is built up with 6 removable chromed stainless steel curves. This system is specially developed to improve the efficiency of the boiler.

ACV N2 — CONSTRUCTION CHARACTERISTICS diagram (page 5)
Fig. 7

Burning chamber The boiler is equipped with a large water-cooled combustion chamber that has been specially developed to ensure good flame development of the burner.

Removable fireplace door The hinged (left or right) fireplace doors are made of STW 22 steel. The door is protected from the flame by a ceramic fibre mat and vermiculite brick.

Insulation The boiler body is insulated by a 30 mm glass fibre mat.

Page 6 of the ACV N2 user manual — Incineration performance N 1 N 2 N 3
Page 6 · click to enlarge
Page 6

TECHNICAL CHARACTERISTICS

General

Conditions of operation

The appliances are fully mounted, tested and packed in shrink film on a wooden palette with bump edges. When receiving and after removing the packaging, please check that the devices have not been damaged during transport. The dimensions and weights below shall be taken into account for transport.

Maximum operating pressure (boil filled with water) - Heating circuit 3 bar - Drinking water Circle 10 bar (*)

Test pressure (boil filled with water) - Heating circuit 4,5 bar - Drinking water circle 13 bar (*)

Operating temperature - Maximum temperature90 °C

(*) If the boiler is connected to a hot water heater.

Dimensions

Diagram . .
Diagram . .
Diagram . .
Diagram . .
Diagram . .
Diagram . .

A mm W mm C mm D Ø mm E mm F mm G mm Kg (*)

N 1 470 700 566 130 550 445 260 108

N 2 470 765 566 130 615 510 260 122

N 3 530 805 656 150 645 550 260 157

(*) The weights given are empty.

Hot drinking water performance . . + SMART (100 L) . N 1 N 2

Peak flow rate at 45°C (ΔT = 35°C) L/10’ 202 202

Peak flow rate at 60 °C (ΔT = 50°C) L/10’ 117 117

Incineration performance N 1 N 2 N 3

Load (input) kW 22,0 / 28,0 30,4 / 40,0 40,0 / 57,0

Net rated power (output) kW 20,0 / 25,0 27,0 / 35,7 36,5 / 51,0

Reduced working load of flue gases mbar 0,15 0,17 0,15

The temperature circuit content L 31 37 53

Connection heating Ø 1” 1” 1” 1/4

Operating regime at 85°C

Page 7 of the ACV N2 user manual — Showing connection
Page 7 · click to enlarge
Page 7

Characteristics of the fireplace connection

A. Upper ventilation B. Sub-exercise C. Tractor D. E. Lookhole. Height of the F. Screen diameter

F

Diagram . .
Diagram . .
  • Important
  • Never cover the vents.
  • Do not store flammable products in the boiler room.
  • Do not store any corrosive substances such as paint, solvents, chlorine, salt, soap or other cleaning products near the boiler.

Accessibility The boiler room should be large enough to ensure easy access to the boiler. It is advisable to provide the following minimum distances (mm) around the boiler:

- front 500 - rear 150 - sides 100 - top 300

Ventilation The boiler room shall be equipped with an underlighting and a upper ventilation (fig. 7).

Every user must ensure that the ventilation of the boiler room complies with local requirements.

For information: the table below shows the values according to Belgian regulations.

Ventilation N 1 N 2 N 3

Supply fresh air m3/h 50 72 102

Upper ventilation (A) dm2 150 150 150

Sub-exercise (B) dm2 150 150 170

the above table is only a guide.

Base The base (or ground) on which the boiler is placed, must be made of non-combustible material.

The high efficiency of our boilers means that the

The exhaust gases are discharged at a very low temperature. Smoke gas condensation is therefore possible, which in some fireplaces could cause damage To avoid that risk we strongly recommend you to provide the chimney with a tube. For further information please contact your installer.

Showing connection

The diameter of the fireplace shall not be less than the

diameter of the boiler's discharge pan.

Shower connection type: B23 (fig. 7) The connection to the fireplace is done with a metal tube, which is placed diagonally between the boiler and the chimney.

A fireplace is necessary.

Scrap N 1 N 2 N 3

E = 5 m Ø min. F mm 130 143 170

E = 10 m Ø min. F mm 130 130 143

E = 15 m Ø min. F mm 130 130

Page 8 of the ACV N2 user manual — HEATING CONNECTION
Page 8 · click to enlarge
Page 8

HEATING CONNECTION

Diagram . .
Diagram . .

Connection example single circuit (fig. 8) 1. Fulfill valve installation 2. Retro-return valve 3. Safety valve with pressure gauge (set at 3 bar) 4. Expansievat 5. Circulation pump 6. Closing valve heating 7. Environmental thermostat (option) 8. Tap tap 9. Automatic air vent

Nutrition principle The boiler works with single phase current 230 V - 50 Hz. A cabinet with main switch and 6A fuses shall be mounted on the outside of the boiler to allow interruptions in the kettle's power supply during maintenance operations and before each intervention on the appliance.

Conformity The installation must comply with the applicable local standards and regulations.

Diagram . .
Diagram . .
1. Environmental Thermostat 2. Circulation pump 3. Overbridging (remove before connecting the ambient thermostat).

The drain valve and the safety valve shall be connected to the sewage system.

Page 9 of the ACV N2 user manual — HEATING CONNECTION
Page 9 · click to enlarge
Page 9

Electrical wiring of boilers N1/N2/N3 (fig. 11) 1. Main switch 2. Minimum thermostat 45°C (T.O.D.) 3. Summer winter switch 4. Safety thermostat with manual re-initiation (max. 103°C) 5. Burner 6. Lockdown Signpost 7. Environmental thermostat (option) 8. Circulation pump (not included) 9. Control thermostat of the boiler

Diagram . .
Diagram . .

B. Blue Bk. Black Br. Brown G. Grey V. Violet R. Red W. White Y/Gr. Yellow / Green

Boiler Control BC 01

Boiler Control BC 03

ACV N2 — HEATING CONNECTION diagram (page 9)
Fig. 15
ACV N2 — HEATING CONNECTION diagram (page 9)
Fig. 16
  • This control cabinet allows a monoof bi-energy boiler to be connected to a heater without sanitary priority.
  • The Boiler Control BC 03 controls a boiler without sanitary priority with a water heater: The control cabinet regulates the operation of the burner, heating circulation pump and boiler - via the drinking water circuit circulating pump or through the three-way supply.
  • The Boiler Contol BC 03 contains an anti-locking device for the circulation pump that regularly lets the circulating pump operate after a long period of standstill.
Page 10 of the ACV N2 user manual — Installation N + Smart with ACV control
Page 10 · click to enlarge
Page 10

Installation N + Smart with ACV control

Installation with 2 circulation pumps(fig. 12)

Diagram . .
Diagram . .
1. Environmental Thermostat 2. Heating circulation pump 3. Food pump drinking water circuit 4. Boiler Control BC 01 or BC 03 5. Boiler Smart 100 L

Installation with a circulation pump and three-way crane with motor (fig. 13)

1. Environmental Thermostat 2. Heating circulation pump 3. Three way crane with engine 4. Boiler Control BC 01 or BC 03 5. Boiler Smart 100 L
Diagram . .
Diagram . .
Page 11 of the ACV N2 user manual — Electric connections of BC 03
Page 11 · click to enlarge
Page 11

Electric connection of BC 01 with 2 pumps

1. Environmental Thermostat 2. Heating circulation pump 3. Food pump drinking water circuit 4. Connection point electric power supply of the boiler 5. Boiler Smart 100 L 6. Electric power supply
Diagram . .
Diagram . .

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Electric connection of BC 01 with 1 threeway crane with motor + 1 pump

1. Environmental Thermostat 2. Food pump drinking water circuit 3. Three way crane with engine 4. Connection point electric power supply of the boiler 5. Boiler Smart 100 L 6. Electric power supply
Diagram . .
Diagram . .

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Electric connections of BC 03

Diagram . .
Diagram . .

230 V ~ 50 HZ PE PE 1 6 2 3 4

1 2 3 4 5 6 7 8 9 10 11

this institution, an · bridging between

Page 12 of the ACV N2 user manual — Startup of the boiler
Page 12 · click to enlarge
Page 12

Startup

Maintenance

Fill the heating circuit (fig. 14)

RECOMMENDATION

You must have the boiler maintained once a year. That maintenance and the burner control must be entrusted to a qualified technician.

The drinking water circuit must be absolutely filled, especially before the heating ring is filled.

Maintenance of the boiler (fig. 15)

1. The main switch of the control board shall be placed in the .offfffff/position. 2. Shut down the electric power supply of the boiler with the switch from the external cabinet and close the fuel feed valve 3. Remove the front piece from the boiler (1). 4. The fireplace door (2) by unscrewing the two mounting nuts. 5. The stainless steel curves (3) and the Council. 6. Brush the smoke channels, clean the fireplace and suck out the soot deposits. 7. Check the condition of insulation of the fireplace door (4). 8. Prior to reassembly the burner's combustion head (5) cleaning. 9. Check the proper functioning of thermostats and safety valves.

1. Fill the heating circuit by opening the taps (one) and (6) without exceeding a pressure of 2 bar.
Diagram . .
Diagram . .
ACV N2 — Maintenance of the boiler (fig. 15) diagram (page 12)
Fig. 23 · Maintenance of the boiler (fig. 15)

SAFETY DEVICE MONITORING

- The proper functioning of all thermostats and safety devices

Control: boiler thermostat and safety thermostat with manual re-initiation 103°C. - Check the safety valves of the heating circuit.

2. Vent the plant.
3. After venting the installation, the pressure shall be set to a value 0.5 bar higher than the static pressure.

Editing the boiler

  • Height of the heating system:
  • 10 m . .
  • 15 m . .

The water flowing out of the drain is very hot

and can cause severe burns so keep everyone away from the hot water flow.

Startup of the boiler

1. Check connection and seal of the fuel supply 2. Check the electrical connection of the boiler, ventilation from the combustion chamber, sealing of the flue-gas ducts and sealing of the fireplace door. 3. Adjust the thermostat of the boiler between 60 and 90 °C. 4. Set Summer-Winter Switch to Winter mode 5. Main switch in the . . Perform necessary ventilations, measurements and adjustments

Elimination of the heating circuit (fig. 14) 1. Put the main switch of the control board in position .OFFS, interrupt the electric power supply of the boiler with the shell of the external cabinet 2. Clamps (6) turn off the heating circuit. 3. A flexible tube at the tap (8) fasten. 4. The tap valve (8) open the heating circuit to reduce.

Page 13 of the ACV N2 user manual — Startup
Page 13 · click to enlarge
Page 13
ACV N2 — Startup diagram (page 13)
Fig. 24 · Startup
Page 14 of the ACV N2 user manual — Startup
Page 14 · click to enlarge
Page 14
  • 664Y5700
  • A NL
  • 14
Page 15 of the ACV N2 user manual — Startup
Page 15 · click to enlarge
Page 15
  • 664Y5700
  • A NL
  • 15
Page 16 of the ACV N2 user manual — Startup
Page 16 · click to enlarge
Page 16
  • 664Y5700
  • A NL
  • 16

Ask about the ACV N2

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the ACV N2

Be the first to ask — other owners or our team will answer.

Original document

ACV N2 manual PDF

16 pages·2.8 MB·Boiler·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…