
Zenith
PEP-II Series Gear Pumps
Installation, Care and Maintenance


Thoroughly read and understand this entire manual before installation and operation of pump.
Zenith
In 1926, Zenith Pumps was approached by the synthetic fiber industry to design a pump to provide a precise, pulseless, and repeatable flow and assure better quality control.
Zenith Pumps' line of PEP-II polymer extrusion pumps has a unique positive displacement design, which provides con- sistent, accurate polymer delivery under varying extruder output conditions of pressure, temperature and viscosity. These virtually pulseless gear pumps are the ideal interface between the extruder and the die of extrusion systems, and pro- vide a homogeneous melt at increased throughputs and tighter gauge tolerances.
Since then, Zenith has provided pumps for virtually every polymer utilized in the plastics extrusion industry. Over the years, Zenith has continually developed and improved its pump designs to meet the stringent demands made by new polymers and new processes.
For years, polymer processors have utilized gear-pump-assisted extrusion to solve critical issues in the diverse plastics industry.
Specifications Capacities: 0.16 to 750 cc/rev.
Body Pressure: 10,000 psi (690 bar).
(950° F maximum with special fasteners and seals).
process parameters

Zenith

ZENITH ADDITIVE INJECTION
ELECTRIC HEAT PLATE
PEP-II PUMP
SYSTEM
EXTRUDER
CHANGER
P P T
PUMP TEMPERATURE INLET PRESSURE
DISCHARGE
PRESSURE
Zenith Pumps can handle all your extrusion pumping applications including additive injection for on-line compounding of tackifiers, colorants, stabilizers, etc.
The PEP-II pump is constructed of two gears rotating in mesh within a closely fit- ted housing that is comprised of three plates. The center, or gear plate, fits closely around the outside diameter of the metering gears and bearings. The front and rear, or cover plates, sandwich the center plate and restrict axial movement of the gears and bearings. In capacities of 5 cc/rev and larger, the driving gear is manufactured integral with the drive shaft, and the driven gear is machined integral with its shaft. In capacities of 3.0 cc/rev and below, the gears are keyed to their respective shafts. In all capacities the shafts are supported by “D” shaped bearings which fit into the center plate. In capacities of 40 cc/rev and above, these bearings are located by two screws which pass through the cover plates. In capacities of 20 cc/rev and below, the bearings are keyed to each other for accurate location.
around the shaft, using both dynamic and static types of sealing mechanisms. A Rheoseal consists of a helical groove on the inner diameter, a cooling jacket and a static, backup seal counter bore and gland. These spiral grooves allow the Rheoseal to act as a screw-type pump. As the fluid attempts to leave the gear pump, the shaft's rotary motion forces the fluid into the grooves. This creates a pres- sure greater than the pressure forcing polymer out of the pump, thus returning the polymer back towards the pump. Since the rotary motion is required of the shaft, two other static types of seals are employed on the Rheoseal—a spring energized lip-seal or a packing seal secured by the gland. Also a flushing cooling jacket surrounds a portion of the grooved seal. Use of the cooling jacket may be required for effective sealing if the viscosity is below 1,000 poise at process conditions. If used, water passing through the housing cools the polymer, increasing the effectiveness of the seal's pumping action. A thermocouple well is provided in the seal housing to allow for measuring the temperature close to the region where sealing actually occurs.
Each cover plate is secured to the center plate by 10 screws (6 screws for below 5 cc/rev). Each side of the center plate has a circular port in the center of a bolt circle for the mounting of adapter flanges that fit the pump to your equiment. Threaded holes are provided on the top and bottom of the center plate for the mounting of heat plates and for the mounting of the pump to its stand. Thermocouple wells (1/8-27 NPT) are located on the body of the pump.
A complete line of accessories is available and includes heating plates (electric, oil and steam), adapter flanges, mounting blocks and pump drive systems complete with power package controls and process controls. Please contact Zenith or your local Zenith representative for further information.
A Zenith Rheoseal assembly secured to each cover plate (front cover plate only on 3.0 cc/rev and below) prevents leakage

Dimensional Diagram


PUMP PUMP DIMENSIONS MAX APPROX CAPACITY A B C D E F G H I J TORQUE WEIGHT
0.16 3.000 3.000 2.860 1.400 2.400 1.960 0.750 1/4 1.500 0.125 80 9 0.3 3.000 3.000 2.860 1.400 2.400 1.960 0.750 1/4 1.500 0.125 80 9 0.6 3.000 3.000 2.860 1.400 2.400 1.960 0.750 1/4 1.500 0.250 195 9 1.2 3.000 3.000 3.650 1.400 2.400 1.960 0.750 5/16 2.500 0.750 410 9 1.8 3.000 3.000 3.650 1.400 2.400 1.960 0.750 5/16 2.500 0.750 410 9 3.0 3.000 3.000 3.650 1.400 2.400 1.960 0.750 5/16 2.500 1.000 600 9
Materials Of Construction Diagram And Chart

1 1 FRONT PLATE TOOL STEEL 2 1 CENTER PLATE TOOL STEEL 3 1 REAR PLATE TOOL STEEL 4 1 DRIVE SHAFT TOOL STEEL 5 1 ARBOR TOOL STEEL 6 2 METERING GEAR TOOL STEEL 8 2 KEY, GEAR 9 2 BEARING TOOL STEEL 10 2 BEARING TOOL STEEL 11 1 RHEOSEAL STAINLESS 13 1 SEAL PLATE STAINLESS 14 1 LIP SEAL FILLED PTFE 15 6 SOCKET HEAD BOLT ALLOY 16 4 SOCKET HEAD BOLT ALLOY 17 4 SOCKET HEAD BOLT ALLOY 18 2 METAL C-RING, PORTS 19 2 KEY, D-BEARING 20 1 KEY, EXTERNAL
Diagram 2 Chart 2
Diagram 1 · Chart 1

Dimensional Diagram


PUMP PUMP DIMENSIONS MAX APPROX CAPACITY A B C D E F G H I J TORQUE WEIGHT
5 3.250 3.250 3.250 1.125 2.875 2.125 0.500 1/4 1.875 0.750 1225 10 10 4.000 4.000 4.000 1.188 3.375 2.615 0.625 5/16 2.344 1.000 2085 18 20 4.750 5.000 5.000 1.188 3.750 3.300 0.750 3/8 2.813 1.250 3250 34 40 5.750 6.000 6.250 1.188 4.438 4.000 1.000 7/16 3.531 1.500 6750 61 100 8.000 8.250 8.250 1.750 5.438 5.458 1.250 5/8 4.688 2.188 12100 150 175 9.500 9.750 9.880 1.813 6.375 6.475 1.500 3/4 5.750 2.625 22400 260 300 11.250 12.000 12.500 2.375 8.063 8.000 2.000 7/8 7.063 3.000 50600 480 750 14.750 15.750 16.500 3.000 10.000 10.542 2.500 1 1/8 9.688 4.250 116600 1100
Materials Of Construction Diagram And Chart

1 1 DRIVING GEAR SHAFT TOOL STEEL 2 1 DRIVEN GEAR SHAFT TOOL STEEL 3 1 CENTER PLATE TOOL STEEL 4 2 COVER PLATE 4140 6 2 BEARING TOOL STEEL 7 2 BEARING TOOL STEEL 14 2 SEAL PLATE STAINLESS 16 2 LIP SEAL FILLED PTFE 17 20 SOCKET HEAD BOLT ALLOY 18 8 SOCKET HEAD BOLT ALLOY 20 2 RHEOSEAL STAINLESS 21 8 SOCKET HEAD CAP SCREW ALLOY 22 2 METAL C-RING, SEALS 23 2 METAL C-RING, PORTS NOT SHOWN
Chart 4 Diagram 4
Diagram 3 · Chart 3

Polymer enters the PEP-II pump on the suction side where shaft rotation exposes gear tooth volumes between the gear teeth. Polymer fills these spaces and is transported to the discharge side where the gear teeth mesh together, decreasing the gear tooth volumes and displacing the polymer. Due to the precision tolerances and close clearances within the rotating spaces, very high pressures can be achieved at the pump discharge with extremely high volumetric efficiencies.
fluids such as water or solvent. When high-viscosity fluids are used, more time is required to fill the tooth volumes. As a result, the inlet pressure must be increased or the gears must rotate at a slower speed to ensure complete volume filling. Proper speed and inlet pressure must always be maintained to prevent cavitation and to ensure proper lubrication.
Slip can occur across the sides of the gears from the high-pressure side to the low-pressure side. The amount of slip depends on four factors: polymer viscosity, speed, differential pressure and pump clearances. Under reasonably stable operating conditions, slip is repeat- able and predictable, and pump operation can be adjusted to compensate.
As PEP-II pumps rely on the metered polymer for lubrication of internal bearing surfaces, the operating speed is designed to be from 10 to 90 rpm on most extrusion processes depending on process parame- ters. Do not allow the pump to run dry or attempt to pump poor lubricating
Pumps should be carefully unpacked to make sure that the shipment is complete. If any items are missing or damaged, the freight carrier and Zenith should be noti- fied immediately.
certain that their mating faces are flat, with no pilots that protrude into the pump. Check that the pump rotates freely by turning the shaft with your hand.
To prepare the pump for use:
On start-up, a small amount of molten polymer should be introduced into the pump by slowly rotating (less than 5 rpm) the pump by hand to ensure that the pump is free turning and well lubricated. With sufficient inlet pressure, the pump can then be started at a very slow speed, with discharge pressure low enough to maintain low loading. When operating satisfactorily, the pump and system may now be gradually brought up to normal process speeds and pressures.

After removal from the system, the assem- bled pump can be cleaned by placing it in a suitable furnace (i.e. vacuum oven, fluidized bed, etc.) and slowly increasing the temperature to 800-850° F in no less than two hours. Special care should be taken to avoid flashing of the polymer. Control of temperature is essential as it is possible to draw back the hardness of the steel and affect dimensional stability if the pump is overheated. The time to com- pletely carbonize the polymer is three to twelve hours, depending on the polymer, temperature, pump size and furnace load.
all parts should be carefully inspected for nicks, burrs, scoring or other signs of wear. The side plates, D-bearings (and sides of the gears on the 3.0 cc/rev and smaller pumps) can be hand blocked on 600 grit paper, and any nick or burrs and other sharp edges very lightly touched with an Arkansas stone.
The pump must be gradually cooled to room temperature (no forced cooling or quenching), then disassembled and cleaned as instructed in the following section. Close adherence to these instruc- tions should be maintained for maximum pump life and performance.
As with any other Zenith pumps, PEP-II pumps may be returned to Zenith for complete rehabilitation as necessary. This procedure may be desirable if only a few pumps are involved. If a large number of pumps are to be maintained at the user’s plant, it may be worthwhile to have key maintenance personnel attend a mainte- nance seminar at the Zenith factory to view the manufacturing, gauging and assembly techniques involved in producing the PEP-II pump. In addition, Zenith also offers a contract service program. Please contact Zenith for further information on these services.
It is recommended that pump users institute a program of dimensional inspec- tion of critical parts in order to keep main- tenance and operating costs at a minimum. By noting the performance of a pump immediately before removing it from service and correlating the performance to meas- ured component wear, the user can establish the maximum wear limits for the pump’s critical components. Further, he can predict the service life of the pump, and schedule his downtime accordingly.
After a pump has been disassembled,
These instructions should be thoroughly read and understood before starting dis- assembly.
General instructions that should be observed to ensure correct disassembly of the pump are as follows:
When maintenance is required, refer to the exploded view and disassemble the pump as follows:

plate and set aside in a safe place to pre- vent damage. At this point, make certain to note the orientation of the groove on the rear of each bearing with respect to the inlet port. They MUST be reassembled in the same way as disassembled; that is, they must point toward the inlet port, or severe pump damage may result when the pump is started. WARNING: (Read before steps 7 & 8) Extreme caution must be exercised when removing the gear shafts and bearing. For the 40 cc/rev and above capacity pumps, which have two (2) tapped holes in the D- bearing faces, an optional disassembly method is possible. If the gear shaft and two D-bearings will not slide out as a complete assembly after tapping with a soft-faced hammer, it is recommended that a gear puller tool be used to extract the individual D-bearings from each side of the gear shafts. If these still exhibit force, soaking in a lubricating (penetrat- ing) oil will help the disassembly.
7) Slide the gear shafts and bearings out of the center plate. They will not come out separately as the gear teeth will not clear the bearings. Take extreme care not to nick or ding the gear teeth or the edges of the bearings. If they will not slide out easily, use a hammer with a plastic or soft brass head to gently tap them out. DO NOT use a steel-headed hammer. Alternate taps on the shafts until the parts slide clear. Separate the two shaft/bearing assemblies, taking care not to lose the keys in the 10 cc/rev and smaller pumps. There are no keys in the 20 cc/rev and larger pumps.
8) Slide the bearings from the shafts, again taking extreme care not to damage the gear teeth, bearing edges or the shafts. If the bearings will not slide easily from the shaft (due to residual polymer), use a plastic or soft brass-headed ham- mer and a soft drift (NOT steel) to gently tap the bearings free. Do not pry them off with a screwdriver or other tool as this may damage the gear teeth. Identify which shaft the bearings came from, and set them aside in a safe place.
For 20 cc/rev and smaller capa- cities, there are no tapped holes in the D-bearing faces to be utilized. The gear shaft and D-bearings must be removed as a complete assembly. Again, soaking the parts in lubricating (penetrating) oil or other non-damaging solution will help ease the disassembly. Do not force the parts out one side with a hammer or arbor press.


These instructions should be thoroughly read and understood before starting reassembly.
configuration. Set the flats on the circum- ference of the bearings against each other, and gently slide the bearings and shafts into the center plate. Slide them far enough through the center plate to allow the drive shaft to protrude out on the front side and allow the front bearings to be installed. See D-bearing orientation schematic on page 8.
General instructions that should be observed to ensure correct reassembly of the pump are as follows:
10 Torque down the cover plate screws in a crisscross pattern, taking them first to 1/4 the recommended torque value, then to 1/2, to 3/4 and finally to their full recommended torque value.

ring on the shaft with the ID tapering toward the pump. On the drive shaft ends, fit the bullnose on the end of the shaft. Work the seal gently over the end of the bullnose and down the shaft, as any dam- age could cause polymer leakage after start-up. Ease the seal into the wide end of the installation ring and, using the pressing tool, gently press the lip seal into the Rheoseal housing. Do not attempt to press on the lip seal with screwdriver or other pointed object, as this will damage the seal. Do not press the lip seal all the way into its cavity. Instead, allow it to protrude slightly so that it will be correctly seated by the seal cover. Carefully remove the special Zenith tools.
14) Slide the seal cover over the shaft until it rests on the protruding lip seal. Align the screw holes in the cover with those in the housing and insert the screws. Tighten them evenly in a criss- cross pattern so that the seal is slowly pressed into the seal housing. When the cover is touching the housing all the way around, remove the seal cover and torque the seal housing bolts down. Reinstall the seal cover on the shaft and torque it down. In reinstalling the pump, be certain to follow the instructions given in the Installation section of this manual.
Size (UNC Recommended Alloy Steel) Torque (in-lbs)
#10-32 49 (UNF thread)

Clockwise rotation, pressure building pump shown (standard).

When ordering replacement parts, please be sure to include the following information: 1) Pump model number 2) Part number (12-digit) and description 3) Quantity 4) Shipping instructions Order parts from your local Zenith representative or direct from Zenith.

OF THE PRODUCTS AND/OR SYSTEMS DESCRIBED
HEREIN OR RELATED ITEMS CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE. This document and other information from Zenith Pumps, its subsidiaries and authorized distributors provide product and/or system options for further investigation by users having technical expertise. It is important that you analyze all aspects of your application and review the information concerning the product or system in the current product catalog. Due to the variety of operating conditions and applications for these products or systems, the user, through its own analysis and testing, is solely responsible for making the final selection of the products and systems and assuring that all performance, safety and warning requirements of the application are met.
The products described herein, including without limitation, product features, specifications, designs, availability and pricing, are subject to change by Zenith Pumps and its subsidiaries at any time without notice.
© Copyright 1992 Zenith Pumps PEP C&M 10/04
Zenith® Pumps
Pages referenced in this manual — manufacturer, support and downloads.
Common problems, likely causes, and what to do.
| Problem | Possible cause | Remedy | |
|---|---|---|---|
| Pump will not turn | 1) Low pump temperature | Check thermocouple and control loop for proper setting/operation. Allow sufficient heat-up time. | p.11 |
| Pump will not turn | 2) Drive malfunction | Verify drive is powered. Check to assure all alarm circuits are clear. Check drive motor current and speed settings. Check all drive couplings. | p.11 |
| Pump will not turn | 3) Process conditions changed | Check process conditions for proper melt temperature, pres- sures, viscosities and materials. | p.11 |
| Pump will not turn | 4) Entrained particle | Disassemble and clean pump; replace any damaged parts. | p.11 |
| Pump will not turn | 5) Possible internal damages | Disassemble and clean pump; replace damaged parts. Consult factory. | p.11 |
| Excessive seal assembly leakage | 1) Worn lip seal | Replace lip seals. | p.11 |
| Excessive seal assembly leakage | 2) Incorrect water flow | Monitor and adjust water flow to provide correct sealing temperature. | p.11 |
| Excessive seal assembly leakage | 3) Clogged Rheoseal channel | Disassemble two-piece seal housing and inspect. | p.11 |
| Reduced pump efficiency | 1) Worn gear(s) | Replace worn gear. | p.11 |
| Reduced pump efficiency | 2) Worn bearings | Replace worn bearings. | p.11 |
| Reduced pump efficiency | 3) Process conditions changed | Consult factory for clearance recommendations on new process conditions. | p.11 |
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.