Operation, Installation & Service Manual SSL and SSIL Series Sight Glass Hopper Loaders Important! Read Carefully Before Attempting to Install or Operate Equipment Part No.
2 Write down your hopper ________________ ________________ loader serial numbers ________________ ________________ here for future reference ________________ ________________ _________ _______ ________________ Performance figures stated in this manual are based on a standard atmosphere of 59°F (15°C) at 29.
3 Shipping Information Unpacking and Inspection You should inspect your SSL/CSL or SSIL/CSIL ho pper loader for possible shipping damage. If the container and packing materials are in re usable condition, save them for reshipment if necessary.
4 If the Shipment is Not Complete Check the packing list. The apparent shortage may be intentional. Back-ordered items are noted on the packing list. You should h ave: ; SSL/CSL Series or SSIL/CSIL Se.
5 T able of Content s CHAPTER 1: SAFETY ................................................................ 7 CHAPTER 2: FUNCTIONAL DESCRIPTION .............................. 8 2-1 Introduction.............................................................
6 5-12 Shutting Down the Hopper Loader using the Series One Plus Controller ................. 43 CHAPTER 6: SERIES ONE PLUS SPI COMMUNICATIONS .. 44 6-1 SPI Network Functions ............................................................................
7 Chapter 1: Safety SSL/CSL Series hopper loaders and SSIL/CSIL Series sight glass hopper loaders are designed to provide safe and reliable operation when insta lled and operated within design specifications, following national and local safety codes.
8 Chapter 2: Functional Description 2-1 Introduction SS/CS Series hopper loaders economically and effici ently load free-flowing pellets or granular materials from supply containers into machine bins or other receivers. They are a modular, stainless steel component design using significan t operational advantages.
9 2-3 Equipment Function SS/CS Series hopper loaders are efficient conveye rs of free-flowing pelletized or granular materials from supply containers into machine bins or other receivers. You can customize operation by adjusting operating parameters accessible through a menu system built into the control.
10 • Removable inlets on 0.2, 0.4, 0. 8, and 1.6 cu. ft. (5.6, 11.3, 22 and 45 liter) models only • Glazed polyester reinforced flat filter • Hopper-mounted junction box with 12 f eet (3.
11 • Hopper-mounted junction box with 12 f eet (3.6 m) of cable to a field-mounted 115/1/60 control b ox • Removable inlets on 0.2 and 0.4 cu. ft. ( 5.
12 Remote Proportioning Valve The remote proportioning valve (SPV/CPV) option le ts you economically and efficiently proportion two (2) different free-flowing granulated materials in a material conveying system. The most common application is mixing virgin and regrind materials in a plastic processing operation.
13 Figure 1: Typical SSL/CSL Series Hopper Loader • 10” Clearance Cutout with (6) ¼” bolt holes equally spaced on an 11” circle. We are committed to a continuing program of product improvement. Specifications, appearances, and dimensions are subject to change without notice.
14 F igure 3: SSL/CSL Series Dimensions, Specificat ions, and Maximum Machine-Side Throughput American Standards Capacity Dimensions in inches cu. ft. A B C D E F 0.1 7.0 17 3 / 8” 6 3 / 8” 12” 1 3 / 4” 6 3 / 8” 0.2 21 1 / 8” 5 1 / 2” 12” 4” 9 1 / 8” 0.
15 Figure 4: Typical SSIL/CSIL Series Sight Glass Hopper Loader We are committed to a continuing program of produ ct improvement. Specifications, appearances, and dimensions are subjec t to change without notice. SSIL/CSIL03 Sight Glass Hopper Loader SRIL01.
16 Figure 5: SSIL/CSIL Series Dimensions, Specifications, and Maximum Machine-Side Throughpu t American Standards Capacity Dimensions in inches cu. ft. A B C D E -sq. G -sq. H -sq. I -sq. c J 0.1 27 5 / 8 ” 17” 6 3 / 8 ” 1 3 / 4 ” 4” 2” 1 1 / 4 ” 2 1 / 2 ” 2” 0.
17 Chapter 3: Inst allation 3-1 Work Rules Install, operate, and maintain this equipment acco rding to all applicable work and safety codes. This includes, but is not limited to: OSHA, NEC, CSA, and any other local, national, and international regulations.
18 For new installations or mounting on othe r manufacturer’s equipment, a hole loc ation template is included in the information packet. Important! We are not responsible for equipment damage from excessive processing machine vibrations.
19 Make sure that the material demand sensor is installed with the proper am ount of clearance, and that it is free of obstructions. If the installation has the SSL/CSL or SSIL/CSIL Series hopper loader wired directly to a power main, you must install a fused disconnect with lockout to allow safe operation and maintenance.
20 provides volume-fill control. When the hopper lo ader is full, the LED on the proximity switch should light and trigger the dum p sequence. If the switch does not reliably sense the material you are conveying, adjust switch sensitivity. Turn the potentiometer (or pot ) clockwise to increase sensitivity, counterclockwise to decrease sensitivity.
21 Chapter 4: Series One Controller Operation 4-1 Pre-Startup Checklist ; Are all electrical connections correct, secure, and to code? ; Is the compressed air connection secure and safe? ; Is the hopp.
22 Figure 6: Series One Graphic Panel A0542127 OFF SERIES ONE MPBEFS BVUP TM ON.
23 4-3 Starting the Hopper Loader 1. Insert the pickup probe into the material supply. 2. Turn on compressed air to the unit. 3. Plug in power to the control enclosure. 4. Move the power switch on the Series One graphic panel to the ON position. 4-4 Changing the Conveying Sequence ! DANGER DISCONNECT POWER BEFORE OPENING THE CONTROL BOX.
24 To select a sequence (see Figures 7 and 8 on the following pages): 1. Turn off and disconnect power to the unit. 2. Remove the controller box cover. 3. Move the DIP switches on the DIP switch array labeled SW1 to one of the sixteen (16) available configurations as shown in Figure 8.
25 12 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 BLOWBACK ON ON ON ON PULSES OFF OFF OFF OFF OFF OF F OFF OFF OF F OFF OF F OFF OPEN OPEN OPEN OPEN 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 12 ON ON ON ON ON ON ON ON BLOW.
26 6 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 BLOWBACK ON ON ON ON PULSES OFF OFF OFF OFF OFF OF F OFF OFF OF F OFF OF F OFF OPEN OPEN OPEN OPEN 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 6 ON ON ON ON ON ON ON ON BLOWBA.
27 Chapter 5: Series One Plus Controller Operation The Series One Plus controller is an optional controller that includes the following features: • Sensor-driven volume fill cycle to assure full loa.
28 Figure 9: Series One Plus Graphic Panel MENU TITLE (FACTORY SETTING) TO DESIRED MENU SCROLL THROUGH MENUS 1-8 MENU UPDATING (WHILE STOPPED) SAVE NEW SETTING ADJUST MENU'S SETTING DISPLAY MEN U.
29 5-2 Operating Sequence 1. Blowback sequence. 2. Motor starts. 3. The flapper discharge valve seals under vacuum. 4. Material conveys. 5. Hopper loader hopper fills. 6. Vacuum time r times out. 7. Motor stops. 8. Blowback sequence begins, the flapper discharge valve opens under the weight, and material dum ps.
30 SCROLL SCROLL Key Press the SCROLL SCROLL key to display: • available menus when the controller is in Standby mode. • operations screens such as batch counter and SPV settings when the controller is operating.
31 BLOWBACK BLOWBACK Indicator The BLOWBACK indicator lights when the air solenoid is open. MA TERIAL "B" MATERIAL “B” Indicator The MATERIAL “B” indicator lights when the Material B port is open. 5-4 Starting Up the Hopper Loader for the First Time Using the Series One Plus Controller Non-Proportioning Models 1.
32 Note: You can adjust the maximum vacuum time from 0 to 360 seconds. See Section 5-11, Menu 1. When the proximity sensor trips or sixty (60) seconds elapses, the vacuum motor shuts off for three (3) seconds to relieve vacuum in the hopper and to allow the material to dump.
33 Note: Press and hold the CLEAR UP key and DOWN key together simultaneously while applying power to restore all factor y defaults. As the controller powers up, the screen displays in succession: • PLUS for three seconds • the software version number n.
34 Note: You can adjust the maximum vacuum time from 0 to 360 seconds. See Section 5-11, Menu 1. The MATERIAL “A” and MATERIAL “B” LEDs alternate on and off as set in Steps 4 to 6 above.
35 Install your SS/CS Series hopper loader, apply power, press the S START/STOP START/STOP key and operation begins. The hopper loader loads itsel f until full, then dumps and repeats, pausing only when the machine bin below it is full. The screen displays the vacuum timer while the vacuum motor is on.
36 Adjusting Proportioning On the Fly During Operation 1. While the hopper loader is operating, press the SCROLL SCROLL key until the screen displays the percent of Material B as P. nn . 2. Press the UP key or the DOWN key to change the value as needed.
37 To return to the vacuum timer screen: Press the SCROLL SCROLL key again. The screen reverts to the vacuum timer display. Resetting the Batch Counter To reset the batch counter to zero ( 0 ) : Press and hold both the CLEAR UP key and DOWN key together simultaneously any time the batch counter is displayed.
38 5-10 Navigating Series One Plus Controller Menus You’ll always enter the menu system when the screen displays AEC on the controller screen. This screen displays at startup before you press the S .
39 Press the S START/STOP START/STOP/SELECT/SET key. The new setting is stored in the battery-backed RAM me mory. If you decide that you don’t want to modify the current setting of a parameter: Press the SCROLL SCROLL key to abort the change.
40 timer as needed, and be sure to disable the alarm (Menu 5 set to zero [ 0 ]) to prevent tripping the No-Convey alarm Er.1 . Menu 2 Number of Blowback Pulses 0 to 16 Pulses, Default = 4 Pulses The N.
41 Figure 10: Proportioning Cycle.
42 Menu 5 Error After n Cycles 0 to 8 Cycles, Default = 3 Cycles The Error After n Cycles menu lets you: • control the number of unsuccessful loading cycle attempts (maximum vacuum timer times out and proximity sensor does not sense a full hopper) before the Er.
43 Note: When operating in this mode, the Er. 2 error message displays at startup or after material changes. To clear the error code and silence the alarm, if installed, press the Clear key combination by pressing and holding both the CLEAR UP key and DOWN key together simultaneously.
44 Chapter 6: Series One Plus SPI Communications 6-1 SPI Network Functions The Series One Plus controller equipped with the SPI communications opti on lets you operate the controller on a network con-forming to Version 3. 01 or later of the SPI proto col specification.
45 Menu 8 SPI Enable/Disable & Loopback Test Range = 0 to 1, Default = 0 When the expanded service menus are enabled, an additional parameter becomes available on this menu. Set this parameter to 1 to enable SPI communications. Set it to 2 to perform an internal self test.
46 6-3 Operating under SPI Control If you enabled the SPI function by setting the Menu 8 set value to 1 , and you press the SCROLL SCROLL key, the screen display s SPI instead of displaying vacuum time. All control is now through th e SPI network, and your SS/CS Series hopper loader now operates as instru cted by the IMM control.
47 Chapter 7: Maintenance 7-1 Routine Maintenance Cleaning Filters Check the condition of the filter frequently until you can determ ine a filter-cleaning interval.
48 7-2 Replacing Motor Brushes Note: Make sure that you replace motor brushes before the brush shunt touches the commutator. Replace ments and spares are available from the manufacturer. SS/CS Series hopper loader vacuum motor brush es require periodic replacement.
49 Replacement and Reassembly 1. Re-attach the brush clips and the end cap after you make sure that the brush assembly is properly seated. Following steps 5 and 6 above, perform the sam e procedure for the opposite side. 2. Remove the armature assembly at the top porti on of the hopper loader to properly seat the replacement brushes.
50 Seating Motor Brushes You have two (2) options for seating motor brushes (Steps 5 to 11): Option 1 Run the SS/CS Series hopper loader at 50% to 75% voltage for abo ut 30 minutes. Apply power from a variable transformer at the motor disconnect, not at the control box.
51 -Notes-.
52 Figure 12: Typical SSL/CSL 03 Series Hopper Loader - Exploded View.
53 Figure 13: SSL/CSL 03 Series Hopper Loader Parts List Refer to Figure 12 on the previous page for parts location . Item Quantity Part no. Description 1 1 A0556521 FLG, M T, ADPT 2 1 A0553741 CONE, .
54 Figure 13: SSL/CSL 03 Series Hopper Loader Parts List (Continued) 230 VAC Options 34 .16 A0535193 TBG, HTSHRNK, 0.75ID, 0.81OD, 48”L 6 1 A05421 90 MTR, 230, 2-STG, LAMB, 116125-01 36 1 A0544851 ASSY, CNTRL, SER, 1.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 55 Figure 15: Typical SLC Series Hopper Loader Parts List, Version 2 Refer to Figure 14 on the previous page for parts location. Item Quantity Part no. Description 1 1 A0563504 CONE, WELD, 9” DIA.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 56 GASKET SELECTION Figure 16: Typical SSIL/CSIL Series Sight Glass Hopper Loader - Exploded View Item Quantity Part no.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 57 Figure 17: SSIL/CSIL Series Sight Glass Hopper Loader Parts List Refer to Figure 16 on the previous page for parts location. Item Model no. Quantit y Part no. Description SSIL/CSIL03 1 A05537 17 PLATE, MACH, TOP, ALU, SRI/IL03 1.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 58 Figure 18: Typical SSIL/CSIL 03 Series Sight Glass Hopper Loader – Expl oded View.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 59 Figure 19: SSIL 03 Series Sight Glass Loader Parts List Refer to Figure 18 on the previous page for parts location. ITEM QTY PA RT NO. P A RT DESCRIPTION 1 1 A05565 31 FLTR, F LAT, WIRE, 8” OD 2 1 A0556820 GSKT, U-CHNL, NPRN, .
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 60 Chapter 8: T roubleshooting SSL/CSL, SLC and SSIL/CSIL Series Hopper Loaders with Standard Series One Controllers Problem Possible cause Solution No power to control box. Plug in power cord. Check main disconnect.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 61 SSL/CSL, SLC and SSIL/CSIL Series Hopper Loaders with Standard Series One Controllers Cont’d. Problem Possible cause Solution Air pressure is too low. Increase air pressure to at least 80 psi (551.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 62 SSL/CSL, SLC, and SSIL/CSIL Series Hopper Loaders with Optional Series One Plus Controllers Problem Possible cause Solution No power to control box. Plug in power cord; check main disconnect. Power switch is off.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 63 SSL/CSL, SLC and SSIL/CSIL Series Hopper Loaders with Optional Series One Plus Controllers Cont’d. Problem Possible cause Solution The blowback valve is unplugged. Plug in the blowback valve cable.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 64 SSL/CSL, SLC and SSIL/CSIL Series Hopper Loaders with Optional Series One Plus Controllers Cont’d. Problem Possible cause Solution Low material supply. Replenish material supply. Material supply obstructed.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 65 SSL/CSL, SLC and SSIL/CSIL Series Hopper Loaders with Optional Series One Plus Controllers Cont’d. Problem Possible cause Solution The customer-supplied auxiliary proximity switch is tripped because of a low material level in the machine bin.
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 66 Technical Assistance Parts Department Call toll-free 7am–5pm CST [ 800 ] 423- 3183 or call [ 630 ] 595-1060, Fax [630] 475-700 5 The ACS Cu.
An important point after buying a device Sterling SSL (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Sterling SSL yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Sterling SSL - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Sterling SSL you will learn all the available features of the product, as well as information on its operation. The information that you get Sterling SSL will certainly help you make a decision on the purchase.
If you already are a holder of Sterling SSL, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Sterling SSL.
However, one of the most important roles played by the user manual is to help in solving problems with Sterling SSL. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Sterling SSL along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center