EN
Speed Queen logo
Official user manual

Speed Queen none

60 pages·1.8 MB·Clothes Dryer·PDF·ENDEFRITNLJA
Speed Queen none
Table of Contents 398 sections Drying Tumblers · 50 Pound Capacity 75 Pound Capacity · Refer to Page 4 for Model Identification · Installation must conform with local codes or, in the absence of local codes, with: · … ShowHide
Drying Tumblersp.150 Pound Capacity 75 Pound Capacityp.1Refer to Page 4 for Model Identificationp.1Installation must conform with local codes or, in the absence of local codes, with:p.3In the U.S.A., installation must conform to the latest edition of the American National Standard Z223.1/ NFPA 54 “National Fuel Gas Code” and Standard ANSI/NFPA 70 “National Electric Code.”p.3In Canada, installation must comply with Standards CSA-B149.1 or Natural Gas and Propane Installation Code and CSA C22.1, latest edition, Canadian Electric Code, Part I.p.3In Australia, installation must comply with the Australian Gas Association Installation Code for Gas Burning Appliances and Equipment.p.3Table of Contentsp.4Introductionp.6Model Identificationp.6Customer Servicep.6Wiring Diagramp.6Serial Plate Locationp.71p.71p.7Safety Informationp.8Save These Instructionsp.9Important Safety Instructionsp.91. Read all instructions before using the tumbler.p.92. Refer to the Grounding Instructions for the proper grounding of the tumbler.p.93. Do not dry articles that have been previously cleaned in, washed in, soaked in, or spotted with gasoline, dry-cleaning solvents, other flammable or explosive substances as they give off vapors that could ignite or explode.p.94. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children. This is a safety rule for all appliances.p.95. Before the tumbler is removed from service or discarded, remove the door to the drying compartment and the door to the lint compartment.p.96. Do not reach into the tumbler if the cylinder is revolving.p.97. Do not install or store the tumbler where it will be exposed to water and/or weather.p.98. Do not tamper with the controls.p.99. Do not repair or replace any part of the tumbler, or attempt any servicing unless specifically recommended in the user-maintenance instructions or in published user-repair instructions that you understand and have the skills to carry out.p.910. Do not use fabric softeners or products to eliminate static unless recommended by the manufacturer of the fabric softener or product.p.911. To reduce the risk of fire, DO NOT DRY plastics or articles containing foam rubber or similarly textured rubberlike materials.p.912. Always clean the lint filter daily.p.913. Keep area around the exhaust opening and adjacent surrounding area free from the accumulation of lint, dust and dirt.p.914. The interior of the tumbler and the exhaust duct should be cleaned periodically by qualified service personnel.p.915. If not installed, operated and maintained in accordance with the manufacturer’s instructions or if there is damage to or mis...p.916. Tumbler will not operate with the loading door open. DO NOT bypass the door safety switch to permit the tumbler to operate w...p.917. Do not put articles soiled with vegetable or cooking oil in the tumbler, as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.p.918. To reduce the risk of fire, DO NOT put clothes which have traces of any flammable substances such as machine oil, flammable ...p.919. Use the tumbler only for its intended purpose, drying fabrics.p.920. ALWAYS disconnect and lockout the electrical power to the tumbler before servicing. Disconnect power by shutting off appropriate breaker or fuse.p.921. Install this tumbler according to the manual. All connections for electrical power, grounding, and gas supply must comply with local codes and be made by licensed personnel when required.p.922. Remove laundry immediately after tumbler stops.p.1023. Always read and follow manufacturer’s instructions on packages of laundry and cleaning aids. Heed all warnings or precaution...p.1024. Do not tumble fiberglass curtains and draperies unless the label says it can be done. If they are dried, wipe out the cylinder with a damp cloth to remove particles of fiberglass.p.1025. Always follow the fabric care instructions supplied by the garment manufacturer.p.1026. Never operate the tumbler with any guards and/or panels removed.p.1027. DO NOT operate the tumbler with missing or broken parts.p.1028. DO NOT bypass any safety devices.p.1029. Solvent vapors from dry-cleaning machines create acids when drawn through the heater of the drying unit. These acids are corrosive to the tumbler as well as to the laundry load being dried. Be sure make-up air is free of solvent vapors.p.1030. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce bodily injury and/or property damage.p.10Specifications and Dimensionsp.11Cabinet Dimensionsp.12Cp.12Exhaust Outlet Locationsp.13Ap.13Gas Connection Locationsp.14Ap.14Electrical Connection Locationsp.15GAS AND STEAMp.15Steam Connection Locationsp.16Cp.16Installationp.17Pre-Installation Inspectionp.17Location Requirementsp.183p.18NOTE: Shaded areas indicate adjacent structure.p.181p.182p.183p.184p.185p.186p.187p.18Figure 1p.18Position and Level the Tumblerp.19Figure 2p.19Installing Accessory Timing Camp.19Table 1p.19Removal of Existing Timing Camp.201. Rotate cam by hand until “V” notch lines up beneath the ratchet tooth. Refer to Figure 3.p.20Installation of New Timing Camp.201. Insert drive fork into timing cam with wide prong in wide hole of cam.p.203. Press timing cam down firmly to seat timing cam onto the motor shaft.p.201p.201p.202p.20Figure 3p.20Before Placing Tumbler into Servicep.211. Remove or open all panels and check accessible bolts, nuts, screws, terminals and fittings for tightness.p.212. Check belt tension and adjust if necessary. Refer to Adjustments Section.p.213. Replace all panels and guards.p.214. Turn on electrical supply to tumbler.p.215. Open the supply valve for gas or steam heated tumblers.p.216. After performing the previous checks, start the tumbler by pressing START. (Refer to the Operating Manual for detailed instru...p.217. Gas models: Start the tumbler and check the burner flame. Adjust the air inlet shutter as required. Refer to Adjustments Section.p.21Table 2p.218. Load the cylinder with a full load of clean rags and run to remove oil or dirt from cylinder.p.219. Check the airflow switch operation by opening the lint panel. The heating systems should shut off when the lint panel is opened a maximum of 1-1/2 inches (38 mm).p.2110. Wipe out the cylinder using an all-purpose cleaner or detergent and water solution. Refer to Figure 4.p.21Figure 4p.21Required for CE Marked (European) Models Onlyp.22Installing Gas Drying Tumblers in the European Union (EU)p.23General Informationp.23Basic Configurationp.241. Determine the necessary conversion operations to convert from the factory-supplied configuration to the desired configuration.p.242. Perform the conversions required so the machine is properly configured for the desired country and gas (refer to Specific Conversion Procedures Section):p.243. If applicable, peel off the appropriate country sticker from Part No. 503382 (included with machine) and apply it to the serial plate over the existing country information. Refer to Figure 9.p.244. If applicable, peel off the appropriate conversion sticker from Part No. M413800 (included with machine) and apply it to the serial plate over the “ADJUSTED FOR ______ GAS: ______” information. Refer to Figure 9.p.24SPECIFIED LOCAL INLET PRESSUREp.241p.242p.243p.24Figure 5p.24Specific Conversion Proceduresp.24a. Disconnect electrical power from tumbler. Close gas shut-off valve to tumbler. Refer to Figure 5.p.24b. Follow instructions in Conversion Kit, Part No. M400763 (Johnson Part No. Y71AA-5C).p.24c. Change injector size as required by the appropriate table according to How to Change Injector (Orifice) Size.p.24d. Commission tumbler for use.p.241p.257p.252p.258p.253p.259p.254p.2510p.255p.2511p.256p.25Figure 6p.251. Disconnect electrical power from tumbler. Close gas shut-off valve to tumbler. Refer to Figure 5.p.252. Remove gas valve.p.253. Install the new, correct injector(s) (orifices). Refer to Figure 8. Torque each to 9-10 Nm.p.254. Reinstall spud holder assembly to gas valve, making certain orifice(s) are in line with burner tube opening. Refer to Figure 6.p.255. Commission tumbler for use.p.251p.261p.266p.262p.267p.263p.268p.264p.269p.265p.26Figure 7p.261. Check gas injector (manifold) pressure as follows. Refer to Figure 7.p.262. Remove screw plug from inside pressure tap.p.263. Connect a “U”-tube manometer (or similar pressure gauge) to the injector (manifold) pressure tap.p.264. Start tumbler and note pressure once flame is burning. Remove regulator cap and adjust regulator screw until the injector pressure per applicable table is achieved. Replace regulator cap. Refer to Figure 6.p.261p.261p.26Figure 8p.26Table 3p.27Table 4p.28Table 5p.29APPLICATION OF STICKERS TO SERIAL PLATEp.30Figure 9p.30Exhaust Requirementsp.31Layoutp.31Make-Up Airp.31Table 6p.31Ventingp.31Individual Ventingp.32Table 7p.32VERTICAL EXHAUST INSTALLATIONp.321p.322p.323p.324p.325p.32Figure 10p.32Manifold Ventingp.33Figure 11p.33Lp.341p.342p.343p.344p.34Figure 12p.34Table 8p.34Gas Requirementsp.351p.361p.362p.363p.364p.365p.366p.367p.368p.36Figure 13p.36Gas Supply Pipe Looping and Sizingp.376p.371p.372p.373p.374p.375p.376p.377p.378p.379p.3710p.3711p.3712p.3713p.37Figure 14p.37Table 9p.38High Altitude Orifice Sizingp.39Table 10p.39Steam Requirementsp.40Piping Recommendationsp.40Installing Steam Trap and Making Condensate Return Connectionsp.411. Connect a flexible hose to each steam coil outlet.p.412. Install a strainer to the ends of each flexible hose.p.413. Install a steam trap to each strainer.p.414. Install a globe shut-off valve to each steam trap.p.415. Connect to the condensate return lines.p.412p.421p.428p.422p.429p.423p.4210p.424p.4211p.425p.4212p.426p.4213p.427p.42Figure 15p.42Table 11p.42Electrical Requirementsp.43Grounding Instructionsp.431. Install a circuit breaker as close to the tumbler as possible. If more than one tumbler is being installed, a disconnect swit...p.442. Connect the conduit-encased leads to the disconnect switch, or circuit breaker. Connect the wire leads to the appropriate labeled terminal on the terminal block. The ground wire must be connected to the ground connection as shown in Figure 16.p.443. Check the electrical service phase sequence (three phase only) as follows:p.44a. Energize the electrical service (on reversing tumblers, ensure nonreversing is selected) and momentarily start the tumbler. C...p.44b. Disconnect and reverse any two service leads on the terminal block.p.441p.441p.442p.443p.444p.445p.446p.447p.44Figure 16p.44Jumper Configuration Instructionsp.45Ferrite Ring Installationp.451. Immediately after connection of power leads and before applying power to machine, locate each of the incoming service leads including ground.p.451p.451p.452p.453p.45Figure 17p.4550 Pound Tumbler Electrical Requirementsp.46Table 12p.4675 Pound Tumbler Electrical Requirementsp.47Table 13p.47Adjustmentsp.48Gas Burner Air Shutterp.481. Open the access panel.p.482. Start the tumbler and check the flame pattern. If the flame pattern is straight up, insufficient air is flowing through the t...p.483. Correct air and gas mixture is indicated if the flame pattern is primarily blue, with small yellow tips, and bends to the right of the heater section. Too little air is indicated if the flame if yellow, lazy and smokey.p.484. To adjust the air shutter, loosen air inlet shutter adjusting screw.p.485. Open or close air shutter as necessary to obtain proper flame intensity.p.486. After air shutter is adjusted for proper flame, tighten air shutter adjusting screw securely.p.481p.481p.48Figure 18p.48Airflow Switchp.491. Load the tumbler. This adjustment is much faster to make with one person opening lint panel in front and another adjusting the counterweight in the rear of tumbler.p.492. Start the tumbler. Open the lint panel 1.5 inches (38.1 mm). The airflow disc should move away from the cabinet, opening the switch contacts and shutting off the heat system. This indicates proper operation and proper adjustment.p.493. If switch is not opening as described in step 2, it should be adjusted so it is MORE sensitive. Depress the spring clip and m...p.494. If switch opens BEFORE lint panel is opened the proper distance, step 2, it should be adjusted so it is LESS sensitive. Depre...p.499p.501p.502p.503p.504p.505p.506p.507p.508p.509p.5010p.50Figure 19p.50Loading Door Switchp.511. Close door and start tumbler, slowly open loading door. Cylinder and heat system should shut off when door is open 2 inches (51 mm) plus or minus 1/4 inch (6 mm).p.512. Slowly close loading door. When door is 2 inches from being fully closed, the tab should contact the interlock rod and depress it enough to operate the switch arm closing the switch with an audible “click.”p.513. If interlock rod does not depress enough to operate the switch, bend tab on loading door OUTWARD 1/8 inch (3 mm) and repeat steps 1 and 2. Bend tab outward an additional 1/8 inch (3 mm) if required to obtain proper rod movement and switch operation.p.514. If proper operation is not obtained by procedure outlined in step 3, unlock and open access panel and remove control panel. L...p.512p.511p.512p.513p.514p.515p.516p.51Figure 20p.511. Start tumbler, following the operating instructions which accompanied it.p.522. Slowly open loading door. Cylinder and heating system should stop when door is open 3 inches (76 mm) maximum.p.523. Slowly close loading door while depressing start switch or pad. Tumbler should start before loading door is 0.5 inch (13 mm) from fully closed.p.524. If opening the loading door 3 inches (76 mm) maximum does not stop tumbler, adjust switch.p.525. Loose lower screw on switch coupler (use 2 mm hex wrench).p.526. Align screw slot with alignment marks on switch top (switch should be closed, or on).p.527. Start tumbler.p.528. Prop door open 2.5 inches (63 mm).p.529. Slowly rotate switch coupler counterclockwise (viewed from above switch) until tumbler stops.p.5210. Tighten lower screw on switch coupler.p.5211. Return to step 1 to verify loading door switch operation.p.522p.521p.522p.523p.52Figure 21p.52Loading Door Strikep.532p.531p.532p.533p.53Figure 22p.53Chain Drivep.54Nonreversing Modelsp.541. Remove guard from rear of tumbler.p.542. Adjust belt first.p.543. To adjust chain tension, loosen jam nut holding idler sprocket to housing.p.544. Move idler sprocket left or right until proper chain tension is reached, then retighten the jam nut.p.545. Replace the guard on rear of tumbler.p.54Reversing Modelsp.541. Remove drive guard.p.542. To adjust chain tension, loosen nut on idler housing attaching bolt. Move entire idler housing assembly up or down in the guide rails to change tension.p.543. When chain tension is correct, tighten idler housing attaching bolt. Hold idler housing firmly in position while tightening nut on attaching bolt.p.544. Check chain tension after tightening nut on idler housing attaching bolt.p.54Belt Drivep.55Nonreversing Modelsp.551. Remove guard from rear of tumbler.p.552. To adjust belt tension, loosen idler housing bolts holding idler housing assembly to the guide rails.p.553. Position housing assembly by turning adjusting bolt until proper belt tension is reached, then retighten idler housing bolts.p.554. Replace the guard on rear of tumbler.p.55Reversing Modelsp.551. Remove guard from rear of tumbler.p.552. To adjust cylinder belt tension, loosen idler housing bolts holding idler housing assembly to the guide rails.p.553. Position housing assembly by turning adjusting bolt until proper belt tension is reached, then retighten idler housing bolts.p.554. Loosen the locking bolt.p.555. Loosen the adjusting nut and use the adjusting screw to move the motor up or down.p.556. Once proper belt tension is reached, retighten the adjusting nut and locking bolt.p.557. Replace the guard on rear of tumbler.p.551p.561p.568p.562p.569p.563p.5610p.564p.5611p.565p.5612p.566p.5613p.567p.5614p.56Figure 23p.561p.571p.577p.572p.578p.573p.579p.574p.5710p.575p.5711p.576p.5712p.57Figure 24p.57NONREVERSING BELT DRIVE MODELSp.581p.582p.583p.584p.585p.58Figure 25p.58REVERSING MODELSp.591p.592p.593p.594p.595p.596p.597p.598p.59Figure 26p.59Removing Tumbler from Servicep.60
Page 1 of the Speed Queen none user manual — www.comlaundry.com
Page 1 · click to enlarge
Page 1

Drying Tumblers

Installation

50 Pound Capacity 75 Pound Capacity Refer to Page 4 for Model Identification

Keep These Instructions for Future Reference. (If this machine changes ownership, this manual must accompany machine.)

Part No. 70256801R1

www.comlaundry.com

August 2007

Page 2 of the Speed Queen none user manual — Drying Tumblers
Page 2 · click to enlarge
Page 2
Page 2 of the Speed Queen none user manual — Drying Tumblers
Page 3 of the Speed Queen none user manual — W053R2QU
Page 3 · click to enlarge
Page 3

Installation must conform with local codes or, in the absence of local codes, with:

In the U.S.A., installation must conform to the latest edition of the American National Standard Z223.1/ NFPA 54 “National Fuel Gas Code” and Standard ANSI/NFPA 70 “National Electric Code.”

In Canada, installation must comply with Standards CSA-B149.1 or Natural Gas and Propane Installation Code and CSA C22.1, latest edition, Canadian Electric Code, Part I.

In Australia, installation must comply with the Australian Gas Association Installation Code for Gas Burning Appliances and Equipment.

WARNING

MISE EN GARDE

FOR YOUR SAFETY, the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury or death.

POUR VOTRE SÉCURITÉ, les informations de ce guide doivent être respectées afin de réduire les risques d’incendie, d’explosion ou d’éviter les dommages matériels, personnels ou blessures mortelles.

W033

W033R3QU

  • Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.
  • WHAT TO DO IF YOU SMELL GAS: – Do not try to light any appliance. – Do not touch any electrical switch; do
  • Ne pas entreposer ou utiliser d’essence ou toutes autres vapeurs et liquides inflammables à proximité de cette machine ou de tout autre appareil.
  • QUE FAIRE EN CAS D’ODEUR DE GAZ : – Ne pas mettre d’appareil en marche. – Ne pas toucher aux interrupteurs

not use any phone in your building. – Clear the room, building or area of all

occupants. – Immediately call your gas supplier from

électriques ; ne pas utiliser le téléphone des lieux. – Évacuer la pièce, le bâtiment ou la zone

a neighbor’s phone. Follow the gas supplier’s instructions. – If you cannot reach your gas supplier,

de tous les occupants. – Appeler immédiatement le fournisseur

call the fire department. • Installation and service must be performed by a qualified installer, service agency or the gas supplier.

de gaz de la maison d’un voisin. Respecter les instructions communiquées par le fournisseur. – Si vous ne pouvez pas joindre le

W052 FOR YOUR SAFETY

fournisseur de gaz, appeler le service d’incendie. • L’installation et l’entretien doivent être effectués par un installateur, service d’entretien qualifiés ou par le fournisseur de gaz.

Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.

W053

W052R5QU POUR VOTRE SÉCURITÉ

Ne pas entreposer ou utiliser d’essence ou toutes autres vapeurs et liquides inflammables à proximité de cette unité ou de tout autre appareil.

W053R2QU

Page 4 of the Speed Queen none user manual — Table of Contents
Page 4 · Contents
Contents

Contents

Drying Tumblersp.150 Pound Capacity 75 Pound Capacityp.1Refer to Page 4 for Model Identificationp.1Installation must conform with local codes or, in the absence of local codes, with:p.3In the U.S.A., installation must conform to the latest edition of the American National Standard Z223.1/ NFPA 54 “National Fuel Gas Code” and Standard ANSI/NFPA 70 “National Electric Code.”p.3In Canada, installation must comply with Standards CSA-B149.1 or Natural Gas and Propane Installation Code and CSA C22.1, latest edition, Canadian Electric Code, Part I.p.3In Australia, installation must comply with the Australian Gas Association Installation Code for Gas Burning Appliances and Equipment.p.3Table of Contentsp.4Introductionp.6Model Identificationp.6Customer Servicep.6Wiring Diagramp.6Serial Plate Locationp.71p.71p.7Safety Informationp.8Save These Instructionsp.9Important Safety Instructionsp.91. Read all instructions before using the tumbler.p.92. Refer to the Grounding Instructions for the proper grounding of the tumbler.p.93. Do not dry articles that have been previously cleaned in, washed in, soaked in, or spotted with gasoline, dry-cleaning solvents, other flammable or explosive substances as they give off vapors that could ignite or explode.p.94. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children. This is a safety rule for all appliances.p.95. Before the tumbler is removed from service or discarded, remove the door to the drying compartment and the door to the lint compartment.p.96. Do not reach into the tumbler if the cylinder is revolving.p.97. Do not install or store the tumbler where it will be exposed to water and/or weather.p.98. Do not tamper with the controls.p.99. Do not repair or replace any part of the tumbler, or attempt any servicing unless specifically recommended in the user-maintenance instructions or in published user-repair instructions that you understand and have the skills to carry out.p.910. Do not use fabric softeners or products to eliminate static unless recommended by the manufacturer of the fabric softener or product.p.911. To reduce the risk of fire, DO NOT DRY plastics or articles containing foam rubber or similarly textured rubberlike materials.p.912. Always clean the lint filter daily.p.913. Keep area around the exhaust opening and adjacent surrounding area free from the accumulation of lint, dust and dirt.p.914. The interior of the tumbler and the exhaust duct should be cleaned periodically by qualified service personnel.p.915. If not installed, operated and maintained in accordance with the manufacturer’s instructions or if there is damage to or mis...p.916. Tumbler will not operate with the loading door open. DO NOT bypass the door safety switch to permit the tumbler to operate w...p.917. Do not put articles soiled with vegetable or cooking oil in the tumbler, as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.p.918. To reduce the risk of fire, DO NOT put clothes which have traces of any flammable substances such as machine oil, flammable ...p.919. Use the tumbler only for its intended purpose, drying fabrics.p.920. ALWAYS disconnect and lockout the electrical power to the tumbler before servicing. Disconnect power by shutting off appropriate breaker or fuse.p.921. Install this tumbler according to the manual. All connections for electrical power, grounding, and gas supply must comply with local codes and be made by licensed personnel when required.p.922. Remove laundry immediately after tumbler stops.p.1023. Always read and follow manufacturer’s instructions on packages of laundry and cleaning aids. Heed all warnings or precaution...p.1024. Do not tumble fiberglass curtains and draperies unless the label says it can be done. If they are dried, wipe out the cylinder with a damp cloth to remove particles of fiberglass.p.1025. Always follow the fabric care instructions supplied by the garment manufacturer.p.1026. Never operate the tumbler with any guards and/or panels removed.p.1027. DO NOT operate the tumbler with missing or broken parts.p.1028. DO NOT bypass any safety devices.p.1029. Solvent vapors from dry-cleaning machines create acids when drawn through the heater of the drying unit. These acids are corrosive to the tumbler as well as to the laundry load being dried. Be sure make-up air is free of solvent vapors.p.1030. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce bodily injury and/or property damage.p.10Specifications and Dimensionsp.11Cabinet Dimensionsp.12Cp.12Exhaust Outlet Locationsp.13Ap.13Gas Connection Locationsp.14Ap.14Electrical Connection Locationsp.15GAS AND STEAMp.15Steam Connection Locationsp.16Cp.16Installationp.17Pre-Installation Inspectionp.17Location Requirementsp.183p.18NOTE: Shaded areas indicate adjacent structure.p.181p.182p.183p.184p.185p.186p.187p.18Figure 1p.18Position and Level the Tumblerp.19Figure 2p.19Installing Accessory Timing Camp.19Table 1p.19Removal of Existing Timing Camp.201. Rotate cam by hand until “V” notch lines up beneath the ratchet tooth. Refer to Figure 3.p.20Installation of New Timing Camp.201. Insert drive fork into timing cam with wide prong in wide hole of cam.p.203. Press timing cam down firmly to seat timing cam onto the motor shaft.p.201p.201p.202p.20Figure 3p.20Before Placing Tumbler into Servicep.211. Remove or open all panels and check accessible bolts, nuts, screws, terminals and fittings for tightness.p.212. Check belt tension and adjust if necessary. Refer to Adjustments Section.p.213. Replace all panels and guards.p.214. Turn on electrical supply to tumbler.p.215. Open the supply valve for gas or steam heated tumblers.p.216. After performing the previous checks, start the tumbler by pressing START. (Refer to the Operating Manual for detailed instru...p.217. Gas models: Start the tumbler and check the burner flame. Adjust the air inlet shutter as required. Refer to Adjustments Section.p.21Table 2p.218. Load the cylinder with a full load of clean rags and run to remove oil or dirt from cylinder.p.219. Check the airflow switch operation by opening the lint panel. The heating systems should shut off when the lint panel is opened a maximum of 1-1/2 inches (38 mm).p.2110. Wipe out the cylinder using an all-purpose cleaner or detergent and water solution. Refer to Figure 4.p.21Figure 4p.21Required for CE Marked (European) Models Onlyp.22Installing Gas Drying Tumblers in the European Union (EU)p.23General Informationp.23Basic Configurationp.241. Determine the necessary conversion operations to convert from the factory-supplied configuration to the desired configuration.p.242. Perform the conversions required so the machine is properly configured for the desired country and gas (refer to Specific Conversion Procedures Section):p.243. If applicable, peel off the appropriate country sticker from Part No. 503382 (included with machine) and apply it to the serial plate over the existing country information. Refer to Figure 9.p.244. If applicable, peel off the appropriate conversion sticker from Part No. M413800 (included with machine) and apply it to the serial plate over the “ADJUSTED FOR ______ GAS: ______” information. Refer to Figure 9.p.24SPECIFIED LOCAL INLET PRESSUREp.241p.242p.243p.24Figure 5p.24Specific Conversion Proceduresp.24a. Disconnect electrical power from tumbler. Close gas shut-off valve to tumbler. Refer to Figure 5.p.24b. Follow instructions in Conversion Kit, Part No. M400763 (Johnson Part No. Y71AA-5C).p.24c. Change injector size as required by the appropriate table according to How to Change Injector (Orifice) Size.p.24d. Commission tumbler for use.p.241p.257p.252p.258p.253p.259p.254p.2510p.255p.2511p.256p.25Figure 6p.251. Disconnect electrical power from tumbler. Close gas shut-off valve to tumbler. Refer to Figure 5.p.252. Remove gas valve.p.253. Install the new, correct injector(s) (orifices). Refer to Figure 8. Torque each to 9-10 Nm.p.254. Reinstall spud holder assembly to gas valve, making certain orifice(s) are in line with burner tube opening. Refer to Figure 6.p.255. Commission tumbler for use.p.251p.261p.266p.262p.267p.263p.268p.264p.269p.265p.26Figure 7p.261. Check gas injector (manifold) pressure as follows. Refer to Figure 7.p.262. Remove screw plug from inside pressure tap.p.263. Connect a “U”-tube manometer (or similar pressure gauge) to the injector (manifold) pressure tap.p.264. Start tumbler and note pressure once flame is burning. Remove regulator cap and adjust regulator screw until the injector pressure per applicable table is achieved. Replace regulator cap. Refer to Figure 6.p.261p.261p.26Figure 8p.26Table 3p.27Table 4p.28Table 5p.29APPLICATION OF STICKERS TO SERIAL PLATEp.30Figure 9p.30Exhaust Requirementsp.31Layoutp.31Make-Up Airp.31Table 6p.31Ventingp.31Individual Ventingp.32Table 7p.32VERTICAL EXHAUST INSTALLATIONp.321p.322p.323p.324p.325p.32Figure 10p.32Manifold Ventingp.33Figure 11p.33Lp.341p.342p.343p.344p.34Figure 12p.34Table 8p.34Gas Requirementsp.351p.361p.362p.363p.364p.365p.366p.367p.368p.36Figure 13p.36Gas Supply Pipe Looping and Sizingp.376p.371p.372p.373p.374p.375p.376p.377p.378p.379p.3710p.3711p.3712p.3713p.37Figure 14p.37Table 9p.38High Altitude Orifice Sizingp.39Table 10p.39Steam Requirementsp.40Piping Recommendationsp.40Installing Steam Trap and Making Condensate Return Connectionsp.411. Connect a flexible hose to each steam coil outlet.p.412. Install a strainer to the ends of each flexible hose.p.413. Install a steam trap to each strainer.p.414. Install a globe shut-off valve to each steam trap.p.415. Connect to the condensate return lines.p.412p.421p.428p.422p.429p.423p.4210p.424p.4211p.425p.4212p.426p.4213p.427p.42Figure 15p.42Table 11p.42Electrical Requirementsp.43Grounding Instructionsp.431. Install a circuit breaker as close to the tumbler as possible. If more than one tumbler is being installed, a disconnect swit...p.442. Connect the conduit-encased leads to the disconnect switch, or circuit breaker. Connect the wire leads to the appropriate labeled terminal on the terminal block. The ground wire must be connected to the ground connection as shown in Figure 16.p.443. Check the electrical service phase sequence (three phase only) as follows:p.44a. Energize the electrical service (on reversing tumblers, ensure nonreversing is selected) and momentarily start the tumbler. C...p.44b. Disconnect and reverse any two service leads on the terminal block.p.441p.441p.442p.443p.444p.445p.446p.447p.44Figure 16p.44Jumper Configuration Instructionsp.45Ferrite Ring Installationp.451. Immediately after connection of power leads and before applying power to machine, locate each of the incoming service leads including ground.p.451p.451p.452p.453p.45Figure 17p.4550 Pound Tumbler Electrical Requirementsp.46Table 12p.4675 Pound Tumbler Electrical Requirementsp.47Table 13p.47Adjustmentsp.48Gas Burner Air Shutterp.481. Open the access panel.p.482. Start the tumbler and check the flame pattern. If the flame pattern is straight up, insufficient air is flowing through the t...p.483. Correct air and gas mixture is indicated if the flame pattern is primarily blue, with small yellow tips, and bends to the right of the heater section. Too little air is indicated if the flame if yellow, lazy and smokey.p.484. To adjust the air shutter, loosen air inlet shutter adjusting screw.p.485. Open or close air shutter as necessary to obtain proper flame intensity.p.486. After air shutter is adjusted for proper flame, tighten air shutter adjusting screw securely.p.481p.481p.48Figure 18p.48Airflow Switchp.491. Load the tumbler. This adjustment is much faster to make with one person opening lint panel in front and another adjusting the counterweight in the rear of tumbler.p.492. Start the tumbler. Open the lint panel 1.5 inches (38.1 mm). The airflow disc should move away from the cabinet, opening the switch contacts and shutting off the heat system. This indicates proper operation and proper adjustment.p.493. If switch is not opening as described in step 2, it should be adjusted so it is MORE sensitive. Depress the spring clip and m...p.494. If switch opens BEFORE lint panel is opened the proper distance, step 2, it should be adjusted so it is LESS sensitive. Depre...p.499p.501p.502p.503p.504p.505p.506p.507p.508p.509p.5010p.50Figure 19p.50Loading Door Switchp.511. Close door and start tumbler, slowly open loading door. Cylinder and heat system should shut off when door is open 2 inches (51 mm) plus or minus 1/4 inch (6 mm).p.512. Slowly close loading door. When door is 2 inches from being fully closed, the tab should contact the interlock rod and depress it enough to operate the switch arm closing the switch with an audible “click.”p.513. If interlock rod does not depress enough to operate the switch, bend tab on loading door OUTWARD 1/8 inch (3 mm) and repeat steps 1 and 2. Bend tab outward an additional 1/8 inch (3 mm) if required to obtain proper rod movement and switch operation.p.514. If proper operation is not obtained by procedure outlined in step 3, unlock and open access panel and remove control panel. L...p.512p.511p.512p.513p.514p.515p.516p.51Figure 20p.511. Start tumbler, following the operating instructions which accompanied it.p.522. Slowly open loading door. Cylinder and heating system should stop when door is open 3 inches (76 mm) maximum.p.523. Slowly close loading door while depressing start switch or pad. Tumbler should start before loading door is 0.5 inch (13 mm) from fully closed.p.524. If opening the loading door 3 inches (76 mm) maximum does not stop tumbler, adjust switch.p.525. Loose lower screw on switch coupler (use 2 mm hex wrench).p.526. Align screw slot with alignment marks on switch top (switch should be closed, or on).p.527. Start tumbler.p.528. Prop door open 2.5 inches (63 mm).p.529. Slowly rotate switch coupler counterclockwise (viewed from above switch) until tumbler stops.p.5210. Tighten lower screw on switch coupler.p.5211. Return to step 1 to verify loading door switch operation.p.522p.521p.522p.523p.52Figure 21p.52Loading Door Strikep.532p.531p.532p.533p.53Figure 22p.53Chain Drivep.54Nonreversing Modelsp.541. Remove guard from rear of tumbler.p.542. Adjust belt first.p.543. To adjust chain tension, loosen jam nut holding idler sprocket to housing.p.544. Move idler sprocket left or right until proper chain tension is reached, then retighten the jam nut.p.545. Replace the guard on rear of tumbler.p.54Reversing Modelsp.541. Remove drive guard.p.542. To adjust chain tension, loosen nut on idler housing attaching bolt. Move entire idler housing assembly up or down in the guide rails to change tension.p.543. When chain tension is correct, tighten idler housing attaching bolt. Hold idler housing firmly in position while tightening nut on attaching bolt.p.544. Check chain tension after tightening nut on idler housing attaching bolt.p.54Belt Drivep.55Nonreversing Modelsp.551. Remove guard from rear of tumbler.p.552. To adjust belt tension, loosen idler housing bolts holding idler housing assembly to the guide rails.p.553. Position housing assembly by turning adjusting bolt until proper belt tension is reached, then retighten idler housing bolts.p.554. Replace the guard on rear of tumbler.p.55Reversing Modelsp.551. Remove guard from rear of tumbler.p.552. To adjust cylinder belt tension, loosen idler housing bolts holding idler housing assembly to the guide rails.p.553. Position housing assembly by turning adjusting bolt until proper belt tension is reached, then retighten idler housing bolts.p.554. Loosen the locking bolt.p.555. Loosen the adjusting nut and use the adjusting screw to move the motor up or down.p.556. Once proper belt tension is reached, retighten the adjusting nut and locking bolt.p.557. Replace the guard on rear of tumbler.p.551p.561p.568p.562p.569p.563p.5610p.564p.5611p.565p.5612p.566p.5613p.567p.5614p.56Figure 23p.561p.571p.577p.572p.578p.573p.579p.574p.5710p.575p.5711p.576p.5712p.57Figure 24p.57NONREVERSING BELT DRIVE MODELSp.581p.582p.583p.584p.585p.58Figure 25p.58REVERSING MODELSp.591p.592p.593p.594p.595p.596p.597p.598p.59Figure 26p.59Removing Tumbler from Servicep.60
Page 6 of the Speed Queen none user manual — Customer Service
Page 6 · click to enlarge
Page 6

Introduction

Model Identification

Information in this manual is applicable to these models:

GasSteam/Thermal OilElectric 50 PoundATB50CG DTB50CG DTB50EG JC50CG JC50EG JCB50CG JCB50EG JT50CG JT50EG JTB50CG JTB50EG SC50CG SC50EG SCB50CG SCB50EG STB50CG STB50EG TKD50CGMTATB50CSH DCB50CSH DCB50CSL DTB50CSH DTB50CSL JCB50CSH JT50CSH JT50CSL JTB50CSH JTB50CSL SCB50CSH SCB50CSL STB50CSH STB50CSLDCB50CE DTB50CE JC50CE JT50CE JCB50CE JTB50CE SC50CE SCB50AT SCB50CE STB50CE TKD50CEMT 75 PoundATB75CG DTB634 DTB75CG DTB75EG JC75EG JCB75CG JT75CG JT75EG JTB75CG JTB75EG SC75CG SCB75CG STB634 STB75CG STB75EGATB75CSH DCB75CSH DCB75CSL DTB75CSH DTB75CSL JC75CSH JCB75CSH JT75CSH JT75CSL JTB75CSH JTB75CSL SC75CSH SCB75CSH STB75CSH STB75CSLDCB75CE DTB75CE JC75CE JCB75CE JT75CE JTB75CE SC75CE SCB75CE STB75CE

Customer Service

Wiring Diagram

If literature or replacement parts are required, contact the source from which the machine was purchased or contact Alliance Laundry Systems at (920) 748-3950 for the name and address of the nearest authorized parts distributor.

The wiring diagram is located in the literature packet supplied with all non-CE Marked models. On CE Marked models, it is located in the junction box.

For technical assistance, call (920) 748-3121.

Page 7 of the Speed Queen none user manual — Serial Plate Location
Page 7 · click to enlarge
Page 7

Serial Plate Location

When calling or writing for information about your product, be sure to mention model and serial numbers. Model and serial numbers are located on the serial plate as shown.

Speed Queen none — Serial Plate Location diagram (page 7)
Fig. 1 · Serial Plate Location
Conversion Table MultiplyByTo ObtainMultiplyByTo Obtain Btu.252kCalPounds/sq. inch.06895 Bars Btu1055JoulesPounds/sq. inch.070 kg/sq. cm Inch25.4MillimetersPounds (lbs.).454 Kilograms Inches W.C..036Pounds/sq. inchBoiler Horsepower34479 Btu/hr. Inches W.C..249kPaBoiler Horsepower34.5 lbs. Steam/hr. lbf/inch2 (psi).0369kPaCFM.471 liters/second ft328.32LiterskW3414 Btu/hr.
Speed Queen none — Serial Plate Location diagram (page 7)
Fig. 2 · Serial Plate Location

Introduction

Page 8 of the Speed Queen none user manual — CAUTION
Page 8 · click to enlarge
Page 8

Safety Information

Precautionary statements (“DANGER,” “WARNING,” and “CAUTION”), followed by specific instructions, are found in this manual and on machine decals. These precautions are intended for the personal safety of the operator, user, servicer, and those maintaining the machine.

WARNING

DANGER

Failure to install, maintain, and/or operate this machine according to manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.

W051R1

WARNING

Always contact your dealer, distributor, service agent or the manufacturer on any problems or conditions you do not understand.

CAUTION

Additional precautionary statements (“IMPORTANT” and “NOTE”) are followed by specific instructions.

Page 9 of the Speed Queen none user manual — W359
Page 9 · click to enlarge
Page 9

Save These Instructions

13. Keep area around the exhaust opening and adjacent surrounding area free from the accumulation of lint, dust and dirt.

Important Safety Instructions

WARNING

14. The interior of the tumbler and the exhaust duct should be cleaned periodically by qualified service personnel.

Hazardous Voltage. Can cause shock, burn or cause death. Allow machine power to remain off for two minutes prior to working in and around AC inverter drive.

15. If not installed, operated and maintained in accordance with the manufacturer’s instructions or if there is damage to or mishandling of this product’s components, use of this product could expose you to substances in the fuel or from fuel combustion which can cause death or serious illness and which are known to the State of California to cause cancer, birth defects or other reproductive harm.

W359

1. Read all instructions before using the tumbler.
2. Refer to the Grounding Instructions for the proper grounding of the tumbler.
3. Do not dry articles that have been previously cleaned in, washed in, soaked in, or spotted with gasoline, dry-cleaning solvents, other flammable or explosive substances as they give off vapors that could ignite or explode.
16. Tumbler will not operate with the loading door open. DO NOT bypass the door safety switch to permit the tumbler to operate with the door open. The cylinder will stop rotating when the door is opened. Do not use the tumbler if the cylinder does not stop rotating when the door is opened or starts rotating without pressing or turning the START mechanism. Remove the tumbler from use and call for service.
4. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children. This is a safety rule for all appliances.
5. Before the tumbler is removed from service or discarded, remove the door to the drying compartment and the door to the lint compartment.
17. Do not put articles soiled with vegetable or cooking oil in the tumbler, as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.
6. Do not reach into the tumbler if the cylinder is revolving.
18. To reduce the risk of fire, DO NOT put clothes which have traces of any flammable substances such as machine oil, flammable chemicals, thinner, etc. or anything containing wax or chemicals such as in mops and cleaning cloths, or anything dry-cleaned at home with dry-cleaning solvent in the tumbler.
7. Do not install or store the tumbler where it will be exposed to water and/or weather.
8. Do not tamper with the controls.
9. Do not repair or replace any part of the tumbler, or attempt any servicing unless specifically recommended in the user-maintenance instructions or in published user-repair instructions that you understand and have the skills to carry out.
19. Use the tumbler only for its intended purpose, drying fabrics.
20. ALWAYS disconnect and lockout the electrical power to the tumbler before servicing. Disconnect power by shutting off appropriate breaker or fuse.
10. Do not use fabric softeners or products to eliminate static unless recommended by the manufacturer of the fabric softener or product.
21. Install this tumbler according to the manual. All connections for electrical power, grounding, and gas supply must comply with local codes and be made by licensed personnel when required.
11. To reduce the risk of fire, DO NOT DRY plastics or articles containing foam rubber or similarly textured rubberlike materials.
12. Always clean the lint filter daily.

Safety Information

Page 10 of the Speed Queen none user manual — W055
Page 10 · click to enlarge
Page 10
22. Remove laundry immediately after tumbler stops.
28. DO NOT bypass any safety devices.
29. Solvent vapors from dry-cleaning machines create acids when drawn through the heater of the drying unit. These acids are corrosive to the tumbler as well as to the laundry load being dried. Be sure make-up air is free of solvent vapors.
23. Always read and follow manufacturer’s instructions on packages of laundry and cleaning aids. Heed all warnings or precautions. To reduce the risk of poisoning or chemical burns, keep them out of reach of children at all times (preferably in a locked cabinet).
30. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce bodily injury and/or property damage.
24. Do not tumble fiberglass curtains and draperies unless the label says it can be done. If they are dried, wipe out the cylinder with a damp cloth to remove particles of fiberglass.
25. Always follow the fabric care instructions supplied by the garment manufacturer.

WARNING

To reduce the risk of serious injury, install lockable door(s) to prevent public access to rear of tumblers.

26. Never operate the tumbler with any guards and/or panels removed.
27. DO NOT operate the tumbler with missing or broken parts.

W055

This machine is intended for commerical use.

Safety Information

Page 11 of the Speed Queen none user manual — Specifications and Dimensions
Page 11 · click to enlarge
Page 11

Specifications and Dimensions

Specifications50 Pound75 Pound634 Net Weight: Pounds (kg)545 (247)615 (279)710 (322) Cylinder Size: Inches (mm)37 x 30 (940 x 762)37 x 36 (940 x 914)37 x 36 (940 x 914) Cylinder Capacity (Dry Weight): Pounds (kg)50 (22.7)75 (34)75 (34) Air Outlet Diameter: Inches (mm)8 (203)8 (203)10 (254) Maximum Static Back Pressure: W.C.I. (mbar)0.5 (1.3)0.5 (1.3)0.5 (1.3) Maximum Airflow: C.F.M. (l/sec.)All Models Except EG750 (354)750 (354) CG: 920 (434)1100 (518) EG Models390 (184)500 (236)Not Applicable Gas Models Gas Connection1/2 in. NPT1/2 in. NPT3/4 in. NPT Gas Consumption: Btu/hr (Mj/hr)CG Models120,000 (126.6)165,000 (174.1)215,000 (227) EG Models95,000 (100.2)140,000 (147.7) Electric Models Heating Elements: Watts21,000 (240 V/50 Hertz) 30,000 (other voltages)30,000Not Applicable Steam Models Steam Connection3/4 in. NPT3/4 in. NPTNot Applicable Steam Consumption: Boiler Horsepower (Btu)6 coil (SH Models)4.6 (154,000)4.6 (154,000) 4 coil (SL Models)3.0 (100,400)4.0 (133,900)Not Applicable
Motor Horsepower 50 Pound75 Pound634 Nonreversing1/23/4Not Applicable ReversingFan1/31/31 Cylinder1/31/31/3
Page 12 of the Speed Queen none user manual — E
Page 12 · click to enlarge
Page 12

Cabinet Dimensions

E

B

D

A

T326I

T326I

ModelsABCDE 50CG 50EG 50CE30.75 in. (781 mm)28.25 in. (717 mm)47 in. (1194 mm)76.625 in. (1946 mm)38.625 in. (981 mm) 50CSH 50CSL30.75 in. (781 mm)28.25 in. (717 mm)47 in. (1194 mm)80 in. (2032 mm)38.625 in. (981 mm) 75CG 75EG 75CE30.75 in. (781 mm)28.25 in. (717 mm)53 in. (1346 mm)76.625 in. (1946 mm)38.625 in. (981mm) 75CSH 75CSL30.75 in. (781 mm)28.25 in. (717 mm)53 in. (1346 mm)80 in. (2032 mm)38.625 in. (981 mm) DTB634 STB63430.75 in. (781 mm)28.25 in. (717 mm)53 in. (1346 mm)76.625 in. (1946 mm)38.625 in. (981 mm)

Specifications and Dimensions

Page 13 of the Speed Queen none user manual — Exhaust Outlet Locations
Page 13 · click to enlarge
Page 13

Exhaust Outlet Locations

Speed Queen none — Exhaust Outlet Locations diagram (page 13)
Fig. 3 · Exhaust Outlet Locations

Specifications and Dimensions

Page 14 of the Speed Queen none user manual — STB634
Page 14 · click to enlarge
Page 14

Gas Connection Locations

A

B

T329I

T329I

Models Diameter A B

50CG 50EG 1/2 in. NPT 15.5 in. (394 mm)

65.75 in. (1670 mm)

75CG 75EG 1/2 in. NPT 15.75 in. (400 mm)

65.75 in. (1670 mm)

DTB634

3/4 in. NPT 15.75 in. (400 mm)

65.75 in. (1670 mm)

STB634

Specifications and Dimensions

Page 15 of the Speed Queen none user manual — A
Page 15 · click to enlarge
Page 15

Electrical Connection Locations

A

A

B B

T330I GAS AND STEAM ELECTRIC

T330I

50CG/50EG 50CSH/50CSL 75CG/75EG 75CSH/75CSL DTB634/STB634

(MT/CD) 3 in. (76.2 mm)

(MT/CD) 72 in. (1067 mm)

(OM) 9.5 in. (241 mm)

(OM) 63.5 in. (1613 mm)

50CE/75CE 19 in. (483 mm) 64 in. (1626 mm)

Specifications and Dimensions · Models A B

Page 16 of the Speed Queen none user manual — A
Page 16 · click to enlarge
Page 16

Steam Connection Locations

A

B

D

T328I T328I

Models Diameter A B C D

50CSH 50CSL 3/4 in. NPT 15.25 in. (387 mm)

72.75 in. (1848 mm)

7.5 in. (190 mm)

64.75 in. (1645 mm)

75CSH 75CSL 3/4 in. NPT 15.25 in. (387 mm)

72.75 in. (1848 mm)

7.5 in. (190 mm)

64.75 in. (1645 mm)

Specifications and Dimensions

Page 17 of the Speed Queen none user manual — Pre-Installation Inspection
Page 17 · click to enlarge
Page 17

Installation

Pre-Installation Inspection

Materials Required (Obtain Locally)

Upon delivery, visually inspect the packaging and portions of the product visible through the packaging for shipping damage. If the package or product is damaged, or if signs of possible damage are evident, have the carrier note the condition on the shipping papers before the shipping receipt is signed, or advise the carrier of the condition as soon as it is discovered.

All Models One fused disconnect switch or circuit breaker.

Gas Models One gas shut-off valve for gas service line to each tumbler.

Steam Models One steam shut-off valve for steam

service line to be connected upstream of solenoid steam valve.

Remove the packaging as soon as possible and check the items listed on the packing list. Advise the carrier of any damaged or missing articles as soon as possible. A written claim should be filed with the carrier immediately if articles are damaged or missing.

Two steam shut-off valves for each condensate return line.

Flexible steam hoses with a 125 psig (pounds per square inch gauge) (8.79 kg/sq. cm) working pressure for connecting steam coils. Refer to Figure 15 for sizing and connection configurations.

IMPORTANT: Warranty is void unless tumbler is installed according to instructions in this manual. Installation should comply with minimum specifications and requirements detailed in this manual and with applicable local gas fitting regulations, municipal building codes, water supply regulations, electrical wiring regulations, and any other relevant statutory regulations. Due to varied requirements, applicable local codes should be thoroughly understood and all pre-installation work arranged for accordingly.

Two steam traps for steam coil outlet to condensate return line.

Two vacuum breakers for condensate return lines.

Page 18 of the Speed Queen none user manual — Location Requirements
Page 18 · click to enlarge
Page 18

Location Requirements

A typical tumbler enclosure is shown in Figure 1. Note that the enclosure touches the tumbler top and side panels. Also, note the minimum and maximum dimensions. There may be local codes and ordinances which must be complied with.

The tumbler must be installed on a level floor. Floor covering materials such as carpeting or tile must be removed.

To assure compliance, consult local building code requirements.

Speed Queen none — Location Requirements diagram (page 18)
Fig. 4 · Location Requirements

The tumbler MUST NOT be installed or stored in an area where it will be exposed to water and/or weather.

To reduce the risk of serious injury, install lockable door(s) to prevent public access to rear of tumblers.

Speed Queen none — Location Requirements diagram (page 18)
Fig. 5 · Location Requirements

To reduce the risk of severe injury, clearance of tumbler cabinet from combustible construction must conform to the minimum clearances.

1 Zero Clearance Permitted for First 4 in. (102 mm) 2 4 in. (102 mm) Maximum Header Thickness 3 12 in. (305 mm) Minimum Clearance Permitted for Remainder 4 Guard 5 Provision for Make-Up Air 6 24 in. (610 mm) Minimum – 36 in. (914 mm) Recommended for Maintenance Purposes 7 Zero Clearance

Installation

Page 19 of the Speed Queen none user manual — Metered Models
Page 19 · click to enlarge
Page 19

Position and Level the Tumbler

Installing Accessory Timing Cam

Remove lint panel door, and unscrew the four shipping bolts (one at each corner). Remove tumbler from skid.

Metered Models

Coin drop tumblers have eight accessory cams in the literature packet. These allow you to change your vending times. Refer to Table 1. Timer motor RPM is printed on the timer motor.

Remove four nuts from the literature packet and screw one fully onto each leveling leg.

Speed Queen none — Metered Models diagram (page 19)
Fig. 6 · Metered Models

Screw the four leveling legs (bolts) back into the level adjusting fittings from the bottom.

Slide tumbler to its permanent location. Adjust the leveling legs until the unit is level within 1/8 inch (32 mm). Tumbler must not rock. Lock leveling legs with nuts previously installed.

Speed Queen none — Metered Models diagram (page 19)
Fig. 7 · Metered Models

Installation · Table 1

Page 20 of the Speed Queen none user manual — T039I
Page 20 · click to enlarge
Page 20

Removal of Existing Timing Cam

4. Remove all accumulated time by turning cam counterclockwise until switch shuts off. Apply moderate clockwise pressure to fully seated timing cam and drive against the timing motor shaft. Meter must be advanced electrically for one cycle before an accurate measure of time can be made.
1. Rotate cam by hand until “V” notch lines up beneath the ratchet tooth. Refer to Figure 3 .
2. Insert narrow screwdriver under nylon cam, close to the clock shaft. Lift gently off shaft. Make sure that pressure is directed upward and that the “V” notch clears the ratchet tooth.

Installation of New Timing Cam

1. Insert drive fork into timing cam with wide prong in wide hole of cam.
2. Position timing cam and drive fork over the timer shaft, aligning the timer flat with the drive fork and the “V” notch with one of the ratchet teeth.
3. Press timing cam down firmly to seat timing cam onto the motor shaft.

T039I

T039I

1 Line Up Notch to Clear Ratchet Tooth 2 Lift Gently with Narrow Blade

Installation

Page 21 of the Speed Queen none user manual — Before Placing Tumbler into Service
Page 21 · click to enlarge
Page 21

Before Placing Tumbler into Service

8. Load the cylinder with a full load of clean rags and run to remove oil or dirt from cylinder.
1. Remove or open all panels and check accessible bolts, nuts, screws, terminals and fittings for tightness.
9. Check the airflow switch operation by opening the lint panel. The heating systems should shut off when the lint panel is opened a maximum of 1-1/2 inches (38 mm).
2. Check belt tension and adjust if necessary. Refer to Adjustments Section.

The airflow switch operation may be affected by shipping tape still in place, lack of make-up air, or an obstruction in the exhaust duct. These should be checked and the required corrective action taken before attempting to adjust the airflow switch. To adjust the airflow switch refer to Adjustments Section.

3. Replace all panels and guards.
4. Turn on electrical supply to tumbler.
5. Open the supply valve for gas or steam heated tumblers.
6. After performing the previous checks, start the tumbler by pressing START. (Refer to the Operating Manual for detailed instructions.) Release the start button and open the loading door. The cylinder should stop rotating within seven seconds after the door is opened.
Speed Queen none — Before Placing Tumbler into Service diagram (page 21)
Fig. 8 · Before Placing Tumbler into Service

The tumbler must not be operated if the airflow switch does not operate properly. Faulty airflow switch operation may cause an explosive gas mixture to collect in the tumbler.

7. Gas models: Start the tumbler and check the burner flame. Adjust the air inlet shutter as required. Refer to Adjustments Section.

IMPORTANT: Refer to Table 2. The electronic ignition system will attempt to light the gas by sparking for the “trial for ignition” period. If gas does ignite within this period, the ignition control will go into a safety lockout and the valve will no longer open until the control is reset. It may be necessary to reset several times to bleed air out of gas lines. To restart open and close loading door and restart unit.

10. Wipe out the cylinder using an all-purpose cleaner or detergent and water solution. Refer to Figure 4 .
Speed Queen none — Before Placing Tumbler into Service diagram (page 21)
Fig. 9 · Before Placing Tumbler into Service
Speed Queen none — Before Placing Tumbler into Service diagram (page 21)
Fig. 10 · Before Placing Tumbler into Service

If the tumbler does not meet ANY of the above requirements, remove tumbler from use. Refer to Removing Tumbler from Service Section.

If lockout condition persists, check that the manual gas shut-off valve is in the ON position and that the gas service is properly connected. If condition still persists, remove tumbler from service.

Installation · Table 2

Page 22 of the Speed Queen none user manual — Required for CE Marked (European) Models Only
Page 22 · click to enlarge
Page 22

Required for CE Marked (European) Models Only

Once machine is installed, please be sure to complete the following items:

  • Review and verify machine operation with customer.
  • Leave all literature and a signed Declaration of Conformity with customer.
  • Review machine warranty information with customer.
  • Apply warning sticker on front panel of machine, in language appropriate to country of sale (included in literature packet).

Installation

Page 23 of the Speed Queen none user manual — W002
Page 23 · click to enlarge
Page 23

Installing Gas Drying Tumblers in the European Union (EU)

Models are built in three different configurations:

  • Regulated Natural Gas – Injector is sized for Natural Gas, second family, group H (E) at 20 mbar inlet pressure. Regulator/governor is operational. Gas valve CAN be field-converted to a non-regulating type.

WARNING

  • To reduce the risk of electric shock, fire, explosion, serious injury or death:
  • Disconnect electric power to the tumbler before servicing.
  • Close gas shut-off valve to gas tumbler before servicing.
  • Close steam valve to steam tumbler before servicing.
  • Never start the tumbler with any guards/ panels removed.
  • Whenever ground wires are removed during servicing, these ground wires must be reconnected to ensure that the tumbler is properly grounded.
  • Unregulated Natural Gas – Injector is sized for Natural Gas, second family, group E+ at 20.25 mbar inlet pressure. Regulator/governor is blocked open. Gas valve CAN be field-converted to a regulating type.
  • Unregulated L.P. (Liquified Petroleum) Gas – Injector is sized for L.P. Gas, third family, group 3+ at 28.37 mbar inlet pressure. Regulator/ governor is blocked open. Gas valve CAN be field-converted to a regulating type.

Serial plates supplied from the factory are configured for one of the three gases for the countries of GB/IE/ PT/ES/IT. This information pertains to situations when the country of use or gas supply is different than that on the serial plate.

W002

General Information

This information is to be used when installing gas tumblers in countries and/or on gases different than the machine’s factory configuration. Tumblers are supplied from the factory for operaton on Natural Gas or L.P. Gas in the countries of GB/IE/PT/ES/IT. To install machines in any other country or on any other gas requires some level of modification.

Table 3, Table 4 and Table 5 describe the different gases that are available in different EU countries, and how the machines need to be configured to operate with those gases. In the EU, there are Natural Gases that do not allow for machine regulation, and L.P. Gases that must be regulated. For L.P. Gas, third family B/P at 50 mbar, order Regulated Natural Gas machines and convert according to tables.

Installation

Page 24 of the Speed Queen none user manual — Specific Conversion Procedures
Page 24 · click to enlarge
Page 24

Basic Configuration

Speed Queen none — Basic Configuration diagram (page 24)
Fig. 11 · Basic Configuration
1. Determine the necessary conversion operations to convert from the factory-supplied configuration to the desired configuration.
2. Perform the conversions required so the machine is properly configured for the desired country and gas (refer to Specific Conversion Procedures Section):
  • How to Convert Gas Valve from Regulated to Unregulated
  • How to Change Injector (Orifice) Size
  • How to Adjust Gas Valve Governor/Regulator
3. If applicable, peel off the appropriate country sticker from Part No. 503382 (included with machine) and apply it to the serial plate over the existing country information. Refer to Figure 9 .

1 Gas Shut-Off Valve (Ahead of pressure tap) 2 Pressure Tap 3 Gas Shut-Off Valve (Shown in closed position)

4. If applicable, peel off the appropriate conversion sticker from Part No. M413800 (included with machine) and apply it to the serial plate over the “ADJUSTED FOR GAS: ” information. Refer to Figure 9 .

Specific Conversion Procedures

How to Convert Gas Valve from Regulated to Unregulated

Speed Queen none — Specific Conversion Procedures diagram (page 24)
Fig. 12 · Specific Conversion Procedures

When converting the tumbler to a different gas or pressure, first verify that the supply inlet pressure is equipped with a pressure regulator (located ahead of the tumbler) that will maintain the gas supply at the inlet pressure specified.

Johnson G96 Gas Valve:

a. Disconnect electrical power from tumbler.

Close gas shut-off valve to tumbler. Refer to Figure 5.

b. Follow instructions in Conversion Kit, Part

No. M400763 (Johnson Part No. Y71AA-5C).

c. Change injector size as required by the

appropriate table according to How to Change Injector (Orifice) Size.

d. Commission tumbler for use.

Installation

Page 25 of the Speed Queen none user manual — 1
Page 25 · click to enlarge
Page 25
Speed Queen none — 1 diagram (page 25)
Fig. 13

1 Burner 7 Nut 2 Gas Valve 8 Anti-Torque Ring 3 Regulator Plate 9 Manifold Pipe 4 Gasket 10 Spud Holder 5 Plate 11 Burner Orifice 6 Regulator Cap

How to Change Injector (Orifice) Size

3. Install the new, correct injector(s) (orifices). Refer to Figure 8 . Torque each to 9-10 Nm.
1. Disconnect electrical power from tumbler. Close gas shut-off valve to tumbler. Refer to Figure 5 .
4. Reinstall spud holder assembly to gas valve, making certain orifice(s) are in line with burner tube opening. Refer to Figure 6 .
2. Remove gas valve.

Johnson G96 Gas Valve – Unscrew spud holder nut near gas valve. Refer to Figure 7. Remove the burner orifice(s) from spud holder. Refer to Figure 6.

5. Commission tumbler for use.

Installation

Page 26 of the Speed Queen none user manual — 1
Page 26 · click to enlarge
Page 26
Speed Queen none — 1 diagram (page 26)
Fig. 14

1 Burner Tube Attaching Screws 6 Spud Holder Nut 2 Burner Support Bracket 7 Spud Holder 3 Pressure Tap 8 Pressure Tap (Alternate location) 4 Gas Valve 9 Manometer 5 Gas Valve Flange

How to Adjust Gas Valve Governor/Regulator

Speed Queen none — 1 diagram (page 26)
Fig. 15
1. Check gas injector (manifold) pressure as follows. Refer to Figure 7 .
2. Remove screw plug from inside pressure tap.
3. Connect a “U”-tube manometer (or similar pressure gauge) to the injector (manifold) pressure tap.
4. Start tumbler and note pressure once flame is burning. Remove regulator cap and adjust regulator screw until the injector pressure per applicable table is achieved. Replace regulator cap. Refer to Figure 6 .

Installation

Page 27 of the Speed Queen none user manual — B/P
Page 27 · click to enlarge
Page 27

Model 50CG

Gas Type GB IE PT ES IT DK NO SE FI DE NL BE FR AT

Inject.

0 Inject. Qty & Part. No.

Inlet Press.

Gvnr./ Regltr.

Inject. Press.

1 2nd family Group H

3.7 mm 2 M401000 20 mbar Yes 8.9 mbar

(E)

Nat. Gas

3 2nd family Group L

3.7 mm 2 M401000 25 mbar Yes 12.6 mbar

(LL)

4 4 2nd family Group E+ 3.0 mm 2 M401017

20.25 mbar No Unreg.

5 3rd family Group

2.1 mm 2 M401003 30 mbar No Unreg.

B/P

L.P. Gas

6 6 3rd family Group

2.1 mm 2 M401003 50 mbar Yes 28.5 mbar

B/P

7 8 8 3rd family Group 3+ 2.1 mm 2 M401033

28.37 mbar No Unreg.

6. Order as Regulated Natural Gas. Convert with regulator spring kit Part No. M411334 and (2) 2.1 mm injectors Part No. M401003. Apply appropriate country and gas stickers.
1. Order as Regulated Natural Gas. No modification needed.
7. Order as Unregulated L.P. Gas. No modification needed.
2. Order as Regulated Natural Gas. Apply appropriate country sticker.
8. Order as Unregulated L.P. Gas. Apply appropriate country sticker.
3. Order as Regulated Natural Gas. Apply appropriate country and gas stickers.

OPEN – No Approval available.

4. Order as Unregulated Natural Gas. Apply appropriate country sticker.

Special Cases – Regulated Gas Valve may be converted to Unregulated with block-open kit Part No. M400763.

5. Order as Unregulated L.P. Gas. Apply appropriate country sticker.
Show 4 more labels / short text on this page
Installation · Gas Family & · Group · Table 3
Page 28 of the Speed Queen none user manual — B/P
Page 28 · click to enlarge
Page 28

Model 50EG Input: 27.8 kW

Gas Type GB IE PT ES IT DK NO SE FI DE NL BE FR AT

Inject.

0 Inject. Qty & Part. No.

Inlet Press.

Gvnr./ Regltr.

Inject. Press.

2nd family Group H

(E)

Nat. Gas

2nd family Group L

(LL)

2nd family Group E+

5 3rd family Group

1.8 mm 2 M401018 30 mbar No Unreg.

B/P

L.P. Gas

B/P

7 8 8 3rd family Group 3+ 1.8 mm 2 M401018

28.37 mbar No Unreg.

5. Order as Unregulated L.P. Gas. Apply appropriate country sticker.
7. Order as Unregulated L.P. Gas. No modification needed.
8. Order as Unregulated L.P. Gas. Apply appropriate country sticker.

OPEN – No Approval available.

Special Cases – Natural Gas not available as a factory order.

Show 5 more labels / short text on this page
Installation · Gas Family & · Group · 3rd family Group · Table 4
Page 29 of the Speed Queen none user manual — B/P
Page 29 · click to enlarge
Page 29

Model 75CG Input: 48.3 kW

Gas Type GB IE PT ES IT DK NO SE FI DE NL BE FR AT

Inject.

0 Inject. Qty & Part. No.

Inlet Press.

Gvnr./ Regltr.

Inject. Press.

1 2nd family Group H

3.6 mm 2 M401014 20 mbar Yes 8.9 mbar

(E)

Nat. Gas

3 2nd family Group L

3.6 mm 2 M401014 25 mbar Yes 12.6 mbar

(LL)

4 4 2nd family Group E+ 2.9 mm 2 M402444

20.25 mbar No Unreg.

5 3rd family Group

2.0 mm 2 M400999 30 mbar No Unreg.

B/P

L.P. Gas

6 6 3rd family Group

2.0 mm 2 M400999 50 mbar Yes 28.5 mbar

B/P

7 8 8 3rd family Group 3+ 2.0 mm 2 M400999

28.37 mbar No Unreg.

6. Order as Regulated Natural Gas. Convert with regulator spring kit Part No. M411334 and (3) 2.0 mm injectors Part No. M400999. Apply appropriate country and gas stickers.
1. Order as Regulated Natural Gas. No modification needed.
7. Order as Unregulated L.P. Gas. No modification needed.
2. Order as Regulated Natural Gas. Apply appropriate country sticker.
8. Order as Unregulated L.P. Gas. Apply appropriate country sticker.
3. Order as Regulated Natural Gas. Apply appropriate country and gas stickers.

OPEN – No Approval available.

4. Order as Unregulated Natural Gas. Apply appropriate country sticker.

Special Cases – Regulated Gas Valve may be converted to Unregulated with block-open kit Part No. M400763.

5. Order as Unregulated L.P. Gas. Apply appropriate country sticker.
Show 4 more labels / short text on this page
Installation · Gas Family & · Group · Table 5
Page 30 of the Speed Queen none user manual — APPLICATION OF STICKERS TO SERIAL PLATE
Page 30 · click to enlarge
Page 30
Speed Queen none — APPLICATION OF STICKERS TO SERIAL PLATE diagram (page 30)
Fig. 16

Installation

Page 31 of the Speed Queen none user manual — Make-Up Air
Page 31 · click to enlarge
Page 31

Exhaust Requirements

Make-up air openings in rooms containing tumbler(s) and/or gas fired hot water heater or other gravity vented appliances must be increased sufficiently to prevent downdrafts in any of the vents when all tumblers are in operation. Do not locate gravity vented appliances between tumbler(s) and make-up air openings. If it is necessary to duct make-up air to tumbler(s), increase area of ductwork by 25% to compensate for restrictions in airflow.

WARNING

A drying tumbler produces combustible lint. To reduce the risk of fire, the tumbler must be exhausted to the outdoors.

W057 To reduce the risk of fire and accumulation of combustible gases, DO NOT exhaust tumbler air into a window well, gas vent, chimney or enclosed, unventilated area such as an attic wall, ceiling, crawl space under a building, or concealed space of a building.

Venting

For maximum efficiency and minimum lint accumulation, tumbler air must be exhausted to the outdoors by the shortest possible route.

W059

Proper sized exhaust ducts are essential for proper operation. All elbows should be sweep type. Exhaust ducts must be assembled so the interior surfaces are smooth, so the joints do not permit the accumulation of lint. DO NOT use plastic or thin foil flexible ducts. Use exhaust ducts made of sheet metal or other noncombustible material. Use duct tape on all joints.

Layout

Whenever possible, install tumblers along an outside wall where duct length can be kept to a minimum, and make-up air can be easily accessed. Construction must not block the airflow at the rear of the tumbler. Doing so would prevent adequate air supply to the tumbler combustion chamber.

Verify that old ducts are thoroughly cleaned out before installing new tumbler.

Make-Up Air

Improperly sized or assembled ductwork causes excess back pressure which results in slow drying, lint collecting in the duct, lint blowing into the room, and increased fire hazard.

A tumbler is forced air exhausted and requires provisions for make-up air to replace air exhausted by tumbler. Refer to Table 6.

Exhaust ducts shall be constructed of sheet metal or other noncombustible material. Such ducts must be equivalent in strength and corrosion resistance to ducts made of galvanized sheet steel not less than 0.0195 inches (0.495 mm) thick.

Required Make-Up Air Opening (to the outside) for Each Tumbler

Where the exhaust duct pierces a combustible wall, ceiling, floor or partition an opening having a diameter of 4 inches (102 mm) larger than the diameter of the exhaust duct shall be provided, with the duct centered in the opening. The space around the duct may be sealed with noncombustible material. Refer to Figure 10.

50 Pound 144 in2 (928 cm2)

75 Pound 195 in2 (1258 cm2)

634 250 in2 (1613 cm2)

Make-up air openings with louvers will restrict airflow. The opening must be increased to compensate for area taken up by louvers.

Model Opening · Table 6

Page 32 of the Speed Queen none user manual — Equivalent Length = 14 ft. + (2) 90° elbows
Page 32 · click to enlarge
Page 32

Individual Venting

Speed Queen none — Individual Venting diagram (page 32)
Fig. 17 · Individual Venting

For maximum efficiency and performance, it is preferred to exhaust tumbler(s) individually to the outdoors.

8 in. (203 mm) 10 in. (254.0 mm) 12 in. (304.8 mm) 14 in. (355.6 mm) 16 in. (406.4 mm) 18 in. (457.2 mm)

One 90° elbow = 9.3 ft. (2.83 m) One 90° elbow = 11.6 ft. (3.5 m) One 90° elbow = 14 ft. (4.3 m) One 90° elbow = 16 ft. (4.9 m) One 90° elbow = 18.7 ft. (5.7 m) One 90° elbow = 21 ft. (6.4 m)

The exhaust duct must be designed so the static back pressure measured 12 inches (305 mm) from the exhaust outlet does not exceed the maximum allowable pressure specified on the installation sticker on the rear of the tumbler. Static back pressure must be measured with the tumbler running (both pockets on stacked models).

Equivalent Length (feet) = 1.17 x Duct Diameter (inches)

Example: A 12 inch diameter duct’s equivalent length of 14 feet of duct and two 90° elbows is:

Equivalent Length = 14 ft. + (2) 90° elbows

The maximum allowable length of venting of the same diameter as the exhaust thimble is 14 feet (4.3 m) and two 90° elbows or equivalent. If the equivalent length of a duct required for an installation exceeds the maximum allowable equivalent length, the diameter of a round duct must be increased by 10% for each additional 20 feet (6.1 meters). Cross section area of a rectangular duct must be increased by 20% for each additional 20 feet (6.1 meters). Refer to Table 7 to determine equivalent venting.

= 14 ft. + 14 ft. + 14 ft. = 42 ft. (12.8 m)

With the tumbler in operation, airflow at any point in the duct should be at least 1200 feet per minute (366 meters per minute) to ensure that lint remains airborne. If 1200 feet per minute cannot be maintained, schedule a regular inspection and cleaning of the ductwork.

Speed Queen none — Equivalent Length = 14 ft. + (2) 90° elbows diagram (page 32)
Fig. 18 · Equivalent Length = 14 ft. + (2) 90° elbows

Consult your local building code for regulations which may also apply. NOTE: Inside of duct shall be smooth. Do not use sheet metal screws to join sections.

1 No Screen or Cap 2 Wall 3 Clearance per Local Codes 4 NOTE: Where the exhaust duct pierces a combustible wall or ceiling, the opening must be sized per local codes. 5 Minimum Distance Between Opening and Roof: 36 in. (914 mm).

Exhaust Requirements · Table 7

Page 33 of the Speed Queen none user manual — T438I
Page 33 · click to enlarge
Page 33

Manifold Venting

With the tumbler in operation, airflow at any point in the duct should be at least 1200 feet per minute (366 meters per minute) to ensure that lint remains airborne. If 1200 feet per minute cannot be maintained, schedule a regular inspection and cleaning of the ductwork.

While it is preferable to exhaust tumblers individually to the outdoors, a main collector duct may be used if it is sized according to Figure 12. This illustration indicates minimum diameters, and should be increased if the collector length exceeds 14 feet (4.2 meters) and two 90° elbows. The diameter of a round duct must be increased by 10% for each additional 20 feet (6.1 meters). Cross sectional area of a rectangular or square duct must be increased 20% for each additional 20 feet (6.1 meters). Refer to Table 8 to determine equivalent ducting sizing. The collector duct may be rectangular or square in cross section, as long as the area is not reduced. Provisions MUST be made for lint removal and cleaning of the collector duct.

The collector system must be designed so the static back pressure measured 12 inches (305 mm) from the exhaust outlet does not exceed the maximum allowable pressure specified on the installation sticker on the rear of tumbler. This must be measured with all tumblers vented into the collector operating.

The vent collector system must be designed so the static back pressure measured 12 inches (305 mm) from the exhaust outlet does not exceed the maximum allowable pressure specified on the installation sticker on the rear of tumbler. Static back pressure must be measured with all tumblers vented into the collector operating.

T438I

Never connect a tumbler duct at a 90° angle to the collector duct. Refer to Figure 11. Doing so will cause excessive back pressure, resulting in poor performance. Never connect two tumbler exhaust ducts directly across from each other at the point of entry to the collector duct.

Exhaust Requirements · T438i

Page 34 of the Speed Queen none user manual — D1 D2 D1 D2
Page 34 · click to enlarge
Page 34
Speed Queen none — L diagram (page 34)
Fig. 19

L K J I H G F E D C B A

T472I 1 NOTE: Where the exhaust duct pierces a combustible wall or ceiling, the opening must be sized per local codes. 2 Outlet Duct Diameter for One Battery Same as Largest Station Used 3 Outlet Duct Diameter for Two Batteries 4 45° Typical

8 Inch Duct 10 Inch Duct

50, 75 Pound 634

D1 D2 D1 D2

A 10 in. (254 mm) 13 in. (330 mm) 10 in. (254 mm) 15 in. (381 mm)

B 12 in. (305 mm) 17 in. (432 mm) 15 in. (381 mm) 22 in. (559 mm)

C 15 in. (381 mm) 18 in. (457 mm) 18 in. (457 mm) 26 in. (660 mm)

D 17 in. (432 mm) 24 in. (610 mm) 21 in. (533 mm) 30 in. (762 mm)

E 19 in. (483 mm) 27 in. (686 mm) 24 in. (610 mm) 34 in. (864 mm)

F 21 in. (533 mm) 30 in. (762 mm) 26 in. (660 mm) 37 in. (940 mm)

G 23 in. (584 mm) 33 in. (838 mm) 28 in. (711 mm) 40 in. (1016 mm)

H 25 in. (635 mm) 34 in. (864 mm) 30 in. (762 mm) 43 in. (1092 mm)

I 26 in. (660 mm) 37 in. (940 mm) 32 in. (813 mm) 46 in. (1168 mm)

J 27 in. (686 mm) 39 in. (991 mm) 33 in. (838 mm) 47 in. (1194 mm)

K 29 in. (737 mm) 40 in. (1016 mm) 35 in. (889 mm) 50 in. (1270 mm)

L 30 in. (762 mm) 42 in. (1067 mm) 36 in. (914 mm) 51 in. (1295 mm)

Exhaust Requirements · Duct Station · Table 8

Page 35 of the Speed Queen none user manual — W062
Page 35 · click to enlarge
Page 35

Gas Requirements

Obtain specific gas service pipe size from the gas supplier. Refer to Table 9 for general pipe size.

WARNING

A dirt and water vapor pipe trap must be furnished and installed. Refer to Figure 13.

To reduce the risk of fire or explosion, DO NOT CONNECT THE GAS LINE TO THE TUMBLER IF THE GAS SERVICE IS NOT THE SAME AS THAT SPECIFIED ON THE TUMBLER SERIAL PLATE! It will first be necessary to convert the gas burner orifice and gas valve. Appropriate conversion kits are available.

Install a 1 inch (25.4 mm) pipe gas loop to maintain equal pressure at all gas connections. Refer to Figure 14.

An in-line pressure regulator may be required on Natural Gas models if the line pressure exceeds 8 water column inches (2.00 kPa) pressure with all gas appliances firing.

W060

WARNING

To reduce the risk of fire or explosion, if the tumbler is to be connected to Liquefied Petroleum (L.P.) gas, a vent to the outdoors must be provided in the room where the tumbler is installed.

W062

NATURAL GAS service must be supplied at 7.0 ± 1.5 inch water column pressure (1.74 ± 0.37 kPa).

L.P. (Liquefied Petroleum) GAS service must be supplied at 11 ± 0.3 inch water column pressure (2.74 ± 0.07 kPa).

EUROPEAN GASES – The above data for Natural and L.P. Gas does not apply in the EU. Refer to Installing Gas Drying Tumblers in the European Union.

  • with the latest edition of the “National Fuel Gas Code,” ANSI Z223.1/NFPA 54 in the U.S.A.,

Pressure checks can be made at the shut-off valve. Refer to Figure 13.

  • with CSA-B149.1 or Natural Gas and Propane Installation Code in Canada,
  • and Australian Gas Association/Australian L.P. Gas Association requirements in Australia.
Page 36 of the Speed Queen none user manual — 1
Page 36 · click to enlarge
Page 36

Turn on gas and check all pipe connections (internal and external) for gas leaks with a non-corrosive leak detection fluid. Purge air in gas service line by operating the tumblers in the drying mode. If burner does not light and unit goes into lockout, open and close the door and restart. Repeat these steps until burner ignites. Use pipe compound, resistant to actions of L.P. Gas, on all pipe threads.

Speed Queen none — 1 diagram (page 36)
Fig. 20
Speed Queen none — 1 diagram (page 36)
Fig. 21

Do not use an open flame to check for gas leaks! To reduce the risk of explosion or fire check all pipe connections, internal and external, for gas leaks using a non- corrosive leak detection fluid. Check gas connections annually for leakage.

1 Gas Line to Tumbler 2 1/8 in. NPT Plug 3 Gas Supply Piping System 4 Gas “T” Fitting 5 6 in. (152 mm) Minimum Gas Pipe 6 Gas Pipe Cap 7 Dirt and Water Vapor Trap 8 Shut-Off Valve

Gas Requirements

Page 37 of the Speed Queen none user manual — SAMPLE CALCULATIONS:
Page 37 · click to enlarge
Page 37

Gas Supply Pipe Looping and Sizing

T494I

1 Gas Furnace (120,000 Btu/hr) 2 Gas Water Heaters (400,000 Btu/hr each) 3 Gas Space Heaters (70,000 Btu/hr each) 4 19 ft. (5.8 m) 5 25 ft. (7.6 m) 6 Main Regulator 7 Gas Meter 8 Pressure Regulator (If required) 9 Gas Tumblers (120,000 Btu/hr each) 10 Gas Line Pressure Tap 11 1 in. (25.4 mm) Gas Pipe Loop 12 NOTE: Minimum Pipe Size is 1/2 in. (12.7 mm) 13 Shut-Off Valves

SAMPLE CALCULATIONS:

Equivalent length = Total length of main gas supply pipe to the far end of the tumblers.

= 25 ft. + 19 ft. (7.6 m + 5.8 m) gas supply pipe = 44 ft. (13.4 m) Total Gas Line Total Btu/hr = The sum of the Btu/hr of all tumblers being fed by the main gas supply pipe. = 9 x 120,000 = 1,080,000 Btu/hr Using Table 9, the main supply pipe diameter should be 2 in. (51 mm).

Gas Requirements

Page 38 of the Speed Queen none user manual — Table 9
Page 38 · click to enlarge
Page 38

Gas Pipe Size Required for 1000 Btu Natural Gas — 0.64 Specific Gravity at 7 ± 1.5 inch (1.62 ± .37 kPa) Water Column Pressure

25 feet (7.63 m)

50 feet (15.25 m)

75 feet (22.88 m)

100 feet (30.50 m)

125 feet (38.13 m)

150 feet (45.75 m)

Gas Appliances Total Btu/hr.

Based on 0.3 in. Water Column Pressure Drop for Length Given

Sizes shown are in inches (mm)

100,000 120,000 140,000 160,000 180,000 200,000 300,000 400,000 500,000 600,000 700,000 800,000 900,000 1,000,000 1,100,000 1,200,000 1,300,000 1,400,000 1,500,000 1,600,000 1,700,000 1,800,000 1,900,000 2,000,000 2,200,000 2,400,000 2,600,000 2,800,000 3,000,000

.75 (19.05) .75 (19.05) .75 (19.05) .75 (19.05)

.75 (19.05)

1 (25.40) 1 (25.40) 1 (25.40) 1 (25.40) 1 (25.40) 1.25 (31.75) 1.25 (31.75) 1.5 (38.10) 1.5 (38.10) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3.5 (88.90)

1 (25.40) 1 (25.40) 1 (25.40) 1.25 (31.75) 1.25 (31.75) 1.25 (31.75) 1.5 (38.10) 1.5 (38.10) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3.5 (88.90) 3.5 (88.90) 3.5 (88.90)

1 (25.40) 1 (25.40) 1 (25.40) 1.25 (31.75) 1.25 (31.75) 1.25 (31.75) 1.5 (38.10) 1.5 (38.10) 2 (50.80) 2 (50.80) 2 (50.80) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3.5 (88.90) 3.5 (88.90) 3.5 (88.90) 3.5 (88.90) 3.5 (88.90)

1 (25.40) 1 (25.40) 1.25 (31.75) 1.25 (31.75) 1.25 (31.75) 1.5 (38.10) 1.5 (38.10) 2 (50.80) 2 (50.80) 2 (50.80) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3.5 (88.90) 3.5 (88.90) 3.5 (88.90) 3.5 (88.90) 3.5 (88.90) 4 (101.60)

1 (25.40) 1 (25.40) 1 (25.40) 1 (25.40) 1 (25.40) 1.25 (31.75) 1.25 (31.75) 1.5 (38.10) 1.5 (38.10) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20) 3 (76.20)

1 (25.40) 1 (25.40) 1 (25.40) 1.25 (31.75) 1.25 (31.75) 1.5 (38.10) 1.5 (38.10) 1.5 (38.10) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2 (50.80) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50) 2.5 (63.50)

  • with the latest edition of the “National Fuel Gas Code,” ANSI Z223.1/NFPA 54 in the U.S.A.,
  • with CSA-B149.1 or Natural Gas and Propane Installation Code in Canada,
  • and Australian Gas Association/Australian L.P. Gas Association requirements in Australia.

Gas Requirements · Equivalent Length · Table 9

Page 39 of the Speed Queen none user manual — 4001-6000 1221-1830 43 0.0890 2.3 M406184 180,600
Page 39 · click to enlarge
Page 39

High Altitude Orifice Sizing

For proper operation at altitudes above 2000 feet (610 meters), the gas orifice size must be reduced to ensure complete combustion. Refer to Table 10 for non-CE Marked models. (For CE Marked models, consult local gas supplier.)

Altitude Orifice New Rate

feet meters No. inches mm Quantity Part Number (Btu/hr)*

Natural Gas 2001-4000 610-1830 30 0.1285 3.3

M401021 87,400

4001-6000 1831-2440 31 0.1200 3.0 M401017 72,200

6001-10,000 2441-3050 32 0.1160 2.9 M402444 64,600

50EG

L.P. Gas 2001-4000 610-1220 47 0.0785 2.0 M400999 87,400

4001-6000 1221-1830 48 0.0760 1.9 M401001 79,800

6001-8000 1831-2440 49 0.0730 1.8 M401018 72,200

8001-10,000 2441-3050 50 0.0700 1.8 M401016 64,600

Natural Gas 2001-4000 610-1830 28 0.1405 3.6

M401014 110,400

4001-6000 1831-2440 29 0.1360 3.4 M400997 100,800

6001-10,000 2441-3050 30 0.1285 3.3 M401021 91,200

50CG

L.P. Gas 2001-4000 610-1220 44 0.0860 2.2 M401011 110,400

4001-6000 1221-1830 45 0.0820 2.1 M401027 100,800

6001-8000 1831-2440 46 0.0810 2.1 M401003 91,200

8001-10,000 2441-3050 47 0.0785 2.0 M400999 81,600

Natural Gas 2001-4000 610-1830 29 0.1360 3.4

M400997 151,800

4001-6000 1831-2440 30 0.1285 3.3 M401021 138,600

6001-10,000 2441-3050 31 0.1200 3.0 M401017 125,400

75CG

L.P. Gas 2001-4000 610-1220 45 0.0820 2.1 M401027 151,800

4001-6000 1221-1830 46 0.0810 2.1 M401003 138,600

6001-8000 1831-2440 47 0.0785 2.0 M400999 125,400

8001-10,000 2441-3050 48 0.0760 1.9 M401001 112,200

Natural Gas 2001-4000 610-1220 23 0.1540 3.9

M401020 197,800

4001-6000 1221-1830 25 0.1495 3.8 M402997 180,600

6001-8000 1831-2440 27 0.1440 3.7 M400998 163,400

8001-10,000 2441-3050 29 0.1360 3.4 M400997 146,200

L.P. Gas 2001-4000 610-1220 42 0.0935 2.4 M403017 197,800

4001-6000 1221-1830 43 0.0890 2.3 M406184 180,600

6001-8000 1831-2440 44 0.0860 2.2 M401011 163,400

8001-10,000 2441-3050 45 0.0820 2.1 M401027 146,200

* Btu/hr derate of 4% per 1000 feet (305 meters) of altitude.

Gas Requirements · Model Gas · Table 10

Page 40 of the Speed Queen none user manual — W427
Page 40 · click to enlarge
Page 40

Steam Requirements

Obtain specific steam service pipe sizes from steam system supplier or a qualified steam fitter.

Piping Recommendations

  • Trap each steam coil individually. Always keep the trap clean and in good working condition.
  • Refer to Figure 15 for proper steam pipe configurations.
  • When tumbler is on the end of a line of equipment, extend header at least 4 feet (1.2 meters) beyond tumbler. Install shut-off valve, union, check valve and bypass trap at end of line. If gravity return to boiler, omit trap.
  • To prevent condensate draining from headers to tumbler, piping should have a minimum 12 inch (305 mm) rise above respective header. Do not make steam connection to header with a horizontal or downward facing tee or elbow.
  • Insulate steam supply and return lines for safety of operator and safety while servicing tumbler.
  • Whenever possible, horizontal runs of steam lines must drain, by gravity, to respective steam header. Water pockets, or an improperly drained steam header will provide wet steam, causing improper operation of tumbler. If pockets or improper drainage cannot be eliminated, install a bypass trap to drain condensate from the low point in the steam header to the return.
  • Keep tumbler in good working condition. Repair or replace any worn or defective parts.

Machines require a (constant) 80 to 100 psig (pounds per square inch gauge) (5.62 to 7.03 kg/sq. cm) steam service for optimum operation.

  • In both steam supply and steam return line, it is recommended that each have a pipe union and globe valve. This will enable you to disconnect the steam connections and service the tumbler while your laundry facility is in operation.

WARNING

All system components must have a 125 psig (10 bar) working pressure. Shut-off gate valves must be installed upstream of the steam solenoid valve and downstream of each steam trap so components can be isolated for maintenance or emergency purposes.

  • Before connecting trap and check valve to tumbler, open shut-off valve in steam supply line and allow steam to flow through tumbler to flush out any dirt and scale from tumbler. This will assure proper operation of trap when connected.

All components (solenoid valve, traps) must be supported to minimize loads on the tumbler steam coil connections.

  • After flushing system, install vacuum breaker, inverted bucket trap (with built-in strainer) and check valve. For successful operation of tumbler, install trap 18 inches (457 mm) below coil and as near to the tumbler as possible. Inspect trap carefully for inlet and outlet markings and install according to trap manufacturer's instructions. If steam is gravity returned to boiler, omit trap but install vacuum breaker and check valve in return line near tumbler. Gravity return requires entire return plumbing be below steam coil outlets.

W427

  • Install union and shut-off valve in return line and make final pipe connections to return header.
Page 41 of the Speed Queen none user manual — W066
Page 41 · click to enlarge
Page 41

Installing Steam Trap and Making Condensate Return Connections

WARNING

The steam trap must be installed and the coil outlet connections must be connected to the condensate return lines. The following steps outline the procedure for installing the steam trap and connecting the condensate return lines. Refer to Figure 15 for typical installations.

The flexible steam hoses connecting the coil outlet connections and steam traps must have a minimum of 125 psig (pounds per square inch gauge) (8.79 kg/ sq. cm.) working pressure. A shut-off valve must be installed downstream from each steam trap so the condensate return line can be isolated in event a steam trap requires maintenance.

1. Connect a flexible hose to each steam coil outlet .
2. Install a strainer to the ends of each flexible hose.
3. Install a steam trap to each strainer.

Each steam trap must be supported so minimum load is exerted on the coil outlet connection.

W066

4. Install a globe shut-off valve to each steam trap.
5. Connect to the condensate return lines.

Steam Requirements

Page 42 of the Speed Queen none user manual — 2
Page 42 · click to enlarge
Page 42
Speed Queen none — 2 diagram (page 42)
Fig. 22

1 Supply 8 18 in. (457 mm) Drop 2 12 in. (305 mm) Riser 9 Solenoid Valve (Supplied with machine) 3 Globe Valve 10 Steam Bonnet 4 Return 11 Check Valve 5 Check Valve 12 Union 6 Condensate Return Line from Supply Line 13 Trap with Built-In Strainer 7 Vacuum Breaker

Speed Queen none — 2 diagram (page 42)
Fig. 23

Steam Requirements · Table 11

Page 43 of the Speed Queen none user manual — W071
Page 43 · click to enlarge
Page 43

Electrical Requirements

This tumbler must be grounded. In the event of malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. This tumbler must be connected to a grounded metal, permanent wiring system; or an equipment grounding conductor must be run with the circuit conductors and connected to the appropriate ground location.

WARNING

  • To reduce the risk of electric shock, fire, explosion, serious injury or death:
  • Disconnect electric power to the tumbler before servicing.
  • Close gas shut-off valve to gas tumbler before servicing.
  • Close steam valve to steam tumbler before servicing.
  • Never start the tumbler with any guards/ panels removed.
  • Whenever ground wires are removed during servicing, these ground wires must be reconnected to ensure that the tumbler is properly grounded.
  • Metal conduit and/or BX cable is not considered ground.
  • Connecting the Neutral from the electrical service box to the tumbler ground screw does not constitute a ground.
  • A dedicated ground conduit (wire) must be connected between the electrical service box ground bar and tumbler ground screw.

W002 To reduce the risk of fire and electric shock, check with a qualified serviceman for proper grounding procedures. Improper connection of the equipment grounding conductor may result in a risk of electric shock.

WARNING

To reduce the risk of electrical shock, de-energize the electrical circuit being connected to the tumbler before making any electrical connections. All electrical connections should be made by a qualified electrician. Never attempt to connect a live circuit.

W068 To reduce the risk of fire and electric shock, if electrical supply is coming from a three phase service, DO NOT connect a “High Leg” or “Stinger Leg” to a single phase machine. On a three phase machine, if there is a “High Leg” or “Stinger Leg” it should be connected to L3.

W409

CAUTION

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

W069

Grounding Instructions

NOTE: To ensure protection against shock, this tumbler MUST be electrically grounded in accordance with the local codes or, in the absence of local codes, with the latest edition of the National Electrical Code ANSI/NFPA No. 70. In Canada the electrical connections are to be made in accordance with CSA C22.1 latest edition Canadian Electrical Code or local codes. Electrical work should be done by a qualified electrician.

W071

For CE Marked Models Only:

All OPL (non-vend) models are factory-equipped with an emergency stop button on the front panel.

Page 44 of the Speed Queen none user manual — 1. Install a circuit breaker as close to the tumbler as possible. If more than one tumbler is being installed, a disconnect swit...
Page 44 · click to enlarge
Page 44

The following steps outline the procedure for connecting the electrical service to the tumbler.

3. Check the electrical service phase sequence (three phase only) as follows:

a. Energize the electrical service (on reversing

tumblers, ensure nonreversing is selected) and momentarily start the tumbler. Check the direction of the cylinder rotation. If the cylinder rotates clockwise (viewed from the front), the phase sequence is correct. If the cylinder rotates counterclockwise, proceed with step b.

1. Install a circuit breaker as close to the tumbler as possible. If more than one tumbler is being installed, a disconnect switch or circuit breaker should be provided for each. This will make it possible to disconnect each tumbler for maintenance purposes.
2. Connect the conduit-encased leads to the disconnect switch, or circuit breaker. Connect the wire leads to the appropriate labeled terminal on the terminal block. The ground wire must be connected to the ground connection as shown in Figure 16 .

b. Disconnect and reverse any two service leads

on the terminal block.

Speed Queen none — 1. Install a circuit breaker as close to the tumbler as possible. If more than one tumbler is being installed, a disconnect swit... diagram (page 44)
Fig. 24 · 1. Install a circuit breaker as close to the tumbler…

1 Electrical Service (Gas and Steam Models) 2 Electrical Service (Electric Models) 3 Accessory Box 4 Ground Lug (Electric Models) 5 Fuses 6 Ground Screw (Gas and Steam Models Only) 7 Contactor Box

Electrical Requirements

Page 45 of the Speed Queen none user manual — OPL Micro Control Models Only
Page 45 · click to enlarge
Page 45

Jumper Configuration Instructions

Ferrite Ring Installation

OPL Micro Control Models Only

Gas and Steam OPL Micro Control Models Only

Changing the transformer configuration jumper is required if any of the following apply:

The ferrite ring provided in the literature packet must be installed over the power leads during connection of electrical service. The ferrite protects the sensitive electronic controls from destructive electrical disturbances which may be present on power lines to the machine. Failure to properly install the ferrite ring may result in damage to the electronic controls and will void control warranty.

  • You have 208 Volt service and are connecting a gas or steam model rated for 208 or 240 Volt.
  • You have 415 Volt service and are connecting a gas or steam model rated for 380 or 415 Volt.

To configure your 208 or 240 Volt tumbler for 208 Volt operation, you must remove the 240 Volt configuration jumper located in the contactor box and replace it with the 208 Volt jumper supplied with the information packet. This must be done prior to supplying power to the machine. Failure to install proper configuration jumper may result in damage to sensitive electronic controls and may void warranty.

To install:

1. Immediately after connection of power leads and before applying power to machine, locate each of the incoming service leads including ground.
2. Snap the ferrite ring closed over all the service leads inside of the contactor box as shown. It is important that the ferrite ring be installed inside the contactor box as shown. Do not install the ferrite outside of the box or other area. Make sure that service leads are in the center of the ferrite before closing the ring so as not to pinch or damage leads.

To configure your 380 or 415 Volt tumbler for 415 Volt operation, you must remove the 380 Volt configuration jumper located in the contractor box and replace it with the 415 Volt jumper supplied with the information packet. This must be done prior to supplying power to machine. Failure to install proper configuration jumper may result in damage to sensitive electronic controls and may void warranty.

Speed Queen none — OPL Micro Control Models Only diagram (page 45)
Fig. 25 · OPL Micro Control Models Only

Electrical Requirements

Page 46 of the Speed Queen none user manual — 50 Pound Tumbler Electrical Requirements
Page 46 · click to enlarge
Page 46

50 Pound Tumbler Electrical Requirements

Refer to Table 12.

Heat Source Serial Plate Voltage

Gas and Steam 120 Volt/60 Hertz/

1 Phase L1, Neutral and ground * 20 Amps 1 12 AWG (3.9 mm2)

Gas and Steam 208 or 240 Volt/

60 Hertz/1 Phase L1, L2, Neutral and ground

* 15 Amps 2 14 AWG (2.6 mm2)

Gas and Steam 230-240 Volt/50 Hertz/

1 Phase L1, Neutral and ground† * 15 Amps 1 14 AWG (2.6 mm2)

Gas and Steam 208 or 240 Volt/

60 Hertz/3 Phase L1, L2, L3, and ground† * 15 Amps 3 14 AWG (2.6 mm2)

Gas and Steam 380 or 415 Volt/

50 Hertz/3 Phase L1, L2, L3 and ground * 15 Amps 3 14 AWG (2.6 mm2)

Gas and Steam 460-480 Volt/60 Hertz/

3 Phase L1, L2, L3 and ground * 15 Amps 3 14 AWG (2.6 mm2)

Electric 240 Volt/50 Hertz/ 1 Phase L1, Neutral and ground 91 Amps 100 Amps 1 2 AWG (43 mm2)

Electric 208 Volt/60 Hertz/ 3 Phase L1, L2, L3 and ground 88 Amps 100 Amps 3 2 AWG (43 mm2)

Electric 240 Volt/60 Hertz/ 3 Phase L1, L2, L3 and ground 78 Amps 90 Amps 3 2 AWG (43 mm2)

Electric 240 Volt/50 Hertz/ 3 Phase L1, L2, L3 and ground 78 Amps 90 Amps 3 2 AWG (27 mm2)

Electric 380 Volt/50 Hertz/ 3 Phase L1, L2, L3 and ground† 50 Amps 60 Amps 3 4 AWG (27 mm2)

Electric 415 Volt/60 Hertz/ 3 Phase L1, L2, L3, and ground† 46 Amps 60 Amps 3 4 AWG (27 mm2)

Electric 480 Volt/60 Hertz/ 3 Phase L1, L2, L3, and ground 38 Amps 50 Amps 3 6 AWG (17 mm2)

*Current Ratings vary slightly depending on model; refer to serial plate. †MT (manual timer)/CD (rotary coin drop) Models may require a Neutral conductor. Consult wiring diagram.

Show 12 more labels / short text on this page
Electrical Requirements · Terminal Block · Rated Current · Breaker · Breaker · Recommended · Connections · Rating · Poles · Wire Size · Required · Table 12
Page 47 of the Speed Queen none user manual — 75 Pound Tumbler Electrical Requirements
Page 47 · click to enlarge
Page 47

75 Pound Tumbler Electrical Requirements

Refer to Table 13.

Heat Source Serial Plate Voltage

Gas and Steam 120 Volt/60 Hertz/

1 Phase L1, Neutral and ground * 20 Amps 1 12 AWG (3.9 mm2)

Gas and Steam 208 or 240 Volt/

60 Hertz/1 Phase L1, L2, Neutral and ground

* 15 Amps 2 14 AWG (2.6 mm2)

Gas and Steam 230-240 Volt/50 Hertz/

1 Phase L1, Neutral and ground† * 15 Amps 1 14 AWG (2.6 mm2)

Gas and Steam 208 or 240 Volt/

60 Hertz/3 Phase L1, L2, L3, and ground† * 15 Amps 3 14 AWG (2.6 mm2)

Gas and Steam 380 or 415 Volt/

50 Hertz/3 Phase L1, L2, L3 and ground * 15 Amps 3 14 AWG (2.6 mm2)

Gas and Steam 460-480 Volt/60 Hertz/

3 Phase L1, L2, L3 and ground * 15 Amps 3 14 AWG (2.6 mm2)

Electric 208 Volt/60 Hertz/ 3 Phase L1, L2, L3 and ground 88 Amps 100 Amps 3 2 AWG (43 mm2)

Electric 240 Volt/60 Hertz/ 3 Phase L1, L2, L3 and ground 78 Amps 90 Amps 3 2 AWG (43 mm2)

Electric 240 Volt/50 Hertz/ 3 Phase L1, L2, L3 and ground 78 Amps 90 Amps 3 2 AWG (27 mm2)

Electric 380 Volt/50 Hertz/ 3 Phase L1, L2, L3 and ground† 50 Amps 60 Amps 3 4 AWG (27 mm2)

Electric 415 Volt/60 Hertz/ 3 Phase L1, L2, L3, and ground† 46 Amps 60 Amps 3 4 AWG (27 mm2)

Electric 480 Volt/60 Hertz/ 3 Phase L1, L2, L3, and ground 38 Amps 50 Amps 3 6 AWG (17 mm2)

*Current Ratings vary slightly depending on model; refer to serial plate. †MT (manual timer)/CD (rotary coin drop) Models may require a Neutral conductor. Consult wiring diagram.

Show 12 more labels / short text on this page
Electrical Requirements · Terminal Block · Rated Current · Breaker · Breaker · Recommended · Connections · Rating · Poles · Wire Size · Required · Table 13
Page 48 of the Speed Queen none user manual — Gas Burner Air Shutter
Page 48 · click to enlarge
Page 48

Adjustments

Gas Burner Air Shutter

Speed Queen none — Gas Burner Air Shutter diagram (page 48)
Fig. 26 · Gas Burner Air Shutter

Air shutter adjustments will vary from location to location and will depend on the vent system, number of units installed, make-up air and line gas pressure. Opening the shutter increases the amount of primary air supplied to the burner while closing the shutter decreases the primary air supply. Adjust air shutter as follows:

Refer to Figure 18.

1. Open the access panel.
2. Start the tumbler and check the flame pattern. If the flame pattern is straight up, insufficient air is flowing through the tumbler and air flow switch is improperly set. A flame pattern that flares to the right and left indicates no air is flowing through the tumbler.
3. Correct air and gas mixture is indicated if the flame pattern is primarily blue, with small yellow tips, and bends to the right of the heater section. Too little air is indicated if the flame if yellow, lazy and smokey.
4. To adjust the air shutter, loosen air inlet shutter adjusting screw.
5. Open or close air shutter as necessary to obtain proper flame intensity.
6. After air shutter is adjusted for proper flame, tighten air shutter adjusting screw securely.
Page 49 of the Speed Queen none user manual — W073
Page 49 · click to enlarge
Page 49

Airflow Switch

The airflow switch operation is controlled by the counterweight position in the shaft. Moving the counterweight either increases or decreases airflow switch sensitivity. The counterweight should be adjusted so the disc moves away from the cabinet when the lint panel is opened 1.5 inches (38.1 mm) with a full load. Adjust the airflow switch as follows:

Gas and Electric Tumblers

WARNING

To reduce the risk of fire, airflow switch operation may be affected by a clogged lint screen, lack of make-up air, obstructions in the vertical recirculation stack or in the customer installed main or collector ducts. These conditions must be checked and necessary corrections made before adjusting airflow switch. Always adjust airflow at installation.

1. Load the tumbler. This adjustment is much faster to make with one person opening lint panel in front and another adjusting the counterweight in the rear of tumbler.
2. Start the tumbler. Open the lint panel 1.5 inches (38.1 mm). The airflow disc should move away from the cabinet, opening the switch contacts and shutting off the heat system. This indicates proper operation and proper adjustment.

W073

The airflow switch (located on the rear of tumbler, Figure 19) is set at the factory for proper operation. However, if there is a problem with the switch, it should be adjusted as follows:

3. If switch is not opening as described in step 2, it should be adjusted so it is MORE sensitive. Depress the spring clip and move counterweight toward disc. Retest by opening lint panel and continue moving counterweight toward disc until switch operates as described in step 2.
4. If switch opens BEFORE lint panel is opened the proper distance, step 2, it should be adjusted so it is LESS sensitive. Depress the spring clip and move counterweight away from the disc. Retest by opening lint panel and continue moving counterweight away from disc until switch operates as described in step 2.

Adjustments

Page 50 of the Speed Queen none user manual — 9
Page 50 · click to enlarge
Page 50
Speed Queen none — 9 diagram (page 50)
Fig. 27

T041I 1 Airflow Switch 2 Mounting Bracket 3 Rear Panel of Tumbler 4 Switch Adjusting Screws 5 Screw 6 Switch Lever 7 Spring Clip 8 Counterweight 9 Disc 10 Vane Lever Arm

Adjustments

Page 51 of the Speed Queen none user manual — Non CE Marked Models
Page 51 · click to enlarge
Page 51

Loading Door Switch

Speed Queen none — Loading Door Switch diagram (page 51)
Fig. 28 · Loading Door Switch

Non CE Marked Models

The door switch should be adjusted so the cylinder stops when door is opened 2 inches (51 mm), plus or minus 1/4 inch (6 mm). This switch is a normally open switch and is closed by the interlock rod when the door is closed. If adjustment is required, refer to Figure 20 and proceed as follows:

1. Close door and start tumbler, slowly open loading door. Cylinder and heat system should shut off when door is open 2 inches (51 mm) plus or minus 1/4 inch (6 mm).
2. Slowly close loading door. When door is 2 inches from being fully closed, the tab should contact the interlock rod and depress it enough to operate the switch arm closing the switch with an audible “click.”
3. If interlock rod does not depress enough to operate the switch, bend tab on loading door OUTWARD 1/8 inch (3 mm) and repeat steps 1 and 2. Bend tab outward an additional 1/8 inch (3 mm) if required to obtain proper rod movement and switch operation.
4. If proper operation is not obtained by procedure outlined in step 3, unlock and open access panel and remove control panel. Loosen the two adjusting screws holding the switch to the bracket and move switch 1/8 inch (3 mm) toward the front of the switch bracket and retighten the screws. Repeat steps 1 and 2. If switch and rod still do not have sufficient movement, move switch forward an additional 1/8 inch (3 mm).

T048I 1 Switch Arm 2 Adjusting Screws 3 Door Safety Switch 4 Tab 5 Interlock Rod 6 Switch Bracket

Adjustments

Page 52 of the Speed Queen none user manual — CE Marked Models
Page 52 · click to enlarge
Page 52

CE Marked Models

Loading door switch is factory adjusted to turn off when the door is opened a maximum of 3 inches (76 mm). If adjustment is needed, refer to Figure 21 and follow these steps:

1. Start tumbler, following the operating instructions which accompanied it.
2. Slowly open loading door. Cylinder and heating system should stop when door is open 3 inches (76 mm) maximum.
3. Slowly close loading door while depressing start switch or pad. Tumbler should start before loading door is 0.5 inch (13 mm) from fully closed.
4. If opening the loading door 3 inches (76 mm) maximum does not stop tumbler, adjust switch.

T495I 1 Loading Door Switch 2 Screw Slot 3 Switch Coupler

5. Loose lower screw on switch coupler (use 2 mm hex wrench).
6. Align screw slot with alignment marks on switch top (switch should be closed, or on).
7. Start tumbler.
8. Prop door open 2.5 inches (63 mm).
9. Slowly rotate switch coupler counterclockwise (viewed from above switch) until tumbler stops.
10. Tighten lower screw on switch coupler.
11. Return to step 1 to verify loading door switch operation.

Adjustments

Page 53 of the Speed Queen none user manual — Loading Door Strike
Page 53 · click to enlarge
Page 53

Loading Door Strike

The door strike must be adjusted to have sufficient tension to hold loading door closed against force of load tumbling against it. There is proper adjustment when 8 to 15 pounds (35.6-66.7 N) pull is required to open door.

If adjustment is required, refer to Figure 22 and proceeds as follows:

To adjust, open door, loosen acorn nut and turn door strike screw in or out as required. Tighten acorn nut.

T048I 1 Door Strike 2 Acorn Nut 3 Door Latch

Adjustments

Page 54 of the Speed Queen none user manual — Chain Drive
Page 54 · click to enlarge
Page 54

Nonreversing Models

WARNING

Refer to Figure 23.

  • To reduce the risk of electric shock, fire, explosion, serious injury or death:
  • Disconnect electric power to the tumbler before servicing.
  • Close gas shut-off valve to gas tumbler before servicing.
  • Close steam valve to steam tumbler before servicing.
  • Never start the tumbler with any guards/ panels removed.
  • Whenever ground wires are removed during servicing, these ground wires must be reconnected to ensure that the tumbler is properly grounded.
1. Remove guard from rear of tumbler.
2. Adjust belt first.
3. To adjust chain tension, loosen jam nut holding idler sprocket to housing.
4. Move idler sprocket left or right until proper chain tension is reached, then retighten the jam nut.
5. Replace the guard on rear of tumbler.

Reversing Models

Refer to Figure 24.

W002

1. Remove drive guard.
2. To adjust chain tension, loosen nut on idler housing attaching bolt. Move entire idler housing assembly up or down in the guide rails to change tension.

Chain Drive

There is proper tension when the chain can be depressed approximately 1/2 inch (13 mm) by applying light thumb pressure at a point midway between the cylinder and drive sprocket.

3. When chain tension is correct, tighten idler housing attaching bolt. Hold idler housing firmly in position while tightening nut on attaching bolt.

IMPORTANT: After a tumbler has been in operation over an extended period of time, a “High Point” will develop on the cylinder drive sprocket through use and wear. Turn the sprocket manually with drive chain in place until this “high point” is at the top center. The “high point” can be found by noticing increased chain tensionwhile slowly rotating the cylinder sprocket manually.

4. Check chain tension after tightening nut on idler housing attaching bolt.

Adjustments

Page 55 of the Speed Queen none user manual — Reversing Models
Page 55 · click to enlarge
Page 55

Belt Drive

There is proper tension when each cylinder belt can be depressed approximately 3/16 inch (5 mm) by applying light thumb pressure (approximately 5 pounds) at a point midway between the sheave and the idler.

Nonreversing Models

Refer to Figure 25. There is proper tension when the drive V-belt can be depressed approximately 1/2 inch (13 mm) by applying light thumb pressure at a point midway between the sheave and motor pulley.

1. Remove guard from rear of tumbler.
2. To adjust cylinder belt tension, loosen idler housing bolts holding idler housing assembly to the guide rails.
1. Remove guard from rear of tumbler.
2. To adjust belt tension, loosen idler housing bolts holding idler housing assembly to the guide rails.
3. Position housing assembly by turning adjusting bolt until proper belt tension is reached, then retighten idler housing bolts.
3. Position housing assembly by turning adjusting bolt until proper belt tension is reached, then retighten idler housing bolts.
4. Replace the guard on rear of tumbler.
4. Loosen the locking bolt.

Reversing Models

5. Loosen the adjusting nut and use the adjusting screw to move the motor up or down.

Refer to Figure 26. There is proper tension when the drive belt can be depressed approximately 1/2 inch (13 mm) by applying light thumb pressure (approximately 5 pounds [2.2 kg]) at a point midway between the sheave and motor pulley.

6. Once proper belt tension is reached, retighten the adjusting nut and locking bolt.
7. Replace the guard on rear of tumbler.

Adjustments

Page 56 of the Speed Queen none user manual — 1
Page 56 · click to enlarge
Page 56
Speed Queen none — 1 diagram (page 56)
Fig. 29

1 Sheave 8 Guide Rail 2 Cylinder Drive Chain 9 Guide Rail Washer 3 Cylinder Sprocket 10 Ground Wire (Green) 4 Idler Sprocket 11 Motor Pulley 5 Jam Nut 12 V-Belt 6 Drive Sprocket 13 1/2 in. (13 mm) Deflection 7 Idler Housing 14 Belt Adjusting Bolt and Nut

Adjustments

Page 57 of the Speed Queen none user manual — 1
Page 57 · click to enlarge
Page 57
Speed Queen none — 1 diagram (page 57)
Fig. 30

1 Motor Pulley 7 1/2 in. (13 mm) Deflection 2 Cylinder Motor 8 Guide Rail 3 Locknut 9 Idler Housing 4 Adjusting Bolt 10 Idler Housing Attaching Bolt and Nut 5 Cylinder Sprocket 11 Sheave 6 Cylinder Drive Chain 12 Poly V-Belt

Adjustments

Page 58 of the Speed Queen none user manual — NONREVERSING BELT DRIVE MODELS
Page 58 · click to enlarge
Page 58
Speed Queen none — NONREVERSING BELT DRIVE MODELS diagram (page 58)
Fig. 31

T234I 1 Poly V-Belt (Self-Adjusting) 2 Idler Housing Bolts (2) 3 Adjusting Bolt 4 Drive V-Belt 5 Idler Housing Assembly

Adjustments

Page 59 of the Speed Queen none user manual — REVERSING MODELS
Page 59 · click to enlarge
Page 59
Speed Queen none — REVERSING MODELS diagram (page 59)
Fig. 32

T322I 1 Locking Bolt 2 Adjusting Nut 3 Adjusting Screw 4 Cylinder Belts 5 Guide Rail 6 Idler Housing Bolts (2) 7 Adjusting Bolt (Not shown) 8 Drive Belt

Adjustments

Page 60 of the Speed Queen none user manual — Removing Tumbler from Service
Page 60 · click to enlarge
Page 60

Removing Tumbler from Service

If the tumbler is to be removed from service, perform the following steps where applicable:

  • Turn off electrical supply external to machine.
  • Turn off electrical disconnect on machine.
  • Turn off gas supply external to machine.
  • Turn off manual gas shut-off valve on machine.
  • Turn off steam supply external to machine.
  • Remove all electric, gas and steam connections.

Ask about the Speed Queen none

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Speed Queen none

Be the first to ask — other owners or our team will answer.

Original document

Speed Queen none manual PDF

60 pages·1.8 MB·Clothes Dryer·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…