

P2701 P3201
Stationary Standby Electric Generator
IMPORTANT SAFETY INSTRUCTIONS – Please make certain that persons who are to install, operate and maintain this equipment thoroughly read and understand these instructions prior to operation. SAVE THESE INSTRUCTIONS — This manual contains important instructions that should be followed during installation and maintenance of the generator and battery.
Product style and configuration may vary. Specifications are subject to change without notice.

Read and understand all safety precautions in this manual and other manuals included with this product before installing, operating and maintaining this equipment. Failure to comply with instructions in this manual could result in personal injury, property damage, and/or voiding of your warranty. The manufacturer WILL NOT be liable for any damage because of failure to follow these instructions.
Record the model and serial numbers of your generator below:
© 2007 Powermate Corporation
200-2653 - Revision A - 9/07



The following information relates to protecting YOUR SAFETY and PREVENTING EQUIPMENT PROBLEMS. To help you recognize this information, we use the following symbols. Please read the manual and pay attention to these sections. Also read and follow all safety labels on the engine/generator set. If labels are damaged or unreadable, contact product service for replacements.
This is the safety alert symbol. It is used to alert you to potential personal injury hazards. Obey all safety messages that follow this symbol to avoid possible injury or death.
Ground Location.
– A POTENTIAL HAZARD THAT WILL CAUSE SERIOUS INJURY OR LOSS OF LIFE.
– A POTENTIAL HAZARD THAT COULD CAUSE SERIOUS INJURY OR LOSS OF LIFE.
– A POTENTIAL HAZARD THAT MAY CAUSE MODERATE INJURY OR DAMAGE TO
personal injury or death. Installation MUST be performed by a licensed electrician, plumber and gas technician. Installation MUST comply with all applicable building and electrical codes. Some areas may require building permits and/or detailed sight inspections prior to approving the unit for operation. NOTE: The important safety instructions appearing in this manual are not meant to cover all possible
conditions and situations that may occur. It must be understood that common sense, caution, and care are factors which are not built into a generator, but are supplied by the person(s) installing, maintaining, and operating it.
circuits at the same time. A properly connected transfer switch helps to prevent backfeed of generator power into commercial lines while the standby generator is operating.
Do not attempt to install the generator yourself. Extremely high and dangerous electrical voltages are present in utility power source lines and in generator load leads when the unit is running. Therefore, be sure to turn OFF all power voltage supplies at their source before attempting to complete electrical connections. Only qualified installation contractors or electrician’s who are familiar with applicable codes, standards, regulations and procedures should install the system. Improper or unauthorized installation, operation, or service of this equipment is extremely hazardous and may result in serious personal injury or death.
This generator supplies extremely high and dangerous power voltages. Any contact with high voltage electrically "hot" components will result in extremely hazardous, and possibly LETHAL, electrical shock. Use care to avoid contact with live terminals, bare connectors, bare wires, etc. Disconnect all power before performing maintenance or service.
Generator exhaust air contains carbon monoxide, a deadly odorless, colorless and tasteless gas. Breathing carbon monoxide causes severe nausea, fainting or death. Install the generator set outdoors only. Do not use exhaust air to heat a room. Do not allow exhaust air to enter a building through windows, doors, air intakes or other means. Avoid breathing exhaust air while installing, operating or servicing generator set. The engine exhaust from this product contains chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.
It is NOT intended that the information in this manual be used by any unqualified persons for the purpose of installing a standby electric power system. This equipment must be installed, inspected, tested and adjusted only by qualified personnel. These people must be familiar with the equipment and installation requirements.
The installation of this unit must comply with the regulations of the United States National Electric Code (NEC) as well as state and local codes and Occupational Safety and Health Administration (OSHA) established in the United States.
Short circuits can cause bodily injury and/or equipment damage. Do not contact electrical connections with tools or jewelry, make sure clothing and shoes are dry and stand on a dry wooden platform while adjustments are made. Remove wristwatch, rings, and jewelry that can cause short circuits.
This equipment, when installed as part of a standby electric power system, must be installed in conjunction with an approved transfer switch. The transfer switch serves to prevent both generator and utility power from being connected to the load
3 200-2653

Units with broken or missing parts, without
The National Electrical Code (NEC) requires the frame and external electrically conductive parts of the generator to be connected to an approved earth ground.
protective housing or covers should never be operated. Contact your service center for replacement parts.
Inspect the generator regularly, and contact your nearest Authorized Dealer for parts needing repair or replacement.
Keep a fire extinguisher near the generator at all times. Extinguishers rated "ABC" by the National Fire Protection Association are appropriate for use on the standby electric system. Keep the extinguisher properly charged and be familiar with its use. If you have any question pertaining to fire extinguishers, consult your local fire department.
Never use the generator or any of its parts as a step. Stepping on the unit can stress and break parts, and may result in dangerous operating conditions from leaking exhaust gases, fuel leakage, oil leakage, etc.
Generator/engine noise can cause hearing loss. Never operate the generator set without a muffler or with a faulty exhaust system. Always wear hearing protection when near or operating the generator.
Thoroughly read the OPERATORS MANUAL before operating the generator. Safe operation and top performance can be obtained only when equipment is operated and maintained properly.
DO NOT permit anyone to operate the standby electric system without proper instruction.
Ensure that enclosure doors are closed and locked at all times other than during service.
In case of accidents caused by electric shock, immediately shut down the source of electrical power. If this is not possible, attempt to free the victim from the live conductor. AVOID DIRECT CONTACT WITH THE VICTIM. Use a nonconducting implement, such as a rope or board, to free the victim from the live conductor. If the victim is unconscious, apply first aid and get immediate medical help.
200-2653 4

After inspecting the generator, engine and enclosure for physical damage, finish reading the Operating and Maintenance Instructions. These manuals contain important safety information.
The stationary standby electric generator is manufactured for our customers to supply reliable backup power. The generator is a compact unit, designed to supply the power for your critical needs when utility power fails.
The standby generator will run on Liquid Propane Gas or Natural Gas allowing flexibility for getting the power you need. Fuel lines should be installed by a licensed plumber or other qualified professionals or licensed gas technician.
DANGER
Taking a few moments to pre-plan before beginning installation of the generator can provide significant savings in materials and labor and lower future maintenance. Some items to consider in planning generator installation are safe generator operation, use of an Automatic Transfer Switch, load requirements, generator location, fuel supply, environmental conditions and applicable local, regional or national codes. Some areas may require building permits and/or detailed site inspections prior to approving the unit for use. Check with local authorities before starting installation.
Immediately inspect the generator carefully for freight loss or damage upon arrival. If loss or damage is noted at the time of delivery, require the person making the delivery to note the loss or damage on the freight bill, or affix his signature under the consignor’s memo of the loss or damage. Contact the carrier for claim procedures.
When loss or damage is noted after delivery, segregate the damaged material, and contact the carrier for claim procedures. Be sure to retain the packaging material for carrier inspection.
Installation of a standby engine/generator system is complex and should not be considered a Do-It-Yourself project. Safe installation requires the skill and knowledge of licensed electricians and plumbers or gas technicians . Contact an authorized dealer for assistance with installation planning and referral to properly qualified, licensed installing contractors.
“Concealed Damage” is understood to mean damage to the contents of a package which is not evident at the time of delivery by the carrier, but which is discovered later. The carrier or carriers are responsible for merchandise lost or damaged in transit. The title to goods rests with the consignee when generators are shipped F.O.B. factory, and only the consignee can legally file a claim.
5 200-2653

Radiator capacity



PLACEMENT
For proper ventilation and maintenance, locate the generator outdoors in an area that will allow a minimum of three feet or more of clearance between the generator and any other structure. Note: Check your local building codes for clearance requirements for your area.
When placing the generator, the direction of the exhaust should be pointing away from windows, doors and any ventilation system.
Insure that sufficient air flow is available to remove the exhaust fumes and cool the generator properly.
The generator should be installed with masonry anchor bolts on a level wire reinforced cement pad that is 4-6 inches thick and extends a minimum of 6” around all sides of the unit (see page 7 for anchor bolt locations).
to attempt a detailed coverage of every installation possibility. For that reason, much of the information is general in nature. Plan the installation carefully. Information in this manual is provided as a guide only and is not meant to serve as a detailed installation plan. Illustrations provided in the manual must not be construed as blueprints.
air in from the end panel slots, circulates it within the enclosure and forces the air through the side panels and the exhaust panel slots.
All local applicable codes, standards and regulations must be followed for the installation of the generator. Some areas may require building permits and/or detailed sight inspections prior to approving the unit for use.
battery charger and other start assisting components should be tightened on the identified terminal block at a torque of 20 lb- in. The wire size is to be selected according to allowable ampacities given in Table 310-16 of the National Electric Code.
Signal wiring from the transfer switch is to be 18AWG multi-strand wire tightened on the identified terminal block to a torque of 20 lb- in.
Power leads from the generator/circuit breaker being wired to the transfer switch should be tightened in the identified terminal block to 120 lb-in. The wire size is to be selected according to allowable ampacities given in Table 310-16 of the National Electric Code.
Field wiring of this unit must be conducted by a licensed electrician.
200-2653 8

PLACEMENT (continued)
Example of Recommended Transfer
Switch Installation (Main Panel Load)

When connecting the generator to a building electrical distribution system, use of a transfer switch is recommended to isolate the normal utility source from the generator supply. By preventing backfeed of the generator power into the utility lines during a utility power outage, the switch provides a level of safety for electrical line workers. An automatic transfer switch listed to Underwriters Laboratories Standard 1008 performs this function while also supplying a method to automatically start and stop the generator set and transfer power to the building electrical system from an appropriate source.
When planning for a transfer switch/generator installation, it is necessary to know the method of interconnection to the building system. As illustrated, it is recommended to connect the generator to power only circuits that are necessary during a power outage. When following this method, the transfer switch feeds only the necessary circuits. Another option is to connect the transfer switch directly to the entire building electrical distribution system. In this case, all circuits or loads must be controlled to avoid overloading and possibly damaging the generator set.
Switch selection is based on factors such as the size of the building distribution system, available generator power and required generator control system. Due to the complex nature of electrical distribution systems, the sizing, selection and installation of a switch is best handled by a licensed electrician or qualified standby generator dealer. Any switch installation must be performed by a licensed electrician to the instructions of the switch manufacturer and any applicable local, regional or national codes.
9 200-2653

MAIN LINE OUTPUT POWER
Once the generator is anchored in its final position, it is ready for electrical connections. The generator is supplied with two terminal blocks for connection of three distinct electrical circuits; main line output power, utility power input and generator start signal. Main line output power is the electrical output of the generator, utility input powers the battery charger and optional block heater devices and the generator start signal is the interface with an Automatic Transfer Switch that allows the generator to operate automatically upon a utility power outage.
The output circuit of the generator is 4-wire, 240V, rated for the amperage as shown on the generator nameplate. Connection to the transfer switch requires two leads, commonly referred to as "hot" leads (L1 & L2), a neutral (N), and ground lead. Positions of these leads are labeled on the main line output terminal block, also shown in Fig. A. Select proper power output wire sizes according to allowable ampacities given in Table 310-16 of the latest revision of The National Electric Code(NFPA 70). To connect the wires, strip the insulation back approximately ½" from the end of the wire, insert the stripped end into the terminal block, then torque the terminal block screw to 35 in-lbs (4.0 N-m).

Fig. A
200-2653 10

A receptacle is provided with the generator to power the battery charger for reliable starting. It is also intended to power an optional block heater if that option is desired. Connection of this circuit to a power supply that is only present when normal utility power is supplied is recommended. By connecting the receptacle in this fashion, it is possible to insure that neither the battery charger or block heater are on while the engine is running. Precautions are engineered into the generator to prevent these occurances but connection of the circuit in this fashion provides an additional fail-safe method of engine and battery protection.
When the control panel mode switch is placed in the AUTO position, generator starting and stopping is controlled by the opening or closing of a set of voltage free contacts. Two wires from those contacts are connected to the generator through the auxiliary connection block shown in Fig. B. Use of a twisted pair of stranded copper wire no smaller than AWG 18 gage is recommended. To insure proper operation of the auto start feature, use a transfer switch offering “close-to-run control contacts. To connect the wires, strip the insulation back approximately ¼" from the end of the wire, insert the stripped end under the screw and washer on the terminal block, then torque the terminal block screw to 20 in-lbs (2.3 N-m).
Input to the utility circuit is 3-wire, 120V, 15A. Connections include a "hot" lead (L1), neutral (N) and ground lead. Positions of the incoming wire connections are labeled at the auxiliary connection block, shown in Fig. B . Select proper utility supply wire size according to allowable ampacities given in Table 310-16 of the latest revision of The National Electric Code(NFPA 70). To connect the wires, strip the insulation back approximately ¼" from the end of the wire, insert the stripped end under the screw and washer on the terminal block, then torque the terminal block screw to 20 in-lbs (2.3 N-m).

Fig. B
11 200-2653



The engine driving the generator is engineered to provide reliable power on either Liquefied Propane Vapor (LPG) or Natural Gas. For proper operation on these fuels, it is important to deliver gas with adequate energy content, at sufficient pressure and flow rate. This generator is designed to operate on Liquefied Propane Vapor (LPG) with a minimum energy content of 2500 BTU per cubic foot or Natural Gas with a minimum energy content of 1000 BTU per cubic foot. This generator is designed to operate with a fuel pressure at the inlet of the unit between 6 and 11 inches of water column (4-6 ounces).
Required fuel flow rates for specific models are given in the table below. To insure correct sizing of the piping supplying fuel to the generator set, provide the flow and pressure requirements of this section to a fuel supplier or licensed plumber during the installation planning stage. If the fuel supplier cannot guarantee delivery of fuel with these properties, the generator may not perform as advertised.
Due to differences in the energy content of fuel used, it is necessary to derate the output of the generator when connected to Natural Gas. Additionally, regional and/or seasonal variations in the makeup of the fuel can further affect output of the engine/generator system. When using Natural Gas fuel with minimum properties as defined, engine output can fall approximately 10% below that of the same set using Propane Vapor.
For the best operation of the unit, the fuels used should have a minimum content of 1000 BTU’s per cubic foot for Natural Gas (NG) and 2520 BTU’s per Cubic foot for Liquid Propane vapor (LPG). Contact local fuel supplier for local BTU content. Fuel supply pressures must be between 4oz (6” H20 per square inch) and 6oz (11” H20 per square inch) at the inlet to the unit.
Per the National Gas Code (NFPA 54 - ANSI 2223.1), a manual shutoff valve in the fuel supply line to the generator is recommended.
Fuel Consumption (@25% load) 0.83 Gal/Hr (LP) 0.94 Gal/Hr (LP) 1.1 Gal/Hr (LP)
80 Cu-ft/Hr (NG) 85 Cu-ft/Hr (NG) 95 Cu-ft/Hr (NG)
Fuel Consumption (@50% load) 1.65 Gal/Hr (LP) 1.84 Gal/Hr (LP) 2.06 Gal/Hr (LP)
160 Cu-ft/Hr (NG) 169 Cu-ft/Hr (NG) 180 Cu-ft/Hr (NG)
Fuel Consumption (@75% load) 2.48 Gal/Hr (LP) 2.78 Gal/Hr (LP) 3.03 Gal/Hr (LP)
220 Cu-ft/Hr (NG) 254 Cu-ft/Hr (NG) 270 Cu-ft/Hr (NG)
Fuel Consumption (@100% load) 3.44 Gal/Hr (LP) 3.71 Gal/Hr (LP) 3.99 Gal/Hr (LP)
280 Cu-ft/Hr (NG) 304 Cu-ft/Hr (NG) 315 Cu-ft/Hr (NG)
All values reflect consumption at 100% rated output.
22kW 27kW 32kW · 13 200-2653

NOTE: DO NOT REMOVE! 3. Start generator - ensure all wires from timing light are free from all moving parts. 4. While generator is operating in a no load condition use timing light to obtain engine timing (FIG. 4). 5. Rotate distributor cap (FIG. 3) slowly to obtain timing of 26 degrees BTDC(36 degrees BTDC for natural gas). 6. Retighten hold down clamp bolt (FIG. 2) - DO NOT MOVE DISTRIBUTOR CAP WHILE RETIGHTENING BOLT. 7. Reverify timing after tightening hold down clamp.
After electrical connections are complete, the next installation step is to connect a fuel supply to the unit. The fuel inlet fitting supplied with the generator is male 3/4" NPT. To accommodate potential settling of the generator relative to rigid supply pipeline, use of a flexible line, provided by manufacturer, in the supply line is suggested. When making connections, use only materials rated for the fuel supplied and approved for use by local, regional or national codes and/or regulatory agencies.


Natural Gas (NG)
Units are tested with natural gas before they leave the factory. If natural gas is to be used, no adjustments are required.

When supplying natural gas as the operating fuel, provide fuel with a minimum of 1000 BTU/ft3 at inlet pressures between 6" and 11" of water column (4 - 6 oz). Failure to meet these minimums will cause the generator to run poorly and/or may limit output to values below nameplate value. If fuel with these qualities is not available, contact the customer service center.
Refer to the Fuel Consumption Table on page 13 for fuel flow requirements for the unit installed. Size all feeding piping to deliver sufficient flow above the minimum pressure of 6" water column (4 oz).
Per the National Gas Code (NFPA 54 - ANSI 2223.1), a manual shutoff valve in the fuel supply line to the generator is recommended.

In cases where liquefied propane vapor is selected as the fuel of choice, the following steps need to be followed for hookup. Engine Timing for LP 1. Connect timing light to spark plug wire #1, power leads to 12V DC power source(FIG 1). 2. Loosen hold down clamp bolt on distributor (FIG. 2).
200-2653 14

BATTERY REQUIREMENTS
To insure reliable starting in most weather conditions, it is important to properly match a battery to the requirements of the generator. The generator uses a 12 Volt, direct current, negative ground control system powered by an automotive style lead acid battery. Successful engine starting is dependent upon the cranking speed of the engine, which in turn is affected by the cranking capacity of the battery. When selecting a battery, choose the model that provides the highest available cold cranking amperes (CCA) within a given size range, as specified by the Battery Council International (BCI). The battery tray and cables supplied with the generator are sized to accept a BCI Group 34 battery, with a minimum recommended rating of 750 CCA.
A battery presents a risk of electrical shock and a high short circuit current. The following precautions are to be observed when working on batteries:
Lead-acid batteries present a risk of fire because they generate hydrogen gas. The following procedures are to be followed:
CONNECTION
The next step in installation of the generator is placement and connection of the engine cranking battery. Provided battery cables and battery rack are sized to accept a BCI Group 34 automotive style battery. A battery with a minimum of 750 CCA (cold cranking amperes) in this size range is recommended to assure reliable engine starting.
The electrolyte is a dilute sulfuric acid that is harmful to the skin and eyes. It is electrically conductive and corrosive. The following procedures are to be observed.
15 200-2653

LUBRICATION AND COOLING
CONNECTION (cont.)
Check oil level before start-up. The unit is shipped with the proper type of oil in the crankcase for operation above 40°F. Follow the engine manufacturer’s recommendations for oil at temperatures below 40°F. Check oil periodically to ensure that the unit is properly lubricated. Follow the engine manufacturer’s recommended service schedule.
To install the battery, begin by placing the battery (A) into the battery rack as shown in Fig G.
After the battery is in the rack, begin attaching the battery cables to the battery posts, starting with the positive (+), or red, cable (B). Loosen the bolt (C) on the post clamp slightly to allow the clamp to expand, then firmly push the clamp onto the battery post marked positive (+) until the top of the post extends past the top of the clamp. Rotate the clamp around the post as required to insure the clamp cannot contact any metal components, then tighten the clamp bolt (C) until snug. Finally,slide the post boot (D) down the cable and place it entirely over the clamp.
Engine oil capacity is 4.0 qt (3.79L) without a filter change and 5.0qt (4.7L) with a filter change.
Before initial start up of the unit, check the coolant level in the radiator. Low coolant levels can cause insufficient engine cooling and possible engine damage. The unit is shipped with a 50\50 mix of water and propylene glycol antifreeze in the radiator. Check coolant levels and concentration periodically, especially in extreme climates. Follow engine manufacturer’s recommended service schedule. If radiator is drained and refilled, make sure to disconnect bypass hose to purge air from radiator and engine head water passages.

Failure to properly bleed air from the cooling system may result in an engine failure not covered under warranty.
Finish connecting the battery by placing the negative (-), or black, battery cable (E) to the battery post marked negative (-). Push the clamp firmly over the post until the post extends past the top of the clamp, then rotate the clamp to avoid contact with any metal parts. Tighten the battery clamp bolt (F) until snug.
The final step of battery installation is to verify proper connection of all battery charger connections. A battery charging system (G) is included with the engine/generator set to maintain the battery charge during extended periods of generator inactivity, therefore providing consistent starting. A quick check of charger connections will verify that factory connections are correct so the charger can function as intended. Insure that the charger is connected by checking to see that it is plugged into a powered receptacle, and that the positive (+) and negative (-) charger cables are connected to their respective battery cables.
200-2653 16

transfer switch following the instructions provided by the switch manufacturer. 4. Ensure utility power to the transfer switch is shut off. 5. Return to the generator and open any manual shutoff valves in the fuel supply system. 6. Move the control panel mode switch to the RUN position. The generator should crank and start. 7. Allow the generator to run for approximately three (3) minutes, then move the main line circuit breaker handle to the ON position.
After completing all installation procedures, read and understand the operating instructions for the generator controller. Know how the control panel operates, what to expect when activating control panel switches and how to shut the generator off in the event of an emergency. Before starting the generator for the first time, check off all items on the following list, then follow the given procedure to verify correct operation of the generator. Is unit level? Is adequate free air space (3 feet minimumor greater,check your local building codes for clearance requirements for your area.) available on all sides of the enclosure? Are all cabinet openings free from blockage? Is the exhaust directed away from dwellings, dwelling air intakes, or combustible materials? Are the fuel supply lines and internal generator fuel connections leak-free? Is fuel supply pressure within specifications? Is the regulator connection properly configured for the fuel supplied? Is an approved transfer switch used to prevent backfeed into utility lines? Are electrical connections tight, and properly connected? Are electrical conductors sized properly? Is the engine filled to the proper level with the correct type of oil? Is the engine filled to the proper level with the correct mix of coolant? Is a properly sized engine cranking battery correctly installed? Is the battery maintenance charger plugged in and operating correctly? Are all protective covers installed and tightened? Are all tools clear of moving or electrically live parts? Is the installation inspected and approved as required by local or regional code? Once all items on the checklist are marked off, complete the initial startup using the listed steps.
8. Check across the terminals of the main line power output block (Red to Black) for proper frequency and voltage. Frequency should read approximately 62.5 Hz and voltage between 240 and 245 volts at no load conditions. 9. Adjust no load speed as required to meet approximately 62.5 Hz. 10. Shut the generator down by moving the mode switch back to the OFF position. 11. Restore utility power to the transfer switch. 12. Place the control panel mode switch on the generator set in the AUTO position. 13. Perform a manual exercise cycle following the instructions provided by the switch manufacturer. If wiring is connected properly to the switch, the generator will start and stop under switch control. While the generator is running, check the voltage and frequency across the emergency supply terminals on the transfer switch. Values should match those found in Steps 8 and 9. 14. Allow the transfer switch to shut the generator off by letting it complete the manual exercise cycle. 15. With the generator mode switch still in the AUTO position, simulate utility power failure by switching utility power to the transfer switch OFF. Verify correct function of the automatic transfer switch as indicated in the switch manual. Restore utility power to the transfer switch and verify correct automatic transfer switch function. Allow the switch to shut the generator down. 16. Inspect the site to ensure no packaging or installation materials remain within or against the generator. 17. Replace all covers on the generator. 18. Place the generator into service by moving the mode switch to the AUTO position.
17 200-2653

B. Status Indicator Lights
Status indicator lights are provided to communicate the status of the generator to the user. Under normal running conditions, only the green Generator On light is lit. Function of all other lights are described on page 21.
A standby generator is an engine driven air cooled system to convert the energy contained in either liquid propane vapor or natural gas to electrical power. When coupled with an automatic transfer switch to monitor for failure of utility power, the unattended system can start, stop and transfer between sources to insure a nearly seamless supply of power. The generator is housed in a weather resistant, sound attenuated enclosure for outdoor installation only.
C. Generator Hour Meter
The Generator Hour Meter is provided to track the total numbers of hours of operation. The hour meter runs whenever the engine is running and the alternator is producing electricity. Placing the main line circuit breaker in the OFF position while the engine is running does not stop the meter from counting hours.
Before installing and starting the generator, become familiar with the controls and operational features of the generator. Know how the control panel operates, what to expect when activating control panel switches and how to shut the generator off in the event of an emergency.
D. Lamp Test Switch
A lamp test switch is provided to check for function of all indicator lights. Press the lamp test switch while the engine is at rest, with the control panel mode switch in the OFF position to illuminate all status lights.
A. MODE SWITCH B. STATUS INDICATOR LIGHTS C. HOUR METER D. LAMP TEST SWITCH E. CONTROL PANEL FUSE
E. Generator Control Panel Fuse
The Generator Control Panel Fuse provides protection against damage from electrical faults. Replace the fuse only with an equivalent size and style of fuse to prevent damage to the control system.

Main Line Circuit Breaker
A Main Line Circuit Breaker is provided to protect the generator from damage caused by electrical faults within the attached electrical distribution system. It is also used to isolate the output of the generator from the connected electrical distribution system by moving the breaker handle to the OFF position. Placing the breaker in this position does not prevent startup of the generator.

A. Mode Switch
The Mode switch is used to set the operating state of the generator. Placing the switch in the OFF position prevents engine operation or stops the engine if it is already running. Moving the switch to the RUN position immediately starts the generator. Putting the switch in the AUTO position sets the generator for unattended operation under the control of properly matched automatic transfer switch.
200-2653 18

is intended for generator control during maintenance or if an automatic transfer switch is not used. With the control panel switch shifted to this position, the generator will immediately attempt to start after a brief pause. Upon starting, the generator runs until the switch is moved from the RUN position, at which time the generator will shut off.
There are three run mode options: Run, Off and Auto. When the Run pushbutton is pressed the unit will immediately start and the “not in auto” light will illuminate. In Run mode, the generator will continue to run until the Off pushbutton is pressed to stop the unit. At this point the “not in auto” light will illuminate and the unit will not operate.
To insure the generator starts without damaging the starter motor, cranking of the engine is performed in a cyclic manner. When the generator is started from either the AUTO or RUN positions, the controller alternates between 10 seconds of engine cranking, followed by 10 seconds of engine rest. If the engine starts during any of the cranking periods, crank attempts are halted and the controller begins monitoring for proper function of the generator. In the event that three 10 second start attempts occur without the engine starting, cranking attempts are halted and the Overcrank light is lit.
When the Auto pushbutton is pressed the unit will enter automatic run mode, where the generator controller and the transfer switch will control the operation of the unit. In automatic run mode, the unit will automatically start up and shut off when power failure occurs and to exercise the unit.
After the engine is started and the generator is producing electrical power, the controller begins operation in a monitoring state. In this state, several generator functions are continuously checked to ensure proper operation of the generator. If functions are determined unacceptable, a fault is declared, the engine is shut down and a status light is lit to communicate the reason for the shutdown.
When power failure occurs, a signal will be sent to the generator to start a warm up cycle. After the warm up cycle is completed, the transfer switch will allow the load to be transferred to the generator until it senses that regular utility power has been restored. When this occurs, the transfer switch will remove the load from the generator and a signal will be sent to the generator to begin a cool down cycle. After the cool down cycle is completed, the unit will stop running, but remain in the automatic run mode.
When operating with the control panel switch in the RUN position, the generator will continue to run until a fault is declared or until the mode switch is moved to the OFF position. Once the switch is shifted to the OFF position, the engine is shut off.
The unit will also automatically start itself to ensure it remains in good working order. Every 14 days the unit will automatically start up without warning and run for 20 minutes before shutting down. The unit will remain in automatic run mode after each exercise session.
When operating with the control panel switch in the AUTO position, the generator continues to run until a fault light is declared or the run signal is removed. Once the signal is removed, the engine shuts down and the controller returns to waiting for a start signal.
Two methods are available to start the generator. The automatic, or AUTO mode is for use with an automatic transfer switch. With the control panel mode switch set to this position, the generator waits for an external signal to start. This signal is supplied by the transfer switch when utility power is of unacceptable quality. Since utility power can fail at any time, be aware the generator can start unexpectedly whenever in the AUTO position. Keep away from moving parts at all times. Once utility power is once again acceptable, the signal from the transfer switch is removed, the generator shuts off, then returns to waiting for another signal to start.
The other method for starting the generating is to place the mode switch into the RUN position. This mode
19 200-2653

the engine. Once the light is on, the generator does not attempt to start until the fault is reset. When the Overcrank light is on , verify fuel is available at the inlet to the unit, then check the condition of the cranking battery.
Status indicator lights relay conditions of generator function for user or service technician convenience. Illumination of these indicator lights communicate conditions that require generator service but are not severe enough to cause damage if the generator is allowed to operate. Contact a qualified service technician immediately for service if any of the listed lights are lit, even if the generator appears to function normally.
The Low Oil light turns on and the engine is shut off if the engine oil level falls too low. To avoid engine damage, engine oil pressure is monitored to determine the amount of oil in the engine. When pressure falls below a preset level, a Low Oil fault occurs. Check for proper oil level if the generator shuts down due to a Low Oil alarm.
The Low Battery light is lit when the cranking battery voltage falls below 11.0 volts. At this level, the battery begins to lose the ability to consistently start the engine. Causes of low battery voltage may include a failing battery, failed battery charger or failed engine alternator.
The High Temperature light illuminates if the temperature of the engine becomes too high. Engine oil temperature is monitored while the engine is active and the engine is shut off to avoid damage if the oil temperature becomes too high. When operating the generator in temperatures above the maximum listed on the nameplate, it is necessary to reduce the load connected to the generator to avoid overheating. If high ambient temperatures or excessive loads are eliminated as possible causes of High Temperature shutdown, check to insure cabinet openings are not restricted by debris.
The Not In Auto light is lit whenever the control panel mode switch is not placed in the AUTO position. This light is provided to call attention to this condition since the generator cannot start automatically during a power outage without the switch in the AUTO position. It is normal for this lamp to light when the generator is running with the mode switch in the RUN position, or if the switch is in the OFF position. To turn the light off, move the mode switch to the AUTO position.
F. OVERSPEED
The Generator On light illuminates when the generators engine is running. This is the only light lit when the generator is supplying power as intended.
The Overspeed light is turned on if the generator engine is running too fast. Electrical output of the generator at high speeds may damage loads connected to the generator output and/or engine failure may occur at excessive speeds. If the generator shuts down on an Overspeed error, seek assistance from a qualified generator service technician.
Fault lights relay conditions that may cause damage to the generator and/or loads connected to the output of the generator. When any of the listed situations occur while the generator is running, the generator is shut down and the fault light associated with the shutdown cause is lit. Once the light is lit, it remains on until it is cleared by moving the control panel mode switch to the OFF position. If a fault light is lit, determine and correct the cause of the problem before restarting the generator. During generator starting, the controller ignores fault conditions until 15 seconds after the generator starts, then uncleared faults will once again cause the generator to shut off. To determine possible fault causes, refer to the troubleshooting section of this manual or contact a qualified service technician for assistance.
The Underspeed light is turned on if the generator engine is running too slow. Electrical output of the generator at low speeds can damage loads connected to the generator output and/or generator failure may occur due to excessive heating in the generator head. If the generator turns off due to an Underspeed error, check to see that the connected loads do not exceed the nameplate rating of the generator.
The Overcrank light is lit if all three 10 second cyclic crank attempts are unsuccessful in starting
200-2653 20

To ensure reliable generator operation, it is critical to periodically inspect all components. The following chart is provided as a guide for service check intervals. When the generator is operated under excessively hot, or dusty conditions, shorten service intervals according to the severity of the conditions encountered. To perform periodic inspections or maintenance, refer to the
procedures listed in the following sections. A qualified generator service technician should perform inspections or adjustments requiring specialized tools or training. Users unfamiliar with any of the listed procedures should contact an authorized dealer for servicing assistance.
Maintenance Item Every month
300 hours Every 2 years
Engine Oil Check X
Engine Oil Filter Change X
Oil Cooler Check and clean X
Engine Air Filter Check X
Battery Check and clean X
Battery Charger Check X
Spark Plugs Check X
Valve Clearance Check and Adjust X
Generator Output Frequency Check and Adjust X
Fuel System Check X
Cooling Air Openings Check X
Engine Coolant Check and Add if necessary X

ENGINE OIL LEVEL CHECK
Prior to checking the oil level, start the generator by moving the Mode switch on the control panel to the RUN position. Allow the generator to run for one or two minutes, then shut it down by returning the switch to the OFF position. After the engine comes to a stop let the engine set for a couple of minutes before checking the oil level. Begin the level check by removing the dipstick (B), wiping it clean, then reinserting it into the engine. Remove the dipstick a second time, checking that the oil level falls between the upper and lower limit marks on the end of the dipstick, as shown in Fig. A. Adjust engine oil level as required so the level is at the upper limit mark on the dipstick, adding oil to the engine through the oil fill cap (A) as shown in Fig B. Add only oil of the same specification as the oil already in the engine.
Fig. A

LOWER LIMIT

Fig. B
200-2653 22

Selection of the correct grade and type of engine oil greatly affects the performance of the generator, especially when starting. Before selecting replacement oil for an oil change, consider the anticipated operating conditions the generator may be exposed to. Choose the appropriate weight of oil for anticipated temperatures from Chart C. If temperatures are expected to fluctuate between extremes prior to the next oil change interval, use of synthetic oil is recommended. Use of oil meeting a minimum American Petroleum Institute (API) classification of SJ is advised.
5W-30
oF -20 0 20 40 60 80 100
oC -30 -20 -10 0 10 20 30 40

Engine oil changes are recommended at the maximum intervals given in the Periodic Maintance Table. When operating in hot or dusty conditions shorter change intervals may be necessary. To change the engine oil and oil filter, the listed procedure is recommended.
Chart C · 23 200-2653

Correctly maintaining the battery at regular intervals is vital to ensure consistent engine starting. Poorly maintained batteries loose charge over time and may not provide enough power to crank the engine fast enough for reliable starts. The steps below are suggested to care for the battery and charger. 1. Access the battery (E) by removing the front generator panels (F). Insert the key (G) into the top locks and turn 1/4 turn counterclockwise to unlock. Lift the panel up and out of the base and set it aside (see Fig. E). Note: there is no need to turn the locks located on the bottom of the panel. 2. Keep the battery cable clamps (H) at the battery posts tight and free of corrosion. Replace the battery cables if cracks are found in the clamps. 3. Check and adjust the level of battery electrolyte according to the battery manufacturer’s instructions if not using a “maintenance-free” battery. If electrolyte is low, add only distilled water to the battery. Do not add tap water to the battery.
The generator engine is equipped with a dry element air filter to block particles in the combustion air from getting into the engine and causing excessive engine wear. Over time this dirt builds-up on the filter, restricting the amount of combustion air available to the engine, in turn leading to a loss of generator power output. To avoid these problems, periodic replacement of the engine air filter is recommended at the intervals outline in the service schedule table on page 21. To change the air filter, follow the listed steps.
4. Insure the battery charger (I) is powered and functioning properly. A correctly operating battery charger displays lights on the face of the charger to relay the state of the charger. Refer to Table A on page 25 to assess the mode the charger is operating in. 5. Reassemble the front panels (F) to the generator by setting the bottom end of the panel into the base and push into place. Insert the key (G) into the top locks and turn 1/4 turn clockwise to lock.

Fig. D

Fig. E
200-2653 24

spark plugs with a 5/8" spark plug wrench. 3. Inspect the spark plugs for fouling or abnormal wear like excessively worn electrodes or cracked or chipped insulator material. If abnormal wear is indicated, replace the spark plugs. Fouled plugs indicate the need for engine service by a qualified engine service technician. New spark plugs or plugs that do not display any abnormal characteristics should be checked for proper gap using a suitable spark plug gauge. Adjust the gap to .035 inches (.889 mm) by carefully bending the grounding electrode. 4. Reinstall the spark plugs by hand until they begin to seat to avoid cross-threading. After the plugs begin to seat, tighten plugs an additional ¼ turn with a 5/8" spark plug wrench to avoid damage to the spark plugs. If a torque wrench is available, tighten all plugs to 13 in-lbs (18 N-m). 5. Reassemble the front and back panels (K) to the generator by setting the bottom end of the panel into the base and push into place. Insert the key (L) into the top locks and turn 1/4 turn clockwise to lock.
Display Operating Condition

Engine spark plugs are an important part of the engine ignition system. Worn or incorrectly adjusted spark plugs can negatively affect engine starting and operation. Therefore, it is important to inspect and regap, or replace the engine spark plugs as indicated in the service interval table. The listed steps are recommended to access and service the engine spark plugs.
1. Access the spark plugs (J) by removing the front and back generator panels (K). Insert the key (L) into the top locks and turn 1/4 turn counterclockwise to unlock. Lift the panels up and out of the base and set them aside. Note: there is no need to turn the locks located on the bottom of the panel. 2. Pull the spark plug boots loose, then clean any dirt from the area around the spark plugs. Remove the

VALVE CLEARANCE CHECK AND
Proper cooling of the generator is vital to maintain performance and prevent equipment failure. Blocked cabinet openings or other airflow obstructions are potential fire hazards and can cause failures. Periodically inspect generator cabinet openings and the engine oil cooler for blockages. Do not allow leaves, grass, dirt, snow or other objects to build up around the cabinet. Keep plants and other landscaping groomed to allow a minimum of three feet or greater of open space around all sides of the generator (check your local building codes for clearance requirements for your area). Do not place a cover over the generator.
Over time, normal engine operation leads to wear in the engine valve train which decreases generator output. To restore generator output, it is necessary to check and adjust the engine valve lash at regular intervals throughout the life of the engine. However, proper valve lash adjustments require specialized training and tools. Adjustment by persons unfamiliar with the procedure can cause damage to the engine not covered under warranty. Contact an authorized generator dealer for assistance in locating qualified service personnel.
Avoid explosive and potentially lethal fuel leaks by inspecting the complete generator fuel supply system at intervals no greater than those listed in the Maintenance Table on page 21` . Visually inspect all hoses for cracks, splits, or brittleness and replace hoses that show these or other signs of wear. Check all connections for tightness and cracks, replacing any broken fittings or clamps. Check all connections for leaks, while the generator is running, using approved equipment and methods. DO NOT use a flame to check for leaks.
200-2653 26

Loose battery cables • Check all battery cable connections.
Defective battery • Test battery. Replace as necessary.
Improper battery charger function
Engine does not crank
Fault in starter signal circuit • Contact a qualified generator dealer for service assistance.
Blown control circuit fuse • Check control circuit fuse.
Engine cranks without starting
Engine starts then immediately shuts down
Main line circuit breaker tripped • Check breaker. Clear faults, then reclose breaker.
Disconnect breaker tripped • Check for tripped breaker in circuit between generator output and transfer switch. Clear fault, then reclose breaker.
Generator loss of excitation • Contact a qualified generator dealer for service assistance.
Excitation capacitor failure • Contact a qualified generator dealer for service assistance.
Generator diode or varistor failure • Contact a qualified generator dealer for service assistance.
Generator head fault • Contact a qualified generator dealer for service assistance.

Excitation capacitor failure • Contact a qualified generator dealer for service assistance.
Low generator output voltage
Generator diode or varistor failure • Contact a qualified generator dealer for service assistance.
Overspeed light stays lit Shutdown due to high engine
speed • Verify correct engine speed setting.
Underspeed light stays lit
Shutdown due to low engine speed • Reduce loads connected to generator.
Overcrank light stays lit Failure to start • See "Engine cranks without starting".
Not In Auto light stays lit Generator not set for
Low oil pressure light stays lit
Shutdown due to low engine oil pressure
Low battery light stays lit Low battery
High engine temperature light stays lit
Shutdown due to high engine temperature
unattended operation · 200-2653 28





Limited Warranty
Warranty: Powermate Corporation warrants to the original consumer purchaser in the U.S. or Canada that it will repair or replace any parts or components found to be defective in material or workmanship. The product must be properly installed and maintained in accordance with operator's manuals, and must be used solely as emergency stand-by power to a utility-supplied primary power system. Warranty service must be performed by an authorized service center.
Warranty Period:
Comprehensive: Covers the entire unit (including engine and alternator) for three (3) years or 1500 hours of operation, whichever occurs first, from the date of purchase. This warranty covers the cost of parts and labor to repair or replace defective parts.
Extended Warranty on Engine/Alternator: Covers the engine and alternator for five (5) years or 1500 hours of operation, whichever occurs first, from the date of purchase. If repair or replacement of defective engine/alternator parts or components is needed after the first three years, Powermate will provide or pay for the replacement parts or components. (Labor not included.)
For warranty service, the customer must provide dated proof of purchase and must notify Powermate within the warranty period. This warranty is not transferable.
Not Covered: The following are not covered by the warranty: o Routine maintenance and tune-ups; replacement of normal maintenance items such as filters, spark plugs, fuses, or lamps; or consumables such as fuel, oil or coolant/antifreeze; o Starting batteries, or service associated with battery failure; o Damages or repairs caused by:
~ Improper installation ~ Improper maintenance, or failure to maintain and service the product according to the operating instructions ~ Operation with improper fuels or lubricants, or at speeds, loads, or conditions contrary to operating instructions ~ Abuse, accident, theft, vandalism, acts of God or other external causes; o Overtime charges during repair or air freight shipping charges incurred at the customer's request, unless done with Powermate's prior approval.
Warranty is void (i) if the product is modified or altered contrary to published specifications, (ii) if repairs are performed by anyone other than Powermate-authorized service center or with parts other than Powermate-approved parts, or (ii) where the generator is used as a primary power source or as back up for solar, wind-power or other alternative power system.
For warranty service: Call toll free 866-769-3703, or write to Powermate Corporation, Product Services, 4970 Airport Road, Kearney, NE 68848.
EXCLUSIONS AND LIMITATIONS: THE COMPANY MAKES NO OTHER WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. IMPLIED WARRANTIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND OF FITNESS FOR A PARTICULAR PURPOSE, ARE HEREBY DISCLAIMED. THE WARRANTY SERVICE DESCRIBED ABOVE IS THE EXCLUSIVE REMEDY UNDER THIS WARRANTY; LIABILITY FOR INCIDENTAL AND CONSEQUENTIAL DAMAGES IS EXCLUDED TO THE EXTENT PERMITTED BY LAW.
This warranty gives you specific legal rights, and you may also have other rights which vary from state to state. Some states do not allow a disclaimer of implied warranties, or the exclusion or limitation of incidental and consequential damages, so the above disclaimers and exclusions may not apply to you.
31 200-2653


1-866-769-3703 to obtain warranty service information or to order replacement parts or accessories.
HOW TO ORDER REPLACEMENT PARTS Even quality built equipment such as the Powermate standby generator you have purchased, might need occasional replacement parts to maintain it in good condition over the
years. To order replacement parts, please give the following information:
4970 Airport Road P. O. Box 6001 Kearney, NE 68848
1-866-769-3703 1-308-237-2181 Fax 1-308-234-4187
Made in USA with domestic and foreign components
Powermate Corporation, Aurora, IL 60504
All Rights Reserved. Tous droits réservés. Reservados todos los derechos.
Powermate® is a registered trademark of Powermate Corporation. Powermate® est une marque déposée de Powermate Corporation. Powermate® es una marca comercial registrada de Powermate Corporation.
PowerStation® is a registered trademark of Powermate Corporation. PowerStation® est une marque déposée de Powermate Corporation. PowerStation® es una marca comercial registrada de Powermate Corporation.
©2007 Powermate Corporation
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.