EN
Peerless Industries logo
Official user manual

Peerless Industries EXB

11 pages·1.6 MB·Projector·PDF·ENDEFRITNLJA
Peerless Industries EXB
Table of Contents 48 sections Installation and Assembly: Projector Ceiling/Wall Mount · CEILING/WALL CONSTRUCTION ADDITIONAL HARDWARE REQUIRED · Tools Needed for Assembly · Parts List · … ShowHide
Installation and Assembly: Projector Ceiling/Wall Mountp.1CEILING/WALL CONSTRUCTION ADDITIONAL HARDWARE REQUIREDp.2Tools Needed for Assemblyp.2Parts Listp.3OUTER CHANNEL, INNER CHANNEL AND CABLE COVERp.3PART NUMBER CHARTp.3EXA 8.69" - 12.79" 055-1779 055-1778 055-1809-2p.3EXA-S 8.69" - 12.79" 055-4779 055-4778 055-4809-2p.3EXA-W 8.69" - 12.79" 055-2779 055-2778 055-2809-2p.3EXB 12.69" - 20.69" 055-1776 055-1775 055-1809-1p.3EXB-S 12.69" - 20.69" 055-4776 055-4775 055-4809-1p.3EXB-W 12.69" - 20.69" 055-2776 055-2775 055-2809-1p.3EXC 19.14" - 32.9" 055-1770 055-1769 055-1809p.3EXC-S 19.14" - 32.9" 055-4770 055-4769 055-4809p.3EXC-W 19.14" - 32.9" 055-2770 055-2769 055-2809p.3Part List Continuedp.4A B C Dp.4E F Gp.4K L M Np.4Q Pp.4Installation to Wood Joist Ceilings or Wood Stud Wallsp.5MOUNTING SLOTS ALLOW FOR ROTATION BEFORE SECURING TO JOIST Op.5Installation to Concrete Ceilings or Concrete/Cinder Block Wallsp.6CEILING INSTALLATIONp.6CONCRETE CEILINGp.6H Bp.6WALL INSTALLATION (EXCEPT FOR EXC MODELS)p.6CINDER BLOCK WALLp.6CONCRETE WALLp.6J B A Hp.6concrete surface 1p.6INCORRECTp.6CORRECTp.6A Ap.6CUTAWAY VIEWp.6Installing Inner Channel and Routing Cablesp.7Installing Projector Mountp.8Installing Projector Mount (continued)p.9Adjusting Mount Extensionp.10CEILING INSTALLATION WALL INSTALLATION (EXCEPT FOR EXC MODELS) Dp.10Install Cable Coversp.10Projector Alignmentp.11SWIVEL ADJUSTMENT WITH PRGp.11SWIVEL ADJUSTMENT WITH PRSp.11SCREWS FOR SWIVEL ADJUSTMENTp.1120° (±10°) SWIVELp.11SWIVEL ADJUSTMENTp.11TOP VIEWp.11
Page 1 of the Peerless Industries EXB user manual — Installation and Assembly: Projector Ceiling/Wall Mount
Page 1 · click to enlarge
Page 1

Installation and Assembly: Projector Ceiling/Wall Mount

Peerless Industries EXB — Installation and Assembly: Projector Ceiling/Wall Mount diagram (page 1)
Fig. 1 · Installation and Assembly: Projector Ceiling/Wall Mo…
Model#Max UL Load Capacity EXA, EXA-S, EXA-W, EXB, EXB-S, EXB-W, EXC, EXC-S, EXC-Wused with PRS projector mount 25 lb (11.3 kg) used with PRG projector mount 50 lb (22.7 kg)

This product is intended for use with UL Listed products and must be installed by a qualified professional installer.

Installed to Wall (EXC models are not wall mountable due to its extensive reach)

Shown with PRG projector mount and projector (not included)

  • Features:
  • For use with PRG-UNV and PRS-UNV Projector Mounts
  • EXA and EXB series for ceiling or wall mounting
  • EXC models for ceiling mounting
  • Integrated cable management
  • Various height adjustments for ideal viewing positions

Shown with PRS projector mount and projector (not included)

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

  • 3215 W. North Ave.
  • Melrose Park, IL 60160
  • (800) 865-2112 or (708) 865-8870
  • Fax: (708) 865-2941
  • <a href="http://www.peerlessmounts.com" rel="nofollow noopener" target="_blank">www.peerlessmounts.com</a>
Page 2 of the Peerless Industries EXB user manual — Tools Needed for Assembly
Page 2 · click to enlarge
Page 2
  • Do not begin to install your Peerless product until you have read and understood the instructions and warnings contained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, please call Peerless customer care at 1-800-865-2112.
  • This product should only be installed by someone of good mechanical aptitude, has experience with basic building construction, and fully understands these instructions.
  • Make sure that the supporting surface will safely support the combined load of the equipment and all attached hardware and components.
  • Never exceed the Maximum UL Load Capacity. See page 1.
  • If mounting to wood ceiling/wall studs, make sure that mounting screws are anchored into the center of the studs. Use of an "edge to edge" stud finder is highly recommended.
  • Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
  • Tighten screws firmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding power.
  • This product is intended for indoor use only. Use of this product outdoors could lead to product failure and personal injury.
  • This product was designed and intended to be mounted to the following supporting surfaces checked below with the hardware included in this product as specified in the installation sheet. To mount this product to an alternative supporting surface, contact Peerless customer care at 1 800 865-2112.
  • This product was designed to be installed on the following ceiling/wall construction only;

CEILING/WALL CONSTRUCTION ADDITIONAL HARDWARE REQUIRED

x Wood Stud None x Wood Joist None x Solid Concrete None x Cinder Block None Metal Stud Do not attach except with Peerless accessory kit for metal studs; Contact Customer Service for Peerless accessory kit for metal studs. Brick Contact Customer Service Other or unsure? Contact Customer Service

Tools Needed for Assembly

  • stud finder ("edge to edge" stud finder is recommended)
  • drill
  • 1/4" bit for concrete and cinder block wall
  • 5/32" bit for wood stud or joist
  • level
  • 8 mm open end wrench

Table of Contents Parts List 3, 4 Install Outer Channel to Ceiling Plate 4 Installation to Wood Joist Ceiling or Wood Stud Wall 5 Installation to Solid Concrete Ceiling or Concrete/Cinder Block Walls 6 Installing Inner Channel and Routing Cables 7 Installing Projector Mount 8-9 Installing Projector 9 Adjusting Mount Extension 10 Install Cable Covers 10 Projector Alignment 11

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

Page 3 of the Peerless Industries EXB user manual — EXA 8.69" - 12.79" 055-1779 055-1778 055-1809-2
Page 3 · click to enlarge
Page 3

Before you begin, make sure all parts shown are included with your product.

Parts List

EXA, EXB Part #

EXA-S, EXB-S Part #

EXA-W, EXB-W Part #

Description Qty.

A ceiling plate 1 055-1773 055-4773 055-2773 055-1773 055-4773 055-2773

B outer channel 1 SEE CHART SEE CHART SEE CHART SEE CHART SEE CHART SEE CHART

C inner channel 1 SEE CHART SEE CHART SEE CHART SEE CHART SEE CHART SEE CHART

D clamp plate 1 055-1771 055-4771 055-2771 055-1771 055-4771 055-2771

E vertical mounting plate 1 055-1876 055-4876 055-2876 055-1876 055-4876 055-2876

F horizontal mounting plate 1 055-1787 055-4787 055-2787 N/A N/A N/A

G M5 x 16 mm socket pin screw 2 520-1161 520-2161 520-2161 520-1161 520-2161 520-2161

H #14 x 2.5 wood screw 2 5S1-015-C03 5S1-015-C04 5S1-015-C04 5S1-015-C03 5S1-015-C04 5S1-015-C04

J Alligator® concrete anchor 2 590-0097

K M6 x 12 mm socket pin screw 2 520-1050 520-2050 520-2050 520-1050 520-2050 520-2050

L M6 x 10 mm socket pin screw 4 520-1066 520-2066 520-2066 520-1066 520-2066 520-2066

M M5 x 10 mm socket pin screw 4 520-1063 520-2063 520-2063 520-1063 520-2063 520-2063

N serrated locknut 2 530-1027 530-2042 530-2042 530-1027 530-2042 530-2042

O flat washer 6 540-1078 540-2078 540-2078 540-1078 540-2078 540-2078

P 4 mm security allen wrench 1 560-9646

Q cable cover 2 SEE CHART SEE CHART SEE CHART SEE CHART SEE CHART SEE CHART

OUTER CHANNEL, INNER CHANNEL AND CABLE COVER

PART NUMBER CHART

extendable outer channel (B) inner channel (C) cable cover (Q)

Model# length part# part# part#

EXA 8.69" - 12.79" 055-1779 055-1778 055-1809-2

EXA-S 8.69" - 12.79" 055-4779 055-4778 055-4809-2

EXA-W 8.69" - 12.79" 055-2779 055-2778 055-2809-2

EXB 12.69" - 20.69" 055-1776 055-1775 055-1809-1

EXB-S 12.69" - 20.69" 055-4776 055-4775 055-4809-1

EXB-W 12.69" - 20.69" 055-2776 055-2775 055-2809-1

EXC 19.14" - 32.9" 055-1770 055-1769 055-1809

EXC-S 19.14" - 32.9" 055-4770 055-4769 055-4809

EXC-W 19.14" - 32.9" 055-2770 055-2769 055-2809

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

EXC Part # · EXC-S Part # · EXC-W Part #

Page 4 of the Peerless Industries EXB user manual — H
Page 4 · click to enlarge
Page 4

Part List Continued

Parts may appear slightly different than illustrated.

A B C D

Peerless Industries EXB — A B C D diagram (page 4)
Fig. 2

H

E F G

K L M N

O

Q P

Peerless Industries EXB — H diagram (page 4)
Fig. 3

1 Attach outer channel (B) to ceiling plate (A) using four M6 x 10 mm socket pin screws (L) as shown.

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

Page 5 of the Peerless Industries EXB user manual — MOUNTING SLOTS ALLOW FOR ROTATION BEFORE SECURING TO JOIST O
Page 5 · click to enlarge
Page 5

Installation to Wood Joist Ceilings or Wood Stud Walls

  • Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached hardware and components.
  • Tighten wood screws so that ceiling/wall plate is firmly attached, but do not overtighten. Overtightening can damage the screws, greatly reducing their holding power.
  • Never tighten in excess of 80 in.
  • lb (9 N.M.).
  • Make sure that mounting screws are anchored into the center of the stud or joist. The use of an "edge to edge" stud finder is highly recommended.
  • Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs or joists. Installers are responsible to provide hardware for other types of mounting situations (not UL approved).

NOTE: Wall installation with models EXC, EXC-S and EXC-W is not available. Use a stud finder to locate the edges of the stud or joist. Use of an edge-to-edge stud finder is highly recommended. Based on its edges, draw a vertical line down the stud's or joist’s center. Place ceiling/wall plate (A) on wall or ceiling as a template, making sure that the two mounting slots are on the centerline. For ceiling installation: Opening on outer channel (B) indicates front of mount. Use the correct mounting slots on the ceiling/wall plate depending on ceiling joist orientation as shown in figure 2.1 and figure 2.2. Mounting slots on ceiling plate allow for 45° (±22.5) of rotation before securing to joist. For wall installation: Opening on outer channel (B) indicates top of mount. Mark the center of the two mounting holes. Drill two 5/32" (4 mm) dia. holes 2-1/2" (65 mm) deep. Secure ceiling/wall plate (A) to wood stud or joist using two #14 x 2-1/2" wood screws (H) and two flat washers (O) as shown. Skip to step 3

Peerless Industries EXB — Installation to Wood Joist Ceilings or Wood Stud Walls diagram (page 5)
Fig. 4 · Installation to Wood Joist Ceilings or Wood Stud Wal…

OPENING ON OUTER CHANNEL (B) INDICATES TOP OF MOUNT

MOUNTING SLOTS ALLOW FOR ROTATION BEFORE SECURING TO JOIST O

OPENING ON OUTER CHANNEL (B) INDICATES FRONT OF MOUNT

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

Page 6 of the Peerless Industries EXB user manual — INCORRECT
Page 6 · click to enlarge
Page 6

Installation to Concrete Ceilings or Concrete/Cinder Block Walls

  • When installing Peerless wall mounts on cinder block, verify that you have a minimum of 1-3/8" of actual concrete thickness in the hole to be used for the concrete anchors. Do not drill into mortar joints! Be sure to mount in a solid part of the block, generally 1" minimum from the side of the block. Cinder block must meet ASTM C-90 specifications. It is suggested that a standard electric drill on slow setting is used to drill the hole instead of a hammer drill to avoid breaking out the back of the hole when entering a void or cavity.
  • Concrete must be 2000 psi density minimum. Lighter density concrete may not hold concrete anchor.
  • Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached hardware and components.

NOTE: Wall installation with models EXC, EXC-S and EXC-W is not available. Place ceiling/wall plate (A) on ceiling or wall as a template. Note: Place ceiling/wall plate according to position of opening in outer channel (B) as shown in figure 2.4. or figure 2.5. Drill two 1/4" (6 mm) dia. holes to a minimum depth of 2.5" (64 mm). Attach ceiling/wall plate (A) using two concrete anchors (J), two #14 x 2.5" wood screws (H) and two washers (O) as shown in figure 2.6. Tighten wood screws (H) until ceiling/wall plate (A) is firmly attached.

CEILING INSTALLATION

J

CONCRETE CEILING

A

O

OPENING ON OUTER CHANNEL (B) INDICATES FRONT OF MOUNT

H B

WALL INSTALLATION (EXCEPT FOR EXC MODELS)

CINDER BLOCK WALL

  • Tighten wood screws firmly, but do not overtighten. Overtightening can damage the screws, greatly reducing their holding power.

CONCRETE WALL

  • Never tighten in excess of 80 in
  • lb (9 N.M.).

OPENING ON OUTER CHANNEL (B) INDICATES TOP OF MOUNT

J B A H

O

  • Always attach concrete expansion anchors directly to load-bearing concrete.

concrete surface 1

  • Never attach concrete expansion anchors to concrete covered with plaster, drywall, or other finishing material. If mounting to concrete surfaces covered with a finishing surface is unavoidable, the finishing surface must be counterbored as shown below. Be sure concrete anchors do not pull away from concrete when tightening screws. If plaster/drywall is thicker than 5/8" (16 mm), custom fasteners must be supplied by installer (not UL approved).

J

Drill holes and insert anchors (J).

H

A

O

J

Place plate (A) over anchors (J) and secure with washers (O) and screws (H).

INCORRECT

CORRECT

A A

CUTAWAY VIEW

Tighten all fasteners.

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

Show 4 more labels / short text on this page
concrete · concrete · plaster/ dry wall · plaster/ dry wall
Page 7 of the Peerless Industries EXB user manual — Installing Inner Channel and Routing Cables
Page 7 · click to enlarge
Page 7

Installing Inner Channel and Routing Cables

3 Note: Be certain holes on inner channel (C) face in the same direction of opening on outer channel (B). Note: Cables must be removed from projector before routing through channels. If cables are not removable from projector, routing through channels is not an option. Guide projector cables into openings in channels then insert inner channel (C) into outer channel (B) as shown in figure 3.1 or 3.3. Position inner channel (C) to the desired extended position and secure using two M6 x 12 mm socket pin screws (K) through clamp plate (D) and into inner channel (C) as shown in figure 3.2 or 3.4.

Peerless Industries EXB — Installing Inner Channel and Routing Cables diagram (page 7)
Fig. 5 · Installing Inner Channel and Routing Cables
Peerless Industries EXB — Installing Inner Channel and Routing Cables diagram (page 7)
Fig. 6 · Installing Inner Channel and Routing Cables

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

Page 8 of the Peerless Industries EXB user manual — Installing Projector Mount
Page 8 · click to enlarge
Page 8

Installing Projector Mount

Installing PRG projector mount with ceiling installation: Attach vertical mounting plate (E) to PRG projector mount (not included) using two M5 x 16 mm socket pin screws (G), four flat washers (O) and two locknuts (N) as shown in figure 4.1. Installing PRG projector mount with wall installation: Position PRG projector mount (not included) to the orientation shown in figure 4.2 and attach to horizontal mounting plate (F) using two M5 x 16 mm socket pin screws (G), four flat washers (O) and two locknuts (N).

Peerless Industries EXB — Installing Projector Mount diagram (page 8)
Fig. 7 · Installing Projector Mount
Peerless Industries EXB — Installing Projector Mount diagram (page 8)
Fig. 8 · Installing Projector Mount

PRG PROJECTOR MOUNT (NOT INCLUDED) PRG PROJECTOR MOUNT (NOT INCLUDED)

Installing PRS projector mount with wall installation: Position PRS projector mount (not included) to the orientation shown in figure 4.3 and attach to horizontal mounting plate (F) using two M5 x 16 mm socket pin screws (G), four flat washers (O) and two locknuts (N). Installing PRS projector mount with ceiling installation: Attach vertical mounting plate (E) to PRS projector mount (not included) using two M5 x 16 mm socket pin screws (G), four flat washers (O) and two locknuts (N) as shown in figure 4.4.

Peerless Industries EXB — Installing Projector Mount diagram (page 8)
Fig. 9 · Installing Projector Mount

PLACE WASHER (O) AND NUT (N) COMBINATION FIRST

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

Page 9 of the Peerless Industries EXB user manual — Installing Projector Mount (continued)
Page 9 · click to enlarge
Page 9

Installing Projector Mount (continued)

5 Ceiling installation: Insert vertical mounting plate (E) into inner channel (C) with projector mount in the correct orientation shown in figure 5.1 or 5.2. Secure vertical mounting plate to inner channel using four socket pin screws (M) as shown in figure 5.3.

Peerless Industries EXB — Installing Projector Mount (continued) diagram (page 9)
Fig. 10 · Installing Projector Mount (continued)

PRG PROJECTOR MOUNT (NOT INCLUDED) PRS PROJECTOR MOUNT (NOT INCLUDED)

Wall installation: Insert horizontal mounting plate (F) into inner channel (C) as shown in figure 5.4 or 5.5. Secure horizontal mounting plate to inner channel using four socket pin screws (M) as shown in figure 5.6.

6 Refer to instruction manual included with your projector mount for installing projector. NOTE: Refer to instruction manual included with your projector mount for max load capacity of your projector mount.

Shown with PRG projector mount and projector (not included)

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

Page 10 of the Peerless Industries EXB user manual — Install Cable Covers
Page 10 · click to enlarge
Page 10

Adjusting Mount Extension

Peerless Industries EXB — Adjusting Mount Extension diagram (page 10)
Fig. 11 · Adjusting Mount Extension

While supporting the weight of the projector, loosen clamp plate screws half a turn and position projector to the desired extended position. Retighten clamp plate screws securely.

  • On ceiling installations, clamp plate adjustment screws support weight of projector when fully tightened. Weight of the projector will need to be supported if clamp plate screws are loosened.

CEILING INSTALLATION WALL INSTALLATION (EXCEPT FOR EXC MODELS) D

Install Cable Covers

Cut cable covers (Q) to the length of inner channel (C) and outer channel (B) openings, leaving space for cables if routed through channels. Snap cable covers (Q) into openings as shown. 8

Peerless Industries EXB — Install Cable Covers diagram (page 10)
Fig. 12 · Install Cable Covers

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

Page 11 of the Peerless Industries EXB user manual — 20° (±10°) SWIVEL
Page 11 · click to enlarge
Page 11

Projector Alignment

For PRG swivel adjustment: Loosen two screws indicated in figure 9.1 half a turn using allen wrench (P) to allow for adjusting swivel. Align projector to the desired swivel position and fully tighten screws indicated.

For PRS swivel adjustment: Loosen two screws indicated in figure 9.1 half a turn using allen wrench (P) to allow for adjusting swivel. Align projector to the desired swivel position and fully tighten screws indicated.

To adjust tilt and roll, refer to instruction included with projector mount.

Peerless Industries EXB — Projector Alignment diagram (page 11)
Fig. 13 · Projector Alignment
  • Do not loosen adjustment screws to the point they become disengaged from the mount. Weight of the projector should be supported in case of accidental disengagement.

SWIVEL ADJUSTMENT WITH PRG

SWIVEL ADJUSTMENT WITH PRS

Peerless Industries EXB — SWIVEL ADJUSTMENT WITH PRG diagram (page 11)
Fig. 14
Peerless Industries EXB — SWIVEL ADJUSTMENT WITH PRG diagram (page 11)
Fig. 15

SCREWS FOR SWIVEL ADJUSTMENT

SCREWS FOR SWIVEL ADJUSTMENT

Peerless Industries EXB — SCREWS FOR SWIVEL ADJUSTMENT diagram (page 11)
Fig. 16

20° (±10°) SWIVEL

SWIVEL ADJUSTMENT

TOP VIEW

Visit the Peerless Web Site at www.peerlessmounts.com For customer care call 1-800-865-2112 or 708-865-8870.

© 2008, Peerless Industries, Inc. All rights reserved. All other brand and product names are trademarks or registered trademarks of their respective owners.

Ask about the Peerless Industries EXB

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Peerless Industries EXB

Be the first to ask — other owners or our team will answer.

Original document

Peerless Industries EXB manual PDF

11 pages·1.6 MB·Projector·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…