EN
NEC logo
Official user manual

NEC PBX System (120)

125 pages·1.2 MB·Answering Machine·PDF·EN
NEC PBX System (120)
Table of Contents 166 sections COVER · IMPORTANT SAFETY CONSIDERATIONS · INDEX · TABLE OF CONTENTS · … ShowHide
COVERp.1IMPORTANT SAFETY CONSIDERATIONSp.6INDEXp.8TABLE OF CONTENTSp.9CHAPTER 1 INTRODUCTIONp.151. Purposep.152. Reference Manualsp.153. How to Follow the Manualp.164. Scope of Installation Worksp.16CHAPTER 2 GENERAL INFORMATIONp.171. Trunking Diagramp.172. System Configurationsp.19CHAPTER 3 INSTALLATION PROCEDUREp.241. PRECAUTIONSp.241.1 Power, Ground Cabling and LIU (for Australia)p.241.2 grounding Requirementsp.241.3 Static Electricity Guardp.251.4 Procedure for Uplugging/Plugging Circuit Cardsp.271.5 Connecting Consoles' Cablesp.272. PROCEDUREp.28NAP-200-001 Unpackingp.30-200-002 Marking and Drillingp.31-200-003 Installation of Main Equipmentp.33-200-004 Installation of Peripheral Equipmentp.62-200-005 Connection of Batteryp.71-200-006 Cable Running to MDFp.75-200-007 Termination of Cables to MDFp.78-200-008 Mounting of Circuit Cardsp.120-200-009 System Insitialsation and System Data Entryp.122-200-010 Operation Testp.125LIST OF ILLUSTRATIONSp.111-1 Reference Manuals for Installationp.151-2: Scope of Installation Proceduresp.162-1 PABX Trunking Diagramp.172-2 1-PIM Configuration for Floor Standing Installationp.192-3 2-PIM Configuration for Floor Standing Installationp.202-4 8-PIM Configuration for Floor Standing Installationp.212-5 1-PIM Configuration for Wall-Mounting Installationp.222-6: 4-PIM Configuration for 19-Inch Rack-Mounting Installationp.233-1 TRC Earth Wiringp.243-2 Static Electricity Guardp.253-3 Procedure Flowchartp.28001-1 Unpacking of Main Equipmentp.30002-1 Floor Marking for Main Equipmentp.31002-2 Wall Mounting Pointsp.32003-1 Location of the Cable Holesp.33003-2 Connection of RACK PARTS and BASEp.34003-3 Connection of RACK PARTSp.35003-4 Connection of the PIM and the RACK PARTSp.36003-5 Connection of PIMsp.37003-6 Wall Mounting Pointsp.38003-7 Screwing RACK PARTS to Wallp.39003-8 Mounting PABX to RACK PARTSp.40003-9 Screwing the RACK PARTS to a Wallp.41003-10 Screwing the RACK PARTS and the BASEp.42003-11 Modular Layout for 1 PIM Configurationp.43003-12 Modular Layout for 2 PIM Configurationp.43003-13 Modular Layout for 3 PIM Configurationp.44003-14 Modular Layout for 4 PIM Configurationp.45003-15 Modular Layout for 5 PIM Configurationp.46003-16 Modular Layout for 6 PIM Configurationp.47003-17 Modular Layout for 7 PIM Configurationp.48003-18 Modular Layout for 8 PIM Configurationp.49003-19 1 PIM Configuration (19”Rack Mount)p.51003-20 2 PIM Configuration (19”Rack Mount)p.52003-21 3 PIM Configuration (19”Rack Mount)p.53003-22 4 PIM Configuration (19”Rack Mount)p.54003-23 Cable Connections and Switch Settings on PZ-PW86p.55003-24 Cable Connections and Switch Settings on PZ-PW86(A)p.56003-25 Cable Connection between the PZ-PW86 and the BWBp.57003-26 AC CORD-A Wiring to BASEp.58003-27 Mounting of the BUS Cardsp.59003-28 BUS Cablep.60003-29 Connection of the BUS Cablesp.61004-1 Mounting of Handset Supportp.62004-2 ATT Cable Connection to SN694 ATTCONp.63004-3 ATT Cable Connection to Main Equipmentp.64004-4 Mounting of Handset Support to SN611 ATTCONp.66004-5 Jack Set Installation for SN611 ATTCONp.67004-6 Access to Switch on SN611 ATTCONp.68004-7 Switch Setting on SN611 ATTCONp.69004-8 Cable Connection to SN611 ATTCONp.70005-1 Internal Battery Mountingp.71005-2 Internal Battery Connectionp.72005-3 PWR CA-Ap.72005-4 Internal Battery Connection for 8 PIMS Configurationp.73006-1 Cable for Existing MDFp.75006-2 Example of Existing MDF Cable Runningp.77007-1 Location of Card Slot and LTC Connec...p.78007-2 Location of LENp.79007-3 LTC Connector Pin Arrangementp.81007-4 MDF Cross Connection for 4 Line C.O. Trunk (PN-4COTE)p.93007-5 MDF Cross Connection for 2 Line C.O. Trunk (PN-2COTD)p.94007-6 MDF Cross Connection for a 4W E&M Trunk Card (PN-2ODTA)p.95007-7 MDF Cross Connection for an LD Trunk (PN-2LDTA)p.97007-8 MDF Cross Connection for a DID Trunk Card (PN-AUCA)p.98007-9 MDF Cross Connection for a Single Line Telephone (Standard Line)p.99007-10 MDF Cross Connection for a Single Line Telephone (Long Line)p.100007-11 MDF Cross Connection for a Dterm/DSS Console (Standard Line)p.101007-12 MDF Cross Connection for a Dterm/DSS Console (Long Line)p.102007-13 MDF Cross Connection for an SN611 ATTCON and Dterm 6D/16Dp.103007-14 MDF Cross Connection for Day/Night Mode Change by External Keyp.104007-15 Outline of the External TAS Indicator Connectionp.105007-16 MDF Cross Connection for a TAS Indicator with a Batteryp.106007-17 MDF Cross Connection for a TAS Indicator without a Batteryp.107007-18 Outline of the Paging Equipment Connectionp.108007-19 MDF Cross Connection for Paging Equipmentp.109007-20 Outline of the External Music Connectionp.111007-21 MDF Cross Connection for External Music Equipmentp.112007-22 Connection Method of Music Source with D.C. Offsetp.114007-23 MDF Cross Connection for External BGM Sourcesp.115007-24 Outline of the PFT Connectionp.116007-25 MDF Cross Connection for the PFTp.117007-26 MDF Cross Connection for Alarm Display Panelp.119008-1 Lamp Indication on PZ-PW86(A) Cardp.1201. Precautionsp.241.1 Power, Ground Cabling and LIU (for Australia)p.241.2 Grounding Requirmentsp.241.3 Static Electricity Guardp.251.4 Procedure for Unplugging/Plugging Circuit Cardsp.271.5 Connecting Consoles' Cablesp.272. Procedurep.28NAP-200-001 Unpackingp.301. Unpacking Procedurep.30NAP-200-002 Marking and Drillingp.311. Confirmation of the Equipment Layoutp.312. Marking and Drillingp.312.1 Floor Standingp.312.2 Wall-Mountingp.32NAP-200-003 Installation of Main Equipmentp.331. Installation of Modulesp.331.1 Installation of the BATTM and MDFMp.331.2 Floor Standing Installationp.341.3 Wall-Mounting Installationp.381.4 19-Inch Rack-Mounting Installationp.502. Precautionsp.502.1 Cable Connections and Switch Settings on PZ-PW86p.552.2 Cable Connections and Switch Settings on PZ-PW86(A)p.56NAP-200-004 Installation of Peripheral Equipmentp.621. Installation of SN694 ATTCONp.622. Installation of SN611 ATTCONp.66NAP-200-005 Connection of Batteryp.711. Internal Battery Connectionp.712. External Battery Connectionp.74NAP-200-006 Cable Running to MDFp.751. Cable Running to MDFp.75NAP-200-007 Termination of Cables on MDFp.781. Cable Connection to MDFp.782. MDF Cross Connectionsp.89NAP-200-008 Mounting of Circuit Cardsp.1201. Mounting Procedurep.120NAP-200-009 System Initialization and System Data Entryp.1221. System Initializationp.1221.1 All Clear, Except LEN0000 CATp.1221.2 Resident System Programp.1222. System Data Entryp.1232.1 CAT (Customer Administration Terminal)p.1232.2 MAT (Maintenance Administration Terminal)p.124NAP-200-010 Operation Testp.1251. Operation Testp.125LIST OF TABLESp.142-1 Description of Symbols in Trunking Diagramp.183-1 Procedure for Unplugging/Plugging Circuit Cardsp.27003-1 Recommended Fastenersp.39007-1 LTC Connector Accommodationp.78007-2 LTC0-LTC2 MDF Cross Connection Informationp.89
Page 1 of the NEC PBX System (120) user manual — AD-25182501
Page 1 · click to enlarge
Page 1

AD-25182501

ISSUE 1.0.1

Model 120 Installation Procedure Manual

OCTOBER, 1995

NEC Australia Pty. Ltd.

Page 2 of the NEC PBX System (120) user manual — LIABILITY DISCLAIMER
Page 2 · click to enlarge
Page 2

LIABILITY DISCLAIMER

NEC Australia Pty. Ltd. reserves the right to change the specifica- tions, functions, or features, at any time, without notice.

NEC Australia Pty. Ltd. has prepared this document for use by its employees and customers. The information contained herein is the property of NEC Australia Pty. Ltd. and shall not be reproduced without prior written approval from NEC Australia Pty. Ltd.

NEC Australia Pty. Ltd.

Copyright 1994 · Printed in Australia

Page 3 of the NEC PBX System (120) user manual — ISSUE 1.0.1 ISSUE 2 ISSUE 3 ISSUE 4
Page 3 · click to enlarge
Page 3

1.0.1

ISSUE

37 38 39 40 41 42 43 44 45 46 47 48 49 50

No.

PAGE N0.

1.0.1

ISSUE

23 24 25 26 27 28 29 30 31 32 33 34 35 36

No.

PAGE N0.

1.0.1

ISSUE

9 10 11 12 13 14 15 16 17 18 19 20 21 22

No.

PAGE N0.

1.0.1

ISSUE

i ii iii iv v vi 1 2 3 4 5 6 7 8

No.

PAGE N0.

ISSUE 1.0.1 ISSUE 2 ISSUE 3 ISSUE 4

DATE OCTOBER, 1995 DATE DATE DATE

ISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8

DATE NEAX7400 ICS Model 120 Installation Procedure Manual Revision Sheet 1/3 AD-25182501

Page 4 of the NEC PBX System (120) user manual — ISSUE 1.0.1 ISSUE 2 ISSUE 3 ISSUE 4
Page 4 · click to enlarge
Page 4

1.0.1

ISSUE

93 94 95 96 97 98 99 100 101 102 103 104 105 106

No.

PAGE N0.

1.0.1

ISSUE

79 80 81 82 83 84 85 86 87 88 89 90 91 92

No.

PAGE N0.

1.0.1

ISSUE

65 66 67 68 69 70 71 72 73 74 75 76 77 78

No.

PAGE N0.

1.0.1

51 52 53 54 55 56 57 58 59 60 61 62 63 64

ISSUE

No.

PAGE N0.

ISSUE 1.0.1 ISSUE 2 ISSUE 3 ISSUE 4

DATE OCTOBER, 1995 DATE DATE DATE

ISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8

DATE NEAX7400 ICS Model 120 Installation Procedure Manual Revision Sheet 2/3 AD-25182501

Page 5 of the NEC PBX System (120) user manual — ISSUE 1.0.1 ISSUE 2 ISSUE 3 ISSUE 4
Page 5 · click to enlarge
Page 5

ISSUE

No. PAGE N0.

ISSUE

No. PAGE N0.

ISSUE

No. PAGE N0.

1.0.1

107 108 109 110 111

ISSUE

No.

PAGE N0.

ISSUE 1.0.1 ISSUE 2 ISSUE 3 ISSUE 4

DATE OCTOBER, 1995 DATE DATE DATE

ISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8

DATE NEAX7400 ICS Model 120 Installation Procedure Manual Revision Sheet 3/3 AD-25182501

Page 6 of the NEC PBX System (120) user manual — IMPORTANT SAFETY CONSIDERATIONS
Page 6 · click to enlarge
Page 6

IMPORTANT SAFETY CONSIDERATIONS

1. Never install telephone wiring during a lightning storm.
2. Never install telephone jacks in wet locations unless the jack is specifically designed for wet locations.
3. Never touch uninsulated telephone wires or terminals unless the telephone line has been disconnected at the network interface.
4. Use caution when installing or moving telephone lines.

When using your telephone equipment, basic safety precautions should always be followed to reduce the risk of fire, electric shock and injury, including the following:

1. Read and understand all instructions.
2. Follow all warnings and instructions marked on the product.
3. Do not use liquid cleaners or aerosol cleaners. Use a damp cloth for cleaning.
4. Slots and openings in the cabinet and the back or bottom are provided for ventilation, to protect it from overheating. These openings must not be blocked or covered. This product should never be placed near or over a radiator or heat register. This product should not be placed in a built-in installation unless proper ventilation is provided.
5. This product should be operated only from the type of power source indicated on the marking label. If you are not sure of the type of power source available, consult with your local power company.
6. This product normally connected with a three wire grounding type plug, a plug having a third (grounding) pin. This plug will only fit into a grounding type power outlet. This is a safety feature. If you are unable to insert the plug into the outlet, contact an electrician to replace your obsolete outlet. Do not defeat the safety purpose of the grounding type plug.
7. Do not allow anything to rest on the power cord. Do not locate this product where the cord will be damaged by persons walking on it.
8. Do not overload wall outlets and extension cords as this can result in the risk of fire or electric shock.
9. Never push objects of any kind into this product through cabinet slots as they may touch dangerous voltage points or short out parts that could result in a risk of fire or electric shock. Never spill liquid of any kind on the product.
10. To reduce the risk of electric shock, do not disassemble this product, but refer all repairs to qualified service personnel. Opening or removing covers may expose you to dangerous voltages or other risks. Incorrect reassembly can cause electric shock when the appliance is subsequently used.
11. Unplug this product from the wall outlet and refer servicing to qualified service personnel under the following conditions:
Page 7 of the NEC PBX System (120) user manual — IMPORTANT SAFETY CONSIDERATIONS
Page 7 · click to enlarge
Page 7

A. When the power supply cord or plug is damaged or frayed.

B. If liquid has been spilled into the product.

C. If the product has been exposed to rain or water.

D. If the product does not operate normally by following the operating instructions. Adjust only those controls, that are covered by the operating instructions because improper adjustment of other controls may result in damage and will often require extensive work by a qualified technician to restore the product to normal operation.

E. If the product has been dropped or the cabinet has been damaged.

F. If the product exhibits a distinct change in performance.

12. Avoid using a telephone (other than a cordless type) during an electrical storm. There may be a remote risk of electric shock from lightning.

13 Do not use the telephone to report a gas leak in the vicinity of the leak.

Page 8 of the NEC PBX System (120) user manual — Table of Contents
Page 8 · Contents
Contents

Contents

COVERp.1IMPORTANT SAFETY CONSIDERATIONSp.6INDEXp.8TABLE OF CONTENTSp.9CHAPTER 1 INTRODUCTIONp.151. Purposep.152. Reference Manualsp.153. How to Follow the Manualp.164. Scope of Installation Worksp.16CHAPTER 2 GENERAL INFORMATIONp.171. Trunking Diagramp.172. System Configurationsp.19CHAPTER 3 INSTALLATION PROCEDUREp.241. PRECAUTIONSp.241.1 Power, Ground Cabling and LIU (for Australia)p.241.2 grounding Requirementsp.241.3 Static Electricity Guardp.251.4 Procedure for Uplugging/Plugging Circuit Cardsp.271.5 Connecting Consoles' Cablesp.272. PROCEDUREp.28NAP-200-001 Unpackingp.30-200-002 Marking and Drillingp.31-200-003 Installation of Main Equipmentp.33-200-004 Installation of Peripheral Equipmentp.62-200-005 Connection of Batteryp.71-200-006 Cable Running to MDFp.75-200-007 Termination of Cables to MDFp.78-200-008 Mounting of Circuit Cardsp.120-200-009 System Insitialsation and System Data Entryp.122-200-010 Operation Testp.125LIST OF ILLUSTRATIONSp.111-1 Reference Manuals for Installationp.151-2: Scope of Installation Proceduresp.162-1 PABX Trunking Diagramp.172-2 1-PIM Configuration for Floor Standing Installationp.192-3 2-PIM Configuration for Floor Standing Installationp.202-4 8-PIM Configuration for Floor Standing Installationp.212-5 1-PIM Configuration for Wall-Mounting Installationp.222-6: 4-PIM Configuration for 19-Inch Rack-Mounting Installationp.233-1 TRC Earth Wiringp.243-2 Static Electricity Guardp.253-3 Procedure Flowchartp.28001-1 Unpacking of Main Equipmentp.30002-1 Floor Marking for Main Equipmentp.31002-2 Wall Mounting Pointsp.32003-1 Location of the Cable Holesp.33003-2 Connection of RACK PARTS and BASEp.34003-3 Connection of RACK PARTSp.35003-4 Connection of the PIM and the RACK PARTSp.36003-5 Connection of PIMsp.37003-6 Wall Mounting Pointsp.38003-7 Screwing RACK PARTS to Wallp.39003-8 Mounting PABX to RACK PARTSp.40003-9 Screwing the RACK PARTS to a Wallp.41003-10 Screwing the RACK PARTS and the BASEp.42003-11 Modular Layout for 1 PIM Configurationp.43003-12 Modular Layout for 2 PIM Configurationp.43003-13 Modular Layout for 3 PIM Configurationp.44003-14 Modular Layout for 4 PIM Configurationp.45003-15 Modular Layout for 5 PIM Configurationp.46003-16 Modular Layout for 6 PIM Configurationp.47003-17 Modular Layout for 7 PIM Configurationp.48003-18 Modular Layout for 8 PIM Configurationp.49003-19 1 PIM Configuration (19”Rack Mount)p.51003-20 2 PIM Configuration (19”Rack Mount)p.52003-21 3 PIM Configuration (19”Rack Mount)p.53003-22 4 PIM Configuration (19”Rack Mount)p.54003-23 Cable Connections and Switch Settings on PZ-PW86p.55003-24 Cable Connections and Switch Settings on PZ-PW86(A)p.56003-25 Cable Connection between the PZ-PW86 and the BWBp.57003-26 AC CORD-A Wiring to BASEp.58003-27 Mounting of the BUS Cardsp.59003-28 BUS Cablep.60003-29 Connection of the BUS Cablesp.61004-1 Mounting of Handset Supportp.62004-2 ATT Cable Connection to SN694 ATTCONp.63004-3 ATT Cable Connection to Main Equipmentp.64004-4 Mounting of Handset Support to SN611 ATTCONp.66004-5 Jack Set Installation for SN611 ATTCONp.67004-6 Access to Switch on SN611 ATTCONp.68004-7 Switch Setting on SN611 ATTCONp.69004-8 Cable Connection to SN611 ATTCONp.70005-1 Internal Battery Mountingp.71005-2 Internal Battery Connectionp.72005-3 PWR CA-Ap.72005-4 Internal Battery Connection for 8 PIMS Configurationp.73006-1 Cable for Existing MDFp.75006-2 Example of Existing MDF Cable Runningp.77007-1 Location of Card Slot and LTC Connec...p.78007-2 Location of LENp.79007-3 LTC Connector Pin Arrangementp.81007-4 MDF Cross Connection for 4 Line C.O. Trunk (PN-4COTE)p.93007-5 MDF Cross Connection for 2 Line C.O. Trunk (PN-2COTD)p.94007-6 MDF Cross Connection for a 4W E&M Trunk Card (PN-2ODTA)p.95007-7 MDF Cross Connection for an LD Trunk (PN-2LDTA)p.97007-8 MDF Cross Connection for a DID Trunk Card (PN-AUCA)p.98007-9 MDF Cross Connection for a Single Line Telephone (Standard Line)p.99007-10 MDF Cross Connection for a Single Line Telephone (Long Line)p.100007-11 MDF Cross Connection for a Dterm/DSS Console (Standard Line)p.101007-12 MDF Cross Connection for a Dterm/DSS Console (Long Line)p.102007-13 MDF Cross Connection for an SN611 ATTCON and Dterm 6D/16Dp.103007-14 MDF Cross Connection for Day/Night Mode Change by External Keyp.104007-15 Outline of the External TAS Indicator Connectionp.105007-16 MDF Cross Connection for a TAS Indicator with a Batteryp.106007-17 MDF Cross Connection for a TAS Indicator without a Batteryp.107007-18 Outline of the Paging Equipment Connectionp.108007-19 MDF Cross Connection for Paging Equipmentp.109007-20 Outline of the External Music Connectionp.111007-21 MDF Cross Connection for External Music Equipmentp.112007-22 Connection Method of Music Source with D.C. Offsetp.114007-23 MDF Cross Connection for External BGM Sourcesp.115007-24 Outline of the PFT Connectionp.116007-25 MDF Cross Connection for the PFTp.117007-26 MDF Cross Connection for Alarm Display Panelp.119008-1 Lamp Indication on PZ-PW86(A) Cardp.1201. Precautionsp.241.1 Power, Ground Cabling and LIU (for Australia)p.241.2 Grounding Requirmentsp.241.3 Static Electricity Guardp.251.4 Procedure for Unplugging/Plugging Circuit Cardsp.271.5 Connecting Consoles' Cablesp.272. Procedurep.28NAP-200-001 Unpackingp.301. Unpacking Procedurep.30NAP-200-002 Marking and Drillingp.311. Confirmation of the Equipment Layoutp.312. Marking and Drillingp.312.1 Floor Standingp.312.2 Wall-Mountingp.32NAP-200-003 Installation of Main Equipmentp.331. Installation of Modulesp.331.1 Installation of the BATTM and MDFMp.331.2 Floor Standing Installationp.341.3 Wall-Mounting Installationp.381.4 19-Inch Rack-Mounting Installationp.502. Precautionsp.502.1 Cable Connections and Switch Settings on PZ-PW86p.552.2 Cable Connections and Switch Settings on PZ-PW86(A)p.56NAP-200-004 Installation of Peripheral Equipmentp.621. Installation of SN694 ATTCONp.622. Installation of SN611 ATTCONp.66NAP-200-005 Connection of Batteryp.711. Internal Battery Connectionp.712. External Battery Connectionp.74NAP-200-006 Cable Running to MDFp.751. Cable Running to MDFp.75NAP-200-007 Termination of Cables on MDFp.781. Cable Connection to MDFp.782. MDF Cross Connectionsp.89NAP-200-008 Mounting of Circuit Cardsp.1201. Mounting Procedurep.120NAP-200-009 System Initialization and System Data Entryp.1221. System Initializationp.1221.1 All Clear, Except LEN0000 CATp.1221.2 Resident System Programp.1222. System Data Entryp.1232.1 CAT (Customer Administration Terminal)p.1232.2 MAT (Maintenance Administration Terminal)p.124NAP-200-010 Operation Testp.1251. Operation Testp.125LIST OF TABLESp.142-1 Description of Symbols in Trunking Diagramp.183-1 Procedure for Unplugging/Plugging Circuit Cardsp.27003-1 Recommended Fastenersp.39007-1 LTC Connector Accommodationp.78007-2 LTC0-LTC2 MDF Cross Connection Informationp.89
Page 15 of the NEC PBX System (120) user manual — REFERENCE MANUALS
Page 15 · click to enlarge
Page 15

CHAPTER 1 INTRODUCTION

1. PURPOSE

This manual explains the installation procedure for the NEAX7400 ICS Model 120 PABX. Before engaging in installation , the installer is required to confirm materials to be prepared and the site conditions. Thereafter, the installer should perform each installation step according to the procedures described in Section 2 of Chapter 3.

2. REFERENCE MANUALS

During installation, refer also to the manuals below:

REFERENCE MANUALS

DESCRIPTION

MAINTENANCE MANUAL

MAINTENANCE PROCEDURE

COMMAND MANUAL

COMMAND DESCRIPTION

SYSTEM DATA SHEET

CONTENTS OF CUSTOMER DATA

QUANTITY OF CIRCUIT CARDS

MODULE FACE LAYOUT

CIRCUIT CARD DESCRIPTIONS

CIRCUIT CARD MANUAL

CIRCUIT CARD MOUNTING CONDITIONS

SWITCH SETTING OF CIRCUIT CARDS

Figure 1-1 Reference Manuals for Installation

Page 16 of the NEC PBX System (120) user manual — Figure 1-2: Scope of Installation Procedures
Page 16 · click to enlarge
Page 16

3. HOW TO FOLLOW THE MANUAL

The Installation Procedure is shown by means of flowcharts with a NAP (NEC Action Procedure) Number and the detail of the work for each step is described in the corresponding NAP.

4. SCOPE OF INSTALLATION WORKS

This manual covers the installation shown in Figure 1-2.

have identical dimensions to a PIM.

NEC PBX System (120) — 4. SCOPE OF INSTALLATION WORKS diagram (page 16)
Fig. 1

Figure 1-2: Scope of Installation Procedures

Page 17 of the NEC PBX System (120) user manual — Figure 2-1 PABX Trunking Diagram
Page 17 · click to enlarge
Page 17

CHAPTER 2 GENERAL INFORMATION

1. TRUNKING DIAGRAM

A typical trunking diagram for the PABX is shown in Figure 2-1.

NEC PBX System (120) — 1. TRUNKING DIAGRAM diagram (page 17)
Fig. 2

Figure 2-1 PABX Trunking Diagram

NEC PBX System (120) — Figure 2-1 PABX Trunking Diagram diagram (page 17)
Fig. 3 · Figure 2-1 PABX Trunking Diagram
Page 18 of the NEC PBX System (120) user manual — PB Sender
Page 18 · click to enlarge
Page 18

Table 2-1: Description of Symbols in Trunking Diagram

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

AMP

Amplifier for External Speaker

ETHER

Enternet Controller, for use with

AP01

AP00

SMDR/Hotel Application Card

FP

Firmware Processor Card

AP01

OAI Interface Card

KEY

External Key

ATI

SN694 ATTCON Interface Card

LCE

Line Circuit Card (for Single Line Telephone)

AUCA

Analog Universal Circuit Card (Long Line Circuit, DID Trunk, PFT Circuit)

LCF

Line Circuit Card (for Single Line Telephone, with MW Lamp)

BGM

External Music Source for D term Background Music Service

LDT

Loop Dial Trunk Card

BRT

Basic Rate Interface Trunk Card

MAT

Maintenance Administration Terminal

CCH

Common Channel Handler Card

MDF

CFT

6/10 party Conference Trunk Card

Main Distribution Frame

MEM

CIS

Call Information System

Main Memory

MLDT

COT

C.O. Trunk Card

Melody Trunk Card

MODEM

DAT

Digital Announcement Trunk Card

Modem

MP

DCH

D-Channel Handler Card

Main Processor Card

PFT

DK

External Relay/Key Interface Card

Power Failure Transfer

PMS

DLCA

Digital Line Circuit Card (for D term )

Property Management System

ODT

OD Trunk Card (2/4 wire E&M)

DLCB

Digital Line Circuit Card (for D term Long Line)

PBR

PB Receiver Card

PBSND

DLCC

Digital Line Circuit Card (for SN611 ATTCON and Dterm 6D/16D).

PB Sender

PLO

Phase Lock Oscillator

SMDR

DSS

DSS Console

Station Message Detail Recording

SW

DTI

Digital Trunk Interface Card

Time Division Switch

16CFT

DTG

Digital Tone Generator

16 Circuit Three Party Conference Trunk

Page 19 of the NEC PBX System (120) user manual — Figure 2-2 1-PIM Configuration for Floor Standing Installation
Page 19 · click to enlarge
Page 19

2. SYSTEM CONFIGURATIONS

The PABX system provides three kinds of installation methods as follows:

  • Floor Standing Installation
  • Wall-Mounting Installation
  • 19-Inch Rack-Mounting Installation

Examples of system configurations for each installation method are shown in Figures 2-2 to 2-6.

NEC PBX System (120) — 2. SYSTEM CONFIGURATIONS diagram (page 19)
Fig. 4

Figure 2-2 1-PIM Configuration for Floor Standing Installation

NEC PBX System (120) — Figure 2-2 1-PIM Configuration for Floor Standing Installation diagram (page 19)
Fig. 5 · Figure 2-2 1-PIM Configuration for Floor Standing In…
Page 20 of the NEC PBX System (120) user manual — Figure 2-3 2-PIM Configuration for Floor Standing Installation
Page 20 · click to enlarge
Page 20
NEC PBX System (120) — 2-3 2-PIM Configuration for Floor Standing Installation diagram (page 20)
Fig. 6 · 2-3 2-PIM Configuration for Floor Standing Installat…

Figure 2-3 2-PIM Configuration for Floor Standing Installation

Page 21 of the NEC PBX System (120) user manual — Figure 2-4 8-PIM Configuration for Floor Standing Installation
Page 21 · click to enlarge
Page 21
NEC PBX System (120) — 2-4 8-PIM Configuration for Floor Standing Installation diagram (page 21)
Fig. 7 · 2-4 8-PIM Configuration for Floor Standing Installat…

Figure 2-4 8-PIM Configuration for Floor Standing Installation

NEC PBX System (120) — Figure 2-4 8-PIM Configuration for Floor Standing Installation diagram (page 21)
Fig. 8 · Figure 2-4 8-PIM Configuration for Floor Standing In…
Page 22 of the NEC PBX System (120) user manual — RACK PARTS
Page 22 · click to enlarge
Page 22

RACK PARTS

BASE

Figure 2-5 1-PIM Configuration for Wall-Mounting Installation

Page 23 of the NEC PBX System (120) user manual — Figure 2-6: 4-PIM Configuration for 19-Inch Rack-Mounting Installation
Page 23 · click to enlarge
Page 23
NEC PBX System (120) — 2-6: 4-PIM Configuration for 19-Inch Rack-Mounting Installation diagram (page 23)
Fig. 9 · 2-6: 4-PIM Configuration for 19-Inch Rack-Mounting I…

Figure 2-6: 4-PIM Configuration for 19-Inch Rack-Mounting Installation

NEC PBX System (120) — Figure 2-6: 4-PIM Configuration for 19-Inch Rack-Mounting Installation diagram (page 23)
Fig. 10 · Figure 2-6: 4-PIM Configuration for 19-Inch Rack-Mou…
Page 24 of the NEC PBX System (120) user manual — Figure 3-1 TRC Earth Wiring
Page 24 · click to enlarge
Page 24

CHAPTER 3 INSTALLATION PROCEDURE

1. PRECAUTIONS

1.1 Power, Ground Cabling and LIU (for Australia)

(a) The power and ground cabling is to be installed only by an AUSTEL Licensed Contractor. (b) The G.P.O. which provides the AC power should be on a dedicated circuit, and must be installed near the PABX in an easily accessible position. (c) An appropriate AUSTEL Approved Line Isolation Unit (LIU) is to be installed at I/O ports, as indicated in Figure 2-1.

1.2 Grounding Requirements

The system protective grounding must have a specific resistance and AC noise level, and is to be connected to a pre-determined terminal in the PABX, by use of a custom-built AC power cord. The TRC Earth connects to the “GND” terminal on the PZ-PW86 power unit in every PIM.

Standard grounding requirements are as shown below:

  • Communication grounding: Less than 1 ohm. See figure 3-1 below.
  • Protective ground for PIM: Less than 1 ohm. [Provided in the AC power cord(s)].
  • Grounding to the Line Protection units on the MDF: Less than 0.1 ohm

PZ-PW86

PZ-PW86

GND

GND

PZ-PW86

PZ-PW86

GND

GND

PZ-PW86

PZ-PW86

GND

GND

PZ-PW86

PZ-PW86

GND

GND

TO TRC EARTH.

Figure 3-1 TRC Earth Wiring

Page 25 of the NEC PBX System (120) user manual — LABEL
Page 25 · click to enlarge
Page 25

1.3 Static Electricity Guard

The installer must wear a grounded wrist strap to protect circuit cards from static electricity.

CAUTION

The installer must hold the card name label area, when plugging or unplugging the circuit card,. If you touch another area, you may be exposed to hazardous voltages.

  • WHEN PLUGGING/UNPLUGGING A CIRCUIT CARD

PABX

WRIST STRAP

FRAME GROUND

  • WHEN HOLDING A CIRCUIT CARD

NEVER TOUCH THE COMPONENTS OR SOLDERED SURFACE WITH BARE HANDS.

LABEL

CARD FRONT

Figure 3-2 Static Electricity Guard

Page 26 of the NEC PBX System (120) user manual — 1.3 Static Electricity Guard
Page 26 · click to enlarge
Page 26
NEC PBX System (120) — 1.3 Static Electricity Guard diagram (page 26)
Fig. 11 · 1.3 Static Electricity Guard
  • WHEN MAKING A SWITCH SETTING ON A CIRCUIT CARD

WEAR A WRIST STRAP AND PERFORM THE WORK ON A GROUNDED CONDUCTIVE WORK SURFACE.

WHEN CARRYING A CIRCUIT CARD AROUND, KEEP THE CARD IN A CONDUCTIVE POLYETHYLENE BAG.

Page 27 of the NEC PBX System (120) user manual — ↓ Plug in
Page 27 · click to enlarge
Page 27

1.4 Procedure for Unplugging/Plugging Circuit Cards

When removing a circuit card from the PIM, or when mounting a circuit card in the PIM, follow the procedure given in Table 3-1 below.

Table 3-1 Procedure for Unplugging/Plugging Circuit Cards

PROCEDURE

CIRCUIT CARD

CONDITION PLUG IN UNPLUG

  • PN-CP00 (MP)
  • PZ-PW86/PW86(A) (PWR)

Power off

Power off

These circuit cards must be plugged in or unplugged only with power off, to prevent damage to the card or other system circuitry.

↓ Plug in

↓ Unplug

↓ Power on

↓ Power on

  • PN-BS00 (BS00)
  • PN-BS01 (BS01)
  • PN-CP01 (FP)
  • PN-AP00 (AP00)
  • PN-ME00 (EXTMEM)
  • PN-BRTA (BRT)
  • PN-CS00 (ATI)
  • PN-30DTC (DTI)
  • PN-SC00 (CCH)
  • PN-SC01 (DCH)

Power off or MB switch on

Power off or MB switch on

These circuit cards must be plugged in or unplugged under Make Busy condition (or power off) to prevent damage to the card or other system circuitry.

↓ Plug in

↓ Unplug

↓ Power on or MB switch off

↓ Power on

1.5 Connecting Consoles’ Cables

If possible, the ATI card (PN-CS00) should be unplugged when connecting/disconnecting the SN694 ATTCON to/from the system. This is because there is some possibility that the console may be damaged.

Ensure that the Make Busy switch of the ATI card is on (Up) during removal/insertion.

Page 28 of the NEC PBX System (120) user manual — START
Page 28 · click to enlarge
Page 28

2. PROCEDURE

This section explains the procedures for installing the PABX system. The installer should follow the procedure shown in the following flowchart. In the flowchart, a NAP (NEC Action Procedure) Number is denoted to the right side of each step. The NAP Number refers to the details for each procedure.

START

UNPACKING

NAP200-001

MARKING AND DRILLING

NAP200-002

INSTALLATION

OF MAIN EQUIPMENT

NAP200-003

INSTALLATION

OF PERIPHERAL EQUIPMENT

NAP200-004

CONNECTION

OF BATTERIES

NAP200-005

CABLE RUNNING

TO THE MDF

NAP200-006

TERMINATION OF CABLES ON THE MDF

NAP200-007

SWITCH SETTING

OF CIRCUIT CARDS

REFER TO CIRCUIT CARD MANUAL

A

Figure 3-3 Procedure Flowchart

Page 29 of the NEC PBX System (120) user manual — ATTENTION
Page 29 · click to enlarge
Page 29

A

MOUNTING

OF CIRCUIT CARDS

NAP200-008

SYSYEM INITIALIZATION

AND SYSTEM DATA ENTRY

NAP200-009

OPERATION

NAP200-010

TEST

END

Figure 3-3 Procedure Flowchart (Continued)

The mark shown below is attached to the NAP sheet for each procedure in which circuit cards are handled. When doing such a procedure, the installer must exercise caution, to prevent damage caused by static electricity (See paragraph 1.3 in this chapter).

ATTENTION

Contents Static Sensitive Handling Precautions Required

Page 30 of the NEC PBX System (120) user manual — Figure 001-1 Unpacking of Main Equipment
Page 30 · click to enlarge
Page 30

NAP200-001 Sheet 1/1 Unpacking

1. Unpacking Procedure

(1) Check the received quantity of packages containing the PABX system with the description on the shipping

document.

(2) Check the packaging for external damage done by transportation, and record it as necessary.

(3) Unpack the modules.

CAUTION

  • For unpacking circuit cards, a grounded wrist strap should be worn.

(4) Check the quantity of equipment and materials with the shipping document.

(5) Perform visual inspection, checking for the following items.

  • Modules Overall distortion.

Scratches and dents on the surface.

Scratches and cracks on the PIM Backplane.

Broken or bent pins on the PIM Backplane.

  • Covers Scratches and dents.
  • Circuit Cards Overall distortion

Scratches and cracks

Loss, or damage of parts on the circuit cards.

  • Attendant Console Scratches and cracks on the keyboard

Overall distortion

Damage to keys and lamps.

Figure 001-1 Unpacking of Main Equipment

Page 31 of the NEC PBX System (120) user manual — Figure 002-1 Floor Marking for Main Equipment
Page 31 · click to enlarge
Page 31

NAP200-002 Sheet 1/2 Marking and Drilling

1. Confirmation of the Equipment Layout

Install the equipment in an area which provides adequate ventilation and is easily accessible to service personnel.

2. Marking and Drilling

2.1 Floor Standing

  • By referring to Figure 002-1, mark and drill the installation holes for the main equipment.
  • Mark and drill the installation holes for the external BATTM and MDFM, if required.

Refer to Figure 003-1 for details.

WALL

RACK PARTS

FRONT UNITmm

Figure 002-1 Floor Marking for Main Equipment

Page 32 of the NEC PBX System (120) user manual — Figure 002-2 Wall Mounting Points
Page 32 · click to enlarge
Page 32
NEC PBX System (120) — 002-2 Wall Mounting Points diagram (page 32)
Fig. 12 · 002-2 Wall Mounting Points

2.2 Wall-Mounting

  • Locate and mark the wall mounting points as shown in Figure 002-2.
NEC PBX System (120) — 2.2 Wall-Mounting diagram (page 32)
Fig. 13 · 2.2 Wall-Mounting

Figure 002-2 Wall Mounting Points

Page 33 of the NEC PBX System (120) user manual — Figure 003-1 Location of the Cable Holes
Page 33 · click to enlarge
Page 33
NEC PBX System (120) — -200-003 Installation of Main Equipment diagram (page 33)
Fig. 14 · -200-003 Installation of Main Equipment

1. Installation of Modules

Install modules according to the installation procedures for Floor Standing, Wall-Mounting or 19-Inch Rack Mounting installation.

1.1 Installation of the BATTM and MDFM

  • Due to weight considerations, it is preferable to Floor-mount the BATTM.
  • Always mount the MDF on the wall, at a minimum height of 300mm, in order to comply with AUSTEL Regulations.
  • Refer to Figures 006-1 and 006-2 for cable routing options, and Figures 003-11 to 003-21 for the preferred modular layouts.

added to the aperture, to protect the insulation. 3. For details of internal cabling for the batteries, see NAP-200-005. 4. The modular layouts shown are based on the use of ribbon-type LT cables, which terminate on a

connectorised 100-pair Krone block. Standard 10-way disconnect-modules are used for the MDF jumpers.

NEC PBX System (120) — 1.1 Installation of the BATTM and MDFM diagram (page 33)
Fig. 15 · 1.1 Installation of the BATTM and MDFM

Figure 003-1 Location of the Cable Holes

Page 34 of the NEC PBX System (120) user manual — Figure 003-2 Connection of RACK PARTS and BASE
Page 34 · click to enlarge
Page 34
NEC PBX System (120) — 003-2 Connection of RACK PARTS and BASE diagram (page 34)
Fig. 16 · 003-2 Connection of RACK PARTS and BASE

1.2 Floor Standing Installation

(1) Connect the RACK PARTS to the rear of the BASE.

NEC PBX System (120) — 1.2 Floor Standing Installation diagram (page 34)
Fig. 17 · 1.2 Floor Standing Installation

Figure 003-2 Connection of RACK PARTS and BASE

Page 35 of the NEC PBX System (120) user manual — Figure 003-3 Connection of RACK PARTS
Page 35 · click to enlarge
Page 35
NEC PBX System (120) — 003-3 Connection of RACK PARTS diagram (page 35)
Fig. 18 · 003-3 Connection of RACK PARTS

(2) When the system is a multiple-PIM configuration, connect the RACK PARTS to each other as shown in Figure 003-3. Position the BASE over the holes drilled as per Figure 002-1, and secure the BASE to the floor, using anchor bolts.

NEC PBX System (120) — 003-3 Connection of RACK PARTS diagram (page 35)
Fig. 19 · 003-3 Connection of RACK PARTS

Figure 003-3 Connection of RACK PARTS

Page 36 of the NEC PBX System (120) user manual — Figure 003-4 Connection of the PIM and the RACK PARTS
Page 36 · click to enlarge
Page 36
NEC PBX System (120) — 003-4 Connection of the PIM and the RACK PARTS diagram (page 36)
Fig. 20 · 003-4 Connection of the PIM and the RACK PARTS

(3) Connect the PIM to the RACK PARTS as shown in Figure 003-4 using the 4 screws provided with the RACK PARTS.

When the system is a multiple-PIM configuration, connect all PIM and RACK PARTS.

Ensure that the PIM’s are bolted together as shown in Figure 003-5.

NEC PBX System (120) — 003-4 Connection of the PIM and the RACK PARTS diagram (page 36)
Fig. 21 · 003-4 Connection of the PIM and the RACK PARTS

Figure 003-4 Connection of the PIM and the RACK PARTS

Page 37 of the NEC PBX System (120) user manual — Figure 003-5 Connection of PIMs
Page 37 · click to enlarge
Page 37
NEC PBX System (120) — 003-5 Connection of PIMs diagram (page 37)
Fig. 22 · 003-5 Connection of PIMs

(4) When the system is a multiple-PIM configuration, connect PIMs to each other as shown in Figure 003-5, using the 3 hex-bolts supplied.

NEC PBX System (120) — 003-5 Connection of PIMs diagram (page 37)
Fig. 23 · 003-5 Connection of PIMs

Figure 003-5 Connection of PIMs

Page 38 of the NEC PBX System (120) user manual — Figure 003-6 Wall Mounting Points
Page 38 · click to enlarge
Page 38
NEC PBX System (120) — 003-6 Wall Mounting Points diagram (page 38)
Fig. 24 · 003-6 Wall Mounting Points

1.3 Wall-Mounting Installation

(1) Locate the four mounting points using the template as shown by Figure 003-6.

NEC PBX System (120) — 1.3 Wall-Mounting Installation diagram (page 38)
Fig. 25 · 1.3 Wall-Mounting Installation

Figure 003-6 Wall Mounting Points

Page 39 of the NEC PBX System (120) user manual — Figure 003-7 Screwing RACK PARTS to Wall
Page 39 · click to enlarge
Page 39
NEC PBX System (120) — 003-7 Screwing RACK PARTS to Wall diagram (page 39)
Fig. 26 · 003-7 Screwing RACK PARTS to Wall

(2) Using four appropriate fasteners for the type of wall construction (locally provided; see Table 003-1), secure the RACK PARTS as shown by Figure 003-7.

Table 003-1 Recommended Fasteners

NEC PBX System (120) — Table 003-1 Recommended Fasteners diagram (page 39)
Fig. 27 · Table 003-1 Recommended Fasteners

“BUTTERFLY” TYPE Min. 3.5 mm DIA. Max. 4.5 mm DIA

WOOD WOOD - SCREWS Min. 3.5 mm DIA Max. 4.5 mm DIA

CONCRETE ANCHOR BOLTS Recommended 4 mm by 25 mm

NEC PBX System (120) — “BUTTERFLY” TYPE Min. 3.5 mm DIA. Max. 4.5 mm DIA diagram (page 39)
Fig. 28 · “BUTTERFLY” TYPE Min. 3.5 mm DIA. Max. 4.5 mm DIA

SCREW-A (x4) SECURING RACK PARTS TO WALL (LOCALLY PROVIDED)

Figure 003-7 Screwing RACK PARTS to Wall

Page 40 of the NEC PBX System (120) user manual — Figure 003-8 Mounting PABX to RACK PARTS
Page 40 · click to enlarge
Page 40
NEC PBX System (120) — 003-8 Mounting PABX to RACK PARTS diagram (page 40)
Fig. 29 · 003-8 Mounting PABX to RACK PARTS

(3) Attach four M4 machine screws (provided) to the RACK PARTS at the location as shown by Figure 003-7. For easy attachment of the PABX, approx. 4 mm spacing should be provided between the inner face of the M4 machine screw and the RACK PARTS front channel. See Figure 003-8.

(4) Align and insert the key hole-slots of the rear cover of the PABX to the machine screws attached in step (3). See Figure 003-8.

(5) Screw the PIM onto the BASE, and tighten the screws at the rear.

NEC PBX System (120) — 003-8 Mounting PABX to RACK PARTS diagram (page 40)
Fig. 30 · 003-8 Mounting PABX to RACK PARTS

Figure 003-8 Mounting PABX to RACK PARTS

Page 41 of the NEC PBX System (120) user manual — Figure 003-9 Screwing the RACK PARTS to a Wall
Page 41 · click to enlarge
Page 41
NEC PBX System (120) — 003-9 Screwing the RACK PARTS to a Wall diagram (page 41)
Fig. 31 · 003-9 Screwing the RACK PARTS to a Wall

M4 MACHINE SCREW-B (x4/PIM) SECURED TO RACK PARTS (PROVIDED WITH RACK PARTS)

SCREW-A (x4/PIM) SECURING RACK PARTS TO WALL (LOCALLY PROVIDED) (SEE TABLE 003-1)

M5 MACHINE SCREW-C (x4/PIM) (PROVIDED WITH RACK PARTS) (SEE FIGURE 003-10)

Figure 003-9 Screwing the RACK PARTS to a Wall

Page 42 of the NEC PBX System (120) user manual — Figure 003-10 Screwing the RACK PARTS and the BASE
Page 42 · click to enlarge
Page 42
NEC PBX System (120) — 003-10 Screwing the RACK PARTS and the BASE diagram (page 42)
Fig. 32 · 003-10 Screwing the RACK PARTS and the BASE

(6) When mounting the RACK PARTS to a wall, connect all the RACK PARTS to each other, and connect the BASE to the bottom RACK PARTS using the M5 Machine screws (provided), as shown in Figure 003-10.

NEC PBX System (120) — 003-10 Screwing the RACK PARTS and the BASE diagram (page 42)
Fig. 33 · 003-10 Screwing the RACK PARTS and the BASE

M5 MACHINE SCREW-C (x2/JOINT AREA) (PROVIDED WITH RACK PARTS)

Figure 003-10 Screwing the RACK PARTS and the BASE

Page 43 of the NEC PBX System (120) user manual — Figure 003-12 Modular Layout for 2 PIM Configuration
Page 43 · click to enlarge
Page 43
NEC PBX System (120) — 003-11 Modular Layout for 1 PIM Configuration diagram (page 43)
Fig. 34 · 003-11 Modular Layout for 1 PIM Configuration

(7) For floor and wall-mounted installations, refer to Figures 003-11 to 003-18 for the recommended layout of the modules.

NEC PBX System (120) — 003-11 Modular Layout for 1 PIM Configuration diagram (page 43)
Fig. 35 · 003-11 Modular Layout for 1 PIM Configuration
PIM0 Notes- MDF cable lengths are 1.5 metres

- MDF0 must be minimum 300mm above floor. - PIM0) - LTC0-2 connect to (L) Krone (MDF0). - 240V direct to wall outlet. - BATTM0 can be supplied for external battery backup either as MIN. or MED. backup configuration. - If BATTM0 is not required use dummy module. - If a 78A-H battery is required, add another BATTM.

Figure 003-11 Modular Layout for 1 PIM Configuration

NEC PBX System (120) — Figure 003-11 Modular Layout for 1 PIM Configuration diagram (page 43)
Fig. 36 · Figure 003-11 Modular Layout for 1 PIM Configuration
PIM1 Notes- MDF cable lengths are 1.5 metres

- Can be mounted on floor. - PIM1 - LTC 1-2 connect to (R) Krone (MDF0) - LTC0 connect to Krone (MDF0) - 240V connects to 4 way power board. - BATTM0 can be supplied for external battery backup either as MIN. or MED. backup configuration. - If BATTM0 is not required use dummy module. - If a a 78A-H battery is required, add another BATTM plus dummy module.

Figure 003-12 Modular Layout for 2 PIM Configuration

Page 44 of the NEC PBX System (120) user manual — Figure 003-13 Modular Layout for 3 PIM Configuration
Page 44 · click to enlarge
Page 44
NEC PBX System (120) — 003-13 Modular Layout for 3 PIM Configuration diagram (page 44)
Fig. 37 · 003-13 Modular Layout for 3 PIM Configuration

- PIM 2 - LTC 2 connect to (L) Krone (MDF 1) - LTC 0-1 connect to (R) Krone (MDF 0). - 240V connect to 4 way power board. - BATTM0 can be supplied for external battery backup either as MIN. or MED. backup configuration. - If BATTM0 is not required use dummy module. - If a 78 A-H battery is required, add another \ BATTM plus dummy module.

Figure 003-13 Modular Layout for 3 PIM Configuration

Page 45 of the NEC PBX System (120) user manual — Figure 003-14 Modular Layout for 4 PIM Configuration
Page 45 · click to enlarge
Page 45
NEC PBX System (120) — 003-14 Modular Layout for 4 PIM Configuration diagram (page 45)
Fig. 38 · 003-14 Modular Layout for 4 PIM Configuration

- PIM 3 - LTC 0-2 connect to (L) Krone (MDF 1). - 240V connects to 4 way power board. - BATTM0 can be supplied for external battery backup either as MIN. or MED. backup configuration. - If BATTM0 is not required use dummy module. - If a 78 A-H battery is required, add another BATTM.

Figure 003-14 Modular Layout for 4 PIM Configuration

Page 46 of the NEC PBX System (120) user manual — Figure 003-15 Modular Layout for 5 PIM Configuration
Page 46 · click to enlarge
Page 46
NEC PBX System (120) — 003-15 Modular Layout for 5 PIM Configuration diagram (page 46)
Fig. 39 · 003-15 Modular Layout for 5 PIM Configuration

Figure 003-15 Modular Layout for 5 PIM Configuration

Page 47 of the NEC PBX System (120) user manual — Figure 003-16 Modular Layout for 6 PIM Configuration
Page 47 · click to enlarge
Page 47
NEC PBX System (120) — 003-16 Modular Layout for 6 PIM Configuration diagram (page 47)
Fig. 40 · 003-16 Modular Layout for 6 PIM Configuration

- PIM 4 - LTC 0-2 connect to (L) Krone (MDF 2).

- If 78 A-H Battery is requried, add only one

- If BATTM0 or BATTM1 is not required use

Figure 003-16 Modular Layout for 6 PIM Configuration

Page 48 of the NEC PBX System (120) user manual — Figure 003-17 Modular Layout for 7 PIM Configuration
Page 48 · click to enlarge
Page 48
NEC PBX System (120) — 003-17 Modular Layout for 7 PIM Configuration diagram (page 48)
Fig. 41 · 003-17 Modular Layout for 7 PIM Configuration

Figure 003-17 Modular Layout for 7 PIM Configuration

Page 49 of the NEC PBX System (120) user manual — Figure 003-18 Modular Layout for 8 PIM Configuration
Page 49 · click to enlarge
Page 49
NEC PBX System (120) — 003-18 Modular Layout for 8 PIM Configuration diagram (page 49)
Fig. 42 · 003-18 Modular Layout for 8 PIM Configuration

- PIM 6 - LTC 0-1 connect to (R) Krone (MDF 2)

- LTC 2 connect to (L) Krone (MDF 3).

- If a 78 A-H Battery is requried, add one more

- If BATTM0 or BATTM1 is not required use

BATTM (one shelf for PIM's 0 to 3 and the

Figure 003-18 Modular Layout for 8 PIM Configuration

Page 50 of the NEC PBX System (120) user manual — 2. Precautions
Page 50 · click to enlarge
Page 50

NAP200-003 Sheet 18/29 Installation of Main Equipment

1.4 19-Inch Rack-Mounting Installation

1.3.1 NEC Australia can provide a rack assembly, which can be configured as follows:

(a) Up to four PIM’s at the front, and the requisite number of MDF units and/or sealed batteries at the rear. Refer to Figure 2-6 for a typical example.

(b) Up to eight PIM’s, mounted back-to-back in one rack, for sites where the MDF and batteries are mounted elsewhere.

1.3.2 For a customer-supplied rack installation, NEC Australia can provide the following mounting hardware:-

ITEM STOCK NUMBER

19” Rack Insert for PIM 4392029

19” Battery Shelf 4392032

Krone MDF 19” back-mount 4392078

1.3.3 For typical rack-mounted layouts, see Figures 003-10 to 003-13. The 19”rack configurations shown herein are based on the use of ribbon-type LT cables, which terminate on a connectorised 100-pair Krone block, and standard 10-way disconnect modules for the MDF jumpers. For installations using an existing MDF, standard 50-pair cables can be used, provided that the LT CHAMP connectors are the centre-loaded type.

1.3.4 The 19” Battery shelves are based on the use of 26 A-H batteries. The Manufacturer’s limitation is three battery modules in parallel, so capacities greater than 78 A-H must be installed external to the rack.

2. Precautions

(i) Where the battery and MDF cables pass through a bulkhead, the grommet strip provided must be added to the aperture, to protect the insulation.

(ii) The protective Earth must be extended to the Krone MDF back-mounts. Note that the MDF is isolated from the rack, to avoid current-loops in the Earthing System. (AUSTEL Regulations apply).

(iii) Ensure that the rack and the PIM’s have reliable bonding to the Protective Earth of the AC power cord(s). It is advisable to use Shakeproof washers on the PIM mounting bolts, to ensure metal-to-metal contact on painted surfaces.

(iv) For PABX’s which are powered from a DC source only, a separate Protective Earth must be connected to the rack and PIM’s.

(v) For a 4-PIM configuration, the capacity of the internal battery option equals that of the minimum external option, so cost should be the only deciding factor as to the preferred type.

Page 51 of the NEC PBX System (120) user manual — SHELF 1 MIN. BACKUP
Page 51 · click to enlarge
Page 51

NAP200-003 Sheet 19/29 Installation of Main Equipment

L = Left C = Centre R = Right

19"KRONE BACK MOUNT

(MDF/TPF)

(L)

SHELF 3 MAX. BACKUP,

+ _ + _

78 A-H (SHELF 1+2+3)

12V 26A-H 12V 26A-H

PWR SUPPLY

MDF (L)

SHELF 2 MED. BACKUP

LTC1

+ _ + _ 12V 26A-H

12V 26A-H

MDF (L)

MDF (L)

52 A-H (SHELF 1+2)

LTC0

LTC2

+ _ + _

SHELF 1 MIN. BACKUP

12V 26A-H 12V 26A-H

26 A-H

REAR VIEW FRONT VIEW

240 V AC

Figure 003-19 1 PIM Configuration (19”Rack Mount)

Show 6 more labels / short text on this page
10 Pair · 100 Pair · 10 Pair · 10 Pair · 10 Pair · 10 Pair
Page 52 of the NEC PBX System (120) user manual — 003-20 2 PIM Configuration (19”Rack Mount)
Page 52 · click to enlarge
Page 52
NEC PBX System (120) — 003-20 2 PIM Configuration (19”Rack Mount) diagram (page 52)
Fig. 43 · 003-20 2 PIM Configuration (19”Rack Mount)

L = Left C = Centre R = Right

Page 53 of the NEC PBX System (120) user manual — 003-21 3 PIM Configuration (19”Rack Mount)
Page 53 · click to enlarge
Page 53
NEC PBX System (120) — 003-21 3 PIM Configuration (19”Rack Mount) diagram (page 53)
Fig. 44 · 003-21 3 PIM Configuration (19”Rack Mount)

L = Left C = Centre R = Right

Page 54 of the NEC PBX System (120) user manual — Figure 003-22 4 PIM Configuration (19”Rack Mount)
Page 54 · click to enlarge
Page 54
NEC PBX System (120) — 003-22 4 PIM Configuration (19”Rack Mount) diagram (page 54)
Fig. 45 · 003-22 4 PIM Configuration (19”Rack Mount)

L = Left C = Centre R = Right

10 Pair 10 Pair 10 Pair 10 Pair 10 Pair

10 Pair 10 Pair 10 Pair 10 Pair 10 Pair

10 Pair 10 Pair 10 Pair 10 Pair 10 Pair

10 Pair 10 Pair 10 Pair 10 Pair 10 Pair

10 Pair 10 Pair 10 Pair 10 Pair 10 Pair

Figure 003-22 4 PIM Configuration (19”Rack Mount)

Page 55 of the NEC PBX System (120) user manual — Figure 003-23 Cable Connections and Switch Settings on PZ-PW86
Page 55 · click to enlarge
Page 55
NEC PBX System (120) — 003-23 Cable Connections and Switch Settings on PZ-PW86 diagram (page 55)
Fig. 46 · 003-23 Cable Connections and Switch Settings on PZ-P…

2.1 Cable Connections and Switch Settings on PZ-PW86

NEC PBX System (120) — 2.1 Cable Connections and Switch Settings on PZ-PW86 diagram (page 55)
Fig. 47 · 2.1 Cable Connections and Switch Settings on PZ-PW86

Note 2: In Australia, GND and FG are bonded

elsewhere, so are not to be linked here. The TRC Earth connects to the “GND” terminal on every PIM. Note 1: Set to ON for

Set the appropriate voltage before turning on the AC switch.

* Cabling method is determined by usage of internal or external battery. See NAP-200-005.

Figure 003-23 Cable Connections and Switch Settings on PZ-PW86

Page 56 of the NEC PBX System (120) user manual — Figure 003-24 Cable Connections and Switch Settings on PZ-PW86(A)
Page 56 · click to enlarge
Page 56
NEC PBX System (120) — 003-24 Cable Connections and Switch Settings on PZ-PW86(A) diagram (page 56)
Fig. 48 · 003-24 Cable Connections and Switch Settings on PZ-P…

2.2 Cable Connections and Switch Settings on PZ-PW86(A)

NEC PBX System (120) — 2.2 Cable Connections and Switch Settings on PZ-PW86(A) diagram (page 56)
Fig. 49 · 2.2 Cable Connections and Switch Settings on PZ-PW86…

Note 2: In Australia, GND and FG are bonded

elsewhere, so are not to be linked here. The TRC Earth connects to the “GND” terminal on every PIM. Note 1: Set to OFF for

Set the appropriate voltage before turning on the AC switch.

* Cabling method is determined by usage of internal or external battery. See NAP-200-005.

Figure 003-24 Cable Connections and Switch Settings on PZ-PW86(A)

Page 57 of the NEC PBX System (120) user manual — Figure 003-25 Cable Connection between the PZ-PW86 and the BWB
Page 57 · click to enlarge
Page 57
NEC PBX System (120) — 003-25 Cable Connection between the PZ-PW86 and the BWB diagram (page 57)
Fig. 50 · 003-25 Cable Connection between the PZ-PW86 and the…

(1) Confirm the connection of the PWR CNT CA-A and power/ringer cables as shown in Figure 003-25 (These

cables are pre-installed).

NEC PBX System (120) — 003-25 Cable Connection between the PZ-PW86 and the BWB diagram (page 57)
Fig. 51 · 003-25 Cable Connection between the PZ-PW86 and the…

Figure 003-25 Cable Connection between the PZ-PW86 and the BWB

Page 58 of the NEC PBX System (120) user manual — Figure 003-26 AC CORD-A Wiring to BASE
Page 58 · click to enlarge
Page 58
NEC PBX System (120) — 003-26 AC CORD-A Wiring to BASE diagram (page 58)
Fig. 52 · 003-26 AC CORD-A Wiring to BASE

(2) The AC CORD-A (AC Power Cable) wiring to the PZ-PW86 power unit(s) is shown below for a 2-PIM system.

NEC PBX System (120) — 003-26 AC CORD-A Wiring to BASE diagram (page 58)
Fig. 53 · 003-26 AC CORD-A Wiring to BASE

Figure 003-26 AC CORD-A Wiring to BASE

Page 59 of the NEC PBX System (120) user manual — BUS SLOT
Page 59 · click to enlarge
Page 59

NAP200-003 Sheet 27/29 Installation of Main Equipment

(3) When the system is a multiple-PIM configuration, mount the BS00 Card in the BUS slot of PIM0. Also, mount the BS01 Card in each BUS slot of PIM1 to PIM7. When the system is a single PIM configuration, neither the BS00 nor BS01 is needed.

BUS SLOT

B S 0 1

B S 0 1

B S 0 1

B S 0 1

B S 0 1

B S 0 1

B S 0 0

B S 0 1

Figure 003-27 Mounting of the BUS Cards

Page 60 of the NEC PBX System (120) user manual — Figure 003-28 BUS Cable
Page 60 · click to enlarge
Page 60
NEC PBX System (120) — 003-28 BUS Cable diagram (page 60)
Fig. 54 · 003-28 BUS Cable

(4) When the system is a multiple-PIM configuration, connect all the BUS Cards (BS00/BS01) to each other using BUS cables, as shown in Figure 003-29.

NEC PBX System (120) — 003-28 BUS Cable diagram (page 60)
Fig. 55 · 003-28 BUS Cable

Figure 003-28 BUS Cable

Page 61 of the NEC PBX System (120) user manual — Figure 003-29 Connection of the BUS Cables
Page 61 · click to enlarge
Page 61
NEC PBX System (120) — 003-29 Connection of the BUS Cables diagram (page 61)
Fig. 56 · 003-29 Connection of the BUS Cables

Figure 003-29 Connection of the BUS Cables

Page 62 of the NEC PBX System (120) user manual — Figure 004-1: Mounting of Handset Support
Page 62 · click to enlarge
Page 62
NEC PBX System (120) — -200-004 Installation of Peripheral Equipment diagram (page 62)
Fig. 57 · -200-004 Installation of Peripheral Equipment

1. Installation of SN694 ATTCON

(1) Screw the handset support onto the bottom of the console as shown in Figure 004-1.

NEC PBX System (120) — 1. Installation of SN694 ATTCON diagram (page 62)
Fig. 58 · 1. Installation of SN694 ATTCON

Figure 004-1: Mounting of Handset Support

Page 63 of the NEC PBX System (120) user manual — Figure 004-2: ATT Cable Connection to SN694 ATTCON
Page 63 · click to enlarge
Page 63
NEC PBX System (120) — 004-2 ATT Cable Connection to SN694 ATTCON diagram (page 63)
Fig. 59 · 004-2 ATT Cable Connection to SN694 ATTCON

(2) Connect an ATT cable to the SN694 ATTCON according to the steps below.

NEC PBX System (120) — 004-2 ATT Cable Connection to SN694 ATTCON diagram (page 63)
Fig. 60 · 004-2 ATT Cable Connection to SN694 ATTCON
  • Remove the screw from the connector cover.
  • Press the retaining clip in the direction of (a) and slide the cover in the direction of (b). The cover will come off.
  • Plug the cable into the connector inside the Console, and screw on to the connector. Then tighten the cable onto the console by the retaining band.
  • Place the connector cover back onto its position and slide it in the direction of (a).
  • Ensure that the retaining clip is seated.
  • Replace the screw in the connector cover.

Figure 004-2: ATT Cable Connection to SN694 ATTCON

Page 64 of the NEC PBX System (120) user manual — OVRA OVRA OVRB OVRB
Page 64 · click to enlarge
Page 64
NEC PBX System (120) — 004-3 ATT Cable Connection to Main Equipment diagram (page 64)
Fig. 61 · 004-3 ATT Cable Connection to Main Equipment

(3) Connect the ATT cable to Main Equipment as shown in Figure 004-3.

PABX

PN-CS00

ATT

INSTALLATION CABLE (MAX. 296m)

SN694 ATTCON

(a) ATI CA-A

ATI CA-A

1 : ATT CONNECTOR (J)

2. HOUSING CONNECTOR (P) 7A NITE 1A E 7B JACK 1B 7C KA 1C 7D KB 1D 8A LMPY 2A 8B LMPZ 2B 8C LMJ 2C 8D M48V 2D 9A 3A 9B 3B 9C 3C 9D 3D 10A 4A 10B 4B 10C 4C 10D 4D 11A 5A 11B 5B 11C 5C 11D 5D E 12A 6A OVRA 12B 6B OVRB 12C 6C A 12D M48V 6D B

3 : CHAMP CONNECTOR (J)

4. CHAMP CONNECTOR (P) 1 26 2 BN48 27 BN48 3 28 4 BN48 29 5 G 30 6 31 7 32 8 33 9 34 10 35 11 36 12 37 13 38 14 39 15 40 BN48 16 41 G 17 G 42 18 ALM 43 G 19 G 44 NC 20 B 45 A 21 G 46 NC 22 47 JACK 23 G 48 NITE 24 AKEYB 49 AKEYA 25 ALMPZ 50 ALMPY

1A E 7A NITE 1B 7B JACK 1C 7C KA 1D 7D KB 2A 8A LMPY 2B 8B LMPZ 2C 8C LMJ 2D 8D M48V 3A 9A 3B 9B 3C 9C 3D 9D 4A 10A 4B 10B 4C 10C 4D 10D 5A 11A 5B 11B 5C 11C 5D E 11D 6A OVRA 12A 6B OVRB 12B 6C A 12C 6D B 12D M48V

26 1 27 BN48 2 BN48 28 3 29 4 BN48 30 5 G 31 6 32 7 33 8 34 9 35 10 36 11 37 12 38 13 39 14 40 BN48 15 41 G 16 42 17 G 43 G 18 ALM 44 NC 19 G 45 A 20 B 46 NC 21 G 47 JACK 22 48 NITE 23 G 49 AKEYA 24 AKEYB 50 ALMPY 25 ALMPZ

OVRA OVRA OVRB OVRB

Figure 004-3: ATT Cable Connection to Main Equipment

Show 6 more labels / short text on this page
ATI CA-A (4m) · 4m 1 · ~ ~ · ~ ~ · ~ · ~
Page 65 of the NEC PBX System (120) user manual — Figure 004-3: ATT Cable Connection to Main Equipment (Continued)
Page 65 · click to enlarge
Page 65

NAP200-004 Sheet 4/9 Installation of Peripheral Equipment

(b) INSTALLATION CABLE

SN694 ATTCON

INSTALLATION CABLE

ATI CA-A

MAX. 296m (WITH 0.5 DIAM. CABLE)

1. CHAMP CONNECTOR (J) 26 1 27 BN48 2 BN48 28 3 29 4 BN48 30 5 G 31 6 32 7 33 8 34 9 35 10 36 11 37 12 38 13 39 14 40 BN48 15 41 G 16 42 17 G 43 G 18 ALM 44 19 G 45 A 20 B 46 21 G 47 JACK 22 48 NITE 23 G 49 AKEYA 24 AKEYB 50 ALMPY 25 ALMPZ
2. CHAMP CONNECTOR (P) 1 26 2 BN48 27 BN48 3 28 4 BN48 29 5 G 30 6 31 7 32 8 33 9 34 10 35 11 36 12 37 13 38 14 39 15 40 BN48 16 41 G 17 G 42 18 ALM 43 G 19 G 44 20 B 45 A 21 G 46 22 47 JACK 23 G 48 NITE 24 AKEYB 49 AKEYA 25 ALMPZ 50 ALMPY
3. CHAMP CONNECTOR (J) 26 1 27 BN48 2 BN48 28 3 29 4 BN48 30 5 G 31 6 32 7 33 8 34 9 35 10 36 11 37 12 38 13 39 14 40 BN48 15 41 G 16 42 17 G 43 G 18 ALM 44 19 G 45 A 20 B 46 21 G 47 JACK 22 48 NITE 23 G 49 AKEYA 24 AKEYB 50 ALMPY 25 ALMPZ

4 : ATT (P)

OVRB OVRB OVRA OVRA

1 26 2 BN48 27 BN48 3 28 4 BN48 29 5 G 30 6 31 7 32 8 33 9 34 10 35 11 36 12 37 13 38 14 39 15 40 BN48 16 41 G 17 G 42 18 ALM 43 G 19 G 44 20 B 45 A 21 G 46 22 47 JACK 23 G 48 NITE 24 AKEYB 49 AKEYA 25 ALMPZ 50 ALMPY

ATTCON to/from the system. This is because there is some possibility that the console may be damaged. Ensure that the Make Busy switch of the ATI card is ON (UP) during removal/insertion.

Figure 004-3: ATT Cable Connection to Main Equipment (Continued)

Show 9 more labels / short text on this page
4 Note · ~ ~ · ~ ~ · ~ ~ · ~ ~ · ~ · ~ · ~ · ~
Page 66 of the NEC PBX System (120) user manual — Figure 004-4: Mounting of Handset Support to SN611 ATTCON
Page 66 · click to enlarge
Page 66
NEC PBX System (120) — 004-4 Mounting of Handset Support to SN611 ATTCON diagram (page 66)
Fig. 62 · 004-4 Mounting of Handset Support to SN611 ATTCON

2. Installation of SN611 ATTCON

(1) Screw the handset support onto the bottom of the console as shown in Figure 004-4.

NEC PBX System (120) — 2. Installation of SN611 ATTCON diagram (page 66)
Fig. 63 · 2. Installation of SN611 ATTCON

Figure 004-4: Mounting of Handset Support to SN611 ATTCON

Page 67 of the NEC PBX System (120) user manual — Figure 004-5: Jack Set Installation for SN611 ATTCON
Page 67 · click to enlarge
Page 67
NEC PBX System (120) — 004-5 Jack Set Installation for SN611 ATTCON diagram (page 67)
Fig. 64 · 004-5 Jack Set Installation for SN611 ATTCON

(2) To provide the console with the headset in place of the handset, unplug the modular cord from the handset and then plug the modular cord to the Jack Set.

NEC PBX System (120) — 004-5 Jack Set Installation for SN611 ATTCON diagram (page 67)
Fig. 65 · 004-5 Jack Set Installation for SN611 ATTCON

Figure 004-5: Jack Set Installation for SN611 ATTCON

Page 68 of the NEC PBX System (120) user manual — Figure 004-6: Access to Switch on SN611 ATTCON
Page 68 · click to enlarge
Page 68
NEC PBX System (120) — 004-6 Access to Switch on SN611 ATTCON diagram (page 68)
Fig. 66 · 004-6 Access to Switch on SN611 ATTCON

(3) Set the switch located inside the console according to type of headset/handset connected.

NEC PBX System (120) — 004-6 Access to Switch on SN611 ATTCON diagram (page 68)
Fig. 67 · 004-6 Access to Switch on SN611 ATTCON
  • Slide the directory out of the way. Then insert a flat screw driver’s blade into the notched opening and apply light upward pressure until the access panel is clear of the front lip. At the same time apply pressure (toward you) at the rear of the pedestal to move the access panel.

Figure 004-6: Access to Switch on SN611 ATTCON

Page 69 of the NEC PBX System (120) user manual — Figure 004-7: Switch Setting on SN611 ATTCON
Page 69 · click to enlarge
Page 69
NEC PBX System (120) — 004-7 Switch Setting on SN611 ATTCON diagram (page 69)
Fig. 68 · 004-7 Switch Setting on SN611 ATTCON
  • Set the switch according to the type of headset/handset connected. C: Carbon Type Handset/Headset S: Electret type Headset (e.g. “Supra”) D: D term Type Handset (Dynamic)

Figure 004-7: Switch Setting on SN611 ATTCON

Page 70 of the NEC PBX System (120) user manual — Figure 004-8: Cable Connection to SN611 ATTCON
Page 70 · click to enlarge
Page 70
NEC PBX System (120) — 004-8 Cable Connection to SN611 ATTCON diagram (page 70)
Fig. 69 · 004-8 Cable Connection to SN611 ATTCON

(4) Plug the line cord into the modular jack located at the bottom of the console. For the MDF cross connection for SN611 ATTCON, refer to NAP- 200-007 (Figure 007-13).

NEC PBX System (120) — 004-8 Cable Connection to SN611 ATTCON diagram (page 70)
Fig. 70 · 004-8 Cable Connection to SN611 ATTCON

Figure 004-8: Cable Connection to SN611 ATTCON

Page 71 of the NEC PBX System (120) user manual — Figure 005-1: Internal Battery Mounting
Page 71 · click to enlarge
Page 71
NEC PBX System (120) — -200-005 Connection of Battery diagram (page 71)
Fig. 71 · -200-005 Connection of Battery

1. Internal Battery Connection

(1) Mount a battery unit (24V, 3.4 AH) into each PIM as shown in Figure 005-1. (2) Set the “MODE” Switch on the PZ-PW86/PZ-PW86(A) power unit(s) to the correct Float Voltage, as shown in NAP-200-003.

NEC PBX System (120) — 1. Internal Battery Connection diagram (page 71)
Fig. 72 · 1. Internal Battery Connection

Figure 005-1: Internal Battery Mounting

Page 72 of the NEC PBX System (120) user manual — Figure 005-3 PWR CA-A
Page 72 · click to enlarge
Page 72
NEC PBX System (120) — 005-2 Internal Battery Connection diagram (page 72)
Fig. 73 · 005-2 Internal Battery Connection

(3) Plug the battery-cable connector into the BATT1 connector on the PZ-PW86 as shown in Figure 005-2.

(4) Secure the batteries and battery-cable using tie-wraps as shown in Figure 005-2.

NEC PBX System (120) — 005-2 Internal Battery Connection diagram (page 72)
Fig. 74 · 005-2 Internal Battery Connection

Figure 005-2: Internal Battery Connection

(5) When the system is a multiple-PIM configuration, connect the PZ-PW86 Cards to each other using PWR CA-A cables, as shown in and Figures 005-4 or 005-5.

NEC PBX System (120) — Figure 005-2: Internal Battery Connection diagram (page 72)
Fig. 75 · Figure 005-2: Internal Battery Connection

Figure 005-3 PWR CA-A

Page 73 of the NEC PBX System (120) user manual — Figure 005-4: Internal Battery Connection for 8 PIMs Configuration
Page 73 · click to enlarge
Page 73
NEC PBX System (120) — 005-4 Internal Battery Connection for 8 PIMS Configuration diagram (page 73)
Fig. 76 · 005-4 Internal Battery Connection for 8 PIMS Configu…

(6) When the system is a multiple PIM configuration, provide the following connections to the internal batteries.

NEC PBX System (120) — 005-4 Internal Battery Connection for 8 PIMS Configuration diagram (page 73)
Fig. 77 · 005-4 Internal Battery Connection for 8 PIMS Configu…

Figure 005-4: Internal Battery Connection for 8 PIMs Configuration

NEC PBX System (120) — Figure 005-4: Internal Battery Connection for 8 PIMs Configuration diagram (page 73)
Fig. 78 · Figure 005-4: Internal Battery Connection for 8 PIMs…
Page 74 of the NEC PBX System (120) user manual — Figure 005-5: External Battery Connection for 8 PIMs Configuration
Page 74 · click to enlarge
Page 74
NEC PBX System (120) — 2. External Battery Connection diagram (page 74)
Fig. 79 · 2. External Battery Connection

2. External Battery Connection

When using an external battery, provide the following connections.

Notes: 1. One battery pack is required for each 4-PIM stack, to ensure that sufficient recharge current is available. 2. The capacity of each external battery is determined by the customers’ back-up requirements. 3. CAUTION: For both sealed and vented batteries, set the “mode” switch on the PZ-PW86/PZ- PW86(A) unit(s) to the correct Float Voltage. The “Equalize” option applies ONLY to external vented batteries for periodic equalize (BOOST) charging, which can be done on-line. When the BATTM is used, the battery capacity is in multiples of 26 A-H, up to a maximum of three sets in parallel for each PIM stack.

NEC PBX System (120) — 2. External Battery Connection diagram (page 74)
Fig. 80 · 2. External Battery Connection

Figure 005-5: External Battery Connection for 8 PIMs Configuration

NEC PBX System (120) — Figure 005-5: External Battery Connection for 8 PIMs Configuration diagram (page 74)
Fig. 81 · Figure 005-5: External Battery Connection for 8 PIMs…
Page 75 of the NEC PBX System (120) user manual — Figure 006-1: Cable for Existing MDF
Page 75 · click to enlarge
Page 75
NEC PBX System (120) — -200-006 Cable Running to MDF diagram (page 75)
Fig. 82 · -200-006 Cable Running to MDF

1. Cable Running to MDF

(1) Usually a pre-wired MDF is provided ex-factory for new installations. In this case, 50-wire ribbon cables are used between the PABX and the MDF, as shown in NAP-200-003.

(2) In order to facilitate the termination of standard 25-pair cables which are shown in Figure 006-2 from the system to an existing MDF, the length of each cable to be used should be determined according to the distance between the MDF and the system, and each cable should be labelled at both ends using cable number or cable designation as shown in Table 006-1.

NEC PBX System (120) — 1. Cable Running to MDF diagram (page 75)
Fig. 83 · 1. Cable Running to MDF

Figure 006-1: Cable for Existing MDF

NEC PBX System (120) — Figure 006-1: Cable for Existing MDF diagram (page 75)
Fig. 84 · Figure 006-1: Cable for Existing MDF
Page 77 of the NEC PBX System (120) user manual — Figure 006-2: Example of Existing MDF Cable Running
Page 77 · click to enlarge
Page 77
NEC PBX System (120) — 006-2 Example of Existing MDF Cable Running diagram (page 77)
Fig. 85 · 006-2 Example of Existing MDF Cable Running

(3) For connection to an existing MDF, bring the MDF cables into the Main Equipment through the cable hole(s) of the BASE as shown in Figure 006-2.

(4) Plug the CHAMP connector of each cable to its LTC connector located on the PIM, and screw them together.

NEC PBX System (120) — 006-2 Example of Existing MDF Cable Running diagram (page 77)
Fig. 86 · 006-2 Example of Existing MDF Cable Running

Figure 006-2: Example of Existing MDF Cable Running

Page 78 of the NEC PBX System (120) user manual — Figure 007-1: Location of Card Slot and LTC Connector
Page 78 · click to enlarge
Page 78
NEC PBX System (120) — -200-007 Termination of Cables to MDF diagram (page 78)
Fig. 87 · -200-007 Termination of Cables to MDF

1. Cable Connection to MDF

(1) Connect the cables to the MDF referring to Figure 007-1 and Table 007-1.

NEC PBX System (120) — 1. Cable Connection to MDF diagram (page 78)
Fig. 88 · 1. Cable Connection to MDF

Figure 007-1: Location of Card Slot and LTC Connector

Table 007-1: LTC Connector Accommodation

NEC PBX System (120) — Figure 007-1: Location of Card Slot and LTC Connector diagram (page 78)
Fig. 89 · Figure 007-1: Location of Card Slot and LTC Connecto…
NEC PBX System (120) — Figure 007-1: Location of Card Slot and LTC Connector diagram (page 78)
Fig. 90 · Figure 007-1: Location of Card Slot and LTC Connecto…
Page 79 of the NEC PBX System (120) user manual — Figure 007-2: Location of LEN
Page 79 · click to enlarge
Page 79
NEC PBX System (120) — 007-2 Location of LEN diagram (page 79)
Fig. 91 · 007-2 Location of LEN

(2) Figure 007-2 shows the relationship between Line Equipment Number (LEN) and Card Slot Number (LT Number).

(a) LEN 0000 ~ 0255

NEC PBX System (120) — (a) LEN 0000 ~ 0255 diagram (page 79)
Fig. 92 · (a) LEN 0000 ~ 0255

Figure 007-2: Location of LEN

Page 80 of the NEC PBX System (120) user manual — Figure 007-2: Location of LEN (Continued)
Page 80 · click to enlarge
Page 80
NEC PBX System (120) — 007-2 Location of LEN diagram (page 80)
Fig. 93 · 007-2 Location of LEN

(b) LEN 0256 ~ 0511

NEC PBX System (120) — (b) LEN 0256 ~ 0511 diagram (page 80)
Fig. 94 · (b) LEN 0256 ~ 0511

Figure 007-2: Location of LEN (Continued)

NEC PBX System (120) — Figure 007-2: Location of LEN (Continued) diagram (page 80)
Fig. 95 · Figure 007-2: Location of LEN (Continued)
Page 81 of the NEC PBX System (120) user manual — Figure 007-3: LTC Connector Pin Arrangement
Page 81 · click to enlarge
Page 81
NEC PBX System (120) — 007-3 LTC Connector Pin Arrangement diagram (page 81)
Fig. 96 · 007-3 LTC Connector Pin Arrangement

(3) Figure 007-3 shows the LTC Connector Pin Arrangement.

(a) PIM0 (LTC0 ~ LTC2)

NEC PBX System (120) — (a) PIM0 (LTC0 ~ LTC2) diagram (page 81)
Fig. 97 · (a) PIM0 (LTC0 ~ LTC2)

LTC1 26 1 27 2 LEN0024 28 3 0025 29 4 0026 30 5 0027 31 6 0028 32 7 0029 33 8 0030 34 9 0031 35 10 0032 36 11 0033 37 12 0034 38 13 0035 39 14 0036 40 15 0037 41 16 0038 42 17 0039 43 18 0040 44 19 0041 45 20 0042 46 21 0043 47 22 0044 48 23 0045 49 24 0046 50 25 LEN0047

LTC2 26 1 27 2 28 3 29 4 30 5 31 6 32 7 33 8 34 9 35 10

Figure 007-3: LTC Connector Pin Arrangement

Page 82 of the NEC PBX System (120) user manual — Figure 007-3: LTC Connector Pin Arrangement (Continued)
Page 82 · click to enlarge
Page 82
NEC PBX System (120) — 007-3 LTC Connector Pin Arrangement diagram (page 82)
Fig. 98 · 007-3 LTC Connector Pin Arrangement

(b) PIM1 (LTC0 ~ LTC2)

NEC PBX System (120) — (b) PIM1 (LTC0 ~ LTC2) diagram (page 82)
Fig. 99 · (b) PIM1 (LTC0 ~ LTC2)

LTC0 26 1 MN 27 2 LEN0164 28 3 0165 29 4 0166 30 5 0167 31 6 0168 32 7 0169 33 8 0170 34 9 0171 35 10 0172 36 11 0173 37 12 0174 38 13 0175 39 14 0176 40 15 0177 41 16 0178 42 17 0179 43 18 0180 44 19 0181 45 20 0082 46 21 0083 47 22 0084 48 23 0085 49 24 0086 50 25 LEN0087

LTC2 26 1 27 2 28 3 29 4 30 5 31 6 32 7 33 8 34 9 35 10

Figure 007-3: LTC Connector Pin Arrangement (Continued)

NEC PBX System (120) — Figure 007-3: LTC Connector Pin Arrangement (Continued) diagram (page 82)
Fig. 100 · Figure 007-3: LTC Connector Pin Arrangement (Continu…
Page 83 of the NEC PBX System (120) user manual — Figure 007-3: LTC Connector Pin Arrangement (Continued)
Page 83 · click to enlarge
Page 83
NEC PBX System (120) — 007-3 LTC Connector Pin Arrangement diagram (page 83)
Fig. 101 · 007-3 LTC Connector Pin Arrangement

(c) PIM2 (LTC0 ~ LTC2)

NEC PBX System (120) — (c) PIM2 (LTC0 ~ LTC2) diagram (page 83)
Fig. 102 · (c) PIM2 (LTC0 ~ LTC2)

LTC2 26 1 27 2 28 3 29 4 30 5 31 6 32 7 33 8 34 9 35 10

Figure 007-3: LTC Connector Pin Arrangement (Continued)

Page 84 of the NEC PBX System (120) user manual — Figure 007-3: LTC Connector Pin Arrangement (Continued)
Page 84 · click to enlarge
Page 84
NEC PBX System (120) — 007-3 LTC Connector Pin Arrangement diagram (page 84)
Fig. 103 · 007-3 LTC Connector Pin Arrangement

(d) PIM3 (LTC0 ~ LTC2)

NEC PBX System (120) — (d) PIM3 (LTC0 ~ LTC2) diagram (page 84)
Fig. 104 · (d) PIM3 (LTC0 ~ LTC2)

LTC0 26 1 27 2 LEN0192 28 3 0193 29 4 0194 30 5 0195 31 6 0196 32 7 0197 33 8 0198 34 9 0199 35 10 0200 36 11 0201 37 12 0202 38 13 0203 39 14 0204 40 15 0205 41 16 0206 42 17 0207 43 18 0208 44 19 0209 45 20 0210 46 21 0211 47 22 0212 48 23 0213 49 24 0214 50 25 LEN0215

LTC2 26 1 27 2 28 3 29 4 30 5 31 6 32 7 33 8 34 9 35 10

Figure 007-3: LTC Connector Pin Arrangement (Continued)

Page 85 of the NEC PBX System (120) user manual — Figure 007-3: LTC Connector Pin Arrangement (Continued)
Page 85 · click to enlarge
Page 85
NEC PBX System (120) — 007-3 LTC Connector Pin Arrangement diagram (page 85)
Fig. 105 · 007-3 LTC Connector Pin Arrangement

(e) PIM4 (LTC0 ~ LTC2)

NEC PBX System (120) — (e) PIM4 (LTC0 ~ LTC2) diagram (page 85)
Fig. 106 · (e) PIM4 (LTC0 ~ LTC2)

LTC0 26 1 27 2 LEN0256 28 3 0257 29 4 0258 30 5 0259 31 6 0260 32 7 0261 33 8 0262 34 9 0263 35 10 0264 36 11 0265 37 12 0266 38 13 0267 39 14 0268 40 15 0269 41 16 0270 42 17 0271 43 18 0272 44 19 0273 45 20 0274 46 21 0275 47 22 0276 48 23 0277 49 24 0278 50 25 LEN0279

LTC2 26 1 27 2 28 3 29 4 30 5 31 6 32 7 33 8 34 9 35 10

Figure 007-3: LTC Connector Pin Arrangement (Continued)

Page 86 of the NEC PBX System (120) user manual — Figure 007-3: LTC Connector Pin Arrangement (Continued)
Page 86 · click to enlarge
Page 86
NEC PBX System (120) — 007-3 LTC Connector Pin Arrangement diagram (page 86)
Fig. 107 · 007-3 LTC Connector Pin Arrangement

(f) PIM5 (LTC0 ~ LTC2)

NEC PBX System (120) — (f) PIM5 (LTC0 ~ LTC2) diagram (page 86)
Fig. 108 · (f) PIM5 (LTC0 ~ LTC2)

LTC2 26 1 27 2 28 3 29 4 30 5 31 6 32 7 33 8 34 9 35 10

Figure 007-3: LTC Connector Pin Arrangement (Continued)

Page 87 of the NEC PBX System (120) user manual — Figure 007-3: LTC Connector Pin Arrangement (Continued)
Page 87 · click to enlarge
Page 87
NEC PBX System (120) — 007-3 LTC Connector Pin Arrangement diagram (page 87)
Fig. 109 · 007-3 LTC Connector Pin Arrangement

(g) PIM6 (LTC0 ~ LTC2)

NEC PBX System (120) — (g) PIM6 (LTC0 ~ LTC2) diagram (page 87)
Fig. 110 · (g) PIM6 (LTC0 ~ LTC2)

LTC2 26 1 27 2 28 3 29 4 30 5 31 6 32 7 33 8 34 9 35 10

Figure 007-3: LTC Connector Pin Arrangement (Continued)

Page 88 of the NEC PBX System (120) user manual — Figure 007-3: LTC Connector Pin Arrangement (Continued)
Page 88 · click to enlarge
Page 88
NEC PBX System (120) — 007-3 LTC Connector Pin Arrangement diagram (page 88)
Fig. 111 · 007-3 LTC Connector Pin Arrangement

(h) PIM7 (LTC0 ~ LTC2)

NEC PBX System (120) — (h) PIM7 (LTC0 ~ LTC2) diagram (page 88)
Fig. 112 · (h) PIM7 (LTC0 ~ LTC2)

LTC0 26 1 27 2 LEN0448 28 3 0449 29 4 0450 30 5 0451 31 6 0452 32 7 0453 33 8 0454 34 9 0455 35 10 0456 36 11 0457 37 12 0458 38 13 0459 39 14 0460 40 15 0461 41 16 0462 42 17 0463 43 18 0464 44 19 0465 45 20 0466 46 21 0467 47 22 0468 48 23 0469 49 24 0470 50 25 LEN0471

LTC2 26 1 27 2 28 3 29 4 30 5 31 6 32 7 33 8 34 9 35 10

Figure 007-3: LTC Connector Pin Arrangement (Continued)

Page 89 of the NEC PBX System (120) user manual — Table 007-2 LTC0-LTC2 MDF Cross Connection Information
Page 89 · click to enlarge
Page 89

2. MDF Cross Connections

Cross connections on the MDF for each 25-pair cable in LTC0 to LTC2 are shown in Table 007-2.

Table 007-2 LTC0-LTC2 MDF Cross Connection Information

TYPE OF INTERFACE

PIN CARD SLOTS

2-WIRE E&M TIE

4-WIRE E&M TIE

CO (4 COT)

CO (2COT)

LD (2LDT)

DID (AUC)

SLT (4LC)

SLT (AUC)

LINE (2ODT)

LINE (2ODT)

T0 R0

T0 R0

T0 R0

T0 R0

TxT0 TxR0

T0 R0

T0 R0

T0 R0

27 2 T1 R1

T1 R1

T1 R1

T1 R1

RxT0 RxR0

T1 R1

T1 R1

T1 R1

28 3 T2 R2

T2 R2

TxT1 TxR1

T2 R2

29 4 T3 R3

T3 R3

RxT1 RxR1

T3 R3

T0 R0

T0 R0

T0 R0

T0 R0

TxT0 TxR0

T0 R0

T0 R0

T0 R0

31 6 T1 R1

T1 R1

T1 R1

T1 R1

RxT0 RxR0

T1 R1

T1 R1

T1 R1

32 7 T2 R2

T2 R2

TxT1 TxR1

T2 R2

33 8 T3 R3

T3 R3

RxT1 RxR1

T3 R3

T0 R0

T0 R0

T0 R0

T0 R0

TxT0 TxR0

T0 R0

T0 R0

T0 R0

35 10 T1 R1

T1 R1

T1 R1

T1 R1

RxT0 RxR0

T1 R1

T1 R1

T1 R1

36 11 T2 R2

T2 R2

TxT1 TxR1

T2 R2

37 12 T3 R3

T3 R3

RxT1 RxR1

T3 R3

Page 90 of the NEC PBX System (120) user manual — Table 007-2 LTC0-LTC2 MDF Cross Connection Information (Continued)
Page 90 · click to enlarge
Page 90

Table 007-2 LTC0-LTC2 MDF Cross Connection Information (Continued)

TYPE OF INTERFACE

PIN CARD SLOTS

2-WIRE E&M TIE

4-WIRE E&M TIE

CO (4 COT)

CO (2COT)

LD (2LDT)

DID (AUC)

SLT (4LC)

SLT (AUC)

LINE (2ODT)

LINE (2ODT)

T0 R0

T0 R0

T0 R0

T0 R0

TxT0 TxR0

T0 R0

T0 R0

T0 R0

39 14 T1 R1

T1 R1

T1 R1

T1 R1

RxT0 RxR0

T1 R1

T1 R1

T1 R1

40 15 T2 R2

T2 R2

TxT1 TxR1

T2 R2

41 16 T3 R3

T3 R3

RxT1 RxR1

T3 R3

T0 R0

T0 R0

T0 R0

T0 R0

TxT0 TxR0

T0 R0

T0 R0

T0 R0

43 18 T1 R1

T1 R1

T1 R1

T1 R1

RxT0 RxR0

T1 R1

T1 R1

T1 R1

44 19 T2 R2

T2 R2

TxT1 TxR1

T2 R2

45 20 T3 R3

T3 R3

RxT1 RxR1

T3 R3

T0 R0

T0 R0

T0 R0

T0 R0

TxT0 TxR0

T0 R0

T0 R0

T0 R0

47 22 T1 R1

T1 R1

T1 R1

T1 R1

RxT0 RxR0

T1 R1

T1 R1

T1 R1

48 23 T2 R2

T2 R2

TxT1 TxR1

T2 R2

49 24 T3 R3

T3 R3

RxT1 RxR1

T3 R3

50 25 MN*

MJ*

*Note: Major and minor alarm connections for external indicators are located on LTC0 of PIM0 only.

Page 91 of the NEC PBX System (120) user manual — Table 007-2 LTC0-LTC2 MDF Cross Connection Information (Continued)
Page 91 · click to enlarge
Page 91

Table 007-2 LTC0-LTC2 MDF Cross Connection Information (Continued)

TYPE OF INTERFACE

PIN CARD SLOTS

SN611 ATTCON/ Dterm 6D/16D

EXT. PAGE/

Dterm 65

Dterm 65

EXT. KEY

EXT. RELAY

MOH/BGM

(4DLCA)

(2DLCB)

(DK00)

(DK00)

(COT)

(2DLCC)

T0 R0

T0 R0

RA0 TA0

K1 K0

K1 K0

T R

27 2 T1 R1

T1 R1

RB0 TB0

K3 K2

K3 K2

T R

28 3 T2 R2

RA1 TA1

K5 K4

K5 K4

T R

29 4 T3 R3

RB0 RB1

K7 K6

K7 K6

T R

T0 R0

T0 R0

RA0 TA0

K1 K0

K1 K0

T R

31 6 T1 R1

T1 R1

RB0 TB0

K3 K2

K3 K2

T R

32 7 T2 R2

RA1 TA1

K5 K4

K5 K4

T R

33 8 T3 R3

RB0 RB1

K7 K6

K7 K6

T R

T0 R0

T0 R0

RA0 TA0

K1 K0

K1 K0

T R

35 10 T1 R1

T1 R1

RB0 TB0

K3 K2

K3 K2

T R

36 11 T2 R2

RA1 TA1

K5 K4

K5 K4

T R

37 12 T3 R3

RB0 RB1

K7 K6

K7 K6

T R

Page 92 of the NEC PBX System (120) user manual — Table 007-2 LTC0-LTC2 MDF Cross Connection Information (Continued)
Page 92 · click to enlarge
Page 92

Table 007-2 LTC0-LTC2 MDF Cross Connection Information (Continued)

TYPE OF INTERFACE

PIN CARD SLOTS

SN611 ATTCON/ Dterm 6D/16D

Dterm 65

Dterm 65

EXT. PAGE/

EXT. KEY

EXT. RELAY

(4DLCA)

(2DLCB)

MOH/BGM

(DK00)

(DK00)

Note 2

Note 2

(COT)

(2DLCC)

T0 R0

T0 R0

RA0 TA0

K1 K0

K1 K0

T R

39 14 T1 R1

T1 R1

RB0 TB0

K3 K2

K3 K2

T R

40 15 T2 R2

RA1 TA1

K5 K4

K5 K4

T R

41 16 T3 R3

RB0 RB1

K7 K6

K7 K6

T R

T0 R0

T0 R0

RA0 TA0

K1 K0

K1 K0

T R

43 18 T1 R1

T1 R1

RB0 TB0

K3 K2

K3 K2

T R

44 19 T2 R2

RA1 TA1

K5 K4

K5 K4

T R

45 20 T3 R3

RB0 RB1

K7 K6

K7 K6

T R

T0 R0

T0 R0

RA0 TA0

K1 K0

K1 K0

T R

47 22 T1 R1

T1 R1

RB0 TB0

K3 K2

K3 K2

T R

48 23 T2 R2

RA1 TA1

K5 K4

K5 K4

T R

49 24 T3 R3

RB0 RB1

K7 K6

K7 K6

T R

50 25 MN*

MJ*

*Note 1: Major and minor alarm connections for external indicators are located on LTC0 of PIM0 only. Note 2: The DSS Console is included.

Page 93 of the NEC PBX System (120) user manual — Figure 007-4: MDF Cross Connection for 4 Line C.O. Trunk (PN-4COTE)
Page 93 · click to enlarge
Page 93
NEC PBX System (120) — 007-4 MDF Cross Connection for 4 Line C.O. Trunk (PN-4COTE) diagram (page 93)
Fig. 113 · 007-4 MDF Cross Connection for 4 Line C.O. Trunk (PN…

(1) C.O./D.I.D. Trunks

(a) 4 Line C.O. Trunks (PN-4COTE and PN-4DITB).

NEC PBX System (120) — (1) C.O./D.I.D. Trunks diagram (page 93)
Fig. 114 · (1) C.O./D.I.D. Trunks

26 T0 1 R0 27 T1 2 R1 28 T2 3 R2 29 T3 4 R3

26 T0 1 R0 27 T1 2 R1 28 T2 3 R2 29 T3 4 R3

Figure 007-4: MDF Cross Connection for 4 Line C.O. Trunk (PN-4COTE)

Page 94 of the NEC PBX System (120) user manual — Figure 007-5: MDF Cross Connection for 2 Line C.O. Trunk (PN-2COTD)
Page 94 · click to enlarge
Page 94
NEC PBX System (120) — 007-5 MDF Cross Connection for 2 Line C.O. Trunk (PN-2COTD) diagram (page 94)
Fig. 115 · 007-5 MDF Cross Connection for 2 Line C.O. Trunk (PN…

(b) 2 Line C.O. Trunk (PN-2COTD)

NEC PBX System (120) — (b) 2 Line C.O. Trunk (PN-2COTD) diagram (page 94)
Fig. 116 · (b) 2 Line C.O. Trunk (PN-2COTD)

Figure 007-5: MDF Cross Connection for 2 Line C.O. Trunk (PN-2COTD)

Page 95 of the NEC PBX System (120) user manual — Figure 007-6 MDF Cross Connection for a 4W E&M Trunk Card (PN-2ODTA)
Page 95 · click to enlarge
Page 95
NEC PBX System (120) — 007-6 MDF Cross Connection for a 4W E&M Trunk Card (PN-2ODTA) diagram (page 95)
Fig. 117 · 007-6 MDF Cross Connection for a 4W E&M Trunk Card (…

(2) Tie Line Trunk

(a) 4W E&M Trunk (PN-2ODTA)

NEC PBX System (120) — (2) Tie Line Trunk diagram (page 95)
Fig. 118 · (2) Tie Line Trunk

Figure 007-6 MDF Cross Connection for a 4W E&M Trunk Card (PN-2ODTA)

Page 96 of the NEC PBX System (120) user manual — 007-6 MDF Cross Connection for a 4W E&M Trunk Card (PN-2ODTA)
Page 96 · click to enlarge
Page 96
NEC PBX System (120) — 007-6 MDF Cross Connection for a 4W E&M Trunk Card (PN-2ODTA) diagram (page 96)
Fig. 119 · 007-6 MDF Cross Connection for a 4W E&M Trunk Card (…

26 TxT0 1 TxR0 27 RxT0 2 RxR0 28 TxT1 3 TxR1 29 RxT1 4 RxR1

1 TxR0 26 TxT0 2 RxR0 27 RxT0 3 TxR1 28 TxT1 4 RxR1 29 RxT1

Figure 007-6 MDF Cross Connection for a 4W E&M Trunk Card (PN-2ODTA) (Continued)

Page 97 of the NEC PBX System (120) user manual — Figure 007-7: MDF Cross Connection for an LD Trunk (PN-2LDTA)
Page 97 · click to enlarge
Page 97
NEC PBX System (120) — 007-7 MDF Cross Connection for an LD Trunk (PN-2LDTA) diagram (page 97)
Fig. 120 · 007-7 MDF Cross Connection for an LD Trunk (PN-2LDTA…

(b) LD Trunk (PN-2LDTA)

NEC PBX System (120) — (b) LD Trunk (PN-2LDTA) diagram (page 97)
Fig. 121 · (b) LD Trunk (PN-2LDTA)

Figure 007-7: MDF Cross Connection for an LD Trunk (PN-2LDTA)

Page 98 of the NEC PBX System (120) user manual — Figure 007-8 MDF Cross Connection for a DID Trunk Card (PN-AUCA)
Page 98 · click to enlarge
Page 98
NEC PBX System (120) — 007-8 MDF Cross Connection for a DID Trunk Card (PN-AUCA) diagram (page 98)
Fig. 122 · 007-8 MDF Cross Connection for a DID Trunk Card (PN-…

(3) 2 Line DID Trunk (PN-AUCA)

NEC PBX System (120) — (3) 2 Line DID Trunk (PN-AUCA) diagram (page 98)
Fig. 123 · (3) 2 Line DID Trunk (PN-AUCA)

26 T0 1 R0 27 T1 2 R1 28 3 29 4

1 R0 26 T0 2 R1 27 T1 3 28 4 29

Figure 007-8 MDF Cross Connection for a DID Trunk Card (PN-AUCA)

Page 99 of the NEC PBX System (120) user manual — Figure 007-9 MDF Cross Connection for a Single Line Telephone (Standard Line)
Page 99 · click to enlarge
Page 99
NEC PBX System (120) — 007-9 MDF Cross Connection for a Single Line Telephone (Standard Line) diagram (page 99)
Fig. 124 · 007-9 MDF Cross Connection for a Single Line Telepho…

(4) Single Line Telephone (SLT)

(a) Standard Line (PN-4LCE/4LCF)

NEC PBX System (120) — (4) Single Line Telephone (SLT) diagram (page 99)
Fig. 125 · (4) Single Line Telephone (SLT)

26 T0 1 R0 27 T1 2 R1 28 T2 3 R2 29 T3 4 R3

1 R0 26 T0 2 R1 27 T1 3 R2 28 T2 4 R3 29 T3

Figure 007-9 MDF Cross Connection for a Single Line Telephone (Standard Line)

Page 100 of the NEC PBX System (120) user manual — Figure 007-10 MDF Cross Connection for a Single Line Telephone (Long Line)
Page 100 · click to enlarge
Page 100
NEC PBX System (120) — 007-10 MDF Cross Connection for a Single Line Telephone (Long Line) diagram (page 100)
Fig. 126 · 007-10 MDF Cross Connection for a Single Line Teleph…

(b) Long Line (PN-AUCA)

NEC PBX System (120) — (b) Long Line (PN-AUCA) diagram (page 100)
Fig. 127 · (b) Long Line (PN-AUCA)

26 T0 1 R0 27 T1 2 R1 28 3 29 4

1 R0 26 T0 2 R1 27 T1 3 28 4 29

Figure 007-10 MDF Cross Connection for a Single Line Telephone (Long Line)

Page 101 of the NEC PBX System (120) user manual — (5) D term /DSS Console
Page 101 · click to enlarge
Page 101
NEC PBX System (120) — 007-11 MDF Cross Connection for a Dterm/DSS Console (Standard Line) diagram (page 101)
Fig. 128 · 007-11 MDF Cross Connection for a Dterm/DSS Console…

(5) D term /DSS Console

(a) Standard Line (PN-4DLCA)

NEC PBX System (120) — (5) D term /DSS Console diagram (page 101)
Fig. 129 · (5) D term /DSS Console

26 T0 1 R0 27 T1 2 R1 28 T2 3 R2 29 T3 4 R3

1 R0 29 T0 2 R1 28 T1 3 R2 27 T2 4 R3 26 T3

* The colours shown are the most common. In any case, use only the inner pair of connector.

Figure 007-11 MDF Cross Connection for a Dterm/DSS Console (Standard Line)

Page 102 of the NEC PBX System (120) user manual — (b) Long Line (PN-2DLCB)
Page 102 · click to enlarge
Page 102
NEC PBX System (120) — 007-12 MDF Cross Connection for a Dterm/DSS Console (Long Line) diagram (page 102)
Fig. 130 · 007-12 MDF Cross Connection for a Dterm/DSS Console…

(b) Long Line (PN-2DLCB)

NEC PBX System (120) — (b) Long Line (PN-2DLCB) diagram (page 102)
Fig. 131 · (b) Long Line (PN-2DLCB)

26 T0 1 R0 27 T1 2 R1 28 3 29 4

1 R0 29 T0 2 R1 28 T1 3 27 4 26

* The colours shown are the most common. In any case, use only the inner pair of connector.

Figure 007-12 MDF Cross Connection for a Dterm/DSS Console (Long Line)

Page 103 of the NEC PBX System (120) user manual — 007-13 MDF Cross Connection for an SN611 ATTCON and Dterm 6D/16D
Page 103 · click to enlarge
Page 103
NEC PBX System (120) — 007-13 MDF Cross Connection for an SN611 ATTCON and Dterm 6D/16D diagram (page 103)
Fig. 132 · 007-13 MDF Cross Connection for an SN611 ATTCON and…

(6) SN611 ATTCON and Dterm 6D/16D series telephones.

NEC PBX System (120) — 007-13 MDF Cross Connection for an SN611 ATTCON and Dterm 6D/16D diagram (page 103)
Fig. 133 · 007-13 MDF Cross Connection for an SN611 ATTCON and…

26 RA0 1 TA0 27 RB0 2 TB0 28 RA1 3 TA1 29 RB1 4 TB1

1 TA0 26 RA0 2 TB0 27 RB0 3 TA1 28 RA1 4 TB1 29 RB1

* The colours shown are the most common. In any case, use only the inner and outer pairs as shown.

Figure 007-13 MDF Cross Connection for an SN611 ATTCON and Dterm 6D/16D.

Page 104 of the NEC PBX System (120) user manual — Figure 007-14 MDF Cross Connection for Day/Night Mode Change by External Key
Page 104 · click to enlarge
Page 104
NEC PBX System (120) — 007-14 MDF Cross Connection for Day/Night Mode Change by External Key diagram (page 104)
Fig. 134 · 007-14 MDF Cross Connection for Day/Night Mode Chang…

(7) Day/Night Mode Change by External Key

NEC PBX System (120) — (7) Day/Night Mode Change by External Key diagram (page 104)
Fig. 135 · (7) Day/Night Mode Change by External Key

26 K1 1 K0 27 K3 2 K2 28 K5 3 K4 29 K7 4 K6

1 K0 26 K1 2 K2 27 K3 3 K4 28 K5 4 K6 29 K7

Figure 007-14 MDF Cross Connection for Day/Night Mode Change by External Key

Page 105 of the NEC PBX System (120) user manual — Figure 007-15 Outline of the External TAS Indicator Connection
Page 105 · click to enlarge
Page 105

(8) External TAS Indicator

(a) Outline of the Connections

PABX

TAS Indicator with Battery

MDF

IND

GND

OR

PABX

MDF

TAS Indicator without Battery

IND

(24V. nominal) PZ-PW86 Card

Figure 007-15 Outline of the External TAS Indicator Connection

PN-DK00 Card · PZ-PW86 Card · PN-DK00 Card

Page 106 of the NEC PBX System (120) user manual — Figure 007-16 MDF Cross Connection for a TAS Indicator with a Battery
Page 106 · click to enlarge
Page 106
NEC PBX System (120) — 007-16 MDF Cross Connection for a TAS Indicator with a Battery diagram (page 106)
Fig. 136 · 007-16 MDF Cross Connection for a TAS Indicator with…

(b) MDF Cross Connection

  • When using a TAS Indicator with a Battery
NEC PBX System (120) — (b) MDF Cross Connection diagram (page 106)
Fig. 137 · (b) MDF Cross Connection

26 K1 1 K0 27 K3 2 K2 28 K5 3 K4 29 K7 4 K6

1 K0 26 K1 2 K2 27 K3 3 K4 28 K5 4 K6 29 K7

Figure 007-16 MDF Cross Connection for a TAS Indicator with a Battery

Page 107 of the NEC PBX System (120) user manual — Figure 007-17 MDF Cross Connection for a TAS Indicator without a Battery
Page 107 · click to enlarge
Page 107
NEC PBX System (120) — 007-17 MDF Cross Connection for a TAS Indicator without a Battery diagram (page 107)
Fig. 138 · 007-17 MDF Cross Connection for a TAS Indicator with…

(c) MDF Cross Connection

  • When using a TAS Indicator without a Battery
NEC PBX System (120) — (c) MDF Cross Connection diagram (page 107)
Fig. 139 · (c) MDF Cross Connection

26 K1 1 K0 27 K3 2 K2 28 K5 3 K4 29 K7 4 K6

1 K0 26 K1 2 K2 27 K3 3 K4 28 K5 4 K6 29 K7

Figure 007-17 MDF Cross Connection for a TAS Indicator without a Battery

Page 108 of the NEC PBX System (120) user manual — PABX
Page 108 · click to enlarge
Page 108

(9) Paging Equipment

The cross connection for customer-owned paging equipment is shown in Figure 007-18 and Figure 007-19, as an example.

the PN-DK00 in the Relay-Drive Mode. }

  • Requirement for the Paging Equipment
  • Input Impedance : 600 ohm
  • Control Method : Start - Ground ON : Stop - Ground Off (Open)

Refer to the Command Manual to set

(a) Outline of the Connection

PABX

MDF

Figure 007-18 Outline of the Paging Equipment Connection

Show 8 more labels / short text on this page
For Amplifier Input · PN-DK00 Card · Paging Equipment · PN-4COT/2COT Card · For Control (Optional) · AUSTEL - approved · Line Isolation Unit · PZ-PW86 Card -27V
Page 109 of the NEC PBX System (120) user manual — Figure 007-19 MDF Cross Connection for Paging Equipment
Page 109 · click to enlarge
Page 109
NEC PBX System (120) — 007-19 MDF Cross Connection for Paging Equipment diagram (page 109)
Fig. 140 · 007-19 MDF Cross Connection for Paging Equipment

(b) MDF Cross Connection Notes: 1. The current capacity of the opto-coupler (PN-DK00 card) is 125 mA. 2. The isolator’s relay must be compatible with nominal 24 Volt circuits, and the suppression diode shown is mandatory. 3. The audio path in the isolator must be capacitor-coupled as shown. 4. The Line-fault detection in the C.O.T. must be disabled. Refer to the Command Manual for details.

NEC PBX System (120) — 007-19 MDF Cross Connection for Paging Equipment diagram (page 109)
Fig. 141 · 007-19 MDF Cross Connection for Paging Equipment

Figure 007-19 MDF Cross Connection for Paging Equipment

Page 110 of the NEC PBX System (120) user manual — Figure 007-19 MDF Cross Connection for Paging Equipment (Continued)
Page 110 · click to enlarge
Page 110
NEC PBX System (120) — 007-19 MDF Cross Connection for Paging Equipment diagram (page 110)
Fig. 142 · 007-19 MDF Cross Connection for Paging Equipment

26 1 K0 27 2 28 3 29 4 30 T0 5 R0 31 6 32 7 33 8

1 K0 26 2 27 3 28 4 29 5 R0 30 T0 6 31 7 32 8 33

Figure 007-19 MDF Cross Connection for Paging Equipment (Continued)

Page 111 of the NEC PBX System (120) user manual — Figure 007-20 Outline of the External Music Connection
Page 111 · click to enlarge
Page 111

(10) External Music Equipment

The cross connection for customer-owned external music equipment is shown in Figure 007-21 and Figure 007-22, as an example.

}

  • Requirement for the External Music Equipment
  • Output level : Less than 0 dbm (Adjustable)
  • Output impedance: Less than 1 K Ω
  • Control Method : Start - Ground On : Stop - Ground Off (Open)

On/Off control is optional. Refer to the Command Manual to set the PN-PK00 in the Relay-Drive mode.

(a) Outline of the Connection

MDF PABX

Line Isolation Unit For Control

Figure 007-20 Outline of the External Music Connection

Show 7 more labels / short text on this page
For Audio · PN-4COT/2COT Card · External Music Equipment · PN-DK00 Card · (Optional) · AUSTEL - approved · PZ-PW86 Card
Page 112 of the NEC PBX System (120) user manual — Figure 007-21 MDF Cross Connection for External Music Equipment
Page 112 · click to enlarge
Page 112
NEC PBX System (120) — 007-21 MDF Cross Connection for External Music Equipment diagram (page 112)
Fig. 143 · 007-21 MDF Cross Connection for External Music Equip…

(b) MDF Cross Connection Notes: 1. The current capacity of the opto-coupler (PN-DK00 card) is 125 mA. 2. The isolator’s relay must be compatible with nominal 24 Volt circuits, and the suppression diode shown is mandatory. 3. The audio path in the isolator must be capacitor-coupled as shown. 4. The Line-fault detection in the C.O.T. must be disabled. Refer to the Command Manual for details.

NEC PBX System (120) — 007-21 MDF Cross Connection for External Music Equipment diagram (page 112)
Fig. 144 · 007-21 MDF Cross Connection for External Music Equip…

Figure 007-21 MDF Cross Connection for External Music Equipment

Page 113 of the NEC PBX System (120) user manual — Figure 007-21 MDF Cross Connection for External Music Equipment (Continued)
Page 113 · click to enlarge
Page 113
NEC PBX System (120) — 007-21 MDF Cross Connection for External Music Equipment diagram (page 113)
Fig. 145 · 007-21 MDF Cross Connection for External Music Equip…

26 1 K0 27 2 28 3 29 4 30 T0 5 R0 31 6 32 7 33 8

1 K0 26 2 27 3 28 4 29 5 R0 30 T0 6 31 7 32 8 33

Figure 007-21 MDF Cross Connection for External Music Equipment (Continued)

Page 114 of the NEC PBX System (120) user manual — Figure 007-22: Connecting Method of Music Source with D.C. Offset
Page 114 · click to enlarge
Page 114
NEC PBX System (120) — 007-22 Connection Method of Music Source with D.C. Offset diagram (page 114)
Fig. 146 · 007-22 Connection Method of Music Source with D.C. O…

External Music Equipment (continued)

  • An AUSTEL-approved isolator must always be included between the Music Source and the PABX trunk.
  • If a D.C. voltage is supplied together with the audio from the external music equipment, a coupling capacitor must be added as shown in Figure 007-22. It is not recommended to mount this capacitor on the MDF, so it should be added to the output cable of the music equipment.
NEC PBX System (120) — External Music Equipment (continued) diagram (page 114)
Fig. 147 · External Music Equipment (continued)

Figure 007-22: Connecting Method of Music Source with D.C. Offset

Page 115 of the NEC PBX System (120) user manual — Figure 007-23 MDF Cross Connection for External BGM Sources
Page 115 · click to enlarge
Page 115
NEC PBX System (120) — 007-23 MDF Cross Connection for External BGM Sources diagram (page 115)
Fig. 148 · 007-23 MDF Cross Connection for External BGM Sources

(11) External Background Music (BGM) Source

The cross connection for customer-owned external BGM sources is shown in Figure 007-23.

NEC PBX System (120) — (11) External Background Music (BGM) Source diagram (page 115)
Fig. 149 · (11) External Background Music (BGM) Source

AUSTEL - approved Line Isolation Units. (If On/Off control is required, use the same method as for external Music-On-Hold).

26 T0 1 R0 27 T1 2 R1 28 T2 3 R2 29 T3 4 R3

1 R0 26 T0 2 R1 27 T1 3 R2 28 T2 4 R3 29 T3

Figure 007-23 MDF Cross Connection for External BGM Sources

ADDITIONAL: The examples shown in Figures 007-18 to 007-20 also apply to other auxiliary equipment such

as, Announcement Machines, etc. When On/Off control circuits are required, the isolator must also have a relay fitted.

Page 116 of the NEC PBX System (120) user manual — PABX
Page 116 · click to enlarge
Page 116

(12) Power Failure Transfer (PFT)

The PFT function is included in the PN-AUCA Card.

(a) Outline of the Connection.

PABX

MDF TEL

MDF

TO C.O. LINE

PN-AUCA

PN-4COT/PN-2COT

Figure 007-24 Outline of the PFT Connection

Page 117 of the NEC PBX System (120) user manual — Figure 007-25 MDF Cross Connection for the PFT
Page 117 · click to enlarge
Page 117
NEC PBX System (120) — 007-25 MDF Cross Connection for the PFT diagram (page 117)
Fig. 150 · 007-25 MDF Cross Connection for the PFT

(b) MDF Cross Connection

NEC PBX System (120) — (b) MDF Cross Connection diagram (page 117)
Fig. 151 · (b) MDF Cross Connection

Figure 007-25 MDF Cross Connection for the PFT

Page 118 of the NEC PBX System (120) user manual — Figure 007-25 MDF Cross Connection for the PFT (Continued)
Page 118 · click to enlarge
Page 118
NEC PBX System (120) — 007-25 MDF Cross Connection for the PFT diagram (page 118)
Fig. 152 · 007-25 MDF Cross Connection for the PFT

26 C.O.T0 1 C.O.R0 27 C.O.T1 2 C.O.R1 28 3 29 4 30 Sta.T0 5 Sta.R0 31 Sta.T1 6 Sta.R1 32 7 33 8

1 C.O.R0 26 C.O.T0 2 C.O.R1 27 C.O.T1 3 28 4 29 5 Sta.R0 30 Sta.T0 6 Sta.R1 31 Sta.T1 7 32 8 33

Figure 007-25 MDF Cross Connection for the PFT (Continued)

Page 119 of the NEC PBX System (120) user manual — Figure 007-26: MDF Cross Connection for Alarm Display Panel
Page 119 · click to enlarge
Page 119
NEC PBX System (120) — 007-26 MDF Cross Connection for Alarm Display Panel diagram (page 119)
Fig. 153 · 007-26 MDF Cross Connection for Alarm Display Panel

(13) Alarm Display Panel (ALM DSPP).

Cross connection for the Alarm Display Panel is shown below.

NEC PBX System (120) — 007-26 MDF Cross Connection for Alarm Display Panel diagram (page 119)
Fig. 154 · 007-26 MDF Cross Connection for Alarm Display Panel

Figure 007-26: MDF Cross Connection for Alarm Display Panel

Page 120 of the NEC PBX System (120) user manual — Figure 008-1: Lamp Indication on PZ-PW86(A) Card
Page 120 · click to enlarge
Page 120
NEC PBX System (120) — -200-008 Mounting of Circuit Cards diagram (page 120)
Fig. 155 · -200-008 Mounting of Circuit Cards

1. Mounting Procedure

(1) For testing, turn on the “SW” switch on the PZ-PW86/PW86(A) Card(s). Make sure that each “ON” lamp (Green) is lit.

NEC PBX System (120) — 1. Mounting Procedure diagram (page 120)
Fig. 156 · 1. Mounting Procedure

Figure 008-1: Lamp Indication on PZ-PW86(A) Card

Page 121 of the NEC PBX System (120) user manual — NAP200-008 Sheet 2/2 Mounting of Circuit Cards
Page 121 · click to enlarge
Page 121

NAP200-008 Sheet 2/2 Mounting of Circuit Cards

(2) Before mounting circuit cards, confirm the folowing items.

  • Wrist Strap and Conductive Work Surface are prepared.
  • Switch setting of circuit cards is already completed (Refer to the Circuit Card Manual).
  • The “SW” switches of all PZ-PW86 Cards are turned off.

(3) Mount circuit cards into their mouting positions according to the “Module Face Layout” and “Port Assignment Table” given in the System Data Sheet.

Page 122 of the NEC PBX System (120) user manual — 1.2 Resident System Program
Page 122 · click to enlarge
Page 122

NAP200-009 Sheet 1/3 System Initialization and System

Data Entry

1. System Initialization

  • There are two methods for System Initialization. The first method is to Clear All Data, except LEN0000 as a CAT terminal, and then program the System Data. The second method is to use the Resident System Program, which causes the system to configure itself automatically to the default settings, wherever the line/ trunk cards are installed. Refer to the System Data Sheet for the default settings.

Turn on the “SW” switch on all the PZ-PW86 power units before initializing anything.

- The “ON” lamp must be lit on all the PZ-PW86 units.

1.1 All Clear, Except LEN0000 CAT

1. On the MP Card, set SW3 to “B” and press SW1.
2. When the “MN” lamp on the system is lit, set SW3 to “0” and press SW1.

- Operating mode has been changed to ON LINE.

1.2 Resident System Program

1. Mount the Line/Trunk cards into PIM.
2. On the MP Card, set SW3 to “C” and press SW1.

- After 3 to 4 seconds, the “MN” lamp is lit.

- If the “MJ” lamp is lit, repeat the procedure of Step 2.

- The system has loaded the Resident System Program.

3. Set SW3 to “0” and press SW1.

- Operating mode has been changed to ON LINE.

Page 123 of the NEC PBX System (120) user manual — #
Page 123 · click to enlarge
Page 123

NAP200-009 Sheet 2/3 System Initialization and System

Data Entry

2. System Data Entry

  • There are two methods for data entry, both of which employ a CAT or a MAT.

2.1 CAT (Customer Administration Terminal)

Any Dterm can be assigned as a CAT terminal through programming. The Dterm can still be used as a regular telephone when it is not in CAT mode. If the system is initialized by “C” (Resident System Program), every Dterm

will be able to go into CAT mode. If the system is initialized by “B” (All Clear), only LEN0000 is assigned as a CAT port (the LDC card must be installed in slot LT00).

To assign a Dterm as a CAT, follow the procedures shown below.

To set CAT mode:

1. Press

TRF

2. Press - CNF lamp flashes

CNF

3. Press - CNF lamp is off

*

4. Press

TRF

5. Press - CNF lamp flashes

CNF

6. Press - CNF, SPKR, ANS lamps are lit - “CAT MODE” is displayed on LCD

#

7. Press - “COMMAND = -” is displayed on LCD

ST

Page 124 of the NEC PBX System (120) user manual — 2.2 MAT (Maintainance Administration Terminal)
Page 124 · click to enlarge
Page 124

NAP200-009 Sheet 3/3 System Initialization and System

Data Entry

To reset CAT mode:

While “COMMAND = -” is displayed on LCD:

1. Lift the handset (off hook) - SPKR lamp is off.
2. Replace the handset (on hook) - CNF, ANS lamps are off. - LCD returns to clock.

2.2 MAT (Maintainance Administration Terminal)

In addition to the CAT mode programming, the MAT can also be used. Refer to the MAT Operation Guide and the Command Manual.

Page 125 of the NEC PBX System (120) user manual — Tie Line Trunk Test (Incoming, Outgoing)
Page 125 · click to enlarge
Page 125

NAP200-010 Sheet 1/1 Operation Test

1. Operation Test

Confirm the system data accuracy and hardware configuration (including cable connections) by the following operation test:

  • Basic Connection Test at MDF

- Station Line Test (Operator Call from all stations) - Central Office Trunk Test (Incoming, Outgoing)

Tie Line Trunk Test (Incoming, Outgoing)

  • Service Feature Test

- Call Transfer - Step Call - Executive Right of Way - Call Hold - Call Back - Call Forwarding-All Calls/Don’t Answer/Busy Line - Call Pickup - Station Hunting-Pilot/Circular - Speed Calling-System/Station - Paging Access - Announcement Service etc. - Music on Hold - Background Music - TAS/Night Service

Ask about the NEC PBX System (120)

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the NEC PBX System (120)

Be the first to ask — other owners or our team will answer.

Original document

NEC PBX System (120) manual PDF

125 pages·1.2 MB·Answering Machine·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…