EN
MPI Technologies logo
Official user manual

MPI Technologies FCX

24 pages·1.1 MB·Boiler·PDF·ENDEFRITNLJA
MPI Technologies FCX
Table of Contents 37 sections TABLE OF CONTENTS · INTRODUCTION · 1 - Product Description · DESIGNATION OF COMPONENTS · … ShowHide
Page 1 of the MPI Technologies FCX user manual — T30.30306.02
Page 1 · click to enlarge
Page 1

MPI Technologies FCX —     diagram (page 1)
Fig. 1
MPI Technologies FCX —     diagram (page 1)
Fig. 2

MPI Technologies FCX —  diagram (page 1)
Fig. 3

T30.30306.02

Page 3 of the MPI Technologies FCX user manual —
Page 3 · click to enlarge
Page 3

Model FCX oil fired boiler utilizes a sealed combus- tion system that operates at a temperature at which the flue products will condense. The flue products temperature is so low that the unit is suitable for use with PVC / Polypropylene flue pipes, which are offe- red as standard options for installation. Model FCX is approved for installation with zero clearance to combustible materials by Intertek Testing Services to the UL Standard for Oil Fired Storage Tank Water Heaters (UL 732).

  • A control panel assembly and all electrical controls for operation of the boiler, including a water temperature thermometer in circuit 1
  • A manual water-mixing valve that can be motorized if desired
  • A safety pressure relief valve
  • An expansion tank
  • A water circulating pump
  • Complete internal water piping terminating in connections for two independent water-heating circuits.

Model FCX is completely assembled and provides standard parts as follows:

  • Complete internal air piping terminating in a connection to a coaxial flue/combustion air intake system.
  • An enameled steel cabinet with thick insulation
  • A completely unitized, thick shelled boiler with combustion chamber and a heat exchanger with a system of removable baffles

Standard options include:

  • A stainless steel condenser, with condensate drain
  • Coaxial balanced flue system components for connection to the boiler to provide venting of the flue products and combustion air intake.
  • A high efficiency, low emission, gun type oil burner with combustion air fan, integral oil pump, oil heater and primary control
MPI Technologies FCX —       diagram (page 3)
Fig. 4

Page 4 of the MPI Technologies FCX user manual —
Page 4 · click to enlarge
Page 4

17 18 19 20 21

! ! " # $ %& ' ( )' * + ', - . / ) . 0 #1 . #1 2 . 1

', 3 1 # 14

% .& 1% $ 5 # ) ( . * 6 ' 5 # ) + ' ' 1 # ) - %& ' 6 6 ' 5 # ' ' 5 # 3 %& ' 1 # 14

% .& ' 7' ' ' . " ' # )%) $ 7")

Show 6 more labels / short text on this page
· View from above · 17 18 19 · Front view · Rear view ·
Page 5 of the MPI Technologies FCX user manual —
Page 5 · click to enlarge
Page 5

MPI Technologies FCX —      diagram (page 5)
Fig. 5

2nd circuit heating output

1st circuit heating output

Combustion air is drawn into the oil burner by the burner fan through the air intake hose connected to the coaxial flue/combustion air intake separator tube assembly. Heated air from combustion of the oil burner cools as it passes through the boiler heat exchanger, then the condenser. Cooled flue pro- ducts exit the unit through the center of the flue/ combustion air separator tube assembly. Conden- sate from the flue products is drained from the bot- tom of the condenser into the condensate drain tube, exiting the unit through the condensate drain system..

Water is circulated through the boiler heat exchan- ger and condenser circuits where it is heated by the combustion of the oil burner. Two independent wa- ter-heating circuits can be connected to the unit:

  • The first circuit passes through a three way mixing valve incorporated into the boiler. This valve can either be used manually as supplied or driven by a regulator (option).
  • The second circuit can supply another heating circuit and/or a domestic hot water production system.
Show 4 more labels / short text on this page
· Circuit heating · return or ·
Page 6 of the MPI Technologies FCX user manual —
Page 6 · click to enlarge
Page 6

Ratings for Model FCX are provided in the following table:

!" #$%& $ $# '%(') "*+&'$'(%, Rated OutputBTUH76,000 Rated InputBTUH81,250 Combustion Chamber LengthInches8.98 Combustion Chamber DiameterInches11.5 Combustion Chamber VolumeCu. Inches915 Combustion Prod. Circuit VolumeCu. Inches3051 Flue Pressure DropInches H2O0.10 Maximum Heating Service PressurePsig43.5 Max Heating circuit water temperatureDeg. F176 Water Overheating Safety Thermostat SettingDeg. F230 Combustion Prod. Overheating Safety Thermostat SettingDeg. F248 Heating Circuit Water CapacityGallons4.23 Primary Water Flow Rate (60/80 deg. C)Gal/hr254 Water Pressure Drop (at nominal flow rate)MCE1.4 Power Absorbed (with burner, without circulator)KW0.22 Packaged WeightLb.267

Ratings are for the boiler when connected to stan- dard option coaxial flue system components.

Electrical Power Supply 115 volts, single phase, 60 Hz

Full Load Current 3.0 Amps FLA

Max Fuse/ Circuit Breaker Size 15 Amps

"%% &'("%($# '%(') Combustion Products3.15 / 4.92Inch Water Heating Supply/Return1Inch Domestic Hot Water or Second Heating Circuit1Inch Condensate Drain1 -1/2Inch Heating Water Drain½Inch Air Bleed3/8Inch Safety pressure relief valve3/4inch

·

Page 7 of the MPI Technologies FCX user manual —      -
Page 7 · click to enlarge
Page 7

-

To open Model FCX to access for installation, and/ or service, follow these steps : - Remove the control panel escutcheon molding (2) by grasping it on both sides and pulling it outward towards you and up. The escutcheon will come free of the attachment clips leaving the con- trol panel exposed. - Remove the top cover of the unit (A) by lifting the cover at the front and rear to free the attachment clips, and then simply lift the cover straight up and off. - Remove the front panel attachment screws (P), then pull the front panel (J) outward towards you at the top to free it from the attachment clips. Lift the panel up to free it from the lower attachment pins, and simply lift the panel off.

MPI Technologies FCX —     -  diagram (page 7)
Fig. 6

-

Model FCX is a free standing (floor mounted) ap- pliance suitable for installation on combustible floo- ring. It is approved for installation with zero clearance to combustible walls, ceiling, doors, etc from the cabinet. Standard option coaxial flue com- ponents are suitable for installation with zero clea- rance to combustible materials.

course, a significant part of the choice.

While Model FCX can be installed in an enclosure such as a closet, ventilation or other means must be provided so that the enclosure temperature does not exceed 113 deg. F (45 deg. C).

These are operating clearances and it is recommen- ded that additional clearances be considered:

  • Sufficient clearance should be provided in back of the unit to facilitate installation and maintenance of water, electrical, flue and condensate drain connections and components.
  • Sufficient clearance over the top of the unit should be provided to allow the top to be removed for service.
  • Sufficient clearance from the front of the unit should also be provided to facilitate adjustments and service.

There is no need for additional clearance to either side of the unit since there is no access to the unit from either side.

Alternative access measures such as doors, remo- vable wall panels, etc. may be provided if desired.

Choosing the location should also take into account the total flue length to the outdoors (See Flue Con- nection and Routing). In addition, the choice of loca- tion should consider the location of utilities such as electrical supply and sewer access for condensate drainage. Location and routing of water lines is, of

Page 8 of the MPI Technologies FCX user manual —
Page 8 · click to enlarge
Page 8

Connection of the coaxial flue/combustion air piping system is in the back of the unit to the separator tube assembly. The combustion products are ven- ted from the boiler and condenser through the cen- ter of the coaxial tube, while the combustion air is supplied through the outside ring of the coaxial tube. Since Model FCX is a condensing boiler, flue pro- ducts exiting the unit are relatively low temperature, from 140 - 185 deg. F (60 - 85 deg C), and saturated with humidity. Consequently, an airtight, corrosion resistant flue system must be provided.

"134 "431 % 5 "%& %' (& '(&$1 #(%$1 " 1$'" 1"4(%,""!

MPI Technologies FCX —          diagram (page 8)
Fig. 7
! %&"1" %,'/ N40.28393 Tile42.5 inches (1080mm)3.15 inch (80mm)4.92 inch (125mm) N40.28394 Black42.5 inches (1080mm)3.15 inch (80mm)4.92 inch (125mm)

Various standard option flue piping components and packages with which to create the flue system are available.

.# ' $(,/'-" (0"%'$1 1+ 2('

Useful length under sleeve tile - 16.9 inches (0.43 m)

MPI Technologies FCX —          diagram (page 8)
Fig. 8

"134 "431 % 5 "%& %' (& -" (0"%'$1 6' %)("%

- joint fitting -

MPI Technologies FCX —          diagram (page 8)
Fig. 9
! %& %,'/ N40.2839938.6 inches (980 mm)
! %& %,'/ N40.2839719.7 inches (500 mm)3.15 inch (80mm)4.92 inch (125mm) N40.2839839.4 inches (1000 mm)3.15 inch (80mm)4.92 inch (125mm)

#%,1 *-" (0"%'$1 1+ 2('

MPI Technologies FCX —          diagram (page 8)
Fig. 10

Useful length after assy. - 17.7 inches (0.45 m) or 37.4 inches (0.95 m)

/00/ ·

Page 9 of the MPI Technologies FCX user manual — Sleeve Tile with Adaptable Coupling
Page 9 · click to enlarge
Page 9

1 7 (1 8('/*$4'$91 "+41(%,

"134 "431 % ""!1$'

MPI Technologies FCX — Sleeve Tile with Adaptable Coupling diagram (page 9)
Fig. 11 · Sleeve Tile with Adaptable Coupling
! %&1"4"7 (%, '34"1" N40.1216525 - 45 degTileTile N40.1216635 - 55 degTileTile N40.1216735 - 55 degSlate - ShingleBlack
MPI Technologies FCX — Sleeve Tile with Adaptable Coupling diagram (page 9)
Fig. 12 · Sleeve Tile with Adaptable Coupling
! %&"1" A90.12172Black

"134 "431 % 5 "%& %' (&19"8

- joint fitting -

MPI Technologies FCX — Sleeve Tile with Adaptable Coupling diagram (page 9)
Fig. 13 · Sleeve Tile with Adaptable Coupling
45 ° bend 90 ° bend ! %&"1" N40.2839545 deg3.15 inch (80mm)4.92 inch (125mm) N40.2839690 deg3.15 inch (80mm)4.92 inch (125mm)

$)' %(%,&"11$ :"4'("%;

MPI Technologies FCX — Sleeve Tile with Adaptable Coupling diagram (page 9)
Fig. 14 · Sleeve Tile with Adaptable Coupling
(, ! %&+#9∅ ## B00.297273125

Collars are essential to bear the weight of the verti- cal extensions so that the boiler does not bear the weight.

.

/00/

Page 10 of the MPI Technologies FCX user manual — Typical installation examples :
Page 10 · click to enlarge
Page 10

All flue-piping components must be assembled to provide an airtight flue/ combustion air system.

The flue/combustion air system piping may be either horizontal or vertical or a combination of both, ob- serving the following:

Application of liquid soap over the flue pipes to be joined will aid in assembly of the parts.

  • The maximum unrestricted horizontal or vertical flue length shall not be more than 16.4 ft (5 m).

Typical installation examples appear in the illustra- tion that follow.

' $(,/'$1$%& * 1+ "%!(,+ $'("%

  • For each 90-degree elbow used in the flue system, subtract 3.3 ft (1m) from the total allowable length.
MPI Technologies FCX — Typical installation examples : diagram (page 10)
Fig. 15 · Typical installation examples :
  • For each 45-degree elbow used in the flue system, subtract 1.65 ft (0.5m) from the total allowable length.
  • Horizontal runs of the flue system must pitch down 3/4 inch per yard (2 cm per m) of length towards the boiler to facilitate proper flue products condensate drainage.
  • Termination of a horizontal flue system shall not be less than 5.96 ft(1.8m) above ground unless other provisions are made to minimize the likelihood of flue/combustion air intake blockage.
  • Do not place the flue terminal less than 3.3 ft. (1 m) from a ventilation hole or opening in a building.
  • Termination of a vertical flue must provide at least 12 inches (30cm) above the roof jack to the combustion air intake collar.
OptionStraight Horizontal Flue Kit
  • If there are two units in the installation with vertical flue systems, the termination of the systems must be separated by 16 inches (40cm).

%,1 *$1$%& * 1+ "%!(,+ $'("%

MPI Technologies FCX — Typical installation examples : diagram (page 10)
Fig. 16 · Typical installation examples :
MPI Technologies FCX — Typical installation examples : diagram (page 10)
Fig. 17 · Typical installation examples :
OptionAngled Horizontal Flue Kit

/00/ · 34(&$1(%)'$11$'("% 6$#41 )< ·

Page 11 of the MPI Technologies FCX user manual — Typical installation examples :
Page 11 · click to enlarge
Page 11

34(&$1(%)'$11$'("% 6$#41 ):&"%';

MPI Technologies FCX — Typical installation examples : diagram (page 11)
Fig. 18 · Typical installation examples :
MPI Technologies FCX — Typical installation examples : diagram (page 11)
Fig. 19 · Typical installation examples :
MPI Technologies FCX — Typical installation examples : diagram (page 11)
Fig. 20 · Typical installation examples :
MPI Technologies FCX — Typical installation examples : diagram (page 11)
Fig. 21 · Typical installation examples :

Options: - 1 90 deg concentric elbow - 3 Concentric extensions - 2 45 deg concentric elbows - 1 concentric vertical terminal - 1 sleeve tile roof flange - 1 roof plate

Options: - 1 90 deg concentric elbow - Concentric extensions - 1 concentric vertical terminal - 1 sleeve tile roof flange - 1 roof plate

#$6=> !': #;>> !': #;

#$6=>!':#; ≤ !': #;

>>!':#;≤ !': #;

Show 8 more labels / short text on this page
/00/ · · · · · · ·
Page 12 of the MPI Technologies FCX user manual — Typical installation examples :
Page 12 · click to enlarge
Page 12

34(&$1(%)'$11$'("% 6$#41 ):&"%';

Options: - 1 45 deg concentric elbow - 1 90 deg concentric elbow - Concentric extensions - 1 concentric vertical terminal - 1 sleeve tile roof flange - 1 roof plate

Options: - 1 90 deg concentric elbow - 3 Concentric extensions - 3 45 deg concentric elbows - 1 concentric vertical terminal - 1 sleeve tile roof flange - 1 roof plate

#$6=> !': #;>!':#;

#$6=> !': #;>> !': #;

≤ !'#;

>>!':#;> !': #; ≤ !': #;

Show 14 more labels / short text on this page
/00/ · 90° elbow · 90° elbow · 45° elbow · 45° elbow · View from above · View from above · · rear boiler · rear boiler · · · ·
Page 13 of the MPI Technologies FCX user manual —
Page 13 · click to enlarge
Page 13

34(&$1(%)'$11$'("% 6$#41 ):&"%';

1,80 m 5.9 ft

Options: - 1 45 deg concentric elbow - 2 90 deg concentric elbow - 1 concentric extension - 1 straight horizontal flue kit

Connection of the condensate drain piping system is to the back of the unit beneath the flue/combus- tion air separator tube assembly. The condensate drain tube provided in the unit is 1 - 19/32 inches (40 mm) O.D. to which the drain trap assembly supplied with the unit may be connected. The condensate drain outlet connection on the trap is 1 - 19/32 in- ches (40mm) O.D. to which standard 1 -1/2 inch tra- de size schedule 40 PVC pipe can be connected to create the rest of the drain system. The drain sys- tem must pitch downward towards the sewer.

Show 7 more labels / short text on this page
/00/ · 90° elbow · 45° elbow · view from above · rear boiler · 1 in ·
Page 14 of the MPI Technologies FCX user manual —  ?
Page 14 · click to enlarge
Page 14

?

Water circuit connections are made in the back of the unit utilizing the four 1" male pipe thread cou- plings provided. Model FCX can be connected to va- rious comfort heating water systems as well as to a domestic hot water heating system if desired, obser- ving that:

  • Isolation valves may be used in the various circuits to facilitate boiler maintenance without having to completely drain each circuit. NEVER place an isolation valve between a pressure relief device and a water tank.
  • An expansion tank must be provided in the system to support an expansion of 6 % of the total water capacity of all the circuits employed.
  • Water circulating pumps provided in the various circuits must be large enough for each circuit including the pressure drop of the boiler/ condenser in the unit. For optimum sound level and power consumption, set the circulator to the speed that is appropriate for the installation flow rate and pressure drop.
  • Safety pressure relief valve must be connected to the drain.
  • The water pressure gauge (not supplied) has to be fitted outside the unit.

$ ("+)'34(&$18$' &( &+(')$ (11+)' $' *9 1"8<

MPI Technologies FCX —  ?     diagram (page 14)
Fig. 22

&

VW VW VW

MPI Technologies FCX —  ?     diagram (page 14)
Fig. 23

VW VW VW

/00/ ·

Page 15 of the MPI Technologies FCX user manual —    @
Page 15 · click to enlarge
Page 15

Various typical water circuits (cont)

MPI Technologies FCX — 6 - Fuel Oil Supply Connections diagram (page 15)
Fig. 24 · 6 - Fuel Oil Supply Connections

VW VW VW

QG QG QG QG !

MPI Technologies FCX — 6 - Fuel Oil Supply Connections diagram (page 15)
Fig. 25 · 6 - Fuel Oil Supply Connections

VW VW VW

QG QG QG QG !

@

Flexible fuel oil supply and return lines are supplied with the unit, and connected to the oil burner. Lines are terminated with 3/8-inch reverse flare fittings for connection of the supply and return lines from the fuel oil tank. When connecting the lines, a 10-micron Gerber oil filter must be installed in the oil supply line to minimize burner contamination.

/00/ ·

Page 16 of the MPI Technologies FCX user manual — 9+]HDUWK
Page 16 · click to enlarge
Page 16

? - 2-AB

- ? @

-

Electrical power and control connections are made to pigtail leads that exit through a hole in the right rear of the unit (facing the front of the unit).

down caused by an unrelated electrical circuit fault, the unit and any related electrical components should be connected to a separate branch circuit specifically dedicated for that purpose.

The power connections must be made in a Listed junction box that is not provided with the unit. All wi- ring should conform to the National Electrical Code and any applicable local codes and standards. To minimize the likelihood of a heating system shut-

The control circuit connections can be in-air splices made to pigtail leads provided. Control circuit con- nections are NEC Class 2, intended for connection to a typical room thermostat.

9+]HDUWK

W : B : Gy : Br : Bk : O : R : Dk. G : Lt. G :

White Blue Grey Brown Black Orange Red Dark green Light green

"#$#% & " & % & % '(& )')** #'!& '+ , #& ) *

- ,& ( . / , 0& 0 *

& ) & * & 0 & 0 123 (4 & , & * 5' 6 &

(7 # * * 7 * 58825 *

%# . /7 7 * * 6 3 %# *

Show 5 more labels / short text on this page
/00/ · /(*(1' · % & · 7 ·
Page 17 of the MPI Technologies FCX user manual — 7 - Electrical Connections
Page 17 · click to enlarge
Page 17

The hole in the right rear of the unit is a large flat oval. Mount a Listed 2 x 4 inch, "HandiBox" type junction box over the oval hole in such manner that part of the hole is left open. When installing the junc- tion box, center the box vertically over the oval hole by using the center knockout in the box. Install a ½ inch trade size cable connector or insulating bushing in the knockout. Secure the box with screws as required.

Route the factory supplied main power pigtail leads through the connector from inside the unit and secu- re the connector clamp on the wires.

Install a second cable or conduit connector in ano- ther knockout in the box for the power wiring system as required. Connect the power wires and groun- ding conductors to the pigtail leads in the box using Listed wire connectors and install a cover.

Route the factory supplied control circuit pigtail leads through the open part of the oval hole from in- side the unit. Connect the room thermostat wires to the control circuit pigtail leads using a suitable Class 2 wiring connection method.

The open part of the oval hole can be either above or below the junction box depending upon the choi- ce of wire routing. The Class 2 control circuit leads will exit the open part of the hole.

(Facing rear of unit)

8 ' & " ! 9 # 0 )) .', 5 ' ' # 0

/00/ ·

Page 18 of the MPI Technologies FCX user manual —
Page 18 · click to enlarge
Page 18

@ - 2

Before starting normal operation of the boiler and heating system, perform the following final installa- tion procedures:

freeze solution if appropriate. Open any shut- off valves in the system.

  • Fill the condensate drain trap with water.
  • Leak-check the flue/combustion air system to minimize the likelihood of leakage.
  • Leak-check the fuel oil supply system and open any fuel shut-off valves.
  • Leak-check the entire water system, repairing any leaks that may be found.
  • Re-check the power and control circuit connections THEN replace all cabinet access panels.
  • Fill the entire water system with water, treated as desired for the application, including anti-
  • Energize the electrical power circuit to the unit.

After completing the pre-start final system checks, the system can be started and run through start-up checks and adjustments as required.

& $' ("

) * + $' ("

/ ! " "

, ! (' - . /

, . / 65 8 29 7 0 125 8 :54 # $ " "

To start the boiler, first make sure the room ther- mostat is set at a high enough temperature to be closed so that any external water circulating pumps are running. Turn the boiler On-off switch to the "ON" position, and set the Boiler Temperature Con- trol thermostat to its maximum temperature setting.

has expired, the burner will start.

Reduce the Boiler Temperature Control thermostat setting to make sure the boiler stops properly when controlled by that thermostat. Increase the room temperature thermostat setting to make sure that the circulating pump(s) stop properly.

Turn the Summer-winter switch to "WINTER". This will start the internal circulating pump. After the start time delay set on the oil burner (for the oil heater)

+ · % ·

Page 19 of the MPI Technologies FCX user manual —  - 2 -  @
Page 19 · click to enlarge
Page 19

C -

While the oil burner is adjusted at the factory, it is re- commended that the operating characteristics of the burner be determined at start-up and readjusted if necessary. Run the unit long enough at the burner maximum firing rate to make sure the burner has reached a stable maximum operating temperature. THEN, check the burner and adjust as follows:

MPI Technologies FCX —   C  -   diagram (page 19)
Fig. 26

Check to determine that the smoke spot number does not exceed 0.5 with a Bacharach control. Ad- just the burner as required to achieve this maximum.

Check to determine that the CO2 rate is from 12 - 13 percent and that there is no CO production. Adjust the burner as required to achieve this operating cha- racteristic.

Measure the temperature of the flue gas exiting the unit to determine that it does not exceed 250 de- grees F (120 C).

Combustion inspection can be carried out on the unit through the hole (item N) provided in the inspec- tion port (item 7). Be sure to replace the washer (item M) and the test point screw (item 6) properly after inspection.

- 2 - @

At the time of start-up, check the safety and control devices as follows : - Thermostats :

- Flame monitoring :

  • Check to make sure that the burner shuts down properly upon the deactivation or disconnection of the flame monitoring device or interruption of the flow of fuel, - Safety Pressure Relief valve :
  • Check to see that the thermostat bulbs are correctly positioned in their housings. This is essential to provide temperature sensing to facilitate burner shut-down in the event of overheating,
  • Check the safety pressure relief valve in the heating circuit for proper operation.

.

/4 / 7/

Page 20 of the MPI Technologies FCX user manual —     -
Page 20 · click to enlarge
Page 20

It is recommend that the boiler and flue/combustion air system be inspected and maintained annually by a qualified technician.

-

@ -@ -? @

- - @ -

To gain access to the inside of the unit, first remove the control panel cover escutcheon by grasping it on both sides and pulling directly outward towards you and up. Remove any front panel screw(s) and remo- ve the front panel by pulling the top out towards you and then lifting up to free the bottom from the moun- ting pins. Remove the top cover by simply pulling it up. Remove the electrical terminal block protection

plate by removing the screws in the rear and lifting. Remove the control panel cover screws and remove the control panel cover.

The water can be bled from the unit by opening the drain-cock on the base of the boiler shell using the tool supplied.

- -

MPI Technologies FCX —     -  - diagram (page 20)
Fig. 27
  • Remove the screws (B) from the cast-iron boiler shell cover (C)
  • Clean the inner walls of the boiler shell
  • Reassemble all the parts the way they were removed, positioning the flue outlet (D) with its centering screw (P) towards the front of the boiler, then positioning the boiler shell cover (C) arrow marker opposite the centering screw (P)
  • Replace the screws (B) in the boiler shell cover.

-

MPI Technologies FCX —     -   diagram (page 20)
Fig. 28
  • Remove the wing nut (F) from the condenser top cover (G) and remove the cover
  • Clean the condenser tubes (H) using a bottle brush or similar tool
  • Observe that the combustion products can flow freely in the condenser tubes
  • Replace the condenser access plug (7) and the top cover (G), making sure that the seal (I) is properly positioned when replacing the cover
  • Make sure that the seal (I) on the cover and the access plug is in good condition.

rature of the flue gasses still exceeds 250 deg. F (120C), perform a boiler check.

Page 21 of the MPI Technologies FCX user manual —
Page 21 · click to enlarge
Page 21

Once adjusted properly, regular maintenance of the oil burner is not generally required. A routine exami- nation of the burner should include examination of the burner fan and nozzle for dirt and the spark elec- trodes for proper clearances. Replace the fuel filter

if necessary. Cleaning and adjustment is always ap- propriate during periodic inspection.

If burner firing rate adjustment is required, follow instructions in "Adjusting the Oil Burner".

?@ - 2 @ 2

Check to see that the safety and regulation devices (safety relief valve, air bleed valve, control box com- ponents, etc.) are operating properly. Check also to see that the condensate drain siphon is clean. If ne- cessary, remove the bottom of the siphon, clean it, replace it and then refill the siphon it with water. Also check to see that neither the installation nor the boi-

ler have any water or fuel leaks (leaks may produce a risk for safety and shorten the lifespan). If it beco- mes frequently necessary to add water to maintain pressure in the installation, even though no leaks have been discovered, perform an expansion tank check.

D 2 - 2

Reduce the pressure in the heating installation by opening the drain cock or the safety valve until the pressure gauge reading is less than 7 - 8 psig (0.5 bar)

pre-inflation pressure of the tank after totally bleeding any air from the installation.

Check the pressure in the expansion tank and if ne- cessary bring it back up to pressure. Replace the tank if the membrane is punctured (water present in the inflating valve)

H

To optimize the efficiency of the expansion tank:

  • Adjust its pre-inflation pressure in line with the installation. The pressure must correspond to the static height of the installation (H), the height between the highest point of the installation and the expansion tank, as expressed in bars where 10 meters in height = 1 bar.

Water inlet Dilated water volume

Inflating valve Pressure rises as the air is compressed Max vessel volume

  • Adjust the filling pressure of the installation to a value greater than 3 psig (0.2 bar) above the

Examine the flue/combustion air system for leaks and obstructions. Leaks can generally be detected by the appearance of condensate stains on the out- side of the pipes. Replace any damaged seals if ne- cessary. The flue/combustion air pipe can be cleaned with running water, if necessary, providing that the water flow is not too great to be drained through the condensate drain system. Leave the ex-

cess water in the condensate trap when cleaning is completed.

!/7/7 · Membrane ·

Page 22 of the MPI Technologies FCX user manual — M
Page 22 · click to enlarge
Page 22

- - --

Replacement of the thermostats or the thermometer requires removal of the bulb from its location and the control from the control box.

remove the thermostat. Replace the thermos- tat with another, routing the bulb capillary the same way as the original, replacing the bulb properly into the pocket as far as possible.

  • The bulb for the Boiler Temperature Thermometer is located on the first circuit heating output tube. Remove the bulb from the tube, remove the thermometer mounting screws in the control box and remove the thermometer. Replace the thermometer with another, routing the bulb capillary the same way as the original, replacing the bulb on the tube properly and as securely as possible.
  • The bulb for the Combustion Product Overheating Thermostat is located in a well provided in the condenser access plug/inspection port. Remove the combustion test point plug and washer from the inspection port to free the thermostat bulb, and remove the bulb from the well. Remove the thermostat mounting screws in the control box and remove the thermostat. Replace the thermostat with another, routing the bulb capillary the same way as the original and replacing the bulb properly into the well as far as possible. Replace the combustion test point plug and washer in the inspection port, securing the bulb in place.
  • The bulbs for the Boiler Temperature Control Thermostat and the Water Overheating Safety Thermostat are both located in pockets on the side of the boiler shell. To change either, remove the bulb from the pocket, remove the thermostat mounting screws in the control box and

M

M

!/7/7 · 23 23 7 ·

Page 23 of the MPI Technologies FCX user manual —
Page 23 · click to enlarge
Page 23

During the course of seemingly normal operation, there may be operating faults experienced in the system. Some of the more common faults that may be encountered are:

- ? - The burner may shut down for any of several reasons, at which point the burner safety device light (red) on the control pa- nel will be ON and the there will be a green fault in- dicator light lit on the oil burner. This may be caused by a loss of fuel oil (tank empty?), a fouled oil spray nozzle in the burner, or perhaps a fouled or faulty flame sensor. To attempt a re-start after correcting any burner problem and the fuel supply is assured, push the reset button on the burner. The burner should re-start after the preset time delay period ex- pires.

- @ - - ? - Opening of either the Water Overheating Safety Thermostat or the Combustion Product Overheating Thermostat will result in an oil burner shutdown. In either case, the burner safety device light (red) on the control panel WILL REMAIN OFF, and the green fault indicator light on the oil burner will REMAIN OFF. The only way to tell if either device has opened is to check electrically or check the position of the reset button, located under the screw cap over each device.

  • The Water Overheating Safety Thermostat may open if the water temperature exceeds 230 deg. F (110C) in the boiler. ONLY a faulty Water Temperature Control causes this shutdown. The Water Temperature Control probably requires replacement.
  • The Combustion Product Overheating Safety Thermostat may open if combustion products exceed 250 deg. F (120C). This may require adjustment of the oil burner to the proper firing rate or cleaning the boiler and/or condenser.

After correcting any fault, either thermostat must be manually reset by removing the screw cap on top and depressing the reset button.

Page 24 of the MPI Technologies FCX user manual — SEPTEMBRE 2001
Page 24 · click to enlarge
Page 24

SEPTEMBRE 2001

MPI - P.O. BOX 3408 PRINCETON, NEW JERSEY 08543 - PHONE 800/524-1102 (NJ 732/329-0900) FAX 732/329-0904

Ask about the MPI Technologies FCX

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the MPI Technologies FCX

Be the first to ask — other owners or our team will answer.

Original document

MPI Technologies FCX manual PDF

24 pages·1.1 MB·Boiler·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…