Air-Conditioners for Building Application INDOOR UNIT PVFY-P-E00A Concealed Vertical Air handler For Use with CITY MULTI Outdoor Units Only
INSTALLATION MANUAL For safe and correct use, please read this installation manual thoroughly before installing the air-conditioner.

1. Inspect Shipment 1
2. Safety Precautions 2
3. Selecting and Installation site 3 4. Installing the unit 3
5. Refrigerant Piping 4
6. Drain Connections 5

Safety Precautions • Before installation and electric work Before installing the unit, make sure you read all the “Safety precautions”.
The “Safety precautions” provide very important points regarding safety. Make sure you follow them. • Symbols used in the text
Describes precautions that should be observed to prevent danger of injury or death to the user
Describes precautions that should be observed to prevent damage to the unit
Carefully read the labels affixed to the main unit.

plastic bag which was not torn apart, they face the risk of suffocation. Before Starting the test run

Air Filter An air filter (provided by others) is to be installed on the return side of the air handler. The face area and pressure drop is to be determined by the installing contractor based on the overall static pressure performance of the system including supply and return ductwork sizing. The factory static pressure performance is .30” esp. A field selectable .50 esp. is available. See instructions for changing to .50 esp in the electrical section. REFRIGERANT PIPING This piping work must be done in accordance with the installation manuals for both outdoor unit and BC controller (R2/WR2 series) Series R2 is designed to operate in a system that the refrigerant pipe from an outdoor unit is received by the BC controller and branches at the BC controller to the indoor units. For constraints on piping length and allowable difference of elevation, refer to the design section of the engineering manual. Unit Mounted on Return Plenum

TOP View Vertical Installation
Clearance Area Clearance Area
Vertical Applications: The air handler must be supported on the bottom only and set on a solid floor with a return plenum below or field supplied supporting frame or plenum. Securely attach the air handler to the floor or supporting frame or plenum.

The method of pipe connection on the air handler is braze connection.
Be sure to use non-oxidative procedures for brazing to ensure that no foreign matter or moisture enters the piping. ALWAYS USE A NITROGEN PURGE IN THE PIPING DURING BRAZING
Provide proper bracing for refrigerant piping so no load is imparted upon the connections at the air handler.
Horizontal (LEFT ONLY) Installations: No changes need to be made to the unit for horizontal installation. The unit can be installed on a platform or suspended from rails as shown below. The rails must run the length of the unit and be of sufficient strength to support the weight of the unit and connected ductwork. Vibration isolation is recommended for horizontal installations. Some jurisdictions may require an auxiliary drain pan be mounted under the unit. Always follow local or national code requirements.
When installing and moving the unit, do not charge it with refrigerant other than the refrigerant specified on the unit. Mixing of a different refrigerant, air, etc. may cause the refrigerant cycle to malfunction and result in severe damage.
Use refrigerant piping made of C1220 (Cu-DHP) phosphorous deoxidized copper as specified in ASTM B280 Standard for copper and copper alloy seamless pipes and tubes. In addition, be sure that the inner and outer surfaces of the pipes are clean and free of hazardous sulphur, oxides, dust/dirt, shaving particles, oils, moisture, or any other contaminant. Never use existing refrigerant piping.


The suction line stub contains a schrader valve where the factory pre-charged the coil with nitrogen. This valve is located behind the panel where the suction line comes out. This can be accessed by removing the blower panel (top panel). (See drawing below) Remove the cap and depress the schrader valve core to release all pressure within the coil. Replace the cap and finger tighten. Once all pressure is released the brazed ends of both tubes can now be removed with a tubing cutter. If necessary ream the connections to accept the refrigerant lines.
Installation Clearances · Width of Unit

Upon completion of installation, it is the responsibility of the installer to ensure the drain pan(s) is capturing all condensate, and all condensate is draining properly and not getting into the ductwork/system. Vertical Mounting: When mounted vertically, the air handler has a choice of left or right hand drain connections. Select the drain connection set that is most convenient for routing piping. For left hand drains the connections are visible and ready for installation. Attach the drain connectors finger tight and install the drain line. For right hand remove the caps covering the drain pan openings. Remove the plugs and reinstall in the left hand drain opening. Install cover caps over these plugs. Now attach the drain connector finger tight and install the drain line. IMPORTANT! Over-tightening the drain connection could result in drain pan breakage and failure. The secondary connection if used should be connected to a separate drainage system. Run the secondary drain so the occupants will be able to notice water flowing through the secondary drain indicating a blockage in the primary drain. Optional use for the secondary is a primary drain line overflow switch (provided by others). This device will shut the cooling operation unit down in the event of a primary drain line blockage. See wiring section for connecting this device. Horizontal: If the unit is installed horizontally, remove the plugs installed in the drain pan openings and attach connector finger tight and route drain line. Any vertical drain pan openings must be covered to eliminate air loss. IMPORTANT! Over-tightening the drain connection could result in drain pan breakage and failure. The secondary connection if used should be connected to a separate drainage system. Run the secondary drain so the occupants will be able to notice water flowing through the secondary drain indicating a blockage in the primary drain. Optional use for the secondary is a primary drain line overflow switch (provided by others). This device will shut the cooling operation unit down in the event of a primary drain line blockage. See wiring section for connecting this device. ELECTRICAL WIRING
Schrader valve Front panel
Cut here after relieving pressure
Always use proper refrigerant line sizes as shown: Unit size P12, P18 1/4” liquid x 1/2” gas P24 – P54 3/8” liquid x 5/8” gas Both refrigerant lines need to be insulated all the way up to the cabinet. Make sure the openings in the cabinet around the refrigerant lines are sealed. 3/8 in thick insulation is the minimum recommended thickness. Based on ambient conditions, local codes and line length, thicker insulation may be desired. Drain Connections IMPORTANT! Over-tightening the drain connections could result in drain pan breakage and failure. The air handler contains three sets of ¾” FPT drain connections. When the unit is used in the vertical position, there are a left-hand set and a right-hand set. When the unit is mounted horizontal (left only) there is one set. Each set contains a primary drain and a secondary or auxiliary drain. The primary drain is the one that is lowest (even with the bottom of the pan). The secondary drain is at the higher level. These units operate with a negative pressure at the drain connections and require a drain trap be installed to prevent air from being drawn in and preventing positive drainage. The trap needs to be installed as close to the unit as possible. Make sure the top of the trap is below the connection to the drain pan to allow complete drainage of the pan.
2" Min. Anti-syphon air vent
2" Min.
2" Min. Vent T
− Be sure to follow local and national code requirements when wiring these units − Install the unit to prevent that any of the control circuit cables (remote controller, transmission cables) is brought in direct contact with the power cable outside the unit. − Ensure that there is no tension on any wire connections
Note: Horizontal runs must also have an anti-siphon air vent (standpipe) install ahead of the horizontal run to eliminate air trapping. Horizontal drain lines must be pitched a minimum 1/8” per foot. Route the drain lines outside or to an appropriate drain. Drain lines must be installed so they do not block service access to the front of the unit. 24” clearance in the front is for routine maintenance or service. Note: Check local codes before connecting the drain line to an existing drainage system. Insulate the drain lines where sweating could cause water damage.
Vapor Connection · Drain Trap

Types of control cables Wiring transmission cables (M-NET) Types of transmission cable: Shielded wire CVVS or CPEVS Cable diameter: (AWG16) Maximum wiring length: Within 200 m (656ft.) Maximum length of transmission lines for centralized control and indoor/outdoor lines (Maximum length via indoor units): 500 m [1640ft] MAX The maximum length of the wiring between power supply (PAC- SC51KUA) for transmission lines (on the transmission lines for centralized control) and each outdoor unit and system controller is 200 m (656ft) Controllers M-NET (ME) Controllers Type of transmission cable: Sheathed 2-core cable (unshielded) Cable diameter: (AWG18) Note: When 10 m (33 ft) is exceeded use same cable as specified for transmission wiring above. MA Controllers – Minimum 18 gauge Type of transmission cable: Sheathed 2-core cable (unshielded) Cable diameter: (AWG18) Note: Length not to exceed 200 m (265’)
Install a remote controller following the manual supplied with the remote controller. Connect the “1” and “2” on the indoor unit TB15 to a MA remote controller. (Non-polarized 2-wire) Connect the “M1” and “M2” on indoor unit TB5 to an M-NET remote controller. (Non-polarized 2-wire)
when using MA remote controllers

M1M2 M1M2 S 1 2 M1 M2 S 1 2
MA Controller The MA remote controller and the M-NET remote controller cannot be used at the same time or interchangeably.
Wire size for Main Power Supply and On/Off Capacities. Minimum Wire size AWG Main Cable: 14 Branch: 14 Ground: 14 Breaker for Wiring (NFB)
Typical transmission wire connections
when using ME remote controllers

Caution:
Do not use anything other than the correct capacity breaker and fuse. Using fuse, wire or copper wire with too large capacity may cause a risk of malfunction or fire.
ME

Caution: Install wiring so that it is not tight and under tension. Wiring under tension may break or overheat and burn. Fix power source wiring to control box by using buffer bushing or tensile force. (PG connection or the like.) Connect transmission wiring to transmission terminal block through the knockout hole of control box using ordinary bushing. After wiring is complete, make sure again that there is no tension on the connections, and attach the cover onto the control box in the reverse order removal.
Line Voltage Terminal Strip Terminal Transformers 208/230V 1ph.
Connecting remote controller, indoor and outdoor transmission cables Connect indoor unit TB5 and outdoor unit TB3. (Non-polarized 2- wire) The “S” on indoor unit TB5 is a shielding wire connection. For specifications about the connecting cables, refer to the outdoor unit installation manual.

Attach shielding ground on the outdoor unit’s ground terminal. If the remote controller cable exceeds 10 m [32 ft], use a 1.25 mm2 [AWG16] diameter cable over the exceeded portion, and add that exceeded position to within 200 m [656 ft]. The BC controller is required only for simultaneous cooling and
Lower right corner of circuit board
heating series R2. Connecting Line Voltage Make sure power supply is off.

On the line voltage terminal block loosen the screws marked L1, L2 and G on the line voltage terminal strip. Insert line voltage wires and tighten screws.
There are two types of rotary switch setting available: setting addresses 1 to 9 and over 10, and setting branch numbers.
How to set addresses: Example: If Address is “3”, leave SW12 (for over 10) at “0”, and match SW11 (for 1 to 9) with “3” How to set branch numbers SW14 (Series R2 only):
Caution: Wire the power supply so that no tension is imparted. Otherwise disconnection, heating, or fire may result. 208 Volt Power Supply The air handler comes from the factory with the 24VAC transformer wired for a 230 volt supply voltage. For 208 volt power supply the line voltage lead needs to be changed. Remove the wire nut covering the orange wire. Disconnect the white wire from the white lead going to the line voltage terminal strip. Connect the orange lead to the white wire going to the line voltage terminal strip using the wire nut. Now cover the white lead with the remaining wire nut (see below)
Match the indoor unit’s refrigerant pipe with the BC controller’s end connection number. If there is no BC controller used leave at “0”. The rotary switches are all set to “0” when shipped from the factory. These switches can be used to set unit addresses and branch numbers at will. The determination of indoor unit addresses varies with the system at site. Set them referring to technical data. Sensing room temperature with the built-in sensor in a remote controller If you want to sense room temperature with the built-in sensor in a remote controller, set SW1-1 on the control board to “ON”. The setting of SW1-7 and SW1-8 as necessary also makes it possible to adjust the air flow at a time when the heating thermometer is off. Condensate overflow safety switch connection (CN31) The circuit board is equipped with a connection to attach a condensate safety float switch. The switch should be a normally closed low voltage rated switch. The switch should be installed in a location that it can sense a drain blockage causing a rise in water level. This resulting rise in level will cause it to open. The switch location is to be determined by the installing contractor. When the switch opens, it will cause the LEV to close, stopping the cooling operation. The fan will continue to run and a fault code will be shown at the controller. Correcting the problem and closing the switch will be required before normal operation can resume. See installation below:
For 208V power supply, switch the transformer lead marked 230V with the one marker 208V. Reattach wire nut to bare wire.
T
24 Volts AC 24 VAC
Setting addresses (Be sure to operate with the main power turned OFF.) <Address board>
208 V Orange · 230 V White · L2 Black

Locate the CN31 connector in the upper right-hand corner of the circuit board. Carefully remove the connector with the jumper from the board. Cut the jumper on the CN31 connector and wire a normally closed safety float switch across these wires. Carefully reinstall the connector back onto the board
Upper right corner of circuit board
Changing Blower Static Pressure The air handler is equipped with an adjustable static pressure setting. The factory setting is 0.30” esp. An optional 0.50 esp. setting is available by moving three wires on the motor. Use pliers to grasp and remove the connectors. Failure to do so could result in the wire pulling free from the spade connectors. Step 1 Remove wire on connector 2 and reinstall on connector 1 Step 2 Remove wire on connector 3 and reinstall on connector 2 Step 3 Remove wire on connector 4 and reinstall on connector 3
.30 esp connection
24 VAC
24 VAC 208/230V 60Hz
24 VAC 208/230V 60Hz
For field selected .50 esp, change low
voltage connections as shown
24 VAC
24 VAC
24 VAC
G
N
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.