This manual must only be used by a qualified heating installer / service technician. Read all instructions, including this manual and the SYNC Service Manual, before installing. Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial property damage.
Save this manual for future reference.
SYNC-I-O Rev N


Installer – Read all instructions, including this manual and the SYNC Service Manual, before installing. Perform steps in the order given.
User – This manual is for use only by a qualified heating installer/ service technician. Refer to the User’s Information Manual for your reference.
Have this boiler serviced/inspected by a qualified service technician, at least annually.
Failure to comply with the above could result in severe personal injury, death or substantial property damage.
When calling or writing about the boiler – Please have the boiler model and serial number from the boiler rating plate.
Consider piping and installation when determining boiler location.
Any claims for damage or shortage in shipment must be filed immediately against the transportation company by the consignee.
Factory warranty (shipped with unit) does not apply to units improperly installed or improperly operated.
Failure to adhere to the guidelines on this page can result in severe personal injury, death, or substantial property damage.
If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.
This appliance MUST NOT be installed in any location where gasoline or flammable vapors are likely to be present.

The SYNC - How it works...
1. Access cover - front Provides access to the gas train and the heat exchanger. 2. Air intake adapter Allows for the connection of the PVC air intake pipe to the boiler. 3. Air pressure switches The air pressure switches detect blocked flue/vent conditions. 4. Air shrouds (1.0 Model only) The air shrouds control air and gas flow into the burners. 5. Automatic air vents Designed to remove trapped air from the heat exchanger coils. 6. Blowers The blowers pull in air and gas through the venturis (item 35). Air and gas mix inside the blowers and are pushed into the burners, where they burn inside the combustion chamber. 7. Boiler drain port Location from which the heat exchangers can be drained. 8. Boiler inlet temperature sensors These sensors monitor system return water temperature. If selected as the controlling sensor, the control module adjusts the boiler firing rate so the inlet temperature matches the set point. 9. Boiler outlet temperature sensors These sensors monitor boiler outlet water temperature. If selected as the controlling sensor, the control module adjusts boiler firing rate so the outlet temperature matches the set point. 10. Burners (not shown) Made with metal fiber and stainless steel construction, the burners use pre-mixed air and gas and provide a wide range of firing rates. 11. Condensate drain connection Connects the condensate drain line to a 1/2" PVC union. 12. Control modules The control modules respond to internal and external signals and control the blowers, gas valves, and pumps to meet the heating demand. 13. Electronic display Digital controls with touch screen technology and full color display. 14. Flame inspection windows The quartz glass windows provide a view of the burner surfaces and flames. 15. Flame sensors Used by the control module to detect the presence of burner flame. 16. Flap valves Prevents recirculation of flue products when only one burner is running. 17. Flue gas sensors These sensors monitor the flue gas exit temperature. The control modules will modulate and shut down the boiler if the flue gas temperature gets too hot. This protects the flue pipe from overheating. 18. Flue pipe adapter Allows for the connection of the PVC vent pipe system to the boiler. 19. Gas connection pipe Threaded 1½" pipe connection. This pipe should be connected to the incoming gas supply for the purpose of delivering gas to the boiler. 20. Gas shutoff valves (inside unit) Manual valves used to isolate the gas valves from the burners. 21. Gas shutoff valve (outside unit) Manual valve used to isolate the gas valve from the gas supply.
22. Gas valves The gas valves sense the negative pressure created by the blowers, allowing gas to flow only if the gas valves are powered and combustion air is flowing. 23. Heat exchanger access covers Allows access to the combustion side of the heat exchanger coils. 24. High gas pressure switches Switches provided to detect excessive gas pressure. 25. High limits Devices used to monitor the outlet water temperature. If the temperature exceeds its setting, they will break the control circuit, shutting the boiler down. 26. Ignition electrodes Provides direct spark for igniting the burners. 27. Line voltage junction box The junction box contains the connection points for the line voltage power and all pumps. 28. Line voltage wiring connections (knockouts) Conduit connection points for the high voltage junction box. 29. Low gas pressure switch Switch provided to detect low gas pressure. 30. Low voltage connection board The connection board is used to connect external low voltage devices. 31. Low voltage wiring connections (knockouts) Conduit connection points for the low voltage connection board. 32. Low water cutoff device (LWCO) Device used to ensure adequate water is supplied to the boiler and in the event of inadequate water levels, will ensure the boiler will shut down. 33. Power switch Turns 120 VAC ON/OFF to the boiler. 34. Pump relay boards The pump relay boards are used to connect the boiler, system and Hot Water Generator (HW) pumps. 35. Relief valve Protects the heat exchangers from an over pressure condition. The relief valve will be set at 50 PSI. 36. Reset switch Reset switch for the low water cutoff. Hold for 10 seconds to reset. 37. Stainless steel heat exchangers Allows system water to flow through specially designed coils for maximum heat transfer, while providing protection against flue gas corrosion. The coils are encased in a jacket that contains the combustion process. 38. Temperature and pressure gauge Monitors the outlet temperature of the boiler as well as the system water pressure. 39. Test switch Test switch for the low water cutoff. Hold for 10 seconds to test. 40. Top panel Removable panel to gain access to the internal components. 41. Venturis The venturis control air and gas flow into the burners. 42. Water inlets Two 2" NPT water connections that return water from the system to the heat exchangers. 43. Water outlets A 3" NPT water connection that supplies hot water to the system. 44. O-temp switch (located underneath access cover) An electrical switch designed to shut down boiler operation in the event the outer back of the heat exchanger, directly above the flue connection does not exceed 604°F (318°C). This is a one time switch and could warrant a heat exchanger replacement. Check the integrity of the rear refractory at the back of the upper coil if the switch opens.



Maximum allowed working pressure is located on the rating plate. NOTICE

HIGH ALTITUDE
3,000 FT. TO 12,000 FT.
Figure A High Altitude Label Location

Installation must comply with:
WARNING This appliance is certified as an indoor
appliance. Do not install the appliance outdoors or locate where the appliance will be exposed to freezing temperatures or to temperatures that exceed 100°F. Do not install the appliance where the relative humidity may exceed 93%. Do not install the appliance where condensation may form on the inside or outside of the appliance, or where condensation may fall onto the appliance. Failure to install the appliance indoors could result in severe personal injury, death, or substantial property damage.
The SYNC gas manifold and controls met safe lighting and other performance criteria when the boiler underwent tests specified in ANSI Z21.13 – latest edition.
This appliance requires a special venting system. Use only the vent materials, primer and cement specified in this manual to make the vent connections. Failure to follow this warning could result in fire, personal injury, or death.
Before locating the boiler, check:
Closet and alcove installations
A closet is any room the boiler is installed in which is less than 778 cubic feet for SB1000 models, 847 cubic feet for SB1300 models, and 914 cubic feet for SB1500 models.
An alcove is any room which meets the criteria for a closet with the exception that it does not have a door.
Example: Room dimensions = 9 feet long, 9 feet wide, and 9 foot ceiling = 9 x 9 x 9 = 729 cubic feet. This would be considered a closet for a SYNC Boiler.
For closet and alcove installations as shown in FIG.’s 1-1 and 1-2, CPVC or stainless steel vent material must be used inside the structure. The ventilating air openings shown in FIG.’s 1-1 and 1-2 are required for this arrangement. Failure to follow this warning could result in fire, personal injury, or death.
Failure to keep boiler area clear and free of combustible materials, gasoline, and other flammable liquids and vapors can result in severe personal injury, death, or substantial property damage.
Provide clearances:
Clearances from combustible materials 1. Hot water pipes – at least 1/4" (6 mm) from combustible materials. 2. Vent pipe – at least 1" (25 mm) from combustible materials. 3. See FIG.’s 1-1 and 1-2 on page 8 for other clearance minimums.
Clearances for service access 1. See FIG.’s 1-1 and 1-2 on page 8 for recommended service clearances. If you do not provide the minimum clearances shown, it may not be possible to service the boiler without removing it from the space.

Figure 1-1 Closet Installation - Minimum Required Clearances

1/4” (6 MM) MINIMUM CLEARANCE AROUND HOT WATER PIPES 1” (25 MM) MINIMUM CLEARANCE AROUND VENT PIPES
For closet installations, CPVC, polypropylene or stainless steel vent material MUST BE used in a closet structure due to elevated temperatures. Failure to follow this warning could result in fire, personal injury, or death.
Front - 30" (762 mm) Top - 24" (610 mm) Left Side - 24" (610 mm) Rear - 24" (610 mm)
*AREA OF EACH OPENING: 1 SQ. INCH PER 1000 BTU PER HOUR INPUT WITH A MINIMUM OF 100 SQ. INCHES
Figure 1-2 Alcove Installation - Minimum Required Clearances

1/4” (6 MM) MINIMUM CLEARANCE AROUND HOT WATER PIPES 1” (25 MM) MINIMUM CLEARANCE AROUND VENT PIPES
For alcove installations, CPVC, polypropylene or stainless steel vent material MUST BE used in an alcove structure due to elevated temperatures. Failure to follow this warning could result in fire, personal injury, or death.
RECOMMENDED SERVICE CLEARANCES: Front - 30" (762 mm) Top - 24" (610 mm) Left Side - 24" (610 mm) Rear - 24" (610 mm)

Provide air openings to room:
Vent and air piping
The SYNC alone in boiler room
The SYNC requires a special vent system, designed for pressurized venting.
The boiler is to be used for either direct vent installation or for installation using indoor combustion air. When room air is considered, see Section 4, Vertical Direct Venting. Note prevention of combustion air contamination below when considering vent/air termination.
Vent and air must terminate near one another and may be vented vertically through the roof or out a side wall, unless otherwise specified. You may use any of the vent/air piping methods covered in this manual. Do not attempt to install the SYNC using any other means.
The SYNC in same space with other gas or oil-fired appliances
Be sure to locate the boiler such that the vent and air piping can be routed through the building and properly terminated. The vent/air piping lengths, routing and termination method must all comply with the methods and limits given in this manual.
The space must be provided with combustion/ventilation air openings correctly sized for all other appliances located in the same space as the SYNC.
Prevent combustion air contamination
Install air inlet piping for the SYNC as described in this manual. Do not terminate vent/air in locations that can allow contamination of combustion air. Refer to Table 1A, page 10 for products and areas which may cause contaminated combustion air.
Do not install the boiler in an attic.
Failure to comply with the above warnings could result in severe personal injury, death, or substantial property damage.
Ensure that the combustion air will not contain any of the contaminants in Table 1A, page 10. Contaminated combustion air will damage the boiler, resulting in possible severe personal injury, death or substantial property damage. Do not pipe combustion air near a swimming pool, for example. Also, avoid areas subject to exhaust fumes from laundry facilities. These areas will always contain contaminants.
The SYNC is approved for installation on combustible flooring, but must never be installed on carpeting.
Do not install the boiler on carpeting even if foundation is used. Fire can result, causing severe personal injury, death, or substantial property damage.
If flooding is possible, elevate the boiler sufficiently to prevent water from reaching the boiler.
Flooring and foundation · Flooring

When using an existing vent system to install a new boiler:
Products to avoid:
Failure to follow all instructions can result in flue gas spillage and carbon monoxide emissions, causing severe personal injury or death.
Spray cans containing chloro/fluorocarbons
Check the following venting components before installing:
Chlorine-based swimming pool chemicals
Calcium chloride used for thawing
Sodium chloride used for water softening
Paint or varnish removers
Antistatic fabric softeners used in clothes dryers
Chlorine-type bleaches, detergents, and cleaning solvents found in household laundry rooms
Adhesives used to fasten building products and other similar products
Areas likely to have contaminants
Dry cleaning/laundry areas and establishments
Furniture refinishing areas and establishments
With polypropylene and stainless steel vent, seal and connect all pipe and components as specified by the vent manufacturer used; with PVC/CPVC vent, see the Installing Vent or Air Piping Section on page 19.
WARNING If any of these conditions are not met,
the existing system must be updated or replaced for that concern. Failure to follow all instructions can result in flue gas spillage and carbon monoxide emissions, causing severe personal injury or death.

When removing a boiler from existing common vent system:
Remove boiler from wood pallet
Do not install the SYNC into a common vent with any other appliance. This will cause flue gas spillage or appliance malfunction, resulting in possible severe personal injury, death, or substantial property damage.
Failure to follow all instructions can result in flue gas spillage and carbon monoxide emissions, causing severe personal injury or death.
Do not drop the boiler or bump the jacket on the floor or pallet. Damage to the boiler can result.
At the time of removal of an existing boiler, the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while the other appliances remaining connected to the common venting system are not in operation.
Figure 1-3 Boiler Mounted on Shipping Pallet

a. Seal any unused openings in the common venting system. b. Visually inspect the venting system for proper size and
horizontal pitch and determine there is no blockage or restriction, leakage, corrosion, or other deficiencies, which could cause an unsafe condition. c. Test vent system – Insofar as is practical, close all building
doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers. d. Place in operation the appliance being inspected. Follow
Maintain minimum specified clearances for adequate operation. All installations must allow sufficient space for servicing the vent connections, water pipe connections, piping and other auxiliary equipment, as well as the appliance. The clearance labels on each appliance note the same service and combustible clearance requirements as shown in this manual.
the lighting instructions. Adjust thermostat so appliance will operate continuously. e. Test for spillage at the draft hood relief opening after 5
Multiple appliances may be installed in a modular boiler installation. Multiple appliances may be installed side by side with no clearance between adjacent appliances because this appliance is approved for zero clearance from combustible surfaces and no service access is required from the sides.
minutes of main burner operation. Use the flame of a match or candle, or smoke from a cigarette, cigar, or pipe. f. After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined herein, return doors, windows, exhaust fans, fireplace dampers, and any other gas-burning appliance to their previous conditions of use. g. Any improper operation of the common venting system
Consult the Venting section of this manual for specific installation instructions for the appropriate type of venting system that you will be using.
should be corrected so the installation conforms with the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or CAN/CSA B149.1, Natural Gas and Propane Installation Code. When resizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables in Part 11 of the National Fuel Gas Code, ANSI Z223.1/NFPA and/or CAN/CSA B149.1, Natural Gas and Propane Installation Code.

Combustion and ventilation air requirements for appliances drawing air from the equipment room

Provisions for combustion and ventilation air must be in accordance with Air for Combustion and Ventilation, of the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment, or applicable provisions of the local building codes.
The equipment room MUST be provided with properly sized openings to assure adequate combustion air and proper ventilation.

Figure 1-5_Combustion Air Through Ducts

FOR TIGHT CONSTRUCTION
Figure 1-4_Combustion Air Direct from Outside
(a) Combustion air opening, with a minimum free area of one square inch per 4000 Btu/hr input (5.5 cm2 per kW). This opening must be located within 12" (30 cm) of the bottom of the enclosure.
Figure 1-6_Combustion Air from Interior Space
(b) Ventilation air opening, with a minimum free area of one square inch per 4000 Btu/hr input (5.5 cm2 per kW). This opening must be located within 12" (30 cm) of the top of the enclosure.


Where two openings are provided, one must be within 12" (30cm) of the ceiling and one must be within 12" (30cm) of the floor of the equipment room. Each opening must have net free area as specified in the chart below (Table 1B). Single openings shall commence within 12" (30cm) of the ceiling.
CAUTION Under no circumstances should the equipment room ever be under negative pressure. Particular care should be taken where exhaust fans, attic fans, clothes dryers, compressors, air handling units, etc., may take away air from the unit.
The combustion air supply must be completely free of any flammable vapors that may ignite or chemical fumes which may be corrosive to the appliance. Common corrosive chemical fumes which must be avoided are fluorocarbons and other halogenated compounds, most commonly present as refrigerants or solvents, such as Freon, trichlorethylene, perchlorethylene, chlorine, etc. These chemicals, when burned, form acids which quickly attack the stainless steel heat exchanger, headers, flue collectors, and the vent system.
Figure 1-7_Combustion Air from Outside - Single Opening 4. If a single combustion air opening is provided to bring combustion air in directly from the outdoors, the opening must be sized based on a minimum free area of one square inch per 3000 Btu/hr (7 cm2 per kW). This opening must be located within 12" (30 cm) of the top of the enclosure (see FIG. 1-7).
The result is improper combustion and a non-warrantable, premature appliance failure.
Combustion air requirements are based on the latest edition of the National Fuel Gas Code, ANSI Z223.1; in Canada refer to the latest edition of CGA Standard CAN B149.1. Check all local code requirements for combustion air.
EXHAUST FANS: Any fan or equipment which exhausts air from the equipment room may deplete the combustion air supply and/or cause a downdraft in the venting system. Spillage of flue products from the venting system into an occupied living space can cause a very hazardous condition that must be corrected immediately.
All dimensions based on net free area in square inches. Metal louvers or screens reduce the free area of a combustion air opening a minimum of approximately 25%. Check with louver manufacturers for exact net free area of louvers.

FIG. 1-4 FIG. 1-5 FIG. 1-6 FIG. 1-7 *Outside Air from 2 Openings Directly from Outdoors
**Inside Air from 2 Ducts Delivered from Interior Space
*Outside Air from 1 Opening Directly from Outdoors, in2 Top Opening, in2
*Outside air openings shall directly communicate with the outdoors. When combustion air is drawn from the outside through a duct, the net free area of each of the two openings must have twice (2 times) the free area required for Outside Air/2 Openings. The above requirements are for the appliance only; additional gas fired appliances in the equipment room will require an increase in the net free area to supply adequate combustion air for all appliances.
**Combined interior space must be 50 cubic feet per 1,000 Btu/hr input. Buildings MUST NOT be of *“Tight Construction”. For buildings of *“Tight Construction”, provide air openings into the building from outside.
*No combustion air openings are needed when the appliance is installed in a space with a volume NO LESS than 50 cubic feet per 1,000 Btu/hr of all installed gas fired appliances. Buildings MUST NOT be of *“Tight Construction”.
*”Tight Construction” is defined as a building with less than 0.40 ACH (air changes per hour).


Figure 2-1 Two Pipe Sidewall Termination - See page 22 for more details
Figure 2- 2 Two Pipe Vertical Termination - See page 26 for more details
Figure 2-3 Vertical Vent, Sidewall Air - See page 18 for more details

DANGER The SYNC boiler must be vented and supplied with combustion and ventilation air as described in this section. Ensure the vent and air piping and the combustion air supply comply with these instructions regarding vent system, air system, and combustion air quality. See also Section 1 of this manual. Inspect finished vent and air piping thoroughly to ensure all are airtight and comply with the instructions provided and with all requirements of applicable codes. Failure to provide a properly installed vent and air system will cause severe personal injury or death.
The SYNC boiler vent and air piping can be installed through the roof or through a sidewall. Follow the procedures in this manual for the method chosen. Refer to the information in this manual to determine acceptable vent and air piping length.
You may use any of the vent/air piping methods covered in this manual. Do not attempt to install the SYNC boiler using any other means.
You must also install air piping from outside to the boiler air intake adapter unless following the Optional Room Air instructions on page 18 of this manual. The resultant installation is direct vent (sealed combustion).
This appliance requires a special venting system. Use only approved stainless steel, PVC, CPVC or polypropylene pipe and fittings listed in Tables 2C, 2D, and 2F for vent pipe, and fittings. Failure to comply could result in severe personal injury, death, or substantial property damage.
WARNING DO NOT mix components from different
systems. The vent system could fail, causing leakage of flue products into the living space. Mixing of venting materials will void the warranty and certification of the appliance.
Figure 2-4 Near Boiler Air Piping
Installation must comply with local requirements and with the National Fuel Gas Code, ANSI Z223.1 for U.S. installations or CSA B149.1 for Canadian installations.
NOTICE

WARNING For closet and alcove installations, CPVC,
polypropylene or stainless steel material MUST BE used in a closet/alcove structure. Failure to follow this warning could result in fire, personal injury, or death.
Improper installation of venting systems may result in injury or death. CAUTION
Follow the instructions in Section 1, page 11 of this manual when removing a boiler from an existing vent system.
WARNING Do not connect any other appliance to the vent pipe or multiple boilers to a common vent pipe. Failure to comply could result in severe personal injury, death, or substantial property damage.
Air intake/vent connections

Requirements for installation in Canada 1. Installations must be made with a vent pipe system certified to ULC-S636. 2. The first three (3) feet of plastic vent pipe from the appliance flue outlet must be readily accessible for visual inspection. 3. The components of the certified vent system must not be interchanged with other vent systems or unlisted pipe/fittings.

The SYNC boiler uses model specific combustion air intake and vent piping sizes as detailed in Table 2A below.
When determining equivalent combustion air and vent length, add 5 feet for each 90° elbow and 3 feet for each 45° elbow.
EXAMPLE: 20 feet of PVC pipe + (4) 90° elbows + (2) 45° elbows + (1) concentric vent kit (CVK3003) = 49 equivalent feet of piping.
Table 2A Air Intake/Vent Piping Sizes

SB 1000 6" 12' 100' 6" 12' 100' 1.25% SB 1300 6" 12' 50' 6" 12' 50' 2.90%
SB 1300 7" 12' 100' 7" 12' 100' 0.95%
SB 1500 6" 12' 50' 6" 12' 50' 3.30%
SB 1500 7" 12' 100' 7" 12' 100' 1.65%
Increasing or decreasing combustion air or vent piping sizes is not authorized. NOTICE

Air inlet pipe materials: The air inlet pipe(s) must be sealed. Choose acceptable combustion air inlet pipe materials from the following list: PVC, CPVC, Polypropylene or ABS Dryer Vent or Sealed Flexible Duct (not recommended for rooftop air inlet) Galvanized steel vent pipe with joints and seams sealed as specified in this section. Type “B” double-wall vent with joints and seams sealed as specified in this section. AL29-4C, stainless steel material to be sealed to specification of its manufacturer.
The PVC, CPVC, or ABS air inlet pipe should be cleaned and sealed with the pipe manufacturer’s recommended solvents and standard commercial pipe cement for the material used. The PVC, CPVC, ABS, Dryer Vent or Flex Duct air inlet pipe should use a silicone sealant to ensure a proper seal at the appliance connection and the air inlet cap connection. Dryer vent or flex duct should use a screw type clamp to seal the vent to the appliance air inlet and the air inlet cap. Proper sealing of the air inlet pipe ensures that combustion air will be free of contaminants and supplied in proper volume.
When a sidewall or vertical rooftop combustion air supply system is disconnected for any reason, the air inlet pipe must be resealed to ensure that combustion air will be free of contaminants and supplied in proper volume.
*Plastic pipe may require an adapter (not provided) to transition between the air inlet connection on the appliance and the plastic air inlet pipe.
DANGER Failure to properly seal all joints and seams as required in the air inlet piping may result in flue gas recirculation, spillage of flue products and carbon monoxide emissions causing severe personal injury or death.
WARNING Using air intake materials other than
those specified can result in personal injury, death or property damage.
Sealing of Type “B” double-wall vent material or galvanized vent pipe material used for air inlet piping on a sidewall or vertical rooftop Combustion Air Supply System: a. Seal all joints and seams of the air inlet pipe using either Aluminum Foil Duct Tape meeting UL Standard 723 or 181A-P or a high quality UL Listed silicone sealant such as those manufactured by Dow Corning or General Electric. b. Do not install seams of vent pipe on the bottom of horizontal runs. c. Secure all joints with a minimum of three (3) sheet metal screws or pop rivets. Apply Aluminum Foil Duct Tape or silicone sealant to all screws or rivets installed in the vent pipe. d. Ensure that the air inlet pipes are properly supported.

Applications utilizing the SYNC boiler may be installed with a single pipe carrying the flue products to the outside while using combustion air from the equipment room. In order to use the room air venting option the following conditions and considerations must be followed.
Table 2B Room Air Minimum / Maximum Allowable Air / Vent Lengths

25 feet of Vent SB 1000 6" 12’ 100’ 0.63% SB 1300 6" 12’ 100’ 1.45%
Pool and laundry products and common household and hobby products often contain fluorine or chlorine compounds. When these chemicals pass through the boiler, they can form strong acids. The acid can eat through the boiler wall, causing serious damage and presenting a possible threat of flue gas spillage or boiler water leakage into the building.
Please read the information given in Table 1A, page 10, listing contaminants and areas likely to contain them. If contaminating chemicals will be present near the location of the boiler combustion air inlet, have your installer pipe the boiler combustion air and vent to another location, per this manual.
WARNING When utilizing the single pipe method,
provisions for combustion and ventilation air must be in accordance with Air for Combustion and Ventilation, of the latest edition of the National Fuel Gas Code, ANSI Z223.1, in Canada, the latest edition of CGA Standard B149 Installation Code for Gas Burning Appliances and Equipment, or applicable provisions of the local building codes.
If the boiler combustion air inlet is located in a laundry room or pool facility, for example, these areas will always contain hazardous contaminants.
To prevent the potential of severe personal injury or death, check for areas and products listed in Table 1A, page 10 before installing the boiler or air inlet piping.
Figure 2-5 Room Air Installation

REMOVE AIR INLET COVER AND INSTALL RUBBER COUPLING FOR PVC / CPVC VENT SYSTEMS OR STAINLESS STEEL ADAPTER FOR STAINLESS STEEL VENT SYSTEMS
If contaminants are found, you MUST:
—OR— • Relocate air inlet and vent terminations
to other areas.
Air contamination

This product has been approved for use with the PVC/CPVC vent materials listed in Table 2C.
Installing vent and air piping
WARNING The vent connection to the appliance must
be made with the starter CPVC pipe section provided with the appliance if PVC/CPVC vent is to be used. The field provided vent fittings must be cemented to the CPVC pipe section using an “All Purpose Cement” suitable for PVC and CPVC pipe. Use only the vent materials, primer, and cement specified in Table 2C to make the vent connections. Failure to follow this warning could result in fire, personal injury, or death.
6. Priming and Cementing: a. Handle fittings and pipes carefully to prevent contamination of surfaces. b. Apply a liberal even coat of primer to the fitting socket and to the pipe end to approximately 1/2" beyond the socket depth. c. Apply a second primer coat to the fitting socket. d. While primer is still wet, apply an even coat of approved cement to the pipe equal to the depth of the fitting socket along with an even coat of approved cement to the fitting socket. e. Apply a second coat of cement to the pipe. f. While the cement is still wet, insert the pipe into the fitting, if possible twist the pipe a 1/4 turn as you insert it. NOTE: If voids are present, sufficient cement was not applied and joint could be defective. g. Wipe excess cement from the joint removing ring or beads as it will needlessly soften the pipe.
Use only cleaners, primers, and solvents that are approved for the materials which are joined together.
NOTICE
All PVC vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of a 1/4 inch per foot back to the boiler (to allow drainage of condensate).
WARNING Insulation should not be used on PVC
or CPVC venting materials. The use of insulation will cause increased vent wall temperatures, which could result in vent pipe failure.
For all installations, the first ten (10) equivalent feet of vent must be CPVC or stainless steel (see FIG. 2-6). Failure to follow this warning could result in fire, personal inury, or death.
Figure 2-6 Near Boiler PVC/CPVC Venting
Table 2C PVC/CPVC Vent Pipe, and Fittings


Use only the adapters and vent system listed in Tables 2E and 2F. DO NOT mix vent systems of different types or manufacturers. Failure to comply could result in severe personal injury, death, or substantial property damage.
This product has been approved for use with polypropylene vent with the manufacturers listed in Table 2D.
All terminations must comply with listed options in this manual and be a single-wall vent offering.
Installations must comply with applicable national, state, and local codes. For Canadian installation, polypropylene vent must be listed as a ULC-S636 approved system.
For use of flex pipe, it is recommended to have the vent material in 32°F or higher ambient space before bending at installation. No bends should be made to greater than 45° and ONLY installed in vertical or near vertical installations.
For support and special connections required, see the manufacturer's instructions. All vent is to conform to standard diameter and equivalent length requirements established.
Installation of a polypropylene vent system should adhere to the vent manufacturer’s installation instructions supplied with the vent system.
Table 2D Polypropylene Vent Pipe and Fittings

Duravent (M & G Group) PolyPro Single-Wall / PolyPro Flex
The installer must use a specific vent starter adapter at the flue collar connection, supplied by the vent manufacturer to adapt to its vent system. See Table 2E for approved vent adapters. Discard CPVC starter piece.
Figure 2-7 Near Boiler Polypropylene Venting

polypropylene venting materials. The use of insulation will cause increased vent wall temperatures, which could result in vent pipe failure.
1000 -1500 ISAAL0606 Not Required IATP0606 ISTAGL0606 FSA-6PVCM-6PPS N/A 6PPS-HLK
* These parts are only needed if the sidewall termination assembly is used (see FIG. 3-4B on page 24).
Polypropylene

Installation of a stainless steel vent system should adhere to the stainless steel vent manufacturer’s installation instructions supplied with the vent system.
This product has been approved for use with stainless steel using only FasNSeal vent systems.
Use only the materials, vent systems, and terminations listed in Table 2F. DO NOT mix vent systems of different types or manufacturers. Failure to comply could result in severe personal injury, death, or substantial property damage.
Figure 2-8 Near Boiler Stainless Steel Venting

PVC/CPVC or ABS is acceptable air inlet pipe material. NOTICE
The installer must use a specific vent starter adapter at the flue collar connection, supplied by the vent manufacturer to adapt to its vent system. See Table 2F for approved vent adapters. Discard CPVC starter piece.
Installations must comply with applicable national, state, and local codes. Stainless steel vent systems must be listed as a UL-1738 approved system for the United States and a ULC-S636 approved system for Canada.
The SYNC uses model specific combustion air intake and vent piping sizes as detailed in Tables 2A and 2B.
Increasing or decreasing combustion air or vent piping to sizes not specified in this manual is not authorized.
Table 2F Approved Stainless Steel Terminations and Adapters

6" Stainless Steel x 7" Stainless Steel Adapters (2)
Stainless steel vent


Figure 3-1A PVC/CPVC/Centrotherm Sidewall Termination of Air and Vent
Follow instructions below when determining vent location to avoid possibility of severe personal injury, death, or substantial property damage.
A gas vent extending through an exterior wall shall not terminate adjacent to a wall or below building extensions such as eaves, parapets, balconies, or decks. Failure to comply could result in severe personal injury, death, or substantial property damage.
Locate the vent/air terminations using the following guidelines:
2. You must consider the surroundings when terminating the vent and air: a. Position the vent termination where vapors will not damage nearby shrubs, plants or air conditioning equipment or be objectionable. b. The flue products will form a noticeable plume as they condense in cold air. Avoid areas where the plume could obstruct window views. c. Prevailing winds could cause freezing of condensate and water/ice buildup where flue products impinge on building surfaces or plants. d. Avoid possibility of accidental contact of flue products with people or pets. e. Do not locate the terminations where wind eddies could affect performance or cause recirculation, such as inside building corners, near adjacent buildings or surfaces, window wells, stairwells, alcoves, courtyards, or other recessed areas.
If using the alternate sidewall termination:
Do not exceed the maximum lengths of the outside vent piping shown in FIG.’s 3-1B and 3-1C. Excessive length exposed to the outside could cause freezing of condensate in the vent pipe, resulting in potential boiler shutdown.

Figure 3-1B Alternate Sidewall Termination of Air and Vent w/Field Supplied Fittings
WARNING Sidewall vent and air inlet terminations must terminate in the same pressure zone.
f. Do not terminate above any door or window. Condensate can freeze, causing ice formations. g. Locate or guard vent to prevent condensate damage to exterior finishes.
Determine location

Figure 3-2A Clearance to Gravity Air Inlets
Figure 3-1C Alternate Stainless Steel Sidewall Termination w/Field Supplied Fittings

PVC/CPVC or ABS is acceptable air inlet pipe material. NOTICE

12" MIN.
TO BOILER INTAKE AIR CONNECTION
12" MIN.
12" MIN.
Figure 3-2B Alternate Clearance to Gravity Air Inlets w/Field Supplied Fittings

Table 3B Stainless Steel Sidewall Vent Kits
1.0 - 1.5 KIT30028 (Stainless Steel) 6 inch vent
1.3 - 1.5 KIT30029 (Stainless Steel) 7 inch vent
12” (305 MM) MIN
Figure 3-3A Clearance to Forced Air Inlets

36" MIN.
INLET
7' MIN. ABOVE ANY PUBLIC WALKWAY

Figure 3-3B Alternate Clearance to Forced Air Inlets w/ Field Supplied Fittings

Air pipe penetration: a. Cut a hole for the air pipe. Size the air pipe hole as close as desired to the air pipe outside diameter.
Table 3C Sidewall Vent Centerline Dimensions
All 6" 6" 7 3/4"
Figure 3-4B Polypropylene Sidewall Termination Assembly

Drill 3/16" diameter holes for inserting the plastic anchors into the wall.
2. For Polypropylene Only: Install the vent and air intake sidewall adapters from Table 2E on page 20 into the vent plate. Slide the sidewall retaining bracket down the sidewall adapters flush to the vent plate (FIG. 3-4B). 3. For PVC/CPVC Only: Install the vent and air intake piping through the wall into the vent plate openings. Use RTV silicone sealant to seal the air pipe. Use the cement/primer listed in Table 2C on page 19 to seal the vent pipe. 4. Mount and secure the vent plate to the wall, using stainless steel screws. 5. Seal all gaps between the pipes and wall. Seal around the plate to the wall assuring no air gaps. 6. Assemble the vent cap to the vent plate (see FIG.’s 3-4A and 3-4B). Insert the stainless steel screws into the vent cap screw hole openings and securely attach the vent cap to the vent plate. 7. Seal all wall cavities.

Prepare wall penetrations (Alternate Field Supplied Options)
All vent pipes and air inlets must terminate at the same height to avoid possibility of severe personal injury, death, or substantial property damage.
Figure 3-5A Multiple Vent Terminations (must also comply with Figure 3-1A)
12" MIN. BETWEEN EDGE OF AIR INLET AND ADJACENT VENT OUTLET
Figure 3-4C Alternate Sidewall Termination Assembly PVC/CPVC or Stainless Steel


SIDEWALL TERMINATION PLATE
ELBOW
VENT PIPING
AIR PIPING
VENT / AIR TERMINATION
Figure 3-5B Alternate Multiple Vent Terminations w/Field Supplied Fittings (must also comply with Figure 3-1B)
VENT
ELBOW
BIRD SCREEN

12” (305 MM) MIN. BETWEEN EDGE OF AIR PIPE AND ADJACENT VENT PIPE
Multiple vent/air terminations

Figure 4-1 PVC/CPVC/Polypropylene Vertical Termination of Air and Vent
Follow instructions below when determining vent location to avoid possibility of severe personal injury, death or substantial property damage.

Locate the vent/air terminations using the following guidelines:
6" (152 MM) MINIMUM ABOVE ROOF / SNOW LINE
Figure 4-2 Stainless Steel Vertical Termination of Air and Vent

5. The vent piping must terminate in an up-turned coupling as shown in FIG. 4-1. The top of the coupling must be at least 1 foot above the air intake. When the vent termination uses a rain cap as illustrated in FIG. 4-1 maintain at least 36" (914 mm) above the air inlet. The air inlet pipe and vent pipe can be located in any desired position on the roof, but must always be no further than 2 feet (.6 m) apart and with the vent termination at least 1 foot for PVC and 3 feet for stainless steel, above the air intake.
VENT OUTLET 36” (914 MM) MINIMUM ABOVE AIR INLET
WARNING Rooftop vent and air inlet terminations must terminate in the same pressure zone, unless vertical vent sidewall air is set up as shown in the General Venting - Vertical Vent, Sidewall Air Section.
Determine location · Prepare roof penetrations

Figure 4-3 Vertical Terminations with Multiple Boilers

12" (305 MM) MINIMUM VERTICALLY FROM VENT OUTLET TO ANY AIR INLET
Terminate all vent pipes at the same height and all air pipes at the same height to avoid recirculation of flue products and the possibility of severe personal injury, death, or substantial property damage.
12" (305 MM) MINIMUM FROM EDGE OF AIR INTAKE PIPE TO ADJACENT VENT PIPE FROM ANOTHER BOILER AIR
12" (305 MM) MINIMUM VERTICALLY FROM VENT OUTLET TO ANY AIR INLET
Multiple vent/air terminations

System water piping methods
The SYNC is designed to function in a closed loop pressurized system not less than 12 psi (83 kPa). A temperature and pressure gauge is included to monitor system pressure and outlet temperature and should be located on the boiler outlet.
Basic steps are listed below along with illustrations on the following pages (FIG.’s 5-5 and 5-6), which will guide you through the installation of the SYNC (reference FIG.s 5-1A and 5-1B).
It is important to note that the boiler has a pressure drop which must be figured in when sizing the circulators. Each boiler installation must have an air elimination device, which will remove air from the system. Install the boiler so the gas ignition system components are protected from water (dripping, spraying, etc.) during appliance operation or basic service of circulator replacement, valves, and others.
Observe a minimum of 1/4 inch (6 mm) clearance around all un-insulated hot water pipes when openings around the pipes are not protected by non-combustible materials.
Low water cutoff device
An electronic low water cutoff is provided as standard equipment on all models. The low water cutoff should be inspected every 6 months.
If the boiler supplies hot water to heating coils in air handler units, flow control valves or other devices must be installed to prevent gravity circulation of heater water in the coils during the cooling cycle. A chilled water medium must be piped in parallel with the heater.
Freeze protection for new or existing systems must use glycol that is specially formulated for this purpose. This includes inhibitors, which prevent the glycol from attacking the metallic system components. Make certain to check that the system fluid is correct for the glycol concentration and inhibitor level. The system should be tested at least once a year and as recommended by the producer of the glycol solution. Allowance should be made for the expansion of the glycol solution in the system piping.
10. This appliance is supplied with a relief valve sized in accordance with ASME Boiler and Pressure Vessel Code, Section IV (“Heating Boilers”). The safety relief valve is installed at the factory and is located on the rear of the boiler. Pipe the discharge of the safety relief valve to prevent injury in the event of pressure relief. Pipe the discharge to a drain. Provide piping that is the same size as the safety relief valve outlet. Never block the outlet of the safety relief valve.
Use only inhibited propylene glycol solutions, which are specifically formulated for hydronic systems. Ethylene glycol is toxic and can attack gaskets and seals used in hydronic systems.
See the piping illustrations included in this section, FIG.’s 5-5 and 5-6 for suggested guidelines in piping the SYNC.
Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes.
General piping information · Chilled water system · Freeze protection

The SYNC heat exchanger does have a pressure drop, which must be considered in your system design. Refer to the graph in FIG. 5-4 for pressure drop through the SYNC heat exchanger.
Figure 5-1A Near Boiler Piping w/Y-Strainer

Figure 5-1B Near Boiler Piping w/Low Loss Header

Circulator sizing

Hot Water Generator pump sizing
The SYNC has two (2) heat exchangers that require two (2) individual pumps for proper installation in the boiler loop and an additional two (2) pumps for the Hot Water Generator loop.
Hot Water Pump Head Loss = Ft. of Head for Heat Exchanger 1 (at required flow) + Ft. of Head for the Hot Water Generator (at 2 X the flow of Heat Exchanger 1)
Example:
Boiler: SB1500 A T of 30° requires a flow through each heat exchanger of 51 GPM. The heat exchanger head loss is 18 ft. of head (see Table 5A).
Coupled with a Lochinvar Hot Water Generator with a 8-42 (diameter-length) tube bundle the calculated pressure drop is 1.2 Ft. of Head at 102 GPM.
Hot Water Pump Head Loss = 18 Ft/Hd (51 GPM) + 1.2 Ft/Hd (102 GPM) = 19.2 Ft/Hd
A pump will need to be selected to flow 51 GPM with a head loss of 19.2 Ft/Hd.
Figure 5-2 Boiler Schematic

HEAT EXCHANGER 2 BOILER PUMP HEAT EXCHANGER 1 BOILER PUMP


0 10 20 30 40 50 60 70 80 90
Table 5A Sizing Information for Temperature Rise Applications_20°F, 25°F, 30°F and 35°F
20°F 25°F 30°F 35°F GPM FT/HD GPM FT/HD GPM FT/HD GPM FT/HD 1000 3" 55 31 40 20 38 18 32 13 1300 3" 65* 30 52 20 45 16 37 11 1500 3" 74* 33 60 23 51 18 42 12
Pump sizing and flow requirements are based on 20 feet (6 m) of black iron piping, 4 - 90° elbows, and 2 - fully ported ball valves.
5. Check valves: Field supplied. Check valves are required for installation as shown in FIG.’s 5-5 and 5-6. Failure to install check valves could result in a reverse flow condition during pump(s) off cycle. 6. Domestic indirect hot water isolation valves: Field supplied. Full port ball valves are required. Failure to use full port ball valves could result in a restricted flow rate through the boiler. 7. Anti-scald mixing valve: Field supplied. An anti-scald mixing valve is recommended when storing domestic hot water above 115°F (46°C). 8. Unions: Field supplied. Recommended for unit serviceability. 9. Pressure relief valve: Factory supplied. The pressure relief valve is sized to ASME specifications. 10. System temperature sensor: Lochinvar supplies a system temperature sensor. The sensor is to be installed in the heating loop downstream from the boiler hot water piping and heating loop junction. The sensor should be located far enough downstream to sense system diluted water temperature.
*When using copper with a 20° temperature rise increase piping to 3".
It is required that near boiler piping systems utilize Primary/Secondary configurations as shown in FIG.’s 5-5 and 5-6 only. The use of other near boiler piping configurations could result in improper building and system flow rates leading to inadvertent boiler high limit shutdowns and poor system performance.
Near boiler piping components
1. Boiler piping: Boiler system piping MUST be sized per the pipe requirements listed in Table 5A. Reducing the pipe size can restrict the flow rate through the boiler, causing inadvertent high limit shutdowns and poor system performance. 2. Boiler circulating pump: Field supplied. The boiler circulating pump MUST be sized to meet the specified minimum flow requirements listed in FIG. 5-4. 3. Hot Water Generator circulating pump: Field supplied. The pump MUST be sized to meet the specified minimum flow requirements listed in FIG. 5-4. Consult the indirect boiler operating guide to determine flow characteristics for the selected product used. 4. Boiler isolation valves: Field supplied. Full port ball valves are required. Failure to use full port ball valves could result in a restricted flow rate through the boiler.

Figure 5-5 Single Boiler - Primary/Secondary Piping

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes. NOTICE

Figure 5-6 Multiple Boilers - Primary/Secondary Piping

Number of Units 2 3 4 5 6 7 8 Manifold Pipe Sizes in Inches (mm) 1000 4 (102) 5 (127) 6 (152) 6 (152) 8 (203) 8 (203) 8 (203) 1300 5 (127) 5 (127) 6 (152) 8 (203) 8 (203) 8 (203) 8 (203) 1500 5 (127) 6 (152) 6 (152) 8 (203) 8 (203) 8 (203) 10 (254)

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes. NOTICE

The gas valve and blower will not support the weight of the piping. Do not attempt to support the weight of the piping with the boiler or its accessories. Failure to comply could result in severe personal injury, death, or substantial property damage.
Figure 6-1 Gas Supply Piping
WARNING Ensure that the high gas pressure regulator is at least 10 feet (3 m) upstream of the appliance.

b. The appliance must be isolated from the gas supply piping system by closing a manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 PSIG (3.5 kPa).
c. The appliance and its gas connection must be leak tested before placing it in operation.
Do not check for gas leaks with an open flame – use the bubble test. Failure to use the bubble test or check for gas leaks can cause severe personal injury, death, or substantial property damage.
Failure to apply pipe sealing compound as detailed in this manual can result in severe personal injury, death, or substantial property damage.

Use two wrenches when tightening gas piping at boiler (FIG. 6-2), using one wrench to prevent the boiler gas line connection from turning. Failure to support the boiler gas connection pipe to prevent it from turning could damage gas line components.
Natural gas supply pressure requirements
Figure 6-2 Inlet Pipe with Backup Wrench

Check boiler rating plate to determine which fuel the boiler is set for. SYNC boilers CAN NOT be field converted. Failure to comply could result in severe personal injury, death, or substantial property damage.
Pipe sizing for propane gas
Propane Supply Pressure Requirements
USE BACK UP WRENCH TO PREVENT PIPE FROM ROTATING
Maximum inlet gas pressure must not exceed the value specified. Minimum value listed is for the purposes of input adjustment.
WARNING Ensure that the high gas pressure regulator is at least 10 feet (3 m) upstream of the appliance.
WARNING Check boiler rating plate to determine
which fuel the boiler is set for. SYNC boilers CANNOT be field converted. Failure to comply could result in severe personal injury, death, or substantial property damage.
Pipe sizing for natural gas

Table 6A Natural Gas Pipe Size Chart

of Btu/hr for gas pressures of 14 Inches Water Column (0.5 PSIG) or less and
10 20 30 40 50 60 70 80 90 100 125 150 175 200
1½ 2,150 1,500 1,210 1,020 923 830 769 707 666 636 564 513 472 441
2 4,100 2,820 2,260 1,950 1,720 1,560 1,440 1,330 1,250 1,180 1,100 974 871 820
2½ 6,460 4,460 3,610 3,100 2,720 2,460 2,310 2,100 2,000 1,900 1,700 1,540 1,400 1,300
on NAT GAS, 1025 Btu/hr per Cubic Foot of
3 11,200 7,900 6,400 5,400 4,870 4,410 4,000 3,800 3,540 3,300 3,000 2,720 2,500 2,340
4 23,500 16,100 13,100 11,100 10,000 9,000 8,300 7,690 7,380 6,870 6,150 5,640 5,130 4,720
DO NOT adjust or attempt to measure gas valve outlet pressure. Attempting to alter or measure the gas valve outlet pressure could result in damage to the valve, causing potential severe personal injury, death, or substantial property damage.
The gas piping must be sized for the proper flow and length of pipe, to avoid excessive pressure drop. Both the gas meter and the gas regulator must be properly sized for the total gas load.
If you experience a pressure drop greater than 1 inch w.c. (249 Pa), the meter, regulator, or gas line is undersized or in need of service. Perform the steps below when checking inlet gas supply:

WARNING Do not check for gas leaks with an open
flame -- use the bubble test. Failure to use the bubble test or check for gas leaks can cause severe personal injury, death, or substantial property damage.
The gas pressure must remain between 4 inches w.c. (.99 kPa) minimum (5 inches w.c. for 1.0 models) and 14 inches w.c. (3.5 kPa) maximum for Natural gas and between 8 inches w.c. (1.9 kPa) minimum and 14 inches w.c. (3.5 kPa) maximum for LP gas during standby (static) mode and while in operating (dynamic) mode. If an in-line regulator is used, it must be a minimum of 10 feet (3 m) from the SYNC boiler. It is very important that the gas line is properly purged by the gas supplier or utility company. Failure to properly purge the lines or improper line sizing, will result in ignition failure.
The problem is especially noticeable in NEW LP installations and also in empty tank situations. This can also occur when a utility company shuts off service to an area to provide maintenance to their lines.
Figure 6-3 Inlet Gas Supply Check

The gas valve MUST NOT be replaced with a conventional gas valve under any circumstances. As an additional safety feature, this gas valve has a flanged connection to the venturi and blower.
Failure to follow all precautions could result in fire, explosion, or death!
DO NOT adjust or attempt to measure gas valve outlet pressure. Attempting to alter or measure the gas valve outlet pressure could result in damage to the valve, causing potential severe personal injury, death, or substantial property damage.
Gas Pressure · Gas valve replacement

ELECTRICAL SHOCK HAZARD – For your safety, turn off electrical power supply before making any electrical connections to avoid possible electric shock hazard. Failure to do so can cause severe personal injury or death.
Wiring must be N.E.C. Class 1.
If original wiring as supplied with boiler must be replaced, use only type 105°C wire or equivalent.
Boiler must be electrically grounded as required by National Electrical Code ANSI/NFPA 70 – latest edition.
Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.
Figure 7-1 Line Voltage Field Wiring Connections


Hot Water Generator (HW) thermostat
Figure 7-2 Routing Field Wiring


Wiring of the cascade
When wiring the boilers for Cascade operation, select one boiler as the Leader boiler. The remaining boilers will be designated as Members. See page 48 “Configuration of the Cascade” for a detailed explanation of this procedure.
Connect the system supply sensor and outdoor air sensor (if used) to the Leader boiler. For the Cascade system to work properly the system supply sensor must be installed.
The location of the system supply sensor should be downstream of the boiler connections in the main system loop (FIG.’s 5-5 and 5-6). The system supply sensor should be wired to the Low Voltage Connection Board at the terminals marked for the system supply sensor (see FIG. 7-3). The Leader control will use the water temperature at the system supply sensor to control the operation of the Cascade.
If outdoor air reset is desired, the outdoor air sensor should be wired to the Low Voltage Connection Board at the terminals marked for the outdoor air sensor on the Leader boiler (FIG. 7-3). If the outdoor air sensor is connected, the Leader control will calculate the water temperature set point based on the programmed reset curve parameters. If the outdoor air sensor is not connected, the Leader control will maintain the fixed water temperature set point that is programmed into the control.
If a Thermostat or Zone Control enable output is available, it should be wired to the Low Voltage Connection Board on the Leader boiler at the terminals marked Enable (FIG. 7-3). If the boilers are to run continuously, connect a jumper wire between the R and W terminals at the Enable input. This will initiate a call for heat on the Cascade. If the SMART TOUCH control is being controlled by a Boiler Management System (BMS), a call for heat may be initiated by the voltage applied to the 0 - 10 VDC input.
The SMART TOUCH control closes a set of dry contacts whenever the burner is running. This is typically used by Building Management Systems to verify that the boiler is responding to a call for heat.
Communication between the Leader boiler and the Member boilers is accomplished by using shielded, 2-wire twisted pair communication cable. Connect one of the twisted pair wires to terminal A on each of the Low Voltage Connection boards, and the other wire of the twisted pair to terminal B on each of the Low Voltage Connection Boards. Connect the shield wires to one of the shield ground terminals on the Low Voltage Connection Boards (FIG. 7-3). If more than two boilers are on the Cascade, daisy chain the wiring from the Sequencing terminals on the second boiler to the Sequencing terminals on the third boiler, then from the third to the forth, and so on. The connections between boilers can be made in any order, regardless of the addresses of the boilers. Try to keep each cable as short as possible.
The SMART TOUCH control closes another set of contacts whenever the boiler is locked out or the power is turned off. This can be used to turn on an alarm, or signal a Building Management System that the boiler is down. Note that these contacts will close momentarily at the end of each call for heat or at least every 24 hours.


20 (-) 19 (+) 18 SHIELD GND 17 B 16 A 15 SHIELD GND
2 CONTACTS 3 RUN TIME 4 CONTACTS 5 LOUVER 6 PROVING
26 SENSOR 25 TANK 24 SENSOR 23 OUT DOOR

Use materials approved by the authority having jurisdiction. In the absence of other authority, PVC and CPVC pipe must comply with ASTM D1785 or D2845. Cement and primer must comply with ASME D2564 or F493. For Canada use CSA or ULC certified PVC or CPVC pipe, fittings, and cement.
NOTICE To allow for proper drainage on large horizontal runs, a second line vent may be required and tubing size may need to increase to 1 inch (25 mm). The condensate line must remain unobstructed, allowing free flow of condensate. If condensate is allowed to freeze in the line or if the line is obstructed in any other manner, condensate can exit from the boiler tee, resulting in potential water damage to property.
A Neutralizer Kit (FIG. 8-1) is available from the factory (KIT3046).
Figure 8-1 Condensate Disposal


Do not use petroleum-based cleaning or sealing compounds in the boiler system. Damage to elastomer seals and gaskets in the system could occur, resulting in substantial property damage.
Eliminate all system leaks. Continual fresh makeup water will reduce boiler life. Minerals can build up in the heat exchanger, reducing heat transfer, overheating the heat exchanger, and causing heat exchanger failure.
Hardness less than 7 grains
Purge air from water system
Chlorine concentration less than 200 ppm
Test/replace freeze protection fluid
Freeze protection (when used)
Fill and test water system
a. The minimum cold water fill pressure for a commercial system is 12 psi (82.7 kPa).
b. Pressure will rise when boiler is turned on and system water temperature increases.
Check/control water chemistry

Check for gas leaks
Before starting the boiler, and during initial operation, smell near the floor and around the boiler for gas odorant or any unusual odor. Remove the top access panel and smell the interior of the boiler enclosure. Do not proceed with startup if there is any indication of a gas leak. Use an approved leak detection solution. Repair any leaks at once.
Propane boilers only – Your propane supplier mixes an odorant with the propane to make its presence detectable. In some instances, the odorant can fade, and the gas may no longer have an odor. Before startup (and periodically thereafter), have the propane supplier verify the correct odorant level in the gas.
DO NOT adjust or attempt to measure gas valve outlet pressure. The gas valve is factory set for the correct outlet pressure. This setting is suitable for natural gas and propane, requiring no field adjustment. Attempting to alter or measure the gas valve outlet pressure could result in damage to the valve, causing potential severe personal injury, death, or substantial property damage.
Figure 9-1 Condensate Trap

Inspect/check condensate lines and fittings
Fill condensate trap with water
The condensate trap (FIG. 9-1) must be filled with water during all times of boiler operation to avoid flue gas emission from the condensate drain line. Failure to fill the trap could result in severe personal injury or death.
Check thermostat circuit(s) · Inspect/fill condensate system

Final checks before starting the boiler
Check vent piping and air piping
Read the SYNC Service Manual to familiarize yourself
with SMART TOUCH control module operation. Read this manual, page 46 for proper steps to start boiler.
Venting system must be sealed gastight to prevent flue gas spillage and carbon monoxide emissions, which will result in severe personal injury or death.
Verify the boiler and system are full of water and all
system components are correctly set for operation.
Verify the preparation procedures of Section 9, pages 43
and 44 have been completed.
Fill the vent condensate trap with water (removing the
retaining screw in order to remove the 2 inch (50.8 mm) PVC cap with the switch located at the top of the trap). Replace the cap. Press the cap onto the trap until the cap makes contact with the drain. Replace the retaining screw.
If you discover evidence of any gas leak, shut down the boiler at once. Find the leak source with a bubble test and repair immediately. Do not start the boiler again until corrected. Failure to comply could result in severe personal injury, death, or substantial property damage.
Verify electrical connections are correct and securely
attached.
Inspect vent piping and air piping for signs of deterioration
from corrosion, physical damage or sagging. Verify air piping and vent piping are intact and correctly installed per this manual.
Check flame and combustion
If boiler does not start correctly
If none of the above corrects the problem, refer to the Troubleshooting Section of the SYNC Service Manual.
Check system and boiler
Check gas piping · Start the boiler · Check water piping

A. This appliance does not have a pilot. It is
equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand. B. BEFORE OPERATING smell all around
the appliance area for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor. WHAT TO DO IF YOU SMELL GAS
Never use tools. If the handle will not turn by hand, don’t try to repair it, call a qualified service technician. Force or attempted repair may result in a fire or explosion.
D. Do not use this appliance if any part has been
under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water.
1. STOP! Read the safety information above on this label. 2. Set the thermostat to lowest setting. 3. Turn off all electric power to the appliance. 4. This appliance is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand. 5. Remove front door. 6. Turn gas shutoff valves counterclockwise to “OFF”. Handle will be perpendicular to pipe. Do not force. 7. Wait five (5) minutes to clear out any gas. If you then smell gas, STOP! Follow “B” in the safety information above this label. If you don’t smell gas, go to next step.


Check flame and combustion (continued)
Set space heating operation
Verify space heat circulator mode
The Space Heating Mode controls the system pump (if connected), and both boiler pumps. When the SMART TOUCH control receives a space heating call for heat, it turns on the system pump. If the boiler is not heating an indirect HW (Hot Water) tank, it also turns on the boiler pump. After the space heating call for heat ends, the system pump continues to run for a short period of time. If the boiler pump was running, it continues to run for a short period of time as well. These pump delays are factory set to 30 seconds. If different delays are desired, the appropriate parameters in the control must be changed. See the SYNC Service Manual for a detailed explanation of this procedure.
Set space heating set point temperature
During normal operation, space heating set point temperatures can be adjusted from the Set Points Menu. Press the following buttons to navigate to the Set Points Menu from the Status Screen:
Table 9A Flue Products Chart
8.0% - 10% 3.0% - 6.5% 9.0% - 11% 4.1% - 6.9%
3. Using the keypad, enter the password and then press the OK button. If the password is not entered correctly, the screen will revert to the Parameter List Screen and you will not be able to adjust the set point. If a digit has been entered incorrectly, press the left arrow key on the keypad to back the digit up. If the password has been entered correctly, the Parameter Change Screen will appear. The Parameter Change Screen will display the set point being changed, the previous setting of the set point, and adjustment buttons.
You must replace the flue gas temperature sensor to prevent flue gas spillage into the room. Failure to comply could result in severe personal injury, death, or substantial property damage.
>> · >> · Natural Gas Propane

2. Using the keypad, adjust the date and time by working from left to right. If a digit has been entered incorrectly, press the left arrow key on the keypad to back the digit up. If no change is necessary, press the BACK button to return to the Parameter List Screen. Once the correct date and time have been entered press the OK button on the display to program the date and time into memory and return to the Parameter List Screen.
programming of the controls. Failure to press the SAVE button will require all changes to be reprogrammed.
Configuration of the cascade
Set Hot Water Generator (HW) operation
When installed in a Cascade system, the individual controls must be programmed for cascade operation. To program the cascade parameters, access the Cascade Menu found in the Setup Menu by pressing the following buttons:
Verify HW circulator mode
The HW Mode is programmed to heat an indirect hot water tank. When a tank thermostat or a tank sensor initiates a call for heat, the SMART TOUCH control will turn on the HW pumps and turn off the boiler pumps (if running). If the system pump is running, it will remain on. When the HW call for heat ends, and there is no space heating call for heat, the HW pumps will continue to run for a period of time. This pump delay is set at the factory to 30 seconds. If a shorter or longer delay is desired, the appropriate parameter in the control must be changed. See the SYNC Service Manual for a detailed explanation of this procedure. If there is an active space heating call for heat, then the boiler pumps will be turned on and the HW pumps will be turned off.
Set HW target temperature
When in the HW Mode, the control will modulate to maintain the outlet temperature to a set point. This set point is set at the factory to 180°F. If a different set point is desired, the appropriate parameter in the control must be changed. See the SYNC Service manual for a detailed explanation of this procedure.
To program the clock, access the night setback parameter by pressing the following buttons:
The SMART TOUCH control has a built-in clock that it uses for its night setback feature and for logging events. This clock must be set when the boiler is installed, and anytime the boiler has been powered off for more than one month. Use the following procedure to set the clock:

The SMART TOUCH control module allows connection of a HW thermostat to the low voltage connection board. When the HW thermostat calls for heat, the control modules activate the HW pumps, shuts down the boiler pumps, and immediately sets the target outlet water temperature to 180°F (82.2°C). This provides automatic priority heat allocation to the HW Generator for maximum response and recovery. The HW pumps continue for 30 seconds after the heating cycle to deliver the most possible heat.
How the boiler operates
The SYNC uses advanced stainless steel heat exchangers and electronic control modules that allow fully condensing operation. The blowers pull in air and push flue products out of the boiler through the heat exchangers and flue piping. The control modules regulate blower speed to control the boiler firing rate. The gas valve senses the amount of air flowing into the boiler and allows only the right amount of gas to flow.
How the control modules operate
The control module is programmed to use the outlet sensor as the control sensor by default. If a system supply sensor is connected, the control automatically uses it as the control sensor.
The SYNC boiler is equipped with two (2) SMART TOUCH control modules. The control modules work in synchronization to meet the heat demand of the system.
The SMART TOUCH control modules receive input from boiler sensors and external inputs. The control modules activate and control the blowers and gas valves to regulate heat input and switches the boiler, Hot Water Generator (HW), and system pumps on and off as needed. The user programs the control modules to meet system needs by adjusting control parameters. These parameters set operating temperatures and boiler operating modes. Boiler operation is based on system temperature.
After a space heating demand has been satisfied, the control will delay the next space heating call for a set time period (time is adjustable by the installer). The time delay will be bypassed if the inlet water temperature drops too far during the delay.
Boiler, system, and HW pump control
When a space heating call for heat starts and no HW call is on, the system and boiler pumps are turned on. As long as the space heating call for heat is on, the system pump will remain on. If a HW call for heat is on, the boiler pumps will wait to turn on until just before the HW pumps turn off. After the space heating call for heat ends, both pumps will run for an additional period of time.
Control inputs and outputs
Room thermostat / zone control
This input tells the boiler to provide water for space heating.
Hot Water Generator (HW) tank thermostat
When a HW call for heat starts, the HW pumps are turned on. If a space heating call for heat was on, the boiler pumps will turn off a few seconds after the HW pumps turn on.
This input tells the boiler to provide water for heating an indirect HW tank.
A dry contact is provided to open and close louvers whenever the SYNC boiler requires combustion air from inside the room. Connect the Louver End Switch to the Louver Proving Switch input on the Low Voltage Connection Board.
The SYNC can be controlled by a Building Management System (BMS) using a 0 - 10 VDC signal. The control can be configured by the installer to use this signal to either control set point or firing rate.
The SYNC is capable of modulating its firing rate from a minimum of 10% to a maximum of 100%. The firing rate is dictated by the call for heat (i.e., space heating or hot water generation), the heating load, and various other temperature limitations.

If during operation of the boiler the outlet water temperature is rising too quickly, the control will reduce the firing rate to its lowest setting.
Outlet temperature, flue temperature, and temperature rise limiting
The outlet temperature is monitored by the boiler outlet temperature sensor. When the outlet temperature exceeds 185°F (85°C), the unit will reduce the fan speed. If the outlet water temperature exceeds 195°F (90°C) the control will shut the unit down until it cools off.
If an outdoor air sensor is connected, the control module will calculate the set point based on the programmed reset curve. The installer can change the slope of the reset curve by several adjustable parameters. The user can limit the maximum set point for the system using the space heating set point.
The control module monitors the flue temperature by a sensor located in the flue exhaust. If the flue temperature exceeds 215°F (102°C) the control will reduce the maximum fan speed. If the flue temperature exceeds 240°F (115°C) the control will shut the unit down. The unit will restart automatically once the flue temperature drops 25°F (14°C) and the minimum off time has expired.
If outdoor air reset is active, and a space heating demand has been active continuously for a set period of time (time adjustable by installer) and there has been no HW demands, the control will increase the set point by a fixed number of degrees (adjustable by installer). This process will continue until the space heating demand ends, the set point reaches the programmed set point or a maximum of 20 increases has occurred. Once the system heat demand is satisfied, the set point will revert to the value determined by the reset curve.
The control monitors the temperature difference between the inlet and the outlet sensor. If this difference exceeds 55°F (31°C) the control will reduce the fan speed. If the temperature difference exceeds 60°F (33°C) the control will shut the unit down. The unit will restart automatically once the temperature difference has dropped below 55°F (31°C) and the minimum off time has expired.
DO NOT install the boiler in a room likely to freeze.
The controller may be programmed to reduce the space heating set point during a certain time each day. A start and stop time can be programmed for each day of the week.
The following integral feature of the SMART TOUCH control module provides some protection for the boiler only -- not for the system.
To prevent nuisance shutdowns when the boiler is firing at minimum rates, the control will increase the firing rate when the flame signal drops too low.
This feature of the SMART TOUCH control module does not eliminate the possibility of freezing. The installation must still use recognized design, installation and maintenance practice to prevent freeze potential for the boiler and system.

Connections are provided on the connection board for external limits such as flow switch and a louver proving switch. The SMART TOUCH control will shut off the burner and inhibit relighting whenever any of these external limits open.
When outlet temperature exceeds 200°F (93.3°C), high limit action occurs. The boiler shuts down until the outlet water cools down.
Low water cutoff protection
Run-time and alarm outputs
The boiler provides dry contacts for indicating when the boiler is running, and when it is unable to operate.
Run-time and cycle counting
The control uses two timers to monitor the total hours of burner operation. One timer monitors the time the boiler is firing under 50% of rate. The other timer monitors the time the boiler is firing over 50% rate.
The control uses four (4) ignition counters to monitor the amount of boiler cycles. The first counter counts all ignitions of the control. The second counter counts only ignition attempts that have failed. The third and fourth counters are the same as the first and second respectively, but can be reset by the installer.
Outdoor reset operation, if used
Target temperature with outdoor reset
The control can be programmed for service reminder notification. This notification will become active when either a set time frame has expired, or a set amount of running hours or cycles has expired (all adjustable by the installer). The display will alternate the standard text on the display screen with Service Due every 5 seconds. The service reminder notification can be reset by the installer.
This feature improves the system’s efficiency as the outdoor temperature warms up.
See the SYNC Service Manual to change the settings.
The reset curve looks at outdoor air temperature and adjusts the set point.
The control will hold in memory the last 10 error codes as well as the last 10 turn-off functions. The date and time of the occurrence will be recorded as well. Only the 10 most current occurrences will be held in memory.
When multiple boilers are installed, they can be wired together in a cascade sequence. A maximum of eight boilers can be controlled from a single control. In this application one boiler would be designated as the Leader control and all others would be designated as Member controls.
The SMART TOUCH control module senses water temperature and regulates boiler firing and firing rate to achieve a target temperature. The target temperature can be set between 70°F (21°C) and 190°F (88°C).
Once the Leader boiler receives a call for heat from the Enable input or 0 - 10 VDC input, the control will determine what the set point will be. If outdoor air reset is desired, connect the outdoor air sensor to the terminals on the Low Voltage Connection Board on the Leader boiler. The set point will be calculated based on the programmed reset curve parameters. See the SYNC Service Manual to program the reset curve. If outdoor air reset is not desired, do not connect the outdoor air sensor. A fixed temperature set point can be programmed into the control.

If the water temperature at the system supply sensor is less than the set point + the turn-off offset - the off-on differential, then the control will initiate a call for heat on the Cascade (see the SYNC Service Manual for an explanation of the offset and differential). The Leader will energize the lead boiler on the Cascade. For a new startup this will be the Leader boiler.
HW operation with cascade
For HW operation any boiler(s) in the Cascade can be selected to provide heat for a HW call. Select a boiler to be designated as the HW boiler. Connect the HW thermostat or sensor to the terminals on the Low Voltage Connection Board marked for the HW Thermostat or sensor. When the boiler receives a HW call, the Leader control will take that boiler out of the Cascade sequence. If another boiler is available, the Leader will start it up to take its place.
The boiler will fire at its ignition speed and will then modulate its firing rate to maintain the set point. If the first boiler reaches 100% of its firing rate, the Leader will calculate at what point the second boiler could fire at 10% of its firing rate. At this point, the Leader will fire the second boiler on the Cascade. For a new startup, this would be the first Member boiler. The boiler will fire at its ignition speed and will then modulate its firing rate to maintain the set point.
The HW boiler will adjust its set point to the programmed HW set point and will adjust its firing rate to maintain this. Once the HW call has been satisfied, the Leader control will place that boiler back into the Cascade sequence.
Night Setback operation with cascade
If the set point still cannot be met, the Leader will continue firing more Members until either the heat demand is met or all boilers on the Cascade are firing. As the heat demand decreases, the last boiler on will modulate down to 10% of its firing rate. Once the demand for that boiler is zero, it will shut down. As the heat demand decreases further, the second to last boiler will modulate down and shut off. This will continue until the demand is satisfied and all boilers are shut off.
Night Setback operation of the boilers within the Cascade is available. Programming of the Night Setback will be done through the Leader boiler. Refer to the SYNC Service Manual for information regarding Night Setback.
Sequence of the cascade
To equalize the run time of all boilers on the Cascade, the firing sequence will automatically be changed at set intervals.
For the first 24 hours after initializing the Cascade, the sequence will be changed every hour. After that the sequence will be changed once every 24 hours. The switching on/off sequence will be as follows:
Day 1 + 1 hour M2-M3-M4-M5-M6-M7-L-M1
Day 1 + 2 hours M4-M5-M6-M7-L-M1-M2-M3
Day 1 L-M1-M2-M3-M4-M5-M6-M7

If the first heat exchanger in the boiler is unable to maintain the desired set point temperature, the second heat exchanger in the boiler will be started, using much of the same sequences as described above. Once both heat exchangers are firing, the controls will work in synchronization to maintain the desired set point temperature. If the heat load should decrease sufficiently, the second heat exchanger will be shut down, much like the sequences described below.

The Status Screen displays boiler status, Cascade addresses, outlet water temperature, inlet water temperature, system temperature, and tank temperature.
The boiler can be changed by pressing the ON/OFF button. The Details Screen and Main Menu Screen can be accessed by pressing the appropriate button.
Figure 10-1 Status Screen

When the ON/OFF switch is turned to the ON position, the first screen visible on the LCD display will be the Status Screen. This screen displays the current status of the SYNC boiler. The following items can be viewed or interacted with on the Status Screen:
On/Off button - Pressing this button allows the boiler to be placed in either Manual Shutdown Mode or Standby Mode.

Boiler Configuration - This line shows the current configuration of the two control modules inside the unit.
Hot Water Tank Temperature - This is the temperature as measured by the tank sensor in the hot water storage tank.
Outlet Water Temperature - This is a calculated temperature based on the readings of the outlet temperatures of the two (2) heat exchangers.
Time - The time is displayed in the upper right-hand corner of the display. It is displayed in 24 hour format. Reference the SYNC Service Manual for Night Setback parameters and more information regarding adjusting the date and time.
System Water Temperature - This is the water temperature as measured by the system supply sensor located in the downstream piping.
Details button - Pressing this button brings up the Details Screen. This screen shows the status of the various safeties, inputs, and outputs to each control module. Reference the Details Screen section in the SYNC Service Manual for more information regarding this screen.
Inlet Water Temperature - This is a calculated temperature based on the inlet temperature readings from the two (2) heat exchangers.
Main button - Pressing this button brings up the Main Screen. From this screen navigation to eight (8) other screens is possible. Reference the Main Screen section on page 56 of this manual for more information regarding this screen.

Use the Main Menu Screen (FIG. 10-2) to access the screens necessary to set temperatures, operating conditions, and monitor boiler operation.
The SYNC is equipped with a SMART TOUCH control system. All menu options are accessed by touching the screen with your finger or a stylus from a PDA.
Figure 10-2 Main Menu Screen

The Main Screen allows navigation to eight (8) additional screens which are used to set temperatures, operating conditions, and monitor boiler operation. These screens are as follows:
Navigation to the Main Screen can be accomplished by pressing the MAIN button at the bottom of the page.
Reference the SYNC Service Manual for more information regarding the eight (8) accessible screens.
Time - The time is displayed in the upper right-hand corner of the display. It is displayed in 24 hour format. Reference the night setback parameters in the SYNC Servie Manual for information regarding adjusting the date and time.
Status button - Pressing this button displays the Status Screen. This screen shows the current status of the SYNC boiler. Reference pages 54 - 55 for more information regarding this screen.

Maintenance and annual startup
Table 11A Service and Maintenance Schedules
Owner maintenance (see the SYNC User’s Information Manual for
months
instructions)

Follow the service and maintenance procedures given throughout this manual and in component literature shipped with the boiler. Failure to perform the service and maintenance could result in damage to the boiler or system. Failure to follow the directions in this manual and component literature could result in severe personal injury, death, or substantial property damage.
The boiler should be inspected annually only by a qualified service technician. In addition, the maintenance and care of the boiler designated in Table 11A and explained on the following pages must be performed to assure maximum boiler efficiency and reliability. Failure to service and maintain the boiler and system could result in equipment failure.
Electrical shock hazard – Turn off power to the boiler before any service operation on the boiler except as noted otherwise in this instruction manual. Failure to turn off electrical power could result in electrical shock, causing severe personal injury or death.
Figure 11-1 Condensate Trap

The condensate trap must be filled with water during all times of boiler operation to avoid flue gas emission from the condensate drain line. Failure to fill the trap could result in severe personal injury or death.
Eliminate all system or boiler leaks. Continual fresh makeup water will reduce boiler life. Minerals can build up in sections, reducing heat transfer, overheating heat exchanger, and causing heat exchanger failure. Leaking water may also cause severe property damage.

Safety relief valves should be re-inspected AT LEAST ONCE EVERY THREE YEARS, by a licensed plumbing contractor or authorized inspection agency, to ensure that the product has not been affected by corrosive water conditions and to ensure that the valve and discharge line have not been altered or tampered with illegally. Certain naturally occurring conditions may corrode the valve or its components over time, rendering the valve inoperative. Such conditions are not detectable unless the valve and its components are physically removed and inspected. This inspection must only be conducted by a plumbing contractor or authorized inspection agency – not by the owner. Failure to re-inspect the boiler relief valve as directed could result in unsafe pressure buildup, which can result in severe personal injury, death, or substantial property damage.
Failure to inspect for the above conditions and have them repaired can result in severe personal injury or death.
Following installation, the valve lever must be operated AT LEAST ONCE A YEAR to ensure that waterways are clear. Certain naturally occurring mineral deposits may adhere to the valve, rendering it inoperative. When manually operating the lever, water will discharge and precautions must be taken to avoid contact with hot water and to avoid water damage. Before operating lever, check to see that a discharge line is connected to this valve directing the flow of hot water from the valve to a proper place of disposal. Otherwise severe personal injury may result. If no water flows, valve is inoperative. Shut down the boiler until a new relief valve has been installed.

Check burner flame
Figure 11-2 Burner Assembly

Check flame signal
Perform start-up and checks

Table 11B Heat Exchanger Cleaning Kits
For recommended materials; including brush, appropriate extension(s), refractory cover, and detailed instructions see Table 11B - Heat Exchanger Cleaning Kits.

* Do NOT use a metal brush. Only use the kit provided brush or an equivalent replacement nylon brush.
Figure 11-3 Rope Gasket - Heat Exchanger Door

The boiler contains ceramic fiber materials. Use care when handling these materials per instructions on page 62 of this manual. Failure to comply could result in severe personal injury.
Connect a field supplied 3/4" diameter hose to a drain pan. Using field supplied means, cover the refractory in the back of the combustion chamber of the heat exchanger.
boiler heating surfaces. Do not use any solvent.
brush. Caution: DO NOT use a metal brush. Re-vacuum the heat exchanger.
water. Rinse out debris with a low pressure water supply.

The combustion chamber insulation in this appliance contains ceramic fiber material. Ceramic fibers can be converted to cristobalite in very high temperature applications. The International Agency for Research on Cancer (IARC) has concluded, “Crystalline silica in the form of quartz or cristobalite from occupational sources is carcinogenic to humans (Group 1).” Normal operating temperatures in this appliance are below the level to convert ceramic fibers to cristobalite. Abnormal operating conditions would have to be created to convert the ceramic fibers in this appliance to cristobalite.
The ceramic fiber material used in this appliance is an irritant; when handling or replacing the ceramic materials it is advisable that the installer follow these safety guidelines.
Avoid breathing dust and contact with skin and eyes. • Use NIOSH certified dust respirator (N95). This type of respirator is based on the OSHA requirements for cristobalite at the time this document was written. Other types of respirators may be needed depending on the job site conditions. Current NIOSH recommendations can be found on the NIOSH website at http://www.cdc.gov/niosh/homepage.html NIOSH approved respirators, manufacturers, and phone numbers are also listed on this website.
Apply enough water to the combustion chamber lining to prevent airborne dust.
Remove the combustion chamber lining from the boiler and place it in a plastic bag for disposal.
Wash potentially contaminated clothes separately from other clothing. Rinse clothes washer thoroughly.
NIOSH stated First Aid.
Eye: Irrigate immediately. Breathing: Fresh air.

Figure 12-1 Ladder Diagram_Part 1




Figure 12-3 Wiring Diagram
HIGH VOLTAGE
CM 1 PC INTERFACE
BOX DEPICTS OPTIONAL ITEMS
CONTROL MODULE 1
LOUVER CONTACTS
JUNCTION
BOX
R1 R2
PC INTERFACE
RELAY BOARD
LOUVER
BR OR
CONNECTION BOARD
K1
CM 2 PC INTERFACE
OR
BOILER 2
SHIELD
CN3-16
CN3
PR
BR
CN3-15
CN4
K2
BR
BOILER 1
CASCADE
RS485
CN3-14
PR
K3
SYSTEM PUMP
SHIELD
CN3-13
GY
PR
TANK SENSOR
CN3-12
CN3-11
GND
HW PUMP RELAY
CN3-10
BK
ON/OFF SWITCH
GND
OUTDOOR
SENSOR
CN3-9
W
GND
120V SUPPLY
CN3-8
N
SYSTEM SENSOR
GR
GND
CN3-7
EXTERNAL
- 10VDC
CN3-6
4 CONDUCTORS
G R
W
CONTROL
CN3-5
SHIELD
CN3-4
CN1
BLOWER
MOD BUS
CN3-3
CN1-10
1 2 4 5 3
RS485
CN3-2
MOD BUS
CN3-1
CN1-2
KIT
X5-5 X5-13
R
SHIELD
CN1-9
T
W
FLAP VALVE
X5-6 X5-12
OR BK
APS
PK
X5-4 X5-10
BL
GY
O-TEMP HEX SW
ENABLE
CN2-14
CN1-11
GY
GY
AUTO RESET LIMIT
BL
CN2-13
PR
CN1-3
W
W
HI-LIMIT
TANK THERMOSTAT
TANK THERMOSTAT
CN2-12
CN1-4
PK
X5-3 X5-8
BK
HEX 1 FLOW SWITCH
CN2-11
T BR
INLET SENSOR
CN2-10
CN1-5 CN1-6
T
RD
OUTLET SENSOR
CN2-9
CN1-13
OR
W
HEX 2 FLOW SWITCH
CN2-8
CN1-14
OR/BK
Y
FLUE SENSOR
CN2-7
PK
LOUVER PROVING
CN2-6
CN1-12
RD
CN1-15
RD
PR
BK
GAS VALVE
CN2-5
CN1-16
Y
RUNTIME CONTACTS
CN2-4
CN1-8
PR
RD
CN2-3
CN1-7
PR
SPARK
G
ALARM CONTACTS
ALARM CONTACTS
CN2-2
PR
ROD
CN2-1
RD
W/RD
CN2
CN1-1
FLAME ROD
BLOCKED
CAUTION HIGH VOLTAGE SPARK LEAD
DRAIN
CONTROL MODULE 2
BR/W
GY
W
LOW GAS PRESSURE SWITCH HIGH GAS PRESSURE 1
BK
GR
RD
G R W
HIGH GAS PRESSURE 2
BLOWER
1 2 4 5 3
X5-5 X5-13
RD
BR
T/BK
W
LOW WATER CUTOFF
X6-10 J3-1
TEST SWITCH
OR/BK
X5-6 X5-12
BK
APS FLAP VALVE
J3-1 J3-2 J3-3 J3-4 J3-5 J3-6
OR/BK BK
PROBE
X5-4 X5-10
OR/BK
GR/BK
BOARD
BL
AUTO RESET LIMIT
O-TEMP HEX SW
RESET
BL/BK
J2-1 J2-2 J2-3
OR
PR/BK
PK
HI-LIMIT
BK/RD
INLET SENSOR
RD/BK
OUTLET SENSOR
W/BK
FLUE SENSOR
Y/BK
PR
BK
GAS VALVE
RD
Y
PR
SPARK
G
RD
ROD
FLAME ROD
RD/W
CAUTION HIGH VOLTAGE SPARK LEAD
Notes: 1. All wiring must be installed in accordance with: local, state, provincial and national code requirements per either N.E.C. in USA or C.S.A. in Canada. 2. If any original equipment wire as supplied with the appliance must be replaced, it must be replaced with wire having same wire gauge (AWG) and rated for a minimum of 105°C. Exceptions: Replacement high vo ltage spark lead and ribbon cables must be purchased from the factory. Use of a non-approved spark lead or ribbon cables can lead to operational problems which could result in non-repairable damage to the integrated controller or other components. 3. Actual connector block locations may vary from those shown on diagrams. Refer to actual components for proper connector block locations when using diagrams to troubleshoot unit.
+



Revision Notes: Revision A (ECO #C02428) initial release.
Revision B (ECO #C03046) reflects the addition of FIG. 5-3 on page 27, the addition of a pressure gauge to FIG. 5-6 on page 30, edits made to FIG. 7-1 on page 35, edits made to the Low Water Cutoff Protection section on page 48 along with the addition of the Flow Sensing Device section.
Revision C (ECO #C03223) reflects edits made to the high altitude section on page 6.
Revision D (ECO #C03735) reflects edits made to the venting section removal of B149.2, along with the addition of the hydro and dirt separator.
Revision E (ECO #C04062) reflects changes to the terminology in all SYNC manuals and labels from module to heat exchanger (exception: control module), along with changing out “dirt separator” for “Y-strainer (ECR #R02455), edits made to the ceramic fiber material warning, removal of the stabilitor from FIG. 11-2 (C04057), and placing the illustrations disclaimer on all the piping drawings (ECR #R02431).
Revision F (ECO #C04560) reflects the addition of Modbus to the manual, new heat exchanger cleaning procedure, schedule 80 as acceptable CPVC material (Table 2A) (R02799), and changes made to Table 5A.
Revision G (ECO C07283) reflects the update of FIG. 7-1 on page 38 to show current label and wiring connections along with an update to the Ladder and Wiring diagrams on pages 64 and 65.
Revision H (ECO C07679) reflects the update of FIG. 6-1 on page 34 to show the gas pressure regulator, ECR 04077 - combustible water pipes changed from 1" to a 1/4", addition of the rope gasket notice on page 61 (R03940) and changes made to Table 2A on page 19.
Revision I (ECO C07981) reflects the addition of the O-temp switch and edits made to LBL20045 (ECR R04243 and C07959 - add O-temp switch, changes made to Table 5A on page 31 (ECR R04335) and change Module 1 and 2 callouts to HEX 1 and 2 on the label).
Revision J (ECO C08327) reflects changes made to the temperature callouts under Protection Features on page 50 (ECR R04145).
Revision K (ECO C08407) reflects updates made to LBL20045 (ECR R04434) along with changing the water outlet from 2 1/2” NPT to 3” NPT (ECR R04003), pages 4, 6, and 31 and updating the O-temp switch description on page 4.
Revision L (ECO #C08689) reflects additional information added to the humidity warning on page 7, updates made to LBL20046 Rev F (ECO CO8689), the addition of the new Polypropylene Vent material section and rearranging the venting section.
Revision M (ECO C09691) reflects the update of AHRI and ASME logos on page 6.
Revision N (ECO C10594) reflects the update of Wiring and Ladder diagrams on pages 64 and 65.
SYNC-I-O Rev N · 05/12