SGH Steam Generating Humidifier Installation and Operation Guide IMPORTANT: Read and save this guide for future reference. This guide to be left with equipment owner.
Table Of Contents INSTALLATION 1 RECEIVING & UNPACKING EQUIPMENT ................................1 PRE-INSTALLATION CHECKPOINT ...................................1 BASIC HUMIDIFIER CONFIGURATION ..................................1 LOCATION & MOUNTING .
INSTALLATION RECEIVING & UNPACKING EQUIPMENT 1. Check packing slip to ensure ALL material has been delivered. 2. All material shortages are to be reported to Liebert within 48 hours from receipt of goods. Liebert assumes no responsibility for any material shortages beyond this period.
to clearances required for plumbing, electrical, and control entrances. The clearance dimensions shown in this manual are for reference only and are the minimum required for maintenance of the humidifier. Local and National Codes should be consulted prior to final location and installation of the humidifier.
FRONT WALL SIDE STEAM CONDENSATE A 005-030 3.2" (8.0cm) 050-100 3.2" (8.0cm) A POWER AND CONTROL WIRING FROM HUMIDIFIER 10-20 050-100 3.2” (8 cm) 3.
5. Exercise extreme caution when installing in fiber glass or internally lined ducts. 6. High positive or negative static pressure ducts or plenums have special requirements. High positive static pressure ducts may require the unit to be fitted with a fill cup extension kit.
10. Any distributor longer than 3 feet (1 meter) should be supported at its end with a threaded rod through top or bottom of duct. See Figure #10. 11. It is recommended that single distributors are mounted near the bottom of the duct to ensure the steam is dispersed into the majority of the air flow.
5. ALWAYS supply and install a shut off valve in the water supply line dedicated to the humidifier to facilitate servicing. Use ½ "O D copper to within 4 feet of the humidifier. Reduce copper to 3/8" OD and connect to the factory-supplied 3/8" olive compression fitting under the humidifier.
3. Liebert steam supply hose or field-supplied piping should be sloped downwards from the steam distributors to the humidifier. Slope should be at least 2" in 12" to promote condensate runback. See Figure #18. If this slope is not possible, condensate must be removed before the distributor.
ACCESSORIES - FILL CUP EXTENSION KIT(S) 1. The SGH humidifier is an electrode humidifier. It produces steam at atmospheric pressure. Pressure head must develop to push steam through supply line and into air duct. 2. Combined resistance of duct positive static pressure and steam line resistance creates a small pressure head in steam cylinder.
impeding condensate flow when duct pressures are below atmosphere. 6. The condensate line can go to either of two large holes in the fill cup cover on top of humidifier.
information is relevant to all controls, factory supplied or otherwise. A, B and C (described below) are to be wired in series (only one path for current) across terminals 8 and 10 on the low voltage control terminal strip, or replaced with a jumper wire for constant operation (see Figure #27).
4. The modulation signal must increase from minimum toward maximum as sensed RH (actual RH) drops below desired RH (%RH setpoint). In response, humidifier ’ s steam output will increase from minimum toward maximum. When humidifier ’ s steam output (lbs/hr) matches humidification load (lbs/hr), modulation signal will stabilize.
satisfied and stops again. The resultant short-cycling is easily overcome. A manual capacity adjustment potentiometer ( “ pot ” ) is provided on the SGH main pc board for that purpose. It is marked “ CAPACITY ADJUST ” and is adjustable from 25 to 100% of rating.
LIMITED WARRANTY Liebert Corporation (hereinafter collectively referred to as THE COMPANY), warrant for a period of two years from date of shipment, that THE COMPANY ’ s manufactured and assembled products, not otherwise expressly warranted (with the exception of the cylinder) are free from defects in material and workmanship.
Model # :_________________________ Serial # :__________________________ Cylinder # :_________________________ Cylinder Last Replaced: _________________________ MTH/DAY/YR _________________________ MTH/DAY/YR _________________________ MTH/DAY/YR PRINTED IN CANADA LIEBERT CORPORATION 1050 Dearborn Drive, P.
An important point after buying a device Liebert SL-14050 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Liebert SL-14050 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Liebert SL-14050 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Liebert SL-14050 you will learn all the available features of the product, as well as information on its operation. The information that you get Liebert SL-14050 will certainly help you make a decision on the purchase.
If you already are a holder of Liebert SL-14050, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Liebert SL-14050.
However, one of the most important roles played by the user manual is to help in solving problems with Liebert SL-14050. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Liebert SL-14050 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center