


WARNING: ELECTRIC SHOCK HAZARD!
INSTALLATION OF THIS APPLIANCE SHOULD BE PERFORMED BY QUALIFIED SERVICE PERSONNEL ONLY. IMPROPER INSTALLATION COULD RESULT IN ELECTROCUTION.
See rough-in drawings in this manual for dimensions and locations of electric and water input.
Prior authorization must be obtained from Grindmaster for all warranty claims.
Grindmaster Corporation™ 4003 Collins Lane Louisville, KY 40245 USA (502) 425-4776 (800) 695-4500 (800) 568-5715 (Technical Service Only) FAX (502) 425-4664 www.grindmaster.com

© Grindmaster Corporation, 1996 Printed in the U.S.A.
1004 FORM # AM-308-06 Part # A090-085
Set-Up/Position · Water Hook-up



WARNING ELECTROCUTION HAZARD
NEVER USE THE GROUND CONDUCTOR AS A NEUTRAL. DO NOT USE GROUND ELIMINATING ADAPTORS. UNIT MUST BE PROPERLY GROUNDED.
Connect water line and turn water valve on. Check for leaks. Plug in power cord (supplied) to 120, 15 Amp (20 Amp for some models, see rating plate on unit) wall outlet.
Once the brewer is full of water, it will take 15 to 35 minutes to heat. The “READY” LAMP will light when water has reached the set temperature.
After “READY” LAMP is lit, portion volume may now be checked. Insert the brew basket and place Shuttle/Airpot under the brew basket. Brew at least one batch at half and full volume to check for proper volumes. Remember that when brewing coffee, the level will be lower. The water must be hot to check for proper levels.
If adjustments are needed, see the Adjustments section of this manual.


All adjustable components are located under the top cover. To access these parts:
The brew volume of the P200/RAPS200 brewer is controlled by its timer. The batch size is directly proportional to the timer setting. The timer adjustment is located under the top cover.
There will always be a small variation (+/- 5%) in level from batch to batch.
Before making the timer adjustment, do the following:
desired brew volume desired brew time = X current brew time current brew volume
Two Batch Timer with Knob Adjustment, See Figure A:


The thermostat controls the water temperature in the tank. Factory setting is 195 degrees F. This is the ideal temperature for brewing coffee. Water should never boil in the tank. If water is boiling in the tank, adjust the temperature appropriately.

Figure B

Urn cleaners that have been used successfully:
DIP-IT, manufactured by Economics Laboratories, Inc. 4 Corporate Park Drive White Plains, NY 10604
OXYLITE, manufactured by Avril, Inc., Syndet Division 601 N. Third Street Reading, PA 19601

The rest of this manual contains information to help the service person who is working on this equipment. This section has information on performing common service tasks.


If you still need help, call our Service Department at (800) 568-5715, press 2 (Monday through Friday, 8 a.m. - 6 p.m. EST) or an authorized service center in your area. Please have the model and serial numbers ready so that accurate information can be given.
Prior authorization must be obtained from Grindmaster Technical Services Department for all warranty claims.























for P200/RAPS200 Series
GENERAL WARRANTY INFORMATION
Grindmaster maintains the highest standard of quality control in the manufacturing of American Metal Ware products. We use the finest components and materials, and employ quality engineering standards and tests. The P200E Brewer is warranted for a period of one year from date of shipment. This warranty will include parts and labor but will not cover transportation and shipping charges and will be limited to equip- ment sold to commercial purchasers and installed in the continental U.S.A., Hawaii, Alaska and Canada.
Coverage is not included for labor needed or caused by:
Call Grindmaster Service Department toll free at 1-800-695-4500 for technical services or write to: Grindmaster Factory Service Center, P.O. Box 35020, Louisville, KY 40232. In order to receive warranty service, you must provide the serial number of the machine requiring service along with a description of the problem. Service will be arranged through one of our authorized local service centers or our factory service center. Transportation is the user's responsibility. Should it become necessary to transport your machine to a service center, make sure it is properly packaged to avoid in-transit damage, which is not covered by this warranty.
No field, outside or service station work is covered by this warranty without prior authorization
by Grindmaster's Service Dept.
Grindmaster Corporation™ 4003 Collins Lane Louisville, KY 40245 USA (800) 695-4500 • (502) 425-4776 FAX: (502) 425-4664 www.grindmaster.com

Printed in the U.S.A. © Grindmaster Corporation, 1996
Pages referenced in this manual — manufacturer, support and downloads.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.