WATER PURIFICATION
MACHINES

AND MAINTENANCE
MANUAL






2.17 Operation and Maintenance 16 2.17.1 Daily Flushing for the Economy Model 16 2.17.2 Daily Flushing for the Deluxe Model 16 2.18 Pre-Filter Cartridge 17 2.19 Membrane Element Cleaning 17 2.19.1 Step Wise Cleaning 17 2.19.2 Procedure to Clean with a CIP Pump 17 2.20 Suction Cleaning 19 2.21 Changing Out Membrane Elements 20 2.22 Troubleshooting 22
2.1 Three-Phase Allen Bradley Motor Starter 6 2.2 Setting-Up the Correct Time on the Autoflush Timer 11 2.3 Programming the Timer 13 2.4 Conductivity Probe Display 15 2.5 Clean-In-Place Pump and Tank Hook-Up 18
2.1 Connections 1 2.2 E-Series Feed Water Requirements 3 2.3 Pressure Correction Factors 4 2.4 Flow Specifications for E4-Series Machines 10
Page · Figure Description · Table Description



2.1 Mounting the Unit
When installing your new GE Infrastructure Water & Process Technologies reverse osmosis (RO) machine, allow at least 45-inches (114 cm) above the machine for mem- brane element removal and loading. If space is not available, the entire membrane element housing can be removed for membrane element change outs. If the mem- brane element housings are to be removed to change out the membrane elements, at least 6-inches (15.2 cm) is required at the end of each membrane element housing and 24-inches (61 cm) behind the machine.
2.2 Plumbing
The feed water source must be able to provide water quantity and pressures to main-
tain an operating feed water pressure of 30 - 60 psig (2.1 - 4.1 barg). If the feed water pressure with the machine is in excess of 60 psig (4.1 barg) or fluctuates by more than 5 psig (0.34 barg) a pressure regulator should be installed up stream of the machine Inlet. If proper water pressure cannot be maintained to the RO, a booster pump may need to be installed in front of the pretreatment to provide the proper water quantity and pressure for the operation of the machine.
Table 2.1 Connections
* Low Energy Membrane Elements

2.3 Installing Clean-In-Place Valves
When installing the CIP valves, a three-way valve should be installed in the inlet feed stream of the machine. The tees on the permeate and concentrate lines should be installed with two-way valves. All valves should be installed in a manner that will allow circulation of the cleaning chemicals through the machine and back to the CIP container during cleaning.
2.4 Concentrate Outlet Connections
Connect proper size drain line to the concentrate outlet (Table 2.1) and run to an open drain. The drain capacity needs to be large enough to properly drain the feed water flow of the RO. The maximum concentrate back pressure is 60 psig (4.1 barg) for the RO machine.
2.5 Feed Water Requirements
The following feed water requirements must be met before installing your new E4 machine to ensure quality permeate and extended membrane element life. Refer to Table 2.2 (E-Series Feed Water Requirements) for feed water information.

Table 2.2
E-Series Feed Water Requirements
* American Standard for Testing Materials
2.6 Transporting Pure Water (Permeate) to Point-of-Use
The pure water, or permeate, is in an aggressive state and should only be transport- ed from the machine to the point-of-use in food grade flexible nylon, stainless steel (SS) tubing, or polyvinyl chloride (PVC) material for the inlet, permeate, and concen- trate piping sizes. Refer to Connections (Table 2.1) for inlet, permeate, and concen- trate piping sizes.

2.7 Pressure Correction Factors
It is often necessary to operate RO machines with permeate back pressure. Permeate back pressure will decrease permeate production. See Table 2.3 (Pressure Correction Factors) to calculate loss of permeate.
Table 2.3 Pressure Correction
Factors

2.8 Electrical
This RO machine requires two supply voltages; the control voltage and the pump motor voltage.
2.8.1 Single-Phase Electrical
The control voltage can be connected to either a 115 VAC, 60 Hertz or 220 VAC, 50 Hertz single-phase power supply. The RO control circuit should always be installed on at least a 15 Amp, single-phase dedi- cated circuit. Reverse osmosis machines with 115 VAC, single-phase control voltage include an eight-foot (2.4 m) cord which plugs into a three-prong grounded receptacle. All machines shipped with a 220 VAC, single-phase control circuit are shipped with an eight-foot electrical cord, but customers must provide electrical plug.
2.8.2 Three-Phase Electrical
The three-phase pump motor requires a 15 AMP dedicated circuit. Always verify correct voltage and Amp rating by checking voltage tag on the starter box or by checking electrical specifications on the pump. The motor is wired for 460 Volts, 60 Hertz, three-phase voltage from the factory (Figure 2.1, Three-Phase Allen Bradley Motor Starter). The pump motor can be rewired to 208 or 230 Volts. If this is done, a wiring change must be made internally in the pump motor and a higher amperage relay and starter may need to be installed. All field wiring must comply with applicable local and national electrical codes.
After checking the voltage tag on the motor starter to ensure the available voltage and amperage are correct, connect the provided three-phase power to the motor starter (Figure 2.1). This can be done by connecting the three phase power to the top of the starter relay terminals: L1, L2, and L3. A separate, fused disconnect for the motor wiring with proper protection for the Horsepower and Amp draw of the motor is recommended. All field wiring must comply with applic- able local and national electrical codes. See Figure 2.1 for three- phase Allen Bradley Starter Hook-Up.


Figure 2.1 Three-Phase Allen Bradley Motor Starter
2.9 Machine Control
2.9.1 Economy Model
To remotely control the Economy Model (ECN) with float switches and/or pre- treatment lockout, remove the jumper between terminals 4 and 5 and wire in the float switches or pretreatment components in series. After all field wiring is complete and complies with local and national electrical codes, move onto Section 2.10 (Pretreatment for Water Purification).
2.9.2 Deluxe Model
To remotely control the Deluxe Model (DLX), with float switches and/or pre- treatment lockout, remove the jumper between terminals 2 and 3 and wire in the float switches and pretreatment in series. After all field wiring is complete

and complies with local and national electrical codes, move onto Section 2.10 (Pretreatment for Water Purification).
2.10 Pretreatment for Water Purification
A water analysis of your feed water should have been performed, as part of the plan- ning and engineering that went into developing your RO system.
The water analysis will provide information on what type of pretreatment may be required and what recovery the machine can be run at on the feed water provided. If the machine is moved to a different water source, a new water analysis should be taken before operating the machine.
Your RO is designed to operate on tap feed water with an SDI) of 5 or less. The pH should be in a range of 5.5 - 8.5. Exposure to any levels of chlorine may cause irre- versible damage to the Thin-layer composite (TLC) polyamide (PA) membrane ele- ments in your machine. Daily water checks are recommended to ensure the integri- ty of your pretreatment and RO system.
2.11 Machine Start-Up Preparation
Check the function and integrity of your pretreatment equipment. Ensure that your water softener and activated carbon filters have been leaked checked and properly flushed, before starting up your RO machine.
2.12 Machine Start-Up

Let the machine run to drain for 5 - 10 minutes. This provides a wet start-up of the pump and removes any air in the system.
After correct rotation has been verified, you are now ready to start the machine and set the flows and pressures.
Primary Pressure for Normal Operation at 77°F (25°C)
While you are doing these valve adjustments, to obtain correct flows and pressures, observe the primary or pump pressure. The pump pressure, while adjusting the orifices, should never operate outside of these ranges:

The concentrate valve is drilled, and when completely closed the machine is running at the correct concentrate flow for a 75% recovery (Table 2.4, Flow Specifications for E4-Series Machines).
If the temperature of the inlet feed water is not 77°F (25°C) use the Temperature Correction Factor Table (Technote 113). The proper adjustment of the recycle and concentrate valves are critical to the correct operation of the machine.
2.13 Temperature Correction Factor
If the temperature of the inlet feed water is not 77°F (25°C), refer to Technote 113 for Temperature Correction Factors.

2.14 Recovery
The machine flow specifications listed below are based on 25°C (77°F).
Table 2.4 Flow Specifications for
LPM/GPM
LPM/GPM
LPM/GPM
LPM/GPM
LPM/GPM
5.8/11.6
11.6/3.06
17.3/4.6
23.1/6.1
28.9/7.6
34.7/9.2
5.8/11.6
11.6/3.06
17.3/4.6
28.9/7.6
34.7/9.2
23.1/6.1
1.9/0.5
3.9/1.0
5.8/1.5
7.7/2.0
9.6/2.5
11.6/3.06
11.5/3.0
23.2/6.1
34.7/9.2
57.8/15.3
69.4/18.3
46.2/12.2
7.7/2.0
15.4/4.1
23.1/6.1
30.8/8.2
38.5/10.2
46.2/12.2

2.15 Autoflush Timer
2.15.1 Programming the Autoflush Timer
The Autoflush timer clock operates and displays in real time, but the Autoflush feature will only work when the RO machine is operating. When the machine is operating in the Autoflush Mode, the total flow through the machine is increased. This provides extra cross flow which flushes the loose foulants from the surface of the membrane elements. When the machine is operating in the Autoflush Mode a slight drop in permeate production, as well as a decrease in the primary and final pressures may be observed. An ideal way to set the timer up is to program ten Autoflush sequences, with a 10 to 15 minute duration, per 24 hours. To do this, follow the procedure below.
2.15.2 Setting Up the Autoflush Timer Clock
If the machine is in Military Time, do the following:
After pressing reset, the display may show A.M.(right). The numbered day symbols will be flash- ing ON and OFF.

If the display does not show A.M., it is in military time mode (24:00 hr.). To change to A.M./P.M. mode, press and hold the h Key and press the ± 1h Key once, A.M. will appear in the display.
If display is in A.M.. mode and military mode is desired, press and hold the h Key, press the ± 1h Key once.
Figure 2.2 Setting-Up the Correct Time
on the Autoflush Timer

If the days are flashing, it indicates the day of the week was not set when setting the time. The timer cannot be programmed unless the day of the week is entered. Each year, in the spring, press the Button to advance the time one hour (Daylight Savings Time). In the fall, press the button to set the timer back one hour (Daylight Savings Time).
2.15.3 Programming the Autoflush Timer Clock
This timer will accept up to 20 programs. Each program consists of the fol- lowing:

2.15.4 Programming Twenty-Four Hour or Seven Day Schedules
Example:

Figure 2.3 Programming the Timer
2.15.5 Changing a Program
Select the program to be changed with the Prog. Key. A new set of days may be selected with the Day Key just as in the initial programming. Hour and minute can be changed with the h and m Keys.
2.15.6 Deleting a Program
To delete one or a few programs: Press the Prog. Key until the desired pro- gram is displayed:

2.15.7 Troubleshooting the Autoflush Timer
PROBLEM: Days are flashing, pressing any Key does nothing except “Hand” Key turns output ON and OFF.
SOLUTION: Time of Day and Day of Week have not been set. See Section 2.15.3 (Setting-Up the Autoflush Timer Clock).
PROBLEM: Time of day was set while holding the Clock Key down, but days are still flashing.
SOLUTION: Current day of week was not set while holding down the Clock Key. See Setting-Up the Autoflush Timer Clock (Section 2.15.2).
PROBLEM: It is 10 A.M. and a ON program for 8 A.M. was entered, but the output is not ON.
SOLUTION: The ON or OFF was not entered as part of the program. ON or OFF must be selected.

2.16 Calibrating the Conductivity Probe
The meter is now calibrated

Figure 2.4 Conductivity Probe Display

2.17 Operation and Maintenance
The operation and maintenance of an E-Series RO machine requires regular data recording and routine preventative maintenance. It cannot be emphasized enough the importance of filling out the Daily Log Sheet (Technote 106) during each operat- ing shift. A Start-Up Data Sheet (Technote 105) should have been completed at start- up containing pertinent facts on the operation of your machine. These two records are invaluable in diagnosing the performance of the equipment, and must be kept for reference. If you have questions concerning the operation of your machine or the method of data recording, contact the manufacturer.
Three preventative maintenance procedures, which must be done on a regular basis, are as follows:
2.17.1 Daily Flushing for the Economy Model
If your E4-Series machine is an ECN Model it needs to be manually flushed daily. The DLX E4-Series machine is equipped with an Autoflush Timer (Section 2.15, Autoflush Timer). A daily manual flush must be performed. To flush the machine:
2.17.2 Daily Flushing for the Deluxe Model
The DLX Model machine includes an Autoflush Timer Option. The Autoflush Timer Option automatically flushes the machine at preset intervals.

2.18 Pre-filter Cartridge
A 5 micron pre-filter cartridge is factory installed to protect the membrane elements and valves from particles, which may be in the feed water. To order replacements, see the Spare Parts List (Technote 118, P/N 1233377).
A pressure drop across the filter of 8 psi (0.55 bar) or more during operation indicates that the pre-filters cartridge(s) need changing. Use only GE approved filters rated for 5 microns or less. Do not attempt to clean used filters.
2.19 Membrane Element Cleaning
GE recommends that you clean your RO every quarter, depending on the quality of your feed water. Cleaning of the membrane elements is vital because contaminants can build up on the membrane element surfaces, reducing the permeate flow rate and affecting the quality of the permeate.
2.19.1 Step Wise Cleaning
This RO machine and many others have a centrifugal pump on them. Centrifugal pumps are not designed to draw water. They are designed to operate with flooded suction only. The manufacturer recommends using a Clean-In-Place (CIP), or booster pump, to provide water pressure and flow to the RO machine pump from the CIP container.
2.19.2 Procedure to Clean with a CIP Pump

When set properly, the RO machine, the CIP pump, and the CIP con- tainer should be assembled in a loop configuration to recirculate the water through the machine and back to the container during clean- ing. The size of the CIP container should be a minimum of three times the permeate rate.

Figure 2.5 Clean-In-Place Pump
With the machine set-up in the CIP configuration and the cleaning solution mixed in the container, you are now ready to start the CIP process. Follow the Steps below.
and Tank Hook-Up

2.20 Suction Cleaning
GE does not recommend the suction cleaning method to clean the E4-Series RO machine. If using suction cleaning, reference cleaning with a CIP pump above (Section 2.19.2, Procedure to Clean with a CIP Pump).
You will begin to hear the RO pump draw the CIP solution into the machine and circulate it back into the CIP tank. After achieving prime, observe the RO closely to ensure that you do not loose pump prime, which may result in pump damage.

2.21 Changing Out Membrane Elements
CAUTION: Replacement membrane elements are shipped from the factory in a plastic bag with a small amount of bactericide solution to prevent bio- logical growth. When installing the membrane elements, always pro- vide adequate ventilation and wear gloves while handling the mem- brane elements as recommended. The membrane elements must be kept moist at all times in to prevent possible damage to the mem- brane element material.
2. Load the down flow membrane elements first, by inserting the membrane element into the membrane element housing with the brine seal end of the membrane element up. Slowly turn the membrane element as you lower it into the membrane element housing. As you reach the bottom of the hous- ing slowly guide the PVC stem or stinger on the end of the membrane element into the head of the end cap. As the membrane element slides into the hous- ing the brine seal will be on the top.

The machine is ready for start-up.

2.22 Troubleshooting
This troubleshooting guide can assist you in identifying common operating problems you may experience with your machine. Many of these problems can be easily corrected by the operator, however, for those that persist or are not understood, you should contact the GE Customer Support Center. Have the following information available when calling the Customer Support Center:
T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSE
SOLUTION
Insufficient feed water pressure
Open the feed pressure, open the
feed water valve, check for
Replace the cartridge.
Close the concentrate valve, check the permeate and concentrate flow
rates and adjust if necessary. Excessive permeate flow may indi-
cate a damaged O-ring.
Dirty or fouled membrane
Flush and clean the membrane
elements.
Solenoid valve not opening
Clean or replace the solenoid valve.

T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSE
SOLUTION
Switch any two of the three-phase
leads to the motor starter.
Check the fuses or circuit breaker,
measure the voltage.
Pump not operating correctly
See pump instructions.
See possible causes for low
pressure.
Dirty or fouled membrane
Flush and clean membrane
Operating on cold water less
Install a hot/cold feed water tem- pering valve if more permeate flow is needed. Operate with a feedwa-
ter temperature of 72° - 75°F
(22° - 25°C).
Install membrane elements in the
direction of fluid flow. Flush and clean the machine immediately. Membrane elements with damaged
concentrate seals should be cleaned and may be returned for
repair.
Check the flow rate manually with a
stop watch and calibrated
container.

T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSE
SOLUTION
Low concentrate flow rate, normal or higher
Remove the concentrate valve step
and/or disassemble the plumbing.
Examine the concentrate line for
obstructions or kinks, repair or
replace the tubing.
Check the flow rate manually with a
stop watch and calibrated
container.
Disassemble and clean the
plumbing to the valve
Recycle or concentrate valve
Disassemble the plumbing to the recycle valve and remove foreign
particles. Check the concentrate
valve stem.
Replace or calibrate the gauge as
required.
See possible causes for low
permeate rate.
Check for blockage of the concen- trate flow at the inlets and outlets of
[over 50 psig (3.0 barg)] (high primary pressure -
the membrane element housings.

T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSE
SOLUTION
Flush and clean the membrane
[over 50 psig (3.0 barg)] (high primary pressure -
Severely fouled or dirty
Flush the machine then clean it with
detergent.
Water flowing when machine is turned OFF
Inlet solenoid valve not closing
Clean or replace the valve. Clean the membrane elements with deter-
gent immediately. Water must not
pass through the inlet when the
machine is OFF.
Dirty or fouled membrane
Flush and clean the membrane
O-ring seal broken or damaged
Replace the O-ring, check the seal-
ing surfaces on the O-ring groove,
interconnectors and end caps.
Replace the damaged parts.
Change in incoming water
Open the concentrate valve and flush. Test the water for pH, hard- ness, TDS and iron content. A water
analysis should be sent to GE
Infrastructure for review.
Calibrate the monitor with a DS
standard solution or check the readings with another conductivity meter. Replace or clean the probe. Check the connections between the
probe and monitor.

T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSE
SOLUTION
Switch ON, unit not
Pressurized storage switch or
Check the permeate back pressure
float switch has cut power to
or position of float in the storage
tank.
Fluid temperature higher than 100F (38C) or thermal overload in motor
Allow the machine to cool; check the feed water supply and/or amp
draw to the motor.
No power to machine
Check the fuses or circuit breakers,
measure the voltage.
Motor and/or pump not
See the pump instructions. Contact GE Infrastructure for possible repair
or replacement.
Alarm condition has turned
Restart the machine by pushing the
alarm bypass. Check all possible alarm conditions: inlet pressure or
Motor starter overloaded, heater
Turn the switch OFF. Rest the heater(s). Check the motor amp
draw and the line voltage.
Replace the relay.



For more information call 952-933-2277 or 800-848-1750 in the U.S., or visit www.gewater.com.
North American Sales Euro/Africa Sales Asia/Pacific Sales 5951 Clearwater Drive 230 rue Robert Schurman 1044/8 SOI 44/2 Minnetonka, MN ZA des Uselles Sukhumvit Road Parkanog 55343-8995 77350 Le Mée sur Seine Bangkok 10110 USA FRANCE THAILAND (952) 933-2277 Phone +33 1 64 10 2000 Phone +66 2 38 14213 Phone (952) 933-0141 Fax +33 1 64 10 3747 Fax +66 2 39 18183 Fax
© 2005, General Electric Company. All rights reserved. P/N 1161875 Rev. D