OSMONICS E4, E4LE, EZ4 SERIES

TM

WATER PURIFICATION

MACHINES

GE E4LE — TM diagram (page 1)
Fig. 1

INSTALLATION, OPERATION,

AND MAINTENANCE

MANUAL

GE E4LE — INSTALLATION, OPERATION, diagram (page 1)
Fig. 2

GE Infrastructure Water & Process Technologies

Page 2 of the GE E4LE user manual — OSMONICS E4, E4LE, EZ4 SERIES
Page 2 · click to enlarge
Page 2
Page 2 of the GE E4LE user manual — OSMONICS E4, E4LE, EZ4 SERIES
Page 3 of the GE E4LE user manual — OSMONICS E4, E4LE, EZ4 SERIES
Page 3 · click to enlarge
Page 3
Page 3 of the GE E4LE user manual — OSMONICS E4, E4LE, EZ4 SERIES
Page 4 of the GE E4LE user manual — LIST OF TABLES
Page 4 · click to enlarge
Page 4

2.17 Operation and Maintenance 16 2.17.1 Daily Flushing for the Economy Model 16 2.17.2 Daily Flushing for the Deluxe Model 16 2.18 Pre-Filter Cartridge 17 2.19 Membrane Element Cleaning 17 2.19.1 Step Wise Cleaning 17 2.19.2 Procedure to Clean with a CIP Pump 17 2.20 Suction Cleaning 19 2.21 Changing Out Membrane Elements 20 2.22 Troubleshooting 22

LIST OF FIGURES

2.1 Three-Phase Allen Bradley Motor Starter 6 2.2 Setting-Up the Correct Time on the Autoflush Timer 11 2.3 Programming the Timer 13 2.4 Conductivity Probe Display 15 2.5 Clean-In-Place Pump and Tank Hook-Up 18

LIST OF TABLES

2.1 Connections 1 2.2 E-Series Feed Water Requirements 3 2.3 Pressure Correction Factors 4 2.4 Flow Specifications for E4-Series Machines 10

Page · Figure Description · Table Description

Page 5 of the GE E4LE user manual — LIST OF FIGURES
Page 5 · click to enlarge
Page 5
Page 5 of the GE E4LE user manual — LIST OF FIGURES
Page 6 of the GE E4LE user manual — 2.0 INSTALLATION
Page 6 · click to enlarge
Page 6

2.0 INSTALLATION

2.1 Mounting the Unit

When installing your new GE Infrastructure Water & Process Technologies reverse osmosis (RO) machine, allow at least 45-inches (114 cm) above the machine for mem- brane element removal and loading. If space is not available, the entire membrane element housing can be removed for membrane element change outs. If the mem- brane element housings are to be removed to change out the membrane elements, at least 6-inches (15.2 cm) is required at the end of each membrane element housing and 24-inches (61 cm) behind the machine.

2.2 Plumbing

The feed water source must be able to provide water quantity and pressures to main-

tain an operating feed water pressure of 30 - 60 psig (2.1 - 4.1 barg). If the feed water pressure with the machine is in excess of 60 psig (4.1 barg) or fluctuates by more than 5 psig (0.34 barg) a pressure regulator should be installed up stream of the machine Inlet. If proper water pressure cannot be maintained to the RO, a booster pump may need to be installed in front of the pretreatment to provide the proper water quantity and pressure for the operation of the machine.

Table 2.1 Connections

E4/EZ4/E4LE* MACHINEINLET inches (cm)PERMEATE inches (cm)CONCENTRATE inches (cm) 22000.75 (1.90)0.50 (1.27)0.50 (1.27) 44000.75 (1.90)0.50 (1.27)0.50 (1.27) 66000.75 (1.90)0.50 (1.27)0.50 (1.27) 88000.75 (1.90)0.75 (1.90)0.75 (1.90) 110000.75 (1.90)0.75 (1.90)0.75 (1.90) 132000.75 (1.90)0.75 (1.90)0.75 (1.90)

* Low Energy Membrane Elements

Page 7 of the GE E4LE user manual — 2.0 INSTALLATION
Page 7 · click to enlarge
Page 7

2.3 Installing Clean-In-Place Valves

When installing the CIP valves, a three-way valve should be installed in the inlet feed stream of the machine. The tees on the permeate and concentrate lines should be installed with two-way valves. All valves should be installed in a manner that will allow circulation of the cleaning chemicals through the machine and back to the CIP container during cleaning.

2.4 Concentrate Outlet Connections

Connect proper size drain line to the concentrate outlet (Table 2.1) and run to an open drain. The drain capacity needs to be large enough to properly drain the feed water flow of the RO. The maximum concentrate back pressure is 60 psig (4.1 barg) for the RO machine.

2.5 Feed Water Requirements

The following feed water requirements must be met before installing your new E4 machine to ensure quality permeate and extended membrane element life. Refer to Table 2.2 (E-Series Feed Water Requirements) for feed water information.

Page 8 of the GE E4LE user manual — 2.0 INSTALLATION
Page 8 · click to enlarge
Page 8

Table 2.2

E-Series Feed Water Requirements

TemperatureT Liypical: 50° - 85°F (10° - 29°C) mits: 33° - 104°F (0.16° - 40°C) Inlet PressureMinimum: 30 psig (2.1 barg) Maximum: 60 psig (4.1 barg) Chlorine (continuous feed)0parts per million (ppm) Operating pH5.5 - 8.5 Silt Density Index (SDI)Less than or equal to 5 to minimize membrane element fouling and extend cleaning intervals. Refer to ASTM* standard D4189.

* American Standard for Testing Materials

2.6 Transporting Pure Water (Permeate) to Point-of-Use

The pure water, or permeate, is in an aggressive state and should only be transport- ed from the machine to the point-of-use in food grade flexible nylon, stainless steel (SS) tubing, or polyvinyl chloride (PVC) material for the inlet, permeate, and concen- trate piping sizes. Refer to Connections (Table 2.1) for inlet, permeate, and concen- trate piping sizes.

Page 9 of the GE E4LE user manual — 2.0 INSTALLATION
Page 9 · click to enlarge
Page 9

2.7 Pressure Correction Factors

It is often necessary to operate RO machines with permeate back pressure. Permeate back pressure will decrease permeate production. See Table 2.3 (Pressure Correction Factors) to calculate loss of permeate.

Table 2.3 Pressure Correction

BACK PRESSURE% LOSS OF PERMEATE FLOWPRESSURE CORRECTION FACTOR (PCF) 10 psig (0.7 barg)E4/EZ4E4LEE4/EZ4E4LE 5%10%0.950.90 20 psig (1.4 barg)10%20%0.900.80 30 psig (2.0 barg)15%30%0.800.70 40 psig (2.7 barg)20%40%0.700.60 50 psig (3.4 barg)25%50%0.600.50 60 psig (4.1 barg)30%60%0.500.40

Factors

Page 10 of the GE E4LE user manual — 2.0 INSTALLATION
Page 10 · click to enlarge
Page 10

2.8 Electrical

This RO machine requires two supply voltages; the control voltage and the pump motor voltage.

2.8.1 Single-Phase Electrical

The control voltage can be connected to either a 115 VAC, 60 Hertz or 220 VAC, 50 Hertz single-phase power supply. The RO control circuit should always be installed on at least a 15 Amp, single-phase dedi- cated circuit. Reverse osmosis machines with 115 VAC, single-phase control voltage include an eight-foot (2.4 m) cord which plugs into a three-prong grounded receptacle. All machines shipped with a 220 VAC, single-phase control circuit are shipped with an eight-foot electrical cord, but customers must provide electrical plug.

2.8.2 Three-Phase Electrical

The three-phase pump motor requires a 15 AMP dedicated circuit. Always verify correct voltage and Amp rating by checking voltage tag on the starter box or by checking electrical specifications on the pump. The motor is wired for 460 Volts, 60 Hertz, three-phase voltage from the factory (Figure 2.1, Three-Phase Allen Bradley Motor Starter). The pump motor can be rewired to 208 or 230 Volts. If this is done, a wiring change must be made internally in the pump motor and a higher amperage relay and starter may need to be installed. All field wiring must comply with applicable local and national electrical codes.

After checking the voltage tag on the motor starter to ensure the available voltage and amperage are correct, connect the provided three-phase power to the motor starter (Figure 2.1). This can be done by connecting the three phase power to the top of the starter relay terminals: L1, L2, and L3. A separate, fused disconnect for the motor wiring with proper protection for the Horsepower and Amp draw of the motor is recommended. All field wiring must comply with applic- able local and national electrical codes. See Figure 2.1 for three- phase Allen Bradley Starter Hook-Up.

Page 11 of the GE E4LE user manual — 2.0 INSTALLATION
Page 11 · click to enlarge
Page 11
GE E4LE — 2.0 INSTALLATION diagram (page 11)
Fig. 3

Figure 2.1 Three-Phase Allen Bradley Motor Starter

2.9 Machine Control

2.9.1 Economy Model

To remotely control the Economy Model (ECN) with float switches and/or pre- treatment lockout, remove the jumper between terminals 4 and 5 and wire in the float switches or pretreatment components in series. After all field wiring is complete and complies with local and national electrical codes, move onto Section 2.10 (Pretreatment for Water Purification).

2.9.2 Deluxe Model

To remotely control the Deluxe Model (DLX), with float switches and/or pre- treatment lockout, remove the jumper between terminals 2 and 3 and wire in the float switches and pretreatment in series. After all field wiring is complete

Page 12 of the GE E4LE user manual — STEPS
Page 12 · click to enlarge
Page 12

and complies with local and national electrical codes, move onto Section 2.10 (Pretreatment for Water Purification).

2.10 Pretreatment for Water Purification

A water analysis of your feed water should have been performed, as part of the plan- ning and engineering that went into developing your RO system.

The water analysis will provide information on what type of pretreatment may be required and what recovery the machine can be run at on the feed water provided. If the machine is moved to a different water source, a new water analysis should be taken before operating the machine.

Your RO is designed to operate on tap feed water with an SDI) of 5 or less. The pH should be in a range of 5.5 - 8.5. Exposure to any levels of chlorine may cause irre- versible damage to the Thin-layer composite (TLC) polyamide (PA) membrane ele- ments in your machine. Daily water checks are recommended to ensure the integri- ty of your pretreatment and RO system.

2.11 Machine Start-Up Preparation

Check the function and integrity of your pretreatment equipment. Ensure that your water softener and activated carbon filters have been leaked checked and properly flushed, before starting up your RO machine.

2.12 Machine Start-Up

STEPS

1. Turn the feed water supply ON, while checking for leaks in the pretreatment and inlet feed water lines.
2. Check to ensure power to the motor is de-energized and the ON/OFF button on the machine is in the OFF position.
3. Plug in the factory-supplied power for the control voltage.
4. For initial start-up, redirect the permeate and concentrate lines to the drain.
5. Open the concentrate and recycle flow control valves two complete turns. These valves are positioned on the flow control plumbing in the top right rear section of the machine.
Page 13 of the GE E4LE user manual — STEPS
Page 13 · click to enlarge
Page 13
6. Turn the ON/OFF button on the machine ON. System will open allowing water to flow through the machine to the drain through the permeate and concentrate CIP valves.

Let the machine run to drain for 5 - 10 minutes. This provides a wet start-up of the pump and removes any air in the system.

7. Turn the ON/OFF button on the machine to the OFF position.
8. Re-energize the pump power and trigger the ON/OFF button on the machine to check rotation of the pump motor. Observing from the back of the pump motor, pump rotation should be clockwise. If rotation is wrong, de-energize the pump voltage from the source and switch any two of the three-phase wires coming in on top of the three-phase starter. Re-energize the pump voltage and re-check, to ensure correct rotation for the start-up and operation of your machine.

After correct rotation has been verified, you are now ready to start the machine and set the flows and pressures.

9. With the recycle and concentrate orifices still two (2) turns open and adequate feed water available, start the machine by turning the ON/OFF button to the ON position.
10. As the pump starts to build pressure, begin to adjust the orifices in the following manner: start by slowly closing the concentrate orifice while slowly opening the recycle valve.

Primary Pressure for Normal Operation at 77°F (25°C)

E4-Series220 psi (15.2 bar) at 77°F (25°C)
EZ4/E4LE-Series115 psi (7.9 bar) at 77°F (25°C)

While you are doing these valve adjustments, to obtain correct flows and pressures, observe the primary or pump pressure. The pump pressure, while adjusting the orifices, should never operate outside of these ranges:

E4-Series Range190 - 275 psi (13.1 - 19.0 bar)
EZ4/E4LE-Series Range100 - 140 psi (6.9 - 9.6 bar)
Page 14 of the GE E4LE user manual — STEPS
Page 14 · click to enlarge
Page 14

The concentrate valve is drilled, and when completely closed the machine is running at the correct concentrate flow for a 75% recovery (Table 2.4, Flow Specifications for E4-Series Machines).

If the temperature of the inlet feed water is not 77°F (25°C) use the Temperature Correction Factor Table (Technote 113). The proper adjustment of the recycle and concentrate valves are critical to the correct operation of the machine.

2.13 Temperature Correction Factor

If the temperature of the inlet feed water is not 77°F (25°C), refer to Technote 113 for Temperature Correction Factors.

Page 15 of the GE E4LE user manual — LPM/GPM
Page 15 · click to enlarge
Page 15

2.14 Recovery

The machine flow specifications listed below are based on 25°C (77°F).

Table 2.4 Flow Specifications for

LPM/GPM

LPM/GPM

LPM/GPM

LPM/GPM

LPM/GPM

LPM/GPM

5.8/11.6

11.6/3.06

17.3/4.6

23.1/6.1

28.9/7.6

34.7/9.2

5.8/11.6

11.6/3.06

17.3/4.6

28.9/7.6

34.7/9.2

23.1/6.1

1.9/0.5

3.9/1.0

5.8/1.5

7.7/2.0

9.6/2.5

11.6/3.06

11.5/3.0

23.2/6.1

34.7/9.2

57.8/15.3

69.4/18.3

46.2/12.2

7.7/2.0

15.4/4.1

23.1/6.1

30.8/8.2

38.5/10.2

46.2/12.2

Show 19 more labels / short text on this page
E4-Series Machines · E4-Series · Recovery · 50-75% · 50-75% · 50-75% · 50-75% · 50-75% · 50-75% · Units · Permeate Rate · Concentrate · Rate (50%) · Concentrate · Rate (75%) · Feed Rate · (50%) · Feed Rate · (75%)
Page 16 of the GE E4LE user manual — SELECTING AM/PM OR MILITARY TIME
Page 16 · click to enlarge
Page 16

2.15 Autoflush Timer

2.15.1 Programming the Autoflush Timer

The Autoflush timer clock operates and displays in real time, but the Autoflush feature will only work when the RO machine is operating. When the machine is operating in the Autoflush Mode, the total flow through the machine is increased. This provides extra cross flow which flushes the loose foulants from the surface of the membrane elements. When the machine is operating in the Autoflush Mode a slight drop in permeate production, as well as a decrease in the primary and final pressures may be observed. An ideal way to set the timer up is to program ten Autoflush sequences, with a 10 to 15 minute duration, per 24 hours. To do this, follow the procedure below.

2.15.2 Setting Up the Autoflush Timer Clock

If the machine is in Military Time, do the following:

SELECTING AM/PM OR MILITARY TIME

After pressing reset, the display may show A.M.(right). The numbered day symbols will be flash- ing ON and OFF.

GE E4LE — SELECTING AM/PM OR MILITARY TIME diagram (page 16)
Fig. 4

If the display does not show A.M., it is in military time mode (24:00 hr.). To change to A.M./P.M. mode, press and hold the h Key and press the ± 1h Key once, A.M. will appear in the display.

If display is in A.M.. mode and military mode is desired, press and hold the h Key, press the ± 1h Key once.

Figure 2.2 Setting-Up the Correct Time

on the Autoflush Timer

Page 17 of the GE E4LE user manual — STEPS
Page 17 · click to enlarge
Page 17

STEPS

1. While holding down the Clock Key ( ⊗ ), press the h key to advance to the current minute.
2. While holding down the Clock Key ( ⊗ ), press the h key to advance to the current minute.
3. While holding down the Clock Key ( ⊗ ), press the h key to advance to the current minute.

If the days are flashing, it indicates the day of the week was not set when setting the time. The timer cannot be programmed unless the day of the week is entered. Each year, in the spring, press the Button to advance the time one hour (Daylight Savings Time). In the fall, press the button to set the timer back one hour (Daylight Savings Time).

2.15.3 Programming the Autoflush Timer Clock

This timer will accept up to 20 programs. Each program consists of the fol- lowing:

1. ON/OFF Command 2. Time of Day (hours and minutes) 3. Single day or multiple days
Page 18 of the GE E4LE user manual — SELECTING AM/PM OR MILITARY TIME
Page 18 · click to enlarge
Page 18

2.15.4 Programming Twenty-Four Hour or Seven Day Schedules

Example:

GE E4LE — SELECTING AM/PM OR MILITARY TIME diagram (page 18)
Fig. 5

Figure 2.3 Programming the Timer

2.15.5 Changing a Program

Select the program to be changed with the Prog. Key. A new set of days may be selected with the Day Key just as in the initial programming. Hour and minute can be changed with the h and m Keys.

2.15.6 Deleting a Program

To delete one or a few programs: Press the Prog. Key until the desired pro- gram is displayed:

1. Press the m Key to :59 and press once again to blank out.
2. Press h Key to 11 P.M. and press once again to blank out.
3. Press the Clock Key, ( ⊗ ) display will flash for several seconds and then enter the Run Mode.
4. Using the Reset Key will delete ALL programs, the time of day, and day of the week.
Page 19 of the GE E4LE user manual — SELECTING AM/PM OR MILITARY TIME
Page 19 · click to enlarge
Page 19

2.15.7 Troubleshooting the Autoflush Timer

PROBLEM: Days are flashing, pressing any Key does nothing except “Hand” Key turns output ON and OFF.

SOLUTION: Time of Day and Day of Week have not been set. See Section 2.15.3 (Setting-Up the Autoflush Timer Clock).

PROBLEM: Time of day was set while holding the Clock Key down, but days are still flashing.

SOLUTION: Current day of week was not set while holding down the Clock Key. See Setting-Up the Autoflush Timer Clock (Section 2.15.2).

PROBLEM: It is 10 A.M. and a ON program for 8 A.M. was entered, but the output is not ON.

SOLUTION: The ON or OFF was not entered as part of the program. ON or OFF must be selected.

Page 20 of the GE E4LE user manual — STEPS
Page 20 · click to enlarge
Page 20

2.16 Calibrating the Conductivity Probe

STEPS

1. Make sure the calibration meter is in Measure Mode (with the MEAS LED light ON).
2. Immerse the Conductivity Probe in a 13.00 microSiemens (mS) prepared solution.
3. Immerse and agitate Conductivity Probe, and wait for the reading to stabilize.
4. Calibrate the meter by adjusting the CAL adjustment screw until the Liquid Crystal Display (LCD) display reads 13 mS of the solution.

The meter is now calibrated

GE E4LE — STEPS diagram (page 20)
Fig. 6

Figure 2.4 Conductivity Probe Display

Page 21 of the GE E4LE user manual — SELECTING AM/PM OR MILITARY TIME
Page 21 · click to enlarge
Page 21

2.17 Operation and Maintenance

The operation and maintenance of an E-Series RO machine requires regular data recording and routine preventative maintenance. It cannot be emphasized enough the importance of filling out the Daily Log Sheet (Technote 106) during each operat- ing shift. A Start-Up Data Sheet (Technote 105) should have been completed at start- up containing pertinent facts on the operation of your machine. These two records are invaluable in diagnosing the performance of the equipment, and must be kept for reference. If you have questions concerning the operation of your machine or the method of data recording, contact the manufacturer.

Three preventative maintenance procedures, which must be done on a regular basis, are as follows:

1. Change the pre-filter cartridges as needed. Pressure drop across the pre-filters should not exceed 8 psi (0.6 bar).
2. Clean the RO membrane elements with approved cleaners at least quarterly, depending on feed water quality.
3. Flush the RO machine daily.

2.17.1 Daily Flushing for the Economy Model

If your E4-Series machine is an ECN Model it needs to be manually flushed daily. The DLX E4-Series machine is equipped with an Autoflush Timer (Section 2.15, Autoflush Timer). A daily manual flush must be performed. To flush the machine:

1. With the machine running, open the concentrate valve 1/2 - 3/4 turn.
2. Allow the machine to operate with the concentrate valve open (Step 1) for 10 - 15 minutes.
3. After 10 - 15 minutes, return the concentrate valve to its previous setting, and return to normal operation.

2.17.2 Daily Flushing for the Deluxe Model

The DLX Model machine includes an Autoflush Timer Option. The Autoflush Timer Option automatically flushes the machine at preset intervals.

Page 22 of the GE E4LE user manual — STEPS
Page 22 · click to enlarge
Page 22

2.18 Pre-filter Cartridge

A 5 micron pre-filter cartridge is factory installed to protect the membrane elements and valves from particles, which may be in the feed water. To order replacements, see the Spare Parts List (Technote 118, P/N 1233377).

A pressure drop across the filter of 8 psi (0.55 bar) or more during operation indicates that the pre-filters cartridge(s) need changing. Use only GE approved filters rated for 5 microns or less. Do not attempt to clean used filters.

2.19 Membrane Element Cleaning

GE recommends that you clean your RO every quarter, depending on the quality of your feed water. Cleaning of the membrane elements is vital because contaminants can build up on the membrane element surfaces, reducing the permeate flow rate and affecting the quality of the permeate.

2.19.1 Step Wise Cleaning

This RO machine and many others have a centrifugal pump on them. Centrifugal pumps are not designed to draw water. They are designed to operate with flooded suction only. The manufacturer recommends using a Clean-In-Place (CIP), or booster pump, to provide water pressure and flow to the RO machine pump from the CIP container.

2.19.2 Procedure to Clean with a CIP Pump

STEPS

1. With the machine running, open the CIP permeate valve, close the permeate service valve and fill the CIP tank with permeate water. When the container is filled to desired level, turn machine OFF.
2. Add and mix up the cleaners in the CIP container. Please use only PA membrane element compatible cleaners.
3. Close the inlet feed water supply valve to the machine and open the CIP inlet feed water to the CIP container.
4. Close the permeate valve to point of use and also the concentrate valve drain.
5. Open the CIP valves, allowing permeate and concentrate to return to the CIP container.
Page 23 of the GE E4LE user manual — STEPS
Page 23 · click to enlarge
Page 23

When set properly, the RO machine, the CIP pump, and the CIP con- tainer should be assembled in a loop configuration to recirculate the water through the machine and back to the container during clean- ing. The size of the CIP container should be a minimum of three times the permeate rate.

GE E4LE — SELECTING AM/PM OR MILITARY TIME diagram (page 23)
Fig. 7

Figure 2.5 Clean-In-Place Pump

With the machine set-up in the CIP configuration and the cleaning solution mixed in the container, you are now ready to start the CIP process. Follow the Steps below.

STEPS

1. Check to ensure that the feed, permeate, and concentrate valves and line are open and unrestricted in the tank loop.
2. Start the CIP and RO machine pumps together. As they start up, observe all RO machine pressures and flows.
3. Recycle the cleaning solution for about 15 minutes. Damage may result to membrane elements if the temperature of the CIP solution exceeds 105°F (40°C). If the water temperature exceeds 100°F (38°C), place bags of ice into the CIP container to absorb the extra heat.
4. After recirculating the cleaner for 15 minutes, shut down the RO and the CIP pump.

and Tank Hook-Up

Page 24 of the GE E4LE user manual — STEPS
Page 24 · click to enlarge
Page 24
5. Let the CIP solution dwell in the machine for 20 minutes.
6. After the 20 minute dwell time, start the CIP recirculation process again for 10 minutes.
7. After the 10 minute recirculation time is complete, de-energize the machine. Then, open the inlet water line and route the concentrate and permeate lines to the drain.
8. Start the RO machine and flush to drain for 20 minutes. Verify the permeate quality is good before returning to normal operation.
9. After permeate quality is verified as good, route the permeate to point of use and concentrate to drain. You are now ready for normal operation.

2.20 Suction Cleaning

GE does not recommend the suction cleaning method to clean the E4-Series RO machine. If using suction cleaning, reference cleaning with a CIP pump above (Section 2.19.2, Procedure to Clean with a CIP Pump).

STEPS

1. Arrange the RO and the CIP container in a closed loop situation with the cleaning solution, reference Section 2.19 (Membrane Element Cleaning).
2. Move the L1 and L2 wires on the pressure switch across to the motor terminals (Figure 2.1, Three Phase Allan Bradley Motor Starter). The wires can also be temporally jumped.
3. Open the inlet feed valve.
4. Start the RO machine
5. As the machine starts up on inlet feed water, slowly close the inlet feed water valve while slowing opening the feed water valve to the CIP tank.

You will begin to hear the RO pump draw the CIP solution into the machine and circulate it back into the CIP tank. After achieving prime, observe the RO closely to ensure that you do not loose pump prime, which may result in pump damage.

6. Refer to the CIP cleaning procedure (Section 2.19.2) for cleaning steps.
Page 25 of the GE E4LE user manual — STEPS
Page 25 · click to enlarge
Page 25
7. After suction cleaning cycle is complete, reopen inlet water and flush machine to drain for twenty minutes.
8. After permeate quality is verified as good, return machine to normal operation mode.

2.21 Changing Out Membrane Elements

CAUTION: Replacement membrane elements are shipped from the factory in a plastic bag with a small amount of bactericide solution to prevent bio- logical growth. When installing the membrane elements, always pro- vide adequate ventilation and wear gloves while handling the mem- brane elements as recommended. The membrane elements must be kept moist at all times in to prevent possible damage to the mem- brane element material.

STEPS

1. Remove the top end caps and clamps from the membrane element housings. Lubricate all O-rings and brine seals, and the PVC membrane element stems (stingers) with a non-petroleum based lubricate (i.e., glycerin or poly water).

2. Load the down flow membrane elements first, by inserting the membrane element into the membrane element housing with the brine seal end of the membrane element up. Slowly turn the membrane element as you lower it into the membrane element housing. As you reach the bottom of the hous- ing slowly guide the PVC stem or stinger on the end of the membrane element into the head of the end cap. As the membrane element slides into the hous- ing the brine seal will be on the top.

3. Next, load the up flow membrane elements, by lubricating all brine seals, Orings, and the membrane element stingers. With the up flow membrane element and the brine seal will be on the bottom of the membrane element. Turn the membrane element slowly as you lower it down into the housing. As with the down flow membrane element, one must slowly guide the PVC stinger on the end of the membrane element into the end cap.
4. Reinstall the end caps by using non-petroleum based lubricant to lubricate the O-ring inside the end cap. Reinstall the end cap on the membrane element by first, aligning the stinger into the hole in the end cap and then turn the end cap slowly clockwise, as you push it down into the membrane element housing.
Page 26 of the GE E4LE user manual — SELECTING AM/PM OR MILITARY TIME
Page 26 · click to enlarge
Page 26
5. Reattach the housing clamp and tighten.
6. Next reconnect the permeate and concentrate lines.

The machine is ready for start-up.

Page 27 of the GE E4LE user manual — PROBLEM
Page 27 · click to enlarge
Page 27

2.22 Troubleshooting

This troubleshooting guide can assist you in identifying common operating problems you may experience with your machine. Many of these problems can be easily corrected by the operator, however, for those that persist or are not understood, you should contact the GE Customer Support Center. Have the following information available when calling the Customer Support Center:

1. Machine installation date
2. Model number
3. Serial number
4. Weekly log sheets
5. Detailed description of problem.

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSE

SOLUTION

Insufficient feed water pressure

Open the feed pressure, open the

feed water valve, check for

Replace the cartridge.

Close the concentrate valve, check the permeate and concentrate flow

rates and adjust if necessary. Excessive permeate flow may indi-

cate a damaged O-ring.

Dirty or fouled membrane

Flush and clean the membrane

elements.

Solenoid valve not opening

Clean or replace the solenoid valve.

Show 7 more labels / short text on this page
Low Operating · Pressure · or flow · restrictions · Clogged pre-filter · High flow rates · elements
Page 28 of the GE E4LE user manual — PROBLEM
Page 28 · click to enlarge
Page 28

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSE

SOLUTION

Switch any two of the three-phase

leads to the motor starter.

Check the fuses or circuit breaker,

measure the voltage.

Pump not operating correctly

See pump instructions.

See possible causes for low

pressure.

Dirty or fouled membrane

Flush and clean membrane

Operating on cold water less

Install a hot/cold feed water tem- pering valve if more permeate flow is needed. Operate with a feedwa-

ter temperature of 72° - 75°F

(22° - 25°C).

Install membrane elements in the

direction of fluid flow. Flush and clean the machine immediately. Membrane elements with damaged

concentrate seals should be cleaned and may be returned for

repair.

Check the flow rate manually with a

stop watch and calibrated

container.

Show 15 more labels / short text on this page
Low Operating · Pump rotating backwards · (continued) · (three-phase power only) · Insufficient electrical power · Low Permeate Flow · Low operating pressure · Rate · elements · elements · than 55°F (13°C) · Membrane elements installed · backwards or damaged · concentrate seal · Flow meter inaccurate
Page 29 of the GE E4LE user manual — PROBLEM
Page 29 · click to enlarge
Page 29

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSE

SOLUTION

Low concentrate flow rate, normal or higher

Remove the concentrate valve step

and/or disassemble the plumbing.

Examine the concentrate line for

obstructions or kinks, repair or

replace the tubing.

Check the flow rate manually with a

stop watch and calibrated

container.

Disassemble and clean the

plumbing to the valve

Recycle or concentrate valve

Disassemble the plumbing to the recycle valve and remove foreign

particles. Check the concentrate

valve stem.

Replace or calibrate the gauge as

required.

See possible causes for low

permeate rate.

Check for blockage of the concen- trate flow at the inlets and outlets of

[over 50 psig (3.0 barg)] (high primary pressure -

the membrane element housings.

Show 16 more labels / short text on this page
Concentrate valve plugged · than normal pressure · Clean the valve · Concentrate outlet line · restricted · Flow meter inaccurate · High operating pressure · Dirty concentrate valve · plugged · Inaccurate pressure gauge · Restricted or reduced · permeate flow rate · Excessive pressure drop · Restricted flow after · pump outlet · low final pressure)
Page 30 of the GE E4LE user manual — PROBLEM
Page 30 · click to enlarge
Page 30

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSE

SOLUTION

Flush and clean the membrane

[over 50 psig (3.0 barg)] (high primary pressure -

Severely fouled or dirty

Flush the machine then clean it with

detergent.

Water flowing when machine is turned OFF

Inlet solenoid valve not closing

Clean or replace the valve. Clean the membrane elements with deter-

gent immediately. Water must not

pass through the inlet when the

machine is OFF.

Dirty or fouled membrane

Flush and clean the membrane

O-ring seal broken or damaged

Replace the O-ring, check the seal-

ing surfaces on the O-ring groove,

interconnectors and end caps.

Replace the damaged parts.

Change in incoming water

Open the concentrate valve and flush. Test the water for pH, hard- ness, TDS and iron content. A water

analysis should be sent to GE

Infrastructure for review.

Calibrate the monitor with a DS

standard solution or check the readings with another conductivity meter. Replace or clean the probe. Check the connections between the

probe and monitor.

Show 17 more labels / short text on this page
Excessive pressure drop · Telescoped membrane element · covering membrane element · elements · housing outlet port · low final pressure) · (continued) · membrane elements · or seating properly · Declining rejection · (high permeate · elements · elements · conductivity) · quality · Inaccurate conductivity monitor · or fouled probe
Page 31 of the GE E4LE user manual — PROBLEM
Page 31 · click to enlarge
Page 31

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSE

SOLUTION

Switch ON, unit not

Pressurized storage switch or

Check the permeate back pressure

float switch has cut power to

or position of float in the storage

tank.

Fluid temperature higher than 100F (38C) or thermal overload in motor

Allow the machine to cool; check the feed water supply and/or amp

draw to the motor.

No power to machine

Check the fuses or circuit breakers,

measure the voltage.

Motor and/or pump not

See the pump instructions. Contact GE Infrastructure for possible repair

or replacement.

Alarm condition has turned

Restart the machine by pushing the

alarm bypass. Check all possible alarm conditions: inlet pressure or

Motor starter overloaded, heater

Turn the switch OFF. Rest the heater(s). Check the motor amp

draw and the line voltage.

Replace the relay.

Show 10 more labels / short text on this page
operating · machine · Deluxe (DLX) electrical · machine shutdown · operating properly · machine OFF · motor starter overload · tripped · Timing relay defective/burned · out
Page 32 of the GE E4LE user manual — PROBLEM
Page 32 · click to enlarge
Page 32
Page 32 of the GE E4LE user manual — PROBLEM
Page 33 of the GE E4LE user manual — GE Infrastructure Water & Process Technologies
Page 33 · click to enlarge
Page 33

For more information call 952-933-2277 or 800-848-1750 in the U.S., or visit www.gewater.com.

GE Infrastructure Water & Process Technologies

North American Sales Euro/Africa Sales Asia/Pacific Sales 5951 Clearwater Drive 230 rue Robert Schurman 1044/8 SOI 44/2 Minnetonka, MN ZA des Uselles Sukhumvit Road Parkanog 55343-8995 77350 Le Mée sur Seine Bangkok 10110 USA FRANCE THAILAND (952) 933-2277 Phone +33 1 64 10 2000 Phone +66 2 38 14213 Phone (952) 933-0141 Fax +33 1 64 10 3747 Fax +66 2 39 18183 Fax

© 2005, General Electric Company. All rights reserved. P/N 1161875 Rev. D

Ask about the GE E4LE

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the GE E4LE

Be the first to ask — other owners or our team will answer.

Original document

GE E4LE manual PDF

33 pages·348 KB·Water System·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…