OSMONICS E2/EZ2 SERIES

TM

WATER PURIFICATION

MACHINES

GE E2 Series — TM diagram (page 1)
Fig. 1

INSTALLATION, OPERATION,

AND MAINTENANCE

MANUAL

GE Infrastructure Water & Process Technologies

Page 2 of the GE E2 Series user manual — Spare Parts
Page 2 · click to enlarge
Page 2

Distributor Information

DistributorContact: Phone: Fax: Email:

Machine Information

Installation DateModel Number: Serial Number:

Service Assistance

Consult the Troubleshooting Section of this manual (Section 2.19). If the problem cannot be identified and correct- ed, contact your distributor. Prior to making the call, have the following information available:

Model Number Daily Log Sheets Serial Number Operating Parameters Installation Date Description of Problem

Spare Parts

Contact your distributor to order spare parts. Refer to the Spare Parts List (Technote 109).

Page 3 of the GE E2 Series user manual — Distributor Information
Page 3 · click to enlarge
Page 3
Page 3 of the GE E2 Series user manual — Distributor Information
Page 4 of the GE E2 Series user manual — LIST OF TABLES
Page 4 · click to enlarge
Page 4

LIST OF FIGURES

2.1 Flow Control Center 6 2.2 Closed Loop Membrane Element Cleaning 11 2.3 Membrane Element Installation 13 2.4 Membrane Element Direction for Installation 14

LIST OF TABLES

2.1 E2/EZ2-Series Machine Piping Connections 1 2.2 E2/EZ2-Series Feed Water Requirements 2 2.3 E2/EZ2-Series Primary Pressure Range 5 2.4 Flow Specifications for E2/EZ2-Series Machines 7 2.5 Permeate Back Pressure Correction Factors 8

www.ge.water.com

Page · Figure Description · Table Description

Page 5 of the GE E2 Series user manual — 2.0 INSTALLATION
Page 5 · click to enlarge
Page 5

2.0 INSTALLATION

2.1 Mounting the Unit

When installing your new GE Osmonics reverse osmosis (RO) machine, allow at least 45-inches (114.3 cm) above the machine for membrane element removal and loading. If space is not available, the entire membrane element housing can be removed for membrane element change-outs. If the membrane element housings are to be removed to change-out the membrane elements, at least 25-inches (65.3 cm) is required at one end of each membrane element housing and 6-inches (15.2 cm) behind the machine.

2.2 Plumbing

The feed water source must be able to provide water quantity and pressures to maintain an

operating feed water pressure of 30 - 60 psi (2.1 - 4.1 bar). If the feed water pressure with the machine is in excess of 60 psi (4.1 bar) or fluctuates by more than 5 psi (0.34 bar) a pressure regulator should be installed upstream of the machine inlet. If prop- er water pressure cannot be maintained to the RO, a booster pump may need to be installed in front of the pretreatment to provide the proper water quantity and pressure for the oper- ation of the machine.

2.3 Plumbing Connections

Connect proper size drain line to the concentrate outlet (Table 2.1, E2/EZ2-Series Machine Piping Connections) and run to an open drain. The drain capacity needs to be large enough to properly drain the feed water flow of the RO.

Table 2.1 E2/EZ2- Series Machine

C O N N E C T I O N S Inlet inch (cm)0.38 (0.96) Permeate inch (cm)0.38 (0.96) Concentrate inch (cm)0.38 (0.96)

Piping Connections

Page 6 of the GE E2 Series user manual — 2.0 INSTALLATION
Page 6 · click to enlarge
Page 6

2.4 Feed Water Requirements

The following feed water requirements must be met before installing your E2/EZ2-Series machine to ensure quality permeate and extended membrane element life. Refer to Table 2.2 (E2/EZ2-Series Feed Water Requirements) for feed water information.

Table 2.2 E2/EZ2-Series Feed Water Requirements

TemperatureTypical: 50° - 85°F (10° - 29°C) Limits: 33° - 104°F (0.60° - 40°C) Inlet PressureMinimum: 30 psig (2.1 barg) Maximum: 60 psig (4.1 barg) Chlorine (continuous feed)0parts per million (ppm) Operating pH5.5 - 8.5 Silt Density Index (SDI)eLess than or equal to 5 to minimize membrane element fouling and xtend cleaning intervals. Refer to ASTM* Standard D4189.

* American Standard for Testing Materials

2.5 Transporting Pure Water (Permeate) to Point-of-Use

Pure water, or permeate, is in an aggressive state and should only be transported from the machine to the point-of-use in food grade flexible nylon, stainless steel (SS) tubing, or polyvinyl chloride (PVC) material for the inlet, permeate, and concentrate piping sizes.

Refer to Connections (Table 2.1, E2/EZ2-Series Machine Plumbing Connections) for inlet, permeate, and concentrate piping sizes.

Page 7 of the GE E2 Series user manual — 2.0 INSTALLATION
Page 7 · click to enlarge
Page 7

2.6 Machine Control

2.6.1 Economy Model

To remotely control the Economy Model (ECN) with float switches and/or pre- treatment lockout, remove the jumper between terminals 4 and 5 and wire in the float switches or pretreatment components in series. After all field wiring is com- plete and complies with local and national electrical codes, move onto Section 2.7 (Single-Phase Electrical).

2.6.2 Deluxe Model

To remotely control the Deluxe Model (DLX), with float switches and/or pre- treatment lockout, remove the jumper between terminals 2 and 3 and wire in the float switches and pretreatment in series. After all field wiring is complete and complies with local and national electrical codes, move onto Section 2.10 (Pretreatment for Water Purification).

2.7 Single-Phase Electrical

Always check voltage tag on the machine to ensure the correct voltage and amperage is available.

The E2/EZ2-Series machines are shipped as either 120 Volt 60 Hertz or 220 Volt 50 Hertz from the factory. Machines should always be connected to a 15 Amp single- phase dedicated circuit. The circuit provided should be a separately fused disconnect with the proper protection for the Hp and Amp draws of the machine. Reverse osmosis (RO) machines with 115 Volt circuit include an 8-foot (2.4 m) electrical cord which plugs into a single-phase outlet. All machines shipped with a 220 VAC single-phase power require- ment are shipped with an 8-foot (2.4 m) electrical cord, but customers must provide electrical plug. All field wiring must comply with applicable local and national electrical codes.

2.8 Machine Start-Up Preparations

2.8.1 Pretreatment for Water Purification

A water analysis of your feed water should have been performed, as part of the planning and engineering that went into developing your RO system.

The water analysis will provide information on what type of pretreatment may be required and what recovery the machine can be run at on the feed water provid- ed. If the machine is moved to a different water source, a new water analysis should be taken before operating the machine.

Page 8 of the GE E2 Series user manual — STEPS
Page 8 · click to enlarge
Page 8

Your RO is designed to operate on softened tap feed water with an SDI of 5 or less. The pH should be in a range of 5.5 - 8.5. Exposure to any levels of chlo- rine may cause irreversible damage to the Thin-layer composite (TLC) polyamide (PA) membrane elements in your machine. Daily water checks are recommend- ed to ensure the integrity of your pretreatment and RO system. Refer to Table 2.2 (E2/EZ2-Series Feed Water Requirements).

2.8.2 Machine Start-Up Preparation

Check the function and integrity of your pretreatment equipment. Ensure that your water softener and activated carbon filters have been leaked checked and properly flushed, before starting up your RO machine.

2.9 Machine Start-Up

STEPS

1. Turn the feed water supply to the machine ON, while checking for leaks in the pretreatment and inlet feed water lines.
2. Check to ensure power to the motor is de-energized and the ON/OFF button, on the machine, is in the ON position.
3. Plug in the factory-supplied power cord.
4. For initial start-up, redirect the permeate and concentrate lines to the drain for start-up flush.
5. Open the concentrate and recycle flow control valves two (2) complete turns. These valves are positioned on the flow control plumbing (Figure 2.1, Flow Control Center).
Page 9 of the GE E2 Series user manual — STEPS
Page 9 · click to enlarge
Page 9
6. Turn the ON/OFF button on the machine ON.
7. As the pump starts to build pressure, begin to adjust the valves in the following manner: start by slowly closing the concentrate valves while slowly opening the recycle valve (Figure 2.1, Flow Control Center).
8. After 20 - 30 minutes of flushing permeate to the drain, ensure all chemical residue has been removed before hooking up to point of use.

While operating, the pressure range should never operate outside of the pressure ranges displayed in Table 2.3 (E2/EZ2-Series Primary Pressure Range).

Table 2.3 E2/EZ2-Series Primary Pressure Range*

E2/EZ2-Series Operating Pressure220 psi (15.2 bar) Operating Range(165 - 250 psi 114. - 17.2 bar)

* Primary pressure temperature for normal operation is 77°F (25°C).

The concentrate valve is drilled, and when completely closed the machine is run- ning at the correct concentrate flow for a 75% recovery (Table 2.4, Flow Specifications for E2/EZ2-Series Machines).

If the temperature of the inlet feed water is not 77°F (25°C) use the Temperature Correction Factor Table (Technote 113). The proper adjustment of the recycle and concentrate valves are critical to the correct operation of the machine.

Page 10 of the GE E2 Series user manual — STEPS
Page 10 · click to enlarge
Page 10
9. Complete the Start-Up Data Sheet (Technote 101). The Start-Up Data Sheet and the Daily Log Sheet (Technote 106) are invaluable in diagnosing the performance of the equipment, and must be be kept for reference. If you have questions concerning the operation of your machine or the method of data recording, contact your distributor or the manufacturer.
GE E2 Series — STEPS diagram (page 10)
Fig. 2

Figure 2.1 Flow Control Center

Show 5 more labels / short text on this page
Feed Water · Inlet · Pressure Gauge · Recycle Valve · Concentrate Valve
Page 11 of the GE E2 Series user manual — STEPS
Page 11 · click to enlarge
Page 11

2.10 Recovery

The machine flow specifications listed below are based on 77°F (25°C).

Table 2.4 E2/EZ2 - Series Flow Specifications for

E2/EZ2-Series Units0375620/ 75011251400/ 16902100/ 2535 Recovery Range33 - 50%33 - 50%33 - 50%33 - 50%33 - 50% Rejection Rate95 - 98%95 - 98%95 - 98%95 - 98%95 - 98% Permeate Rate gpm (m3/h)0.3 (0.07)0.5 (0.11)0.9 (0.20)1.2 (0.27)1.8 (0.40) Concentrate Rate gpm (m3/h)0.3 - 0.2 (0.07 -0.14)0.5 - 0.3 (0.11 - 0.07)0.9 -0.6 (0.20 - 0.13)1.2 - 0.8 (0.27 - 0.54)1.8 - 1.2 (0.41 - 0.82)

Machines

Page 12 of the GE E2 Series user manual — STEPS
Page 12 · click to enlarge
Page 12

2.11 Permeate Back Pressure Correction Factors

It is often necessary to operate RO machines with permeate back pressure. Permeate back pressure will decrease permeate production. See Table 2.5 (Permeate Back Pressure Correction Factors) to calculate loss of permeate.

Table 2.5 E2/EZ2-Series Permeate Back Pressure Correction

BACK PRESSURE% LOSS OF PERMEATE FLOWPRESSURE CORRECTION FACTOR (PCF) 10 psig (0.7 barg)5%0.95 20 psig (1.4 barg)10%0.90 30 psig (2.0 barg)15%0.80 40 psig (2.7 barg)20%0.70 50 psig (3.4 barg)25%0.60 60 psig (4.1 barg)30%0.50

Factors

Page 13 of the GE E2 Series user manual — STEPS
Page 13 · click to enlarge
Page 13

2.12 Operation and Maintenance

The operation and maintenance of an E2/EZ2-Series RO machine requires regular data recording and routine preventative maintenance. It cannot be emphasized enough the importance of filling out the Daily Log Sheet (Technote 106) during each operating shift. A Start-Up Data Sheet (Technote 101) should have been completed at start-up. The Start- Up Data Sheet contains pertinent facts on the operation of your machine. These two records are invaluable in diagnosing the performance of the equipment, and must be kept for reference. If you have questions concerning the operation of your machine or the method of data recording, contact the manufacturer.

Three preventative maintenance procedures, which must be done on a regular basis, are as follows:

1. Change the pre-filter cartridges as needed.
2. The machine needs to run and flush for at least 10 minutes every 72 hours, clock time.
3. Clean the RO membrane elements with approved cleaners at least quarterly, depending on feed water quality.

2.13 Pre-filter Cartridge

A 1 micron pre-filter cartridge is factory installed to protect the membrane elements and valves from particles, which may be in the feed water. To order replacements, see the Spare Parts List (Technote 109).

A pressure drop across the filter of 8 psi (0.55 bar) or more during operation indicates that the pre-filter cartridge(s) need changeing. Use only GE approved filters rated at 2 microns or less. Refer to Technote 109 (Spare Parts List) for pre-filter cartridge replacements. Do not attempt to clean used pre-filter cartridges.

2.14 Daily Flushing

A manually flush of the E2/EZ2-Series must be done machine daily.

To flush the machine:

STEPS

1. With the machine running, open the concentrate valve 1/2 -3/4 of a turn (Figure 2.1, Flow Control Center).
Page 14 of the GE E2 Series user manual — STEPS
Page 14 · click to enlarge
Page 14
2. Allow the machine to operate with the concentrate valve open 1/2 - 3/4of a turn (Step 1) for 10 - 15 minutes.
3. After 10 - 15 minutes, return the concentrate valve to its previous setting, and return to normal operation.

2.15 Membrane Element Cleaning

Periodic cleaning of the machine with appropriate membrane element cleaners will pro- long the life of the membrane elements. Local conditions will determine the frequency of cleaning. Cleaning may be required when:

1. The permeate quality begins to decline.
2. The reading on the final pressure gauge begins to change noticeably.

GE recommends that you clean your E2/EZ2-Series RO machine every quarter. You may have to clean the RO machine more frequently, depending on the quality of your feed water. Cleaning of the membrane elements is vital because contanimants can build-up on the membrane element surfaces, reducing the permeate flow rate and affecting the quali- ty of the permeate.

To clean the membrane elements:

STEPS

1. Remove and replace the pre-filter cartridge (Section 2.14, Pre-filter Cartridge).
2. In a clean container, collect approximately five (5) gallons (19 Liters) of RO permeate water.
3. Turn machine and water supply OFF.
Page 15 of the GE E2 Series user manual — STEPS
Page 15 · click to enlarge
Page 15
GE E2 Series — STEPS diagram (page 15)
Fig. 3

Figure 2.2 E2/EZ2-Series Closed Loop Membrane

4. Disconnect and route the inlet, permeate, concentrate lines from their service locations to the CIP container (Figure 2.2 E2/EZ2-Series Closed Loop Membrane Element Cleaning.
5. Connect the CIP feed line to the E2/EZ2-Series machine inlet feed water port (Figure 2.2, E2/EZ2-Series Closed Loop Membrane Element Cleaning).
6. Mix the appropriate cleaning compound in the 5 gallons of permeate water, in the CIP container, according to the cleaning label instructions.
7. Turn machine ON and allow machine to recirculate the cleaning solution for 10 - 15 minutes.

As machine starts up it will achieve prime and begin to draw solution into the machine and circulate the solution back into the CIP container.

If the machine makes noise or primary pressure does not climb to normal operat- ing pressure (Table 2.3, E2/EZ2-Series Primary Pressure Range) turn machine OFF. Refer to Troubleshooting (Section 1.18). Once pressure range is corrected, continue start-up procedure.

As the machine runs normally check CIP tank to ensure that the CIP inlet line to the machine is submerged in the cleaning solution, so the pump prime will not be lost.

Element Cleaning

Page 16 of the GE E2 Series user manual — STEPS
Page 16 · click to enlarge
Page 16
8. After circulaiting the macine for 10 - 15 minutes or solution has reached 95 ° F (35°C), shut machine OFF.
9. Dump solution. Repeat Setps 6 - 8.
10. With machine OFF (Step 8), let cleaning solution dwell in machine for 15 - 30 minutes.
11. After 15 - 30 minutes, reconnect feed to RO unit and connect concentrate and permeate to drain. Turn machine ON and flush permeate water to the drain for 10 - 15 minutes.

This ensures that all cleaning agents have been removed for the machine.

12. If cleaning with an organic cleaner, return to Step 1 and repeat Steps 1 -11.
13. After completing cleaning (normal and organic) and flushing to the drain reconnect permeate to the point of use, concentrate to the drain, and reconnect feed to the RO unit.

2.16 Membrane Element Replacement

CAUTION: Replacement membrane elements are shipped from the factory in a plas- tic bag with a small amount of bactericide solution to prevent biological growth. When installing the membrane elements, always provide ade- quate ventilation and wear gloves while handling the membrane elements as recommended. The membrane elements must be kept moist at all times to prevent possible damage to the membrane element material.

STEPS

1. Remove the top end caps and clamps from the membrane element housings (Figure 2.4, Membrane Element Installation). Lubricate all O-rings and brine seals, and the polyvinyl chloride (PVC) membrane element stems (stingers) with a non-petroleum based lubricate (i.e., glycerin or poly water).
2. Load the down flow membrane elements first, by inserting the membrane element into the membrane element housing with the brine seal end of the membrane element up. Slowly turn the membrane element as you lower it into the membrane
Page 17 of the GE E2 Series user manual — STEPS
Page 17 · click to enlarge
Page 17

element housing. As you reach the bottom of the housing slowly guide the PVC

stem or stinger on the end of the membrane element into the head of the end cap. As the membrane element slides into the housing the brine seal will be on the top (Figure 2.4, Direction of Membrane Element Installation).

GE E2 Series — STEPS diagram (page 17)
Fig. 4

Figure 2.3 Membrane Element

3. Next, load the up flow membrane elements, by lubricating all brine seals, O-rings, and the membrane element stingers. With the up flow membrane element and the brine seal will be on the bottom of the membrane element. Turn the membrane element slowly as you lower it down into the housing. As with the down flow membrane element, one must slowly guide the PVC stinger on the end of the membrane element into the end cap.
4. Reinstall the end caps by using non-petroleum based lubricant to lubricate the Oring inside the end cap. Reinstall the end cap on the membrane element by first, aligning the stinger into the hole in the end cap and then turn the end cap slowly clockwise, as you push it down into the membrane element housing.
5. Reattach the housing clamp and tighten.
6. Reattach the feed line and flush permeate and concentrate lines to the drain for 25 - 30 minutes.
7. Take appropriate tests to insure biocide has been flushed from the machine.
8. Reconnect permeate line to point-of-use.
9. The machine is now ready for operation.

Installation

Page 18 of the GE E2 Series user manual — STEPS
Page 18 · click to enlarge
Page 18
GE E2 Series — STEPS diagram (page 18)
Fig. 5

Figure 2.4 Membrane Element

Direction for · Installation

Page 19 of the GE E2 Series user manual — PROBLEM
Page 19 · click to enlarge
Page 19

2.17 Troubleshooting

This troubleshooting guide can assist you in identifying common operating problems you may experience with your machine. The operator can easily correct may of these problems, however, for those that persist or are not understood you should contact the GE Customer Support Center. Have the following information available when calling the Customer Support Center:

1. Machine installation date
2. Model number
3. Serial number
4. Detailed description of problem.

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSES

REMEDIES

Insufficient feed water pressure

Open feed water valve. Check feed water valve for restrictions

in feed plumbing.

Replace pre-filter cartridge.

Dirty or fouled membrane

Flush and/or clean machine.

Inlet solenoid valve not

Verify valve receiving power when machine is ON. Clean or

replace solenoid valve.

Verify proper voltage is present.

Check fuses and circuit

breakers.

Pump or motor not operating

Contact your distributor for replacement or repair of pump

or motor.

Show 7 more labels / short text on this page
Low operating pressure · or flow · Clogged pre-filter cartridge · elements · opening · Insufficient electrical power · correctly
Page 20 of the GE E2 Series user manual — PROBLEM
Page 20 · click to enlarge
Page 20

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSES

REMEDIES

Concentrate or recycle valve to

Refer to Section 2.9 for proper-

ly setting concentrate and

See above.

Machine operating on cold

Check the water temperature.

If needed, install a hot/cold tempering valve. Permeate production rate is dependent on

77°F (25°C). Refer to Section 2.5 (Temperature Correction Factor).

Refer to Section 2.18 for cor-

installation procedure. Membrane elements with damaged brine seals may be returned for repair. For low

permeate production, it is wise to test the permeate pro-

duction of each membrane

element.

Brine seal has “rolled” or been

Refer to Section 2.18 for cor-

installation.

Dirty or fouled membrane

Flush and/or clean the

machine.

Backpressure on the permeate

Reduce permeate line back- pressure. Check for restric- tions in permeate plumbing.

Show 14 more labels / short text on this page
Low operating pressure · (continued) · far open · recycle valves · Low permeate production · Low operating pressure · water · Membrane elements installed · incorrectly · rect membrane element · damaged · rect membrane element · elements · line
Page 21 of the GE E2 Series user manual — PROBLEM
Page 21 · click to enlarge
Page 21

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSES

REMEDIES

Useful life of membrane

Install new membrane ele- ment(s). See Spare Parts List

(Section 2.20).

Inaccurate permeate flow meter

Check the flow rate manually

with a stop watch and a cali-

brated container.

Low concentrate flow with

Dirty or fouled membrane

Flush and/or clean machine.

normal or high operating

O-rings on membrane ele-

Replace the O-rings, check

the sealing surfaces on the O-ring groove and end caps.

Replace damaged parts.

Useful life of membrane ele-

Replace with new membrane

elements. See Spare Parts

List (Section 2.20).

Calibrate the meter with a DS standard solution or check the readings with another conduc- tivity meter. Replace or clean the probe. Check the connec-

tions between the probe and

monitor. Refer to Section

2.16.2 (Deluxe Model).

ON/OFF switch ONmachine not running

No power to machine

plugged in.

Show 15 more labels / short text on this page
Low permeate production · (continued) · element(s) expired · (DLX only) · element (s) · pressure · Declining rejection · (high permeate · ment(s) unseated or · conductivity) · damaged parts · ment(s) expired · Change in incoming · water quality · Ensure machine is
Page 22 of the GE E2 Series user manual — PROBLEM
Page 22 · click to enlarge
Page 22

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSES

REMEDIES

ON/OFF switch ONmachine not running

Pressurized storage switch or

The storage tank may be full.

storage tank float switch cut

The switch control may

require adjustment.

Thermal overload of motor

Allow the machine to cool. Check the Amp draw to the

machine.

Check the fuses or circuit breakers; measure the volt- age. Contact your distributor

for service.

Pressure does not drop when

Disconnect and clean the

concentrate valve.

Restricted flow after pump

Check for blockage of the concentrate flow at the inlets

element(s) [over 50 psi (3.5 bar)]

and outlets of membrane

element housings.

Ensure that the anti-telescop-

ing device (ATD) is intact.

Fouled or dirty membrane

Flush and/or clean the

machine.

Show 12 more labels / short text on this page
(continued) · power to machine · Pump motor failure · Dirty concentrate valve · concentrate valve opened · Excessive pressure drop · acrosse membrane · outlet · Telescoped membrane element · covering membrane element · housing · elements
Page 23 of the GE E2 Series user manual — PROBLEM
Page 23 · click to enlarge
Page 23

T R O U B L E S H O O T I N G G U I D E

PROBLEM

POSSIBLE CAUSES

REMEDIES

Flow through machine while

Inlet solenoid valve not fully

Ensure valve is not getting any

power when machine is OFF.

Replace inlet solenoid valve.

power is OFF · closed

Page 24 of the GE E2 Series user manual — PROBLEM
Page 24 · click to enlarge
Page 24
Page 24 of the GE E2 Series user manual — PROBLEM
Page 25 of the GE E2 Series user manual — GE Infrastructure Water & Process Technologies
Page 25 · click to enlarge
Page 25

For more information call 952-933-2277 or 800-848-1750 in the U.S., or visit www.gewater.com.

GE Infrastructure Water & Process Technologies

North American Sales Euro/Africa Sales Asia/Pacific Sales 5951 Clearwater Drive 230 rue Robert Schurman 1044/8 SOI 44/2 Minnetonka, MN ZA des Uselles Sukhumvit Road Parkanog 55343-8995 77350 Le Mée sur Seine Bangkok 10110 USA FRANCE THAILAND (952) 933-2277 Phone +33 1 64 10 2000 Phone +66 2 38 14213 Phone (952) 933-0141 Fax +33 1 64 10 3747 Fax +66 2 39 18183 Fax

© 2004, General Electric Company. All rights reserved. P/N 1227273 Rev.C

Ask about the GE E2 Series

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the GE E2 Series

Be the first to ask — other owners or our team will answer.

Original document

GE E2 Series manual PDF

25 pages·205 KB·Water System·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…