
WATER PURIFICATION
MACHINES

AND MAINTENANCE
MANUAL

Consult the Troubleshooting Section of this manual (Section 2.19). If the problem cannot be identified and correct- ed, contact your distributor. Prior to making the call, have the following information available:
Model Number Daily Log Sheets Serial Number Operating Parameters Installation Date Description of Problem
Contact your distributor to order spare parts. Refer to the Spare Parts List (Technote 109).



2.1 Flow Control Center 6 2.2 Closed Loop Membrane Element Cleaning 11 2.3 Membrane Element Installation 13 2.4 Membrane Element Direction for Installation 14
2.1 E2/EZ2-Series Machine Piping Connections 1 2.2 E2/EZ2-Series Feed Water Requirements 2 2.3 E2/EZ2-Series Primary Pressure Range 5 2.4 Flow Specifications for E2/EZ2-Series Machines 7 2.5 Permeate Back Pressure Correction Factors 8
Page · Figure Description · Table Description

2.1 Mounting the Unit
When installing your new GE Osmonics reverse osmosis (RO) machine, allow at least 45-inches (114.3 cm) above the machine for membrane element removal and loading. If space is not available, the entire membrane element housing can be removed for membrane element change-outs. If the membrane element housings are to be removed to change-out the membrane elements, at least 25-inches (65.3 cm) is required at one end of each membrane element housing and 6-inches (15.2 cm) behind the machine.
2.2 Plumbing
The feed water source must be able to provide water quantity and pressures to maintain an
operating feed water pressure of 30 - 60 psi (2.1 - 4.1 bar). If the feed water pressure with the machine is in excess of 60 psi (4.1 bar) or fluctuates by more than 5 psi (0.34 bar) a pressure regulator should be installed upstream of the machine inlet. If prop- er water pressure cannot be maintained to the RO, a booster pump may need to be installed in front of the pretreatment to provide the proper water quantity and pressure for the oper- ation of the machine.
2.3 Plumbing Connections
Connect proper size drain line to the concentrate outlet (Table 2.1, E2/EZ2-Series Machine Piping Connections) and run to an open drain. The drain capacity needs to be large enough to properly drain the feed water flow of the RO.
Table 2.1 E2/EZ2- Series Machine
Piping Connections

2.4 Feed Water Requirements
The following feed water requirements must be met before installing your E2/EZ2-Series machine to ensure quality permeate and extended membrane element life. Refer to Table 2.2 (E2/EZ2-Series Feed Water Requirements) for feed water information.
Table 2.2 E2/EZ2-Series Feed Water Requirements
* American Standard for Testing Materials
2.5 Transporting Pure Water (Permeate) to Point-of-Use
Pure water, or permeate, is in an aggressive state and should only be transported from the machine to the point-of-use in food grade flexible nylon, stainless steel (SS) tubing, or polyvinyl chloride (PVC) material for the inlet, permeate, and concentrate piping sizes.
Refer to Connections (Table 2.1, E2/EZ2-Series Machine Plumbing Connections) for inlet, permeate, and concentrate piping sizes.

2.6 Machine Control
2.6.1 Economy Model
To remotely control the Economy Model (ECN) with float switches and/or pre- treatment lockout, remove the jumper between terminals 4 and 5 and wire in the float switches or pretreatment components in series. After all field wiring is com- plete and complies with local and national electrical codes, move onto Section 2.7 (Single-Phase Electrical).
2.6.2 Deluxe Model
To remotely control the Deluxe Model (DLX), with float switches and/or pre- treatment lockout, remove the jumper between terminals 2 and 3 and wire in the float switches and pretreatment in series. After all field wiring is complete and complies with local and national electrical codes, move onto Section 2.10 (Pretreatment for Water Purification).
2.7 Single-Phase Electrical
Always check voltage tag on the machine to ensure the correct voltage and amperage is available.
The E2/EZ2-Series machines are shipped as either 120 Volt 60 Hertz or 220 Volt 50 Hertz from the factory. Machines should always be connected to a 15 Amp single- phase dedicated circuit. The circuit provided should be a separately fused disconnect with the proper protection for the Hp and Amp draws of the machine. Reverse osmosis (RO) machines with 115 Volt circuit include an 8-foot (2.4 m) electrical cord which plugs into a single-phase outlet. All machines shipped with a 220 VAC single-phase power require- ment are shipped with an 8-foot (2.4 m) electrical cord, but customers must provide electrical plug. All field wiring must comply with applicable local and national electrical codes.
2.8 Machine Start-Up Preparations
2.8.1 Pretreatment for Water Purification
A water analysis of your feed water should have been performed, as part of the planning and engineering that went into developing your RO system.
The water analysis will provide information on what type of pretreatment may be required and what recovery the machine can be run at on the feed water provid- ed. If the machine is moved to a different water source, a new water analysis should be taken before operating the machine.

Your RO is designed to operate on softened tap feed water with an SDI of 5 or less. The pH should be in a range of 5.5 - 8.5. Exposure to any levels of chlo- rine may cause irreversible damage to the Thin-layer composite (TLC) polyamide (PA) membrane elements in your machine. Daily water checks are recommend- ed to ensure the integrity of your pretreatment and RO system. Refer to Table 2.2 (E2/EZ2-Series Feed Water Requirements).
2.8.2 Machine Start-Up Preparation
Check the function and integrity of your pretreatment equipment. Ensure that your water softener and activated carbon filters have been leaked checked and properly flushed, before starting up your RO machine.
2.9 Machine Start-Up

While operating, the pressure range should never operate outside of the pressure ranges displayed in Table 2.3 (E2/EZ2-Series Primary Pressure Range).
Table 2.3 E2/EZ2-Series Primary Pressure Range*
* Primary pressure temperature for normal operation is 77°F (25°C).
The concentrate valve is drilled, and when completely closed the machine is run- ning at the correct concentrate flow for a 75% recovery (Table 2.4, Flow Specifications for E2/EZ2-Series Machines).
If the temperature of the inlet feed water is not 77°F (25°C) use the Temperature Correction Factor Table (Technote 113). The proper adjustment of the recycle and concentrate valves are critical to the correct operation of the machine.


Figure 2.1 Flow Control Center

2.10 Recovery
The machine flow specifications listed below are based on 77°F (25°C).
Table 2.4 E2/EZ2 - Series Flow Specifications for
Machines

2.11 Permeate Back Pressure Correction Factors
It is often necessary to operate RO machines with permeate back pressure. Permeate back pressure will decrease permeate production. See Table 2.5 (Permeate Back Pressure Correction Factors) to calculate loss of permeate.
Table 2.5 E2/EZ2-Series Permeate Back Pressure Correction
Factors

2.12 Operation and Maintenance
The operation and maintenance of an E2/EZ2-Series RO machine requires regular data recording and routine preventative maintenance. It cannot be emphasized enough the importance of filling out the Daily Log Sheet (Technote 106) during each operating shift. A Start-Up Data Sheet (Technote 101) should have been completed at start-up. The Start- Up Data Sheet contains pertinent facts on the operation of your machine. These two records are invaluable in diagnosing the performance of the equipment, and must be kept for reference. If you have questions concerning the operation of your machine or the method of data recording, contact the manufacturer.
Three preventative maintenance procedures, which must be done on a regular basis, are as follows:
2.13 Pre-filter Cartridge
A 1 micron pre-filter cartridge is factory installed to protect the membrane elements and valves from particles, which may be in the feed water. To order replacements, see the Spare Parts List (Technote 109).
A pressure drop across the filter of 8 psi (0.55 bar) or more during operation indicates that the pre-filter cartridge(s) need changeing. Use only GE approved filters rated at 2 microns or less. Refer to Technote 109 (Spare Parts List) for pre-filter cartridge replacements. Do not attempt to clean used pre-filter cartridges.
2.14 Daily Flushing
A manually flush of the E2/EZ2-Series must be done machine daily.
To flush the machine:

2.15 Membrane Element Cleaning
Periodic cleaning of the machine with appropriate membrane element cleaners will pro- long the life of the membrane elements. Local conditions will determine the frequency of cleaning. Cleaning may be required when:
GE recommends that you clean your E2/EZ2-Series RO machine every quarter. You may have to clean the RO machine more frequently, depending on the quality of your feed water. Cleaning of the membrane elements is vital because contanimants can build-up on the membrane element surfaces, reducing the permeate flow rate and affecting the quali- ty of the permeate.
To clean the membrane elements:


Figure 2.2 E2/EZ2-Series Closed Loop Membrane
As machine starts up it will achieve prime and begin to draw solution into the machine and circulate the solution back into the CIP container.
If the machine makes noise or primary pressure does not climb to normal operat- ing pressure (Table 2.3, E2/EZ2-Series Primary Pressure Range) turn machine OFF. Refer to Troubleshooting (Section 1.18). Once pressure range is corrected, continue start-up procedure.
As the machine runs normally check CIP tank to ensure that the CIP inlet line to the machine is submerged in the cleaning solution, so the pump prime will not be lost.
Element Cleaning

This ensures that all cleaning agents have been removed for the machine.
2.16 Membrane Element Replacement
CAUTION: Replacement membrane elements are shipped from the factory in a plas- tic bag with a small amount of bactericide solution to prevent biological growth. When installing the membrane elements, always provide ade- quate ventilation and wear gloves while handling the membrane elements as recommended. The membrane elements must be kept moist at all times to prevent possible damage to the membrane element material.

element housing. As you reach the bottom of the housing slowly guide the PVC
stem or stinger on the end of the membrane element into the head of the end cap. As the membrane element slides into the housing the brine seal will be on the top (Figure 2.4, Direction of Membrane Element Installation).

Figure 2.3 Membrane Element
Installation


Figure 2.4 Membrane Element
Direction for · Installation

2.17 Troubleshooting
This troubleshooting guide can assist you in identifying common operating problems you may experience with your machine. The operator can easily correct may of these problems, however, for those that persist or are not understood you should contact the GE Customer Support Center. Have the following information available when calling the Customer Support Center:
T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSES
REMEDIES
Insufficient feed water pressure
Open feed water valve. Check feed water valve for restrictions
in feed plumbing.
Replace pre-filter cartridge.
Dirty or fouled membrane
Flush and/or clean machine.
Inlet solenoid valve not
Verify valve receiving power when machine is ON. Clean or
replace solenoid valve.
Verify proper voltage is present.
Check fuses and circuit
breakers.
Pump or motor not operating
Contact your distributor for replacement or repair of pump
or motor.

T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSES
REMEDIES
Concentrate or recycle valve to
Refer to Section 2.9 for proper-
ly setting concentrate and
See above.
Machine operating on cold
Check the water temperature.
If needed, install a hot/cold tempering valve. Permeate production rate is dependent on
77°F (25°C). Refer to Section 2.5 (Temperature Correction Factor).
Refer to Section 2.18 for cor-
installation procedure. Membrane elements with damaged brine seals may be returned for repair. For low
permeate production, it is wise to test the permeate pro-
duction of each membrane
element.
Brine seal has “rolled” or been
Refer to Section 2.18 for cor-
installation.
Dirty or fouled membrane
Flush and/or clean the
machine.
Backpressure on the permeate
Reduce permeate line back- pressure. Check for restric- tions in permeate plumbing.

T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSES
REMEDIES
Useful life of membrane
Install new membrane ele- ment(s). See Spare Parts List
(Section 2.20).
Inaccurate permeate flow meter
Check the flow rate manually
with a stop watch and a cali-
brated container.
Low concentrate flow with
Dirty or fouled membrane
Flush and/or clean machine.
normal or high operating
O-rings on membrane ele-
Replace the O-rings, check
the sealing surfaces on the O-ring groove and end caps.
Replace damaged parts.
Useful life of membrane ele-
Replace with new membrane
elements. See Spare Parts
List (Section 2.20).
Calibrate the meter with a DS standard solution or check the readings with another conduc- tivity meter. Replace or clean the probe. Check the connec-
tions between the probe and
monitor. Refer to Section
2.16.2 (Deluxe Model).
No power to machine
plugged in.

T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSES
REMEDIES
Pressurized storage switch or
The storage tank may be full.
storage tank float switch cut
The switch control may
require adjustment.
Thermal overload of motor
Allow the machine to cool. Check the Amp draw to the
machine.
Check the fuses or circuit breakers; measure the volt- age. Contact your distributor
for service.
Pressure does not drop when
Disconnect and clean the
concentrate valve.
Restricted flow after pump
Check for blockage of the concentrate flow at the inlets
element(s) [over 50 psi (3.5 bar)]
and outlets of membrane
element housings.
Ensure that the anti-telescop-
ing device (ATD) is intact.
Fouled or dirty membrane
Flush and/or clean the
machine.

T R O U B L E S H O O T I N G G U I D E
POSSIBLE CAUSES
REMEDIES
Flow through machine while
Inlet solenoid valve not fully
Ensure valve is not getting any
power when machine is OFF.
Replace inlet solenoid valve.
power is OFF · closed



For more information call 952-933-2277 or 800-848-1750 in the U.S., or visit www.gewater.com.
North American Sales Euro/Africa Sales Asia/Pacific Sales 5951 Clearwater Drive 230 rue Robert Schurman 1044/8 SOI 44/2 Minnetonka, MN ZA des Uselles Sukhumvit Road Parkanog 55343-8995 77350 Le Mée sur Seine Bangkok 10110 USA FRANCE THAILAND (952) 933-2277 Phone +33 1 64 10 2000 Phone +66 2 38 14213 Phone (952) 933-0141 Fax +33 1 64 10 3747 Fax +66 2 39 18183 Fax
© 2004, General Electric Company. All rights reserved. P/N 1227273 Rev.C
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.