EN
GE logo
Official user manual

GE DPSE810EGWT

8 pages·2.2 MB·Clothes Dryer·PDF·ENDEFRITNLJA
GE DPSE810EGWT
Table of Contents 80 sections Electric Dryer · Questions on Installation? Call: 1-800-GECARES (US) · BEFORE YOU BEGIN · WARNING RISK OF FIRE · … ShowHide
Electric Dryerp.1Questions on Installation? Call: 1-800-GECARES (US)p.1BEFORE YOU BEGINp.1WARNING RISK OF FIREp.1TOOLS YOUp.1MATERIALS YOU WILL NEEDp.1WILL NEEDp.14" DIA. METAL DUCT (RECOMMENDED)p.1SLIP JOINT PLIERSp.14" DUCT CLAMPS (2)p.14" DIA. METAL ELBOWp.1EXHAUSTp.1SAFETY GLASSESp.1DRYER POWERp.1HOODp.1CORD KIT (NOT PROVIDEDp.1FLAT BLADE SCREWDRIVERp.1OR 4" SPRING CLAMPS (2)p.1WITH DRYER)p.1(IF NEEDED) KIT WX08X10077 (INCLUDES 2 ELBOWS)p.1PHILLIPS SCREWDRIVERp.13/4" STRAIN RELIEF UL RECOGNIZEDp.1DUCT TAPEp.1GLOVESp.1LEVELp.1(IF NEEDED.)p.11 PREPARING FOR INSTALLATION OF NEW DRYERp.22 ELECTRICAL CONNECTION INFORMATIONp.2REMOVING LINT FROM WALL EXHAUST OPENINGp.2WALLp.2CONNECTING DRYER USING 4-WIRE CONNECTION (MUST BE USED FOR MOBILE HOME INSTALLATION)p.2HOT WIREp.2RELOCATE GREEN GROUND SCREW HEREp.2GREEN OR YELLOW WIREp.2SCREWS (3)p.2STRAIN RELIEF BRACKETp.23/4", UL RECOGNIZED STRAIN RELIEF HOT WIREp.2COVERp.23 EXHAUST INFORMATIONp.3WARNING - IN CANADA AND IN THE UNITEDp.3CONNECTING DRYER USING 3-WIRE CONNECTIONp.3EXHAUST LENGTHp.3GROUND STRAP GREEN GROUND SCREWp.33/4", UL RECOGNIZED STRAIN RELIEFp.34 EXHAUST CONNECTIONp.4STANDARD REAR EXHAUSTp.4WARNING - TO REDUCE THE RISK OF FIRE OR PERSONAL INJURY:p.4(Vented above floor level)p.4ELBOW HIGHLY RECOMMENDEDp.45 LEVELING AND STABILIZING YOUR DRYERp.4(Vented at floor level)p.4EXTERNAL DUCT OPENINGp.4DUCT TAPE OR DUCT CLAMPp.44" METAL DUCTp.4(CUT TO PROPER LENGTH)p.44 LEVELING LEGSp.4MUST BE UL-LISTED METALp.4Installation Instructions, Indoor Exhaustingp.5CONNECTING THE DRYERp.5DON’Tp.5TO HOUSE VENTp.5RIGID METAL TRANSITION DUCTp.5DO NOT USE EXCESSIVE EXHAUST LENGTHp.5UL-LISTED FLEXIBLE METAL (SEMI-RIGID) TRANSITION DUCTp.5UL-LISTED FLEXIBLE METAL (FOIL-TYPE) TRANSITION DUCTp.58 MOBILE OR MANUFACTURED HOME INSTALLATIONp.5DOp.5ELBOWS HIGHLY RECOMMENDEDp.59 DRYER EXHAUST TO RIGHT, LEFT OR BOTTOM CABINETp.6ADDING NEW DUCTp.6FIXING HOLEp.6PORTION "A"p.6RIGHT OR LEFT SIDE EXHAUSTp.6A Bp.6TAB LOCATIONp.6BEND TAB UP 45p.6ADDING ELBOW FOR EXHAUST THROUGH BOTTOM OF CABINETp.710 CHANGING DIRECTION OF DOOR OPENINGp.7ADDING COVER PLATE TO REAR OF CABINET (SIDES AND BOTTOM EXHAUST)p.7PLATE (KIT WE1M454)p.7
Page 1 of the GE DPSE810EGWT user manual — LEVEL
Page 1 · click to enlarge
Page 1

Electric Dryer

Questions on Installation? Call: 1-800-GECARES (US)

or Visit our Web site at: www.GEAppliances.com (US)

BEFORE YOU BEGIN

WARNING RISK OF FIRE

Read these instructions completely and

carefully.

  • To reduce the risk of severe injury or death, follow all installation instructions.
  • Clothes dryer installation must be performed by a qualified installer.
  • Install the clothes dryer according to these instructions and in accordance with local codes.
  • This dryer must be exhausted to the outdoors.
  • Use only 4” rigid metal ducting for exhausting the clothes dryer to the outdoors.
  • IMPORTANTSave these instructions for local inspector’s use.
  • IMPORTANTObserve all governingcodes and ordinances.
  • Note to Installer - Be sure to leave these instructions with the customer.
  • Note to Customer - Keep these instructions with your Use and Care Book for future reference.
  • Before the old dryer is removed from service or discarded, remove the dryer door.
  • Service information and the wiring dia-
  • DO NOT install a clothes dryer with flexible plastic ducting materials. If flexible metal (semi-rigid or foil-type) duct is installed, it must be UL listed and installed in accordance with the instructions found in "Connecting The Dryer To House Vent" on page 5 of this manual. Flexible venting materials are known to collapse, be easily crushed, and trap lint. These conditions will obstruct dryer airflow and increase the risk of fire.
  • Do not install or store this appliance in any location where it could be exposed to water and or weather.
  • Save these instructions. (Installers: Be sure to leave these instructions with the customer).

gram are located in the control console. • Do not allow children on or in the appli- ance. Close supervision of children is necessary when the appliance is used near children. Install the dryer where the temperature is above 50°F for satisfactory operation of the dryer control system.

TOOLS YOU

MATERIALS YOU WILL NEED

WILL NEED

4" DIA. METAL DUCT (RECOMMENDED)

SLIP JOINT PLIERS

4" DUCT CLAMPS (2)

4" DIA. METAL ELBOW

EXHAUST

SAFETY GLASSES

DRYER POWER

HOOD

CORD KIT (NOT PROVIDED

FLAT BLADE SCREWDRIVER

OR 4" SPRING CLAMPS (2)

4" DIA. FLEXIBLE METAL (SEMI-RIGID) UL LISTED TRANSITION DUCT

WITH DRYER)

(IF NEEDED) KIT WX08X10077 (INCLUDES 2 ELBOWS)

UL RATED 120/240V,30A WITH 3 OR 4 PRONGS. IDENTIFY THE PLUG TYPE AS PER THE HOUSE RECEPTACLE BEFORE PURCHASING LINE CORD.

PHILLIPS SCREWDRIVER

3/4" STRAIN RELIEF UL RECOGNIZED

DUCT TAPE

GLOVES

4" DIA. FLEXIBLE METAL (FOIL TYPE) UL LISTED TRANSITION DUCT

LEVEL

(IF NEEDED.)

Step 1 Prepare the Area and Exhaust for Installation of New Dryer (see section 1). Step 2 Check and Ensure the Existing External Exhaust is Clean (see section 1) and Meets Attached Installation Specifications (see section 3). Step 3 Remove the Foam Shipping Pads (see section 1). Step 4 Move the Dryer to the Desired Location. Step 5 Connect the Power Supply (see section 2). Step 6 Connect the External Exhaust (see section 4). Step 7 Level Your Dryer (see section 5).

Step 8 Check the Operation of the Power Supply and Venting. Step 9 Place the Owners Manual and the Installation Instructions in a Location Where They Will Be Noticed By the Owner.

For Alcove or Closet Installation, see section 6. For Bathroom or Bedroom Installation, see section 7. For Mobile or Manufactured Home see, section 8. For side or bottom exhaust, see section 9.

•

Page 2 of the GE DPSE810EGWT user manual — COVER
Page 2 · click to enlarge
Page 2

Minimum Clearance Other Than Alcove or Closet Installation Minimum clearance to combustible surfaces and for air opening are: 0 in. clearance both sides and 1 in. rear. Consideration must be given to provide adequate clearance for installation and service.

1 PREPARING FOR INSTALLATION OF NEW DRYER

2 ELECTRICAL CONNECTION INFORMATION

  • DO NOT USE AN EXTENSION CORD OR AN ADAPTER PLUG WITH THIS APPLIANCE.

REMOVING LINT FROM WALL EXHAUST OPENING

Dryer must be electrically grounded in accordance with local codes and ordinances, or in the absence of local codes, in accordance with the NATIONAL ELECTRI- CAL CODE, ANSI/NFPA NO. 70.

Remove and discard existing plastic or metal foil transition duct and replace with UL listed transition duct.

ELECTRICAL REQUIREMENTS This dryer must be connected to an individual branch circuit, protected by the required time-delay fuses or circuit breakers. A four or three-wire, single phase, 120/240V or 120/208V, 60Hz, 30 amp circuit is required.

WALL

INTERNAL DUCT OPENING CHECK THAT EXHAUST HOOD DAMPER OPENS AND CLOSES FREELY.

If the electric supply does not meet the above specifications, then call a licensed electrician. GROUNDING INSTRUCTIONS This dryer must be connected to a grounded metal, permanent wiring system, or an equipment-grounding conductor must be run with the circuit conductors and connected to the equipment- grounding terminal on the appliance.

TILT THE DRYER SIDEWAYS AND REMOVE THE FOAM SHIPPING PADS BY PULLING AT THE SIDES AND BREAKING THEM AWAY FROM THE DRYER LEGS. BE SURE TO REMOVE ALL OF THE FOAM PIECES AROUND THE LEGS.

CONNECTING DRYER USING 4-WIRE CONNECTION (MUST BE USED FOR MOBILE HOME INSTALLATION)

REMOVE GROUND STRAP AND DISCARD. KEEP GREEN GROUND SCREW

HOT WIRE

RELOCATE GREEN GROUND SCREW HERE

GREEN OR YELLOW WIRE

N

SCREWS (3)

STRAIN RELIEF BRACKET

3/4", UL RECOGNIZED STRAIN RELIEF HOT WIRE

4 #10 AWG MINIMUM COPPER CONDUCTORS OR 120/240V 30A POWER SUPPLY CORD KIT MARKED FOR USE WITH DRYERS & PROVIDED WITH CLOSED LOOP OR SPADE TERMINALS WITH UPTURNED ENDS (NOT SUPPLIED).

COVER

• · NEUTRAL (White)

Page 3 of the GE DPSE810EGWT user manual — COVER
Page 3 · click to enlarge
Page 3

1. Turn off the circuit breaker (s) (30 amp) or remove the dryer’s circuit fuse at the electrical box. 2. Be sure the dryer cord is unplugged from the wall receptacle. 3. Remove the power cord cover located at the lower back. 4. Remove and discard ground strap. Keep the green ground screw for step 7. 5. Install 3/4 in. UL recognized strain relief to power cord entry hole. Bring power cord through strain relief. 6. Connect power cord as follows: A. Connect the 2 hot lines to the outer screws of the terminal block (marked L1 and L2). B. Connect the neutral (white) line to the center of the terminal block (marked N). 7. Attach ground wire of power cord with the green ground screw (hole above strain relief bracket). Tighten all terminal block screws (3) completely. 8. Properly secure power cord to strain relief. 9. Reinstall the cover.

3 EXHAUST INFORMATION

WARNING - IN CANADA AND IN THE UNITED

IS 4 IN (102mm). DO NOT USE DUCT LONGER STATES, THE REQUIRED EXHAUST DUCT DIAMETER

THAN SPECIFIED IN THE EXHAUST LENGTH TABLE.

Using exhaust longer than specified length will:

  • Increase the drying times and the energy cost.
  • Reduce the dryer life.
  • Accumulate lint, creating a potential fire hazard.

The correct exhaust installation is YOUR RESPONSIBILITY. Problems due to incorrect installation are not covered by the warranty.

Remove and discard existing plastic or metal foil transition duct and replace with UL listed transition duct.

The MAXIMUM ALLOWABLE duct length and number of bends of the exhaust system depends upon the type of duct, number of turns, the type of exhaust hood (wall cap), and all conditions noted below. The maximum duct length for rigid metal duct is shown in the table below.

CONNECTING DRYER USING 3-WIRE CONNECTION

EXHAUST LENGTH

RECOMMENDED MAXIMUM LENGTH Exhaust Hood Types RecommendedUse only for short run installations 4" DIA. 4" DIA. 4"4" DIA. 2-1/2" No. of 90º ElbowsRigid MetalRigid Metal 0 1 2 3 490 Feet 60 Feet 45 Feet 35 Feet 25 Feet60 Feet 45 Feet 35 Feet 25 Feet 15 Feet

IF REQUIRED, BY LOCAL CODE, INSTALL EXTERNAL GROUND (NOT PROVIDED) TO GROUNDED METAL, COLD WATER PIPE, OR OTHER ESTABLISHED GROUND DETERMINED BY A QUALIFIED ELECTRICIAN.

GROUND STRAP GREEN GROUND SCREW

HOT WIRE

STRAIN RELIEF BRACKET

3/4", UL RECOGNIZED STRAIN RELIEF

SCREWS (3)

HOT WIRE

  • EXHAUST SYSTEM CHECK LIST HOOD OR WALL CAP
  • Terminate in a manner to prevent back drafts or entry of birds or other wildlife.
  • Termination should present minimal resistance to the exhaust air flow and should require little or no maintenance to prevent clogging.
  • Never install a screen in or over the exhaust duct. This could cause lint build up.
  • Wall caps must be installed at least 12 in. above ground level or any other obstruction with the opening pointed down.

3 #10 AWG MINIMUM COPPER CONDUCTORS OR 120/240V 30A POWER SUPPLY CORD KIT MARKED FOR USE WITH DRYERS & PROVIDED WITH CLOSED LOOP OR SPADE TERMINALS WITH UPTURNED ENDS (NOT SUPPLIED).

COVER

1. Turn off the circuit breaker(s) (30 amp) or remove the dryer’s circuit fuse at the electrical box. 2. Be sure the dryer cord is unplugged from the wall. 3. Remove the power cord cover located at the lower back. 4. Install 3/4 in. UL recognized strain relief to power cord entry hole. Bring power cord through strain relief. 5. Connect power cord as follows: A. Connect the 2 hot lines to the outer screws of the terminal block (marked L1 and L2).

SEPARATION OF TURNS For best performance, separate all turns by at least 4 ft. of straight duct, including distance between last turn and exhaust hood.

  • TURNS OTHER THAN 90º
  • One turn of 45º or less may be ignored.
  • Two 45º turns should be treated as one 90º turn.
  • Each turn over 45º should be treated as one 90º turn.
  • SEALING OF JOINTS
  • All joints should be tight to avoid leaks. The male end of each section of duct must point away from the dryer.
  • Do not assemble the ductwork with fasteners that extend into the duct. They will serve as a collection point for lint.
  • Duct joints can be made air and moisture-tight by wrapping the overlapped joints with duct tape.
  • Horizontal runs should slope down toward the outdoors ½inch per foot

B. Connect the neutral (white) line to the center of the terminal block (marked N). 6. Be sure ground strap is connected to neutral (center) terminal of block and to green ground screw on cabinet rear. Tighten all terminal block screws (3) completely. 7. Properly secure power cord to strain relief. 8. Reinstall the cover.

INSULATION Duct work that runs through an unheated area or is near air conditioning should be insulated to reduce condensation and lint build-up.

NEUTRAL (White)

Page 4 of the GE DPSE810EGWT user manual — MUST BE UL-LISTED METAL
Page 4 · click to enlarge
Page 4

4 EXHAUST CONNECTION

STANDARD REAR EXHAUST

WARNING - TO REDUCE THE RISK OF FIRE OR PERSONAL INJURY:

(Vented above floor level)

ELBOW HIGHLY RECOMMENDED

  • This clothes dryer must be exhausted to the outdoors.
  • Use only 4” rigid metal ducting for the home exhaust duct. Use only 4” rigid metal or UL-listed flexible metal (semi-rigid or foil-type) duct to connect the dryer to the home exhaust duct. It must be installed in accordance with the instructions found in “Connecting The Dryer To House Vent” on page 5 of this manual.

RECOMMENDED CONFIGURATION TO MINIMIZE EXHAUST BLOCKAGE.

Do not terminate exhaust in a chimney, a wall, a ceiling, gas vent, crawl space, attic, under an enclosed floor, or in any other concealed space of a building. The accumulated lint could create a fire hazard.

Never terminate the exhaust into a common duct with a kitchen exhaust system. A combination of grease and lint creates a potential fire hazard.

Do not use duct longer than specified in the exhaust length table. Longer ducts can accumulate lint, creating a potential fire hazard.

ELBOW HIGHLY RECOMMENDED

Never install a screen in or over the exhaust duct. This will cause lint to accumulate, creating a potential fire hazard.

Do not assemble ductwork with any fasteners that extend into the duct. These fasteners can accumulate lint, creating a potential fire hazard.

  • Do not obstruct incoming or exhausted air.

Provide an access for inspection and cleaning of the exhaust system, especially at turns and joints. Exhaust system shall be inspected and cleaned at least once a year.

5 LEVELING AND STABILIZING YOUR DRYER

THIS DRYER COMES READY FOR REAR EXHAUSTING. IF SPACE IS LIMITED, USE THE INSTRUCTIONS IN SECTION 9 TO EXHAUST DIRECTLY FROM THE SIDES OR BOTTOM OF THE CABINET.

STAND THE DRYER UPRIGHT NEAR THE FINAL LOCATION AND ADJUST THE 4 LEVELING LEGS, AT THE CORNERS, TO ENSURE THAT THE DRYER IS LEVEL FROM SIDE TO SIDE AND FRONT TO REAR.

LEVEL FRONT-TO-BACK.

LEVEL SIDE-TO-SIDE.

STANDARD REAR EXHAUST

(Vented at floor level)

FOR STRAIGHT LINE INSTALLATION, CONNECT THE DRYER EXHAUST TO THE EXTERNAL EXHAUST HOOD USING DUCT TAPE OR CLAMP.

GE DPSE810EGWT — STANDARD REAR EXHAUST diagram (page 4)
Fig. 1

EXTERNAL DUCT OPENING

GE DPSE810EGWT — EXTERNAL DUCT OPENING diagram (page 4)
Fig. 2
GE DPSE810EGWT — EXTERNAL DUCT OPENING diagram (page 4)
Fig. 3

DUCT TAPE OR DUCT CLAMP

4" METAL DUCT

(CUT TO PROPER LENGTH)

DUCT TAPE OR DUCT CLAMP

4 LEVELING LEGS

MUST BE UL-LISTED METAL

Show 6 more labels / short text on this page
• · • · • · • · • · •
Page 5 of the GE DPSE810EGWT user manual — ELBOW HIGHLY RECOMMENDED
Page 5 · click to enlarge
Page 5

Installation Instructions, Indoor Exhausting

CONNECTING THE DRYER

DON’T

TO HOUSE VENT

RIGID METAL TRANSITION DUCT

DO NOT SIT DRYER ON FLEXIBLE EXHAUST.

  • For best drying performance, a rigid metal transition duct is recommended.

Rigid metal transitions ducts reduce the risk of crush- ing and kinking. •

DO NOT USE EXCESSIVE EXHAUST LENGTH

UL-LISTED FLEXIBLE METAL (SEMI-RIGID) TRANSITION DUCT

  • If rigid metal duct cannot be used, then UL-listed flexible metal (semi-rigid) ducting can be used (Kit WX08X10077).

DO NOT CRUSH FLEXIBLE EXHAUST AGAINST WALL.

Never install flexible metal duct in walls, ceilings, floors or other enclosed spaces. •

Total length of flexible metal duct should not exceed 8 feet (2.4m). •

For many applications, installing elbows at both the dryer and the wall is highly recommended (see illustra- tions below). Elbows allow the dryer to sit close to the wall without kinking and or crushing the transition duct, maximizing drying performance.

  • 6 ALCOVE OR CLOSET INSTALLATION 6 ALCOVE OR CLOSET INSTALLATION
  • If your dryer is approved for installation in an alcove or closet, it will be stated on a label on the dryer back.
  • The dryer MUST be vented to the outdoors. See the EXHAUST INFORMATION sections 3 & 4.
  • Minimum clearance between dryer cabinet and adjacent walls or other surfaces is:

Avoid resting the duct on sharp objects. •

UL-LISTED FLEXIBLE METAL (FOIL-TYPE) TRANSITION DUCT

  • In special installations, it may be necessary to connect the dryer to the house vent using a flexible metal (foiltype) duct. A UL-listed flexible metal (foil-type)duct may be used ONLY in installations where rigid metal or flexible metal (semi-rigid) ducting cannot be used AND where a 4" diameter can be maintained throughout the entire length of the transition duct.

0 in. either side

  • 3 in. front and rear
  • Minimum vertical space from floor to overhead cabinets, ceiling, etc. is 52 in.
  • Closet doors must be louvered or otherwise ventilated and must contain a minimum of 60 sq. in. of open area equally distributed. If the closet contains both a washer and a dryer, doors must contain a minimum of 120 sq. in. of open area equally distributed.

In Canada and the United States, only the flexible metal(foil-type) ducts that comply with the “Outline for Clothes Dryer Transition Duct Subject 2158A” shall be used.

Never install flexible metal duct in walls, ceilings, floors or other enclosed spaces. •

Total length of flexible metal duct should not exceed 8 feet (2.4m). •

  • Avoid resting the duct on sharp objects.
  • For best drying performance:
  • 1. Slide one end of the duct over the clothes dryer outlet pipe. 2. Secure the duct with a clamp. 3. With the dryer in its permanent position, extend the duct to its full length. Allow 2” of duct to overlap the exhaust pipe. Cut off and remove excess duct. Keep the duct as straight as possible for maximum airflow. 4. Secure the duct to the exhaust pipe with the other clamp.
  • 7 BATHROOM OR BEDROOM INSTALLATION
  • The dryer MUST be vented to the outdoors. See EXHAUST INFORMATION section 3 & 4.
  • The installation must conform with local codes or, in the absence of local codes, with the NATIONAL ELECTRICAL CODE, ANSI/NFPA NO. 70.

8 MOBILE OR MANUFACTURED HOME INSTALLATION

DO

  • Installation must conform to the MANUFACTURED HOME CONSTRUCTION & SAFETY STANDARD, TITLE 24, PART 32-80 or, when such standard is not applicable, with AMERICAN NATIONAL STANDARD FOR MOBILE HOME, ANSI/NFPA NO. 501B.
  • The dryer MUST be vented to the outdoors with the termination securely fastened to the mobile home structure. (See EXHAUST INFORMATION section 3 & 4.)
  • The vent MUST NOT be terminated beneath a mobile or manufactured home.
  • The vent duct material MUST BE METAL.
  • Do not use sheet metal screws or other fastening devices which extend into the interior of the exhaust vent.
  • See section 2 for electrical connection information.

ELBOW HIGHLY RECOMMENDED

ELBOWS HIGHLY RECOMMENDED

• · •

Page 6 of the GE DPSE810EGWT user manual — DUCT TAPE
Page 6 · click to enlarge
Page 6

9 DRYER EXHAUST TO RIGHT, LEFT OR BOTTOM CABINET

ADDING NEW DUCT

FIXING HOLE

PORTION "A"

RIGHT OR LEFT SIDE EXHAUST

Reconnect the cut portion (A) of the duct to the blower housing. Make sure that the shortened duct is aligned with the tab in the base. Use the screw saved previously to secure the duct in place through the tab on the appliance base.

REMOVE SCREW AND SAVE.

ADDING ELBOW AND DUCT FOR EXHAUST TO LEFT OR RIGHT SIDE OF CABINET

REMOVE DESIRED KNOCKOUT (ONE ONLY).

  • Preassemble 4" elbow with 4" duct. Wrap duct tape around joint.
  • Insert duct assembly, elbow first, through the side opening and connect the elbow to the dryer internal duct.

Detach and remove the bottom, right or left side knockout as desired. Remove the screw inside the dryer exhaust duct and save. Pull the duct out of the dryer.

FIXING HOLE

when inserting the duct.

A B

Cut the duct as shown and keep portion A.

EXHAUST CAN BE ADDED TO LEFT OR RIGHT SIDE

TAB LOCATION

DUCT TAPE

BEND TAB UP 45

  • Apply duct tape as shown on the joint between the dryer internal duct and the elbow.

DUCT TAPE

Through the rear opening, locate the tab in the middle of the appliance base. Lift the tab to about 45º using a flat blade screwdriver.

9" · o

Page 7 of the GE DPSE810EGWT user manual — www.GEAppliances.com (US)
Page 7 · click to enlarge
Page 7

ADDING ELBOW FOR EXHAUST THROUGH BOTTOM OF CABINET

10 CHANGING DIRECTION OF DOOR OPENING

1. Open the door and remove the filler plugs opposite the hinges. With the door completely open, remove the bottom screws from each hinge on the dryer face. Insert these screws about half way into the TOP holes, for each hinge on the opposite side (where you removed the filler plugs). Apply firm pressure to get the screw started. 2. Loosen the top screws from each hinge on the dryer face half way. With one hand holding the top of the door and the other hand holding the bottom, remove the door from the dryer by lifting it UP and OUT. 3. Rotate the door 180º. Insert the door on the opposite side of the opening by moving the door IN and DOWN until the top hinge and the bottom hinge are resting on the top screws inserted in step 1. 4. Remove the remaining screws from the side of the opening from which the door was removed. With these screws secure each hinge at the bottom. Tighten the two top screws on each hinge. Reinsert the plastic plugs on the side from which the door was removed.

  • Insert the elbow through the rear opening and connect it to the dryer internal duct.
  • Apply duct tape on the joint between the dryer internal duct and elbow, as shown on page 6.

LOOSEN THE TOP SCREWS FROM EACH HINGE ON THE DRYER FACE HALF WAY.

REMOVE THE BOTTOM SCREW FROM EACH HINGE ON THE DRYER FACE.

ADDING COVER PLATE TO REAR OF CABINET (SIDES AND BOTTOM EXHAUST)

MOVE THE DOOR IN AND DOWN UNTIL THE TOP HINGE AND THE BOTTOM HINGE ARE RESTING ON THE TOP SCREWS INSERTED IN STEP 1.

SECURE EACH HINGE AT THE BOTTOM AND TIGHTEN THE TWO TOP SCREWS OF EACH HINGE.

PLATE (KIT WE1M454)

Connect standard metal elbows and ducts to complete the exhaust system. Cover back opening with a plate (Kit WE1M454) available from your local service provider. Place dryer in final location.

WARNING - NEVER LEAVE THE BACK OPENING WITHOUT THE PLATE. (Kit WE1M454)

11 SERVICING

TO REGISTER YOUR DRYER

CALL TOLL-FREE

1-888-269-1192

Prompt registration confirms your right to protection under the

terms of your warranty.

www.GEAppliances.com (US)

7 For Questions on Installation, Call: 1-800-GECARES (US)

500A436P005_Rev0 · Pub # 31-16224

Page 8 of the GE DPSE810EGWT user manual — Notes
Page 8 · click to enlarge
Page 8

Notes

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the GE DPSE810EGWT

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the GE DPSE810EGWT

Be the first to ask — other owners or our team will answer.

Original document

GE DPSE810EGWT manual PDF

8 pages·2.2 MB·Clothes Dryer·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…