Instruction/ maintenance manual of the product 5200 GE
Go to page of 24
3 Important Safety Information 10 Installation Instructions Important Electrical Safety Adjustments and Auxiliary Controls 4 Operating Instructions The Controls on Y our Zoneline Care of Product 20 He.
Welcome to the GE family. We’re proud of our quality products and we believe in dependable service. You’ll see it in this easy-to-use manual and you’ll hear it in the friendly voices of our customer service department. Best of all, you’ll experience these values each time you enjoy the comfort of your Zoneline.
• This Zoneline must be properly installed in accordance with the Installation Instructions before it is used. • Repair or replace immediately all electric service cords that have become frayed or otherwise damaged. • Unplug or disconnect the Zoneline at the fuse box or circuit breaker before making any repairs.
The temp control is used to maintain the room temperature. The compressor will cycle on and off to keep the room at the same level of comfort. Press the + pad to raise the temperature. Press the – pad to lower the temperature. F AN —sets the fan operation for HIGH, LOW or AUTO speed.
5 Ener gy T ips K eep the v ent control at CLOSE . The room air will be filtered and circulated. Set the FAN at AUTO . It switches between LOW and HIGH to adjust for room temperature changes. The ventilation control lever is located at the lower left side of the Zoneline unit, behind the room cabinet.
Operating Instructions Other Zoneline features Additional controls are located behind the room cabinet. T o remove: Pull out at the bottom to release it from the tabs. Then lift up. T o replace: Place the tabs over the top rail. Push inward at the bottom until it snaps into place.
Switch E controls the Freeze Sentinel. When the switch is DOWN the Freeze Sentinel automatically turns on the resistance heater and fan if the room temperature (sensed at the unit) drops to approximately 40 ° F. It will turn the heater off when the temperature reaches about 45 ° F.
8 Operating Instructions Care & Cleaning Turn the Zoneline off and disconnect the power supply. To clean, use water and a mild detergent. Do not use bleach or abrasives. Some commercial cleaners may damage the plastic parts. Room Cabinet and Case The coils on the outdoor side of the Zoneline should be checked regularly.
T ur n the Zoneline off before cleaning. The most important thing you can do to maintain the Zoneline is to clean the filter at least every 30 days. Clogged filters reduce cooling, heating and air flow. Keeping these filters clean will: • Decrease cost of operation.
Installation Instructions Read carefully If you have any questions, call the GE Answer Center at 800.626.2000. • Use the correct wall case. This chassis is designed to be installed in a GE plastic or insulated metal wall case. This mini- mizes condensation from forming on the room side of the case.
Important Electrical Safety—Read Carefully Installer: Leave these instructions with the Zoneline. Owner: Keep these instructions for future use. • Follow the National Electrical Code (NEC) or local codes and ordinances. • For personal safety, this Zoneline must be prop- erly grounded.
12 Installation Instructions 1 Remove the room cabinet. 2 Install the power supply kit per the instructions in the kit. 3 See the special instructions below for applicable supply voltages. 4 Reinstall the room cabinet. How to Connect A power supply kit must be used to supply power to the Zoneline unit.
These models must be installed using the appropriate GE power supply kit for the branch circuit amperage and the electrical resistance heater wattage desired. See page 14. One of the following installation methods must be used: A Electrical subbase kits are available to provide a flexible enclosure for direct connection.
Installation Instructions 6 Use the round knockout at the bottom of the junction box to attach conduit coming from the branch circuit. Remove the knockout, attach the conduit and bring wires into the junction box. Leave 6 ″ of wire free at the end of the conduit to allow connections to be made.
1 The RAB71 or RAB77 wall case must be properly installed per instructions packed with the case. 2 Remove the corrugated stiffener and the outdoor protective panel. Use the slit in the outdoor panel as a handhold and push out. 3 Install the exterior grille from the room side following instructions packed with the grille.
Installation Instructions 16 Slide the unit into the wall case and secure with four screws through the unit flange holes. If an insulated wall case is needed, see Install the Wall Case and Exterior Grille section on the previous page.
Low Voltage Connectors & Auxiliary Controls The Boost Heat Option increases the Zoneline air temperature by adding electric heat to supplement the heat pump. It automatically turns on when the outside temperature is between 25 ° F and 45 ° F. To set the Boost Heat Option, move switch #8 to the UP (on) position.
Installation Instructions To operate the Remote Control/Wall Thermostat (Class 2) switch A, you must use an Optional Interface Module kit. See the Installation Instructions with accessory kit RAK0IM.
Temperature limiting can reduce energy costs by limiting the lowest temperature that can be set for cooling and the highest temperature that can be set for heating.
20 Noise Explanation 3-Minute Dela y You may hear a pinging or popping noise caused by water being picked up and thrown against the condenser on rainy days or when the humidity is high. This design feature helps remove moisture and improve efficiency.
The unit is unplugged • Make sure the Zoneline plug is pushed completely into the outlet. The fuse is blown/circuit • Check the house fuse/circuit breaker breaker is tripped box and replace fuse or reset the breaker. The unit is waiting for the • This is normal.
22 Problem Possible Causes What to Do T emperature Display Flashes The compressor • Move the control to STOP and then may hav e failed restart the unit.
800.626.2000 TDD 800-833-4322 GE Service Numbers We’ll be there! Open 24 hours a day, 7 days a week. GE Answer Center ® 800-GE-CARES (800-432-2737) We provide expert repair service, scheduled at a time that’s convenient for you.
Printed in China 12-97 CG Pub. No. 49-7367 Zoneline 5200 Series What Is Not Covered FULL ONE- YEAR W ARRANT Y For one year from date of original pur- chase, we will provide, free of charge, parts and service labor on site to repair or replace any part of the Zoneline that fails because of a manufacturing defect.
An important point after buying a device GE 5200 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought GE 5200 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data GE 5200 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, GE 5200 you will learn all the available features of the product, as well as information on its operation. The information that you get GE 5200 will certainly help you make a decision on the purchase.
If you already are a holder of GE 5200, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime GE 5200.
However, one of the most important roles played by the user manual is to help in solving problems with GE 5200. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device GE 5200 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center