EN
GE logo
Official user manual

GE 268

44 pages·2.8 MB·Water System·PDF·ENDEFRITNLJA
GE 268
Table of Contents 52 sections Models: 268 Co-Current Conditioner 263 Three-Cycle Filter · Table of Contents · How To Use This Manual · Icons That Appear In This Manual · … ShowHide
Page 1 of the GE 268 user manual — Models: 268 Co-Current Conditioner
Page 1 · click to enlarge
Page 1

Operations Manual

Models: 268 Co-Current Conditioner

263 Three-Cycle Filter

GE 268 — Models: 268 Co-Current Conditioner diagram (page 1)
Fig. 1 · Models: 268 Co-Current Conditioner
Page 3 of the GE 268 user manual — Introduction
Page 3 · click to enlarge
Page 3

How To Use This Manual

This installation manual is designed to guide the installer through the process of installing and starting conditioners featuring the Ultramax series controllers.

This manual is a reference and will not include every system installation situation. The person installing this equipment should have:

GE 268 — How To Use This Manual diagram (page 3)
Fig. 2 · How To Use This Manual
  • Knowledge of water conditioning and how to determine proper control settings
  • Basic plumbing skills
  • The directional instructions "left" and “right" are determined by looking at the front of the unit.

Icons That Appear In This Manual

GE 268 — Icons That Appear In This Manual diagram (page 3)
Fig. 3 · Icons That Appear In This Manual
GE 268 — Icons That Appear In This Manual diagram (page 3)
Fig. 4 · Icons That Appear In This Manual

Introduction

Inspect the unit for damage or missing parts. Contact your supplier if any discrepancies exist.

How To Use This Manual 3 Rev A

Page 4 of the GE 268 user manual — Mechanical
Page 4 · click to enlarge
Page 4

General Warnings And Safety Information

Electrical

There are no user-serviceable parts in the AC adapter, motor, or controller. In the event of a failure, these should be replaced.

  • All electrical connections must be completed according to local codes.
  • Use only the power AC adapter that is supplied.
  • The power outlet must be grounded.
  • To disconnect power, unplug the AC adapter from its power source.

Mechanical

  • Do not use petroleum based lubricants such as vaseline, oils, or hydrocarbon based lubricants. Use only 100% silicone lubricants.
  • All plastic connections should be hand tightened. Teflon tape may be used on connections that do not use an O-ring seal. Do not use pliers or pipe wrenches.
  • All plumbing must be completed according to local codes.
  • Soldering near the drain line should be done before connecting the drain line to the valve. Excessive heat will cause interior damage to the valve.
  • Observe drain line requirements.
  • Do not use lead-based solder for sweat solder connections.
  • The drain line must be a minimum of 1/2-inch diameter. Use 3/4-inch pipe if the backwash flow rate is greater than 7 GPM (26.5 Lpm) or the pipe length is greater than 20 feet (6 m).
  • Do not support the weight of the system on the control valve fittings, plumbing, or the bypass.
  • It is not recommended to use sealants on the threads. Use Teflon* tape on the threads of the 1-inch NPT elbow, the drain line connections, and other NPT threads.

*Teflon is a trademark of E.I. duPont de Nemours.

4 General Warnings And Safety Information Rev A

Page 5 of the GE 268 user manual — General
Page 5 · click to enlarge
Page 5

General

  • Observe all warnings that appear in this manual.
  • Keep the media tank in the upright position. Do not turn upside down or drop. Turning the tank upside down will cause media to enter the valve.
  • Operating ambient temperature is between 34 ° F (1 ° C) and 120 ° F (49 ° C).
  • Operating water temperature is between 34 ° F (1 ° F) and 100 ° F (38 ° C).
  • Working water pressure range is 20 to 120 psi (1.38 to 8.27 bar). In Canada the acceptable working water pressure range is 20 to 100 psi (1.38 to 6.89 bar).
  • Use only regenerant salts designed for water softening. Do not use ice melting, block, or rock salts.
  • Follow state and local codes for water testing. Do not use water that is microbiologically unsafe or of unknown quality.
  • When filling media tank, do not open water valve completely. Fill tank slowly to prevent media from exiting the tank.
  • When installing the water connection (bypass or manifold) connect to the plumbing system first. Allow heated parts to cool and cemented parts to set before installing any plastic parts. Do not get primer or solvent on O-rings, nuts, or the valve.

General Warnings And Safety Information 5 Rev A

Page 6 of the GE 268 user manual — System Operation Cycle Functions
Page 6 · click to enlarge
Page 6

System Operation Cycle Functions

1. Service (Downflow)

Untreated water is directed down through the resin bed and up through the riser tube. The hardness ions attach themselves to the resin and are removed from the water. The water is conditioned as it passes through the resin bed.

2. Backwash (Upflow)

The flow of water is reversed by the control valve and directed down the riser tube and up through the resin bed. During the backwash cycle, the bed is expanded and debris is flushed to the drain.

3. Brine/Slow Rinse (Downflow)

The control directs water through the brine injector and brine is drawn from the regenerant tank. The brine is then directed down through the resin bed and up through the riser tube to the drain. The hardness ions are displaced by sodium ions and are sent to the drain. The resin is regenerated during the brine cycle. Brine draw is completed when the air check closes.

4. Repressurized Cycle (Hard Water Bypass Flapper Open)

This cycle allows the air and water to hydraulically balance in the valve before continuing the regeneration.

5. Fast Rinse (Downflow)

The control directs water down through the resin bed and up through the riser tube to the drain. Any remaining brine residual is rinsed from the resin bed.

6. Brine Refill

Water is directed down through the resin bed to the regenerant tank at a controlled rate, to create brine for the next regeneration.

6 System Operation Cycle Functions Rev A

Page 7 of the GE 268 user manual — Cycle Water Flows
Page 7 · click to enlarge
Page 7

Cycle Water Flows

GE 268 — Cycle Water Flows diagram (page 7)
Fig. 5 · Cycle Water Flows

System Operation Cycle Functions 7 Rev A

Page 8 of the GE 268 user manual — Equipment Installation
Page 8 · click to enlarge
Page 8

Equipment Installation

Valve Layout

GE 268 — Equipment Installation diagram (page 8)
Fig. 6 · Equipment Installation
GE 268 — Equipment Installation diagram (page 8)
Fig. 7 · Equipment Installation

8 Equipment Installation Rev A

Show 11 more labels / short text on this page
One Piece Valve · Disc Spring · Valve Discs · Control Module · Mount · Regenerant Tube Connection · Optical Sensor · Outlet · Drain · Backwash Injector Screen · Drain Control Filter
Page 9 of the GE 268 user manual — Ultramax Controller
Page 9 · click to enlarge
Page 9

Control Layout

Ultramax Controller

GE 268 — Ultramax Controller diagram (page 9)
Fig. 8 · Ultramax Controller

Set Button Up Button

Refill Sensor Probe Outlet

GE 268 — Ultramax Controller diagram (page 9)
Fig. 9 · Ultramax Controller

AC Adapter (low voltage) Input

Main Motor & Optical Sensor Connection

Secondary Valve Motor Control (not used)

Turbine Input or Dry Contact Signal Input

Control Layout 9 Rev A

LCD Display · Lockout Connection

Page 10 of the GE 268 user manual — Outdoor Locations
Page 10 · click to enlarge
Page 10

Location Selection

Location of a water treatment system is important. The following conditions are required:

  • Level platform or floor
  • Room to access equipment for maintenance and adding regenerant (salt) to tank.
  • Ambient temperatures over 34 ° F (1 ° C) and below 120 ° F (49 ° C).
  • Water pressure below 120 psi (8.27 bar) and above 20 psi (1.4 bar).
  • In Canada the water pressure must be below 100 psi (6.89 bar).
  • Constant electrical supply to operate the controller.
  • Total minimum pipe run to water heater of ten feet (three meters) to prevent backup of hot water into system.
  • Local drain for discharge as close as possible.
  • Water line connections with shutoff or bypass valves.
  • Must meet any local and state codes for site of installation.
  • Valve is designed for minor plumbing misalignments. Do not support weight of system on the plumbing.
  • Be sure all soldered pipes are fully cooled before attaching plastic valve to the plumbing.

Outdoor Locations

When the water conditioning system is installed outdoors, several items must be considered.

  • Moisture — The valve and controller are rated for NEMA 3 locations. Falling water should not affect performance. The system is not designed to withstand extreme humidity or water spray from below. Examples are: constant heavy mist, near corrosive environment, upwards spray from sprinkler.
  • Direct Sunlight — The materials used will fade or discolor over time in direct sunlight. The integrity of the materials will not degrade to cause system failures. If it is necessary to locate the conditioner in direct sunlight, a protective outdoor cover (PN 1242287) over the valve and controller is necessary. A valve skirt (PN 1242286) that provides further protection is available.
  • Temperature — Extreme hot or cold temperatures will cause damage to the valve or controller. Freezing temperatures will freeze the water in the valve. This will cause physical damage to the internal parts as well as the plumbing. High temperatures will affect the controller. The display may become unreadable but the controller should continue to function. When the temperature drops down into normal operating limits the display will

10 Location Selection Rev A

Page 11 of the GE 268 user manual — Location Selection
Page 11 · click to enlarge
Page 11

return to normal. A protective cover should assist with high temperature applications.

  • Insects — The controller and valve have been designed to keep all but the smallest insects out of the critical areas. Any holes in the top plate can be covered with a metal foil ductwork tape. The top cover should be installed securely in place.
  • Wind — The Ultramax cover is designed to withstand a 30 mph (48 Kph) wind when properly installed on the valve.

Location Selection 11 Rev A

Page 12 of the GE 268 user manual — Water Line Connection
Page 12 · click to enlarge
Page 12

Water Line Connection

A bypass valve system should be installed on all water conditioning systems. Bypass valves isolate the conditioner from the water system and allow unconditioned water to be used. Service or routine maintenance procedures may also require that the system is bypassed. The illustrations below show the two common bypass methods.

Figure 1 Autotrol Series 1265 bypass for use with Performa

Normal Operation In Bypass

GE 268 — Water Line Connection diagram (page 12)
Fig. 10 · Water Line Connection

Figure 2 Typical Globe Valve Bypass System

Normal Operation In Bypass

GE 268 — Water Line Connection diagram (page 12)
Fig. 11 · Water Line Connection
GE 268 — Water Line Connection diagram (page 12)
Fig. 12 · Water Line Connection

12 Water Line Connection Rev A

In Out · In Out

Page 13 of the GE 268 user manual — Water Line Connection
Page 13 · click to enlarge
Page 13

Water Line Connection 13 Rev A

Page 14 of the GE 268 user manual — Drain Line Connection
Page 14 · click to enlarge
Page 14

Drain Line

Drain Line Connection

1. The unit should be above and not more than 20 feet (6.1 m) from the drain. Use an appropriate adapter fitting to connect 1/2-inch (1.3 cm) plastic tubing to the drain line connection of the control valve.
2. If the backwash flow rate exceeds 5 gpm (22.7 Lpm) or if the unit is located 20-40 feet (6.1-12.2 m) from drain, use 3/4-inch (1.9 cm) tubing. Use appropriate fittings to connect the 3/4-inch tubing to the 3/4-inch NPT drain connection on valve.
3. The drain line may be elevated up to 6 feet (1.8 m) providing the run does not exceed 15 feet (4.6 m) and water pressure at the conditioner is not less than 40 psi (2.76 bar). Elevation can increase by 2 feet (61 cm) for each additional 10 psi (.69 bar) of water pressure at the drain connector.
4. Where the drain line is elevated but empties into a drain below the level of the control valve, form a 7-inch (18-cm) loop at the far end of the line so that the bottom of the loop is level with the drain line connection. This will provide an adequate siphon trap.

Where the drain empties into an overhead sewer line, a sink-type trap must be used. Secure the end of the drain line to prevent it from moving.

Figure 3 Drain Line Connection

GE 268 — Drain Line Connection diagram (page 14)
Fig. 13 · Drain Line Connection

Right Way Air Gap

14 Drain Line Rev A

Drain

Page 15 of the GE 268 user manual — (not used with 3-cycle filter system)
Page 15 · click to enlarge
Page 15

Regenerant Line Connection

(not used with 3-cycle filter system)

The regenerant line from the tank connects to the valve. Make the connections and hand tighten. Be sure that the regenerant line is secure and free from air leaks. Even a small leak may cause the regenerant line to drain out, and the conditioner will not draw regenerant from the tank. This may also introduce air into the valve causing problems with valve operation.

Ensure that pipe sealant (Teflon* tape) is applied to the 3/8-inch NPT regenerant line connection.

Figure 4 Regenerant Line Connection

GE 268 — (not used with 3-cycle filter system) diagram (page 15)
Fig. 14 · (not used with 3-cycle filter system)

*Teflon is a trademark of E.I. duPont de Nemours.

Regenerant Line Connection 15 Rev A

Regenerant Line Connection

Page 16 of the GE 268 user manual — (not used with 3-cycle filter system)
Page 16 · click to enlarge
Page 16

Overflow Line Connection

(not used with 3-cycle filter system)

In the event of a malfunction, the regenerant TANK OVERFLOW will direct “overflow” to the drain instead of spilling on the floor. This fitting should be on the side of the cabinet or regenerant tank. Most tank manufacturers include a post for the tank overflow connector.

To connect the overflow line, locate hole on side of tank. Insert overflow fitting into tank and tighten with plastic thumb nut and gasket as shown (Figure 5). Attach length of 1/2-inch (1.3-cm) I.D. tubing (not supplied) to fitting and run to drain. Do not elevate overflow line higher than overflow fitting.

Do not tie into drain line of control unit. Overflow line must be a direct, separate line from overflow fitting to drain, sewer or tub. Allow an air gap as per drain line instructions.

Figure 5 Overflow Line Connection

Secure hose in place

16 Overflow Line Connection Rev A

Show 4 more labels / short text on this page
Overflow Fitting · Drain Tubing · Air Gap · Drain
Page 17 of the GE 268 user manual — Overflow Line Connection
Page 17 · click to enlarge
Page 17

Figure 6 Regenerant Tank Check Valve* (not used with 3-cycle filter system)

* Furnished as an option from system manufacturer.

Overflow Line Connection 17 Rev A

Page 18 of the GE 268 user manual — Controller Location
Page 18 · click to enlarge
Page 18

Electrical Connection

All Ultramax controllers operate on 12-volt alternating current power supply. This requires use of the GE Water Technologies supplied AC adapter. A variety of AC adapters are available for different applications. These AC adapters are available from your supplier. They include:

AC Adapter Input Voltage Application Part Number

Standard wall-mount AC adapter

120V 60Hz Standard indoor application

Outdoor rated AC adapter

120V 60Hz UL listed for outdoor installations

120 VAC AC Adapters:

Make sure power source matches the rating printed on the AC adapter.

Controller Location

The Ultramax controllers are designed to be mounted on the valve or attached to a flat surface. Installations that do not provide easy access to the valve can have the controller mounted for remote operation.

A remote mount connection, PN 1256257, is available for the Ultramax Series controller.

18 Electrical Connection Rev A

1000811 · 1235448

Page 19 of the GE 268 user manual — Valve Camshaft
Page 19 · click to enlarge
Page 19

Valve Camshaft

The front end of the camshaft has an indicator cup. The cup has slots in the outer periphery and numbers on the inside face (Figure 7).

The numbers can be seen with the cover off, from the front over the top of the controller. The number at the top indicates which regeneration cycle is currently in progress.

Figure 7 Camshaft Front End for 263 and 268 valve bodies

Treated Water Indicator (normal operation)

The corresponding slot for the number is positioned at the optical sensor which is approximately 90 degrees out of phase.

0 = Treated Water - normal operation mode 1 = Backwash Cycle 2 = Regenerant Draw Cycle (not used in filter mode) 3 = Slow Rinse Cycle (not used in filter mode) 4 = System Pause 5 = Fast Rinse Cycle 1 6 = Backwash Cycle 2 (not used in filter mode) 7 = Fast Rinse Cycle 2 (not used in filter mode) 8 = Regenerant Refill (not used in filter mode)

Valve Camshaft 19 Rev A

Treated Water Slot · Regeneration Cycle Indicators

Page 20 of the GE 268 user manual — Disinfection Of Water Conditioners
Page 20 · click to enlarge
Page 20

Valve Disc Operation

Figure 8 - Ultramax Valve

GE 268 — Valve Disc Operation diagram (page 20)
Fig. 15 · Valve Disc Operation

Disinfection Of Water Conditioners

The materials of construction of the modern water conditioner will not support bacterial growth, nor will these materials contaminate a water supply. During normal use, a conditioner may become fouled with organic matter, or in some cases with bacteria from the water supply. This may result in an off-taste or odor in the water.

Some conditioners may need to be disinfected after installation and some conditioners will require periodic disinfection during their normal life.

Depending upon the conditions of use, the style of conditioner, the type of ion exchanger, and the disinfectant available, a choice can be made among the following methods.

Sodium or Calcium Hypochlorite

These materials are satisfactory for use with polystyrene resins, synthetic gel zeolite, greensand and bentonites.

5.25% Sodium Hypochlorite

These solutions are available under trade names such as Clorox*. If stronger solutions are used, such as those sold for commercial laundries, adjust the dosage accordingly.

1. Dosage

A. Polystyrene resin; 1.2 fluid ounce (35.5 mL) per cubic foot.

B. Non-resinous exchangers; 0.8 fluid ounce (23.7 mL) per cubic foot.

2. Brine tank conditioners

A. Backwash the conditioner and add the required amount of

hypochlorite solution to the well of the regenerant tank. The regenerant tank should have water in it to permit the solution to be carried into the conditioner.

B. Proceed with the normal regeneration.

*Clorox is a trademark of the Clorox Company.

20 Disinfection Of Water Conditioners Rev A

1 Regenerant Valve · Application

Page 21 of the GE 268 user manual — Valve Disc Operation
Page 21 · click to enlarge
Page 21

Calcium hypochlorite, 70% available chlorine, is available in several forms including tablets and granules. These solid materials may be used directly without dissolving before use.

1. Dosage

A. Two grains (approximately 0.1 ounce [3 mL]) per cubic foot.

2. Regenerant tank conditioners

A. Backwash the conditioner and add the required amount of

hypochlorite to the well of the regenerant tank. The regenerant tank should have water in it to permit the chlorine solution to be carried into the conditioner.

B. Proceed with the normal regeneration.

Disinfection Of Water Conditioners 21 Rev A

Calcium Hypochlorite

Page 22 of the GE 268 user manual — Variable Reserve Function
Page 22 · click to enlarge
Page 22

Ultramax Controller

Power Loss Memory Retention

The Ultramax series controllers feature battery-free time and date retention during the loss of power. This is designed to last a minimum of 8 hours depending on the installation. The controller will continue to keep time and day in dynamic memory while there is no AC power.

The controller will not track water usage on volumetric demand controls in the event of a power failure.

All programmed parameters are stored in the Ultramax series static memory and will not be lost in the event of a power failure. These settings are maintained separately from the time and day settings.

Motor

The Ultramax series controller uses a standard 12-volt AC motor that works with either 50 Hz or 60 Hz. The same motor is used worldwide and does not need to be changed for different power conditions.

Controller Memory

Information entered or calculated by the controller is stored in two different ways.

A static memory will store:

Model number Regenerant setting Time of regeneration Days between regeneration Filter mode

A dynamic memory with 8 hour retention will store:

Current day of week Running clock

Variable Reserve Function

The Ultramax metered-demand volumetric controllers are designed with a variable reserve feature. This feature automatically adjusts the reserve to the end-user’s water usage schedule.

A variable reserve saves salt and water by only regenerating when absolutely necessary, and ensures enough soft water for typical high-water usage days.

Each day of regeneration the controller reviews the last four weeks of water usage for the same day of the week to determine if the remaining capacity is adequate for the next day of the week. If not, it will initiate an automatic regeneration.

22 Ultramax Controller Rev A

Page 23 of the GE 268 user manual — PM MIN
Page 23 · click to enlarge
Page 23

Display Icons

PM MIN

LBS

1. Displays amount of conditioning capacity remaining.
2. "PM" indicates that the time displayed is between 12:00 noon and 12:00 midnight (there is no AM indicator). PM indicator is not used if clock mode is set to 24-hour.
3. When "MIN" is displayed, the value entered is in minute increments.
4. When "LBS" is displayed, the value entered is in pounds.
5. When "Kg" is displayed, the value entered is in kilograms or kilograins.
6. Four digits used to display the time or program value. Also used for error codes.
7. Colon flashes as part of the time display. Indicates normal operation.
8. X100 multiplier for large values.
9. Shows when water is flowing through the valve.
10. Banner display.

Display Icons 23 Rev A

KG x100

Page 24 of the GE 268 user manual — Programming Conventions
Page 24 · click to enlarge
Page 24

Keypad — Buttons

2 1 3 4

1. DOWN arrow. Generally used to scroll down or increment through a group of choices.
2. SET. Used to accept a setting that normally becomes stored in memory. Also used together with the arrow buttons.
3. UP arrow. Generally used to scroll up or increment through a group of choices.
4. Regen. Used to command the controller to regenerate.

Programming Conventions

The Ultramax controller is programmed using the buttons on the keypad. The programming instructions will be described two ways whenever a section has keypad input.

First, a table shows simplified instructions. Second, text follows that describes the action. In each table:

"Action" lists the event or action desired.

"Keys" are listed as:

UP for up arrow DOWN for down arrow SET for set REGEN for regeneration

"Duration" describes how long a button is held down:

P/R for press and release HOLD for press and hold X sec for a number of seconds to press the button and hold it down

"Display" calls out the display icons that are visible.

24 Keypad — Buttons Rev A

Page 25 of the GE 268 user manual — Things You Might Need to Know
Page 25 · click to enlarge
Page 25

Things You Might Need to Know

  • When the controller is first plugged in, it may display a flashing Err 3 and scrolling "Call Dealer for Service" message. This means that the controller is rotating to the home position. The Err 3 will clear when the control reaches the home position.
  • The preset default time of regeneration is 2:00 AM. If you want to change it, see the Level II Programming section.
  • The controller can be programmed to regenerate on specific days of the week. See Level II Programming section.
  • If electrical power is not available, the camshaft can be rotated counterclockwise by hand if the motor is removed.
  • The Ultramax series controller sends commands to the motor for camshaft movement. However, water pressure/flow are required during the regeneration cycle for backwash, purge and refill, and brine draw to actually take place.
  • Make sure control power source is plugged in. The transformer should be connected to a non-switched power source.

Things You Might Need to Know 25 Rev A

Page 26 of the GE 268 user manual — Level I Programming
Page 26 · click to enlarge
Page 26

Programming Overview

The Ultramax Series controller is designed to operate by setting the Time of Day, Day of the Week, and the Hardness. The remaining settings are set at the factory using a Model Number.

The controller menu has three levels:

Level I Basic — This level is easily accessed by the user. Only the Time of Day, Day of Week and Time of Regeneration can be changed in Level I.

Level II Professional — This level allows the installer to change settings such as hardness, capacity, and cycle times.

Level III History — This operation history and the program are viewable. This information is used to troubleshoot and maintain the system.

Level I Programming

Level I program parameters are those that can be accessed by the end user by pressing the SET button. They include:

Time of Day Day of Week Time of Regeneration

  • Setting Time of Day

Upon initial start up of the controller, you will need to set the time of day. The words “Time of Day” will scroll across the banner display and the currently programmed time of day will be flashing below. If time is not flashing, press the SET button. To change the time of day, press and hold the UP or DOWN button until the correct time of day is displayed. Press the SET button to accept the selection.

26 Programming Overview Rev A

Page 27 of the GE 268 user manual — Programming Overview
Page 27 · click to enlarge
Page 27
  • Setting Day of Week

After setting the Time of Day the banner display will show the word “Day” followed by an abbreviated day of the week. SU = Sunday MO = Monday TU = Tuesday WE = Wednesday TH = Thursday FR = Friday SA = Saturday

Use the UP or DOWN arrow buttons to change the flashing day of week. Press the SET button when the current day of week is flashing.

  • Setting Regeneration Time

The "Regeneration Time" is the setting which allows the programmer to select the time of day that regeneration should occur. The words “Regeneration Time” will scroll through the banner display. To change the regeneration time press and hold the UP or DOWN button until the desired regeneration time is displayed. Press SET to lock this time into memory.

Level I Programming 27 Rev A

Page 28 of the GE 268 user manual — Level II Programming
Page 28 · click to enlarge
Page 28

Level II Programming

Level II program parameters are those parameters used to fine-tune a conditioners operation. These are accessible by pressing and holding the UP and DOWN buttons until the display goes blank. Then release the buttons. Calendar Override is the first Level II parameter displayed. Level II program parameters include:

268 Conditioner Operation Type 263 Filter Operation Type

CALENDAR OVERRIDE CALENDAR OVERRIDE SALT AMOUNT REGEN SU CAPACITY K GRAIN REGEN MO HARDNESS GPG REGEN TU SELECT LANGUAGE REGEN WE CLOCK MODE REGEN TH UNITS OF MEASURE REGEN FR INJECTOR SELECTION* REGEN SA BACKWASH 1 CAPACITY GAL SLOW RINSE SELECT LANGUAGE FAST RINSE 1 CLOCK MODE BACKWASH 2 UNITS OF MEASURE FAST RINSE 2 BACKWASH OPERATION TYPE 268* FAST RINSE SERVICE INTERVAL OPERATION TYPE 263* CHLORINE GENERATOR SERVICE INTERVAL CHLORINE GENERATOR

*View only.

Level II parameters will, in almost all cases, be preset to meet your configuration needs. The predefined system number will preprogram all of the Level II parameters to the selected default values.

  • Setting the Calendar Override

Calendar Override allows the programmer to set the maximum days between regenerations. A setting of 0 (zero) means the calendar override is disabled. To change the calendar override, press the SET button while the words “CALENDAR OVERRIDE" appear on the banner display. The blinking digit can be changed to the desired numbers of days. To lock in the parameter, press the SET button.

28 Level II Programming Rev A

Page 29 of the GE 268 user manual — Level II Programming
Page 29 · click to enlarge
Page 29

The calendar override days between regeneration must be set to zero to enable regeneration on specific days.

  • Setting Backwash Days (263 filter only)

The 263 filter controller can be programmed to regenerate on an elapsed time period (calendar override) or by the day of the week. If you would like to regenerate on specific days select a 0 (zero) for the calendar override setting, the 263 filter will prompt you to select the days of the week in which you would like the unit to regenerate/backwash. For example, the unit could be programmed to regenerate every Monday, Wednesday and Friday.

  • Setting the Salt Amount (268 softener only)

Is selected by the system model number. Your Ultramax Water Treatment Dealer enters the model numbers based on the specific application requirements.

  • Setting Capacity

Softener Default Capacity Setting The default capacity setting is accurately calculated when the model number is entered by the factory. The capacity can be changed to operate "custom systems". Contact your Ultramax Water Treatment Dealer before adjusting the capacity setting. Default capacities are shown in Table 1.

Filter Capacity Filter capacity is set in gallons or cubic meters. It is programmable from 100 to 14000 gallons or 1 to 140 cubic meters of capacity. Press the SET button and the digits will begin flashing. Change the capacity by using the up and down arrows to adjust the setting. To accept the setting, press the SET button.

  • Setting the Hardness (conditioner only)

Hardness is set in grains per gallon (gpg) or parts per million (ppm) and should be programmed to the total hardness level of the incoming water supply. Press the SET button to make the display flash. Use the UP and DOWN buttons to adjust the hardness setting. Press the SET button when the desired setting has been reached.

  • Setting the Language

Level II Programming 29 Rev A

Page 30 of the GE 268 user manual — Level II Programming
Page 30 · click to enlarge
Page 30

The controller is capable of displaying 6 different languages. They are as follows:

1 = English 2 = Spanish 3 = French 4 = Italian 5 = Flemish 6 = German Press the SET button and select the desired language using the UP or DOWN buttons. Press the SET button to accept the selection.

  • Setting Clock Mode

The controller can be programmed to operate with a 12- or 24-hour clock. Program the clock mode to "12" for a 12-hour clock or "24" for a 24-hour clock. When the controller is programmed as a 12-hour clock the PM indicator will illuminate during the PM hours. There is no AM indicator.

  • Setting Units of Measure

The controller can be programmed to operate in U.S. or Metric units. Program the Units of Measure to 0 (zero) for U.S. units or 1 for Metric units.

  • Viewing the Injector Type

Is selected by system model number and cannot be changed.

  • Adjusting the Cycle Times

Conditioner Cycle Times The following cycle times are adjustable.

Cycle Range Backwash 1 1-60 minutes Slow Rinse * 1-125 minutes Fast Rinse 1 1-30 minutes Backwash 2 0-30 minutes Fast Rinse 2 0-30 minutes

263 Filter Cycle Times Cycle Range Backwash 1-50 minutes Fast Rinse 1-30 minutes

Refill time does not appear as this cycle time is determined by the salt setting.

*The controller calculates the Slow Rinse default time on injector type, system size and salt dosage. The cycle times can be adjusted for custom applications. Please contact your Ultramax Water Treatment Dealer before attempting to adjust the Slow Rinse time.

30 Level II Programming Rev A

268 Conditioner

Page 31 of the GE 268 user manual — Level II Programming
Page 31 · click to enlarge
Page 31
  • Operation Type

This parameter displays the controller type and is preset at the factory: 268 softener, 263 filter.

  • Setting the Service Interval

The service interval feature is an option that will allow the installer to program the unit to ask for maintenance after a programmed duration. The feature is programmed from 0 (zero) to 99 months. When the programmed length of time has been reached the words "CALL DEALER FOR SERVICE" will appear in the banner display to signal the end user that regular maintenance may be required. If it is set to 0 (zero) the function is disabled. If you wish to enable this function program the desired service interval duration.

Level II Programming 31 Rev A

Page 32 of the GE 268 user manual — Level II Programming
Page 32 · click to enlarge
Page 32
  • Setting the Chlorine Generator/Salt Check (conditioner only)

The controller has the capability to produce a low level of chlorine during the brine draw stage of regeneration. It can also sense if there is any brine present during the time when brine draw is occurring. This parameter can be adjusted to the following:

0 = Chlorine Generator with Salt Check disabled 1 = Chlorine Generator with Salt Check enabled 2 = Salt Check only

A refill sensor probe kit (P/N 3002122) must be installed for this function to work properly. After it is installed, select the desired parameter and push SET to accept the selection.

32 Level II Programming Rev A

Page 33 of the GE 268 user manual — Level III Programming
Page 33 · click to enlarge
Page 33

Level III Programming

Historical information can be retrieved from the controller be pressing the SET and DOWN buttons simultaneously, with the controller in the home position. Release both buttons when the controller displays MODEL NUMBER. Press the UP or DOWN buttons to navigate to each setting. The readout will scroll across the top of the display and the value will be displayed below the readout. Upon completing the initial programming procedure the average daily usages will display the same value. These values will changes as the unit logs water usage.

Scrolling Display Readout Range/Values

MODEL NUMBERa See Salt/Capacity Table X X

DAYS SINCE REGENERATION 0 to 255 days X X

PEAK FLOW RATE - DAY AND TIME Language/Clock Mode Dependant X

PEAK FLOW RATE GPMa 0 to 47 GPM X

WATER TREATED TODAY GAL 0 to 65536 gal. X

WATER SINCE REGENERATION GAL 0 to 65536 gal. X

SUNDAY AVERAGE USAGE GAL 0 to 65536 gal. X

MONDAY AVERAGE USAGE GAL 0 to 65536 gal. X

TUESDAY AVERAGE USAGE GAL 0 to 65536 gal. X

WEDNESDAY AVERAGE USAGE GAL 0 to 65536 gal. X

THURSDAY AVERAGE USAGE GAL 0 to 65536 gal. X

FRIDAY AVERAGE USAGE GAL 0 to 65536 gal. X

SATURDAY AVERAGE USAGE GAL 0 to 65536 gal. X

TOTAL WATER USED GAL X 100a 0 TO 999900 gal.a X

TOTAL WATER USED GAL X 1000000a 0 to 42,940,000 gal.a X

MONTHS SINCE SERVICEa 0 to 2184 monthsa X X

a. Bold text indicates that specific values can be reset. Press and hold the SET button for 5 seconds to reset

the value.

Level III Programming 33 Rev A

Valve Type · 268 263

Page 34 of the GE 268 user manual — Conditioner and Filter Start-Up
Page 34 · click to enlarge
Page 34

Placing Conditioner Into Operation

Conditioner and Filter Start-Up

After you have performed the previous initial power-up steps, you will need to place the conditioner into operation. Follow these steps carefully, as they differ from previous Autotrol valve instructions.

Function Display Text (268) Display Text (263)

Treated Water Ultramax (268) Ultramax (263)

Regeneration Backwash Brine Draw/Slow Rinse Pause - Please Wait Fast Rinse 1 Backwash 2 Fast Rinse 2 Brine Tank Refill

Backwash Pause - Please Wait Fast Rinse

1. Remove the cover from the valve. Removing the cover will allow you to see that the camshaft is turning, and in which cycle the camshaft is currently positioned.
2. With the supply water for the system still turned off, position the bypass valve to the “not in bypass” (normal operation) position.
3. Press and release the REGEN button on the controller. The scrolling text on the display will show "DELAYED REGENERATION". Press UP to navigate to "IMMEDIATE REGENERATION".
4. Press and release SET and UP to begin regeneration. The display will show eight LEDs moving from left to right on the banner display indicating that the motor is running. Additionally, the display will show the total regeneration time remaining.

Pressing SET when the motor has stopped displays the cycle description and cycle time remaining.

5. Press and release SET and UP simultaneously to advance to each cycle.
6. Advance the control to the Backwash. See below for the cycle sequences.
7. Fill the media tank with water.

A. While the controller is in cycle (Backwash), open the water supply

valve very slowly to approximately the 1/4 open position.

34 Placing Conditioner Into Operation Rev A

Page 35 of the GE 268 user manual — Placing Conditioner Into Operation
Page 35 · click to enlarge
Page 35

B. When all of the air has been purged from the media tank (water

begins to flow steadily from the drain line), open the main supply valve all of the way. This will purge the final air from the tank.

C. Allow water to run to drain until the water runs clear from the drain

line. This purges any refuse from the media bed.

D. Turn off the water supply and let the system stand for about five

minutes. This will allow any air trapped to escape from the tank.

8. Add water to the regenerant tank (initial fill) (conditioner only).

A. With a bucket or hose, add approximately 4 gallons (15 liters) of

water to the regenerant tank.

If the tank has a salt platform in the bottom of the tank, add water until the water level is approximately 1 inch (25 mm) above the platform.

Action Key Duration Display

SET 5 Sec. Current cycle

Advance to next cycle

SET and UP Press and release

SET and UP 5 Sec. Regeneration canceled

Placing Conditioner Into Operation 35 Rev A

Display current cycle · Next cycle · Cancel regeneration

Page 36 of the GE 268 user manual — Placing Conditioner Into Operation
Page 36 · click to enlarge
Page 36
9. Engage the refill cycle to prime the line between the regenerant tank and the valve (conditioner only).

A. Slowly open the main water supply valve again, to the fully open

position. Be sure not to open too rapidly as that would push the media out of the media tank.

B. Advance the controller to the regenerant tank Refill position. From

the Backwash 1 cycle, press and hold the SET button. This will display the current cycle.

C. With the water supply completely open, when you arrive at the

regenerant tank refill cycle, the controller will direct water down through the line to the regenerant tank. Let the water flow through the line until all air bubbles have been purged from the line.

D. Do not let the water flow down the line to the tank for more than one

to two minutes, or the tank may overfill.

E. Once the air is purged from the line, press the SET button and the UP

button simultaneously to advance to Treated Water position.

10. Draw water from the regenerant tank.

A. From the treated water position initiate a manual regeneration.

The controller will begin a manual regen, and advance the control valve to the backwash cycle. Press the SET and UP button to advance to brine draw/slow rinse cycle.

B. With the controller in this position, check to see that the water in the

regenerant tank is being drawn out of the tank. The water level in the tank should recede very slowly.

C. Observe the water being drawn from the regenerant tank for at

least three minutes. If the water level does not recede, or goes up, check all hose connections. C2 should be displayed.

11. If the water level is receding from the regenerant tank you can then advance the controller back to the treated water position by pressing SET and the UP buttons simultaneously.
12. Finally, turn on a faucet plumbed after the water conditioner. Run the faucet until the water runs clear.

36 Placing Conditioner Into Operation Rev A

Page 37 of the GE 268 user manual — Performa Exploded View
Page 37 · click to enlarge
Page 37

Performa Exploded View

GE 268 — Performa Exploded View diagram (page 37)
Fig. 16 · Performa Exploded View

Performa Exploded View 37 Rev A

Page 38 of the GE 268 user manual — Performa Parts List
Page 38 · click to enlarge
Page 38

Performa Parts List

No. Description Qty. Code

No. Description Qty.

1 1244651 Valve Assembly w/o Flow Controls 1 16 Plumbing Adapter Kits: 1

2 1235338* Top Plate, Ultramax Series Valves 1 1001606 3/4-inch Copper Tube Adapter Kit

3 1235339 Valve Disc Spring, One Piece, Performa 1 1001670 1-inch Copper Tube Adapter Kit

Valve 1001608 22-mm Copper Tube Adapter Kit

4 1242282 Cover, Valve, Ultramax Series 1 1001613 3/4-inch CPVC Tube Adapter Kit

Controller 1001614 1-inch CPVC Tube Adapter Kit

5 1235352* Cam, 263-268 Ultramax Series Valve, STD, 1 1001615 25-mm CPVC Tube Adapter Kit

Black 1001769 3/4-inch NPT Plastic Pipe Adapter Kit

6 Drain Control Assembly1 1001603 1-inch NPT Plastic Pipe Adapter Kit

1000212 No. 10 (2.5 gpm; 9.5 Lpm) 1001604 3/4-inch BSPT Plastic Pipe Adapter Kit

1000213 No. 12 (3.5 gpm; 13.2 Lpm) 1001605 1-inch BSPT Plastic Pipe Adapter Kit

1000214 No. 13 (4.1 gpm; 15.5 Lpm) 1001611 3/4-inch BSPT Brass Pipe Adapter Kit

1000215 No. 14 (4.8 gpm; 18.2 Lpm) 1001610 1-inch NPT Brass Pipe Adapter Kit

7 1235269 Motor/Optical Cable Assembly, Ultramax Series

1 1001612 1-inch BSPT Brass Pipe Adapter Kit

Controller 17 1235373 Module, Sensor, Photo Interrupter 1

8 1000226 Screen/Cap Assembly w/ O-Ring 1 18 1235361 Motor w/Spacer & Pinion, Ultramax Series 1

9 Injector (High Efficiency) OptionsController, 12 V, 50/60 Hz

1035733 “H” Injector (High Efficiency) - Lt Purple 19 1001986 13/16 inch Rubber Insert (Optional) 1

(9-inch tank) 20 1235446 Turbine Cable 1

1035734 “J” Injector (High Efficiency) - Lt Blue 21 1010154 Tank O-Ring 1

(10-inch tank) 22 1000811 AC Adapter, North American 1

1030413 “K” Injector (High Efficiency) - Pink 23 1238362 Ultramax Controller 1

1035736 “L” Injector (High Efficiency) - Orange * 1033444 Turbine Assembly

(13 & 14-inch tank) * 1239979 Cable Harness, Remote Regen 740F

1032978 Plugged Injector for 263 Filter * 1239711 Switch Kit, Front Mount, 0.1 amp

1032985 Plugged Injector Cap * 1239752 Switch Kit, Front Mount, 5 amp

10A 1000222 Regenerant Refill Controller, No Ball 1 * 1239753 Switch Kit, Top Plate Mount, 0.1 amp

10B 1243510 Regenerant Refill Controller * 1239754 Switch Kit, Top Plate Mount, 5 amp

11 1030502 Ball, Refill Flow Control * 1242286 Valve Skirt

12 1002449 Drain Fitting Elbow (3/4-inch hose 1 * 1242287 Cover with Shield

barbed) * 1033444 Internal Turbine Meter

13 1010428 O-Ring 1 * 1233187 Motor Locking Pin

14 1000269 Injector Cap with O-Ring 1 * 3002122 Refill Sensor Probe Kit

15 1035622 Tank Ring 1 * 1239760 Blending Valve Kit Ultramax

* Drain Line Flow Control 1

1030355 Drain Line Flow Control, 5 gpm (19 Lpm)

1030356 Drain Line Flow Control, 6 gpm (22.5 Lpm)

1030357 Drain Line Flow Control, 7 gpm (26.5 Lpm)

1030358 Drain Line Flow Control, 8 gpm (30 Lpm)

1030359 Drain Line Flow Control, 9 gpm (34 Lpm)

1030360 Drain Line Flow Control, 10 gpm (38 Lpm)

* 1030334 Plugged Refill Flow Control - for 263

* 1041174 Valve Disc Kit

*Not shown on drawing.

38 Performa Parts List Rev A

Show 5 more labels / short text on this page
Part · Part · Code · (12-inch tank) (unprogrammed) · Valve
Page 39 of the GE 268 user manual — Ultramax Series Controller Troubleshooting
Page 39 · click to enlarge
Page 39

Troubleshooting

Ultramax Series Controller Troubleshooting

Problem Possible Cause Solution

ERR 1 is displayed. Program settings have been corrupted. Press any key and reset model number.

ERR 3 is displayed. Controller does not know the position of the camshaft. Camshaft should be rotating to find Home position.

Wait for two minutes for the controller to return to Home position. The hourglass should be flashing on the display indicating the motor is running.

Camshaft is not turning during ERR 3 display.

Check that motor is connected. Verify that motor wire harness is connected to motor and controller module. Verify that optical sensor is connected and in place. Verify that motor gear has engaged cam gear. If everything is connected, try replacing in this order:

—Wire harness —Motor —Optical sensor —Controller

If camshaft is turning for more than five minutes to find Home position:

Verify that optical sensor is in place and connected to wire. Verify that camshaft is connected appropriately. Verify that no dirt or rubbish is clogging any of the cam slots. If motor continues to rotate indefinitely, replace the following components in this order:

—Wire harness —Motor —Optical sensor —Controller

Time of Day incorrect. Power failure occurred. Press SET to reset the time display.

Troubleshooting 39 Rev A

Page 40 of the GE 268 user manual — System Troubleshooting
Page 40 · click to enlarge
Page 40

System Troubleshooting

Problem Possible Cause Solution 1. Brine tank overflow.

a. Uncontrolled brine refill flow rate. b. Air leak in brine line to air check.

a. Remove brine control to clean ball and seat. b. Check all connections in brine line for leaks. Refer to instructions. c. Clean drain control.

c. Drain control clogged with resin or other debris.

2. Flowing or dripping water at drain or brine line after regeneration.

a. Valve stem return spring weak. b. Debris is preventing valve disc from closing.

a. Replace spring. (Contact dealer.) b. Remove debris.

3. Hard water leakage after regeneration.

a. Improper regeneration.

a. Repeat regeneration after making certain

correct regenerant dosage was set. b. Replace bypass valve. (Contact dealer.) c. Replace O-ring. (Contact dealer.)

b. Leaking of external bypass valve. c. O-ring around riser pipe damaged. d. Incorrect capacity.

d. Verify appropriate regenerant amount and

system capacity. (Contact dealer.) 4. Control will not draw brine.

a. Low water pressure.

a. Make correct setting according to

instructions. b. Remove restriction. c. Clean injector and screen. d. Replace injector and cap. (Contact dealer.) e. Remove foreign matter from disc and check disc for closing by pushing in on stem. Replace if needed. (Contact dealer.) f. Put control momentarily into brine refill. Replace or repair air check if needed. (Contact dealer.) 5. Control will not regenerate automatically.

b. Restricted drain line. c. Injector plugged. d. Injector defective. e. Valve disc 2 and/or 3 not closed.

f. Air check valve prematurely closed.

a. AC adapter or motor not

a. Connect power.

connected. b. Defective motor.

b. Replace motor. (Contact dealer.) 6. Control regenerates at wrong time of day.

a. Controller set incorrectly. a. Correct time setting according to

instructions.

7. Valve will not draw brine.

a. Set pump to maintain 20 psi at softener. b. Change drain to remove restriction. c. Clean injector and screen. d. Replace injector. (Contact dealer.) e. Put control momentarily into brine/slow rinse. Replace or repair air check if needed. (Contact dealer.) 8. System using more or less salt than regenerant setting.

a. Low water pressure. b. Restricted drain line. c. Injector plugged. d. Injector defective. e. Air check valve closes prematurely on brine pickup tube.

a. Foreign matter in valve causing

a. Remove brine control and flush out foreign

incorrect flow rates.

matter. Advance control to brine/slow rinse, to clean valve (after so doing position control to "fast rinse” to remove regenerant from tank).

40 Troubleshooting Rev A

Page 41 of the GE 268 user manual — System Troubleshooting
Page 41 · click to enlarge
Page 41
9. Intermittent or irregular regenerant draw.

a. Low water pressure. b. Defective injector.

a. Set pump to maintain 20 psi at conditioner. b. Replace injector. (Contact dealer.)

10. No conditioned water after regeneration.

a. No regenerant in regenerant

a. Add regenerant to regenerant tank.

tank. b. Injector plugged. c. Air check valve closes prematurely.

b. Clean injector and screen. c. Put control momentarily into brine/slow rinse. Replace or repair air check if needed. (Contact dealer.) 11. Backwashes or purges at excessively low or high rate.

a. Incorrect drain controller used.

a. Replace with correct size controller. (Contact

dealer.) b. Remove drain controller and clean ball and

b. Foreign matter affecting valve operation.

seat. 12. No water flow display when water is flowing.

a. Bypass valve in bypass. b. Meter probe disconnected or not fully connected to meter housing. c. Restricted meter turbine rotation due to foreign material in meter.

a. Shift bypass valve to not-in-bypass position. b. Fully insert probe into meter housing.

c. Remove meter housing, free up turbine and flush with clean water. Turbine should spin freely. If not, replace meter. (Contact dealer.)

13. Run out of conditioned water between regenerations.

a. Improper regeneration.

a. Repeat regeneration, making certain that

correct regenerant dosage is used. b. Set P6 to proper level. See salt setting chart. c. Set to correct values. See Programming section. d. Set hardness to new value. See

b. Incorrect regenerant setting. c. Incorrect hardness or capacity settings. d. Water hardness has increased.

Programming section. e. Remove meter housing, free up turbine and flush with clean water. Turbine should spin freely; if not, replace meter. (Contact dealer.) 14. Regenerant tank overflow.

e. Restricted meter turbine rotation due to foreign material in meter.

a. Regenerant valve disc 1 being

a. Manually operate valve stem to flush away

held open by foreign matter. b. Valve disc 2 not closed during regenerant draw causing brine refill. c. Air leak in regenerant line to air check. d. Improper drain control for

obstruction. b. Flush out foreign matter holding disc open

by manually operating valve stem.

c. Check all connections in regenerant line for leaks. Refer to instructions. d. Too small of a drain control with a larger

injector. e. Drain control clogged with resin or other debris.

injector will reduce draw rates. e. Clean drain control.

Troubleshooting 41 Rev A

Page 42 of the GE 268 user manual — System Troubleshooting
Page 42 · click to enlarge
Page 42

42 Troubleshooting Rev A

Page 43 of the GE 268 user manual — Controller Reset:
Page 43 · click to enlarge
Page 43

UltraMax System Configurations

Upon initial start-up of the UltraMax controller, the software will request a pre-determined model number. This model number populates the default values within the controller, allowing for quick and easy set-up of the software without entering several levels of data. The table below shows the pre-determined model numbers for the controller and the associated primary valve functions for each number.

Use the UP and DOWN buttons to scroll through the available model numbers. Press the SET button to select the number and move to the standard programming value.

Model Number System Description Operation

10 1.0 cu ft Conditioner 268 Valve 15 Kgrains 3.0 lbs

15 1.5 cu ft Conditioner 268 Valve 23 Kgrains 4.5 lbs

20 2.0 cu ft Conditioner 268 Valve 31 Kgrains 6.0 lbs

93 Generic Filter 263 Valve N/A N/A

98 Generic Conditioner 268 Valve 25 Kgrains 9.0 lbs

Controller Reset:

If the incorrect model number is accidentally selected for the controller, you can easily reset the controller to the factory default mode. When the controller is in normal operating mode showing the time of day, perform the following steps.

1. Press the DOWN and SET buttons simultaneously and hold for 5 seconds.
2. After 5 seconds the controller will go blank. Release the buttons and the controller will scroll "MODEL NUMBER " and the selected model will be displayed.
3. If the number is correct, wait 30 seconds and the controller will automatically go back to normal operation mode.
4. If the model number is incorrect, press and hold the SET button for 5 seconds. This will default the controller back to the factory default setting. The controller will scroll "MODEL NUMBER " and the factory model number will begin flashing, meaning it can be changed. USe the UP or DOWN buttons to scroll to the correct model number. Select that number by pressing the SET button.

UltraMax System Configurations 43 Rev A

System Capacity · Salt Amount · Type

Page 44 of the GE 268 user manual — UltraMax System Configurations
Page 44 · click to enlarge
Page 44

© Copyright 2005 General Electric Company

Printed in USA P/N 3002774 Rev. A

Fix-it

Troubleshooting

Common problems, likely causes, and what to do.

ProblemPossible causeRemedy
ERR 1 is displayed.Program settings have been corrupted.Press any key and reset model number. p.39
ERR 3 is displayed.Controller does not know the position of the camshaft. Camshaft should be rotating to find Home position.Wait for two minutes for the controller to return to Home position. The hourglass should be flashing on the display indicating the motor is running. p.39
ERR 3 is displayed.Camshaft is not turning during ERR 3 display.Check that motor is connected. Verify that motor wire harness is connected to motor and controller module. Verify that optical sensor is connected and in place. Verify that motor gear has engaged cam gear. If everything is connected, try replacing in this order: —Wire harness —Motor —Optical sensor —Controller p.39
ERR 3 is displayed.If camshaft is turning for more than five minutes to find Home position:Verify that optical sensor is in place and connected to wire. Verify that camshaft is connected appropriately. Verify that no dirt or rubbish is clogging any of the cam slots. If motor continues to rotate indefinitely, replace the following components in this order: —Wire harness —Motor —Optical sensor —Controller p.39
Time of Day incorrect.Power failure occurred.Press SET to reset the time display. p.39
1. Brine tank overflow.a. Uncontrolled brine refill flow rate. b. Air leak in brine line to air check. c. Drain control clogged with resin or other debris.a. Remove brine control to clean ball and seat. b. Check all connections in brine line for leaks. Refer to instructions. c. Clean drain control. p.40
2. Flowing or dripping water at drain or brine line after regeneration.a. Valve stem return spring weak. b. Debris is preventing valve disc from closing.a. Replace spring. (Contact dealer.) b. Remove debris. p.40
3. Hard water leakage after regeneration.a. Improper regeneration. b. Leaking of external bypass valve. c. O-ring around riser pipe damaged. d. Incorrect capacity.a. Repeat regeneration after making certain correct regenerant dosage was set. b. Replace bypass valve. (Contact dealer.) c. Replace O-ring. (Contact dealer.) d. Verify appropriate regenerant amount and system capacity. (Contact dealer.) p.40
4. Control will not draw brine.a. Low water pressure. b. Restricted drain line. c. Injector plugged. d. Injector defective. e. Valve disc 2 and/or 3 not closed. f. Air check valve prematurely closed.a. Make correct setting according to instructions. b. Remove restriction. c. Clean injector and screen. d. Replace injector and cap. (Contact dealer.) e. Remove foreign matter from disc and check disc for closing by pushing in on stem. Replace if needed. (Contact dealer.) f. Put control momentarily into brine refill. Replace or repair air check if needed. (Contact dealer.) p.40
5. Control will not regenerate automatically.a. AC adapter or motor not connected. b. Defective motor.a. Connect power. b. Replace motor. (Contact dealer.) p.40
6. Control regenerates at wrong time of day.a. Controller set incorrectly.a. Correct time setting according to instructions. p.40
7. Valve will not draw brine.a. Low water pressure. b. Restricted drain line. c. Injector plugged. d. Injector defective. e. Air check valve closes prematurely on brine pickup tube.a. Set pump to maintain 20 psi at softener. b. Change drain to remove restriction. c. Clean injector and screen. d. Replace injector. (Contact dealer.) e. Put control momentarily into brine/slow rinse. Replace or repair air check if needed. (Contact dealer.) p.40
8. System using more or less salt than regenerant setting.a. Foreign matter in valve causing incorrect flow rates.a. Remove brine control and flush out foreign matter. Advance control to brine/slow rinse, to clean valve (after so doing position control to "fast rinse” to remove regenerant from tank). p.40

Ask about the GE 268

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the GE 268

Be the first to ask — other owners or our team will answer.

Original document

GE 268 manual PDF

44 pages·2.8 MB·Water System·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…