

For Heavy Duty (FAS Models) and Median (FAM Models) Air Conditioners
Please read ALL instructions before installing. Two people are
recommended to install this product. If a new electrical outlet
is required, have the outlet installed by a qualified electrician
before installing unit, See#5 in Preliminary Instructions
following.
Do the following before starting to install unit. See illustrations below.
LOCKENG SCREW_._._ X
Check dimenstions of your unit to determine model type:
(LEFT)
Heavy duty (FAS) Median (FAM) Unit Height: 18,5/8" 17.5/8" Unit Width: 261/2" 231/2" Min. Window Opening: 19" 181/2" Min. Window Width: 31" 26 Vj' Max. Window Width: 43" 40 V2"
with this air conditioner are made to install in a wooden
sill double-hung window.The standard parts are for
window dimensions listed above.Open sash to a minimum
of 1g"(483mm). (FIG. 1)
frame does not allow the clearance required, correct by
must be in good shape and able to firmly hold the needed
adding a piece of wood as shown in FIG.2, or by removing
screws.if not, make repairs before installing unit.
storm window while room air conditioner is being installed.
// SASH
f 19" MIN 1112
19" MIN
1/2" MIN
STORM WINDOW FRAME OR
STORM WINDOW FRAME OR WITH TWO NAILS OR
OTHER OBSTRUCTION
OTHER OBSTRUCTION SCREWS.
(continued)


Tools Required
AIRFLOW - check area outside of window for things
such as shrubs, trees, or awnings. Inside, be sure
a large flat blade screwdriver
furniture, drapes, or blinds will not stop proper air flow.
adjustable wrench or pliers
be the same as that shown on the unit serial nameplate.
_/ Level _/ Socket wrenches
(See Owner's Guide for serial plate Iocation.)Power cord
is 48"long. Be sure you have an outlet near.
All models have a 3-prong service plug to provide proper
service and safe positive grouding. Do not change plug in
any way. Do not use an adapter plug. If your present wall
outlet does not match your plug, call a qualified electrician
LJty.
to make the needed change.
Washer Head Locking Screw For window panels
::_i Avoid fire hazard or electric shock, Do not use an extensioncord or an adaptor plug. Do not remove any prong from the power cord.
3/4" Long Hex- Head Screw
Grounding type wall receptacle
4 ea.
_ 1/2" Long Screw and Iocknut
3/4" Long Flat Head Bolt and Locknut
2 ea.
NIth 3-prong groundi plug and current detection device
material. Protect floor or carpet from damage. Two
locking screw for top angle, side retainer 5116"
people should be used to move and install unit.


g Remove Chassis
D Install Top Angle and Side Bracket
shown in FIG. 6.
will be needed to re-install the front later. (See FIG.2) 4. Pry away front from cabinet sides as per photo (see FIG .3) 5. Gently lift front off unit and place to one side (See FIG.4).
on the side of the cabinet (see Figures 7-8). Do both
sides.
FRAME PANEL
SIDE
INTO THE CABINET. (See FIG. 5).
TOP
FRAME
VIEW
LOCKING
'T'SECTION WINDOW SCREW HOLE FILLER
PANEL


frame into channel in the to angle and bottom rail.
Do both sides.
and tight to bottom of cabinet as shown below. Mark
top leg d filler panel frame (see Step 6). Do not
brackets at top level of sill, and remove.
totally tighten. Allow leg to slide freely. Screws will
be tightened after Section 6.
center of window stool.
L=ET _.1/2" LONG SCREWS
'- r'_:_/i_N D LOC _N UTS LODKNUT !/
. Place cabinet in window with bottom stool angle firmly
scated over window stool as shown. Bring window
down temporarily behind top angle to hold cabinet in
place.
2 EACH REQ'D FOR EACH SUPPORT BRACKET
marked position, as shown. Hand tighten, but allow
for any changes later.
attached) to correct hole in bottom of cabinet as shown.
holes.(You may wish to pre-drill pilot holes.)
Z_ I/2" long screws
-- o N /o --
and Iocknuts · Bottom Rail Seal · _' tong HEX+


install Chassis into Cabinet and install Front to Unit
1, Lift air conditioner and carefully slide into cabinet leaving 6" protruding,
screws. Loosen screws so filler panels slide easily.
3, Be sure chassis is firmly seated towards rear of cabinet. 4. Installation of front is the reverse of removal outlined in Section 1.
Tighten locking screws on top,
1, Trim sash seal to fit window width. Insert into space
between upper and lower sashes.
3/4" }orlg hex-


Carefully measure and cut an opening with the following
or a qualified carpenter.
dimensions depending on your model. See FIGS, land 2.
WIDTH "X" = inside model width plus twice the thickness of framing material used. HEIGHT "Y" = inside model height plus twice the thickness of framing material used.
This air conditioner has a slide-out chassis, so that it can
be installed through an outside wall as specified below:
Heavy Duty(FAS) Median (FAM)
18" (45.7cm)
Max wall thickness 10" 8"
231J8"(60.6cm)
are provided,except a wood frame, shims, and 10 wood
screws (#10-1" long minimum). Select a wall surface that:
1, does not support major structural loads such as the
frame construction at ends of windows, and under
truss-bearing points, etc.
3, is near existing electrical outlets, or where another
outlet can be installed,
(outside) of installed air conditioner.
your model listed above. Measure twice remember...)
Frame depth should be the same as wall thickness. Fill
and stucco veneer). Working from inside the room,
in the space from the opening to the studs with wood
find wall stud nearest the center of area where air
spacers, as shown.
conditioner will be installed (by sounding wall, or by
5, Nail framd to spacers to spacers with front flush with
magnetically finding nails).
dry wall.
shown in FIG. 1.
3-3/8" MIN (8.8 cm)
Heavy Duty (FAS) · Median (FAM) · 8-1/2"


flashing over bottom of frame opening to assure no water
can enter area between inner and outer wall.
Refer to Step 4 d Window Mounting for assembly of
support brackets.A wooden strip nailed to the outside
wall should be used in conjunction with sill support
angle brackets.
Window Mounting.
firmly on bottom board d wooden frame.
(See FIG.1 below.)
frame is oversized, to eliminate distortion. Remember
to maintain proper slope as described in Step 3.
5/16" TO
LEVEL '_
screws 1"(2.5 cm)long using the two holes in the bottom
of the channel resting on frame.(See FIG.2 following)
Step 8 of Window Mounting.(continued)
brakcet · 3/8"


wall may be done. You can buy wood from your local lumber
or hardware supply. On the outside, caulk openings around top
and sides of cabinet, and all sides of wood sleeve to the opening.
for bottom rail seal location.
to the frame construction(refer to Step 2 d Thru-the-Wall
Installation for a wall thickness greater than 8-1/2").
masonry anchor screws.(Another way to do this is to build
an in -between frame of2x4 's as shown in the Step 2 Prepare
Wall illustrations-but make it double framed on either side,
and install between masonry wall opening and cabinet.
Frame must be securely anchored to masonry wal! opening)
This way gives very good louver clearance on either side of cabinet.
Existing holes in cabinet can be used and/or additions holes
can be drilled to fasten cabinet at various positions.Be sure
that side louver clearance is in accordance with Step 1above.
Step 2 d Thru-the-Wall Installation.Caulk or flash if
neede, to provide a wether-tight seal around top and sides of cabinet.
around room side projection d cabinet.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.